1
Contents

• Nuclear Energy in Turkey
-Energy
-Nuclear Energy Projects
-Business Opportunities

2
Energy
•

Turkey’s energy bill was $60bn in 2012.

•

It is estimated that Turkey’s demand for electricity will increase at an annual rate of 6-8% between 2009 and
2023.

•

For Turkey to meet its energy demand, significant investments are necessary in the energy sector, estimated
around US$130 billion by 2023.

•

Turkey’s energy dependency is currently at 70% with;
92% of oil
98% of gas imported causing over 50% of current account deficit(CAD).

•

Turkey plans to reform energy production to meet increasing demand and aims to become a transit hub for
energy transportation in the region.

•

Turkey is aiming to increase energy production using domestic energy sources; coal, renewable energy and
nuclear energy.

Type your title and date here 00/00/0000

3
Energy
Chal lenges and Opportunities:
Challenges:
Need for new legislations and regulations
Competitive environment,
Tax problems.
Opportunities:
Turkey’s goal of becoming an energy hub,
Increasing need for energy,
High potential natural resources,
Geographic advantages.
Type your title and date here 00/00/0000

4
Nuclear Energy Projects
• Turkey is planning to build 3 nuclear power plants by 2023.
• The Turkish Prime Minister announced a notice to facilitate and speed up the
procedures for nuclear energy in 2012.
• The first nuclear power plant project, Akkuyu is contracted to Russia and the second
nuclear plant which will be built in Sinop is contracted to Japan/France. Trakya region
which is the European part of Turkey is considered for the 3rd nuclear power plant to be
built.

Type your title and date here 00/00/0000

5
Nuclear Energy Projects
•

In May 2010 Turkish government and Russian government signed an agreement for Rosatom to build, own
and operate the Akkuyu plant of four 3rd generation VVER 1200 MWe reactors as a US$ 20 billion project.
Rosatom, through Atomstroyexport and Inter RAO UES, will finance the project and start off with 100%
equity in the Turkish project company set up to build, own and operate the plant. In December 2011 the
project company Akkuyu Nukleer Santral Elektrik Uretim had filed applications for construction permits and a
power generation license, as well as an environmental impact assessment by the deadline, with a view to
starting construction in 2015 and finishing the first unit at the end of 2020.

•

According to the agreement between Russia and Turkey, all the work that does not require high tech will be
carried out by Turkish companies. The construction work(excluding nuclear island), environmental impact
assessment, studies on the construction site, etc will be contracted to local companies.

Type your title and date here 00/00/0000

6
Business Opportunities
• As there is a lack of experience and knowledge the Turkish Government is in need of
working with an international nuclear consultancy firm to map the project and also to be
able to manage the project.
• Project management,
• Legal and regulatory advice,
• Training,
• Supply Chain Capability Building,
• Physical and cyber security,
• Supply Chain Opportunities and nuclear island components within Main Contractor
Russia.

Type your title and date here 00/00/0000

7
Contacts
Um ay Uysal
T rade M anager
British Embassy, Sehit Ersan
Caddesi No. 46/A, Cankaya, Ankara
Tel: +90-312-455-3258 
Email: umay.uysal@fco.gov.uk
www.ukinturkey.fco.gov.uk

8

Weitere ähnliche Inhalte

Was ist angesagt?

China Wind Power - May 2010 Investor Presentation
China Wind Power - May 2010 Investor PresentationChina Wind Power - May 2010 Investor Presentation
China Wind Power - May 2010 Investor Presentation
TMX Equicom
 
Energy policy outlook kse 2012
Energy policy outlook kse 2012Energy policy outlook kse 2012
Energy policy outlook kse 2012
ICPS
 
Radioactive emission
Radioactive emissionRadioactive emission
Radioactive emission
yutoyama
 

Was ist angesagt? (19)

Plans for Egypt's First Coal-Fired Power Plant
Plans for Egypt's First Coal-Fired Power PlantPlans for Egypt's First Coal-Fired Power Plant
Plans for Egypt's First Coal-Fired Power Plant
 
RCREEE-enerMENA_sudan renewable energy projects-21.08.2013
RCREEE-enerMENA_sudan renewable energy projects-21.08.2013RCREEE-enerMENA_sudan renewable energy projects-21.08.2013
RCREEE-enerMENA_sudan renewable energy projects-21.08.2013
 
