Oil Pipeline Risks: Issues to consider

        By Louisette Lanteigne
         700 Star Flower Ave.
            Waterloo Ont.
              N2V 2L2

      butterflybluelu@rogers.com
Issue #1: Seisemic Risks & Pipeline Welds
Seismic Risks of Eastern Canada
http://www.earthquakescanada.nrcan.gc.ca/zones/eastcan-eng.php
Earthquakes & Oil Pipes




Pipeline damages from earthquakes can result in compression or
wrinkling, joint weld cracking or separation, bending or shear from
localized wrinkling and tension. Joints made with oxy-acetelyne welds
break 100 times more than those with electric arc welded joints .

      Source: USGS, The Shake Out Scenario Supplemental Study
  http://books.google.ca/books/about/The_ShakeOut_Scenario_Supplemental_Study.html?id=7PU1A6N3ZOAC&redir_esc=y
An earthquake occurs in the Western Quebec Seismic Zone
               every five days on average.
  http://www.earthquakescanada.nrcan.gc.ca/zones/eastcan-eng.php
A REVIEW OF NBCC 2005 SEISMIC HAZARD RESULTS FOR CANADA - THE INTERFACE
        TO THE GROUND AND PROGNOSIS FOR URBAN RISK MITIGATION
                        John Adams and Stephen Halchuk
             Geological Survey of Canada, Natural Resources Canada,
Earthquake risks should be identified within
EA applications of pipelines so we can set
reasonable design criteria to mitigate the
risks, particularly with regards to pipeline
welds.
Issue #2: Bacterium & PE tape
Spingomonas and Pseudomonas Eat Plastic

  In May 2008, 16 year old
  Canadian boy named Daniel
  Burd from Waterloo Collegiate
  Institute found and isolated two
  naturally occurring bacterium,
  Spingomonas and
  Pseudomonas, that literally eats
  plastic.
  He stored Spingomonas and
  Pseudomonas at 37 degree
  Celsius with plastic and in six
  weeks time, 43% of the plastic
  was consumed.




http://wiki.duke.edu/download/attachments/10715770/08burdreport.pdf
Spingomonas and Pseudomonas
naturally occurs in Canadian soil and water.




 Enbridge pipelines travel across farmlands and waterways. These
 areas are suitable for Spingomonas and Pseudomonas because the
 bacterias thrives off nitrates in these locations.
            To read Daniel Bird's study please visit here:
      https://wiki.duke.edu/download/attachments/10715770/08BurdReport.pdf
Example of a PE tape issue;
     Kalamazoo Michigan Enbridge Oil Spill, 2010




The National Transportation Safety Board (NTSB) determines that the
probable cause of the pipeline rupture was corrosion fatigue cracks
that grew and coalesced from crack and corrosion defects under dis-
bonded polyethylene tape coating, producing a substantial crude oil
release that went undetected by the control centre for over 17 hours .
Questions:



Is there any data to either prove or disprove the role that
 Spingomonas and Pseudomonas may play in regards to “tenting”
 issues of PE tape?
Warmer weather and longer growing seasons associated with climate
change may serve to increase the presence of these bacterium in the
natural environment. If these bacteria are an issue, what measures
can we take to avert risk in existing pipes?
How can we monitor for issues related to this?
Issue #3: Climate Change:
Plan for hotter, wetter weather
Example: Rain and extream heat expected for the city
                of Toronto by 2040

  Toronto will see almost 40 days per year with a
  humidex over 40˚C (current average is 9 per year).
  Heat waves (3+ days of 32˚C) will occur 5 times a
  year, instead of once every two years.
  We'll see 80% more summer rain in July, 50% more in
  August.
  Extreme rain events will almost triple in size to
  166mm in 24hrs from the current 66 mm.
Source: TORONTO'S FUTURE WEATHER & CLIMATE
      DRIVER STUDY: OUTCOMES REPORT

                  Summary of the SENES
                  Consultants Ltd Study by
                 Toronto Environment Office
                      October 30, 2012

http://www.toronto.ca/legdocs/mmis/2012/pe/bgrd/backgroundfile-51653.pdf
Enbridge's 'Line 9' pipeline exposed in the Rouge River,
 Toronto. Credit: Adam Scott/Environmental Defence
Pipelines and Aquifers: the need to examine
groundwater influences of subsurface geology
Topography isn't enough to delineate
     watersheds or prevent water risks.




