Jip Nelissen, Innovation Advisor | UE presentation 24-03 2011 |
Barefoot Architect |
     Innovation for Relief and Development |




2.
Experience vs Fresh insight.
      | Groundwork as a starting point..




3.
Carrefour
                                                                                     Nan ti sous & Nan Cocteau




                                                                                                   Port-au Prince 6eme Turgeau;
                                                                                                   St Marie & Villa Rosa




                                           Léogane - Section Communale 1 & 3: Lompré




     Grand Goave




       Grand Goave - Section Communale 7



                                                        Different approaches for different Operational Area’s.
                                                              | Vernacular Rural environment VS Urban informal context.




4.
Getting to know the people and the area’s.
                              | Social Assesments.




5.
Understanding the typology, damage and the need.
                                  | Technical Assesments.




6.
Approach and Strategy; Emergency to Transitional
     IDEJEN local carpentry interns built high quality Core structure T-Shelters.




7.
Process
                             After construction of 152 core-structures
     Technical and Social evaluation of the PILOT phase took
        place, to have lessons-learnt for the up-scaling of the project.




8.
Strategy Evaluation; Social.
     Implementing of Community Action Planning.




9.
Cordaid T S
Approved b     helter Core
                           -Structure
           y UNOPS c
                       alcs for 108
                                    mph.
     Specificatio
                 ns quarante
       for 15 years            ed
                     at least.




                                                  Strategy Evaluation; Technical
                                           up-grading of architectural design & specs.




   10.
Appropriate approach for Rual Area’s.
                                                 | Fits the local typology.
      | Good starting point for sustainable (neighborhood) development




11.
Strategy shift; Emergency to Development
      Initial Transitional Shelters with tarps upgraded towards permanent Shelters.




12.
Research Transition to permanent;
                       Walling prototype.
              Patchwork of 11 different techniques,
      used as a Research and Communication tool.




13.
Research Transition to permanent;
                                                                             Walling prototype.
                                                          11 X Walls are based on vernacular techniques,
                                                                 previous experiences and lessons from
                                                                    Cordaid Indonesia, and other NGO’s:




14. Transition to permanent | Research permanent walls.
D.

                                                                                                                                                                                                                                                                                                                                                          E.

  B.                                                                                                                                                                                                                                                                                                                                                      F.
  C.
  A.

                                                                                             J.                                                   K.                                                            G.                          H.                                        I.




                                                                                                                                                                                                        Sustainability / Viabilite
                         Chema           < Design >
                                                                                                                                                 Pep < people > >
                                                                                                                                                  Profi < profit                                     Planet < planet >                               Profi   < profit >

                                                                                                                                                                                                                      Rezilta Total (sou 39)     <                                                                         Rezilta Total (sou 39)         <
                                                                                                                                        uraje mache Enkouraje                         Rezilta Viabilite (sou 21) <            total Enkouraje mache            Enkouraje            Rezilta Viabilite (sou 21)         <
       Nimewo       Deskripsyon                                           <       Rezilta Vilnerab (sou 18)     <   Aseptans                Adaptasyon            Mentnans              Dirabilite Score of 21 < Efe ekolojik <Score of 39 >
                                                                                                                                                                                         Sustainability        >                                                                        Sustainability Score of 21 >
                                                                                                                                                                                                                                                                                                                                  total Score   of 39 >

       < number >   techniquer >                                                  Vulnerability Score of 18 >       < acceptability >       < adaptability > travaye lokal
                                                                                                                                                         <        < maintenance > <     durability >             eco-load >         lokal          <           travaye lokal    <
                                                                                                                                        rket stimilus >       local labour >                                                     local market stimilus >       local labour >


