SlideShare a Scribd company logo
1 of 7
Curriculum Vitae
Zane Peter Engelbrecht
Mechanical and Rotating Equipment Specialist
Cell 072 8075420 zane.e@gmx.com
EDUCATIONAL PROFILE
SECONDARY EDUCATION
Last School Attended : Milton Boys High(Zimbabwe)
HighestStandardPassed : “O” Level
Year : 1977
Subjects : English Geography
Mathematics Art
Science Metalwork
History Woodwork
Extra Mural Activities : Athletics WaterPolo
Rugby Golf
Cricket
TERTIARY EDUCATION
National Diploma(Mechanical) : Machine Drawing (N3)
EngineeringMathematics (N3)
Mechanicsof Machines (N3)
Strengthof Materials (N3)
CoursesCompleted : Mechanical Seals – Mechanics
FluidDrive Coupling –FluidDynamics
BearingStrengthandTechnology
LaserAlignment
VariousGearbox Mechanics
Turbine Machine Design
ValvesandFluidControl Systems
EMPLOYMENT HISTORY
Saudi Aramco
Saudi Arabia
Mechanical EngineerII
Employed by Saudi Aramco, working on the downstream pipeline and Abu-Hadriyah water drill sites for the
Manifa projects Darren Port and Abu Ali Fish Hatchery .
 Supervising mechanical construction of PUAC air-cooling systems. Commissioning and TAB Testing
 Supervising mechanical construction of Fire Water Pumps. Commissioning
 Supervising mechanical construction of Fire Water system and sprinkler systems.
 Installation of well water pumps and piping.
 Supervising mechanical construction of Pumps for water system for Fish Hatchery.
 Supervising mechanical construction of water filtering system for Fish Hatchery.
 Installation of the Fire protection systems.
 Supervising mechanical construction of Air Blow and oxygen systems of Fish Hatchery.
 Supervising mechanical construction, pipeline and scrapper and launcher areas. On 5 sites, and 5
pipelines, ranging from 25KM, up to 151KM in length.
 Walk downs, punch listing and clearing of mechanical, Valves and scrapper and receivers inside
plant
 Commissioned 5 Water drill sites, Scraper launchers and receivers and surge valve stations.
 Hydro Testing and cleaning and gauging of pipelines.
 Responsible for the liaison between Contractor and Saudi Aramco
 Commissioned Corrosion inhibitor skid on each drill site and inside the plants
 All relevant paperwork and Safety Standards. Reporting and scheduling of workflow, et
Name ofCompany : Fraser Alexander– Zambia
Type of Company : Tailings
PositionHeld : Mechanical Supervisoron Three projects
Contract Period : July2011 to September2016
Duties
 RepresentedFraserAlexanderat all meetingswithKankola Copper Mine Management.
 Supervisedand trainedZambian employees andexpatriateson the Muntimpa Station and
OpenCast Mine Dams project.
 Supervisedand planedall Mechanical work on the Muntimpa pumpstation inside the
plant and outside on the opencast dames pumpingand production plant.
 Supervisedand trainedthe Refurbishmentworkshopfor Pumps and gearboxesfor the
pump stations.
 ConductedSafety meetingand all relevantpaper work regardingsafety standards and
reporting.
Name ofCompany : PetroSA – Mossel Bay
Type of Company : PetroChemical Plant
PositionHeld : SeniorTurbine Fitter - Permanent
PeriodEmployed : January2004 to June 2011
Duties
 Overhaulingof mulitstage pumps and gearboxes namely(Sulzer,KSB pumps and David
Drown and Marg Gear boxers)
 Overhaul of centrifugal compressors and reciprocatingcompressors.(PerterbrotherHood
Nuova PigeonThomason.)
 . The reconditionof compressor valves,stuffingboxes,oil scraper and intermitted
scrapers.
 The overhaul mechanical seals,balancingrotors.
 Laser Alignmentonpump compressorsand turbines
EMPLOYMENT ON CONTRACT
Name ofCompany : Koeberg
Type of Company : Nuclear PowerStation
PositionHeld : Turbine Technician
Contract Period : October 2003 to November2003
 Overhaulsof Generators. Remove Stator, Remove Bearings,H2 seals,Rotor and reinstall
and correct alignmenton 900 mw (Alstom Atlantic)
Name ofCompany : Sasol 1
Type of Company : Petro Chemical Plant
PositionHeld : Turbine Technician
Contract Period : August 2003 to September2003
 Overhaulsof Turbo Machinery.Turbines,Compressorsand all auxiliaryequipment.

