Enbridge Pipelines Inc. (Enbridge) Line 9 Reversal Phase I Project (Project)
     Application under section 58 (Application) of the National Energy Board Act (NEB Act)
                                         OH-005-2011

              Enbridge Response to Louisette Lanteigne Information Request No. 1
                              File OF-Fac-Oil-E101-2011-01 1


PROLOGUE:

The preambles to several of the information requests include assertions that may not be factually
correct. Unless expressly stated otherwise, Enbridge does not concede the accuracy of any preamble or
part thereof. Similarly, Enbridge does not concede the relevance of any request to which it has provided
a response. Unless expressly stated otherwise, responses are provided only to requests as they relate to
the segment of the Line 9 pipeline between Sarnia Terminal and North Westover Pump Station and to
the period since reversal of Line 9 to its current operation (in a westward direction).

Reference: Enbridge Pipelines Inc. (Enbridge)
             Line 9 Reversal Phase I Project (Project)Scope of the Environmental Assessment (EA)
             i. Section 2.2. Factors to be considered
             ii. Section 2.3 Scope of Factors to be Considered

Preamble: Under the terms of the Canadian Environmental Assessment Act S.C 1992, c.37
          “environmental effect” means, in respect of a project, health and socio-economic
          conditions, physical and cultural heritage, and any change to the project that may be
          caused by the environment, whether any such change or effect occurs within or outside
          Canada. The purposes of this Act are
             (a) to ensure that projects are considered in a careful and precautionary manner before
             federal authorities take action in connection with them, in order to ensure that such
             projects do not cause significant adverse environmental effects;
             (b) to encourage responsible authorities to take actions that promote sustainable
             development and thereby achieve or maintain a healthy environment and a healthy
             economy;
             (b.1) to ensure that responsible authorities carry out their responsibilities in a
             coordinated manner with a view to eliminating unnecessary duplication in the
             environmental assessment process;
             (b.2) to promote cooperation and coordinated action between federal and provincial
             governments with respect to environmental assessment processes for projects;
             (b.3) to promote communication and cooperation between responsible authorities and
             Aboriginal peoples with respect to environmental assessment;
OF-Fac-Oil-E101-2011-01 01/Hearing Order: OH-5-2011
                                            Enbridge Response to Louise Lanteigne IR No. 1
                                                                               Page 2 of 4

           (c) to ensure that projects that are to be carried out in Canada or on federal lands do not
           cause significant adverse environmental effects outside the jurisdictions in which the
           projects are carried out;

Request:   In light of the above passages, I would like to request the following information.
           1 In terms of proposed liability coverage associated with this pipeline reversal, what is
           the general scope of the coverage in terms of environmental liability protection? What
           assets are being protected?
           2 Is insurance for this proposal capped, if so, at what rate? This question relates to the
           CEA where it states the act's purpose is “to ensure that projects are considered in a
           careful and precautionary manner before federal authorities take action in connection
           with them, in order to ensure that such projects do not cause significant adverse
           environmental effects”. If the insurance from Enbridge is capped it would be reasonable
           to define that limit now so the government can reasonably consider how much funding
           would be required should an incident exceed that limit. A swift response time is needed
           and we shouldn't waste time looking for additional funding in order to address a crisis
           situation. The more data the Government has about the insurance coverage, the more they
           can allocate funding to mitigate risks in a timely manner.
           3 Using the Terms of the Canadian Environmental Assessment Act “environmental
           effect” means, in respect of a project, health and social-economic conditions, physical
           and cultural heritage, and any change to the project that may be caused by the
           environment. In light of this passage, does current or projected liability coverage for this
           pipeline have regard to compensate farmers, food producers and related industries and
           municipalities should a spill adversely impact wells, aquifers and/or farmlands? If so
           what is the worth of the current value given towards protecting these sectors that rely
           upon these environmental features? Again this information is needed to allow the
           government the chance to see if the value given reflects actual current data. If not,
           perhaps we need to reassess the risks to protect these vital environmentally based
           economic systems.
           4 The Grand River Conservation Authority (GRCA) is now doubling flood zones to
           address climate change risks. Both the GRCA and the Canadian Water Quality Network
           have stated we are going to see more incidents of high precipitation in fewer events
           which will bring about more flood/drought scenarios. Is it possible that we can secure a
           review of Line 9 to check if structural risks exist in light of this new information? I am
           concerned about the potential erosion issues stressing pipes along the route, particularly
           in proximity to tributaries, wetlands and primary recharge areas.
           5 Will the application for line reversal have regard to current consolidated versions of
           the following legislation: Clean Water Act 2006, Ontario Water Resources Act and the
           Environmental Protection Act? I understand the project is focused on a pipe already built
           however, the direction of the flow the pressure rates and density of materials being
           transported is changing and the NEB process validates the fact that ecological concerns
           still exist to warrant a review on this matter. I want to make sure that the water policies
OF-Fac-Oil-E101-2011-01 01/Hearing Order: OH-5-2011
                                            Enbridge Response to Louise Lanteigne IR No. 1
                                                                               Page 3 of 4

