SUMMARY OF QUALIFICATIONS AND STRENGTHS
Project Management
Customer Communications
Planning, Scheduling, and Estimating
Distribution System Troubleshooting
Decision Making
OBJECTIVE:
I am seeking a challenging position that will utilize my broad range of skills in project management, Facilities
Distribution Management, underground systems design, construction and system startup.
SUMMARY OF SKILLS
Utility Master Planning and Management including:
Personal Skills
Self Starter
Over Twenty-five years’ experience in Distribution Management
strong organizational skills
Analyze, present and implement solutions to utilities problems
Written and Oral Communication Skills
Make decisions based on qualified data
Computer Skills
AutoCAD 14
Microsoft Project
Microsoft Excel
Microsoft Power Point
Mechanical and Construction Management
Site Support
Technical Expertise in Design and Troubleshooting Underground
Systems
Coordinate Installation for Underground Utility Projects
Facility Environmental Regulation Compliance
Environmental Compliance Team
Ensure environmental compliance by Submitting of Regulatory timely Reports
Troubleshooting wastewater site compliance issues
Filing Wastewater permit applications
Experienced in Asbestos Removal Procedures
Underground storage tank removal compliance procedures
EMPLOYMENT HISTORY
Project Management and design for various sizes and types of HVAC, Mechanical and distribution piping
systems:
1987 to PRESENT
2. Page 2
MASSACHUSETTS INSTITUTE OF TECHNOLOGY
Department of Facilities
Job title and Description:
Engineering and Environmental Construction Coordinator
My present responsibilities are to manage; triage and troubleshooting for the underground utilities from
the central utility plant to the first disconnect within all of the MIT buildings. These utilities include high-
pressure steam, chilled water, campus compressed air, demineralized water systems, and emergency power
generation. Other duties consist of the utility capital projects keeping up with never ending campus
expansion. I am also the campus contact for all compliance issues involving the MWRA Sewer Discharge
Permit and other Wastewater Management Issues.
Leading project to redesign Department of Facilities Design Guidelines, Phase I complete.
Provide civil and structural engineering expertise to projects as needed
Position Summary:
Troubleshoot Service Disruptions to Campus teaching labs and dormitory buildings
Campus Contact for Massachusetts Wastewater Resources Authority
Consultation on the best practices for Campus underground utility projects
UTILITY PROJECT MAJOR COMPLETIONS
Design Install and Startup of Building De-mineralized Water Systems
1. Building 48 System
2. Building E34
Buildings E17, E18 & E19 chilled water interconnect:
Project Manager - Installed a new chilled water pumping system servicing buildings E17, E18
and E19. This work included the installation of phased piping to keep the chilled water services
running during construction.
1. Demolition of Existing Cooling Towers
2. Demolition and Removal of (2) Existing Absorption Chillers
3. Installation drawings, hydraulics, including interim piping connections during
construction.
2. Construction Management and start-up.
Abatement of asbestos form a 500 linear foot steam tunnel:
1. Project manager - Remove asbestos from approximately 500 linear feet of steam tunnel
piping. This involved the removal of the asbestos while keeping steam service running.
2. Also included was the re-installation of all piping insulation.
Vassar street Steam System Upgrade and Installation
1. The Installation of Approximately 550’ linear of steam manholes and Piping to service the
Main and West campus.
2. Installation drawings, construction management and startup
COMPLETED MISCELLANEOUS PROJECTS
Main Campus Fire Pump Feed Upgrade
Central Utilities Plant - Raw Water System Upgrade
Campus Elevator Venting Compliance Program
3. Page 3
Building NW14 Emergency Generator Installation
Building W31 Emergency Generator Installation
Building W1 Emergency Generator Installation
5ESS Telecommunications Expansion Project
Building 5 Chilled Water Central Pumping System Installation
Building 10 Chilled Water Central Pumping System Installation
UNITED ENGINEERS & CONTRACTORS INC.
Job Description: Mechanical Designer
PHILIP MORRIS INC.,
Steam and Condensate piping design and pipe support systems
POLAROID CORP.
Chiller and cooling tower systems design
POTLATCH CORP.
No. 4 Paper Machine lube oil system design 1979 – 1981
CHARLES T. MAIN INC.
Job Description: Mechanical Designer
REVIEW COMMITTEES
Utilities Review Committee
Department of Facilities Supervisor Reengineering Committee
Current State of Utilities Infrastructure Assessment Committee
Campus Race Relations Committee
EDUCATION
Cathedral High School 1965
Massachusetts College of Art - 4 years part time 1 year full time
University Of Massachusetts – 2 years
PERSONAL ACCOMPLISHMENTS
MILITARY
US Army veteran 1967 - 1970
Republic of Vietnam 1968
Completed Drill Sergeant School
MY HOBBIES
Football Coach
Coaching Youth Soccer
Oil Painting
PERSONAL AND PROFESSIONAL AWARDS
1995 City of Cambridge Community Service Award
1995 M.I.T. Community Service Award
1998 YMCA Black Achievers Award