Name ofCompany : Petro SA
Type of Company : Petro Chemical Plan
PositionHeld : Turbine Fitter
Contract Period : April 2003 (PlantShutdown0
 Overhaulsof pumps and gearboxes.(DavidBrown
 Renewal of mechanical seals,balancing of rotors and pinions
 Overhaul of firewatergearbox for the FA PlatformRig.
 Run out checks on rotating parts
Name ofCompany : Rotek Engineering
Type of Company : Engineering
PositionHeld : Turbine Fitter
Contract Period : January 2003 to March 2003
Contract Period : April 2002 to December2002
PositionHeld : Manager Mechanical Projects
Contract Period : April 2002 to July2002
Name ofCompany : Cooperheat
Type of Company : Leak Sealing
PositionHeld : Site Manager
Contract Period : June 2001 to March 2002
 Managing of the Leak-sealingcontract at Sasol SyntheticFuels
 The supervisionofthe leaksealingtechnicians.
 The orderingof spears and consumables. The invoicingand general admin work.
Managing of the Leak-sealingcontract at Sasol SyntheticFuel.

Name ofCompany : Sasol SyntheticFuels
Type of Company : Petro– Chemical
PositionHeld : Turbine Technician
Contract Period : February 2000 to May 2001
 The installingof boilerfeedpumps and oil pipe work manufacturing and the supervisorof
sub-contractors. Involvedin the commissioningof auxiliaryand main pump.
 Other dutiesinvolvedinwere to maintaincompressor, pumps,turbinesand various gear
boxes. General overhaulsand shut down work associated with the above equipment.
Name ofCompany : Engen – Rotating EquipmentWorkshop
(Durban)
Type of Company : Petro-Chemical
PositionHeld : SeniorRotating Technician
Contract Period : October 1997 to January 2000
 Overhaulingof Turbine compressors and auxiliary’sassociatedwith this
equipment.(ThomasonGHHRand )
 Overhaulingof all types of pumpsassociated with a Petro chemical plant.(SulzerKSB)
 Overhaulingof Mechanical seals.(ChestertonJohnCrane Bergmann)
 Rotor balancing.
 Laser alignment
Name ofCompany : Sulzer – South Africa
Type of Company : Engineering
PositionHeld : Site Supervisor
PeriodEmployed : February 1987 to August 1997
 Area of responsibility,were sixhighpressure BoilerFeedPumps,drivenby 11mw steam
Turbine.(SulzerandAEG Turbines)
 Twelve electrical boilerfeedpumpsdrivenby 11 mw motor.
 Auxiliaryequipmentoil pumpscontrol valves instrumentationassociatedthis plant.
 Area of responsibility,were sixhighpressure BoilerPumps,driven by 11mw steam
Turbine.
 My dutiesinclude install and maintain BoilerFeedPumps,Voith GearBoxes, Booster
Pumps,all Oil Pumps,Inspectionof all Bearingand Rotating equipment. The
commissioningofBoilerFeedand the Pressure test of 600mw BoilerPumps and Auxiliary
Plant. Report to Eskom PowerStation Maintenance Manager. The budget undermy
control amounts to 2.2 Million. The inspectionofall equipmentand tools,all
administrationassociated with 5 star safeties.
Name ofCompany : I.M.S (Industrial Machine Suppliers)
Type of Company : Mechanical Engineering
PositionHeld : Senior Turbine Technician
Periodof Employment : April 1986 to January 1987
 Installationof two screw compressor type G.H.H and maintenance of Auxiliary Plant
associatedwith these Compressors.
 The managing of sub-contractors and materials inclusive.
 The overhauling,maintenance ofcompressor
 . The managing of sub- contractors and materials.
 The overhauling,maintenance ofcompressor gearboxestype David Brown Episclick. The
overhaulingof turbine type K.K.K. the re bladingof turbine rotor and overhaulingof
compressor valves

 The controllingof maintenance contract with variousgold mines. Meetingof the
requirementssetout by the clientand general clientliaison
.
Name ofCompany : A.P.E Africa – South Africa
(AmalgamatedPowerEng.)
Type of Company : Engineering
PositionHeld : SeniorApprentice TurbineMachinery
(Turbine Fitter11.07.1985)
PeriodEmployed : April 1986 to January1987
 Felixtonll –SugarMill. Was SeniorTurbine technicianonthe installationof three Alan
10mw back pressure turbine andAuxiliaryplant
 Sappi PulpMill – installationof twoturbines.(One 50mw condensingandone 50mw back
pressure turbine) the inspectionandhandlingof plantmaterialsandequipmentassociated
withconstruction
 The commissioningof andincludingthe maintenance andfaultfindingof recipicating
compressorsupto 5000cfm, namelyBellisandMorcom Marley,Ingersoll Rand,Various
Gearboxes,AuxiliaryPumponthermal stationandpumpStations

