Mobile Network Optimisation is dedicated to mobile operators to learn the strategies and solutions that would optimise the capacity and improve the performance of their networks to ensure optimal QoS and prevent churn. Operators will also explore how they can effectively manage capacity when evolving their networks to 4G to cope with future customer needs.
1. op ook re yo
Plu to s
Produced by:
s b ecu
50
er and ur e
at pa ar
or y b ly b
%
di y 18 ird
Mobile Network
sc th pric
ou Ma e!
nt rch
Optimisation
6th-9th June 2011 Courtyard by Marriott Vienna Messe, Austria
Learn how to develop the tools and strategies to manage the increase in data
traffic and to optimise network capacity, service performance and customer
experience across 3G and 4G networks
14 Operator Case Studies Led By: key Issues To Be Addressed:
Matthias Sauder Hear how to overcome the critical optimisation challenges associated
Head of Access Engineering, with the migration to LTE
Design & Optimisation
Learn how to develop a frequency planning strategy to meet network
Vodafone Germany
capacity requirements
Uwe Löwenstein Understand how to develop and integrate the tools and KPIs required
Spectrum Technology Manager to optimise service quality management and customer experience
Telefónica O2 Germany
Determine how to achieve effective offloading and how to overcome
Terje Engebretsen the associated technical challenges
Radio Planner,
GSM & WCDMA/UMTS Network
Telenor Norway “Exchange ideas around new str es to optimise your network that will
ategi
Omer Goc ensure sustainability for the future”
Radio & Transport Network Matthias Sauder
Optimisation Manager Head of Access Engineering, Design & Optimisation
Turkcell Vodafone Germany
Dr. Jakov Stojanovic
Network Quality Planning Manager PLUS, TAkE ADVANTAGE OF THE ADDITIONAL
Telenor Serbia
LEARNING OPPORTUNITIES
Dr. Vasiliy Pantov
Head of Services & Network PRE-CONFERENCE WORkSHOP MONDAY 6TH JUNE 2011
Performance Management Department - Determining how to integrate femtocells with your network planning
Kyivstar strategy to effectively manage increasing data traffic
Sponsors: POST-CONFERENCE WORkSHOP THURSDAY 9TH JUNE 2011
- Scrutinising the costs, benefits and effectiveness of using SON to
optimise network performance
“An excellent opportunity to gain valuable insight into the latest optimisation
techniques to deliver enhanced network performance”
Giovanni Romano
Radio Standards Coordinator
Telecom Italia
Register now at www.mobilenetworkoptimisation.com
2. Is your network struggling to handle increasing and more complex Case Studies
data traffic? With mobile data traffic forecast to rise 40-fold over Not To Be Missed:
the next five years (Coda Research Consultancy), is your network
Hear how Vodafone Germany
ready to support this?
are overcoming the challenges
If, like the 40+ specialists I spoke to in my research, these questions are keeping you of optimising Europe’s first 800
awake at night, book your place at Mobile Network Optimisation to find some solutions. MHz LTE network
Gain expert advice from operators from across Europe and the Middle East on how
to optimise the performance and capacity of your network. Find out what strategies See how Telefónica O2
you can use to ensure the cost-effective management of your data traffic and to Germany are managing the
enhance the customer experience. spectrum requirements for IMT
More specifically, key presentations will discuss how to: and IMT-Advanced (4G) networks
Accurately forecast and manage changes in network traffic
Establish how Telenor Serbia
Overcome the optimisation challenges when migrating to an LTE network
have integrated customer-
Use offloading to reduce the strain on your networks centric KPIs into their
Manage spectrum requirements for IMT-Advanced networks performance monitoring
Take advantage of a programme led by 14 operator case studies including: strategy to measure and
Head of Access Engineering, Design & Optimisation, Vodafone Germany enhance the customer
Head of Services & Network Performance Management Department, Kyvistar experience
Spectrum Technology Manager, Telefónica O2 Germany Understand how Kyivstar are
Network Quality Planning Manager, Telenor Serbia accurately forecasting and
Network Planning Optimisation Manager, Vodafone Turkey managing changes in traffic
Radio Standards Coordinator, Telecom Italia levels to deliver the right amount
VAS Performance Analyst, Etihad Etisalat Mobily of capacity to the right
We are delighted to offer all operators a 50% DISCOUNT off the standard
customers at the right time
conference price. Plus book and pay by 18th March to secure your early bird
price. Register now on +44 (0) 20 7368 9300
Learn from Etihad Etisalat
Mobily how to develop a
We look forward to seeing you at the event in June. P.S D
o broadband network
Best regards prese wnload free
and rentations
performance monitoring
ww
strategy
from o sources
w. mobile
Net ur Mob
work O ile Hear how Vodafone España are
media ptimisation
om
centre managing HSPA networks to
n.c
Joanna Sturgess : ensure optimum data
et
at
io
wo performance
n
Conference Producer, Telecoms IQ
rk o pti mi s
Pre-Conference Workshop | Monday 6th June 2011
Registration and coffee will begin at 09.30.