Alternative Energy (for Kaznex)
Alternative Energy (for Kaznex)Alternative Energy (for Kaznex)
Alternative Energy (for Kaznex)
 
Uae nuclear power sector opportunity analysis
Uae nuclear power sector opportunity analysisUae nuclear power sector opportunity analysis
Uae nuclear power sector opportunity analysis
 
China Wind Power - May 2010 Investor Presentation
China Wind Power - May 2010 Investor PresentationChina Wind Power - May 2010 Investor Presentation
China Wind Power - May 2010 Investor Presentation
 
Gcc renewable energy sector opportunity analysis
Gcc renewable energy sector opportunity analysisGcc renewable energy sector opportunity analysis
Gcc renewable energy sector opportunity analysis
 
VIETNAM - SOLAR POWER FEED IN TARIFFS BREAKING NEWS - FINAL DRAFT DECISION ON...
VIETNAM - SOLAR POWER FEED IN TARIFFS BREAKING NEWS - FINAL DRAFT DECISION ON...VIETNAM - SOLAR POWER FEED IN TARIFFS BREAKING NEWS - FINAL DRAFT DECISION ON...
VIETNAM - SOLAR POWER FEED IN TARIFFS BREAKING NEWS - FINAL DRAFT DECISION ON...
 
South korea wind power sector analysis 2013
South korea wind power sector analysis 2013South korea wind power sector analysis 2013
South korea wind power sector analysis 2013
 
Bel Air Short Presentation.2009[1]
Bel Air Short Presentation.2009[1]Bel Air Short Presentation.2009[1]
Bel Air Short Presentation.2009[1]
 
Water and energy
Water and energyWater and energy
Water and energy
 
Current status of energy sector in sudan
Current status of energy sector in sudanCurrent status of energy sector in sudan
Current status of energy sector in sudan
 
Prospective of large scale wind power in Sudan
Prospective of large scale wind power in SudanProspective of large scale wind power in Sudan
Prospective of large scale wind power in Sudan
 
Uae power sector analysis
Uae power sector analysisUae power sector analysis
Uae power sector analysis
 
Turkish Energy Outlook
Turkish Energy OutlookTurkish Energy Outlook
Turkish Energy Outlook
 
Financing nuclear projects — A. Abdel Aziz
Financing nuclear projects — A. Abdel AzizFinancing nuclear projects — A. Abdel Aziz
Financing nuclear projects — A. Abdel Aziz
 
Energy policy outlook kse 2012
Energy policy outlook kse 2012Energy policy outlook kse 2012
Energy policy outlook kse 2012
 
Radioactive emission
Radioactive emissionRadioactive emission
Radioactive emission
 
LAWYER IN VIETNAM DR. OLIVER MASSMANN SOLAR POWER BREAKING NEWS - NEW FEED IN...
LAWYER IN VIETNAM DR. OLIVER MASSMANN SOLAR POWER BREAKING NEWS - NEW FEED IN...LAWYER IN VIETNAM DR. OLIVER MASSMANN SOLAR POWER BREAKING NEWS - NEW FEED IN...
LAWYER IN VIETNAM DR. OLIVER MASSMANN SOLAR POWER BREAKING NEWS - NEW FEED IN...
 
REG-Scatec Solar awarded 258 MW in latest bidding round in South Africa
REG-Scatec Solar awarded 258 MW in latest bidding round in South AfricaREG-Scatec Solar awarded 258 MW in latest bidding round in South Africa
REG-Scatec Solar awarded 258 MW in latest bidding round in South Africa
 

Andere mochten auch

Market Briefing. Vietnam. 27th January
Market Briefing. Vietnam. 27th JanuaryMarket Briefing. Vietnam. 27th January
Market Briefing. Vietnam. 27th January
UKTI2014
 
Colin Bird. Doosan Babcock. 29th January
Colin Bird. Doosan Babcock. 29th JanuaryColin Bird. Doosan Babcock. 29th January
Colin Bird. Doosan Babcock. 29th January
UKTI2014
 
Market Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th JanuaryMarket Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th January
UKTI2014
 