.
Draw down effects bring contaminates towards the nearest wells
regardless of topography. Professor Mike Stone: chloride loadings to
              Waterloo Regional wells reveals this fact.
Understanding the subsurface geology and localized well
   data in proximity to pipes can help contain spills.

  Mapping subsurface geology is critical data to have in
  order to quickly and reasonably isolate and contain spills.
  It allows us to view which aquifers may be impacted,
  which wells to shut off to immediately stop the draw down
  spread of contaminates shoud a spill occur.
  EA processes could mandate that firms have that data
  prior to final approvals in order to make sure they are
  reasonably capable of swift responses should a spill occur
  along that route.
Arctic Risk #1 Upheaval buckling

Thermal expansion occurs when a buried steel pipeline is
operated at a temperature and pressure higher than that
experienced during installation. In hard frozen areas the pipeline
is not free to expand so the axial compressive force serves to
push the pipe up leading to risks of ruptures.
Arctic Risk #2: Ice gouging by pressure ridges
    and icebergs in shallow water depths.
Arctic Risk #3: Permafrost thaw settlement.
Arctic Risk #4 Strudel Scour
Strudel scour occurs when fresh water in rivers and streams flows over frozen ice along the
shores. The overflow water drains through cracks, holes, even breathing holes in ice sheets
                     eroding supporting sediments underneith pipes.
What is a reasonable depth to avoid these risks?


Based on the literature review of the research on subgouge
deformations, the industry is still in need of direct rule of thumb that
provides safe and economical burial depth for pipelines. From one
hand, pipes must be trenched sufficiently far beneath the influence
zone of soil displaced below ice keel to limit pipe bending to
acceptable limits. On the other hand, designers must not go to an
over-conservative solution and consequently a non-economical
one. Therefore, the desired burial depth is the minimum depth
needed for the survival of the pipeline during its design life time.
Such depth has not been established.

Source: The Technical Challenges of Designing Oil and Gas
Pipelines in the Arctic - Basel Abdalla PhD PE, Paul Jukes PhD,
Ayman Eltaher PhD PE, and Billy Duron
Issue #5: The Public Finds the Spills.

 A newly published draft report by the US department of
 Transportation Pipeline and Hazardous Materials Safety
 Administration reveals that it is up to the public to find oil and gas
 leaks.
 Pipeline leaks, ruptures and spills are “systematically causing more
 and more property damage…in a bad year you can have up to $5
 billion in property damages due to pipeline related accidents.”
 Given the volume of public property damage, pipeline companies
 would be “probably justified” in spending $490,000 a year for every
 400 miles of pipeline but the reality is that “right now companies might
 spend a tenth of that figure."
              Here is a published news article regarding this:
http://oilandgas-investments.com/2012/energy-services/leak-detection-pipeline-industry/
Here is the link to the actual Draft report:
             U.S. Department of Transportation
  Pipeline and Hazardous Materials Safety Administration
Draft Report: Leak Detection Study – DTPH56-11-D- 000001

   Dr. David Shaw, Dr. Martin Phillips, Ron Baker, Eduardo Munoz,
        Hamood Rehman, Carol Gibson, Christine Mayernik

                         September 28, 2012
        https://primis.phmsa.dot.gov/meetings/FilGet.mtg?fil=397


This report clearly shows that we need more money invested in prevention
            and better science to reasonably mitigate the risks!

