T.Time KETERANGAN
01 3-12 05.40 05.55 15 09.12 197 09.47 35 247
9-4 12.15 12.30 15 15.08 158 16.16 68 241
02 3-2 22.35 22.50 15 01.26 156 02.18 52 223
-8 10.42 10.58 16 13.30 152 14.40 70 238
3-12 18.06 18.30 24 21.05 155 22.30 75 264
03 9-6 06.31 06.55 24 10.26 211 11.28 62 297
3-12 17.20 17.45 25 21.35 230 23.25 100 355
04 9-4 05.39 05.49 10 08.55 186 09.16 21 217
1-10 16.15 16.25 10 19.51 206 20.34 33 259
05 7-4 02.37 02.53 16 05.04 131 09.06 242 389 44’ tggu waktu. 50’ langsir - 4211368-508402
kontiner 067-283 terbuka .25’ periksa scowing
PANTAUAN SOP KA SCT “ BAU”
BULAN MARET 2014
TGL NO
KA
DAT MULAI
ISI
SOP
C1
SELESAI
ISI
SOP
C2
BER SOP
D1
T.Time KETERANGAN
06 7-4 05.06 05.30 24 08.08 158 10.35 147 329 19’ langs - 421290 tdk bisa di kunci , + 421209 +
421277
11-8 12.55 13.18 23 15.42 144 17.34 112 279
07 5-2 01.31 01.50 19 05.20 210 06.10 50 279 9’ x s.3 // 2724
1-10 17.00 17.17 17 19.45 148 21.27 102 267
08 7-4 04.12 04.20 8 06.55 155 09.21 146 309 39’ + 4211387
11.37 12.00 23 14.30 150 15.55 85 258
09 5-2 23.15 23.45 30 02.11 146 02.51 40 208
3-12 17.40 18.08 28 20.09 121 23.36 207 356 86’ tggu sct5 // 2724
11-8 09.30 09.40 10 11.51 131
10 9-4 07.06 07.35 29 10.40 185 11.25 45 259
PANTAUAN SOP KA SCT “ BAU”
BULAN MARET 2014
TGL NO
KA
DAT MULAI
ISI
SOP
C1
SELESAI
ISI
SOP
C2
BER SOP
D1
T.Time KETERANGAN
11 3-10 20.45 21.00 15 23.40 160 00.41 61 236
7-2 03.41 04.10 29 06.50 160 08.06 76 265
12.30 12.34 4 15.08 144 16.08 60 218
12 7-2 23.59 00.15 16 03.43 207 03.43 5 226
08.50 09.05 15 11.55 170 12.28 33 218
3-12 19.33 20.05 32 23.02 177 23.31 29 238
13 9-6 10.30 10.40 10 13.25 165 15.13 108 212
14 1-10 21.08 21.24 16 23.46 142 00.40 54 255
9-4 05.50 06.05 15 09.30 205 10.05 35 269
19.24 19.40 16 22.40 180 23.53 73 325 55’ tgg x 2723 dan tggu waktu
PANTAUAN SOP KA SCT “ BAU”
BULAN MARET 2014
TGL NO
KA
DAT MULAI
ISI
SOP
C1
SELESAI
ISI
SOP
C2
BER SOP
D1
T.Time KETERANGAN
15 7-4 02.55 03.28 33 06.12 164 08.20 128 214
1-10 13.56 14.17 21 16.28 131 17.30 62 276 6’ tgg x 2723
16 7-2 04.10 04.25 15 07.05 160 08.46 101 222
1-8 13.00 13.28 28 16.02 154 16.42 40 222
17 5-4 05.15 05.50 35 09.54 244 10.31 37 316 46’ load satu alat . Roder pecah ban
11-8 13.20 13.35 15 18.05 270 18.50 45 330 87’ tggu x sct7
18 3-12 22.03 22.15 12 01.28 119 04.00 152 357 87’ tggu x sct7
1-8 12.45 12.58 13 17.52 294 18.18 20 333 63’ tggu x s6 mogok.
19 7-4 07.26 07.50 24 10.17 157 11.38 81 252
11-8 17.11 17.22 11 19.53 151 21.18 85 247 125’ tgg x sct5
PANTAUAN SOP KA SCT “ BAU”
BULAN MARET 2014
TGL NO
KA
DAT MULAI