More Related Content

What's hot

CV (Phillip A Evans)
CV (Phillip A Evans)CV (Phillip A Evans)
CV (Phillip A Evans)Phillip Evans
 
R_SealsResume2015
R_SealsResume2015R_SealsResume2015
R_SealsResume2015Rocky Seals
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerTarun Sharna
 
Veerappa Panchal_Piping Stress Engineer
Veerappa Panchal_Piping Stress EngineerVeerappa Panchal_Piping Stress Engineer
Veerappa Panchal_Piping Stress Engineerveerappa panchal
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leonardo David
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisorJames Ct
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICRoy Encallado
 
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKSDAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKSIslam Nassef
 

What's hot (15)

03 Mohamed_fathi
03 Mohamed_fathi03 Mohamed_fathi
03 Mohamed_fathi
 
CV (Phillip A Evans)
CV (Phillip A Evans)CV (Phillip A Evans)
CV (Phillip A Evans)
 
chris's CV
chris's CVchris's CV
chris's CV
 
R_SealsResume2015
R_SealsResume2015R_SealsResume2015
R_SealsResume2015
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
Veerappa Panchal_Piping Stress Engineer
Veerappa Panchal_Piping Stress EngineerVeerappa Panchal_Piping Stress Engineer
Veerappa Panchal_Piping Stress Engineer
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
khizar hayat cv.
khizar hayat cv.khizar hayat cv.
khizar hayat cv.
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKSDAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
 
Eng.mamdouh azab.
Eng.mamdouh azab.Eng.mamdouh azab.
Eng.mamdouh azab.
 

Similar to Zane P Engelbrecht CV-1

Omar AlHajri CV
Omar AlHajri  CVOmar AlHajri  CV
Omar AlHajri CVomar5854
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2 Alaa Ammar
 
Waqar zeb cv
Waqar zeb cvWaqar zeb cv
Waqar zeb cvwaqar zeb
 
Gavin Murray new layout Resume
Gavin Murray new layout ResumeGavin Murray new layout Resume
Gavin Murray new layout ResumeGavin Murray
 
Saad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC EngineerSaad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC EngineerSaad mohamed gad
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad
 
Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane
 
Project Mechanical Engineer C.V
Project Mechanical Engineer C.VProject Mechanical Engineer C.V
Project Mechanical Engineer C.Vali ibrahim
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEERnader rizq
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane
 
KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)Kee M
 
Resume of John Prince (Rotating Equipment Technician)
Resume of John Prince (Rotating Equipment Technician)Resume of John Prince (Rotating Equipment Technician)
Resume of John Prince (Rotating Equipment Technician)JOHN PRINCE
 

Similar to Zane P Engelbrecht CV-1 (20)

Mohmed ali haroun CV
Mohmed ali haroun  CVMohmed ali haroun  CV
Mohmed ali haroun CV
 
Omar AlHajri CV
Omar AlHajri  CVOmar AlHajri  CV
Omar AlHajri CV
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
Waqar zeb cv
Waqar zeb cvWaqar zeb cv
Waqar zeb cv
 
Gavin Murray new layout Resume
Gavin Murray new layout ResumeGavin Murray new layout Resume
Gavin Murray new layout Resume
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 
M.Reda CV
M.Reda CVM.Reda CV
M.Reda CV
 
CV Ahmed1
CV Ahmed1CV Ahmed1
CV Ahmed1
 
MOTAZ ALI C.V LAST UPDATE
MOTAZ ALI C.V LAST UPDATEMOTAZ ALI C.V LAST UPDATE
MOTAZ ALI C.V LAST UPDATE
 
Saad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC EngineerSaad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC Engineer
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane CV 2015
Stewart Kane CV 2015
 
Project Mechanical Engineer C.V
Project Mechanical Engineer C.VProject Mechanical Engineer C.V
Project Mechanical Engineer C.V
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 
jayaprakash
jayaprakashjayaprakash
jayaprakash
 
KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)
 
Mhmd Saeed C.V
Mhmd Saeed C.VMhmd Saeed C.V
Mhmd Saeed C.V
 
Resume of John Prince (Rotating Equipment Technician)
Resume of John Prince (Rotating Equipment Technician)Resume of John Prince (Rotating Equipment Technician)
Resume of John Prince (Rotating Equipment Technician)
 

