5. Benefits
• Reduced CSO discharges to Euclid Creek
and Lake Erie
– Today: 40
– When complete: ≤ 2
• To handle “5-year, 6-hour storm”
• Reduced basement flooding
6. Alignment Facts
• By the numbers:
– 4890’ sewer from Triangle Park to intersection of
Lakeshore Blvd. & Rosecliff Ave.
• Diameter: 27” to 66”
– 1230’ sewer from East Park Dr. to Dorchester Dr.
• Diameter: 24”
– 330’ sewer along Crestland Rd.
• Diameter: 18”
Construction largely in
public right-of-way.
10. Construction Facts, cont.
• Triangle Park New Shaft by Pump Station
– Trenchless sewer construction
– 70’ deep
– No impact to Louis Stokes Bridge
12. Construction Facts, cont.
• Lakeshore Blvd. from New Shaft Rosecliff Ave.
– Open cut construction
– 15’-25’ deep
• New Shaft Crestland Rd.
– Open cut construction in westbound (north)
lanes of Lakeshore Blvd.
– Parallel to existing Lakeshore Blvd. Interceptor
13. Construction Facts, cont.
• Crestland Rd. Rosecliff Ave.
– Open cut construction in eastbound (south)
lanes of Lakeshore Blvd.
– Existing Lakeshore Blvd. Interceptor replaced by
new Lakeshore Blvd. Relief Sewer
16. EXISTING
LAKESHORE BLVD.
INTERCEPTOR
NEW LAKESHORE
BLVD. RELIEF
SEWER
New Relief Sewer vs.
Existing Interceptor Sewer
• Regulators will divert wet weather from
existing interceptor to new relief sewer
– Marcella Rd., Neff Rd. & Harland Ave.
17. Who is the Contractor?
• McNally/Kiewit ECT JV (Euclid Creek Tunnel
contractor) will perform trenchless work
– Triangle Park to EC Pump Station
– Start date: Summer 2013
– Duration: 18 months
• Advertise remainder of project fall 2013
– Lakeshore Blvd., East Park Dr. & Crestland Rd.
– Start date: Early 2014
– Duration: 18 months
21. Anticipated Construction Schedule
• July 2013 January 2015
– Trenchless construction from Triangle Park to
new shaft by pump station
– Contractor: McNally/Kiewit ECT JV
• March 2014 September 2015
– Open cut construction on Lakeshore Blvd.,
East Park Dr. & Crestland Rd.
– Contractor: TBD
22. Euclid Creek Pump
Station Renovations
• New roof, gutters and downspouts
• Improved site drainage
• New driveway
• New pumps and piping system
• New HVAC system
• New interior stairwells
• New interior paint
24. Stay Informed
• Blog
– EuclidCreek.blogspot.com
• Collinwood Observer
– Ads and articles
• Semi-Monthly Newsletter
– E-mail distribution
– eltingj@neorsd.org to be added to the list
25. How to Reach Us
Social Media
facebook.com/yoursewerdistrict
@neorsd | @wallywaterdrop
Customer Service
(216) 881-8247
Emergencies: NEORSD ECT Field Office
(216) 268-5469
Ryan Sullivan, sullivanr@neorsd.org
Jenn Elting, eltingj@neorsd.org
Hinweis der Redaktion
3 ½ miles longCapacity 60.5 million gallons24’ finished diameterMore than 50% complete
Again mention reduced basement flooding. I promise you that this will be one of three key important take-aways for residents.Reduced basement floodingBetter beachesTraffic headaches