SlideShare ist ein Scribd-Unternehmen logo
1 von 11
Downloaden Sie, um offline zu lesen
TEEKAY OFFSHORE
Second Quarter 2013
Earnings Presentation
August 9, 2013
1
TEEKAY OFFSHORE
This presentation contains forward-looking statements (as defined in Section 21E of the Securities Exchange Act of 1934, as
amended) which reflect management’s current views with respect to certain future events and performance, including statements
regarding: the expected contribution of recent acquisitions, vessel deliveries and new contracts to cash flow growth; the timing of the
Voyageur Spirit achieving final acceptance and commencing full operations under the E.ON contract; the timing of the Lambada
Spirit shuttle tanker commencing its contract with BG; the timing of the HiLoad DP unit commencing its 10-year time-charter contract
with Petroleo Brasileiro SA; the potential for the Partnership to acquire future HiLoad projects developed by Remora, including
development of the next generation HiLoad DP units with BG Brasil; the timing of and cost of converting the Navion Clipper into an
FSO unit and the timing of the commencement of its 10-year charter contract with Salamander; the timing of and cost of converting
the Randgrid into an FSO unit and the timing of the commencement of the commencement of its 3-year charter contract with Statoil;
the potential for Teekay Corporation to offer additional vessels to the Partnership and the Partnership’s acquisition of any such
vessels, including the Petrojarl Foinaven, the Hummingbird Spirit and the newbuilding FPSO unit that will service the Knarr field
under contract with BG Norge Limited; the timing of delivery of vessels under construction or conversion; and the potential for the
Partnership to acquire other vessels or offshore projects from Teekay Corporation or directly from third parties. The following factors
are among those that could cause actual results to differ materially from the forward-looking statements, which involve risks and
uncertainties, and that should be considered in evaluating any such statement: vessel operations and oil production volumes; the
inability of the Voyageur Spirit FPSO to complete the repair of its compressors, achieve full production and receive final acceptance
by E.ON during August 2013; the potential for the loss of revenue under the charter with E.ON from the date of acquisition until final
acceptance exceeds Teekay Corporation’s maximum indemnification of $54 million; significant changes in oil prices; variations in
expected levels of field maintenance; increased operating expenses; different-than-expected levels of oil production in the North
Sea and Brazil offshore fields; potential early termination of contracts; potential delays to the commencement of the BG shuttle
tanker time-charters; failure of Teekay Corporation to offer to the Partnership additional vessels; the inability of the joint venture
between Teekay Corporation and Odebrecht to secure new Brazil FPSO projects that may be offered for sale to the Partnership; the
inability of Remora to develop future HiLoad DP units; failure to obtain required approvals by the Conflicts Committee of Teekay
Offshore’s general partner to approve the acquisition of vessels offered from Teekay Corporation, or third parties; the Partnership’s
ability to raise adequate financing to purchase additional assets; delays in vessel deliveries or conversions; and other factors
discussed in Teekay Offshore’s filings from time to time with the SEC, including its Report on Form 20-F for the fiscal year ended
December 31, 2012. The Partnership expressly disclaims any obligation or undertaking to release publicly any updates or revisions
to any forward-looking statements contained herein to reflect any change in the Partnership’s expectations with respect thereto or
any change in events, conditions or circumstances on which any such statement is based.
Forward Looking Statements
2
TEEKAY OFFSHORE
Recent Highlights
• Generated distributable Q2-13 cash flow of $43.0 million
• Declared Q2-13 cash distribution of $0.5253 per unit
• Completed $744 million of FPSO acquisitions including the