           are not grandfathered because hydrogeological data has advanced a great deal since the
           time this pipe was first approved. Walkerton demonstrated the true costs associated with
           undermining risk. We can't afford to do that with a pipeline that travels over top primary
           recharge areas, aquifers and tributaries that all drain into the Great Lakes.
           6 The CEAA promotes cooperation and coordinated action between federal and
           provincial governments with respect to EA processes and it promotes communications
           between responsible authorities while ensuring that projects do not cause significant
           adverse environmental effects outside the jurisdiction in which the projects are carried
           out. In light of this information, has any reasonable attempt been made to engage the
           International Joint Committee into the discussions regarding this proposal? The Great
           Lakes Water Quality Agreement recognizes the need for both Canada and the US to
           cooperate to manage these waters wisely and to protect them for the benefit of today's
           citizens and future generations. The IJC's jurisdiction includes all watersheds and
           tributaries heading to the Great Lakes Basin. Have they been informed of this project? If
           not, please explain in writing.
           7 It is my understanding that Enbridge uses modelling tools to predict corrosion growth
           rates along pipelines but how does this system address variables such as road salt runoff,
           acid rain and incidents of hail that could scratch off the protective corrosion barriers?
           8 The pipeline crosses over top the Waterloo and Paris Galt Moraines. If there is a leak
           of benzene into the aquifers system how would this issue be addressed? Many areas of
           these moraines have deep aquifer connectivity. What is the proposed strategy to re-
           mediate?
           9 In a worst case scenario, how much water could be affected and how big the plume of
           benzene?

Response   1-3 Enbridge maintains insurance that responds to Enbridge’s legal liability for property
           damage arising from its operations, including cleanup and remediation associated with
           environmental damage resulting from a sudden and accidental release of pollutants.
           Enbridge maintains insurance coverage and limits that are consistent with industry best
           practices and that are adequate and appropriate. Continuous assessment of risk exposures
           from operational activities, potential loss scenarios and availability of coverage in the
           marketplace assist in determining insurance limits.
           4   Refer to Enbridge Response to OME IR No. 1.3d).
           The Enbridge Integrity Management System is complemented by damage prevention
           activities and right of way monitoring programs. Relevant activities include:

                  aerial patrols approximately every 2 weeks;
                  underwater survey of water body crossings; and
                  depth of cover surveys.
           Enbridge completed a river bottom survey in 2007. Such surveys are generally conducted
OF-Fac-Oil-E101-2011-01 01/Hearing Order: OH-5-2011
                                 Enbridge Response to Louise Lanteigne IR No. 1
                                                                    Page 4 of 4

at 5-year intervals; with one planned for 2012.
Enbridge also has a public awareness program with landowners whose land the right of
way passes through, which encourages open communication. This can also be a source of
reporting of surface changes on the right of way.
5   Enbridge will comply with the requirements of all applicable laws and regulations.
6 Please see Section 5.4 of the ESEIA. In-water works are not required for the Project,
as construction will be localized to the existing fenced-in compounds and there will be no
changes to the existing right of way. As a result, The International Joint Committee was
not contacted or informed of the Project.
7 The coated pipeline is buried and therefore is protected from hail damage. All
coating types applied to buried pipelines in North America are resistant to acid rain and
the chemicals used for road de-icing.
Refer to the Enbridge Response to Lanteigne IR No. 4.
8 A leak from the pipeline of benzene alone is highly unlikely, as it is just one of the
many hydrocarbon constituents that can make up crude oil. If a leak were to occur,
Enbridge would immediately implement its emergency response measures in order to
minimize impacts to human health and the environment.
Enbridge would work with appropriate regulatory agencies and stakeholders to develop a
remedial action plan specific to the circumstances of the incident. The specific remedial
measures, which may include but not be limited to in-situ bioremediation, chemical
oxidation, or natural attenuation, would depend on many site-specific factors including
the crude type, volume released, soil type and depth to bedrock, degree of bedrock
fracturing, depth to groundwater, and aquifer characteristics.
9 The size of any plume would be dependent on many site and incident-specific
variables which include, among other things, the concentrations of benzene in the crude
at the time of the release, the volume spilled, the duration and nature of the event, as well
as the nature and characteristics of the soils, geology, and groundwater. Working in
conjunction with appropriate regulatory agencies and other stakeholders, Enbridge’s
emergency response priorities would be to quickly contain and recover any released
product, and to minimize the overall impacts to human health and the environment.