ISI
SOP
C1
SELESAI
ISI
SOP
C2
BER SOP
D1
T.Time KETERANGAN
20 02.45 04.05 80 05.32 87 09.11 219 395 125’ tgg x sct5
1-10 18.11 18.27 16 21.22 175 22.56 94 285 15’ x sct3
7-2 06.13 06.50 37 09.22 152 10.18 56 245
21 11-8 13.22 13.22 0 16.16 174 18.25 129 303 33’ tgg x sct1
22 5-2 01.33 01.40 7 04.35 175 06.36 121 303 33’ tgg x sct9
1-10 15.26 15.35 9 17.58 142 18.20 22 174
23 7-4 06.47 07.09 22 11.02 233 11.30 28 283
11-8 15.20 15.35 15 19.16 220 21.10 114 350 80’ tgg x sct1
24 5-2 23.43 00.05 22 02.38 153 03.20 42 217
1-10 16.51 17.00 9 19.36 156 21.00 84 249
PANTAUAN SOP KA SCT “ BAU”
BULAN MARET 2014
TGL NO
KA
DAT MULAI
ISI
SOP
C1
SELESAI
ISI
SOP
C2
BER SOP
D1
T.Time KETERANGAN
25 7-4 03.27 03.40 13 05.53 133 09.27 210 360 90’ x sct9
11-8 11.46 11.55 9 14.14 139 16.35 141 289 19’ tgg rest krew
26 5-2 00.18 00.50 32 04.15 205 05.02 47 284 14’ load satu alat , rusak pompa hidrolik
11-6 10.24 10.35 11 12.47 132 14.33 106 249
27 5-12 21.31 21.45 14 23.24 159 00.00 36 149
9-4 07.55 08.06 11 10.30 144 11.08 38 193
28 3-12 21.02 21.40 38 23.25 105 01.45 140 283
7-4 02.20 07.40 20 10.08 148 12.02 114 288
1-12 17.21 17.30 9 19.44 134 20.36 52 195
29 9-4 06.20 06.40 20 09.32 172 10.28 56 248
PANTAUAN SOP KA SCT “ BAU”
BULAN MARET 2014
TGL NO
KA
DAT MULAI
ISI
SOP
C1
SELESAI
ISI
SOP
C2
BER SOP
D1
T.Time KETERANGAN
1-10 13.11 13.25 14 15.55 150 16.55 60 224
30 5-2 21.37 21.50 13 00.00 130 02.45 165 308 38’ tgg rest
1-8 12.34 12.48 14 14.56 128 15.45 49 191
31 7-2 03.15 03.30 15 06.10 160 06.50 40 215
11-6 12.06 12.17 11 15.14 177 16.47 93 281 11’ sct1 2721
PANTAUAN SOP KA SCT “ BAU” PERSIAPAN PENGISIAN
BULAN MARET 2014
SOP: 20MENIT
PANTAUAN SOP KA SCT “ BAU” PROSES ISI
BULAN MARET 2014
SOP : 150MENIT
PANTAUAN SOP KA SCT “ BAU” PERSIAPAN BERANGKAT
BULAN MARET 2014
SOP : 100MENIT
SOP KA SCT DI STASIUN SCT
KEGIATAN SOP KETERANGAN
 PERSIAPAN PENGISIAN 20 MENIT
 PENGISIAN / LOADING 1 DAN 2 150MENIT
 PERSIAPAN BERANGKAT : 100 MENIT
- PERSIAPAN KREW
- LANGSIR LOKO LAHAT –SCT
- PERIKSA SCOWING
- ADMINISTRASI (LHM DAN LAPKA)
- PERCOBAAN PENGEREMAN
TOTAL = 270 MENIT
PANTAUAN SOP KA SCT “ BAU” TOTAL TIME
BULAN MARET 2014
SOP :270 MENIT
SCT KPT
8. WPI = MENIT
4. WPK = MENIT
5. PERSIAPAN ISI=
MENIT
2. PENGISIAN =
150 MENIT .
164menit
32PPCW /
64CONTEINER
3. PERSIAPAN
BERANGKA
KOSONG=
100 MENIT
94 menit
7. PERSIAPAN
BERANGKAT ISI =
MENIT
6. MUAT BATUBARA =
MENIT
1. PESIAPAN
PENGISIAN =
20MENIT’
17menit
SOP KA SCT BMSS
KERTAPATI – SUKA CINTA
PROGRAM SOP
PROGRAM SOP
267 ’
270’
SEKIAN
BY JMI OPS 3.1 C LLG