Voyageur Spirit FPSO and a 50% interest in Cidade de
Itajai FPSO
• Took delivery of first two (of four) shuttle tanker
newbuildings for long-term charter to BG in Brazil
– Financed with new bank facility and a portion of proceeds from
$150 million preferred unit offering in April 2013
– Financing for second two vessels with proceeds
from $174 million bond private placement which will close just
prior to deliveries
• Secured Gina Krog FSO project from Statoil
• Working on multiple FPSO FEED studies
3
TEEKAY OFFSHORE
Voyageur Spirit FPSO Operational Start-up Issue
• On April 13, 2013, the Voyageur Spirit FPSO unit began production (“first oil”) and was
acquired by TOO on May 2, 2013
• Upon achieving first oil, Teekay had a specified time period to receive Certificate of Final
Acceptance (full production) from the charterer, E.ON, at which point full revenues
would commence under the contract retroactive to first oil
• Due to a defective gas compressor on the Voyageur Spirit, the unit was unable to reach
full production within the allowable timeframe, resulting in E.ON declaring the unit off-
hire from first oil
• Given the unit had not achieved final acceptance from E.ON at the date of acquisition,
as per the purchase contract, Teekay Corporation, as seller, has agreed to indemnify
TOO for lost revenues until final acceptance by E.ON. Indemnification capped at 10%,
or $54m
• Teekay Corporation’s indemnification effectively treated as a reduction in Teekay
Offshore’s May 2013 purchase price of $540m and has no impact on TOO’s
distributable cash flow
• Indemnification amount for May 2 – June 30, 2013 was ~$12.5m
• Since April 2013, Voyageur Spirit has been operating at partial
capacity and is expected to reach full production levels
during August, following completion of repairs and testing
4
TEEKAY OFFSHORE
• Signed contract with Statoil to convert an existing shuttle
tanker (Randgrid) to an FSO for operation on the Gina
Krog field in the North Sea
o Initial term of 3 years, commencing Q1-17, plus 12x1-year
extension options
o Expected project cost: ~$220m
o Expected annual avg. CFVO*: ~$45m
• Martin Linge FSO project (North Sea) awarded to our
competition
Current Business Development
5
* Cash flow from vessel operations represents income from vessel operations before depreciation and amortization expense and amortization of deferred gains and in-process revenue contract, loss on
sale of vessel and write-down of vessels, includes the realized gains (losses) on the settlement of foreign exchange forward contracts and adjusting for direct financing leases to a cash basis. Cash
flow from vessel operations is a non-GAAP financial measure used by certain investors to measure the financial performance of shipping companies.
FSO
Projects
FEED
Studies
• Currently involved in three front end engineering and
design (FEED) studies for potential new FPSO projects
• Signed agreement to complete a FEED study to
develop the next generation of Remora DP HiLoad
offtake units
TEEKAY OFFSHORE
Project Bond (July 2013):
o Priced a $174 million, 4.96% 10-year U.S. project bond for two of the four BG shuttle
tanker newbuildings, Bossa Nova Spirit and Sertanejo Spirit
o The bonds are rated “BBB-” by Fitch
Continuous Offering Program (COP) (May 2013)
o In May 2013, TOO commenced selling under a $100 million COP program
o To date, TOO has issued 85,508 new units under the COP raising net proceeds of
approximately $2.7 million
Preferred Units (April 2013)
o In April 2013, TOO completed a 6,000,000 unit, $150 million perpetual preferred unit
offering with a fixed coupon of 7.25%
o Trading on NYSE under the ticker “TOO.PR.A”
Financing Update
6
TEEKAY OFFSHORE
Adjusted Operating Results for Q2 2013 vs. Q1 2013
(1) See Appendix A to the Partnership's Q2-13 earnings release for description of Appendix A items.
(2) Reallocating the realized gains/losses to their respective line as if hedge accounting had applied. Please refer to footnotes (4) and (5) to the Summary Consolidated
Statements of Income (Loss) in the Q2-13 earnings release.
