Union Budget 2014-15
Power, Coal and Capital Goods
Virendra Patil
TBWES 11-07-2014
Highlights
 Sunset clause for tax holiday for power generation
extended for 10 years
 Assures coal supply to plants commissioning by
March 2015
 Allocates Rs 1,000 crore for clean energy schemes
 Excise duty exemption on raw materials for
renewable energy equipments
 Levies uniform 2.5% custom duty and 2% CVD on
coal
 Budget allocation for power sector increases by 11%
 Outlay for coal sector up by more than Rs 1,620 crore
at Rs 12,561 crore
2 11-07-2014
Sunset clause for tax holiday for power generation
extended for 10 years
 Finance Minister, Arun Jaitely, has set a new trend in his
maiden budget by extending the tax holiday enjoyed by
companies involved in a generation, transmission and
distribution business for a straight ten year period instead of
an annual extension.
 Pertinently, an annual extension to this tax holiday had
become a sort of norm in the budget announcements for the
past few years.
 Breaking the norm, Jaitely has decided to give the tax
holiday for a longer period of ten years to the companies
who begin generation, transmission or distribution of power
before March 31, 2017.
 Justifying his move, the Jaitely noted that stability in policy
is critical as it will help investors plan their investments
better.
 To note, this tax holiday is provided to the power sector
under Section 80-IA(4)(iv) of the Income Tax Act
3 11-07-2014
Assures coal supply to plants commissioning by
March 2015
 Coal shortage is the biggest problem plaguing the Indian
power sector currently. Even more worrisome is the situation
of those power plants that are likely to come by March, 2015
but have no assured coal linkages with them.
 While the Presidential Directive issued in July, 2013 assured
coal supply to 78,000 MW worth of power plants, the Finance
Minister has gone one step forward by assuring coal supply to
all power plants which are already commissioned or will come
up by March, 2015.
 The Minister is confident that this move will help unlock dead
investments.
 Giving his maiden budget speech in the Parliament, the
Finance Minister contended that, "comprehensive measures for
enhancing domestic coal production are being put in place
along with stringent mechanism for quality control and
environmental protection, which includes supply of crushed
coal and setting up of washeries".
 He further noted that an exercise to rationalise coal linkages to
optimise transport of coal and reduce cost of power is also
underway.4 11-07-2014
Allocates Rs 1,000 crore for clean energy schemes
 According highest priority to renewable energy in his power
sector related schemes in his budget allocations for the
current fiscal, the Finance Minister Arun Jaitely has decided
to allocate Rs 1,000 crore approximately for introducing new
clean energy schemes in the country.
 On this account, the Minister has set aside a sum of Rs
500 crore for setting up of ultra mega solar power
projects in Rajasthan, Gujarat, Tamil Nadu, and Ladakh in
J&K.
 Morever, an additional Rs 100 crore is set aside for the
development of 1 MW Solar Parks on the banks of canals.
 The Minister has also allocated Rs 400 crore for a scheme
for solar power driven agricultural pump sets and water
pumping stations for energizing one lakh pumps.
 Implementation of"Green Energy Corridor Project will be
accelerated in this financial year to facilitate evacuation of
renewable energy across the country", the Minister added.
5 11-07-2014
Excise duty exemption on raw materials for
renewable energy equipments
 Furthering his emphasis on development of renewable
energy in the country, Finance Minister, Arun Jaitely has
provided excise duty exemption on critical raw material
used in solar, wind and biomas equipments. These products
and materials that have been exempted are as follows:
 EVA sheets and solar back sheets and specified inputs used
in their manufacture
 Solar tempered glass used in the manufacture of solar
photovoltaic cells and modules
 Flat copper wire for the manufacture of PV ribbons for use
in solar cells and modules
 Machinery and equipment required for setting up of a
project for solar energy production
 Forged steel rings used in the manufacture of bearings of
wind operated generators
 Machinery and equipment required for setting up of
compressed biogas plants (Bio-CNG)
6 11-07-2014
Levies uniform 2.5% custom duty and 2% CVD on coal
 As a measure to levelise the custom duty and CVD on
various coal varieties, the Finance Minister has rationalized
the duty structure on all non-agglomerated coal at 2.5
percent basic customs duty and 2 percent CVD.
 With this tax rationalization measure in place, anthracite
coal, bituminous coal, coking coal, steam, coal and other
coal will attract the same duty.
 Earlier, the custom duties varied depending on the variety of
coal.
 Now, by levying a uniform custom duty and CVD, Jiately
aims at eliminating all assessment disputes and transaction
costs associated with testing of various parameters of coal.
 However, in the current year budget estimates, Jaitely has
increased the duty on metallurgical coke from Nil to 2.5
percent in line with the duty on coking coal
7 11-07-2014
Budget allocation for power sector increases by 11%
 Increased the budgetary outlay for the power sector to Rs 60,384
crore for 2014-15, from the revised budget allocation of Rs
53,962.89 in the previous fiscal.
 Allocation for investments in public power sector enterprises has also
been increased substantially, to Rs 51,425.84 crore this fiscal, from
