• On Wednesday, October 28, 2009, NASA launched its Ares I-X
prototype vehicle, the first launch from Kennedy's pads of a
vehicle other than the space shuttle since the Apollo
Program's Saturn rockets were retired. NASA's Constellation
Program's 327-foot-tall rocket produced 2.96 million pounds
of thrust at liftoff and reached a speed of 100 mph in eight
seconds. The two-minute sub-orbital test flight encountered a
few problems along the way, as the launch pad was slightly
damaged, a planned stage separation did not go according to
plan, and a possible parachute failure led to a hard
splashdown for its first stage. The Constellation program is
under pressure as a recent committee report depicted it as
overly expensive. The Obama administration is set to make a
decision in the next several months about the near-term
direction of U.S. Space Policy.
Smoke engulfs Launch Pad 39B as the Ares I-X test rocket takes off from NASA's Kennedy Space Centre in Florida
at 11:30 a.m. EDT on October 28, 2009
Ares I First Stage Motor Unveiled on July 20, 2009. The Ares first stage five-segment development
motor is 154 feet in length and generates a maximum of 3.6 million lbs of thrust, 24 percent more
power than one twin Shuttle solid rocket booster.
Flames shot more than 100 feet high in a successful 5.5-second ground test firing Thursday, Nov. 20, 2008 of a launch
abort motor for NASA's next generation spacecraft, the Orion crew exploration vehicle. NASA and the Orion industry
team conducted the firing at the Alliant Techsystems, or ATK, facility in Promontory, Utah.
NASA and ATK successfully conducted an Ares I main cluster parachute test at the U.S. Army Proving Grounds in Yuma,
Arizona. The test was conducted on May 20, 2009. It involved three 150-feet diameter parachutes lowering a 41,500
Pound test weight to the desert floor. The parachute system will be used to recover the first stage of Ares I. It was also
used to recover the first stage of Ares I-X following its test flight.
On Sept. 10, 2009, NASA and industry engineers lit up the Utah sky with the initial full-scale, full-duration test firing of the
first stage motor for the Ares I rocket. The 154-foot solid rocket motor produced heat two-thirds the temperature of the
sun and its 12-foot-diameter cylinder delivered 3.6 million pounds of thrust.
At the Shuttle Landing Facility at NASA's Kennedy Space Centre in Florida, hardware that will be used in the launch of the
Ares I-X rocket is offloaded from a C-5 aircraft. The hardware consists of a precisely machined, full-scale simulator crew
module and launch abort system to form the tip of NASA's Ares I-X rocket.
A-3 Test Stand Construction at NASA's Stennis Space Centre in in Hancock County, Mississippi. Nine water, isopropyl alcohol (IPA) and
liquid oxygen (LOX) tanks have been delivered and installed, with five more water tanks scheduled to arrive in upcoming weeks. The two
IPA tanks shown on the left and the three LOX tanks shown on the right are 35,000 gallons each. The four water tanks in the centre are
39,000 gallons each. All 14 of the tanks will be used by the chemical steam generators units that will be installed on the A-3 stand for
creating simulated altitudes of up to 100,000 feet, a testing environment for Constellation, initially to validate the performance of the
J2-X engine for the upper stage of the new Ares I launch vehicle
In High Bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Centre in Florida, the Ares I-X upper stage
simulator service module/service adapter (left, centre) has been installed on a stand. Other segments are placed and
stacked on the floor around it. Ares I-X is the test vehicle for the Ares I, which is part of the Constellation Program to
return men to the moon and beyond.
In the Vehicle Assembly Building's High Bay 3 at NASA's Kennedy Space Centre in Florida, the Ares I-X aft centre booster
segment is lowered for attachment to the aft booster and skirt.
In High Bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Centre in Florida, technicians move a second
roll control system module into place for installation in the Ares I-X segment.
The NASA Railroad hauls cars carrying the Ares I-X motor segments and nozzle exit cone over a river bridge to NASA's
Kennedy Space Centre in Florida. The four reusable motor segments and the nozzle exit cone, manufactured by the
Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day,
cross-country trip to Florida.
The oxygen vent arm and hood removed from the fixed service structure at NASA Kennedy Space Centre's Launch Pad 39B is ready for
transfer from the pad to a storage facility, after the pad was transferred from the Space Shuttle Program to the Constellation Program.
The ground operations team is modifying pad B for the Ares I-X rocket launch. Modifications also include installing access platforms and
a vehicle stabilization system.
In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Centre in Florida, a technician performs propellant grain inspection
of the inside of the Ares I-X motor segment. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage
prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being
modified by adding new forward structures and a fifth segment simulator.
In the Vehicle Assembly Building's High Bay 4, assembly of the Ares I-X rocket nears completion. The yellow framework, nicknamed the
"birdcage," lifts Super Stack 5 toward an opening at the 16th floor crossover into the transfer aisle. The stack will be positioned on top of
the segments already in place on the mobile launcher platform in High Bay 3, completing assembly of the 327-foot-tall rocket. Five super
stacks make up the rocket's upper stage that is integrated with the four-segment solid rocket booster first stage.
In the Vehicle Assembly Building's High Bay 3, a yellow framework, lifts Super Stack 5 atop Super Stack 4. Once in position,
assembly of the Ares I-X rocket will be complete. The 327-foot-tall rocket is one of the largest processed in the bay,
rivaling the height of the Apollo Program's 364-foot-tall Saturn V.
The Ares I-X rocket, shown in in High Bay 3 of Kennedy Space Centre's Vehicle Assembly Building is being prepared for the
Launch Vehicle Readiness Test in Cape Canaveral, Fla. on Monday, October 5, 2009.
The 327-foot-tall Ares I-X test rocket moves slowly to launch pad 39B from the Vehicle Assembly Building at the Kennedy
Space Centre in Cape Canaveral, Fla., Tuesday, Oct. 20, 2009.
NASA's Ares 1-X rocket rolls out to launch pad 39-B at the Kennedy Space Centre October 20, 2009
in Cape Canaveral, Florida.
The top section of NASA's new Ares 1-X test vehicle is reflected in a pond as an alligator lurks near launch pad 39-B at
Kennedy Space Centre, Florida on October 26, 2009
The Ares 1-X test rocket lifts off on a six-minute suborbital flight from launch pad 39B at the Kennedy Space Centre
in Cape Canaveral, Florida, October 28, 2009.
NASA's Ares 1-X rocket lifts off from launch pad 39-b at the Kennedy Space Centre
October 28, 2009 in Cape Canaveral, Florida.
THE END