(3) Removal of Voyageur Spirit FPSO results from April 13, 2013 through May 1, 2013, the period prior to acquisition by the Partnership but while under control of our sponsor,
Teekay Corporation, referred to as the “Dropdown Predecessor”.
UNAUDITED
(in thousands of US dollars)
As Reported
Appendix A items
(1)
Reclass for
Realized
Gains/Losses on
Derivatives
(2)
Net Loss
Attributable to
Dropdown
Predecessor (3)
TOO Adjusted
Income Statement
TOO Adjusted Income
Statement
NET REVENUES
Revenues 222,412 - - 1,090 221,322 212,112
Voyage expenses 23,273 - - - 23,273 22,948
Net revenues 199,139 - - 1,090 198,049 189,164
OPERATING EXPENSES
Vessel operating expenses 86,519 - (218) 1,354 84,947 76,971
Time-charter hire expense 14,093 - - - 14,093 14,777
Depreciation and amortization 50,265 - - 1,095 49,170 44,510
General and administrative 10,417 - - 237 10,180 10,331
Restructuring charge 1,395 (1,395) - - - -
Total operating expenses 162,689 (1,395) (218) 2,686 158,390 146,589
Income from vessel operations 36,450 1,395 218 (1,596) 39,659 42,575
OTHER ITEMS
Interest expense (16,035) - (14,659) (218) (30,476) (25,526)
Interest income 1,465 - - - 1,465 195
Realized and unrealized gain on
derivative instruments 33,901 (48,755) 14,738 (116) - -
Equity income 1,598 (1,185) - - 413 -
Foreign exchange gain 3,555 (3,529) (297) (271) - -
Loss on bond repurchase - - - - - -
Other income – net 260 106 - (24) 390 417
Income tax expense (456) - - - (456) 234
Total other items 24,288 (53,363) (218) (629) (28,664) (24,680)
Net income from continuing operations 60,738 (51,968) - (2,225) 10,995 17,895
Net loss from discontinued operations (2,134) 3,302 - - 1,168 2,274
Less: Net income attributable to non-controlling
interests (3,274) 808 - - (2,466) (1,307)
ADJUSTED NET INCOME ATTRIBUTABLE TO
THE PARTNERSHIP 57,555 (47,858) - - 9,697 18,862
June 30, 2013 March 31, 2013
Three Months Ended Three Months Ended
7
TEEKAY OFFSHORE
Distributable Cash Flow and Cash Distribution
Three Months Ended Three Months Ended
June 30, 2013 March 31, 2013
(unaudited) (unaudited)
Net income 58,604 21,970
Net loss attributable to Dropdown Predecessor 2,225 -
60,829 21,970
Add (subtract):
Depreciation and amortization 49,169 44,456
Non-cash items in discontinued operations/write down of vessel 8,179 12,140
Distributions relating to equity financing of newbuilding installments 2,813 2,459
Partnership's share of equity accounted joint ventures' distributable cash flow
before estimated maintenance capital expenditures 814 -
Equity income (1,598) -
Distributions relating to preferred units (1,817) -
Foreign exchange and other, net (3,382) 2,598
Estimated maintenance capital expenditures (1)
(26,808) (24,620)
Indemnification from Teekay Corporation relating to Voyageur Spirit FPSO 12,505 -
revenues (May 2, 2013 to June 30, 2013) (1)
Unrealized gains on non-designated derivative instruments (50,618) (13,193)
Loss on bond repurchase - 1,759
Distributable Cash Flow before Non-Controlling Interest 50,086 47,569
Non-controlling interests’ share of DCF (7,046) (5,813)
Distributable Cash Flow 43,040 41,756
Total Distributions 47,639 46,762
Coverage Ratio 0.90x 0.89x
(1) Indemnification of the loss of revenues from the Voyageur Spirit FPSO is effectively treated as a reduction to estimated maintenance capital expenditures in
the second quarter of 2013, since the indemnification amount received from Teekay Corporation is effectively treated as a reduction to the purchase price of the
Voyageur Spirit FPSO.
A
B
=A/B
8
TEEKAY OFFSHORE
Appendix
9
TEEKAY OFFSHORE
2013 TOO Drydock Schedule
10
Note: In the case that a vessel drydock straddles between quarters, the drydock has been allocated to the quarter in which the majority of drydock days occur.
Entity Segment
Vessels
Drydocked
Total
Offhire
Days
Vessels
Drydocked
Total
Offhire
Days
Vessels
Drydocked
Total
Offhire
Days
Vessels
Drydocked
Total
Offhire
Days
Vessels
Drydocked
Total
Offhire
Days
Teekay Offshore Conventional Tanker - - - - 1 25 - - 1 25
FSO - - - - - - - - - -
Shuttle Tanker 1 32 1 32 2 49 1 32 5 145
1 32 1 32 3 74 1 32 6 170
March 31, 2013 (A) June 30, 2013 (E) September 30, 2013 (E) December 31, 2013 (E) Total 2013
TEEKAY OFFSHORE 11