Zane P Engelbrecht CV-1

  • 1. Curriculum Vitae Zane Peter Engelbrecht Mechanical and Rotating Equipment Specialist Cell 072 8075420 zane.e@gmx.com EDUCATIONAL PROFILE SECONDARY EDUCATION Last School Attended : Milton Boys High(Zimbabwe) HighestStandardPassed : “O” Level Year : 1977 Subjects : English Geography Mathematics Art Science Metalwork History Woodwork Extra Mural Activities : Athletics WaterPolo Rugby Golf Cricket
  • 2. TERTIARY EDUCATION National Diploma(Mechanical) : Machine Drawing (N3) EngineeringMathematics (N3) Mechanicsof Machines (N3) Strengthof Materials (N3) CoursesCompleted : Mechanical Seals – Mechanics FluidDrive Coupling –FluidDynamics BearingStrengthandTechnology LaserAlignment VariousGearbox Mechanics Turbine Machine Design ValvesandFluidControl Systems EMPLOYMENT HISTORY Saudi Aramco Saudi Arabia Mechanical EngineerII Employed by Saudi Aramco, working on the downstream pipeline and Abu-Hadriyah water drill sites for the Manifa projects Darren Port and Abu Ali Fish Hatchery .  Supervising mechanical construction of PUAC air-cooling systems. Commissioning and TAB Testing  Supervising mechanical construction of Fire Water Pumps. Commissioning  Supervising mechanical construction of Fire Water system and sprinkler systems.  Installation of well water pumps and piping.  Supervising mechanical construction of Pumps for water system for Fish Hatchery.  Supervising mechanical construction of water filtering system for Fish Hatchery.  Installation of the Fire protection systems.  Supervising mechanical construction of Air Blow and oxygen systems of Fish Hatchery.  Supervising mechanical construction, pipeline and scrapper and launcher areas. On 5 sites, and 5 pipelines, ranging from 25KM, up to 151KM in length.  Walk downs, punch listing and clearing of mechanical, Valves and scrapper and receivers inside plant  Commissioned 5 Water drill sites, Scraper launchers and receivers and surge valve stations.  Hydro Testing and cleaning and gauging of pipelines.  Responsible for the liaison between Contractor and Saudi Aramco  Commissioned Corrosion inhibitor skid on each drill site and inside the plants
  • 3.  All relevant paperwork and Safety Standards. Reporting and scheduling of workflow, et Name ofCompany : Fraser Alexander– Zambia Type of Company : Tailings PositionHeld : Mechanical Supervisoron Three projects Contract Period : July2011 to September2016 Duties  RepresentedFraserAlexanderat all meetingswithKankola Copper Mine Management.  Supervisedand trainedZambian employees andexpatriateson the Muntimpa Station and OpenCast Mine Dams project.  Supervisedand planedall Mechanical work on the Muntimpa pumpstation inside the plant and outside on the opencast dames pumpingand production plant.  Supervisedand trainedthe Refurbishmentworkshopfor Pumps and gearboxesfor the pump stations.  ConductedSafety meetingand all relevantpaper work regardingsafety standards and reporting. Name ofCompany : PetroSA – Mossel Bay Type of Company : PetroChemical Plant PositionHeld : SeniorTurbine Fitter - Permanent PeriodEmployed : January2004 to June 2011 Duties  Overhaulingof mulitstage pumps and gearboxes namely(Sulzer,KSB pumps and David Drown and Marg Gear boxers)  Overhaul of centrifugal compressors and reciprocatingcompressors.(PerterbrotherHood Nuova PigeonThomason.)  . The reconditionof compressor valves,stuffingboxes,oil scraper and intermitted scrapers.  The overhaul mechanical seals,balancingrotors.  Laser Alignmentonpump compressorsand turbines
  • 4. EMPLOYMENT ON CONTRACT Name ofCompany : Koeberg Type of Company : Nuclear PowerStation PositionHeld : Turbine Technician Contract Period : October 2003 to November2003  Overhaulsof Generators. Remove Stator, Remove Bearings,H2 seals,Rotor and reinstall and correct alignmenton 900 mw (Alstom Atlantic) Name ofCompany : Sasol 1 Type of Company : Petro Chemical Plant PositionHeld : Turbine Technician Contract Period : August 2003 to September2003  Overhaulsof Turbo Machinery.Turbines,Compressorsand all auxiliaryequipment.  Name ofCompany : Petro SA Type of Company : Petro Chemical Plan PositionHeld : Turbine Fitter Contract Period : April 2003 (PlantShutdown0  Overhaulsof pumps and gearboxes.(DavidBrown  Renewal of mechanical seals,balancing of rotors and pinions  Overhaul of firewatergearbox for the FA PlatformRig.  Run out checks on rotating parts Name ofCompany : Rotek Engineering Type of Company : Engineering PositionHeld : Turbine Fitter Contract Period : January 2003 to March 2003