More Related Content

What's hot

WOLLONGONG GOLF CLUB CART ANALYSIS REPORT
WOLLONGONG GOLF CLUB CART ANALYSIS REPORTWOLLONGONG GOLF CLUB CART ANALYSIS REPORT
WOLLONGONG GOLF CLUB CART ANALYSIS REPORTDarius Gear
 
Slotting, Tuck-Pointing and Grinding Tool: PLW 1503
Slotting, Tuck-Pointing and Grinding Tool: PLW 1503Slotting, Tuck-Pointing and Grinding Tool: PLW 1503
Slotting, Tuck-Pointing and Grinding Tool: PLW 1503CS Unitec
 
Moyno l frame dimensions
Moyno l frame dimensionsMoyno l frame dimensions
Moyno l frame dimensionsNelsonBort
 
Moyno 2000 g1 dimension
Moyno 2000 g1 dimensionMoyno 2000 g1 dimension
Moyno 2000 g1 dimensionNelsonBort
 
Moyno pump 2000 dimensions g2
Moyno pump 2000 dimensions g2Moyno pump 2000 dimensions g2
Moyno pump 2000 dimensions g2NelsonBort
 

What's hot (8)

WOLLONGONG GOLF CLUB CART ANALYSIS REPORT
WOLLONGONG GOLF CLUB CART ANALYSIS REPORTWOLLONGONG GOLF CLUB CART ANALYSIS REPORT
WOLLONGONG GOLF CLUB CART ANALYSIS REPORT
 
Slotting, Tuck-Pointing and Grinding Tool: PLW 1503
Slotting, Tuck-Pointing and Grinding Tool: PLW 1503Slotting, Tuck-Pointing and Grinding Tool: PLW 1503
Slotting, Tuck-Pointing and Grinding Tool: PLW 1503
 
Vec calendar 2015 remar
Vec calendar 2015 remarVec calendar 2015 remar
Vec calendar 2015 remar
 
Crane
CraneCrane
Crane
 
Moyno l frame dimensions
Moyno l frame dimensionsMoyno l frame dimensions
Moyno l frame dimensions
 
Moyno 2000 g1 dimension
Moyno 2000 g1 dimensionMoyno 2000 g1 dimension
Moyno 2000 g1 dimension
 
Moyno pump 2000 dimensions g2
Moyno pump 2000 dimensions g2Moyno pump 2000 dimensions g2
Moyno pump 2000 dimensions g2
 
District calendar-2019-2020
District calendar-2019-2020District calendar-2019-2020
District calendar-2019-2020
 

Viewers also liked

Virtual education for the xxi century
Virtual education  for the xxi centuryVirtual education  for the xxi century
Virtual education for the xxi centuryDaniela Londoño
 
Analisa wesel stel (1)
 Analisa wesel stel  (1) Analisa wesel stel  (1)
Analisa wesel stel (1)abdulah_hubai
 
CANADIAN ON-ORBIT AUTOMATED ROBOTIC SERVICING EXPERIMENT (COARSE) STUDY
CANADIAN ON-ORBIT AUTOMATED ROBOTIC SERVICING EXPERIMENT (COARSE) STUDYCANADIAN ON-ORBIT AUTOMATED ROBOTIC SERVICING EXPERIMENT (COARSE) STUDY
CANADIAN ON-ORBIT AUTOMATED ROBOTIC SERVICING EXPERIMENT (COARSE) STUDYAlexandre Parent
 
Tupoksi JMI Juli 2013
Tupoksi JMI Juli 2013Tupoksi JMI Juli 2013
Tupoksi JMI Juli 2013abdulah_hubai
 
Virtual education for the xxi century
Virtual education  for the xxi centuryVirtual education  for the xxi century
Virtual education for the xxi centuryDaniela Londoño
 
Telenor Group Q3 2014 financial results
Telenor Group Q3 2014 financial resultsTelenor Group Q3 2014 financial results
Telenor Group Q3 2014 financial resultsTelenor_Group
 
Telenor Group Q1 2014 results
Telenor Group Q1 2014 resultsTelenor Group Q1 2014 results
Telenor Group Q1 2014 resultsTelenor_Group
 
Telenor Group company presentation Q4-2013
Telenor Group company presentation Q4-2013Telenor Group company presentation Q4-2013
Telenor Group company presentation Q4-2013Telenor_Group
 