Weitere ähnliche Inhalte

Was ist angesagt?

Teekay Offshore Partners Fourth Quarter 2014 Earnings Presentatio
Teekay Offshore Partners Fourth Quarter 2014 Earnings PresentatioTeekay Offshore Partners Fourth Quarter 2014 Earnings Presentatio
Teekay Offshore Partners Fourth Quarter 2014 Earnings PresentatioAltera Infrastructure
 
Teekay Offshore Partners Q2-2017 Earnings Presentation
Teekay Offshore Partners Q2-2017 Earnings Presentation Teekay Offshore Partners Q2-2017 Earnings Presentation
Teekay Offshore Partners Q2-2017 Earnings Presentation Altera Infrastructure
 
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay LNG Partners L.P.
 
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceAltera Infrastructure
 
Teekay Corporation First Quarter 2013 Earnings Presentation
Teekay Corporation First Quarter 2013 Earnings PresentationTeekay Corporation First Quarter 2013 Earnings Presentation
Teekay Corporation First Quarter 2013 Earnings PresentationTeekay Corporation
 
September 2013 Investor Presentation
September 2013 Investor PresentationSeptember 2013 Investor Presentation
September 2013 Investor PresentationTeekay Corporation
 
Teekay Offshore (NYSE: TOO) Investor Day Presentation September 30 2014
Teekay Offshore (NYSE: TOO)  Investor Day Presentation September 30 2014Teekay Offshore (NYSE: TOO)  Investor Day Presentation September 30 2014
Teekay Offshore (NYSE: TOO) Investor Day Presentation September 30 2014Altera Infrastructure
 
Teekay Corporation Q2 2017 Earnings Presentation
Teekay Corporation Q2 2017 Earnings PresentationTeekay Corporation Q2 2017 Earnings Presentation
Teekay Corporation Q2 2017 Earnings PresentationTeekay Corporation
 
Teekay Offshore Partners Q3-2018 Earnings Presentation
Teekay Offshore Partners Q3-2018 Earnings PresentationTeekay Offshore Partners Q3-2018 Earnings Presentation
Teekay Offshore Partners Q3-2018 Earnings PresentationAltera Infrastructure
 
Teekay Offshore Partners Q3-2015 Earnings Presentation
Teekay Offshore Partners Q3-2015 Earnings PresentationTeekay Offshore Partners Q3-2015 Earnings Presentation
Teekay Offshore Partners Q3-2015 Earnings PresentationAltera Infrastructure
 
Teekay LNG Partners Third Quarter 2013 Earnings Presentation
Teekay LNG Partners Third Quarter 2013 Earnings PresentationTeekay LNG Partners Third Quarter 2013 Earnings Presentation
Teekay LNG Partners Third Quarter 2013 Earnings PresentationTeekay LNG Partners L.P.
 
Teekay Offshore Partners Q1-2015 Earnings Presentation
Teekay Offshore Partners Q1-2015 Earnings PresentationTeekay Offshore Partners Q1-2015 Earnings Presentation
Teekay Offshore Partners Q1-2015 Earnings PresentationTeekay LNG Partners L.P.
 
