1. 66 Marikas Kotopouli Str., P.C. 45444 Ioannina - Greece
Tel: +30 26510 76019 -+30 26510 37357, Fax: +30 26510 37019
E-mail: info@metron-ec.com
1
Name of Firm: METRON Engineering &
Consultants S.A.
Name of Staff: Syntosis Vasileios
Profession: Civil engineer
Date of Birth: October 18th
1965
Years with Firm -Permanent 11years Nationality (ies): Greek
-Part time
Key Qualifications:
Fields of Expertise Construction Construction
Supervision
Construction
Management
Project
Managenent
Experience 1993-1996
(3years)
1996-2005
(9years)
1996-2005
(9years)
2005-2014
(9 years)
Training Civil Engineer
Degree of Responsibility
within the firm
Vice President CEO
Relevant assignments Senior Engineer
(road and structures)
Cost Control and
Time schedule
Technical Assistant QA/Lead Auditor
ISO 9000:2000
Education:
Education
Degree Specialization University Graduation Year
B.Eng. Civil Engineer Polytechnic School, University of
Thessaloniki - Greece
1991
AUDITOR/
LEAD
AUDITOR
ISO 9000:2000 series' Quality
Assurance Systems, certified
by the IRCA
(International Register of
Certificated Auditors),
registration number:
IQ - LA5358/TUV HELLAS
- 2007
Memberships of Professional Societies:
Memberships of
Professional Societies
Professional Body Country Class of
Membership
Date of
Selection
Acronym
Hellenic Technical
Chamber
Greece Member 1992 TCG
Association of Civil
Engineers of
Greece
Greece Member 1992 ACEG
Greek Tunneling
Society
Greece Member 2000 GTS
2. 66 Marikas Kotopouli Str., P.C. 45444 Ioannina - Greece
Tel: +30 26510 76019 -+30 26510 37357, Fax: +30 26510 37019
E-mail: info@metron-ec.com
2
Employment and Experience Record:
From – Until 11/2007 - on going
Position title Administrator of company’s branch in Albania
Employer METRON Engineering &Consultants S.A.
Location ALBANIA
Contract Technical Consulting Services and Management Consultant in projects:
“SARANDA - KONISPOL (SAGIADA) ROAD”, total construction budget 32.000.000 €
and overall length 32km (AEGEK CONSTRUCTION S.A.)
“Construction of the Dames – Tepelene section of the North South Corridor,
Contract No.2”, total construction budget 30.000.000€ and overall length 34km.
(AEGEK CONSTRUCTION S.A. – VEGA CONSTRUCTION GROUP)
“LEVAN – VLORE” section of the Pan – European VIIIth Corridor – ALVANIA, total
construction budget 55.000.000€ and overall length 25km. (ALPINE BAU G.m.b.H.)
“Assignment of the remaining works of the Project North-South Corridor, Dames -
Tepelena Road Section No.2 dated 05/08/2008”, total construction budget
5.557.000 € and overall length 34km. (VEGA CONSTRUCTION GROUP)
"Preparatory works Access Roads Banja, Contract No. PBR1 dated 11.04.2013",
total construction budget 1.700.000€ and overall length 3.30km. (VEGA
CONSTRUCTION GROUP)
Participation in the feasibility study for the project “Begaj HydroPower Plant”, on
Begaj at the city Bajram Curri in Albania, total construction budget 20.000.000€,
24MW. (AGNA S.A.)
“Hidrocentrali Sasaj, Bunec, Komuna Lukove"- hydropower plant Sasaj - ALBANIA,
total construction budget 5.000.000€ (ENERGO-SAS Sh.p.k.)
Type of activities
performed
Technical Consulting Services and Management Consultant
Deputy Head of Project Team.
Consulting and technical assistance, road designs, cost control, time scheduling, in
transportation projects.
Participation and active support in time and financial scheduling in the framework of
the Contractor’s strategy regarding the Project
From – Until 11/2008 - ongoing
Position title Vice President and CEO of the Board of Directors
Employer Metron engineering & consultants S.A.
Location GREECE
Contract “Ag. Dimitrios – Sellades, Arta – Filippiada bypass”, with total construction budget
21.017.031€.(ELTER ATE)
“Ag. Dimitrios – Sellades bypass Arta – Filippiada”, with total construction budget
21.017.031€.(INTRAKAT)
“Connection of Patra wide bypass with the city of Patra, covering Diakoniari
stream”, with total construction budget 42.724.664€.(MICHANIKI S.A.)
“Connection of Patra wide bypass with the new port & the National Road Patra –
Pirgos with the construction of Glafkos side arteries, and remaining works of Patra
wide bypass”, with total construction budget METROY 1.1: 9.887.545,11€ &
METROY 1.4:32.036.270,5€. (MICHANIKI S.A.)