Viewers also liked (16)

mi hija
mi hijami hija
mi hija
 
Virtual education for the xxi century
Virtual education  for the xxi centuryVirtual education  for the xxi century
Virtual education for the xxi century
 
Kelka ka sna feb
Kelka ka sna febKelka ka sna feb
Kelka ka sna feb
 
Analisa wesel stel (1)
 Analisa wesel stel  (1) Analisa wesel stel  (1)
Analisa wesel stel (1)
 
Analisa wesel stel
Analisa wesel stel Analisa wesel stel
Analisa wesel stel
 
2014 power point
2014 power point2014 power point
2014 power point
 
Animals in english
Animals in englishAnimals in english
Animals in english
 
CANADIAN ON-ORBIT AUTOMATED ROBOTIC SERVICING EXPERIMENT (COARSE) STUDY
CANADIAN ON-ORBIT AUTOMATED ROBOTIC SERVICING EXPERIMENT (COARSE) STUDYCANADIAN ON-ORBIT AUTOMATED ROBOTIC SERVICING EXPERIMENT (COARSE) STUDY
CANADIAN ON-ORBIT AUTOMATED ROBOTIC SERVICING EXPERIMENT (COARSE) STUDY
 
Tupoksi JMI Juli 2013
Tupoksi JMI Juli 2013Tupoksi JMI Juli 2013
Tupoksi JMI Juli 2013
 
Virtual education for the xxi century
Virtual education  for the xxi centuryVirtual education  for the xxi century
Virtual education for the xxi century
 
Kelka ka bgm feb
Kelka ka bgm  febKelka ka bgm  feb
Kelka ka bgm feb
 
Tupoksi jmi des
Tupoksi jmi des Tupoksi jmi des
Tupoksi jmi des
 
Jornada Itabirito
Jornada ItabiritoJornada Itabirito
Jornada Itabirito
 
Telenor Group Q3 2014 financial results
Telenor Group Q3 2014 financial resultsTelenor Group Q3 2014 financial results
Telenor Group Q3 2014 financial results
 
Telenor Group Q1 2014 results
Telenor Group Q1 2014 resultsTelenor Group Q1 2014 results
Telenor Group Q1 2014 results
 
Telenor Group company presentation Q4-2013
Telenor Group company presentation Q4-2013Telenor Group company presentation Q4-2013
Telenor Group company presentation Q4-2013
 

Similar to Pantau sop bau maret 14 (3)

MielingVictorActivity2 (1) (1) 2
MielingVictorActivity2 (1) (1) 2MielingVictorActivity2 (1) (1) 2
MielingVictorActivity2 (1) (1) 2Victor Mieling
 
NUEVO Y ACTUAL HORARIO TREN BELGRANO NORTE.pdf
NUEVO Y ACTUAL HORARIO TREN BELGRANO NORTE.pdfNUEVO Y ACTUAL HORARIO TREN BELGRANO NORTE.pdf
NUEVO Y ACTUAL HORARIO TREN BELGRANO NORTE.pdfJavierPodesta1
 
PKG-II.pptx
PKG-II.pptxPKG-II.pptx
PKG-II.pptxKIOSCN
 
Chuan phat trien cua tre duoi 5 tuoi WHO
Chuan phat trien cua tre duoi 5 tuoi WHOChuan phat trien cua tre duoi 5 tuoi WHO
Chuan phat trien cua tre duoi 5 tuoi WHOhangntbk83
 
Kombat Copper September 2015 Corporate Presentation
Kombat Copper September 2015 Corporate PresentationKombat Copper September 2015 Corporate Presentation
Kombat Copper September 2015 Corporate PresentationKombat_Copper
 
(597922903) trabajo sobre aguas residuales 1
(597922903) trabajo sobre aguas residuales 1(597922903) trabajo sobre aguas residuales 1
(597922903) trabajo sobre aguas residuales 1Juliana Hincapié Rojo
 
Mar splits-berlin-2017-v3 3-vers15-women-final-corrected
Mar splits-berlin-2017-v3 3-vers15-women-final-correctedMar splits-berlin-2017-v3 3-vers15-women-final-corrected
Mar splits-berlin-2017-v3 3-vers15-women-final-correctedAlberto Stretti
 