Teekay Corporation - Second Quarter 2012 Earnings Results Presentation
Teekay Corporation - Second Quarter 2012 Earnings Results PresentationTeekay Corporation - Second Quarter 2012 Earnings Results Presentation
Teekay Corporation - Second Quarter 2012 Earnings Results PresentationTeekay Corporation
 
Teekay Offshore Partners Q1-2016 Earnings Presentation
Teekay Offshore Partners Q1-2016 Earnings PresentationTeekay Offshore Partners Q1-2016 Earnings Presentation
Teekay Offshore Partners Q1-2016 Earnings PresentationAltera Infrastructure
 
Teekay Corporation Q2-2016 Earnings Presentation
Teekay Corporation Q2-2016 Earnings PresentationTeekay Corporation Q2-2016 Earnings Presentation
Teekay Corporation Q2-2016 Earnings PresentationTeekay Corporation
 
Teekay LNG Partners Q1-2017 Earnings Presentation
Teekay LNG Partners Q1-2017 Earnings PresentationTeekay LNG Partners Q1-2017 Earnings Presentation
Teekay LNG Partners Q1-2017 Earnings PresentationTeekay LNG Partners L.P.
 
Teekay LNG Partners Q1-2016 Earnings Presentation
Teekay LNG Partners Q1-2016 Earnings Presentation Teekay LNG Partners Q1-2016 Earnings Presentation
Teekay LNG Partners Q1-2016 Earnings Presentation Teekay LNG Partners L.P.
 

Was ist angesagt? (18)

Teekay Offshore Partners Fourth Quarter 2014 Earnings Presentatio
Teekay Offshore Partners Fourth Quarter 2014 Earnings PresentatioTeekay Offshore Partners Fourth Quarter 2014 Earnings Presentatio
Teekay Offshore Partners Fourth Quarter 2014 Earnings Presentatio
 
Q3 20 ER Presentation
Q3 20 ER PresentationQ3 20 ER Presentation
Q3 20 ER Presentation
 
Teekay Offshore Partners Q2-2017 Earnings Presentation
Teekay Offshore Partners Q2-2017 Earnings Presentation Teekay Offshore Partners Q2-2017 Earnings Presentation
Teekay Offshore Partners Q2-2017 Earnings Presentation
 
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
 
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
 
Teekay Corporation First Quarter 2013 Earnings Presentation
Teekay Corporation First Quarter 2013 Earnings PresentationTeekay Corporation First Quarter 2013 Earnings Presentation
Teekay Corporation First Quarter 2013 Earnings Presentation
 
September 2013 Investor Presentation
September 2013 Investor PresentationSeptember 2013 Investor Presentation
September 2013 Investor Presentation
 
Teekay Offshore (NYSE: TOO) Investor Day Presentation September 30 2014
Teekay Offshore (NYSE: TOO)  Investor Day Presentation September 30 2014Teekay Offshore (NYSE: TOO)  Investor Day Presentation September 30 2014
Teekay Offshore (NYSE: TOO) Investor Day Presentation September 30 2014
 
Teekay Corporation Q2 2017 Earnings Presentation
Teekay Corporation Q2 2017 Earnings PresentationTeekay Corporation Q2 2017 Earnings Presentation
Teekay Corporation Q2 2017 Earnings Presentation
 
Teekay Offshore Partners Q3-2018 Earnings Presentation
Teekay Offshore Partners Q3-2018 Earnings PresentationTeekay Offshore Partners Q3-2018 Earnings Presentation
Teekay Offshore Partners Q3-2018 Earnings Presentation
 
Teekay Offshore Partners Q3-2015 Earnings Presentation
Teekay Offshore Partners Q3-2015 Earnings PresentationTeekay Offshore Partners Q3-2015 Earnings Presentation
Teekay Offshore Partners Q3-2015 Earnings Presentation
 
Teekay LNG Partners Third Quarter 2013 Earnings Presentation
Teekay LNG Partners Third Quarter 2013 Earnings PresentationTeekay LNG Partners Third Quarter 2013 Earnings Presentation
Teekay LNG Partners Third Quarter 2013 Earnings Presentation
 