                    klisade avek bwa lokal                            <
       A            klissade of local trees, finshed >
                                                                                                      12                       3             2            1               2 1                     12
                                                                                                                                                                                                   2                  1         24            2                            2                       12                                   24
                    mi ak ròch
       B            < wall of rocks >
                                                                                                      16                       3             2            1               3 3                     17
                                                                                                                                                                                                   3                  2         33            2                            3                       17                                   33
                    planch palmis                                             <
       C            plancks made of palm tree >
                                                                                                      11                       3             2            2               3 2                     16
                                                                                                                                                                                                   3                  1         27            2                            3                       16                                   27
                    blòk ak planch mango                                  <
       D            concrete blocks and plancks Mango >
                                                                                                      12                       2             3            1               3 2                     14
                                                                                                                                                                                                   2                  1         26            3                            3                       14                                   26
                    blòk ak plywood
       E            < concrete blocks and plywood >
                                                                                                      12                       2             3            1               3 2                     16
                                                                                                                                                                                                   2                  3         28            3                            3                       16                                   28
                    blòk ak tòl
       F            < concrete blocks and roofsheets >
                                                                                                      12                       1             3            1               2 2                     14
                                                                                                                                                                                                   2                  3         26            3                            2                       14                                   26
                    klisad ak bwa entrange                                <
       G            wattle and daub of imported wood, with finish >
                                                                                                      12                       3             1            1               3 1                     14
                                                                                                                                                                                                   2                  3         26            1                            3                       14                                   26
                    tablo siman
       H            < sheets of fiber cementboard >
                                                                                                      16                       2             1            1               1 3                     14
                                                                                                                                                                                                   3                  3         30            1                            1                       14                                   30
                    mi ki f è t ak debri
       I            < wall of rubble >
                                                                                                      16                       3             3            1               3 3                     19
                                                                                                                                                                                                   3                  3         35            3                            3                       19                                   35
                    randwi ak nas banbou                                  <
       J            cement rendering with a mesh of bamboo >
                                                                                                      17                       3             3            1               3 3                     18
                                                                                                                                                                                                   3                  2         35            3                            3                       18                                   35
                    randwi ak nas gabyon                                  <
       K            cement rendering with metal chain-link >
                                                                                                      17                       3             1            1               3 3                     17
                                                                                                                                                                                                   3                  3         34            1                            3                       17                                   34




15. Transition to permanent | Comparing Sustainability and Vulnerability Criteria.
Traditional wattle and daub                                      wattle and daub of imported
            wall of local trees, with finish
                               < klisade avek bwa lokal >
                                                              A.                         wood, with finish
                                                                                               < klisad ak bwa entrange >
                                                                                                                               G.
                            vulnerability score                                            vulnerability score
                  12     /18
                                             < rezilta vilnerab sou >
                                                                                   12    /18
                                                                                                              < rezilta vilnerab sou >




                     sustainability score                                            sustainability score
                                                        12
                                < rezilta Viabilite sou >
                                                                        /21                                              14
                                                                                                 < rezilta Viabilite sou >
                                                                                                                                         /21




16. Transition to permanent | Best Rated.
Ferro-cement rendering
                Ferro-cement rendering
                   with metal chain-link
                               < randwi ak nas gabyon >
                                                             K.              with a mesh of bamboo
                                                                                         < andwi ak nas banbou >
                                                                                                                       J.
                                                                                      vulnerability score
                  17     /18
                            vulnerability score
                                            < rezilta vilnerab sou >
                                                                             17    /18
                                                                                                      < rezilta vilnerab sou >




                                                                                sustainability score
                    sustainability score
                                                       17
                               < rezilta Viabilite sou >
                                                                       /21                                       18
                                                                                         < rezilta Viabilite sou >
                                                                                                                                 /21




17. Transition to permanent | Best Rated.
Wall of Debris
                  Traditional wall of rocks
                                           < mi ak ròch >
                                                              B.                             < mi ki fèt ak debri >
                                                                                                                       I.
                             vulnerability score                                     vulnerability score
                   16     /18
                                             < rezilta vilnerab sou >
                                                                              16   /18
                                                                                                      < rezilta vilnerab sou >




                      sustainability score                                    sustainability score
                                                        17
                                < rezilta Viabilite sou >
                                                                        /21                                      19
                                                                                         < rezilta Viabilite sou >
                                                                                                                                 /21




18. Transition to permanent | Best Rated.
Barefoot Architect |
      Innovation for Relief and Development |




19.
Actors                                 Cordaid | Haiti


                                                         SPM




                 Community


                                                             IA


            Local Partners



                                                                                      Logistics

           Int. Partners




                   Suppliers
                                      AM’s & Teams Leogane        AM’s & Teams PauP



           IA Bridging, initating and facilitating between SPM, AM’s, other departments and actors.