More Related Content

What's hot

Fracking: A Sensible Response to Peak Conventional Oil? Paul Bruce
Fracking: A Sensible Response to Peak Conventional Oil? Paul BruceFracking: A Sensible Response to Peak Conventional Oil? Paul Bruce
Fracking: A Sensible Response to Peak Conventional Oil? Paul BruceManu Caddie
 
Special Protections And Areas Of Special Biological Significance Casqa Powerp...
Special Protections And Areas Of Special Biological Significance Casqa Powerp...Special Protections And Areas Of Special Biological Significance Casqa Powerp...
Special Protections And Areas Of Special Biological Significance Casqa Powerp...awaltner
 
Esi Focus On The South East
Esi Focus On The South EastEsi Focus On The South East
Esi Focus On The South Eastchrisberryman
 
Hydrocarbon Concentration Levels in Groundwater in Jesse and Environ, Ethiope...
Hydrocarbon Concentration Levels in Groundwater in Jesse and Environ, Ethiope...Hydrocarbon Concentration Levels in Groundwater in Jesse and Environ, Ethiope...
Hydrocarbon Concentration Levels in Groundwater in Jesse and Environ, Ethiope...Editor IJCATR
 
Marcellus shaleempowermenttrainingmarcellu soverview
Marcellus shaleempowermenttrainingmarcellu soverviewMarcellus shaleempowermenttrainingmarcellu soverview
Marcellus shaleempowermenttrainingmarcellu soverviewPASAfarming
 
Gasline presentation 10 29-14
Gasline presentation 10 29-14Gasline presentation 10 29-14
Gasline presentation 10 29-14beckyjmeier
 
Stewards of the Bay: Lifestyles of Stewardship
Stewards of the Bay: Lifestyles of Stewardship  Stewards of the Bay: Lifestyles of Stewardship
Stewards of the Bay: Lifestyles of Stewardship Z8Y
 
Final Paper - The Clean Water Act
Final Paper - The Clean Water ActFinal Paper - The Clean Water Act
Final Paper - The Clean Water Acttrisol1
 
Hydraulic Fracturing Presentation
Hydraulic Fracturing PresentationHydraulic Fracturing Presentation
Hydraulic Fracturing Presentationbishopcj
 
Sandy Mackie on Restoration vs. Mitigation
Sandy Mackie on Restoration vs. MitigationSandy Mackie on Restoration vs. Mitigation
Sandy Mackie on Restoration vs. MitigationBSH Admin
 
Fact-Based Regulation for Environmental Protection in Shale Gas Development
Fact-Based Regulation for Environmental Protection in Shale Gas DevelopmentFact-Based Regulation for Environmental Protection in Shale Gas Development
Fact-Based Regulation for Environmental Protection in Shale Gas DevelopmentMarcellus Drilling News
 
WV SB 373 - New Law to Regulate Chemical Storage Tanks
WV SB 373 - New Law to Regulate Chemical Storage TanksWV SB 373 - New Law to Regulate Chemical Storage Tanks
WV SB 373 - New Law to Regulate Chemical Storage TanksMarcellus Drilling News
 
The Clean Water Act: Up Sh*!t Creek
The Clean Water Act: Up Sh*!t CreekThe Clean Water Act: Up Sh*!t Creek
The Clean Water Act: Up Sh*!t CreekCraig Collins, Ph.D.
 
Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011Blake, Cassels & Graydon LLP
 
BBarton resume
BBarton resumeBBarton resume
BBarton resumeBen Barton
 

What's hot (20)

Fracking: A Sensible Response to Peak Conventional Oil? Paul Bruce
Fracking: A Sensible Response to Peak Conventional Oil? Paul BruceFracking: A Sensible Response to Peak Conventional Oil? Paul Bruce
Fracking: A Sensible Response to Peak Conventional Oil? Paul Bruce
 
EPA DROE Email 6.23.03 (c)
EPA DROE Email 6.23.03 (c)EPA DROE Email 6.23.03 (c)
EPA DROE Email 6.23.03 (c)
 
Special Protections And Areas Of Special Biological Significance Casqa Powerp...
Special Protections And Areas Of Special Biological Significance Casqa Powerp...Special Protections And Areas Of Special Biological Significance Casqa Powerp...
Special Protections And Areas Of Special Biological Significance Casqa Powerp...
 
Current Issues in Stormwater Management
Current Issues in Stormwater ManagementCurrent Issues in Stormwater Management
Current Issues in Stormwater Management
 
Esi Focus On The South East
Esi Focus On The South EastEsi Focus On The South East
Esi Focus On The South East
 
Hydrocarbon Concentration Levels in Groundwater in Jesse and Environ, Ethiope...
Hydrocarbon Concentration Levels in Groundwater in Jesse and Environ, Ethiope...Hydrocarbon Concentration Levels in Groundwater in Jesse and Environ, Ethiope...
Hydrocarbon Concentration Levels in Groundwater in Jesse and Environ, Ethiope...
 
Marcellus shaleempowermenttrainingmarcellu soverview
Marcellus shaleempowermenttrainingmarcellu soverviewMarcellus shaleempowermenttrainingmarcellu soverview
Marcellus shaleempowermenttrainingmarcellu soverview
 
Gasline presentation 10 29-14
Gasline presentation 10 29-14Gasline presentation 10 29-14
Gasline presentation 10 29-14
 
NLCP Guideline
NLCP GuidelineNLCP Guideline
NLCP Guideline
 
Stewards of the Bay: Lifestyles of Stewardship
Stewards of the Bay: Lifestyles of Stewardship  Stewards of the Bay: Lifestyles of Stewardship
Stewards of the Bay: Lifestyles of Stewardship
 
The Clean Water Act
The Clean Water ActThe Clean Water Act
The Clean Water Act
 
Final Paper - The Clean Water Act
Final Paper - The Clean Water ActFinal Paper - The Clean Water Act
Final Paper - The Clean Water Act
 
Hydraulic Fracturing Presentation
Hydraulic Fracturing PresentationHydraulic Fracturing Presentation
Hydraulic Fracturing Presentation
 
Sandy Mackie on Restoration vs. Mitigation
Sandy Mackie on Restoration vs. MitigationSandy Mackie on Restoration vs. Mitigation
Sandy Mackie on Restoration vs. Mitigation
 
MS4 Permits - Get Ready for the Next Round
MS4 Permits - Get Ready for the Next RoundMS4 Permits - Get Ready for the Next Round
MS4 Permits - Get Ready for the Next Round
 
Fact-Based Regulation for Environmental Protection in Shale Gas Development
Fact-Based Regulation for Environmental Protection in Shale Gas DevelopmentFact-Based Regulation for Environmental Protection in Shale Gas Development
Fact-Based Regulation for Environmental Protection in Shale Gas Development
 
WV SB 373 - New Law to Regulate Chemical Storage Tanks
WV SB 373 - New Law to Regulate Chemical Storage TanksWV SB 373 - New Law to Regulate Chemical Storage Tanks
WV SB 373 - New Law to Regulate Chemical Storage Tanks
 
The Clean Water Act: Up Sh*!t Creek
The Clean Water Act: Up Sh*!t CreekThe Clean Water Act: Up Sh*!t Creek
The Clean Water Act: Up Sh*!t Creek
 
Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011
 
BBarton resume
BBarton resumeBBarton resume
BBarton resume
 

Similar to Enbridge Line 9 Reversal Project Insurance Coverage

Lanteignerenuclearwastelakehuron 120711130433-phpapp01
Lanteignerenuclearwastelakehuron 120711130433-phpapp01Lanteignerenuclearwastelakehuron 120711130433-phpapp01
Lanteignerenuclearwastelakehuron 120711130433-phpapp01Louisette Lanteigne
 
