End of Work Term Presentation Template - Summer 2013
1. End of Term Presentation
Summer 2013
Tyler Ross Lambert
Power Distribution
Demopolis, AL
7-25-2013
2. About me
• School: Auburn University
• Major: Mechanical Engineering
• GPA (Cumulative): 3.93
• Graduation Date: Fall 2015
• Number of Completed Rotations: 1
• Hometown: Montgomery, AL
• Interesting Fact: I have attended at least one Auburn football
game each season since I turned three years old.
3. Work experience
• Draw jobs in DistGIS
• Estimate jobs with JETS
• Obtain MISSALL and ROW
Learning to:
4. Work experience
Black Warrior – APCO Crossings
Over 80 crossing points found in the
field and drawn in DistGIS.
Drawings include the nearest switch
and phase information, and the
BWE line is color coded to match
provided BWE maps.
5. Work experience
Working with the Demopolis Line Crew
Job for Stanley Walters
• Ran three phase primary line in order to feed
three 75 kVA padmount transformers connected to
irrigation systems.
• ~ 1 mile of wire hung
• 13 poles placed in ground
6. Summary
• I enjoy dealing with personal interactions and
performing tasks that utilize design work
(SolidWorks/AutoCAD) and/or computer
programming (MATLAB/C++).
• In future work terms, I would enjoy gaining a work
experience with a focus on design, and a utilization of
computer software in the development in power
delivery systems.
7. Summary
• I enjoy dealing with personal interactions and
performing tasks that utilize design work
(SolidWorks/AutoCAD) and/or computer
programming (MATLAB/C++).
• In future work terms, I would enjoy gaining a work
experience with a focus on design, and a utilization of
computer software in the development in power
delivery systems.