Market Briefing. South korea. 27th January
Market Briefing. South korea. 27th JanuaryMarket Briefing. South korea. 27th January
Market Briefing. South korea. 27th January
UKTI2014
 
David Edwards. Engineering Construction Training Board. 28th January
David Edwards. Engineering Construction Training Board. 28th JanuaryDavid Edwards. Engineering Construction Training Board. 28th January
David Edwards. Engineering Construction Training Board. 28th January
UKTI2014
 
Gerrit Zenner. Sarens UK Ltd. 29th January
Gerrit Zenner. Sarens UK Ltd. 29th JanuaryGerrit Zenner. Sarens UK Ltd. 29th January
Gerrit Zenner. Sarens UK Ltd. 29th January
UKTI2014
 

Andere mochten auch (6)

Market Briefing. Vietnam. 27th January
Market Briefing. Vietnam. 27th JanuaryMarket Briefing. Vietnam. 27th January
Market Briefing. Vietnam. 27th January
 
Colin Bird. Doosan Babcock. 29th January
Colin Bird. Doosan Babcock. 29th JanuaryColin Bird. Doosan Babcock. 29th January
Colin Bird. Doosan Babcock. 29th January
 
Market Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th JanuaryMarket Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th January
 
Market Briefing. South korea. 27th January
Market Briefing. South korea. 27th JanuaryMarket Briefing. South korea. 27th January
Market Briefing. South korea. 27th January
 
David Edwards. Engineering Construction Training Board. 28th January
David Edwards. Engineering Construction Training Board. 28th JanuaryDavid Edwards. Engineering Construction Training Board. 28th January
David Edwards. Engineering Construction Training Board. 28th January
 
Gerrit Zenner. Sarens UK Ltd. 29th January
Gerrit Zenner. Sarens UK Ltd. 29th JanuaryGerrit Zenner. Sarens UK Ltd. 29th January
Gerrit Zenner. Sarens UK Ltd. 29th January
 

Ähnlich wie Market Briefing. Turkey. 28th January

MENA nuclear decommissioning market, 2012
MENA nuclear decommissioning market, 2012MENA nuclear decommissioning market, 2012
MENA nuclear decommissioning market, 2012
piersfrench
 

Ähnlich wie Market Briefing. Turkey. 28th January (20)

MENA nuclear decommissioning market, 2012
MENA nuclear decommissioning market, 2012MENA nuclear decommissioning market, 2012
MENA nuclear decommissioning market, 2012
 
World Energy Focus - Agosto 2015
World Energy Focus - Agosto 2015World Energy Focus - Agosto 2015
World Energy Focus - Agosto 2015
 
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
 
Tajikistan
TajikistanTajikistan
Tajikistan
 
Kazakhstan
KazakhstanKazakhstan
Kazakhstan
 
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS - GETTING DEALS DONE
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS - GETTING DEALS DONEVIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS - GETTING DEALS DONE
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS - GETTING DEALS DONE
 
Turkey
TurkeyTurkey
Turkey
 
Vietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsVietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key Highlights
 
Jordan renewable energy market latest eg_jo_034925
Jordan renewable energy market latest eg_jo_034925Jordan renewable energy market latest eg_jo_034925
Jordan renewable energy market latest eg_jo_034925
 
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
 
Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8 Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8
 
report
reportreport
report
 
Dr. Oliver Massmann - Future Energy of Vietnam - Opportunities and Challenges
Dr. Oliver Massmann - Future Energy of Vietnam - Opportunities and Challenges Dr. Oliver Massmann - Future Energy of Vietnam - Opportunities and Challenges
Dr. Oliver Massmann - Future Energy of Vietnam - Opportunities and Challenges
 
INVESTING IN LIQUEFIED NATURAL GAS (LNG) IN VIETNAM
INVESTING IN LIQUEFIED NATURAL GAS (LNG) IN VIETNAM INVESTING IN LIQUEFIED NATURAL GAS (LNG) IN VIETNAM
INVESTING IN LIQUEFIED NATURAL GAS (LNG) IN VIETNAM
 
Issues and challenges with renewable energy in oman
Issues and challenges with renewable energy in omanIssues and challenges with renewable energy in oman
Issues and challenges with renewable energy in oman
 