The workshop will take place between 10.00 & 16.00 with appropriate breaks for lunch and refreshments.
Determining how to integrate femtocells with your network planning strategy to
effectively manage increasing data traffic
In this workshop delegates will discuss the benefits of using femtocells as a way to reduce the strain on the network
and enhance the customer experience. You will learn how to identify and overcome the challenges of integrating
femtocells with your network planning strategy.
Key issues to be addressed:
Evaluate the pros and cons of using open femtocells versus closed femtocells
Determine how to manage the traffic flow from femtocells back to the main network and ensure a seamless handover
Establish how to plan your existing frequency allocation and how to use femtocells to optimise your performance strategy
Understand how to manage interference between different layers in the network when using femtocells
Determine how to convince your customers to pay for offloading to enhance their network coverage and user experience
For updates on the workshop leader, please visit www.mobilenetworkoptimisation.com
Register now at www.mobilenetworkoptimisation.com
3. Post-Conference Workshop | Thursday 9th June 2011
Registration and coffee will begin at 09.30.
The workshop will take place between 10:00 & 16:00 with appropriate breaks for lunch and refreshments.
Scrutinising the costs, benefits and effectiveness of using SON to optimise network
performance
In this interactive session you will examine the effectiveness of using SON to automate the configuration and operation
of your network to optimise performance. Delegates will learn how SON can minimise OPEX and reduce the time it
takes to respond to network bottlenecks. In addition, delegates will evaluate the pros and cons of using SON to reduce
OPEX and increase network performance.
Key issues to be addressed:
Quantifying the costs of implementation against the OPEX savings that can be made
To what extent can SON be used on 2G and 3G networks as well as LTE?
Establishing which areas of the network require SON automation the most: Handover management, power control
To what extent can SON be used to automatically configure the network?
Identifying and overcoming the challenges of integrating SON with your legacy network architecture
For updates on the workshop leader, please visit www.mobilenetworkoptimisation.com
You Will Meet And Network With: Your Expert Speaker Panel Includes:
Matthias Sauder
Heads/Managers/Experts of: Western Europe Head of Access Engineering, Design & Optimisation
Radio Networks 20% Vodafone Germany
Eastern Europe
Radio Network Optimisation
Scandanavia Uwe Löwenstein
Network Planning 40% Spectrum Technology Manager
Radio Frequency Planning Middle East Telefónica O2 Germany
10%
Radio Performance Planning
Network Performance Dr. Vasiliy Pantov
Head of Services & Network Performance Management
Network Design 30% Department
Network Coverage Kyivstar
Giovanni Romano
Radio Standards Coordinator
Telecom Italia
Sponsors:
Aitor García Viñas
Radio-Frequency Telecommunications Engineer -
Design & Engineering Specialist
Vodafone España
Kenneth Helge Molnes
Capacity & Quality Planner, WCDMA & GSM Network
Telenor Norway
Meet Prospects For Your Mobile Planning, we can help you connect with your Robert Dimitrovski
Project Manager
Network Optimisation Solution: prospects. Our conferences attract senior
T-Mobile Croatia
80% of the delegates will use this event players responsible for budget allocation.