“Remaining works of Arta – Filippiada bypass – Arta interchange”, with total
construction budget 5.715.459€.(HLIOXWRA SA)
3. 66 Marikas Kotopouli Str., P.C. 45444 Ioannina - Greece
Tel: +30 26510 76019 -+30 26510 37357, Fax: +30 26510 37019
E-mail: info@metron-ec.com
3
“Port – Fishing Shelter Pantokratora Preveza”, total construction budget 2.813.008€
(J/V ARHIMHDHS ATE – REBCON)
“Port of Kavala, northern section extending platforms, Western area”, with total
construction budget 7.619.982€.(THOLOS SA)
“Consulting Services on projects of insufficient management for potential
beneficiaries”. (Region of Epirus – Interim Management Authority)
“Construction of motorway with the accompanying works in section: beginning of
Ag. Marina Stylida – beginning of Rachon of PATHE road axis, with total
construction budget 123.000.000€. (J/V AKTOR ATE – TERNA SA)
Construction of interchange connection of Glafkos side arteries with the New Port
of Patra and construction of technical estuary of Diakoniari torrent from ch. 0-
001.50 to ch. 1-050.00, with total construction budget 24.000.000€. (TERNA
ABETE)
Type of activities
performed
Management Consulting Services
Technical Assistance, road projects, cost control, time scheduling, project’s registry
and safety & health file in transportation projects.
From – Until 01/2009 – 12/2011
Position title Executive Quality Control Consultant
Employer EPTISA SERVICIOS DE INGENIERIA SL
Location GREECE
Contract ‘Specialized Consultant of Quality Control’, EPTISA SL at the ¼ of the Hellenic Domain,
for up to 500 Projects.
Type of activities
performed
Quality control consultant
Technical support services
Coordination services for the organization and control of records of contractual data
and of technical projects studies
From – Until 02-2005/12-2010
Position title Vice President and CEO of the Board of Directors
Employer Metron engineering & consultants S.A.
Location GREECE
Contract PROJECT MANAGER for the completion of the Agrinio and Arta wide diversions 50 Km.
(IONIA ODOS Motorway)
Sub-contractor of J/V PRISMA Consulting Engineers S.A. – WS ATKINS INTERNATIONAL
LIMITED
Type of activities
performed
Team Manager on site
Development of a Quality Control, Time Scheduling and Cost Control System for the
works, Design Checking, Supervision of works.
From – Until 09-2004/01-2005
Position title Member of project team.
Employer Metron engineering & consultants S.A.
Location GREECE
Contract Consulting Services for the Constitutive Analysis of the Objective of Works and the
checking of Bills of Quantities and Budgets, for five EGNATIA ODOS S.A. projects being
under procurement
Type of activities
performed
Checking of Bills of Quantities, designs (tunnels, bridges, technical works, highways,
signaling – security, drainage etc. and contractual agreement of tariff articles with
the tender documents, the approved final designs and the construction works.
From – Until 1996 / 2004
Position title Construction supervision.
Section Manager / Coordinator of Supervisors
4. 66 Marikas Kotopouli Str., P.C. 45444 Ioannina - Greece
Tel: +30 26510 76019 -+30 26510 37357, Fax: +30 26510 37019
E-mail: info@metron-ec.com
4
Human Resources Manager.
Employer J/V OMEK Consulting Engineers S.A. – THALES Engineering & Consulting S.A.
& METRON Consulting Engineers S.A
Location GREECE
Contract CONSTRUCTION MANAGEMENT
EGNATIA ODOS MOTORWAY
(West Region 123 Km – Budget 1.149.340.000 €)
Includes 32 Twin Tunnels 58 km (measured as a single bore) (among them Driskos
tunnel – which is 4.530m long per branch)., 28 bridges (spans up to 490m), retaining
walls, Berlin type walls, pile walls, 4 junctions, control rooms buildings, drains,
reinforced, earth embankments and cuts
Type of activities
performed
Constant evaluation of Supervisors and teams performance. Coordination of work
teams (supervisors, topographers, geologists, quality control/assurance engineers,
bridge/tunnel/road construction engineers, health and safety engineers, quantity
surveyors).
Detailed check and report on the performance of the Contractors.
Monitoring of work progress (time and financial scheduling), Head of the Work Team
for the Compilation, Development and Improvement of the Quality Assurance, Time
and Financial Scheduling, Health and Safety Management Systems, for all projects of
the Western Section of West Region of Egnatia Odos.
From – Until 1994/1996
Position title Resident Engineer (Roads and structures)
Employer Α. J/V AETE TECHNODOMI TRAYLOS BROS – EKTER S.A.
Β. J/V ODON & ODOSTROMATON S.A. – IRIS S.A & A.T.E. OMAS
Location GREECE
Contract -Construction of Egnatia Odos – Section Lykopodi to Makrihora, CH. 8+000 – CH.
13+000. Budget 11,740,000 €.
-Construction of Egnatia Odos – Section Makrihora to Kristallopigi, CH. 13+000 – CH.
25+000. Budget 10,270,000 €.
Type of activities
performed
Monitoring of work progress in tunnel excavation and support .
Participation in the organization, the time and financial schedules and the execution
of the project.
From – Until 1993/1994
Position title Resident Engineer (Roads and structures)
Employer IRIS S.A.
Location GREECE
Contract -Construction of Road Project: “Ioannina- Kalpaki- Kakavia”.
Type of activities
performed
Resident Engineer (Roads and structures)
Languages Speak Read Write
Excellent Good Fair Excellent Good Fair Excellent Good Fair
-Greek x x x
-English x x x
-Other
(specify)