A Corporation Not-for Profit

                                        MINUTES OF
                            MEETING OF THE BOARD OF DIRECTORS
                             Wednesday, June 15, 2011 at 5:30 p.m.

Call to Order

The Meeting of the Board of Directors was held on the date, time and at the place set forth in
the Notice of Meeting fixing such time and place, and attached to the Minutes of this Meeting.
Notice of the Meeting was posted 48 forty-eight hours prior to the Meeting. The President called
the meeting to order at 5:31 p.m.

Calling of the Roll
A quorum of Board of Directors was established.

There were present the following Board Members:

                 Magali Uribarri, President
                 Maria Victoria Rua, Secretary
                 Randall Gluss, Vice President

There were present the following Management Representatives:

                 Elaine Perez, LCAM
                 Gary Pyott, Continental President


Anago

Magali explains to all those present who Anago is and the issues with respect to this company
and the association. Anago was the janitorial company in place at the time of the Developer.
They remained servicing the association for a few months after turnover when the board
requested for the manager at the time Karen Castro to cancel the contract. Karen did so without
following the cancellation clause stipulated on the contract and Anago in turn filed a lawsuit
against the association. Magali then proceeds to read a letter she wrote out loud to all those
present and the board directed to Anago.

Gary Pyott then explains Continental’s position with respect to the contract cancellation and also
reminds the board that after turnover, the board had a certain amount of time to cancel all
contractors and vendors and this was not done. Gary proceeded to explain that he is not willing
                                                                                                 1
OPS/Minutes- BOD Meeting
Rev. 3/18/2010
to assume full responsibility for the mistake and believes association should partially assume
responsibility for fees, costs and settlement. Board decided they would discuss further and then
present response to Continental.


Engineer Report

Elaine provided an update on the Engineer’s Report. At the time the meeting was held, a final
version of the Engineer’s Report had not been provided to the association. Therefore, the
association is awaiting for this to be provided in order for the next update to be provided to all
owner’s.


Landscaping

Randall informed all those present that the association has decided to cancel contract with the
current landscaper and Lukes Landscaping was hired as the association’s new landscaper.
Improvements to the entire landscaping surrounding the building are almost done. Company
performing the work is Lukes.

DirecTV

Elaine and Randall gave an update on the DirecTV issue. It was explained to all those present
that at the present time there are many items that the association does not agree on with
respect to the contract terms that DirecTV is presenting and the association’s attorney is
working on going through all the items in order to reach a mutual agreement.

Minutes

Randall and Vicky wanted Elaine to change last meeting minutes to state that they both agree
with the discuss project at that meeting.

Gary and Elaine were then asked to leave the meeting by the board. Therefore, Elaine
explained that minutes would adjourn at the time of her leaving and that Vicky would be
responsible for completing the minutes to the remainder of the meeting discussion.

Adjournment

6:37 p.m.




                                                                                                 2
OPS/Minutes- BOD Meeting
Rev. 3/18/2010

Weitere Àhnliche Inhalte

Mehr von VillaAlhambra

Villa Alhambra Financials July 2012
Villa Alhambra Financials July 2012Villa Alhambra Financials July 2012
Villa Alhambra Financials July 2012
VillaAlhambra
 
Villa Alhambra Financials May 2012
Villa Alhambra Financials May 2012Villa Alhambra Financials May 2012
Villa Alhambra Financials May 2012
VillaAlhambra
 
Villa Alhambra Financials Apr. 2012
Villa Alhambra Financials Apr. 2012Villa Alhambra Financials Apr. 2012
Villa Alhambra Financials Apr. 2012
VillaAlhambra
 
Villa Alhambra Financials Feb. 2012
Villa Alhambra Financials Feb. 2012Villa Alhambra Financials Feb. 2012
Villa Alhambra Financials Feb. 2012
VillaAlhambra
 
Villa Alhambra Financials Jan. 2012
Villa Alhambra Financials Jan. 2012Villa Alhambra Financials Jan. 2012
Villa Alhambra Financials Jan. 2012
VillaAlhambra
 
Villa alhambra financials 2011
Villa alhambra financials 2011Villa alhambra financials 2011
Villa alhambra financials 2011
VillaAlhambra
 
Gerri Brod Written Request Response E-mail 3-5-2012
Gerri Brod Written Request Response E-mail 3-5-2012Gerri Brod Written Request Response E-mail 3-5-2012
Gerri Brod Written Request Response E-mail 3-5-2012
VillaAlhambra
 
Dania Fernandez Cease and Desist Letter 2 2012
Dania Fernandez Cease and Desist Letter 2 2012Dania Fernandez Cease and Desist Letter 2 2012
Dania Fernandez Cease and Desist Letter 2 2012
VillaAlhambra
 
