Elgin Local Schools K-12 Project
Construction Systems Management 4660
Dr. Tom Marshall
Zach Himler
4/17/13
(MLA Format)
Introduction
I live in Marion, Ohio, and in Marion there is a school district that is known as Elgin
Local Schools. This is the school district that I graduated from in May of 2009. The schools in
this district are very old and are very out of date. Most of the schools were built clear back into
the late 1800’s early 1900’s. They tend to be smaller in size and falling apart. Not only do you
have these issues to worry about, but the whole district is located around the Scioto River that
runs through La Rue, Green Camp, and Prospect and eventually down through the Columbus
area. The school buildings are located in the flood plain area near the river, so every time the
river rises, the buildings flood and have water sitting in them. Several rooms and bathrooms
would have standing water in them for days until the water would go down or be pumped out.
Many of the bathroom toilets and sinks would have backflow come up through the plumbing and
flood even more. Because of these horrible conditions, the school district has been trying to pass
a levy for several years to get a new school building built. Finally, in 2008, the levy passed and
new buildings are currently being built. I will discuss several things about this project including
more of a description, project funding, how it is relevant to Construction Systems Management
4660, and some of the challenges of the project(Schreck, 2010).
Project Description
The current school district has all of the buildings spread out over the entire district
having a building located in the major towns of the district. There are currently two elementary
schools, one middle school, and one high school, and all of these buildings are very old and need
updated. The new building for the district will be one huge building that will have the elementary
school, middle school, and high school all in one building and will close down the old buildings
completely. Some of them may even be torn down. The new building is known as the new Elgin
K-12 School project, and is in the construction management hands of Turner Construction
(Elgin, 2012).
The construction for the $35 million building started on March 14, 2012 which lead into
pouring the first footing the next day on March 15, 2012. Remembering back to a year ago to
when this part of the project was going on, the weather was extremely warm and sunny which
allowed for the work to move very smoothly and quickly. Because of this great weather, the last
footing had been poured by April 11, 2012 which was two weeks ahead of the scheduled date.
Being two weeks ahead of schedule allowed the masonry crews to get an early start to building
the concrete walls. This is very critical because the building is scheduled to be built through
building enclosure, so the walls need to be done first before the rest of the project can move
forward. The building enclosure is scheduled to be finished by December of 2012 and they were
right on-time, even a little ahead of schedule. The school has 165,800 square feet of space to use
which includes a main gym and an auxiliary gym. There is no auditorium because the district
will reuse the current auditorium plus the cafeteria is made to be used as an auditorium if needed
because there is a stage up front. There is a courtyard in the middle of the building that the
building itself is built around. The building’s shell is built and everything that is left to do is
mostly interior. The project is still about ten days ahead of schedule, and it is scheduled to be
finished in the summer of 2013 just in time for school to start in September (Schreck, 2010).
Project Funding
The originalconstruction plans were going to use the same site that the building is
currently resting in now as the site for the new building and basically renovating the original
building to make it up-to-date. Elgin Schools and Turner Construction researched more into this
idea and found out that this plan would lay the new building into the 100-year flood plain and
would actually be at a lower elevation than what the current building sits. This means that there
would have to be tons and tons of dirt brought in to raise the elevation of the building to get it
out of the 100-year flood plain. I interviewed Steve Hoyt who is the Project Executive for Turner
Construction. He told me that Turner Construction thought that Elgin should think about moving