20. Position |   Innovation Advisor
Sustainable sourcing and technical assistance.




21.
Partnership Build Change.
      | All the local Bosses of Cordaid Area’s trained and certified.
                            | Owner Driven reconstruction support.




22.
Process; Transition to Permanent Shelters
                    Local Bosses built Walls and Floor.




23.
Transition to permanent.
      | All the Walls & Floors made by trained local Bosses.
                | Implementation process and system design.
                    | Manuals, design and technical detailling.




24.
25.
Urban Area’s need alternative strategy.
      KEYCHALLENGE | Integral interventions for sustainable (neighborhood) development,
                                         >>Mandate Cordaid; 8100 Shelters, including 2000 Repairs.




26.
Urban Area’s need alternative strategy.
            KEYCHALLENGE | That fits the urban reality.
      KEYCHALLENGE | That is sustainable and replicable.




27.
Redesign of the Core-Sructure.
       | All the Panels are interchangeable.
             | Flexible width 3mtr to 4,5mtr




28.
KEYCHALLENGE Support self-building &
                                                                                   Owner Driven Reconstruction Strategies.
                                                                                                             | Knowledge based.
                                                                 | Improving quality on existing typology of confined measonry.
                                                            | Aimed on increasing capacity on resources and material sourcing.




29.Approaches & Key Challenges |   Owner Driven Reconstruction Strategies.
KEYCHALLENGE | Rubble removal, -management and -recycling.




30.
Partnership Foyer st Marie on rubble recycling.
      |1st Entrepreneur is being trained and will produce materials.
                    | Partner in community driven site preperation.




31.
KEYCHALLENGE | Land improvement, stabilization and infrastructural interventions




32.
Integral Community Driven Site Preparation.
                         | Community prepares land and work.
      | Cordaid buys recycled materials, community produces.
               | Cordaid monitors and assists with knowledge.




      Integral Community Driven Site Preparation.
                        | Community prepares land and work.
      | Cordaid buys recycled materials, community produces.
               |Cordaid monitors and assists with knowledge.


33.

Weitere ähnliche Inhalte

Was ist angesagt?

sari_sudhan_udportfolio
sari_sudhan_udportfoliosari_sudhan_udportfolio
sari_sudhan_udportfolio
sarisudhan
 
Smart City ICT
Smart City ICTSmart City ICT
Smart City ICT
Paul Goff
 
Mountford Pigott Select Portfolio 2012 (100dpi)
Mountford Pigott Select Portfolio 2012 (100dpi)Mountford Pigott Select Portfolio 2012 (100dpi)
Mountford Pigott Select Portfolio 2012 (100dpi)
MatMills
 
10 15-12 ggu-obj1_instruction_inventory
10 15-12 ggu-obj1_instruction_inventory10 15-12 ggu-obj1_instruction_inventory
10 15-12 ggu-obj1_instruction_inventory
MKThink Strategy
 
Dobson Portfolio
Dobson PortfolioDobson Portfolio
Dobson Portfolio
dobbern
 
Dobson Portfolio
Dobson PortfolioDobson Portfolio
Dobson Portfolio
dobbern
 
Retrofitting web version2
Retrofitting web version2Retrofitting web version2
Retrofitting web version2
neil052005
 
Heizer om10 mod_b-linear programming
Heizer om10 mod_b-linear programmingHeizer om10 mod_b-linear programming
Heizer om10 mod_b-linear programming
Rozaimi Mohd Saad
 
Quality assurance 11x17
Quality assurance 11x17Quality assurance 11x17
Quality assurance 11x17
swiss1234
 
Quality assurance 11x17
Quality assurance 11x17Quality assurance 11x17
Quality assurance 11x17
swiss1234
 
Project manager delivering project success
Project manager delivering project successProject manager delivering project success
Project manager delivering project success
Bipin Barma
 

Was ist angesagt? (19)

sari_sudhan_udportfolio
sari_sudhan_udportfoliosari_sudhan_udportfolio
sari_sudhan_udportfolio
 
Smart City ICT
Smart City ICTSmart City ICT
Smart City ICT
 
Tim Middleton Portfolio
Tim Middleton PortfolioTim Middleton Portfolio
Tim Middleton Portfolio
 