the revised allocation of Rs 49,731.90 in 2013-14.
 The budgetary support extended for the power ministry's rural
electrification scheme, Rajiv Gandhi Grameen Vidyutikaran Yojana
(RGGVY) has also increased. The scheme now stands to receive Rs
4,850 crore, against the revised budget estimate of Rs 2,868.5 crore
for the previous fiscal.
 Further, the budgetary support for research and development
programs has been increased manifold, from Rs 20 crore in the
revised budget estimate for the previous fiscal to Rs 295.53 crore for
the 2014-15 fiscal.
 Taking due cognizance of the T&D programs, the lump sum provision
for various schemes has been enhanced to Rs 2,036.36 crore, from
the previous year revised estimates of Rs 566.40 crore. This, it may
be said, signals the urgent impetus that the government has put on
development of T&D infrastructure in the country.8 11-07-2014
Outlay for coal sector up by more than Rs 1,620 crore
at Rs 12,561 crore
 total outlay for the coal sector to Rs 12,561 crore, as against the
revised expenditure estimate of Rs 10,940.14 crore for the previous
fiscal year.
 The government has increased its budgetary support to Coal India
Limited (CIL) to Rs 5,225 crore, as against the previous Rs 5,000
crore.
 It should be noted that the budgetary support of Rs 2,936 crore and
Rs 3,850 crore have been provided to Neyveli Lignite Corporation
Limited and Singareni Colleries Company Limited, respectively.
 The contribution to the coal mines pension scheme has increased
from Rs 22 crore to Rs 24 crore. Conversely, the budgetary
provision for conservation and safety of coal mines has remained
the same at Rs 169.83 crore.
 Further, the budgetary support for development of road and rail
transport infrastructure in the coalfield areas and research and
development programs has been increased from Rs 86.65 crore in
the previous fiscal to Rs 92.95 crore for the 2014-15 fiscal.
9 11-07-2014
Outlay for MNRE (renewable)pegged at Rs 3,941 crore
 Pertinently, the plan outlay for new and renewable sources
has increased to Rs 3,941 crore as against the revised
budget estimates of Rs 3,392.75 crore in previous fiscal.
 Allocation for investments in Grid Interactive and Distributed
Renewable Power has been increased substantially, from Rs
1144.83 crore in previous year revised estimates to Rs 1,949
crore this year.
 Notably, Indian Renewable Energy Development Agency
(IREDA) and Solar Energy Corporation Of India (SECI) are
the two big players in the new renewable energy market.
 Keeping in view the urgency to tap the solar potential of the
country, IREDA has been backed by the government with a
plan outlay of Rs 3,040 crore in the current fiscal, as against
the revised estimates of Rs 3,011 crore for FY14.
 Moreover, the planned outlay for SECI has increased from Rs
36 crore in previous year to Rs 55 crore in the current year.
10 11-07-2014
 Total plan outlay for nuclear power schemes at Rs 8,213.42 crore
against the revised outlay of Rs 6,073.72 crore for 2013-14.
 As per the scheme wise allocation presented in the Union Budget
speech, the outlay for the Rajasthan Atomic Power Station saw a
marginal increase at Rs 84.77 crore against the previous year's
revised outlay of Rs 83.83 crore.
 Similarly for the Bhabha Atomic Research Centre and the Indira
Gandhi Centre for Atomic Research, a slight increase in allocation is
seen at Rs 8 crore and Rs 9 crore respectively.
 However, budget allocation for neighborhood development project in
Kundankulam is a whooping Rs 150 crore compared to revised
outlay of Rs 20 crore for 2013-14.
 Also the allocation for investment in public sector is pegged at Rs
643 crore, more than double of last year's Rs 307.88 crore. Other
major allocation for the nuclear power sector are made for Heavy
water pool management at Rs 950 crore
Nuclear power : Allocation of Rs 8,213 crore
11 11-07-2014
Other highlights
 Allocates Rs 500 crore to provide 24x7 power supply: Committed to
provide 24x7 uninterrupted power supply to all homes, the
government in the Budget 2014-15 has noted that “Deen Dayal
Upadhyaya Gram Jyoti Yojana” for feeder separation will be
launched this fiscal.
 This scheme will help augment power supply to the rural areas and
for strengthening sub-transmission and distribution systems.
 The Finance Minister has allocated a sum of Rs 500 crore for this
purpose.
 Provides concessional basic custom duty on machinery needed for
bio-gas plants: The Finance Minister has also shown his inclination
to promote bio-gas energy in the country.
 To this end, he has proposed a concessional basic customs duty of
5 percent on machinery and equipment required for setting up of
compressed biogas plants (Bio-CNG).
 Ensures optimum exploitation of CBM reserves: Keen on fully
utilising the available natural resources of the country, the Finance
Minister in his budget speech has noted his government`s intention
to accelerate production and exploitation of Coal Bed Methane
(CBM) reserves of the country.
12 11-07-2014
Capital Goods
 Banks will be permitted to raise long term funds for
infrastructure lending with minimum regulatory pre-
emption such as CRR, SLR & PSL. This would lower the
cost of funds by 100-200 bps
 Reduced capex threshold to Rs 250 mn from Rs 1 bn
earlier for availing higher depreciation rate of 15%
 Debt facility for urban development raised from Rs 50 bn
to Rs 500 bn for next five years
 FDI in Defense raised to 49% from 26%
 Subsidies for wind turbine sector not restored
 Outlays: Increase in Defense by 20%, Railways budgetary
support hiked by 25%
13 11-07-2014
Thank You
Virendra Patil
TBWES
14 11-07-2014