the location of the project to a different site to save money and have less work just to lift the new
building’s elevation. He told me that it would cost $1.5 million to do all this dirt work. Elgin
then decided to buy 35 acres of land across the street from the current building for $200,000 and
move the site to this new location. Not only did this save money, but it causes less disruption on
the students and the school functions that go during and after school hours (Hoyt, 2013).
Elgin Local Schools had to pass a levy by the people who live in the district to get the
new school approved and built. The levy would use some money given by the state to use on the
project and the rest would come from the school district. The taxpayers passed the levy that
included a combined $7.49 million, 28 year bond issue and a $1 million continuous improvement
levy. The bond issue covers the local share of a $35 million building project that included $20
million from the Ohio School Facilities Commission Fund(Schreck, 2010).
Relevance to CSM 4660
This project relates to the Peurifoy textbook for our class in several of the chapters out of
the book. The first way is that there was a bunch of earthwork that was done to prepare the
footing to be poured and set into place. This is included in Chapter 1 (Machines Make it
Possible), Chapter 2 (Equipment Economics), Chapter 3 (Planning for Earthwork Construction),
Chapter 7 (Dozers), Chapter 8 (Scrapers), Chapter 9 (Excavators), Chapter 10 (Trucks and
Hauling Equipment), Chapter 11 (Finishing Equipment), and Chapter 16 (Concrete and Concrete
Equipment). Chapter 1 is involved because there are machines involved in this project. Chapter 2
is included because there has to be costs figured up for every aspect of the project. Chapter 3 is
all of the planning of the earthwork. Chapters 7, 8, 9, 10, and 11 includes dozers, scrapers,
excavators, trucks and hauling equipment, and finishing equipment, and all of these were used in
this project. Chapter 16 is concrete and concrete equipment, and concrete is used on most
projects including this one. It is very rare to find a project that doesn’t have concrete
used(Peurifoy, Schexnayder, Shapira, and Schmitt).
Project Challenges
There were several challenges of this project that had to be dealt with during the
construction. One challenge was dealing with the elevation of the project and making sure the
building is out of the 100-year flood plain that surrounds the whole construction site area. They
brought in enough dirt to raise the building out of the flood plain. Another challenge that I have
already talked about was how the placement of the building could save money, so they had to
find the right location to start building. The third challenge was with funding from the Ohio
School Facilities Commission Fund. The number of students who attend school in the Elgin
Local School district has been decreasing years now and the state of Ohio has lowered the
amount of funding that is going to be given to the project. A fourth challenge was dealing with
one of the workers having a heart attack while working on the job. There are several challenges
that follow an incident like this. They include, but aren’t limited to, dealing with OSHA, and
helping the family get through incident and helping them. These were just some of the challenges
of this project (Hoyt, 2013).
Conclusion
This $35 million project has had many positives with it and many challenges as well. The
Elgin Local Schools K-12 project is currently ahead of schedule by about ten days. If the
progress keeps up at this rate, the project should be finished with days to spare before school
starts in the fall. The project has been a huge success so far, with the exception of the one
incident, and Turner Construction, the Elgin community, and the students are all looking forward
to seeing the building after completion and just enjoying the new building.
"Elgin Local Schools."Elgin Local Schools ISD News.N.p., n.d. Web. 17 Apr. 2013.
<http://www.elginschools.org/content_page.aspx?cid=42.
Hoyt, Steve. Personal Interview. 15 Mar 2013.
Peurifoy, Robert, Clifford Schexnayder, AviadShapira, and Robert Schmitt.8th Edition. New
York: McGraw-Hill Companies, Inc., 2006. Print.
Schreck, Justin. "Justin Schreck." Elgin building site moved across the road . Blogger, 09 Jun
2010. Web.Web. 17 Apr. 2013. <http://j-dogthe2.blogspot.com/2010/06/elgin-buildingsite-moved-across-road.html>.