LCP Team
LCP Team LCP Team
LCP Team
 
Mountford Pigott Select Portfolio 2012 (100dpi)
Mountford Pigott Select Portfolio 2012 (100dpi)Mountford Pigott Select Portfolio 2012 (100dpi)
Mountford Pigott Select Portfolio 2012 (100dpi)
 
Q210newsletter
Q210newsletterQ210newsletter
Q210newsletter
 
Asset integrity 2012 pdfw9(6pp)
Asset integrity 2012 pdfw9(6pp)Asset integrity 2012 pdfw9(6pp)
Asset integrity 2012 pdfw9(6pp)
 
10 15-12 ggu-obj1_instruction_inventory
10 15-12 ggu-obj1_instruction_inventory10 15-12 ggu-obj1_instruction_inventory
10 15-12 ggu-obj1_instruction_inventory
 
Brief Review Of Notable Projects In Which Rajnish1121
Brief  Review  Of  Notable  Projects   In  Which  Rajnish1121Brief  Review  Of  Notable  Projects   In  Which  Rajnish1121
Brief Review Of Notable Projects In Which Rajnish1121
 
Dobson Portfolio
Dobson PortfolioDobson Portfolio
Dobson Portfolio
 
Dobson Portfolio
Dobson PortfolioDobson Portfolio
Dobson Portfolio
 
Retrofitting web version2
Retrofitting web version2Retrofitting web version2
Retrofitting web version2
 
Heizer om10 mod_b-linear programming
Heizer om10 mod_b-linear programmingHeizer om10 mod_b-linear programming
Heizer om10 mod_b-linear programming
 
03-26-12 Huckabee Project Update
03-26-12 Huckabee Project Update03-26-12 Huckabee Project Update
03-26-12 Huckabee Project Update
 
Quality assurance 11x17
Quality assurance 11x17Quality assurance 11x17
Quality assurance 11x17
 
Quality assurance 11x17
Quality assurance 11x17Quality assurance 11x17
Quality assurance 11x17
 
BFL - Claire Warnock
BFL - Claire WarnockBFL - Claire Warnock
BFL - Claire Warnock
 
Project manager delivering project success
Project manager delivering project successProject manager delivering project success
Project manager delivering project success
 
Kathleen English Gulf Coast Green 2010
Kathleen English Gulf Coast Green 2010Kathleen English Gulf Coast Green 2010
Kathleen English Gulf Coast Green 2010
 

Andere mochten auch (6)

Haiti shelter presentation 25-03-2011
Haiti   shelter presentation 25-03-2011Haiti   shelter presentation 25-03-2011
Haiti shelter presentation 25-03-2011
 
През "Образование и карьера"
През "Образование и карьера"През "Образование и карьера"
През "Образование и карьера"
 
11.11.11 presentation to cordaid
11.11.11 presentation to cordaid11.11.11 presentation to cordaid
11.11.11 presentation to cordaid
 
Presentacya
PresentacyaPresentacya
Presentacya
 
P2 Richard de Ruiter
P2 Richard de RuiterP2 Richard de Ruiter
P2 Richard de Ruiter
 
Causes of success and failure in post disaster reconstruction projects – a ca...
Causes of success and failure in post disaster reconstruction projects – a ca...Causes of success and failure in post disaster reconstruction projects – a ca...
Causes of success and failure in post disaster reconstruction projects – a ca...
 

Ähnlich wie 110324 ue ia

Digital portfolio
Digital portfolioDigital portfolio
Digital portfolio
jadamsm
 
Arch Resume
Arch ResumeArch Resume
Arch Resume
gosush
 
Isesi project em_8_dec2010.ppt
Isesi project em_8_dec2010.pptIsesi project em_8_dec2010.ppt
Isesi project em_8_dec2010.ppt
Graham Sinclair
 
Vassilis Tsakiris presentation at PMI-GREECE1/6/2010, AIT
Vassilis Tsakiris presentation at PMI-GREECE1/6/2010, AITVassilis Tsakiris presentation at PMI-GREECE1/6/2010, AIT
Vassilis Tsakiris presentation at PMI-GREECE1/6/2010, AIT
12PM Consulting
 
160730_Resume_Swaroop
160730_Resume_Swaroop160730_Resume_Swaroop
160730_Resume_Swaroop
swaroop patil
 