  • 5. Contract Period : April 2002 to December2002 PositionHeld : Manager Mechanical Projects Contract Period : April 2002 to July2002 Name ofCompany : Cooperheat Type of Company : Leak Sealing PositionHeld : Site Manager Contract Period : June 2001 to March 2002  Managing of the Leak-sealingcontract at Sasol SyntheticFuels  The supervisionofthe leaksealingtechnicians.  The orderingof spears and consumables. The invoicingand general admin work. Managing of the Leak-sealingcontract at Sasol SyntheticFuel.  Name ofCompany : Sasol SyntheticFuels Type of Company : Petro– Chemical PositionHeld : Turbine Technician Contract Period : February 2000 to May 2001  The installingof boilerfeedpumps and oil pipe work manufacturing and the supervisorof sub-contractors. Involvedin the commissioningof auxiliaryand main pump.  Other dutiesinvolvedinwere to maintaincompressor, pumps,turbinesand various gear boxes. General overhaulsand shut down work associated with the above equipment. Name ofCompany : Engen – Rotating EquipmentWorkshop (Durban) Type of Company : Petro-Chemical PositionHeld : SeniorRotating Technician Contract Period : October 1997 to January 2000  Overhaulingof Turbine compressors and auxiliary’sassociatedwith this equipment.(ThomasonGHHRand )  Overhaulingof all types of pumpsassociated with a Petro chemical plant.(SulzerKSB)
  • 6.  Overhaulingof Mechanical seals.(ChestertonJohnCrane Bergmann)  Rotor balancing.  Laser alignment Name ofCompany : Sulzer – South Africa Type of Company : Engineering PositionHeld : Site Supervisor PeriodEmployed : February 1987 to August 1997  Area of responsibility,were sixhighpressure BoilerFeedPumps,drivenby 11mw steam Turbine.(SulzerandAEG Turbines)  Twelve electrical boilerfeedpumpsdrivenby 11 mw motor.  Auxiliaryequipmentoil pumpscontrol valves instrumentationassociatedthis plant.  Area of responsibility,were sixhighpressure BoilerPumps,driven by 11mw steam Turbine.  My dutiesinclude install and maintain BoilerFeedPumps,Voith GearBoxes, Booster Pumps,all Oil Pumps,Inspectionof all Bearingand Rotating equipment. The commissioningofBoilerFeedand the Pressure test of 600mw BoilerPumps and Auxiliary Plant. Report to Eskom PowerStation Maintenance Manager. The budget undermy control amounts to 2.2 Million. The inspectionofall equipmentand tools,all administrationassociated with 5 star safeties. Name ofCompany : I.M.S (Industrial Machine Suppliers) Type of Company : Mechanical Engineering PositionHeld : Senior Turbine Technician Periodof Employment : April 1986 to January 1987  Installationof two screw compressor type G.H.H and maintenance of Auxiliary Plant associatedwith these Compressors.  The managing of sub-contractors and materials inclusive.  The overhauling,maintenance ofcompressor  . The managing of sub- contractors and materials.  The overhauling,maintenance ofcompressor gearboxestype David Brown Episclick. The overhaulingof turbine type K.K.K. the re bladingof turbine rotor and overhaulingof compressor valves 
  • 7.  The controllingof maintenance contract with variousgold mines. Meetingof the requirementssetout by the clientand general clientliaison . Name ofCompany : A.P.E Africa – South Africa (AmalgamatedPowerEng.) Type of Company : Engineering PositionHeld : SeniorApprentice TurbineMachinery (Turbine Fitter11.07.1985) PeriodEmployed : April 1986 to January1987  Felixtonll –SugarMill. Was SeniorTurbine technicianonthe installationof three Alan 10mw back pressure turbine andAuxiliaryplant  Sappi PulpMill – installationof twoturbines.(One 50mw condensingandone 50mw back pressure turbine) the inspectionandhandlingof plantmaterialsandequipmentassociated withconstruction  The commissioningof andincludingthe maintenance andfaultfindingof recipicating compressorsupto 5000cfm, namelyBellisandMorcom Marley,Ingersoll Rand,Various Gearboxes,AuxiliaryPumponthermal stationandpumpStations