Weitere ähnliche Inhalte

Ähnlich wie Methods and Materials Term Paper

LEADERSHIP ROLES With a project of this magnitude, it .docx
LEADERSHIP ROLES With a project of this magnitude, it .docxLEADERSHIP ROLES With a project of this magnitude, it .docx
LEADERSHIP ROLES With a project of this magnitude, it .docxcroysierkathey
 
Case Study Analysis - ECO Modern Flats- quentin torbert
Case Study Analysis - ECO Modern Flats- quentin torbertCase Study Analysis - ECO Modern Flats- quentin torbert
Case Study Analysis - ECO Modern Flats- quentin torbertQuin T
 
Managing the repair and rehabilitation process of deped school building in ur...
Managing the repair and rehabilitation process of deped school building in ur...Managing the repair and rehabilitation process of deped school building in ur...
Managing the repair and rehabilitation process of deped school building in ur...JamieChanMarcos
 
Egbe comprehensive college egbe - draft rehabilitation plan 2017 ver2
Egbe comprehensive college   egbe - draft  rehabilitation plan 2017 ver2Egbe comprehensive college   egbe - draft  rehabilitation plan 2017 ver2
Egbe comprehensive college egbe - draft rehabilitation plan 2017 ver2cosordec
 
School for Kids Vietnam 2014 in Ha Giang - Detailed project
School for Kids Vietnam 2014 in Ha Giang - Detailed projectSchool for Kids Vietnam 2014 in Ha Giang - Detailed project
School for Kids Vietnam 2014 in Ha Giang - Detailed projectTrang Nguyen
 
renovation presentation
renovation presentationrenovation presentation
renovation presentationDavid Peck
 
Marquette Engineering Hall
Marquette Engineering HallMarquette Engineering Hall
Marquette Engineering HallKent Stolt
 
Woodburn booklet web
Woodburn booklet webWoodburn booklet web
Woodburn booklet webJared Gorby
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_knelischer
 
SCSD 1 Facilities Master Plan
SCSD 1 Facilities Master PlanSCSD 1 Facilities Master Plan
SCSD 1 Facilities Master PlanJay Harnack
 
Sra Pou Vocational School For The Team
Sra Pou Vocational School For The TeamSra Pou Vocational School For The Team
Sra Pou Vocational School For The Teamhillarudanko
 
Successful green schools
Successful green schoolsSuccessful green schools
Successful green schoolsOsvajoca
 
Bond Informational Slideshow
Bond Informational SlideshowBond Informational Slideshow
Bond Informational SlideshowKatie Morrow
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_knelischer
 
Noyaa project REPORT
Noyaa project REPORTNoyaa project REPORT
Noyaa project REPORTTom Vaughan
 
Senior Project Proposal Form
Senior Project Proposal FormSenior Project Proposal Form
Senior Project Proposal FormCasie Bowman
 

Ähnlich wie Methods and Materials Term Paper (20)

LEADERSHIP ROLES With a project of this magnitude, it .docx
LEADERSHIP ROLES With a project of this magnitude, it .docxLEADERSHIP ROLES With a project of this magnitude, it .docx
LEADERSHIP ROLES With a project of this magnitude, it .docx
 
Case Study Analysis - ECO Modern Flats- quentin torbert
Case Study Analysis - ECO Modern Flats- quentin torbertCase Study Analysis - ECO Modern Flats- quentin torbert
Case Study Analysis - ECO Modern Flats- quentin torbert
 
Managing the repair and rehabilitation process of deped school building in ur...
Managing the repair and rehabilitation process of deped school building in ur...Managing the repair and rehabilitation process of deped school building in ur...
Managing the repair and rehabilitation process of deped school building in ur...
 
Measure A Status Report, 2010
Measure A Status Report, 2010Measure A Status Report, 2010
Measure A Status Report, 2010
 
Egbe comprehensive college egbe - draft rehabilitation plan 2017 ver2
Egbe comprehensive college   egbe - draft  rehabilitation plan 2017 ver2Egbe comprehensive college   egbe - draft  rehabilitation plan 2017 ver2
Egbe comprehensive college egbe - draft rehabilitation plan 2017 ver2
 
School for Kids Vietnam 2014 in Ha Giang - Detailed project
School for Kids Vietnam 2014 in Ha Giang - Detailed projectSchool for Kids Vietnam 2014 in Ha Giang - Detailed project
School for Kids Vietnam 2014 in Ha Giang - Detailed project
 
renovation presentation
renovation presentationrenovation presentation
renovation presentation
 
Marquette Engineering Hall
Marquette Engineering HallMarquette Engineering Hall
Marquette Engineering Hall
 
Woodburn booklet web
Woodburn booklet webWoodburn booklet web
Woodburn booklet web
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_
 
SCSD 1 Facilities Master Plan
SCSD 1 Facilities Master PlanSCSD 1 Facilities Master Plan
SCSD 1 Facilities Master Plan
 
Sra Pou Vocational School For The Team
Sra Pou Vocational School For The TeamSra Pou Vocational School For The Team
Sra Pou Vocational School For The Team
 
Successful green schools
Successful green schoolsSuccessful green schools
Successful green schools
 
Professional Portfolio
Professional PortfolioProfessional Portfolio
Professional Portfolio
 