New base energy news 16 august 2018 no 1195 by khaled al awadi-compressed
New base energy news 16 august 2018 no 1195  by khaled al awadi-compressedNew base energy news 16 august 2018 no 1195  by khaled al awadi-compressed
New base energy news 16 august 2018 no 1195 by khaled al awadi-compressed
 
Microsoft word new base 664 special 13 august 2015
Microsoft word   new base 664 special  13 august 2015Microsoft word   new base 664 special  13 august 2015
Microsoft word new base 664 special 13 august 2015
 
Lawyer in Vietnam Oliver Massmann - Investing in Solar Energy - How To Do I...
Lawyer in Vietnam Oliver Massmann  -  Investing in Solar Energy - How To Do I...Lawyer in Vietnam Oliver Massmann  -  Investing in Solar Energy - How To Do I...
Lawyer in Vietnam Oliver Massmann - Investing in Solar Energy - How To Do I...
 
Issues and challenges with renewable energy in oman
Issues and challenges with renewable energy in omanIssues and challenges with renewable energy in oman
Issues and challenges with renewable energy in oman
 
Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptx
 

Mehr von UKTI2014

Market Briefing. Malaysia. 27th January
Market Briefing. Malaysia. 27th JanuaryMarket Briefing. Malaysia. 27th January
Market Briefing. Malaysia. 27th January
UKTI2014
 
Nuclear Showcase 29th January - Manufacturing and the Supply Chain
Nuclear Showcase 29th January - Manufacturing and the Supply ChainNuclear Showcase 29th January - Manufacturing and the Supply Chain
Nuclear Showcase 29th January - Manufacturing and the Supply Chain
UKTI2014
 
Galleon suite 28th market briefings
Galleon suite 28th market briefingsGalleon suite 28th market briefings
Galleon suite 28th market briefings
UKTI2014
 
Galleon suite 27th market briefings
Galleon suite 27th market briefingsGalleon suite 27th market briefings
Galleon suite 27th market briefings
UKTI2014
 
Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen' Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen'
UKTI2014
 
Ian Tough. Weir Group. 29th January
Ian Tough. Weir Group.  29th JanuaryIan Tough. Weir Group.  29th January
Ian Tough. Weir Group. 29th January
UKTI2014
 
Richard Smith. Wall Rover Ltd. 29th January
Richard Smith. Wall Rover Ltd.  29th JanuaryRichard Smith. Wall Rover Ltd.  29th January
Richard Smith. Wall Rover Ltd. 29th January
UKTI2014
 
Neil Foreman. Centronic Ltd. 29th January
Neil Foreman. Centronic Ltd. 29th JanuaryNeil Foreman. Centronic Ltd. 29th January
Neil Foreman. Centronic Ltd. 29th January
UKTI2014
 
Ron Gorham. Nuclear Decommissioning Authority. 29th January
Ron Gorham. Nuclear Decommissioning Authority. 29th JanuaryRon Gorham. Nuclear Decommissioning Authority. 29th January
Ron Gorham. Nuclear Decommissioning Authority. 29th January
UKTI2014
 
Market Briefing. USA. 28th January
Market Briefing. USA. 28th JanuaryMarket Briefing. USA. 28th January
Market Briefing. USA. 28th January
UKTI2014
 
Rob Buckingham. OC Robotics. 28th January
Rob Buckingham. OC Robotics. 28th JanuaryRob Buckingham. OC Robotics. 28th January
Rob Buckingham. OC Robotics. 28th January
UKTI2014
 
Market Briefing. Japan part 1. 28th January
Market Briefing. Japan part 1. 28th JanuaryMarket Briefing. Japan part 1. 28th January
Market Briefing. Japan part 1. 28th January
UKTI2014
 
India presentation 2
India presentation 2India presentation 2
India presentation 2
UKTI2014
 
Cevn Vibert. Thales UK. 28th January
Cevn Vibert. Thales UK. 28th JanuaryCevn Vibert. Thales UK. 28th January
Cevn Vibert. Thales UK. 28th January
UKTI2014
 
Nigel Houlton. EDF Energy. 28th January
Nigel Houlton. EDF Energy. 28th JanuaryNigel Houlton. EDF Energy. 28th January
Nigel Houlton. EDF Energy. 28th January
UKTI2014
 