JBA Consulting Guide to Environmental Assessment for Renewable Projects
JBA Consulting Guide to Environmental Assessment for Renewable ProjectsJBA Consulting Guide to Environmental Assessment for Renewable Projects
JBA Consulting Guide to Environmental Assessment for Renewable ProjectsJBAConsulting
 
Lanteigne re: nuclear waste dump planned by Lake Huron
Lanteigne re: nuclear waste dump planned by Lake Huron Lanteigne re: nuclear waste dump planned by Lake Huron
Lanteigne re: nuclear waste dump planned by Lake Huron louisette lanteigne
 
Mountain Valley Pipeline, Analysis of Environmental Issues
Mountain Valley Pipeline, Analysis of Environmental IssuesMountain Valley Pipeline, Analysis of Environmental Issues
Mountain Valley Pipeline, Analysis of Environmental IssuesJacqueline Tkac
 
June 11 ARTBA T&I wotus hearing statement
June 11 ARTBA T&I wotus hearing statementJune 11 ARTBA T&I wotus hearing statement
June 11 ARTBA T&I wotus hearing statementartba
 
Lanteigneredarlingtonnuclearplant 121015183235-phpapp01
Lanteigneredarlingtonnuclearplant 121015183235-phpapp01Lanteigneredarlingtonnuclearplant 121015183235-phpapp01
Lanteigneredarlingtonnuclearplant 121015183235-phpapp01Louisette Lanteigne
 
Lanteigne on Darlington Nuclear Plant
Lanteigne on Darlington Nuclear PlantLanteigne on Darlington Nuclear Plant
Lanteigne on Darlington Nuclear Plantlouisette lanteigne
 
Coop Student Paper
Coop Student PaperCoop Student Paper
Coop Student PaperMegan Wesley
 
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...Nicholas Phelan
 
Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009 Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009 jlarndt_51
 
FTA White Paper - Building Transit Projects without Environmental Delays - Copy
FTA White Paper - Building Transit Projects without Environmental Delays - CopyFTA White Paper - Building Transit Projects without Environmental Delays - Copy
FTA White Paper - Building Transit Projects without Environmental Delays - CopyDarrell Burtner
 
May 29 2014 Draft Small Business Wotus Hearing Statement
May 29 2014 Draft Small Business Wotus Hearing StatementMay 29 2014 Draft Small Business Wotus Hearing Statement
May 29 2014 Draft Small Business Wotus Hearing Statementartba
 
tompkins_comm dev_Pilgrim Power Plant
tompkins_comm dev_Pilgrim Power Planttompkins_comm dev_Pilgrim Power Plant
tompkins_comm dev_Pilgrim Power PlantEmily Tompkins
 
Port lavaca desalination study
Port lavaca desalination studyPort lavaca desalination study
Port lavaca desalination studyJeffrey Pickett
 
Shifting Regulatory Trends
Shifting Regulatory TrendsShifting Regulatory Trends
Shifting Regulatory TrendsAdam Frey
 

Similar to Enbridge Line 9 Reversal Project Insurance Coverage (20)

Lanteignerenuclearwastelakehuron 120711130433-phpapp01
Lanteignerenuclearwastelakehuron 120711130433-phpapp01Lanteignerenuclearwastelakehuron 120711130433-phpapp01
Lanteignerenuclearwastelakehuron 120711130433-phpapp01
 
JBA Consulting Guide to Environmental Assessment for Renewable Projects
JBA Consulting Guide to Environmental Assessment for Renewable ProjectsJBA Consulting Guide to Environmental Assessment for Renewable Projects
JBA Consulting Guide to Environmental Assessment for Renewable Projects
 
Lanteigne re: nuclear waste dump planned by Lake Huron
Lanteigne re: nuclear waste dump planned by Lake Huron Lanteigne re: nuclear waste dump planned by Lake Huron
Lanteigne re: nuclear waste dump planned by Lake Huron
 
Mountain Valley Pipeline, Analysis of Environmental Issues
Mountain Valley Pipeline, Analysis of Environmental IssuesMountain Valley Pipeline, Analysis of Environmental Issues
Mountain Valley Pipeline, Analysis of Environmental Issues
 
June 11 ARTBA T&I wotus hearing statement
June 11 ARTBA T&I wotus hearing statementJune 11 ARTBA T&I wotus hearing statement
June 11 ARTBA T&I wotus hearing statement
 
Kitsap Alliance Critique of the County's SMP
Kitsap Alliance Critique of the County's SMPKitsap Alliance Critique of the County's SMP
Kitsap Alliance Critique of the County's SMP
 