Zafer Genc
primarily to network. Position yourself as a For more information on
Network Planning Optimisation Manager
leading solution provider to global network sponsorship opportunities, contact: Vodafone Turkey
operators at Telecoms IQ’s Mobile Network Paul Williamson
Optimisation conference. Omer Goc
Sponsorship Sales Manager, Telecoms IQ
Radio & Transport Network Optimisation Manager
Attendees have an active interest +44 (0) 207 368 9500 Turkcell
in hearing from: Email: sponsor@iqpc.co.uk
Muhammad Al-Kilani
Network monitoring solution providers For more information on the VAS Performance Analyst, Network Performance
Traffic management solution providers conference programme and Management
Capacity management solution providers speaking opportunities, contact: Etihad Etisalat Mobily
Network planning solution providers (Awaiting final confirmation)
Joanna Sturgess
If you have a solution for Directors of Radio Conference Producer, Telecoms IQ Dr. Jakov Stojanovic
Networks, Directors of Radio Network +44 (0) 207 368 9300 Network Quality Planning Manager
Email: telecoms@iqpc.co.uk Telenor Serbia
Optimisation and Heads of Network
Miha Tomšič
Radio Network Engineer
Mobitel
Media Partners: Join Telecoms Networking
Andrey Seleznev
Head of Network Performance Management Unit
Forum on Kyivstar
Terje Engebretsen
Follow Telecoms IQ on Radio Planner, GSM & WCDMA/UMTS Network
Telenor Norway
@TelecomsForum
Register now by contacting us on +44 (0) 20 7368 9300
4. Conference Day One | Tuesday 7th June 2011
08.30 Registration and coffee 900, GSM 1800, UMTS and LTE
- Determining how many antennas are required and ensuring compliance
08.55 Welcome address with the WHO guidelines for EMR (Electromagnetic Radiation)
Joanna Sturgess, Conference Producer, Telecoms IQ - Discussing the options available when you are unable to extend an
09.00 Opening remarks from the Chair existing site due to a lack of space
Followed by Speed Networking - Establishing how to modify your cell sites whilst complying with
existing contractual requirements
09.20 Identifying and overcoming the challenges of optimising - Determining a timeline for the building of your future cell sites
Europe’s first 800 MHz LTE network Terje Engebretsen, Radio Planner for GSM & WCDMA/UMTS
- Understanding how to optimise an 800 MHz LTE network in order to Networks, Telenor Norway
assure quality and performance 14.50 Learning from T-Mobile Croatia’s experiences of developing
- Learning from the first field experiences which methodologies and a tool that optimises core network planning and service
KPIs can be used to optimise the network quality management
- Establishing how to overcome the challenges of migrating to a single - Defining the scope of the project: MSS, MGW, HLRd, CNTdB, PGW,
RAN network CDS, SGSN and GGSN
Matthias Sauder, Head of Access Engineering, Design & - Understanding how T-Mobile Croatia are collecting data from all
Optimisation, Vodafone Germany network elements:
• HWI data
10.00 Understanding how Telefónica O2 Germany are effectively • Configuration data
managing the spectrum requirements for IMT and IMT- • Performance measurement data
Advanced (4G) networks - Identifying and overcoming the challenges of using this tool to ensure
- Understanding the spectrum demand for IMT networks: effective core network planning and capacity management
Robert Dimitrovski, Project Manager, T-Mobile Croatia
• IMT / IMT-2000 / IMT-Advanced
• ITU and WRC-12 / WRC-16 15.30 Determining how to use small cells to optimise network
• Future spectrum demand quality
- Determining what spectrum should be used for each technology: - Analysing typical KPIs and their importance in measuring network quality
• GSM / UMTS / HSPA+ / LTE - Comparing and contrasting the different methods used to improve
• Carrier Aggregation network quality:
- Examining the minimum requirements for IMT-Advanced (4G) • Increasing macro coverage
Uwe Löwenstein, Spectrum Technology Manager, Telefónica O2 • Adding new network architectures: WLAN, pico cells, femtocells,
Germany small cells
10.40 Using Next Generation policy based data optimisation to - Analysing the architecture and key features of pico networks and
enhance the delivery of video services femto networks
- Determining how to measure and enhance the customers’ - Evaluating the pros and cons of using:
experience when using video services in: • Flat versus hierarchical networks
• Today’s networks • Combined macro/pico/femto E2E network
- Testing and integrating a combined macro/pico/femto network:
• Tomorrow’s congested networks
• Examining the architecture
- Understanding how to carry out congestion aware data optimisation • Determining which KPIs to use
- Establishing how to achieve effective, data optimisation in LTE Dirk Zetzsche, Director, Nash Technologies
networks
- Learning from proven case studies and field data how to optimise 16.10 Afternoon refreshments
video service quality
Yehuda Elmaliach, CTO, Mobixell 16.30 Establishing how Kyivstar are accurately forecasting and
managing changes in traffic levels
11.20 Morning refreshments - Examining Kyivstar’s dynamic forecasting approach based on
quarterly voice and data traffic predictions
11.50 The spectrum challenge: Understanding how Telecom Italia
- Understanding how Kyivstar are leveraging data forecasts to ensure
are managing service deployment in new frequency bands to
there is enough capacity in the network to support it
deliver the required network capacity
- Evaluating the trade-off between supporting the demand in data
- Examining different migration scenarios from a 3G to an LTE network traffic, providing the required QoS and minimising your costs
- Determining which bands need to be implemented to ensure the - Determining how to improve network development strategies to
minimal level of roaming effectively meet business targets:
- Determining how to manage new spectrum and assessing the impact • Leveraging marketing activities as a driver to enhance your network
it has on your existing network and terminals evolution strategies
- Discussing how multi-carrier and multi-band is effective in achieving • Testing new services prior to launching them
very high bit rates • Analysing the performance requirements of customer devices
Giovanni Romano, Radio Standards Coordinator, Telecom Italia (specifically dongles) and understanding how to manage their
12.30 Examining Mobitel’s frequency planning strategy in a 3G demand on network capacity
environment Dr. Vasiliy Pantov, Head of Services & Network Performance
Management Department, Kyivstar
- Understanding the rationale behind implementing a second carrier
& Dr. Igor Yereshchenko, Head of Radio Planning Department,
into the network
Kyivstar
- Identifying the triggers that should be used to determine when to
implement a second carrier in the network 17.10 Roundtable Discussion Session
- Determining whether the network requires a third carrier Take advantage of this facilitated discussion session to share best
- Evaluating the benefits of implementing a third carrier into your practice and benchmark your strategies in Mobile Network
network to optimise performance and QoS Optimisation. Delegates will have the opportunity to participate in
Miha Tomšič, Radio Network Engineer, Mobitel two out of three discussion sessions. At the end of each session, the
facilitator for each group will summarise the key findings before
13.10 Lunch opening up the discussion to the floor.
14.10 Examining how Telenor Norway are designing and evolving Topic 1: Establishing how to develop a cost-effective network
optimisation strategy to radically improve QoS
their cell sites to optimise network performance
Often the focus on optimisation in mobile networks is related to traffic Topic 2: Evaluating the efficiency and limitations of common
management, the use of measuring tools and advanced algorithms. KPIs used for increasing network performance
Telenor Norway have decided to focus on the optimisation of cell sites. Topic 3: Determining how to enhance the performance and
- Understanding how Telenor Norway are finding new cell sites capacity of your network to manage data traffic
- Identifying and managing the optimisation challenges associated effectively
with building a new site versus modifying an existing site 18.10 Closing remarks from the Chair
- Overcoming the difficulties associated with placing multiple antennas
for multiple technologies that are supplied by different vendors: GSM 18.20 End of conference day one
Register now by contacting us on +44 (0) 20 7368 9300
6. Mobile Network Optimisation
To speed registration, please provide the priority code located on the mailing label or in the box below.