Conversão do IMC em percentis determinados pelo CDC
Conversão do IMC em percentis determinados pelo CDCConversão do IMC em percentis determinados pelo CDC
Conversão do IMC em percentis determinados pelo CDCJoao P. Dubas
 
transportation impact study in city of toronto
transportation impact study in city of  torontotransportation impact study in city of  toronto
transportation impact study in city of torontok9048520328
 
Carneros entregados 17/12/2010
Carneros entregados 17/12/2010Carneros entregados 17/12/2010
Carneros entregados 17/12/2010lanasultrafinas
 
Laporan 1 Sistem dan Signal (DFT Ms. Excel)
Laporan 1 Sistem dan Signal (DFT Ms. Excel)Laporan 1 Sistem dan Signal (DFT Ms. Excel)
Laporan 1 Sistem dan Signal (DFT Ms. Excel)Bayu Nurcahyo
 
Trends in public debt and the burden of interest payments in Tamil Nadu since...
Trends in public debt and the burden of interest payments in Tamil Nadu since...Trends in public debt and the burden of interest payments in Tamil Nadu since...
Trends in public debt and the burden of interest payments in Tamil Nadu since...Jeyanthi A
 
MONSOON RUN 2014 CMSC (Calcutta Motor Sports Club) Result
MONSOON RUN 2014 CMSC (Calcutta Motor Sports Club) ResultMONSOON RUN 2014 CMSC (Calcutta Motor Sports Club) Result
MONSOON RUN 2014 CMSC (Calcutta Motor Sports Club) ResultWadhwani Foundation
 
MSE601 Inspection Tracking And Improvement Analysis
MSE601 Inspection Tracking And Improvement AnalysisMSE601 Inspection Tracking And Improvement Analysis
MSE601 Inspection Tracking And Improvement Analysistrojanbrewer
 

Similar to Pantau sop bau maret 14 (3) (20)

MielingVictorActivity2 (1) (1) 2
MielingVictorActivity2 (1) (1) 2MielingVictorActivity2 (1) (1) 2
MielingVictorActivity2 (1) (1) 2
 
NUEVO Y ACTUAL HORARIO TREN BELGRANO NORTE.pdf
NUEVO Y ACTUAL HORARIO TREN BELGRANO NORTE.pdfNUEVO Y ACTUAL HORARIO TREN BELGRANO NORTE.pdf
NUEVO Y ACTUAL HORARIO TREN BELGRANO NORTE.pdf
 
PKG-II.pptx
PKG-II.pptxPKG-II.pptx
PKG-II.pptx
 
Chuan phat trien cua tre duoi 5 tuoi WHO
Chuan phat trien cua tre duoi 5 tuoi WHOChuan phat trien cua tre duoi 5 tuoi WHO
Chuan phat trien cua tre duoi 5 tuoi WHO
 
Chuan phat trien cua tre duoi 5 tuoi WHO 2006
Chuan phat trien cua tre duoi 5 tuoi WHO 2006Chuan phat trien cua tre duoi 5 tuoi WHO 2006
Chuan phat trien cua tre duoi 5 tuoi WHO 2006
 
9926009601
99260096019926009601
9926009601
 
Kombat Copper September 2015 Corporate Presentation
Kombat Copper September 2015 Corporate PresentationKombat Copper September 2015 Corporate Presentation
Kombat Copper September 2015 Corporate Presentation
 
(597922903) trabajo sobre aguas residuales 1
(597922903) trabajo sobre aguas residuales 1(597922903) trabajo sobre aguas residuales 1
(597922903) trabajo sobre aguas residuales 1
 
Mar splits-berlin-2017-v3 3-vers15-women-final-corrected
Mar splits-berlin-2017-v3 3-vers15-women-final-correctedMar splits-berlin-2017-v3 3-vers15-women-final-corrected
Mar splits-berlin-2017-v3 3-vers15-women-final-corrected
 
Calc3
Calc3Calc3
Calc3
 
Conversão do IMC em percentis determinados pelo CDC
Conversão do IMC em percentis determinados pelo CDCConversão do IMC em percentis determinados pelo CDC
Conversão do IMC em percentis determinados pelo CDC
 
transportation impact study in city of toronto
transportation impact study in city of  torontotransportation impact study in city of  toronto
transportation impact study in city of toronto
 
Carneros entregados 17/12/2010
Carneros entregados 17/12/2010Carneros entregados 17/12/2010
Carneros entregados 17/12/2010
 