Weitere ähnliche Inhalte

Was ist angesagt?

Lag 305 siddiqsons generation lic 14-09-2015-13666-71
Lag 305 siddiqsons generation lic 14-09-2015-13666-71Lag 305 siddiqsons generation lic 14-09-2015-13666-71
Lag 305 siddiqsons generation lic 14-09-2015-13666-71zubeditufail
 
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...Silicon Energy
 
Green Hydrogen Financial Model Toolkit LCOH V6
Green Hydrogen Financial Model Toolkit LCOH V6Green Hydrogen Financial Model Toolkit LCOH V6
Green Hydrogen Financial Model Toolkit LCOH V6Fadi Maalouf, PMP
 
Session 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, JordanSession 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, JordanOECDGlobalRelations
 
Business Plan: Biomass Power Plant
Business Plan: Biomass Power PlantBusiness Plan: Biomass Power Plant
Business Plan: Biomass Power PlantSunil Kumar
 
Green Hydrogen Financial Model Toolkit
Green Hydrogen Financial Model ToolkitGreen Hydrogen Financial Model Toolkit
Green Hydrogen Financial Model ToolkitFadi Maalouf, PMP
 
Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...
Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...
Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...OECD Environment
 
Final Report Biomass
Final Report BiomassFinal Report Biomass
Final Report BiomassNeel Patel
 
Energy generation 10_11
Energy generation 10_11Energy generation 10_11
Energy generation 10_11rameshgoudru
 
Feasibility Study of Low Carbon Energy Investments in Jordan. By Bashar Zagha
Feasibility Study of Low Carbon Energy Investments in Jordan. By Bashar ZaghaFeasibility Study of Low Carbon Energy Investments in Jordan. By Bashar Zagha
Feasibility Study of Low Carbon Energy Investments in Jordan. By Bashar Zaghabasharzagha
 