160730_Resume_Swaroop
160730_Resume_Swaroop160730_Resume_Swaroop
160730_Resume_Swaroop
swaroop patil
 
White paper and CRP6: Co-learning on Impact Evaluation Design in NRM Research...
White paper and CRP6: Co-learning on Impact Evaluation Design in NRM Research...White paper and CRP6: Co-learning on Impact Evaluation Design in NRM Research...
White paper and CRP6: Co-learning on Impact Evaluation Design in NRM Research...
WorldFish
 
Open2012 sustainable-community-o neill-asu
Open2012 sustainable-community-o neill-asuOpen2012 sustainable-community-o neill-asu
Open2012 sustainable-community-o neill-asu
the nciia
 
Tim Middleton Portfolio
Tim Middleton PortfolioTim Middleton Portfolio
Tim Middleton Portfolio
beingtomothy
 
Ruby Montalbo -Architect.updated
Ruby Montalbo -Architect.updatedRuby Montalbo -Architect.updated
Ruby Montalbo -Architect.updated
Montalbo Ruby
 

Ähnlich wie 110324 ue ia (20)

Digital portfolio
Digital portfolioDigital portfolio
Digital portfolio
 
Arch Resume
Arch ResumeArch Resume
Arch Resume
 
Dredging brochure
Dredging brochureDredging brochure
Dredging brochure
 
Isesi project em_8_dec2010.ppt
Isesi project em_8_dec2010.pptIsesi project em_8_dec2010.ppt
Isesi project em_8_dec2010.ppt
 
SYNERGY launches Ecosyne
SYNERGY launches EcosyneSYNERGY launches Ecosyne
SYNERGY launches Ecosyne
 
USP&amp;E Company Overview 2012 1
USP&amp;E Company Overview 2012 1USP&amp;E Company Overview 2012 1
USP&amp;E Company Overview 2012 1
 
Vassilis Tsakiris presentation at PMI-GREECE1/6/2010, AIT
Vassilis Tsakiris presentation at PMI-GREECE1/6/2010, AITVassilis Tsakiris presentation at PMI-GREECE1/6/2010, AIT
Vassilis Tsakiris presentation at PMI-GREECE1/6/2010, AIT
 
Icon ecpma09
Icon ecpma09Icon ecpma09
Icon ecpma09
 
160730_Resume_Swaroop
160730_Resume_Swaroop160730_Resume_Swaroop
160730_Resume_Swaroop
 
160730_Resume_Swaroop
160730_Resume_Swaroop160730_Resume_Swaroop
160730_Resume_Swaroop
 
Common Carbon Metric in Buildings in Putrajaya
Common Carbon Metric in Buildings in PutrajayaCommon Carbon Metric in Buildings in Putrajaya
Common Carbon Metric in Buildings in Putrajaya
 
White paper and CRP6: Co-learning on Impact Evaluation Design in NRM Research...
White paper and CRP6: Co-learning on Impact Evaluation Design in NRM Research...White paper and CRP6: Co-learning on Impact Evaluation Design in NRM Research...
White paper and CRP6: Co-learning on Impact Evaluation Design in NRM Research...
 
Japanese Project Manager
Japanese Project ManagerJapanese Project Manager
Japanese Project Manager
 
Open2012 sustainable-community-o neill-asu
Open2012 sustainable-community-o neill-asuOpen2012 sustainable-community-o neill-asu
Open2012 sustainable-community-o neill-asu
 
6th Wave member Trento Health & Well Being Territorial Lab
6th Wave member Trento Health & Well Being Territorial Lab6th Wave member Trento Health & Well Being Territorial Lab
6th Wave member Trento Health & Well Being Territorial Lab
 
JAPAN × INDONESIA Business Acceleration Program
JAPAN × INDONESIA Business Acceleration ProgramJAPAN × INDONESIA Business Acceleration Program
JAPAN × INDONESIA Business Acceleration Program
 
Web Analytics Congress 2013 a/b-test workshop
Web Analytics Congress 2013 a/b-test workshopWeb Analytics Congress 2013 a/b-test workshop
Web Analytics Congress 2013 a/b-test workshop
 