Villa Alhambra Financials 2011
Villa Alhambra Financials 2011Villa Alhambra Financials 2011
Villa Alhambra Financials 2011
VillaAlhambra
 
Carjacking Warning
Carjacking WarningCarjacking Warning
Carjacking Warning
VillaAlhambra
 
Written Request E-mail 3-29-2012
Written Request E-mail 3-29-2012Written Request E-mail 3-29-2012
Written Request E-mail 3-29-2012
VillaAlhambra
 
Villa Alhambra Owners Meeting Presentation 3-19-2012 (meeting version)
Villa Alhambra Owners Meeting Presentation 3-19-2012 (meeting version)Villa Alhambra Owners Meeting Presentation 3-19-2012 (meeting version)
Villa Alhambra Owners Meeting Presentation 3-19-2012 (meeting version)
VillaAlhambra
 
Florida Statute Chapter 718
Florida Statute Chapter 718Florida Statute Chapter 718
Florida Statute Chapter 718
VillaAlhambra
 
Waste Management Contract - Villa Alhambra
Waste Management Contract - Villa AlhambraWaste Management Contract - Villa Alhambra
Waste Management Contract - Villa Alhambra
VillaAlhambra
 
The Continental Group Contract - Villa Alhambra
The Continental Group Contract - Villa AlhambraThe Continental Group Contract - Villa Alhambra
The Continental Group Contract - Villa Alhambra
VillaAlhambra
 
SIS Contract - Villa Alhambra
SIS Contract - Villa AlhambraSIS Contract - Villa Alhambra
SIS Contract - Villa Alhambra
VillaAlhambra
 
Power Exterminators Contract - Villa Alhambra
Power Exterminators Contract - Villa AlhambraPower Exterminators Contract - Villa Alhambra
Power Exterminators Contract - Villa Alhambra
VillaAlhambra
 
Otis Elevator Contract - Villa Alhambra
Otis Elevator Contract - Villa AlhambraOtis Elevator Contract - Villa Alhambra
Otis Elevator Contract - Villa Alhambra
VillaAlhambra
 
Lukes Sawgrass Landscaping Maintenance Contract - Villa Alhambra
Lukes Sawgrass Landscaping Maintenance Contract - Villa AlhambraLukes Sawgrass Landscaping Maintenance Contract - Villa Alhambra
Lukes Sawgrass Landscaping Maintenance Contract - Villa Alhambra
VillaAlhambra
 
Hivac Contract - Villa Alhambra
Hivac Contract - Villa AlhambraHivac Contract - Villa Alhambra
Hivac Contract - Villa Alhambra
VillaAlhambra
 

Mehr von VillaAlhambra (20)

Villa Alhambra Financials July 2012
Villa Alhambra Financials July 2012Villa Alhambra Financials July 2012
Villa Alhambra Financials July 2012
 
Villa Alhambra Financials May 2012
Villa Alhambra Financials May 2012Villa Alhambra Financials May 2012
Villa Alhambra Financials May 2012
 
Villa Alhambra Financials Apr. 2012
Villa Alhambra Financials Apr. 2012Villa Alhambra Financials Apr. 2012
Villa Alhambra Financials Apr. 2012
 
Villa Alhambra Financials Feb. 2012
Villa Alhambra Financials Feb. 2012Villa Alhambra Financials Feb. 2012
Villa Alhambra Financials Feb. 2012
 
Villa Alhambra Financials Jan. 2012
Villa Alhambra Financials Jan. 2012Villa Alhambra Financials Jan. 2012
Villa Alhambra Financials Jan. 2012
 
Villa alhambra financials 2011
Villa alhambra financials 2011Villa alhambra financials 2011
Villa alhambra financials 2011
 
Gerri Brod Written Request Response E-mail 3-5-2012
Gerri Brod Written Request Response E-mail 3-5-2012Gerri Brod Written Request Response E-mail 3-5-2012
Gerri Brod Written Request Response E-mail 3-5-2012
 
Dania Fernandez Cease and Desist Letter 2 2012
Dania Fernandez Cease and Desist Letter 2 2012Dania Fernandez Cease and Desist Letter 2 2012
Dania Fernandez Cease and Desist Letter 2 2012
 
Villa Alhambra Financials 2011
Villa Alhambra Financials 2011Villa Alhambra Financials 2011
Villa Alhambra Financials 2011
 
Carjacking Warning
Carjacking WarningCarjacking Warning
Carjacking Warning
 
Written Request E-mail 3-29-2012
Written Request E-mail 3-29-2012Written Request E-mail 3-29-2012
Written Request E-mail 3-29-2012
 