Lanteigneredarlingtonnuclearplant 121015183235-phpapp01
Lanteigneredarlingtonnuclearplant 121015183235-phpapp01Lanteigneredarlingtonnuclearplant 121015183235-phpapp01
Lanteigneredarlingtonnuclearplant 121015183235-phpapp01
 
Lanteigne on Darlington Nuclear Plant
Lanteigne on Darlington Nuclear PlantLanteigne on Darlington Nuclear Plant
Lanteigne on Darlington Nuclear Plant
 
Coop Student Paper
Coop Student PaperCoop Student Paper
Coop Student Paper
 
More bang for less bucks
More bang for less bucksMore bang for less bucks
More bang for less bucks
 
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
 
Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009 Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
FTA White Paper - Building Transit Projects without Environmental Delays - Copy
FTA White Paper - Building Transit Projects without Environmental Delays - CopyFTA White Paper - Building Transit Projects without Environmental Delays - Copy
FTA White Paper - Building Transit Projects without Environmental Delays - Copy
 
Dam guide for communities
Dam guide for communitiesDam guide for communities
Dam guide for communities
 
May 29 2014 Draft Small Business Wotus Hearing Statement
May 29 2014 Draft Small Business Wotus Hearing StatementMay 29 2014 Draft Small Business Wotus Hearing Statement
May 29 2014 Draft Small Business Wotus Hearing Statement
 
tompkins_comm dev_Pilgrim Power Plant
tompkins_comm dev_Pilgrim Power Planttompkins_comm dev_Pilgrim Power Plant
tompkins_comm dev_Pilgrim Power Plant
 
storage tanks
storage tanksstorage tanks
storage tanks
 
Port lavaca desalination study
Port lavaca desalination studyPort lavaca desalination study
Port lavaca desalination study
 
Shifting Regulatory Trends
Shifting Regulatory TrendsShifting Regulatory Trends
Shifting Regulatory Trends
 

More from louisette lanteigne (17)

DarlingtonNuclearLanteigne2015
DarlingtonNuclearLanteigne2015DarlingtonNuclearLanteigne2015
DarlingtonNuclearLanteigne2015
 
Aggregatecreation
AggregatecreationAggregatecreation
Aggregatecreation
 
Keystone XL Feedback
Keystone XL FeedbackKeystone XL Feedback
Keystone XL Feedback
 
Attachment a
Attachment aAttachment a
Attachment a
 
Farmsat risk
Farmsat riskFarmsat risk
Farmsat risk
 
Reason to rescind OMB decision
Reason to rescind OMB decisionReason to rescind OMB decision
Reason to rescind OMB decision
 
Pipelinespillsprevention
PipelinespillspreventionPipelinespillsprevention
Pipelinespillsprevention
 
Raceway
RacewayRaceway
Raceway
 
Enbridge line 9 earthquake risks
Enbridge line 9 earthquake risksEnbridge line 9 earthquake risks
Enbridge line 9 earthquake risks
 
National energystrategypetition
National energystrategypetitionNational energystrategypetition
National energystrategypetition
 
Nelson quarry lanteigne
Nelson quarry lanteigneNelson quarry lanteigne
Nelson quarry lanteigne
 
Brant's Water Risks
Brant's Water RisksBrant's Water Risks
Brant's Water Risks
 
Brant's water supply, aggregate & development risks
Brant's water supply, aggregate & development risksBrant's water supply, aggregate & development risks
Brant's water supply, aggregate & development risks
 
Waterloo Region’s drained ponds
Waterloo Region’s drained pondsWaterloo Region’s drained ponds
Waterloo Region’s drained ponds
 
Ara submission lanteigne: aggregate risks & gdp impacts
Ara submission lanteigne: aggregate risks & gdp impactsAra submission lanteigne: aggregate risks & gdp impacts
Ara submission lanteigne: aggregate risks & gdp impacts
 
Aggregateact
AggregateactAggregateact
Aggregateact
 
Lanteigne line9hearing
Lanteigne line9hearingLanteigne line9hearing
Lanteigne line9hearing
 