Tim Middleton Portfolio
Tim Middleton PortfolioTim Middleton Portfolio
Tim Middleton Portfolio
 
Semjet international company profile 2012
Semjet international company profile 2012Semjet international company profile 2012
Semjet international company profile 2012
 
Ruby Montalbo -Architect.updated
Ruby Montalbo -Architect.updatedRuby Montalbo -Architect.updated
Ruby Montalbo -Architect.updated
 

110324 ue ia

  • 1. entremedio Jip Nelissen, Innovation Advisor | UE presentation 24-03 2011 |
  • 2. Barefoot Architect | Innovation for Relief and Development | 2.
  • 3. Experience vs Fresh insight. | Groundwork as a starting point.. 3.
  • 4. Carrefour Nan ti sous & Nan Cocteau Port-au Prince 6eme Turgeau; St Marie & Villa Rosa Léogane - Section Communale 1 & 3: Lompré Grand Goave Grand Goave - Section Communale 7 Different approaches for different Operational Area’s. | Vernacular Rural environment VS Urban informal context. 4.
  • 5. Getting to know the people and the area’s. | Social Assesments. 5.
  • 6. Understanding the typology, damage and the need. | Technical Assesments. 6.
  • 7. Approach and Strategy; Emergency to Transitional IDEJEN local carpentry interns built high quality Core structure T-Shelters. 7.
  • 8. Process After construction of 152 core-structures Technical and Social evaluation of the PILOT phase took place, to have lessons-learnt for the up-scaling of the project. 8.
  • 9. Strategy Evaluation; Social. Implementing of Community Action Planning. 9.
  • 10. Cordaid T S Approved b helter Core -Structure y UNOPS c alcs for 108 mph. Specificatio ns quarante for 15 years ed at least. Strategy Evaluation; Technical up-grading of architectural design & specs. 10.
  • 11. Appropriate approach for Rual Area’s. | Fits the local typology. | Good starting point for sustainable (neighborhood) development 11.
  • 12. Strategy shift; Emergency to Development Initial Transitional Shelters with tarps upgraded towards permanent Shelters. 12.
  • 13. Research Transition to permanent; Walling prototype. Patchwork of 11 different techniques, used as a Research and Communication tool. 13.
  • 14. Research Transition to permanent; Walling prototype. 11 X Walls are based on vernacular techniques, previous experiences and lessons from Cordaid Indonesia, and other NGO’s: 14. Transition to permanent | Research permanent walls.
  • 15. D. E. B. F. C. A. J. K. G. H. I. Sustainability / Viabilite Chema < Design > Pep < people > > Profi < profit Planet < planet > Profi < profit > Rezilta Total (sou 39) < Rezilta Total (sou 39) < uraje mache Enkouraje Rezilta Viabilite (sou 21) < total Enkouraje mache Enkouraje Rezilta Viabilite (sou 21) < Nimewo Deskripsyon < Rezilta Vilnerab (sou 18) < Aseptans Adaptasyon Mentnans Dirabilite Score of 21 < Efe ekolojik <Score of 39 > Sustainability > Sustainability Score of 21 > total Score of 39 > < number > techniquer > Vulnerability Score of 18 > < acceptability > < adaptability > travaye lokal < < maintenance > < durability > eco-load > lokal < travaye lokal < rket stimilus > local labour > local market stimilus > local labour > klisade avek bwa lokal < A klissade of local trees, finshed > 12 3 2 1 2 1 12 2 1 24 2 2 12 24 mi ak ròch B < wall of rocks > 16 3 2 1 3 3 17 3 2 33 2 3 17 33 planch palmis < C plancks made of palm tree > 11 3 2 2 3 2 16 3 1 27 2 3 16 27 blòk ak planch mango < D concrete blocks and plancks Mango > 12 2 3 1 3 2 14 2 1 26 3 3 14 26 blòk ak plywood E < concrete blocks and plywood > 12 2 3 1 3 2 16 2 3 28 3 3 16 28 blòk ak tòl F < concrete blocks and roofsheets > 12 1 3 1 2 2 14 2 3 26 3 2 14 26 klisad ak bwa entrange < G wattle and daub of imported wood, with finish > 12 3 1 1 3 1 14 2 3 26 1 3 14 26 tablo siman H < sheets of fiber cementboard > 16 2 1 1 1 3 14 3 3 30 1 1 14 30 mi ki f è t ak debri I < wall of rubble > 16 3 3 1 3 3 19 3 3 35 3 3 19 35 randwi ak nas banbou < J cement rendering with a mesh of bamboo > 17 3 3 1 3 3 18 3 2 35 3 3 18 35 randwi ak nas gabyon < K cement rendering with metal chain-link > 17 3 1 1 3 3 17 3 3 34 1 3 17 34 15. Transition to permanent | Comparing Sustainability and Vulnerability Criteria.