Sectoral and-regional-mobilisation-to-support-the-achievement-of-indonesia’s-...
Sectoral and-regional-mobilisation-to-support-the-achievement-of-indonesia’s-...Sectoral and-regional-mobilisation-to-support-the-achievement-of-indonesia’s-...
Sectoral and-regional-mobilisation-to-support-the-achievement-of-indonesia’s-...OECD Environment
 
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...OECD Environment
 
Solar Power Project (45 MW): Bulgarian Electricity Market Study
Solar Power Project (45 MW): Bulgarian Electricity Market  Study  Solar Power Project (45 MW): Bulgarian Electricity Market  Study
Solar Power Project (45 MW): Bulgarian Electricity Market Study Simeon Arnaudov
 
Learning to Walk Before Learning to Run: First Steps Toward EPA’s Clean Pow...
Learning to Walk Before Learning to Run: First Steps Toward EPA’s Clean Pow...Learning to Walk Before Learning to Run: First Steps Toward EPA’s Clean Pow...
Learning to Walk Before Learning to Run: First Steps Toward EPA’s Clean Pow...DNVGLEnergy
 
Ultra mega power projects
Ultra mega power projectsUltra mega power projects
Ultra mega power projectsshivraj negi
 
Day 1 NEEAP, Lebanon
Day 1 NEEAP, Lebanon Day 1 NEEAP, Lebanon
Day 1 NEEAP, Lebanon RCREEE
 
Budget 2014 15 Energy sector Edelman
Budget 2014 15 Energy sector EdelmanBudget 2014 15 Energy sector Edelman
Budget 2014 15 Energy sector EdelmanEdelmanIndiaPA
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...IPPAI
 

Was ist angesagt? (20)

Lag 305 siddiqsons generation lic 14-09-2015-13666-71
Lag 305 siddiqsons generation lic 14-09-2015-13666-71Lag 305 siddiqsons generation lic 14-09-2015-13666-71
Lag 305 siddiqsons generation lic 14-09-2015-13666-71
 
SunBurn Test Presentation
SunBurn Test PresentationSunBurn Test Presentation
SunBurn Test Presentation
 
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...
 
Green Hydrogen Financial Model Toolkit LCOH V6
Green Hydrogen Financial Model Toolkit LCOH V6Green Hydrogen Financial Model Toolkit LCOH V6
Green Hydrogen Financial Model Toolkit LCOH V6
 
Session 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, JordanSession 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, Jordan
 
Business Plan: Biomass Power Plant
Business Plan: Biomass Power PlantBusiness Plan: Biomass Power Plant
Business Plan: Biomass Power Plant
 
Green Hydrogen Financial Model Toolkit
Green Hydrogen Financial Model ToolkitGreen Hydrogen Financial Model Toolkit
Green Hydrogen Financial Model Toolkit
 
Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...
Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...
Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...
 
Final Report Biomass
Final Report BiomassFinal Report Biomass
Final Report Biomass
 
Energy generation 10_11
Energy generation 10_11Energy generation 10_11
Energy generation 10_11
 
Feasibility Study of Low Carbon Energy Investments in Jordan. By Bashar Zagha
Feasibility Study of Low Carbon Energy Investments in Jordan. By Bashar ZaghaFeasibility Study of Low Carbon Energy Investments in Jordan. By Bashar Zagha
Feasibility Study of Low Carbon Energy Investments in Jordan. By Bashar Zagha
 
Sectoral and-regional-mobilisation-to-support-the-achievement-of-indonesia’s-...
Sectoral and-regional-mobilisation-to-support-the-achievement-of-indonesia’s-...Sectoral and-regional-mobilisation-to-support-the-achievement-of-indonesia’s-...
Sectoral and-regional-mobilisation-to-support-the-achievement-of-indonesia’s-...
 
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
 
Solar Power Project (45 MW): Bulgarian Electricity Market Study
Solar Power Project (45 MW): Bulgarian Electricity Market  Study  Solar Power Project (45 MW): Bulgarian Electricity Market  Study
Solar Power Project (45 MW): Bulgarian Electricity Market Study
 
Uic Strategy
Uic StrategyUic Strategy
Uic Strategy
 
Learning to Walk Before Learning to Run: First Steps Toward EPA’s Clean Pow...
Learning to Walk Before Learning to Run: First Steps Toward EPA’s Clean Pow...Learning to Walk Before Learning to Run: First Steps Toward EPA’s Clean Pow...
Learning to Walk Before Learning to Run: First Steps Toward EPA’s Clean Pow...
 