Weitere ähnliche Inhalte

Ähnlich wie Pipelinespillsprevention

Enbridge line 9 earthquake risks
Enbridge line 9 earthquake risksEnbridge line 9 earthquake risks
Enbridge line 9 earthquake riskslouisette lanteigne
 
Lanteigne on Darlington Nuclear Plant
Lanteigne on Darlington Nuclear PlantLanteigne on Darlington Nuclear Plant
Lanteigne on Darlington Nuclear Plantlouisette lanteigne
 
Lanteigneredarlingtonnuclearplant 121015183235-phpapp01
Lanteigneredarlingtonnuclearplant 121015183235-phpapp01Lanteigneredarlingtonnuclearplant 121015183235-phpapp01
Lanteigneredarlingtonnuclearplant 121015183235-phpapp01Louisette Lanteigne
 
Lanteigne re: nuclear waste dump planned by Lake Huron
Lanteigne re: nuclear waste dump planned by Lake Huron Lanteigne re: nuclear waste dump planned by Lake Huron
Lanteigne re: nuclear waste dump planned by Lake Huron louisette lanteigne
 
Friends of the UNB Woodlot - 2nd Presentation to the Public Safety and Enviro...
Friends of the UNB Woodlot - 2nd Presentation to the Public Safety and Enviro...Friends of the UNB Woodlot - 2nd Presentation to the Public Safety and Enviro...
Friends of the UNB Woodlot - 2nd Presentation to the Public Safety and Enviro...friendsoftheunbwoodlot
 
10WORKPLACE SAFETYWorkplace SafetyBUS 642.docx
10WORKPLACE SAFETYWorkplace SafetyBUS 642.docx10WORKPLACE SAFETYWorkplace SafetyBUS 642.docx
10WORKPLACE SAFETYWorkplace SafetyBUS 642.docxpaynetawnya
 
Lanteignerenuclearwastelakehuron 120711130433-phpapp01
Lanteignerenuclearwastelakehuron 120711130433-phpapp01Lanteignerenuclearwastelakehuron 120711130433-phpapp01
Lanteignerenuclearwastelakehuron 120711130433-phpapp01Louisette Lanteigne
 
Fact Sheet Hydraulic Fracturing
Fact Sheet Hydraulic FracturingFact Sheet Hydraulic Fracturing
Fact Sheet Hydraulic FracturingSantos Ltd
 
Fracking and Misson
Fracking and MissonFracking and Misson
Fracking and Missonclintspoon
 
David Farkas_Dissertation_Final
David Farkas_Dissertation_FinalDavid Farkas_Dissertation_Final
David Farkas_Dissertation_FinalDavid Farkas
 
Green it overview jan 6 2011
Green it overview jan 6 2011Green it overview jan 6 2011
Green it overview jan 6 2011Bill St. Arnaud
 
Last Updated October 31, 2011Hydrofracking Is hydraulic fractu.docx
Last Updated October 31, 2011Hydrofracking Is hydraulic fractu.docxLast Updated October 31, 2011Hydrofracking Is hydraulic fractu.docx
Last Updated October 31, 2011Hydrofracking Is hydraulic fractu.docxsmile790243
 
How PRAGMA Can Help Save the Planet
How PRAGMA Can Help Save the PlanetHow PRAGMA Can Help Save the Planet
How PRAGMA Can Help Save the PlanetLarry Smarr
 
The Vale Brazilian Dam Collapse: An Ethical and Engineering Disaster
The Vale Brazilian Dam Collapse: An Ethical and Engineering DisasterThe Vale Brazilian Dam Collapse: An Ethical and Engineering Disaster
The Vale Brazilian Dam Collapse: An Ethical and Engineering DisasterAJSERJournal
 

Ähnlich wie Pipelinespillsprevention (20)

Enbridge line 9 earthquake risks
Enbridge line 9 earthquake risksEnbridge line 9 earthquake risks
Enbridge line 9 earthquake risks
 
Lanteigne on Darlington Nuclear Plant
Lanteigne on Darlington Nuclear PlantLanteigne on Darlington Nuclear Plant
Lanteigne on Darlington Nuclear Plant
 
Lanteigneredarlingtonnuclearplant 121015183235-phpapp01
Lanteigneredarlingtonnuclearplant 121015183235-phpapp01Lanteigneredarlingtonnuclearplant 121015183235-phpapp01
Lanteigneredarlingtonnuclearplant 121015183235-phpapp01
 
Keystone XL Feedback
Keystone XL FeedbackKeystone XL Feedback
Keystone XL Feedback
 