Fiona Reilly. Price Waterhouse Cooper. 28th January
Fiona Reilly. Price Waterhouse Cooper. 28th JanuaryFiona Reilly. Price Waterhouse Cooper. 28th January
Fiona Reilly. Price Waterhouse Cooper. 28th January
UKTI2014
 
Tim Stone. 28th January
Tim Stone. 28th JanuaryTim Stone. 28th January
Tim Stone. 28th January
UKTI2014
 
Graham Fairhall. National Nuclear Laboratory. 28th January
Graham Fairhall. National Nuclear Laboratory. 28th JanuaryGraham Fairhall. National Nuclear Laboratory. 28th January
Graham Fairhall. National Nuclear Laboratory. 28th January
UKTI2014
 
Paul Littler. Atkins Global. 28th January
Paul Littler. Atkins Global. 28th JanuaryPaul Littler. Atkins Global. 28th January
Paul Littler. Atkins Global. 28th January
UKTI2014
 
Market Briefing. India part 3. 27th January
Market Briefing. India part 3. 27th JanuaryMarket Briefing. India part 3. 27th January
Market Briefing. India part 3. 27th January
UKTI2014
 

Mehr von UKTI2014 (20)

Market Briefing. Malaysia. 27th January
Market Briefing. Malaysia. 27th JanuaryMarket Briefing. Malaysia. 27th January
Market Briefing. Malaysia. 27th January
 
Nuclear Showcase 29th January - Manufacturing and the Supply Chain
Nuclear Showcase 29th January - Manufacturing and the Supply ChainNuclear Showcase 29th January - Manufacturing and the Supply Chain
Nuclear Showcase 29th January - Manufacturing and the Supply Chain
 
Galleon suite 28th market briefings
Galleon suite 28th market briefingsGalleon suite 28th market briefings
Galleon suite 28th market briefings
 
Galleon suite 27th market briefings
Galleon suite 27th market briefingsGalleon suite 27th market briefings
Galleon suite 27th market briefings
 
Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen' Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen'
 
Ian Tough. Weir Group. 29th January
Ian Tough. Weir Group.  29th JanuaryIan Tough. Weir Group.  29th January
Ian Tough. Weir Group. 29th January
 
Richard Smith. Wall Rover Ltd. 29th January
Richard Smith. Wall Rover Ltd.  29th JanuaryRichard Smith. Wall Rover Ltd.  29th January
Richard Smith. Wall Rover Ltd. 29th January
 
Neil Foreman. Centronic Ltd. 29th January
Neil Foreman. Centronic Ltd. 29th JanuaryNeil Foreman. Centronic Ltd. 29th January
Neil Foreman. Centronic Ltd. 29th January
 
Ron Gorham. Nuclear Decommissioning Authority. 29th January
Ron Gorham. Nuclear Decommissioning Authority. 29th JanuaryRon Gorham. Nuclear Decommissioning Authority. 29th January
Ron Gorham. Nuclear Decommissioning Authority. 29th January
 
Market Briefing. USA. 28th January
Market Briefing. USA. 28th JanuaryMarket Briefing. USA. 28th January
Market Briefing. USA. 28th January
 
Rob Buckingham. OC Robotics. 28th January
Rob Buckingham. OC Robotics. 28th JanuaryRob Buckingham. OC Robotics. 28th January
Rob Buckingham. OC Robotics. 28th January
 
Market Briefing. Japan part 1. 28th January
Market Briefing. Japan part 1. 28th JanuaryMarket Briefing. Japan part 1. 28th January
Market Briefing. Japan part 1. 28th January
 
India presentation 2
India presentation 2India presentation 2
India presentation 2
 
Cevn Vibert. Thales UK. 28th January
Cevn Vibert. Thales UK. 28th JanuaryCevn Vibert. Thales UK. 28th January
Cevn Vibert. Thales UK. 28th January
 
Nigel Houlton. EDF Energy. 28th January
Nigel Houlton. EDF Energy. 28th JanuaryNigel Houlton. EDF Energy. 28th January
Nigel Houlton. EDF Energy. 28th January
 