Ultra mega power projects
Ultra mega power projectsUltra mega power projects
Ultra mega power projects
 
Day 1 NEEAP, Lebanon
Day 1 NEEAP, Lebanon Day 1 NEEAP, Lebanon
Day 1 NEEAP, Lebanon
 
Budget 2014 15 Energy sector Edelman
Budget 2014 15 Energy sector EdelmanBudget 2014 15 Energy sector Edelman
Budget 2014 15 Energy sector Edelman
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
 

Ähnlich wie Union budget 2014-15 : What for Power, Coal and Capital Goods -Virendra Patil

Energy Survey of Pakistan 2021.pptx
Energy Survey of Pakistan 2021.pptxEnergy Survey of Pakistan 2021.pptx
Energy Survey of Pakistan 2021.pptxEngrMusavirHussain
 
PSAG - August 2014 (13Th Edition)
PSAG - August 2014 (13Th Edition)PSAG - August 2014 (13Th Edition)
PSAG - August 2014 (13Th Edition)UPES Dehradun
 
IRJET-A Review of Renewable Energy Scenario in India
IRJET-A Review of Renewable Energy Scenario in IndiaIRJET-A Review of Renewable Energy Scenario in India
IRJET-A Review of Renewable Energy Scenario in IndiaIRJET Journal
 
Indian Fiscal Budget 2013-14: Analysis on Energy Sector
Indian Fiscal Budget 2013-14: Analysis on Energy SectorIndian Fiscal Budget 2013-14: Analysis on Energy Sector
Indian Fiscal Budget 2013-14: Analysis on Energy Sectornhareesh2003
 
Construction Industry Review 28 july 14, 2014
Construction Industry Review  28 july 14, 2014Construction Industry Review  28 july 14, 2014
Construction Industry Review 28 july 14, 2014Remona Divekar
 
State-Brochure-Final-Dec.-2-2015
State-Brochure-Final-Dec.-2-2015State-Brochure-Final-Dec.-2-2015
State-Brochure-Final-Dec.-2-2015Rohit Tyagi
 
India’s Union Budget 2014 - 15
India’s Union Budget 2014 - 15India’s Union Budget 2014 - 15
India’s Union Budget 2014 - 15MSL
 
Guru Nanak Dev Ji.docx
Guru Nanak Dev Ji.docxGuru Nanak Dev Ji.docx
Guru Nanak Dev Ji.docxsanchit chadha
 

Ähnlich wie Union budget 2014-15 : What for Power, Coal and Capital Goods -Virendra Patil (20)

Nl energy sep 5 - 11, 2015
Nl energy sep 5 - 11, 2015Nl energy sep 5 - 11, 2015
Nl energy sep 5 - 11, 2015
 
Union budget 2014 15
Union budget 2014 15Union budget 2014 15
Union budget 2014 15
 
India Union Budget 2014-15 | A Holistic Plan of Action
India Union Budget 2014-15 | A Holistic Plan of ActionIndia Union Budget 2014-15 | A Holistic Plan of Action
India Union Budget 2014-15 | A Holistic Plan of Action
 
Energy Survey of Pakistan 2021.pptx
Energy Survey of Pakistan 2021.pptxEnergy Survey of Pakistan 2021.pptx
Energy Survey of Pakistan 2021.pptx
 
Nl energy sep 19-sep 25,2015
Nl energy sep 19-sep 25,2015Nl energy sep 19-sep 25,2015
Nl energy sep 19-sep 25,2015
 
PSAG - August 2014 (13Th Edition)
PSAG - August 2014 (13Th Edition)PSAG - August 2014 (13Th Edition)
PSAG - August 2014 (13Th Edition)
 
Summary of Union Budget 2010
Summary of Union Budget 2010Summary of Union Budget 2010
Summary of Union Budget 2010
 
PWC renewable energy report India 2012
PWC renewable energy report India 2012PWC renewable energy report India 2012
PWC renewable energy report India 2012
 