Proc,Air,Water_July 2016
Proc,Air,Water_July 2016Proc,Air,Water_July 2016
Proc,Air,Water_July 2016
 
Lanteigne re: nuclear waste dump planned by Lake Huron
Lanteigne re: nuclear waste dump planned by Lake Huron Lanteigne re: nuclear waste dump planned by Lake Huron
Lanteigne re: nuclear waste dump planned by Lake Huron
 
Friends of the UNB Woodlot - 2nd Presentation to the Public Safety and Enviro...
Friends of the UNB Woodlot - 2nd Presentation to the Public Safety and Enviro...Friends of the UNB Woodlot - 2nd Presentation to the Public Safety and Enviro...
Friends of the UNB Woodlot - 2nd Presentation to the Public Safety and Enviro...
 
Sasha Fracking
Sasha FrackingSasha Fracking
Sasha Fracking
 
10WORKPLACE SAFETYWorkplace SafetyBUS 642.docx
10WORKPLACE SAFETYWorkplace SafetyBUS 642.docx10WORKPLACE SAFETYWorkplace SafetyBUS 642.docx
10WORKPLACE SAFETYWorkplace SafetyBUS 642.docx
 
Lanteignerenuclearwastelakehuron 120711130433-phpapp01
Lanteignerenuclearwastelakehuron 120711130433-phpapp01Lanteignerenuclearwastelakehuron 120711130433-phpapp01
Lanteignerenuclearwastelakehuron 120711130433-phpapp01
 
Fact Sheet Hydraulic Fracturing
Fact Sheet Hydraulic FracturingFact Sheet Hydraulic Fracturing
Fact Sheet Hydraulic Fracturing
 
Fracking and Misson
Fracking and MissonFracking and Misson
Fracking and Misson
 
David Farkas_Dissertation_Final
David Farkas_Dissertation_FinalDavid Farkas_Dissertation_Final
David Farkas_Dissertation_Final
 
Fracking 14
Fracking 14Fracking 14
Fracking 14
 
Green it overview jan 6 2011
Green it overview jan 6 2011Green it overview jan 6 2011
Green it overview jan 6 2011
 
Last Updated October 31, 2011Hydrofracking Is hydraulic fractu.docx
Last Updated October 31, 2011Hydrofracking Is hydraulic fractu.docxLast Updated October 31, 2011Hydrofracking Is hydraulic fractu.docx
Last Updated October 31, 2011Hydrofracking Is hydraulic fractu.docx
 
02_WP-CPL_0702_LR
02_WP-CPL_0702_LR02_WP-CPL_0702_LR
02_WP-CPL_0702_LR
 
How PRAGMA Can Help Save the Planet
How PRAGMA Can Help Save the PlanetHow PRAGMA Can Help Save the Planet
How PRAGMA Can Help Save the Planet
 
The Vale Brazilian Dam Collapse: An Ethical and Engineering Disaster
The Vale Brazilian Dam Collapse: An Ethical and Engineering DisasterThe Vale Brazilian Dam Collapse: An Ethical and Engineering Disaster
The Vale Brazilian Dam Collapse: An Ethical and Engineering Disaster
 
Coal risk update_07_2013_vhigh
Coal risk update_07_2013_vhighCoal risk update_07_2013_vhigh
Coal risk update_07_2013_vhigh
 

Mehr von louisette lanteigne (13)

DarlingtonNuclearLanteigne2015
DarlingtonNuclearLanteigne2015DarlingtonNuclearLanteigne2015
DarlingtonNuclearLanteigne2015
 
Aggregatecreation
AggregatecreationAggregatecreation
Aggregatecreation
 
Attachment a
Attachment aAttachment a
Attachment a
 
Reason to rescind OMB decision
Reason to rescind OMB decisionReason to rescind OMB decision
Reason to rescind OMB decision
 
Raceway
RacewayRaceway
Raceway
 
EnbridgeResponse
EnbridgeResponseEnbridgeResponse
EnbridgeResponse
 
National energystrategypetition
National energystrategypetitionNational energystrategypetition
National energystrategypetition
 
Nelson quarry lanteigne
Nelson quarry lanteigneNelson quarry lanteigne
Nelson quarry lanteigne
 