Fiona Reilly. Price Waterhouse Cooper. 28th January
Fiona Reilly. Price Waterhouse Cooper. 28th JanuaryFiona Reilly. Price Waterhouse Cooper. 28th January
Fiona Reilly. Price Waterhouse Cooper. 28th January
 
Tim Stone. 28th January
Tim Stone. 28th JanuaryTim Stone. 28th January
Tim Stone. 28th January
 
Graham Fairhall. National Nuclear Laboratory. 28th January
Graham Fairhall. National Nuclear Laboratory. 28th JanuaryGraham Fairhall. National Nuclear Laboratory. 28th January
Graham Fairhall. National Nuclear Laboratory. 28th January
 
Paul Littler. Atkins Global. 28th January
Paul Littler. Atkins Global. 28th JanuaryPaul Littler. Atkins Global. 28th January
Paul Littler. Atkins Global. 28th January
 
Market Briefing. India part 3. 27th January
Market Briefing. India part 3. 27th JanuaryMarket Briefing. India part 3. 27th January
Market Briefing. India part 3. 27th January
 

Kürzlich hochgeladen

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Kürzlich hochgeladen (20)

Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 

Market Briefing. Turkey. 28th January

  • 1. 1
  • 2. Contents • Nuclear Energy in Turkey -Energy -Nuclear Energy Projects -Business Opportunities 2
  • 3. Energy • Turkey’s energy bill was $60bn in 2012. • It is estimated that Turkey’s demand for electricity will increase at an annual rate of 6-8% between 2009 and 2023. • For Turkey to meet its energy demand, significant investments are necessary in the energy sector, estimated around US$130 billion by 2023. • Turkey’s energy dependency is currently at 70% with; 92% of oil 98% of gas imported causing over 50% of current account deficit(CAD). • Turkey plans to reform energy production to meet increasing demand and aims to become a transit hub for energy transportation in the region. • Turkey is aiming to increase energy production using domestic energy sources; coal, renewable energy and nuclear energy. Type your title and date here 00/00/0000 3
  • 4. Energy Chal lenges and Opportunities: Challenges: Need for new legislations and regulations Competitive environment, Tax problems. Opportunities: Turkey’s goal of becoming an energy hub, Increasing need for energy, High potential natural resources, Geographic advantages. Type your title and date here 00/00/0000 4
  • 5. Nuclear Energy Projects • Turkey is planning to build 3 nuclear power plants by 2023. • The Turkish Prime Minister announced a notice to facilitate and speed up the procedures for nuclear energy in 2012. • The first nuclear power plant project, Akkuyu is contracted to Russia and the second nuclear plant which will be built in Sinop is contracted to Japan/France. Trakya region which is the European part of Turkey is considered for the 3rd nuclear power plant to be built. Type your title and date here 00/00/0000 5
  • 6. Nuclear Energy Projects • In May 2010 Turkish government and Russian government signed an agreement for Rosatom to build, own and operate the Akkuyu plant of four 3rd generation VVER 1200 MWe reactors as a US$ 20 billion project. Rosatom, through Atomstroyexport and Inter RAO UES, will finance the project and start off with 100% equity in the Turkish project company set up to build, own and operate the plant. In December 2011 the project company Akkuyu Nukleer Santral Elektrik Uretim had filed applications for construction permits and a power generation license, as well as an environmental impact assessment by the deadline, with a view to starting construction in 2015 and finishing the first unit at the end of 2020. • According to the agreement between Russia and Turkey, all the work that does not require high tech will be carried out by Turkish companies. The construction work(excluding nuclear island), environmental impact assessment, studies on the construction site, etc will be contracted to local companies. Type your title and date here 00/00/0000 6
  • 7. Business Opportunities • As there is a lack of experience and knowledge the Turkish Government is in need of working with an international nuclear consultancy firm to map the project and also to be able to manage the project. • Project management, • Legal and regulatory advice, • Training, • Supply Chain Capability Building, • Physical and cyber security, • Supply Chain Opportunities and nuclear island components within Main Contractor Russia. Type your title and date here 00/00/0000 7
  • 8. Contacts Um ay Uysal T rade M anager British Embassy, Sehit Ersan Caddesi No. 46/A, Cankaya, Ankara Tel: +90-312-455-3258  Email: umay.uysal@fco.gov.uk www.ukinturkey.fco.gov.uk 8