  • 16. Traditional wattle and daub wattle and daub of imported wall of local trees, with finish < klisade avek bwa lokal > A. wood, with finish < klisad ak bwa entrange > G. vulnerability score vulnerability score 12 /18 < rezilta vilnerab sou > 12 /18 < rezilta vilnerab sou > sustainability score sustainability score 12 < rezilta Viabilite sou > /21 14 < rezilta Viabilite sou > /21 16. Transition to permanent | Best Rated.
  • 17. Ferro-cement rendering Ferro-cement rendering with metal chain-link < randwi ak nas gabyon > K. with a mesh of bamboo < andwi ak nas banbou > J. vulnerability score 17 /18 vulnerability score < rezilta vilnerab sou > 17 /18 < rezilta vilnerab sou > sustainability score sustainability score 17 < rezilta Viabilite sou > /21 18 < rezilta Viabilite sou > /21 17. Transition to permanent | Best Rated.
  • 18. Wall of Debris Traditional wall of rocks < mi ak ròch > B. < mi ki fèt ak debri > I. vulnerability score vulnerability score 16 /18 < rezilta vilnerab sou > 16 /18 < rezilta vilnerab sou > sustainability score sustainability score 17 < rezilta Viabilite sou > /21 19 < rezilta Viabilite sou > /21 18. Transition to permanent | Best Rated.
  • 19. Barefoot Architect | Innovation for Relief and Development | 19.
  • 20. Actors Cordaid | Haiti SPM Community IA Local Partners Logistics Int. Partners Suppliers AM’s & Teams Leogane AM’s & Teams PauP IA Bridging, initating and facilitating between SPM, AM’s, other departments and actors. 20. Position | Innovation Advisor
  • 21. Sustainable sourcing and technical assistance. 21.
  • 22. Partnership Build Change. | All the local Bosses of Cordaid Area’s trained and certified. | Owner Driven reconstruction support. 22.
  • 23. Process; Transition to Permanent Shelters Local Bosses built Walls and Floor. 23.
  • 24. Transition to permanent. | All the Walls & Floors made by trained local Bosses. | Implementation process and system design. | Manuals, design and technical detailling. 24.
  • 25. 25.
  • 26. Urban Area’s need alternative strategy. KEYCHALLENGE | Integral interventions for sustainable (neighborhood) development, >>Mandate Cordaid; 8100 Shelters, including 2000 Repairs. 26.
  • 27. Urban Area’s need alternative strategy. KEYCHALLENGE | That fits the urban reality. KEYCHALLENGE | That is sustainable and replicable. 27.
  • 28. Redesign of the Core-Sructure. | All the Panels are interchangeable. | Flexible width 3mtr to 4,5mtr 28.
  • 29. KEYCHALLENGE Support self-building & Owner Driven Reconstruction Strategies. | Knowledge based. | Improving quality on existing typology of confined measonry. | Aimed on increasing capacity on resources and material sourcing. 29.Approaches & Key Challenges | Owner Driven Reconstruction Strategies.
  • 30. KEYCHALLENGE | Rubble removal, -management and -recycling. 30.
  • 31. Partnership Foyer st Marie on rubble recycling. |1st Entrepreneur is being trained and will produce materials. | Partner in community driven site preperation. 31.
  • 32. KEYCHALLENGE | Land improvement, stabilization and infrastructural interventions 32.
  • 33. Integral Community Driven Site Preparation. | Community prepares land and work. | Cordaid buys recycled materials, community produces. | Cordaid monitors and assists with knowledge. Integral Community Driven Site Preparation. | Community prepares land and work. | Cordaid buys recycled materials, community produces. |Cordaid monitors and assists with knowledge. 33.