You Can Keep Listening To The Music Or Press ‘Esc’ To Exit

Weitere ähnliche Inhalte

Was ist angesagt?

Pictures of SpaceX's Rockets and Spacecrafts
Pictures of SpaceX's Rockets and SpacecraftsPictures of SpaceX's Rockets and Spacecrafts
Pictures of SpaceX's Rockets and SpacecraftsJoshua Miranda
 
Paper - SmallSat 1999 Management Challenges
Paper - SmallSat 1999 Management ChallengesPaper - SmallSat 1999 Management Challenges
Paper - SmallSat 1999 Management ChallengesDave Callen
 
Launch Services Program
Launch Services ProgramLaunch Services Program
Launch Services ProgramNASA Kennedy
 
Final Flight of Endeavour: A Space Shuttle Mission Overview
Final Flight of Endeavour: A Space Shuttle Mission OverviewFinal Flight of Endeavour: A Space Shuttle Mission Overview
Final Flight of Endeavour: A Space Shuttle Mission OverviewNASAJohnson
 
Perspectives onpropulsion
Perspectives onpropulsionPerspectives onpropulsion
Perspectives onpropulsionClifford Stone
 
Indian space launch vehicle
Indian space launch vehicleIndian space launch vehicle
Indian space launch vehicleDinesh Babu
 
Space Shuttle Challenger
Space Shuttle ChallengerSpace Shuttle Challenger
Space Shuttle ChallengerNASA Kennedy
 
Atlantisthefinalmission 110726070334-phpapp02
Atlantisthefinalmission 110726070334-phpapp02Atlantisthefinalmission 110726070334-phpapp02
Atlantisthefinalmission 110726070334-phpapp02George Martin
 
Atlantis -the_final_mission - Technobytes
Atlantis  -the_final_mission - TechnobytesAtlantis  -the_final_mission - Technobytes
Atlantis -the_final_mission - Technobytesrec
 
Atlantis: The Final Mission
Atlantis: The Final MissionAtlantis: The Final Mission
Atlantis: The Final MissionEmerito Razon
 
