Weitere ähnliche Inhalte Ähnlich wie 2009 Summer Capital Projects (20) Mehr von Wellesley Public School (20) Kürzlich hochgeladen (20) 2009 Summer Capital Projects1. Summer 2009 Capital Projects Elementary Debt Exclusion Work Summer 2009 Presentation for Town Meeting April 2010 7. Old flooring was abated down to a wood subfloor. A new wood subfloor was installed in preparation for the new tile. 11. Ceiling tiles were removed. A new ceiling with new lights and new acoustical panels were installed. 12. Ceiling tiles were removed. A new ceiling with new lights and new acoustical panels were installed. 14. The DPW completed work on a redesigned Hardy Road with increased parent drop off and pick up area. 25. An area of old ceiling previously abated as a result of water damage The old ceiling was removed in preparation for the installation of fire protection (sprinkler system), new lights and a new suspended ceiling. 26. New smoke and acoustical stops were installed above the new suspended ceiling in walls separating classrooms. 34. In the process of replacing the gym ceiling the gym floor was damaged. 35. The floor was sanded, lines repainted and new coats of sealant applied. 42. Entrance to the Schofield boiler room 43. Entrance to the Schofield boiler room 44. Entrance to the Schofield boiler room 51. On site demolition of the old boiler was required in preparation for installation of the new heating system. 52. On site demolition of the old boiler was required in preparation for installation of the new heating system. 53. Gym ceilings at Upham, Hardy and Fiske were abated and replaced this summer . 54. Gym ceilings at Upham, Hardy and Fiske were abated and replaced this summer. 55. Gym ceilings at Upham, Hardy and Fiske were abated and replaced this summer.