Laporan 1 Sistem dan Signal (DFT Ms. Excel)
Laporan 1 Sistem dan Signal (DFT Ms. Excel)Laporan 1 Sistem dan Signal (DFT Ms. Excel)
Laporan 1 Sistem dan Signal (DFT Ms. Excel)
 
Estacion huancabamba
Estacion huancabambaEstacion huancabamba
Estacion huancabamba
 
Trends in public debt and the burden of interest payments in Tamil Nadu since...
Trends in public debt and the burden of interest payments in Tamil Nadu since...Trends in public debt and the burden of interest payments in Tamil Nadu since...
Trends in public debt and the burden of interest payments in Tamil Nadu since...
 
Example bowles pp 234 239to240 2docs
Example bowles pp 234 239to240 2docsExample bowles pp 234 239to240 2docs
Example bowles pp 234 239to240 2docs
 
MONSOON RUN 2014 CMSC (Calcutta Motor Sports Club) Result
MONSOON RUN 2014 CMSC (Calcutta Motor Sports Club) ResultMONSOON RUN 2014 CMSC (Calcutta Motor Sports Club) Result
MONSOON RUN 2014 CMSC (Calcutta Motor Sports Club) Result
 
MSE601 Inspection Tracking And Improvement Analysis
MSE601 Inspection Tracking And Improvement AnalysisMSE601 Inspection Tracking And Improvement Analysis
MSE601 Inspection Tracking And Improvement Analysis
 
Gps rtk observation
Gps rtk observationGps rtk observation
Gps rtk observation
 

More from abdulah_hubai

More from abdulah_hubai (20)

Kelka ka llg mart (3)
Kelka ka llg mart (3)Kelka ka llg mart (3)
Kelka ka llg mart (3)
 
Kelka ka llg mart (1)
Kelka ka llg mart (1)Kelka ka llg mart (1)
Kelka ka llg mart (1)
 
Kelka ka llg MARET 2014
 Kelka ka llg MARET 2014 Kelka ka llg MARET 2014
Kelka ka llg MARET 2014
 
Analisa wesel stel (2)
Analisa wesel stel  (2)Analisa wesel stel  (2)
Analisa wesel stel (2)
 
Emplasemen bji (1)
Emplasemen bji (1)Emplasemen bji (1)
Emplasemen bji (1)
 
Emplasemen bji
Emplasemen bjiEmplasemen bji
Emplasemen bji
 
Kelka ka ti jan
Kelka ka ti janKelka ka ti jan
Kelka ka ti jan
 
Kelka ka sna jan
Kelka ka sna janKelka ka sna jan
Kelka ka sna jan
 
Kelka ka sua feb
Kelka ka sua febKelka ka sua feb
Kelka ka sua feb
 
Kelka ka sua jan
Kelka ka sua  janKelka ka sua  jan
Kelka ka sua jan
 
Kelka ka sua jan
Kelka ka sua  janKelka ka sua  jan
Kelka ka sua jan
 
Kelka ka bgm jan
Kelka ka bgm janKelka ka bgm jan
Kelka ka bgm jan
 
Kelka ka lt feb
Kelka ka lt  febKelka ka lt  feb
Kelka ka lt feb
 
Kelka ka bji feb (1)
Kelka ka bji  feb (1)Kelka ka bji  feb (1)
Kelka ka bji feb (1)
 
Kelka ka sct feb
Kelka ka sct  febKelka ka sct  feb
Kelka ka sct feb
 
Kelka ka sct jan
Kelka ka sct janKelka ka sct jan
Kelka ka sct jan
 
Kelka ka bji feb
Kelka ka bji  febKelka ka bji  feb
Kelka ka bji feb
 
Kelka ka bji jan
Kelka ka bji  janKelka ka bji  jan
Kelka ka bji jan
 
Kelka ka kop feb
Kelka ka kop febKelka ka kop feb
Kelka ka kop feb
 
Kelka ka kop jan
Kelka ka kop  janKelka ka kop  jan
Kelka ka kop jan
 

Pantau sop bau maret 14 (3)