Atlantisthefinalmission 110726070334-phpapp02
Atlantisthefinalmission 110726070334-phpapp02Atlantisthefinalmission 110726070334-phpapp02
Atlantisthefinalmission 110726070334-phpapp02Nilce Bravo
 

Was ist angesagt? (20)

Pictures of SpaceX's Rockets and Spacecrafts
Pictures of SpaceX's Rockets and SpacecraftsPictures of SpaceX's Rockets and Spacecrafts
Pictures of SpaceX's Rockets and Spacecrafts
 
GPS II F12
GPS II F12GPS II F12
GPS II F12
 
Paper - SmallSat 1999 Management Challenges
Paper - SmallSat 1999 Management ChallengesPaper - SmallSat 1999 Management Challenges
Paper - SmallSat 1999 Management Challenges
 
Launch Services Program
Launch Services ProgramLaunch Services Program
Launch Services Program
 
Space x ppt
Space x pptSpace x ppt
Space x ppt
 
SPACE SHUTTLE & ITS TPS
SPACE SHUTTLE  & ITS TPSSPACE SHUTTLE  & ITS TPS
SPACE SHUTTLE & ITS TPS
 
Reusable launch vehicle
Reusable launch vehicleReusable launch vehicle
Reusable launch vehicle
 
Ares I Integrated Test Approach
Ares I Integrated Test ApproachAres I Integrated Test Approach
Ares I Integrated Test Approach
 
REUSABLE LAUNCH VEHICLE
REUSABLE LAUNCH VEHICLE REUSABLE LAUNCH VEHICLE
REUSABLE LAUNCH VEHICLE
 
ISS Servicing for NASA
ISS Servicing for NASAISS Servicing for NASA
ISS Servicing for NASA
 
Final Flight of Endeavour: A Space Shuttle Mission Overview
Final Flight of Endeavour: A Space Shuttle Mission OverviewFinal Flight of Endeavour: A Space Shuttle Mission Overview
Final Flight of Endeavour: A Space Shuttle Mission Overview
 
Skylon Space Plane
Skylon Space PlaneSkylon Space Plane
Skylon Space Plane
 
Atlantis_-_The_Final_Mission
Atlantis_-_The_Final_MissionAtlantis_-_The_Final_Mission
Atlantis_-_The_Final_Mission
 
Perspectives onpropulsion
Perspectives onpropulsionPerspectives onpropulsion
Perspectives onpropulsion
 
Indian space launch vehicle
Indian space launch vehicleIndian space launch vehicle
Indian space launch vehicle
 
Space Shuttle Challenger
Space Shuttle ChallengerSpace Shuttle Challenger
Space Shuttle Challenger
 
Atlantisthefinalmission 110726070334-phpapp02
Atlantisthefinalmission 110726070334-phpapp02Atlantisthefinalmission 110726070334-phpapp02
Atlantisthefinalmission 110726070334-phpapp02
 
Atlantis -the_final_mission - Technobytes
Atlantis  -the_final_mission - TechnobytesAtlantis  -the_final_mission - Technobytes
Atlantis -the_final_mission - Technobytes
 
Atlantis: The Final Mission
Atlantis: The Final MissionAtlantis: The Final Mission
Atlantis: The Final Mission
 
Atlantisthefinalmission 110726070334-phpapp02
Atlantisthefinalmission 110726070334-phpapp02Atlantisthefinalmission 110726070334-phpapp02
Atlantisthefinalmission 110726070334-phpapp02
 

Ähnlich wie Ares1 x-nasa-r-091031204434-phpapp02

NewSpace: Space Travel For All Of Us
NewSpace: Space Travel For All Of UsNewSpace: Space Travel For All Of Us
NewSpace: Space Travel For All Of UsChris Radcliff
 
Space Launch System Solid Rocket Booster
Space Launch System Solid Rocket BoosterSpace Launch System Solid Rocket Booster
Space Launch System Solid Rocket BoosterDr. Pankaj Dhussa
 
Reusable Launch Vehicle
Reusable Launch VehicleReusable Launch Vehicle
Reusable Launch VehicleUday Reddy
 