Bond Informational Slideshow
Bond Informational SlideshowBond Informational Slideshow
Bond Informational Slideshow
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_
 
Noyaa project REPORT
Noyaa project REPORTNoyaa project REPORT
Noyaa project REPORT
 
2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review
 
Ici final pdf
Ici final  pdfIci final  pdf
Ici final pdf
 
Senior Project Proposal Form
Senior Project Proposal FormSenior Project Proposal Form
Senior Project Proposal Form
 

Kürzlich hochgeladen

定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一z zzz
 
LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024Bruce Bennett
 
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改yuu sss
 
美国SU学位证,雪城大学毕业证书1:1制作
美国SU学位证,雪城大学毕业证书1:1制作美国SU学位证,雪城大学毕业证书1:1制作
美国SU学位证,雪城大学毕业证书1:1制作ss846v0c
 
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一A SSS
 
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一A SSS
 
Unlock Your Creative Potential: 7 Skills for Content Creator Evolution
Unlock Your Creative Potential: 7 Skills for Content Creator EvolutionUnlock Your Creative Potential: 7 Skills for Content Creator Evolution
Unlock Your Creative Potential: 7 Skills for Content Creator EvolutionRhazes Ghaisan
 
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证nhjeo1gg
 
办理(Salford毕业证书)索尔福德大学毕业证成绩单原版一比一
办理(Salford毕业证书)索尔福德大学毕业证成绩单原版一比一办理(Salford毕业证书)索尔福德大学毕业证成绩单原版一比一
办理(Salford毕业证书)索尔福德大学毕业证成绩单原版一比一diploma 1
 
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一z xss
 
Protection of Children in context of IHL and Counter Terrorism
Protection of Children in context of IHL and  Counter TerrorismProtection of Children in context of IHL and  Counter Terrorism
Protection of Children in context of IHL and Counter TerrorismNilendra Kumar
 
AI ppt introduction , advandtage pros and cons.pptx
AI ppt introduction , advandtage pros and cons.pptxAI ppt introduction , advandtage pros and cons.pptx
AI ppt introduction , advandtage pros and cons.pptxdeepakkrlkr2002
 
Human Rights are notes and helping material
Human Rights are notes and helping materialHuman Rights are notes and helping material
Human Rights are notes and helping materialnadeemcollege26
 
ME 205- Chapter 6 - Pure Bending of Beams.pdf
ME 205- Chapter 6 - Pure Bending of Beams.pdfME 205- Chapter 6 - Pure Bending of Beams.pdf
ME 205- Chapter 6 - Pure Bending of Beams.pdfaae4149584
 
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样umasea
 
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书saphesg8
 
Ioannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfIoannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfjtzach
 
Digital Marketing Training Institute in Mohali, India
Digital Marketing Training Institute in Mohali, IndiaDigital Marketing Training Institute in Mohali, India
Digital Marketing Training Institute in Mohali, IndiaDigital Discovery Institute
 

Kürzlich hochgeladen (20)

定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一
 
Students with Oppositional Defiant Disorder
Students with Oppositional Defiant DisorderStudents with Oppositional Defiant Disorder
Students with Oppositional Defiant Disorder
 
LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024
 
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
 
美国SU学位证,雪城大学毕业证书1:1制作
美国SU学位证,雪城大学毕业证书1:1制作美国SU学位证,雪城大学毕业证书1:1制作
美国SU学位证,雪城大学毕业证书1:1制作
 
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一
 
Young Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort Service
Young Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort ServiceYoung Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort Service
Young Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort Service
 
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
 
Unlock Your Creative Potential: 7 Skills for Content Creator Evolution
Unlock Your Creative Potential: 7 Skills for Content Creator EvolutionUnlock Your Creative Potential: 7 Skills for Content Creator Evolution
Unlock Your Creative Potential: 7 Skills for Content Creator Evolution
 
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
 
办理(Salford毕业证书)索尔福德大学毕业证成绩单原版一比一
办理(Salford毕业证书)索尔福德大学毕业证成绩单原版一比一办理(Salford毕业证书)索尔福德大学毕业证成绩单原版一比一
办理(Salford毕业证书)索尔福德大学毕业证成绩单原版一比一
 