IRJET-A Review of Renewable Energy Scenario in India
IRJET-A Review of Renewable Energy Scenario in IndiaIRJET-A Review of Renewable Energy Scenario in India
IRJET-A Review of Renewable Energy Scenario in India
 
Nl energy oct 10 - oct 16, 2015
Nl energy oct 10 - oct 16, 2015Nl energy oct 10 - oct 16, 2015
Nl energy oct 10 - oct 16, 2015
 
Indian Fiscal Budget 2013-14: Analysis on Energy Sector
Indian Fiscal Budget 2013-14: Analysis on Energy SectorIndian Fiscal Budget 2013-14: Analysis on Energy Sector
Indian Fiscal Budget 2013-14: Analysis on Energy Sector
 
Construction Industry Review 28 july 14, 2014
Construction Industry Review  28 july 14, 2014Construction Industry Review  28 july 14, 2014
Construction Industry Review 28 july 14, 2014
 
Nl energy oct 24 - oct 30, 2015
Nl energy oct 24 - oct 30, 2015Nl energy oct 24 - oct 30, 2015
Nl energy oct 24 - oct 30, 2015
 
Nl energy aug 1-aug 7 2015 2
Nl energy aug 1-aug 7 2015 2Nl energy aug 1-aug 7 2015 2
Nl energy aug 1-aug 7 2015 2
 
State-Brochure-Final-Dec.-2-2015
State-Brochure-Final-Dec.-2-2015State-Brochure-Final-Dec.-2-2015
State-Brochure-Final-Dec.-2-2015
 
14-Energy.pdf
14-Energy.pdf14-Energy.pdf
14-Energy.pdf
 
India’s Union Budget 2014 - 15
India’s Union Budget 2014 - 15India’s Union Budget 2014 - 15
India’s Union Budget 2014 - 15
 
Guru Nanak Dev Ji.docx
Guru Nanak Dev Ji.docxGuru Nanak Dev Ji.docx
Guru Nanak Dev Ji.docx
 
Nl energy july18 -24, 2015
Nl energy july18 -24, 2015Nl energy july18 -24, 2015
Nl energy july18 -24, 2015
 
23PESGM4066.pptx
23PESGM4066.pptx23PESGM4066.pptx
23PESGM4066.pptx
 

Kürzlich hochgeladen

Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 

Kürzlich hochgeladen (20)

Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 

Union budget 2014-15 : What for Power, Coal and Capital Goods -Virendra Patil

  • 1. Union Budget 2014-15 Power, Coal and Capital Goods Virendra Patil TBWES 11-07-2014
  • 2. Highlights  Sunset clause for tax holiday for power generation extended for 10 years  Assures coal supply to plants commissioning by March 2015  Allocates Rs 1,000 crore for clean energy schemes  Excise duty exemption on raw materials for renewable energy equipments  Levies uniform 2.5% custom duty and 2% CVD on coal  Budget allocation for power sector increases by 11%  Outlay for coal sector up by more than Rs 1,620 crore at Rs 12,561 crore 2 11-07-2014
  • 3. Sunset clause for tax holiday for power generation extended for 10 years  Finance Minister, Arun Jaitely, has set a new trend in his maiden budget by extending the tax holiday enjoyed by companies involved in a generation, transmission and distribution business for a straight ten year period instead of an annual extension.  Pertinently, an annual extension to this tax holiday had become a sort of norm in the budget announcements for the past few years.  Breaking the norm, Jaitely has decided to give the tax holiday for a longer period of ten years to the companies who begin generation, transmission or distribution of power before March 31, 2017.  Justifying his move, the Jaitely noted that stability in policy is critical as it will help investors plan their investments better.  To note, this tax holiday is provided to the power sector under Section 80-IA(4)(iv) of the Income Tax Act 3 11-07-2014
  • 4. Assures coal supply to plants commissioning by March 2015  Coal shortage is the biggest problem plaguing the Indian power sector currently. Even more worrisome is the situation of those power plants that are likely to come by March, 2015 but have no assured coal linkages with them.  While the Presidential Directive issued in July, 2013 assured coal supply to 78,000 MW worth of power plants, the Finance Minister has gone one step forward by assuring coal supply to all power plants which are already commissioned or will come up by March, 2015.  The Minister is confident that this move will help unlock dead investments.  Giving his maiden budget speech in the Parliament, the Finance Minister contended that, "comprehensive measures for enhancing domestic coal production are being put in place along with stringent mechanism for quality control and environmental protection, which includes supply of crushed coal and setting up of washeries".  He further noted that an exercise to rationalise coal linkages to optimise transport of coal and reduce cost of power is also underway.4 11-07-2014
  • 5. Allocates Rs 1,000 crore for clean energy schemes  According highest priority to renewable energy in his power sector related schemes in his budget allocations for the current fiscal, the Finance Minister Arun Jaitely has decided to allocate Rs 1,000 crore approximately for introducing new clean energy schemes in the country.  On this account, the Minister has set aside a sum of Rs 500 crore for setting up of ultra mega solar power projects in Rajasthan, Gujarat, Tamil Nadu, and Ladakh in J&K.  Morever, an additional Rs 100 crore is set aside for the development of 1 MW Solar Parks on the banks of canals.  The Minister has also allocated Rs 400 crore for a scheme for solar power driven agricultural pump sets and water pumping stations for energizing one lakh pumps.  Implementation of"Green Energy Corridor Project will be accelerated in this financial year to facilitate evacuation of renewable energy across the country", the Minister added. 5 11-07-2014
  • 6. Excise duty exemption on raw materials for renewable energy equipments  Furthering his emphasis on development of renewable energy in the country, Finance Minister, Arun Jaitely has provided excise duty exemption on critical raw material used in solar, wind and biomas equipments. These products and materials that have been exempted are as follows:  EVA sheets and solar back sheets and specified inputs used in their manufacture  Solar tempered glass used in the manufacture of solar photovoltaic cells and modules  Flat copper wire for the manufacture of PV ribbons for use in solar cells and modules  Machinery and equipment required for setting up of a project for solar energy production  Forged steel rings used in the manufacture of bearings of wind operated generators  Machinery and equipment required for setting up of compressed biogas plants (Bio-CNG) 6 11-07-2014
  • 7. Levies uniform 2.5% custom duty and 2% CVD on coal  As a measure to levelise the custom duty and CVD on various coal varieties, the Finance Minister has rationalized the duty structure on all non-agglomerated coal at 2.5 percent basic customs duty and 2 percent CVD.  With this tax rationalization measure in place, anthracite coal, bituminous coal, coking coal, steam, coal and other coal will attract the same duty.  Earlier, the custom duties varied depending on the variety of coal.  Now, by levying a uniform custom duty and CVD, Jiately aims at eliminating all assessment disputes and transaction costs associated with testing of various parameters of coal.  However, in the current year budget estimates, Jaitely has increased the duty on metallurgical coke from Nil to 2.5 percent in line with the duty on coking coal 7 11-07-2014