Brant's Water Risks
Brant's Water RisksBrant's Water Risks
Brant's Water Risks
 
Waterloo Region’s drained ponds
Waterloo Region’s drained pondsWaterloo Region’s drained ponds
Waterloo Region’s drained ponds
 
Ara submission lanteigne: aggregate risks & gdp impacts
Ara submission lanteigne: aggregate risks & gdp impactsAra submission lanteigne: aggregate risks & gdp impacts
Ara submission lanteigne: aggregate risks & gdp impacts
 
Aggregateact
AggregateactAggregateact
Aggregateact
 
Lanteigne line9hearing
Lanteigne line9hearingLanteigne line9hearing
Lanteigne line9hearing
 

Pipelinespillsprevention

  • 1. Oil Pipeline Risks: Issues to consider By Louisette Lanteigne 700 Star Flower Ave. Waterloo Ont. N2V 2L2 butterflybluelu@rogers.com
  • 2. Issue #1: Seisemic Risks & Pipeline Welds
  • 3. Seismic Risks of Eastern Canada http://www.earthquakescanada.nrcan.gc.ca/zones/eastcan-eng.php
  • 4. Earthquakes & Oil Pipes Pipeline damages from earthquakes can result in compression or wrinkling, joint weld cracking or separation, bending or shear from localized wrinkling and tension. Joints made with oxy-acetelyne welds break 100 times more than those with electric arc welded joints . Source: USGS, The Shake Out Scenario Supplemental Study http://books.google.ca/books/about/The_ShakeOut_Scenario_Supplemental_Study.html?id=7PU1A6N3ZOAC&redir_esc=y
  • 5. An earthquake occurs in the Western Quebec Seismic Zone every five days on average. http://www.earthquakescanada.nrcan.gc.ca/zones/eastcan-eng.php
  • 6. A REVIEW OF NBCC 2005 SEISMIC HAZARD RESULTS FOR CANADA - THE INTERFACE TO THE GROUND AND PROGNOSIS FOR URBAN RISK MITIGATION John Adams and Stephen Halchuk Geological Survey of Canada, Natural Resources Canada,
  • 7. Earthquake risks should be identified within EA applications of pipelines so we can set reasonable design criteria to mitigate the risks, particularly with regards to pipeline welds.
  • 9. Spingomonas and Pseudomonas Eat Plastic In May 2008, 16 year old Canadian boy named Daniel Burd from Waterloo Collegiate Institute found and isolated two naturally occurring bacterium, Spingomonas and Pseudomonas, that literally eats plastic. He stored Spingomonas and Pseudomonas at 37 degree Celsius with plastic and in six weeks time, 43% of the plastic was consumed. http://wiki.duke.edu/download/attachments/10715770/08burdreport.pdf
  • 10. Spingomonas and Pseudomonas naturally occurs in Canadian soil and water. Enbridge pipelines travel across farmlands and waterways. These areas are suitable for Spingomonas and Pseudomonas because the bacterias thrives off nitrates in these locations. To read Daniel Bird's study please visit here: https://wiki.duke.edu/download/attachments/10715770/08BurdReport.pdf
  • 11. Example of a PE tape issue; Kalamazoo Michigan Enbridge Oil Spill, 2010 The National Transportation Safety Board (NTSB) determines that the probable cause of the pipeline rupture was corrosion fatigue cracks that grew and coalesced from crack and corrosion defects under dis- bonded polyethylene tape coating, producing a substantial crude oil release that went undetected by the control centre for over 17 hours .
  • 12. Questions: Is there any data to either prove or disprove the role that Spingomonas and Pseudomonas may play in regards to “tenting” issues of PE tape? Warmer weather and longer growing seasons associated with climate change may serve to increase the presence of these bacterium in the natural environment. If these bacteria are an issue, what measures can we take to avert risk in existing pipes? How can we monitor for issues related to this?
  • 13. Issue #3: Climate Change: Plan for hotter, wetter weather
  • 14. Example: Rain and extream heat expected for the city of Toronto by 2040 Toronto will see almost 40 days per year with a humidex over 40˚C (current average is 9 per year). Heat waves (3+ days of 32˚C) will occur 5 times a year, instead of once every two years. We'll see 80% more summer rain in July, 50% more in August. Extreme rain events will almost triple in size to 166mm in 24hrs from the current 66 mm.