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
 
Protection of Children in context of IHL and Counter Terrorism
Protection of Children in context of IHL and  Counter TerrorismProtection of Children in context of IHL and  Counter Terrorism
Protection of Children in context of IHL and Counter Terrorism
 
AI ppt introduction , advandtage pros and cons.pptx
AI ppt introduction , advandtage pros and cons.pptxAI ppt introduction , advandtage pros and cons.pptx
AI ppt introduction , advandtage pros and cons.pptx
 
Human Rights are notes and helping material
Human Rights are notes and helping materialHuman Rights are notes and helping material
Human Rights are notes and helping material
 
ME 205- Chapter 6 - Pure Bending of Beams.pdf
ME 205- Chapter 6 - Pure Bending of Beams.pdfME 205- Chapter 6 - Pure Bending of Beams.pdf
ME 205- Chapter 6 - Pure Bending of Beams.pdf
 
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
 
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
 
Ioannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfIoannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdf
 
Digital Marketing Training Institute in Mohali, India
Digital Marketing Training Institute in Mohali, IndiaDigital Marketing Training Institute in Mohali, India
Digital Marketing Training Institute in Mohali, India
 

Methods and Materials Term Paper

  • 1. Elgin Local Schools K-12 Project Construction Systems Management 4660 Dr. Tom Marshall Zach Himler 4/17/13 (MLA Format)
  • 2. Introduction I live in Marion, Ohio, and in Marion there is a school district that is known as Elgin Local Schools. This is the school district that I graduated from in May of 2009. The schools in this district are very old and are very out of date. Most of the schools were built clear back into the late 1800’s early 1900’s. They tend to be smaller in size and falling apart. Not only do you have these issues to worry about, but the whole district is located around the Scioto River that runs through La Rue, Green Camp, and Prospect and eventually down through the Columbus area. The school buildings are located in the flood plain area near the river, so every time the river rises, the buildings flood and have water sitting in them. Several rooms and bathrooms would have standing water in them for days until the water would go down or be pumped out. Many of the bathroom toilets and sinks would have backflow come up through the plumbing and flood even more. Because of these horrible conditions, the school district has been trying to pass a levy for several years to get a new school building built. Finally, in 2008, the levy passed and new buildings are currently being built. I will discuss several things about this project including more of a description, project funding, how it is relevant to Construction Systems Management 4660, and some of the challenges of the project(Schreck, 2010). Project Description The current school district has all of the buildings spread out over the entire district having a building located in the major towns of the district. There are currently two elementary schools, one middle school, and one high school, and all of these buildings are very old and need updated. The new building for the district will be one huge building that will have the elementary school, middle school, and high school all in one building and will close down the old buildings completely. Some of them may even be torn down. The new building is known as the new Elgin K-12 School project, and is in the construction management hands of Turner Construction (Elgin, 2012). The construction for the $35 million building started on March 14, 2012 which lead into pouring the first footing the next day on March 15, 2012. Remembering back to a year ago to when this part of the project was going on, the weather was extremely warm and sunny which allowed for the work to move very smoothly and quickly. Because of this great weather, the last
  • 3. footing had been poured by April 11, 2012 which was two weeks ahead of the scheduled date. Being two weeks ahead of schedule allowed the masonry crews to get an early start to building the concrete walls. This is very critical because the building is scheduled to be built through building enclosure, so the walls need to be done first before the rest of the project can move forward. The building enclosure is scheduled to be finished by December of 2012 and they were right on-time, even a little ahead of schedule. The school has 165,800 square feet of space to use which includes a main gym and an auxiliary gym. There is no auditorium because the district will reuse the current auditorium plus the cafeteria is made to be used as an auditorium if needed because there is a stage up front. There is a courtyard in the middle of the building that the building itself is built around. The building’s shell is built and everything that is left to do is mostly interior. The project is still about ten days ahead of schedule, and it is scheduled to be finished in the summer of 2013 just in time for school to start in September (Schreck, 2010). Project Funding The originalconstruction plans were going to use the