SlideShare ist ein Scribd-Unternehmen logo
1 von 2
MATERIALS HANDLING Lead Reclaiming and  Ingot -Stacker Automation Fry's metals of Wadeville
Lead Reclaiming and Ingot -Stacker Automation In line with their philosophy of client relationship marketing, AGE Engineering undertook this project at Fry's metals of Wadeville during their annual end-of-year shutdown. Although small in size the process to be automated was quite sophisticated from the point of view of all the different processes that had to be brought together Lead reclamation has it's own characteristics and AGE Engineering had to firstly familiarise themselves with the reclamation process. Once that was done they had to write the process software for the ingot pouring, handling and stacking system.  In addition to the InTouch SCADA package, ControlWize made use of a Microsoft SQL Server with an Access data base for the train handling facility at the load-out station. The project included management, PLC engineering, equipment supply, installation and commissioning and took one man-month to execute. Being a shutdown there was no margin for error and the automation, using an Allen Bradley S5 PLC, went off smoothly with no technical hitches experienced at handover.  AGE Technologies  contact us: 011 869  3925    www.age.co.za

Weitere ähnliche Inhalte

Mehr von Site Web

Public testimonials
Public testimonialsPublic testimonials
Public testimonialsSite Web
 
E power Machine
E power MachineE power Machine
E power MachineSite Web
 
Water Treatment
Water TreatmentWater Treatment
Water TreatmentSite Web
 
Randgolds Lorraine Gold Mine
Randgolds Lorraine Gold MineRandgolds Lorraine Gold Mine
Randgolds Lorraine Gold MineSite Web
 
Tutuka Power Station
Tutuka Power StationTutuka Power Station
Tutuka Power StationSite Web
 
Pretoria Council Various Pumpstations
Pretoria Council Various PumpstationsPretoria Council Various Pumpstations
Pretoria Council Various PumpstationsSite Web
 
Matimba Power Station
Matimba Power StationMatimba Power Station
Matimba Power StationSite Web
 
Concast Water Treatment Iscor Vanderbijlpark
Concast Water Treatment Iscor VanderbijlparkConcast Water Treatment Iscor Vanderbijlpark
Concast Water Treatment Iscor VanderbijlparkSite Web
 

Mehr von Site Web (9)

Public testimonials
Public testimonialsPublic testimonials
Public testimonials
 
E power Machine
E power MachineE power Machine
E power Machine
 
Water Treatment
Water TreatmentWater Treatment
Water Treatment
 
Randgolds Lorraine Gold Mine
Randgolds Lorraine Gold MineRandgolds Lorraine Gold Mine
Randgolds Lorraine Gold Mine
 
Tutuka Power Station
Tutuka Power StationTutuka Power Station
Tutuka Power Station
 
Pretoria Council Various Pumpstations
Pretoria Council Various PumpstationsPretoria Council Various Pumpstations
Pretoria Council Various Pumpstations
 
Pb Sishen
Pb SishenPb Sishen
Pb Sishen
 
Matimba Power Station
Matimba Power StationMatimba Power Station
Matimba Power Station
 
Concast Water Treatment Iscor Vanderbijlpark
Concast Water Treatment Iscor VanderbijlparkConcast Water Treatment Iscor Vanderbijlpark
Concast Water Treatment Iscor Vanderbijlpark
 

Lead Reclaiming And Ingot Stacker Automation

  • 1. MATERIALS HANDLING Lead Reclaiming and Ingot -Stacker Automation Fry's metals of Wadeville
  • 2. Lead Reclaiming and Ingot -Stacker Automation In line with their philosophy of client relationship marketing, AGE Engineering undertook this project at Fry's metals of Wadeville during their annual end-of-year shutdown. Although small in size the process to be automated was quite sophisticated from the point of view of all the different processes that had to be brought together Lead reclamation has it's own characteristics and AGE Engineering had to firstly familiarise themselves with the reclamation process. Once that was done they had to write the process software for the ingot pouring, handling and stacking system. In addition to the InTouch SCADA package, ControlWize made use of a Microsoft SQL Server with an Access data base for the train handling facility at the load-out station. The project included management, PLC engineering, equipment supply, installation and commissioning and took one man-month to execute. Being a shutdown there was no margin for error and the automation, using an Allen Bradley S5 PLC, went off smoothly with no technical hitches experienced at handover. AGE Technologies contact us: 011 869 3925 www.age.co.za