  • 15. Source: TORONTO'S FUTURE WEATHER & CLIMATE DRIVER STUDY: OUTCOMES REPORT Summary of the SENES Consultants Ltd Study by Toronto Environment Office October 30, 2012 http://www.toronto.ca/legdocs/mmis/2012/pe/bgrd/backgroundfile-51653.pdf
  • 16. Enbridge's 'Line 9' pipeline exposed in the Rouge River, Toronto. Credit: Adam Scott/Environmental Defence
  • 17. Pipelines and Aquifers: the need to examine groundwater influences of subsurface geology
  • 18. Topography isn't enough to delineate watersheds or prevent water risks. .
  • 19. Draw down effects bring contaminates towards the nearest wells regardless of topography. Professor Mike Stone: chloride loadings to Waterloo Regional wells reveals this fact.
  • 20. Understanding the subsurface geology and localized well data in proximity to pipes can help contain spills. Mapping subsurface geology is critical data to have in order to quickly and reasonably isolate and contain spills. It allows us to view which aquifers may be impacted, which wells to shut off to immediately stop the draw down spread of contaminates shoud a spill occur. EA processes could mandate that firms have that data prior to final approvals in order to make sure they are reasonably capable of swift responses should a spill occur along that route.
  • 21. Arctic Risk #1 Upheaval buckling Thermal expansion occurs when a buried steel pipeline is operated at a temperature and pressure higher than that experienced during installation. In hard frozen areas the pipeline is not free to expand so the axial compressive force serves to push the pipe up leading to risks of ruptures.
  • 22. Arctic Risk #2: Ice gouging by pressure ridges and icebergs in shallow water depths.
  • 23. Arctic Risk #3: Permafrost thaw settlement.
  • 24. Arctic Risk #4 Strudel Scour Strudel scour occurs when fresh water in rivers and streams flows over frozen ice along the shores. The overflow water drains through cracks, holes, even breathing holes in ice sheets eroding supporting sediments underneith pipes.
  • 25. What is a reasonable depth to avoid these risks? Based on the literature review of the research on subgouge deformations, the industry is still in need of direct rule of thumb that provides safe and economical burial depth for pipelines. From one hand, pipes must be trenched sufficiently far beneath the influence zone of soil displaced below ice keel to limit pipe bending to acceptable limits. On the other hand, designers must not go to an over-conservative solution and consequently a non-economical one. Therefore, the desired burial depth is the minimum depth needed for the survival of the pipeline during its design life time. Such depth has not been established. Source: The Technical Challenges of Designing Oil and Gas Pipelines in the Arctic - Basel Abdalla PhD PE, Paul Jukes PhD, Ayman Eltaher PhD PE, and Billy Duron
  • 26. Issue #5: The Public Finds the Spills. A newly published draft report by the US department of Transportation Pipeline and Hazardous Materials Safety Administration reveals that it is up to the public to find oil and gas leaks. Pipeline leaks, ruptures and spills are “systematically causing more and more property damage…in a bad year you can have up to $5 billion in property damages due to pipeline related accidents.” Given the volume of public property damage, pipeline companies would be “probably justified” in spending $490,000 a year for every 400 miles of pipeline but the reality is that “right now companies might spend a tenth of that figure." Here is a published news article regarding this: http://oilandgas-investments.com/2012/energy-services/leak-detection-pipeline-industry/
  • 27. Here is the link to the actual Draft report: U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Draft Report: Leak Detection Study – DTPH56-11-D- 000001 Dr. David Shaw, Dr. Martin Phillips, Ron Baker, Eduardo Munoz, Hamood Rehman, Carol Gibson, Christine Mayernik September 28, 2012 https://primis.phmsa.dot.gov/meetings/FilGet.mtg?fil=397 This report clearly shows that we need more money invested in prevention and better science to reasonably mitigate the risks!