5 WAYS TO REGISTER
Online: www.mobilenetworkoptimisation.com
My registration code is
Tel: +44 (0) 20 7368 9300
Please contact our database manager on +44 (0) 20 7368 9300 or at database@iqpc.co.uk quoting the registration Fax: +44 (0) 20 7368 9301
code above to inform us of any changes or to remove your details.
Monday 6th June 2011 Pre-Conference Workshop:
Email: telecoms@iqpc.co.uk
Determining how to integrate femtocells with your network planning strategy to effectively manage increasing data traffic Post: your booking form to
Tuesday 7th - Wednesday 8th June 2011 Two-Day Conference
IQPC Ltd,
Thursday 9th June 2011 Post-Conference Workshop:
Scrutinising the costs, benefits and effectiveness of using SON to optimise network performance 2nd Floor,
129 Wilton Road,
Discounted Operator Rates**
London, SW1V 1JZ
Package Tick Book and pay before Book and pay before Standard Price
18th March 2011 * 13th May 2011 *
Full Access Pass
Pre-Conference Workshop Two-Day Conference Save €350 Save €150
Team Discounts*
Post-Conference Workshop IQPC recognises the value of learning in teams. Groups of 3 or more booking at the
€1,449 + VAT € 1,649 + VAT € 1,799 + VAT
same time from the same company receive a 10% discount. 5 or more receive a
Three Day Pass
Two-Day Conference AND Pre-Conference Workshop
15% discount. 7 receive a 20% discount. Only one discount available per person.
Save €250 Save €100 Team discounts are not applicable in conjunction with another discount.
OR Post-Conference Workshop
€ 1,149 + VAT € 1,299 + VAT € 1,399 + VAT
Two-Day Conference Save €120 Save €70
Two-Day Conference ONLY € 829 + VAT € 879 + VAT € 949 + VAT Venue and Accommodation
** Discounted Operator rates apply to company that provides public telecommunications services such as telephony and data communications
Venue: Courtyard by Marriott Vienna Messe Hotel, Trabrennstrasse 4, Vienna
1020 Austria
Vendor Rates Tel: + 43-1-72730 Website: https://www.marriott.com/hotels/travel/viefg-
Package Tick Book and pay before Book and pay before Standard Price courtyard-vienna-messe/
18th March 2011 * 13th May 2011 * Accommodation: Travel and accommodation is not included in the registra-
Full Access Pass tion fee. However a number of discounted bedrooms have been reserved at
Pre-Conference Workshop Two-Day Conference Save €700 Save €300 the Courtyard Hotel. Please call the hotel directly on +43 1 727 30 and quote
Post-Conference Workshop
€2,899 + VAT € 3,299 + VAT € 3,599 + VAT booking reference ‘IQPC’ to receive your discounted rate, prices start from
€144 plus taxes. There is limited availability so we do encourage attendees
Three Day Pass
Two-Day Conference AND Pre-Conference Workshop
to book early to avoid disappointment. Alternatively for a further selection of
Save €500 Save €200 hotels, please visit: http://www.4cityhotels.com/vienna.html www.4cityhotels.
OR Post-Conference Workshop
€ 2,299 + VAT € 2,599 + VAT € 2,799 + VAT com/vienna.html
Two-Day Conference Save €250 Save €150
Two-Day Conference ONLY € 1,649 + VAT € 1,749 + VAT € 1.899 + VAT Free Online Resources
* To qualify for discounts, payment must be received with booking by the registration deadline. Early booking discounts are not valid in conjunction with any
other offer. All prices are exclusive of Austria VAT at 20%. Austria VAT registration no. ATU66015858
To claim a variety of articles, podcasts and other free resources please visit
www.mobilenetworkoptimisation.com
Delegate Details
Please photocopy for each additional delegate
Digital Conference On CD-ROM
Mr Mrs Miss Ms Dr Other A digital version of the conference proceedings, including all
presentations, is available to buy.
First Name Family Name I cannot attend the event, please send me the CD Rom priced at
Job Title £599 plus VAT
Tel No. Mobile No. Recent digital conference available - £599 plus VAT
Email FTTx
Yes I would like to receive information about products and services via email Please send me conference materials indicated above.