Enbridge Line 9 Reversal Project Insurance Coverage

  • 1. Enbridge Pipelines Inc. (Enbridge) Line 9 Reversal Phase I Project (Project) Application under section 58 (Application) of the National Energy Board Act (NEB Act) OH-005-2011 Enbridge Response to Louisette Lanteigne Information Request No. 1 File OF-Fac-Oil-E101-2011-01 1 PROLOGUE: The preambles to several of the information requests include assertions that may not be factually correct. Unless expressly stated otherwise, Enbridge does not concede the accuracy of any preamble or part thereof. Similarly, Enbridge does not concede the relevance of any request to which it has provided a response. Unless expressly stated otherwise, responses are provided only to requests as they relate to the segment of the Line 9 pipeline between Sarnia Terminal and North Westover Pump Station and to the period since reversal of Line 9 to its current operation (in a westward direction). Reference: Enbridge Pipelines Inc. (Enbridge) Line 9 Reversal Phase I Project (Project)Scope of the Environmental Assessment (EA) i. Section 2.2. Factors to be considered ii. Section 2.3 Scope of Factors to be Considered Preamble: Under the terms of the Canadian Environmental Assessment Act S.C 1992, c.37 “environmental effect” means, in respect of a project, health and socio-economic conditions, physical and cultural heritage, and any change to the project that may be caused by the environment, whether any such change or effect occurs within or outside Canada. The purposes of this Act are (a) to ensure that projects are considered in a careful and precautionary manner before federal authorities take action in connection with them, in order to ensure that such projects do not cause significant adverse environmental effects; (b) to encourage responsible authorities to take actions that promote sustainable development and thereby achieve or maintain a healthy environment and a healthy economy; (b.1) to ensure that responsible authorities carry out their responsibilities in a coordinated manner with a view to eliminating unnecessary duplication in the environmental assessment process; (b.2) to promote cooperation and coordinated action between federal and provincial governments with respect to environmental assessment processes for projects; (b.3) to promote communication and cooperation between responsible authorities and Aboriginal peoples with respect to environmental assessment;
  • 2. OF-Fac-Oil-E101-2011-01 01/Hearing Order: OH-5-2011 Enbridge Response to Louise Lanteigne IR No. 1 Page 2 of 4 (c) to ensure that projects that are to be carried out in Canada or on federal lands do not cause significant adverse environmental effects outside the jurisdictions in which the projects are carried out; Request: In light of the above passages, I would like to request the following information. 1 In terms of proposed liability coverage associated with this pipeline reversal, what is the general scope of the coverage in terms of environmental liability protection? What assets are being protected? 2 Is insurance for this proposal capped, if so, at what rate? This question relates to the CEA where it states the act's purpose is “to ensure that projects are considered in a careful and precautionary manner before federal authorities take action in connection with them, in order to ensure that such projects do not cause significant adverse environmental effects”. If the insurance from Enbridge is capped it would be reasonable to define that limit now so the government can reasonably consider how much funding would be required should an incident exceed that limit. A swift response time is needed and we shouldn't waste time looking for additional funding in order to address a crisis situation. The more data the Government has about the insurance coverage, the more they can allocate funding to mitigate risks in a timely manner. 3 Using the Terms of the Canadian Environmental Assessment Act “environmental effect” means, in respect of a project, health and social-economic conditions, physical and cultural heritage, and any change to the project that may be caused by the environment. In light of this passage, does current or projected liability coverage for this pipeline have regard to compensate farmers, food producers and related industries and municipalities should a spill adversely impact wells, aquifers and/or farmlands? If so what is the worth of the current value given towards protecting these sectors that rely upon these environmental features? Again this information is needed to allow the government the chance to see if the value given reflects actual current data. If not, perhaps we need to reassess the risks to protect these vital environmentally based economic systems. 4 The Grand River Conservation Authority (GRCA) is now doubling flood zones to address climate change risks. Both the GRCA and the Canadian Water Quality Network have stated we are going to see more incidents of high precipitation in fewer events which will bring about more flood/drought scenarios. Is it possible that we can secure a review of Line 9 to check if structural risks exist in light of this new information? I am concerned about the potential erosion issues stressing pipes along the route, particularly in proximity to tributaries, wetlands and primary recharge areas. 5 Will the application for line reversal have regard to current consolidated versions of the following legislation: Clean Water Act 2006, Ontario Water Resources Act and the Environmental Protection Act? I understand the project is focused on a pipe already built however, the direction of the flow the pressure rates and density of materials being transported is changing and the NEB process validates the fact that ecological concerns still exist to warrant a review on this matter. I want to make sure that the water policies