  • 1.
  • 2. PANTAUAN SOP KA SCT “ BAU” BULAN MARET 2014 TGL NO KA DAT MULAI ISI SOP C1 SELESAI ISI SOP C2 BER SOP D1 T.Time KETERANGAN 01 3-12 05.40 05.55 15 09.12 197 09.47 35 247 9-4 12.15 12.30 15 15.08 158 16.16 68 241 02 3-2 22.35 22.50 15 01.26 156 02.18 52 223 -8 10.42 10.58 16 13.30 152 14.40 70 238 3-12 18.06 18.30 24 21.05 155 22.30 75 264 03 9-6 06.31 06.55 24 10.26 211 11.28 62 297 3-12 17.20 17.45 25 21.35 230 23.25 100 355 04 9-4 05.39 05.49 10 08.55 186 09.16 21 217 1-10 16.15 16.25 10 19.51 206 20.34 33 259 05 7-4 02.37 02.53 16 05.04 131 09.06 242 389 44’ tggu waktu. 50’ langsir - 4211368-508402 kontiner 067-283 terbuka .25’ periksa scowing
  • 3. PANTAUAN SOP KA SCT “ BAU” BULAN MARET 2014 TGL NO KA DAT MULAI ISI SOP C1 SELESAI ISI SOP C2 BER SOP D1 T.Time KETERANGAN 06 7-4 05.06 05.30 24 08.08 158 10.35 147 329 19’ langs - 421290 tdk bisa di kunci , + 421209 + 421277 11-8 12.55 13.18 23 15.42 144 17.34 112 279 07 5-2 01.31 01.50 19 05.20 210 06.10 50 279 9’ x s.3 // 2724 1-10 17.00 17.17 17 19.45 148 21.27 102 267 08 7-4 04.12 04.20 8 06.55 155 09.21 146 309 39’ + 4211387 11.37 12.00 23 14.30 150 15.55 85 258 09 5-2 23.15 23.45 30 02.11 146 02.51 40 208 3-12 17.40 18.08 28 20.09 121 23.36 207 356 86’ tggu sct5 // 2724 11-8 09.30 09.40 10 11.51 131 10 9-4 07.06 07.35 29 10.40 185 11.25 45 259
  • 4. PANTAUAN SOP KA SCT “ BAU” BULAN MARET 2014 TGL NO KA DAT MULAI ISI SOP C1 SELESAI ISI SOP C2 BER SOP D1 T.Time KETERANGAN 11 3-10 20.45 21.00 15 23.40 160 00.41 61 236 7-2 03.41 04.10 29 06.50 160 08.06 76 265 12.30 12.34 4 15.08 144 16.08 60 218 12 7-2 23.59 00.15 16 03.43 207 03.43 5 226 08.50 09.05 15 11.55 170 12.28 33 218 3-12 19.33 20.05 32 23.02 177 23.31 29 238 13 9-6 10.30 10.40 10 13.25 165 15.13 108 212 14 1-10 21.08 21.24 16 23.46 142 00.40 54 255 9-4 05.50 06.05 15 09.30 205 10.05 35 269 19.24 19.40 16 22.40 180 23.53 73 325 55’ tgg x 2723 dan tggu waktu
  • 5. PANTAUAN SOP KA SCT “ BAU” BULAN MARET 2014 TGL NO KA DAT MULAI ISI SOP C1 SELESAI ISI SOP C2 BER SOP D1 T.Time KETERANGAN 15 7-4 02.55 03.28 33 06.12 164 08.20 128 214 1-10 13.56 14.17 21 16.28 131 17.30 62 276 6’ tgg x 2723 16 7-2 04.10 04.25 15 07.05 160 08.46 101 222 1-8 13.00 13.28 28 16.02 154 16.42 40 222 17 5-4 05.15 05.50 35 09.54 244 10.31 37 316 46’ load satu alat . Roder pecah ban 11-8 13.20 13.35 15 18.05 270 18.50 45 330 87’ tggu x sct7 18 3-12 22.03 22.15 12 01.28 119 04.00 152 357 87’ tggu x sct7 1-8 12.45 12.58 13 17.52 294 18.18 20 333 63’ tggu x s6 mogok. 19 7-4 07.26 07.50 24 10.17 157 11.38 81 252 11-8 17.11 17.22 11 19.53 151 21.18 85 247 125’ tgg x sct5