Propulsion System in Hypersonic Spacecraft Rocket: A Review of Recent Develop...
Propulsion System in Hypersonic Spacecraft Rocket: A Review of Recent Develop...Propulsion System in Hypersonic Spacecraft Rocket: A Review of Recent Develop...
Propulsion System in Hypersonic Spacecraft Rocket: A Review of Recent Develop...IRJET Journal
 
Future inventions of aerospace engineering presentation
Future inventions of aerospace engineering presentationFuture inventions of aerospace engineering presentation
Future inventions of aerospace engineering presentationAsad Jamil
 
NASA Launching High-Tech Inflatable Heat Shield Test Saturday
NASA Launching High-Tech Inflatable Heat Shield Test SaturdayNASA Launching High-Tech Inflatable Heat Shield Test Saturday
NASA Launching High-Tech Inflatable Heat Shield Test Saturdaycravenbunch6057
 
LASER AIAA PAPER (1)
LASER AIAA PAPER (1)LASER AIAA PAPER (1)
LASER AIAA PAPER (1)Austin Gerber
 
ARIES NASA Langley S Airborne Research Facility
ARIES  NASA Langley S Airborne Research FacilityARIES  NASA Langley S Airborne Research Facility
ARIES NASA Langley S Airborne Research FacilityKimberly Pulley
 
An Overview Of The NASA F-18 High Alpha Research
An Overview Of The NASA F-18 High Alpha ResearchAn Overview Of The NASA F-18 High Alpha Research
An Overview Of The NASA F-18 High Alpha ResearchShannon Green
 
Ares V: Supporting Space Exploration from LEO to Beyond
Ares V: Supporting Space Exploration from LEO to BeyondAres V: Supporting Space Exploration from LEO to Beyond
Ares V: Supporting Space Exploration from LEO to BeyondAmerican Astronautical Society
 
Long_Alexandra-8900_final
Long_Alexandra-8900_finalLong_Alexandra-8900_final
Long_Alexandra-8900_finalAlexandra Long
 
11:00am - NASA Constellation Projects - Pepper Phillips (ppt ...
11:00am - NASA Constellation Projects - Pepper Phillips (ppt ...11:00am - NASA Constellation Projects - Pepper Phillips (ppt ...
11:00am - NASA Constellation Projects - Pepper Phillips (ppt ...webhostingguy
 
Harmon Rocket N540RM
Harmon Rocket N540RMHarmon Rocket N540RM
Harmon Rocket N540RMrobmokry
 
Pacificon 200905
Pacificon 200905Pacificon 200905
Pacificon 200905Ian Kluft
 

Ähnlich wie Ares1 x-nasa-r-091031204434-phpapp02 (20)

NewSpace: Space Travel For All Of Us
NewSpace: Space Travel For All Of UsNewSpace: Space Travel For All Of Us
NewSpace: Space Travel For All Of Us
 
Space Launch System Solid Rocket Booster
Space Launch System Solid Rocket BoosterSpace Launch System Solid Rocket Booster
Space Launch System Solid Rocket Booster
 
Space x
Space x Space x
Space x
 
Space shuttle and its advancement
Space shuttle and its advancementSpace shuttle and its advancement
Space shuttle and its advancement
 
Space travel
Space travelSpace travel
Space travel
 
Reusable Launch Vehicle
Reusable Launch VehicleReusable Launch Vehicle
Reusable Launch Vehicle
 
Propulsion System in Hypersonic Spacecraft Rocket: A Review of Recent Develop...
Propulsion System in Hypersonic Spacecraft Rocket: A Review of Recent Develop...Propulsion System in Hypersonic Spacecraft Rocket: A Review of Recent Develop...
Propulsion System in Hypersonic Spacecraft Rocket: A Review of Recent Develop...
 
Final Year Seminar Presentation.
Final Year Seminar Presentation.Final Year Seminar Presentation.
Final Year Seminar Presentation.
 