  • 3. OF-Fac-Oil-E101-2011-01 01/Hearing Order: OH-5-2011 Enbridge Response to Louise Lanteigne IR No. 1 Page 3 of 4 are not grandfathered because hydrogeological data has advanced a great deal since the time this pipe was first approved. Walkerton demonstrated the true costs associated with undermining risk. We can't afford to do that with a pipeline that travels over top primary recharge areas, aquifers and tributaries that all drain into the Great Lakes. 6 The CEAA promotes cooperation and coordinated action between federal and provincial governments with respect to EA processes and it promotes communications between responsible authorities while ensuring that projects do not cause significant adverse environmental effects outside the jurisdiction in which the projects are carried out. In light of this information, has any reasonable attempt been made to engage the International Joint Committee into the discussions regarding this proposal? The Great Lakes Water Quality Agreement recognizes the need for both Canada and the US to cooperate to manage these waters wisely and to protect them for the benefit of today's citizens and future generations. The IJC's jurisdiction includes all watersheds and tributaries heading to the Great Lakes Basin. Have they been informed of this project? If not, please explain in writing. 7 It is my understanding that Enbridge uses modelling tools to predict corrosion growth rates along pipelines but how does this system address variables such as road salt runoff, acid rain and incidents of hail that could scratch off the protective corrosion barriers? 8 The pipeline crosses over top the Waterloo and Paris Galt Moraines. If there is a leak of benzene into the aquifers system how would this issue be addressed? Many areas of these moraines have deep aquifer connectivity. What is the proposed strategy to re- mediate? 9 In a worst case scenario, how much water could be affected and how big the plume of benzene? Response 1-3 Enbridge maintains insurance that responds to Enbridge’s legal liability for property damage arising from its operations, including cleanup and remediation associated with environmental damage resulting from a sudden and accidental release of pollutants. Enbridge maintains insurance coverage and limits that are consistent with industry best practices and that are adequate and appropriate. Continuous assessment of risk exposures from operational activities, potential loss scenarios and availability of coverage in the marketplace assist in determining insurance limits. 4 Refer to Enbridge Response to OME IR No. 1.3d). The Enbridge Integrity Management System is complemented by damage prevention activities and right of way monitoring programs. Relevant activities include:  aerial patrols approximately every 2 weeks;  underwater survey of water body crossings; and  depth of cover surveys. Enbridge completed a river bottom survey in 2007. Such surveys are generally conducted
  • 4. OF-Fac-Oil-E101-2011-01 01/Hearing Order: OH-5-2011 Enbridge Response to Louise Lanteigne IR No. 1 Page 4 of 4 at 5-year intervals; with one planned for 2012. Enbridge also has a public awareness program with landowners whose land the right of way passes through, which encourages open communication. This can also be a source of reporting of surface changes on the right of way. 5 Enbridge will comply with the requirements of all applicable laws and regulations. 6 Please see Section 5.4 of the ESEIA. In-water works are not required for the Project, as construction will be localized to the existing fenced-in compounds and there will be no changes to the existing right of way. As a result, The International Joint Committee was not contacted or informed of the Project. 7 The coated pipeline is buried and therefore is protected from hail damage. All coating types applied to buried pipelines in North America are resistant to acid rain and the chemicals used for road de-icing. Refer to the Enbridge Response to Lanteigne IR No. 4. 8 A leak from the pipeline of benzene alone is highly unlikely, as it is just one of the many hydrocarbon constituents that can make up crude oil. If a leak were to occur, Enbridge would immediately implement its emergency response measures in order to minimize impacts to human health and the environment. Enbridge would work with appropriate regulatory agencies and stakeholders to develop a remedial action plan specific to the circumstances of the incident. The specific remedial measures, which may include but not be limited to in-situ bioremediation, chemical oxidation, or natural attenuation, would depend on many site-specific factors including the crude type, volume released, soil type and depth to bedrock, degree of bedrock fracturing, depth to groundwater, and aquifer characteristics. 9 The size of any plume would be dependent on many site and incident-specific variables which include, among other things, the concentrations of benzene in the crude at the time of the release, the volume spilled, the duration and nature of the event, as well as the nature and characteristics of the soils, geology, and groundwater. Working in conjunction with appropriate regulatory agencies and other stakeholders, Enbridge’s emergency response priorities would be to quickly contain and recover any released product, and to minimize the overall impacts to human health and the environment.