  • 6. PANTAUAN SOP KA SCT “ BAU” BULAN MARET 2014 TGL NO KA DAT MULAI ISI SOP C1 SELESAI ISI SOP C2 BER SOP D1 T.Time KETERANGAN 20 02.45 04.05 80 05.32 87 09.11 219 395 125’ tgg x sct5 1-10 18.11 18.27 16 21.22 175 22.56 94 285 15’ x sct3 7-2 06.13 06.50 37 09.22 152 10.18 56 245 21 11-8 13.22 13.22 0 16.16 174 18.25 129 303 33’ tgg x sct1 22 5-2 01.33 01.40 7 04.35 175 06.36 121 303 33’ tgg x sct9 1-10 15.26 15.35 9 17.58 142 18.20 22 174 23 7-4 06.47 07.09 22 11.02 233 11.30 28 283 11-8 15.20 15.35 15 19.16 220 21.10 114 350 80’ tgg x sct1 24 5-2 23.43 00.05 22 02.38 153 03.20 42 217 1-10 16.51 17.00 9 19.36 156 21.00 84 249
  • 7. PANTAUAN SOP KA SCT “ BAU” BULAN MARET 2014 TGL NO KA DAT MULAI ISI SOP C1 SELESAI ISI SOP C2 BER SOP D1 T.Time KETERANGAN 25 7-4 03.27 03.40 13 05.53 133 09.27 210 360 90’ x sct9 11-8 11.46 11.55 9 14.14 139 16.35 141 289 19’ tgg rest krew 26 5-2 00.18 00.50 32 04.15 205 05.02 47 284 14’ load satu alat , rusak pompa hidrolik 11-6 10.24 10.35 11 12.47 132 14.33 106 249 27 5-12 21.31 21.45 14 23.24 159 00.00 36 149 9-4 07.55 08.06 11 10.30 144 11.08 38 193 28 3-12 21.02 21.40 38 23.25 105 01.45 140 283 7-4 02.20 07.40 20 10.08 148 12.02 114 288 1-12 17.21 17.30 9 19.44 134 20.36 52 195 29 9-4 06.20 06.40 20 09.32 172 10.28 56 248
  • 8. PANTAUAN SOP KA SCT “ BAU” BULAN MARET 2014 TGL NO KA DAT MULAI ISI SOP C1 SELESAI ISI SOP C2 BER SOP D1 T.Time KETERANGAN 1-10 13.11 13.25 14 15.55 150 16.55 60 224 30 5-2 21.37 21.50 13 00.00 130 02.45 165 308 38’ tgg rest 1-8 12.34 12.48 14 14.56 128 15.45 49 191 31 7-2 03.15 03.30 15 06.10 160 06.50 40 215 11-6 12.06 12.17 11 15.14 177 16.47 93 281 11’ sct1 2721
  • 9. PANTAUAN SOP KA SCT “ BAU” PERSIAPAN PENGISIAN BULAN MARET 2014 SOP: 20MENIT
  • 10. PANTAUAN SOP KA SCT “ BAU” PROSES ISI BULAN MARET 2014 SOP : 150MENIT
  • 11. PANTAUAN SOP KA SCT “ BAU” PERSIAPAN BERANGKAT BULAN MARET 2014 SOP : 100MENIT
  • 12. SOP KA SCT DI STASIUN SCT KEGIATAN SOP KETERANGAN  PERSIAPAN PENGISIAN 20 MENIT  PENGISIAN / LOADING 1 DAN 2 150MENIT  PERSIAPAN BERANGKAT : 100 MENIT - PERSIAPAN KREW - LANGSIR LOKO LAHAT –SCT - PERIKSA SCOWING - ADMINISTRASI (LHM DAN LAPKA) - PERCOBAAN PENGEREMAN TOTAL = 270 MENIT
  • 13. PANTAUAN SOP KA SCT “ BAU” TOTAL TIME BULAN MARET 2014 SOP :270 MENIT
  • 14. SCT KPT 8. WPI = MENIT 4. WPK = MENIT 5. PERSIAPAN ISI= MENIT 2. PENGISIAN = 150 MENIT . 164menit 32PPCW / 64CONTEINER 3. PERSIAPAN BERANGKA KOSONG= 100 MENIT 94 menit 7. PERSIAPAN BERANGKAT ISI = MENIT 6. MUAT BATUBARA = MENIT 1. PESIAPAN PENGISIAN = 20MENIT’ 17menit SOP KA SCT BMSS KERTAPATI – SUKA CINTA PROGRAM SOP PROGRAM SOP 267 ’ 270’
  • 15. SEKIAN BY JMI OPS 3.1 C LLG