Future inventions of aerospace engineering presentation
Future inventions of aerospace engineering presentationFuture inventions of aerospace engineering presentation
Future inventions of aerospace engineering presentation
 
NASA Launching High-Tech Inflatable Heat Shield Test Saturday
NASA Launching High-Tech Inflatable Heat Shield Test SaturdayNASA Launching High-Tech Inflatable Heat Shield Test Saturday
NASA Launching High-Tech Inflatable Heat Shield Test Saturday
 
LASER AIAA PAPER (1)
LASER AIAA PAPER (1)LASER AIAA PAPER (1)
LASER AIAA PAPER (1)
 
ARIES NASA Langley S Airborne Research Facility
ARIES  NASA Langley S Airborne Research FacilityARIES  NASA Langley S Airborne Research Facility
ARIES NASA Langley S Airborne Research Facility
 
An Overview Of The NASA F-18 High Alpha Research
An Overview Of The NASA F-18 High Alpha ResearchAn Overview Of The NASA F-18 High Alpha Research
An Overview Of The NASA F-18 High Alpha Research
 
Hypersonic aircraft
Hypersonic aircraftHypersonic aircraft
Hypersonic aircraft
 
Ares V: Supporting Space Exploration from LEO to Beyond
Ares V: Supporting Space Exploration from LEO to BeyondAres V: Supporting Space Exploration from LEO to Beyond
Ares V: Supporting Space Exploration from LEO to Beyond
 
Long_Alexandra-8900_final
Long_Alexandra-8900_finalLong_Alexandra-8900_final
Long_Alexandra-8900_final
 
11:00am - NASA Constellation Projects - Pepper Phillips (ppt ...
11:00am - NASA Constellation Projects - Pepper Phillips (ppt ...11:00am - NASA Constellation Projects - Pepper Phillips (ppt ...
11:00am - NASA Constellation Projects - Pepper Phillips (ppt ...
 
Saltman
SaltmanSaltman
Saltman
 
Harmon Rocket N540RM
Harmon Rocket N540RMHarmon Rocket N540RM
Harmon Rocket N540RM
 
Pacificon 200905
Pacificon 200905Pacificon 200905
Pacificon 200905
 

Kürzlich hochgeladen

Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 

Kürzlich hochgeladen (20)

Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 

Ares1 x-nasa-r-091031204434-phpapp02

  • 2. • On Wednesday, October 28, 2009, NASA launched its Ares I-X prototype vehicle, the first launch from Kennedy's pads of a vehicle other than the space shuttle since the Apollo Program's Saturn rockets were retired. NASA's Constellation Program's 327-foot-tall rocket produced 2.96 million pounds of thrust at liftoff and reached a speed of 100 mph in eight seconds. The two-minute sub-orbital test flight encountered a few problems along the way, as the launch pad was slightly damaged, a planned stage separation did not go according to plan, and a possible parachute failure led to a hard splashdown for its first stage. The Constellation program is under pressure as a recent committee report depicted it as overly expensive. The Obama administration is set to make a decision in the next several months about the near-term direction of U.S. Space Policy.
  • 3. Smoke engulfs Launch Pad 39B as the Ares I-X test rocket takes off from NASA's Kennedy Space Centre in Florida at 11:30 a.m. EDT on October 28, 2009
  • 4. Ares I First Stage Motor Unveiled on July 20, 2009. The Ares first stage five-segment development motor is 154 feet in length and generates a maximum of 3.6 million lbs of thrust, 24 percent more power than one twin Shuttle solid rocket booster.
  • 5. Flames shot more than 100 feet high in a successful 5.5-second ground test firing Thursday, Nov. 20, 2008 of a launch abort motor for NASA's next generation spacecraft, the Orion crew exploration vehicle. NASA and the Orion industry team conducted the firing at the Alliant Techsystems, or ATK, facility in Promontory, Utah.
  • 6. NASA and ATK successfully conducted an Ares I main cluster parachute test at the U.S. Army Proving Grounds in Yuma, Arizona. The test was conducted on May 20, 2009. It involved three 150-feet diameter parachutes lowering a 41,500 Pound test weight to the desert floor. The parachute system will be used to recover the first stage of Ares I. It was also used to recover the first stage of Ares I-X following its test flight.
  • 7. On Sept. 10, 2009, NASA and industry engineers lit up the Utah sky with the initial full-scale, full-duration test firing of the first stage motor for the Ares I rocket. The 154-foot solid rocket motor produced heat two-thirds the temperature of the sun and its 12-foot-diameter cylinder delivered 3.6 million pounds of thrust.
  • 8. At the Shuttle Landing Facility at NASA's Kennedy Space Centre in Florida, hardware that will be used in the launch of the Ares I-X rocket is offloaded from a C-5 aircraft. The hardware consists of a precisely machined, full-scale simulator crew module and launch abort system to form the tip of NASA's Ares I-X rocket.
  • 9. A-3 Test Stand Construction at NASA's Stennis Space Centre in in Hancock County, Mississippi. Nine water, isopropyl alcohol (IPA) and liquid oxygen (LOX) tanks have been delivered and installed, with five more water tanks scheduled to arrive in upcoming weeks. The two IPA tanks shown on the left and the three LOX tanks shown on the right are 35,000 gallons each. The four water tanks in the centre are 39,000 gallons each. All 14 of the tanks will be used by the chemical steam generators units that will be installed on the A-3 stand for creating simulated altitudes of up to 100,000 feet, a testing environment for Constellation, initially to validate the performance of the J2-X engine for the upper stage of the new Ares I launch vehicle
  • 10. In High Bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Centre in Florida, the Ares I-X upper stage simulator service module/service adapter (left, centre) has been installed on a stand. Other segments are placed and stacked on the floor around it. Ares I-X is the test vehicle for the Ares I, which is part of the Constellation Program to return men to the moon and beyond.
  • 11. In the Vehicle Assembly Building's High Bay 3 at NASA's Kennedy Space Centre in Florida, the Ares I-X aft centre booster segment is lowered for attachment to the aft booster and skirt.
  • 12. In High Bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Centre in Florida, technicians move a second roll control system module into place for installation in the Ares I-X segment.
  • 13. The NASA Railroad hauls cars carrying the Ares I-X motor segments and nozzle exit cone over a river bridge to NASA's Kennedy Space Centre in Florida. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.
  • 14. The oxygen vent arm and hood removed from the fixed service structure at NASA Kennedy Space Centre's Launch Pad 39B is ready for transfer from the pad to a storage facility, after the pad was transferred from the Space Shuttle Program to the Constellation Program. The ground operations team is modifying pad B for the Ares I-X rocket launch. Modifications also include installing access platforms and a vehicle stabilization system.
  • 15. In the Rotation, Processing and Surge Facility at NASA's Kennedy Space Centre in Florida, a technician performs propellant grain inspection of the inside of the Ares I-X motor segment. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator.
  • 16. In the Vehicle Assembly Building's High Bay 4, assembly of the Ares I-X rocket nears completion. The yellow framework, nicknamed the "birdcage," lifts Super Stack 5 toward an opening at the 16th floor crossover into the transfer aisle. The stack will be positioned on top of the segments already in place on the mobile launcher platform in High Bay 3, completing assembly of the 327-foot-tall rocket. Five super stacks make up the rocket's upper stage that is integrated with the four-segment solid rocket booster first stage.
  • 17. In the Vehicle Assembly Building's High Bay 3, a yellow framework, lifts Super Stack 5 atop Super Stack 4. Once in position, assembly of the Ares I-X rocket will be complete. The 327-foot-tall rocket is one of the largest processed in the bay, rivaling the height of the Apollo Program's 364-foot-tall Saturn V.
  • 18. The Ares I-X rocket, shown in in High Bay 3 of Kennedy Space Centre's Vehicle Assembly Building is being prepared for the Launch Vehicle Readiness Test in Cape Canaveral, Fla. on Monday, October 5, 2009.
  • 19. The 327-foot-tall Ares I-X test rocket moves slowly to launch pad 39B from the Vehicle Assembly Building at the Kennedy Space Centre in Cape Canaveral, Fla., Tuesday, Oct. 20, 2009.
  • 20. NASA's Ares 1-X rocket rolls out to launch pad 39-B at the Kennedy Space Centre October 20, 2009 in Cape Canaveral, Florida.
  • 21. The top section of NASA's new Ares 1-X test vehicle is reflected in a pond as an alligator lurks near launch pad 39-B at Kennedy Space Centre, Florida on October 26, 2009
  • 22. The Ares 1-X test rocket lifts off on a six-minute suborbital flight from launch pad 39B at the Kennedy Space Centre in Cape Canaveral, Florida, October 28, 2009.
  • 23. NASA's Ares 1-X rocket lifts off from launch pad 39-b at the Kennedy Space Centre October 28, 2009 in Cape Canaveral, Florida.
  • 24.
  • 25. THE END You Can Keep Listening To The Music Or Press ‘Esc’ To Exit