Organisation I have filled out credit card details below
Nature of business For further information Please call: +44 (0) 20 7368 9300
Address or email: knowledgebank@iqpc.co.uk. To search IQPC’s archived conference
Postcode Country documentation visit: www.iqpcknowledgebank.com
Telephone Fax
Approving Manager Terms and Conditions
Name of person completing form if different from delegate: Please read the information listed below as each booking is subject to IQPC Ltd standard terms and conditions.
Signature Payment Terms: Upon completion and return of the registration form full payment is required no later than 5
business days from the date of invoice. Payment of invoices by means other than by credit card, or purchase
I agree to IQPC’s cancellation, substitution and payment terms order (UK Plc and UK government bodies only) will be subject to a €65 (plus VAT) per delegate processing fee.
Payment must be received prior to the conference date. We reserve the right to refuse admission to the conference
Special dietary requirements: Vegetarian Non-dairy Other (please specify) if payment has not been received.
Please indicate if you have already registered by Phone Fax Email Web
IQPC Cancellation, Postponement and Substitution Policy: You may substitute delegates at any time by
Please note: if you have not received an acknowledgement before the conference, please call us to confirm your booking. providing reasonable advance notice to IQPC.
For any cancellations received in writing not less than eight (8) days prior to the conference, you will receive a 90%
Payment Method credit to be used at another IQPC conference which must occur within one year from the date of issuance of such
credit. An administration fee of 10% of the contract fee will be retained by IQPC for all permitted cancellations. No
credit will be issued for any cancellations occurring within seven (7) days (inclusive) of the conference.
Total price for your Organisation: (Add total of all individuals attending): In the event that IQPC cancels an event for any reason, you will receive a credit for 100% of the contract fee paid.
You may use this credit for another IQPC event to be mutually agreed with IQPC, which must occur within one year
Card Type: VISA M/C AMEX from the date of cancellation.
In the event that IQPC postpones an event for any reason and the delegate is unable or unwilling to attend in on the
Card Number: rescheduled date, you will receive a credit for 100% of the contract fee paid. You may use this credit for another
Conference code 19922.001
Exp. Date: / Security Number / IQPC event to be mutually agreed with IQPC, which must occur within one year from the date of postponement.
Except as specified above, no credits will be issued for cancellations. There are no refunds given under any
circumstances.
Name On Card: Signature: IQPC is not responsible for any loss or damage as a result of a substitution, alteration or cancellation/postponement
of an event. IQPC shall assume no liability whatsoever in the event this conference is cancelled, rescheduled or
Billing Address (if different from below): postponed due to a fortuitous event, Act of God, unforeseen occurrence or any other event that renders performance
of this conference impracticable, illegal or impossible. For purposes of this clause, a fortuitous event shall include,
but not be limited to: war, fire, labour strike, extreme weather or other emergency.
City/County/Postcode Cheque enclosed for: € (Made payable to IQPC Ltd.) Please note that while speakers and topics were confirmed at the time of publishing, circumstances beyond the
control of the organizers may necessitate substitutions, alterations or cancellations of the speakers and/or topics.
(Please quote 19922.001 with remittance advice) As such, IQPC reserves the right to alter or modify the advertised speakers and/or topics if necessary without any
IQPC Bank details: HSBC Bank, 67 George Street, Richmond, Surrey, TW9 1HG. United Kingdom. liability to you whatsoever. Any substitutions or alterations will be updated on our web page as soon as possible.
Sort Code: 40 05 15, Account No: 59090618, IBAN Code: GB98 MIDL 4005 1559 0906 18 Discounts: All ‘Early Bird’ Discounts require payment at time of registration and before the cut-off date in order to
Swift Code: MIDLGB22 Account name: International Quality & Productivity Centre Ltd. receive any discount. Any discounts offered whether by IQPC (including team discounts) must also require payment
at the time of registration. All discount offers cannot be combined with any other offer
PAYMENT MUST BE RECEIVED PRIOR TO THE CONFERENCE
Please do not pass my information to any third party