same site that the building is currently resting in now as the site for the new building and basically renovating the original building to make it up-to-date. Elgin Schools and Turner Construction researched more into this idea and found out that this plan would lay the new building into the 100-year flood plain and would actually be at a lower elevation than what the current building sits. This means that there would have to be tons and tons of dirt brought in to raise the elevation of the building to get it out of the 100-year flood plain. I interviewed Steve Hoyt who is the Project Executive for Turner Construction. He told me that Turner Construction thought that Elgin should think about moving the location of the project to a different site to save money and have less work just to lift the new building’s elevation. He told me that it would cost $1.5 million to do all this dirt work. Elgin then decided to buy 35 acres of land across the street from the current building for $200,000 and move the site to this new location. Not only did this save money, but it causes less disruption on the students and the school functions that go during and after school hours (Hoyt, 2013). Elgin Local Schools had to pass a levy by the people who live in the district to get the new school approved and built. The levy would use some money given by the state to use on the project and the rest would come from the school district. The taxpayers passed the levy that included a combined $7.49 million, 28 year bond issue and a $1 million continuous improvement
  • 4. levy. The bond issue covers the local share of a $35 million building project that included $20 million from the Ohio School Facilities Commission Fund(Schreck, 2010). Relevance to CSM 4660 This project relates to the Peurifoy textbook for our class in several of the chapters out of the book. The first way is that there was a bunch of earthwork that was done to prepare the footing to be poured and set into place. This is included in Chapter 1 (Machines Make it Possible), Chapter 2 (Equipment Economics), Chapter 3 (Planning for Earthwork Construction), Chapter 7 (Dozers), Chapter 8 (Scrapers), Chapter 9 (Excavators), Chapter 10 (Trucks and Hauling Equipment), Chapter 11 (Finishing Equipment), and Chapter 16 (Concrete and Concrete Equipment). Chapter 1 is involved because there are machines involved in this project. Chapter 2 is included because there has to be costs figured up for every aspect of the project. Chapter 3 is all of the planning of the earthwork. Chapters 7, 8, 9, 10, and 11 includes dozers, scrapers, excavators, trucks and hauling equipment, and finishing equipment, and all of these were used in this project. Chapter 16 is concrete and concrete equipment, and concrete is used on most projects including this one. It is very rare to find a project that doesn’t have concrete used(Peurifoy, Schexnayder, Shapira, and Schmitt). Project Challenges There were several challenges of this project that had to be dealt with during the construction. One challenge was dealing with the elevation of the project and making sure the building is out of the 100-year flood plain that surrounds the whole construction site area. They brought in enough dirt to raise the building out of the flood plain. Another challenge that I have already talked about was how the placement of the building could save money, so they had to find the right location to start building. The third challenge was with funding from the Ohio School Facilities Commission Fund. The number of students who attend school in the Elgin Local School district has been decreasing years now and the state of Ohio has lowered the amount of funding that is going to be given to the project. A fourth challenge was dealing with one of the workers having a heart attack while working on the job. There are several challenges that follow an incident like this. They include, but aren’t limited to, dealing with OSHA, and
  • 5. helping the family get through incident and helping them. These were just some of the challenges of this project (Hoyt, 2013). Conclusion This $35 million project has had many positives with it and many challenges as well. The Elgin Local Schools K-12 project is currently ahead of schedule by about ten days. If the progress keeps up at this rate, the project should be finished with days to spare before school starts in the fall. The project has been a huge success so far, with the exception of the one incident, and Turner Construction, the Elgin community, and the students are all looking forward to seeing the building after completion and just enjoying the new building.
  • 6. "Elgin Local Schools."Elgin Local Schools ISD News.N.p., n.d. Web. 17 Apr. 2013. <http://www.elginschools.org/content_page.aspx?cid=42. Hoyt, Steve. Personal Interview. 15 Mar 2013. Peurifoy, Robert, Clifford Schexnayder, AviadShapira, and Robert Schmitt.8th Edition. New York: McGraw-Hill Companies, Inc., 2006. Print. Schreck, Justin. "Justin Schreck." Elgin building site moved across the road . Blogger, 09 Jun 2010. Web.Web. 17 Apr. 2013. <http://j-dogthe2.blogspot.com/2010/06/elgin-buildingsite-moved-across-road.html>.