  • 8. Budget allocation for power sector increases by 11%  Increased the budgetary outlay for the power sector to Rs 60,384 crore for 2014-15, from the revised budget allocation of Rs 53,962.89 in the previous fiscal.  Allocation for investments in public power sector enterprises has also been increased substantially, to Rs 51,425.84 crore this fiscal, from the revised allocation of Rs 49,731.90 in 2013-14.  The budgetary support extended for the power ministry's rural electrification scheme, Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) has also increased. The scheme now stands to receive Rs 4,850 crore, against the revised budget estimate of Rs 2,868.5 crore for the previous fiscal.  Further, the budgetary support for research and development programs has been increased manifold, from Rs 20 crore in the revised budget estimate for the previous fiscal to Rs 295.53 crore for the 2014-15 fiscal.  Taking due cognizance of the T&D programs, the lump sum provision for various schemes has been enhanced to Rs 2,036.36 crore, from the previous year revised estimates of Rs 566.40 crore. This, it may be said, signals the urgent impetus that the government has put on development of T&D infrastructure in the country.8 11-07-2014
  • 9. Outlay for coal sector up by more than Rs 1,620 crore at Rs 12,561 crore  total outlay for the coal sector to Rs 12,561 crore, as against the revised expenditure estimate of Rs 10,940.14 crore for the previous fiscal year.  The government has increased its budgetary support to Coal India Limited (CIL) to Rs 5,225 crore, as against the previous Rs 5,000 crore.  It should be noted that the budgetary support of Rs 2,936 crore and Rs 3,850 crore have been provided to Neyveli Lignite Corporation Limited and Singareni Colleries Company Limited, respectively.  The contribution to the coal mines pension scheme has increased from Rs 22 crore to Rs 24 crore. Conversely, the budgetary provision for conservation and safety of coal mines has remained the same at Rs 169.83 crore.  Further, the budgetary support for development of road and rail transport infrastructure in the coalfield areas and research and development programs has been increased from Rs 86.65 crore in the previous fiscal to Rs 92.95 crore for the 2014-15 fiscal. 9 11-07-2014
  • 10. Outlay for MNRE (renewable)pegged at Rs 3,941 crore  Pertinently, the plan outlay for new and renewable sources has increased to Rs 3,941 crore as against the revised budget estimates of Rs 3,392.75 crore in previous fiscal.  Allocation for investments in Grid Interactive and Distributed Renewable Power has been increased substantially, from Rs 1144.83 crore in previous year revised estimates to Rs 1,949 crore this year.  Notably, Indian Renewable Energy Development Agency (IREDA) and Solar Energy Corporation Of India (SECI) are the two big players in the new renewable energy market.  Keeping in view the urgency to tap the solar potential of the country, IREDA has been backed by the government with a plan outlay of Rs 3,040 crore in the current fiscal, as against the revised estimates of Rs 3,011 crore for FY14.  Moreover, the planned outlay for SECI has increased from Rs 36 crore in previous year to Rs 55 crore in the current year. 10 11-07-2014
  • 11.  Total plan outlay for nuclear power schemes at Rs 8,213.42 crore against the revised outlay of Rs 6,073.72 crore for 2013-14.  As per the scheme wise allocation presented in the Union Budget speech, the outlay for the Rajasthan Atomic Power Station saw a marginal increase at Rs 84.77 crore against the previous year's revised outlay of Rs 83.83 crore.  Similarly for the Bhabha Atomic Research Centre and the Indira Gandhi Centre for Atomic Research, a slight increase in allocation is seen at Rs 8 crore and Rs 9 crore respectively.  However, budget allocation for neighborhood development project in Kundankulam is a whooping Rs 150 crore compared to revised outlay of Rs 20 crore for 2013-14.  Also the allocation for investment in public sector is pegged at Rs 643 crore, more than double of last year's Rs 307.88 crore. Other major allocation for the nuclear power sector are made for Heavy water pool management at Rs 950 crore Nuclear power : Allocation of Rs 8,213 crore 11 11-07-2014
  • 12. Other highlights  Allocates Rs 500 crore to provide 24x7 power supply: Committed to provide 24x7 uninterrupted power supply to all homes, the government in the Budget 2014-15 has noted that “Deen Dayal Upadhyaya Gram Jyoti Yojana” for feeder separation will be launched this fiscal.  This scheme will help augment power supply to the rural areas and for strengthening sub-transmission and distribution systems.  The Finance Minister has allocated a sum of Rs 500 crore for this purpose.  Provides concessional basic custom duty on machinery needed for bio-gas plants: The Finance Minister has also shown his inclination to promote bio-gas energy in the country.  To this end, he has proposed a concessional basic customs duty of 5 percent on machinery and equipment required for setting up of compressed biogas plants (Bio-CNG).  Ensures optimum exploitation of CBM reserves: Keen on fully utilising the available natural resources of the country, the Finance Minister in his budget speech has noted his government`s intention to accelerate production and exploitation of Coal Bed Methane (CBM) reserves of the country. 12 11-07-2014
  • 13. Capital Goods  Banks will be permitted to raise long term funds for infrastructure lending with minimum regulatory pre- emption such as CRR, SLR & PSL. This would lower the cost of funds by 100-200 bps  Reduced capex threshold to Rs 250 mn from Rs 1 bn earlier for availing higher depreciation rate of 15%  Debt facility for urban development raised from Rs 50 bn to Rs 500 bn for next five years  FDI in Defense raised to 49% from 26%  Subsidies for wind turbine sector not restored  Outlays: Increase in Defense by 20%, Railways budgetary support hiked by 25% 13 11-07-2014