Villa Alhambra Owners Meeting Presentation 3-19-2012 (meeting version)
Villa Alhambra Owners Meeting Presentation 3-19-2012 (meeting version)Villa Alhambra Owners Meeting Presentation 3-19-2012 (meeting version)
Villa Alhambra Owners Meeting Presentation 3-19-2012 (meeting version)
 
Florida Statute Chapter 718
Florida Statute Chapter 718Florida Statute Chapter 718
Florida Statute Chapter 718
 
Waste Management Contract - Villa Alhambra
Waste Management Contract - Villa AlhambraWaste Management Contract - Villa Alhambra
Waste Management Contract - Villa Alhambra
 
The Continental Group Contract - Villa Alhambra
The Continental Group Contract - Villa AlhambraThe Continental Group Contract - Villa Alhambra
The Continental Group Contract - Villa Alhambra
 
SIS Contract - Villa Alhambra
SIS Contract - Villa AlhambraSIS Contract - Villa Alhambra
SIS Contract - Villa Alhambra
 
Power Exterminators Contract - Villa Alhambra
Power Exterminators Contract - Villa AlhambraPower Exterminators Contract - Villa Alhambra
Power Exterminators Contract - Villa Alhambra
 
Otis Elevator Contract - Villa Alhambra
Otis Elevator Contract - Villa AlhambraOtis Elevator Contract - Villa Alhambra
Otis Elevator Contract - Villa Alhambra
 
Lukes Sawgrass Landscaping Maintenance Contract - Villa Alhambra
Lukes Sawgrass Landscaping Maintenance Contract - Villa AlhambraLukes Sawgrass Landscaping Maintenance Contract - Villa Alhambra
Lukes Sawgrass Landscaping Maintenance Contract - Villa Alhambra
 
Hivac Contract - Villa Alhambra
Hivac Contract - Villa AlhambraHivac Contract - Villa Alhambra
Hivac Contract - Villa Alhambra
 

KĂŒrzlich hochgeladen

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

KĂŒrzlich hochgeladen (20)

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 

June 2011 Villa Alhambra Board Minutes

  • 1. A Corporation Not-for Profit MINUTES OF MEETING OF THE BOARD OF DIRECTORS Wednesday, June 15, 2011 at 5:30 p.m. Call to Order The Meeting of the Board of Directors was held on the date, time and at the place set forth in the Notice of Meeting fixing such time and place, and attached to the Minutes of this Meeting. Notice of the Meeting was posted 48 forty-eight hours prior to the Meeting. The President called the meeting to order at 5:31 p.m. Calling of the Roll A quorum of Board of Directors was established. There were present the following Board Members: Magali Uribarri, President Maria Victoria Rua, Secretary Randall Gluss, Vice President There were present the following Management Representatives: Elaine Perez, LCAM Gary Pyott, Continental President Anago Magali explains to all those present who Anago is and the issues with respect to this company and the association. Anago was the janitorial company in place at the time of the Developer. They remained servicing the association for a few months after turnover when the board requested for the manager at the time Karen Castro to cancel the contract. Karen did so without following the cancellation clause stipulated on the contract and Anago in turn filed a lawsuit against the association. Magali then proceeds to read a letter she wrote out loud to all those present and the board directed to Anago. Gary Pyott then explains Continental’s position with respect to the contract cancellation and also reminds the board that after turnover, the board had a certain amount of time to cancel all contractors and vendors and this was not done. Gary proceeded to explain that he is not willing 1 OPS/Minutes- BOD Meeting Rev. 3/18/2010
  • 2. to assume full responsibility for the mistake and believes association should partially assume responsibility for fees, costs and settlement. Board decided they would discuss further and then present response to Continental. Engineer Report Elaine provided an update on the Engineer’s Report. At the time the meeting was held, a final version of the Engineer’s Report had not been provided to the association. Therefore, the association is awaiting for this to be provided in order for the next update to be provided to all owner’s. Landscaping Randall informed all those present that the association has decided to cancel contract with the current landscaper and Lukes Landscaping was hired as the association’s new landscaper. Improvements to the entire landscaping surrounding the building are almost done. Company performing the work is Lukes. DirecTV Elaine and Randall gave an update on the DirecTV issue. It was explained to all those present that at the present time there are many items that the association does not agree on with respect to the contract terms that DirecTV is presenting and the association’s attorney is working on going through all the items in order to reach a mutual agreement. Minutes Randall and Vicky wanted Elaine to change last meeting minutes to state that they both agree with the discuss project at that meeting. Gary and Elaine were then asked to leave the meeting by the board. Therefore, Elaine explained that minutes would adjourn at the time of her leaving and that Vicky would be responsible for completing the minutes to the remainder of the meeting discussion. Adjournment 6:37 p.m. 2 OPS/Minutes- BOD Meeting Rev. 3/18/2010