Teekay Offshore Partners Q1-2015 Earnings Presentation
Teekay Offshore Partners Q1-2015 Earnings PresentationTeekay Offshore Partners Q1-2015 Earnings Presentation
Teekay Offshore Partners Q1-2015 Earnings Presentation
 
Teekay Corporation - Second Quarter 2012 Earnings Results Presentation
Teekay Corporation - Second Quarter 2012 Earnings Results PresentationTeekay Corporation - Second Quarter 2012 Earnings Results Presentation
Teekay Corporation - Second Quarter 2012 Earnings Results Presentation
 
Teekay Offshore Partners Q1-2016 Earnings Presentation
Teekay Offshore Partners Q1-2016 Earnings PresentationTeekay Offshore Partners Q1-2016 Earnings Presentation
Teekay Offshore Partners Q1-2016 Earnings Presentation
 
Teekay Corporation Q2-2016 Earnings Presentation
Teekay Corporation Q2-2016 Earnings PresentationTeekay Corporation Q2-2016 Earnings Presentation
Teekay Corporation Q2-2016 Earnings Presentation
 
Teekay LNG Partners Q1-2017 Earnings Presentation
Teekay LNG Partners Q1-2017 Earnings PresentationTeekay LNG Partners Q1-2017 Earnings Presentation
Teekay LNG Partners Q1-2017 Earnings Presentation
 
Teekay LNG Partners Q1-2016 Earnings Presentation
Teekay LNG Partners Q1-2016 Earnings Presentation Teekay LNG Partners Q1-2016 Earnings Presentation
Teekay LNG Partners Q1-2016 Earnings Presentation
 

Andere mochten auch

Jinhui Shipping Q4 2013 results presentation
Jinhui Shipping Q4 2013 results presentationJinhui Shipping Q4 2013 results presentation
Jinhui Shipping Q4 2013 results presentationTradeWindsnews
 
Dorian LPG IPO prospectus
Dorian LPG IPO prospectusDorian LPG IPO prospectus
Dorian LPG IPO prospectusTradeWindsnews
 
Ship Finance International Q1 2014 results presentation
Ship Finance International Q1 2014 results presentationShip Finance International Q1 2014 results presentation
Ship Finance International Q1 2014 results presentationTradeWindsnews
 
Olympic Shipping investor presentation 27 May 2014
Olympic Shipping investor presentation 27 May 2014Olympic Shipping investor presentation 27 May 2014
Olympic Shipping investor presentation 27 May 2014TradeWindsnews
 
Siem Offshore presentation
Siem Offshore presentationSiem Offshore presentation
Siem Offshore presentationTradeWindsnews
 
Hoegh LNG Q1 2014 results presentation
Hoegh LNG Q1 2014 results presentationHoegh LNG Q1 2014 results presentation
Hoegh LNG Q1 2014 results presentationTradeWindsnews
 
The Near Future of CSS
The Near Future of CSSThe Near Future of CSS
The Near Future of CSSRachel Andrew
 
Classroom Management Tips for Kids and Adolescents
Classroom Management Tips for Kids and AdolescentsClassroom Management Tips for Kids and Adolescents
Classroom Management Tips for Kids and AdolescentsShelly Sanchez Terrell
 
The Buyer's Journey - by Chris Lema
The Buyer's Journey - by Chris LemaThe Buyer's Journey - by Chris Lema
The Buyer's Journey - by Chris LemaChris Lema
 
The Presentation Come-Back Kid
The Presentation Come-Back KidThe Presentation Come-Back Kid
The Presentation Come-Back KidEthos3
 

Andere mochten auch (10)

Jinhui Shipping Q4 2013 results presentation
Jinhui Shipping Q4 2013 results presentationJinhui Shipping Q4 2013 results presentation
Jinhui Shipping Q4 2013 results presentation
 
Dorian LPG IPO prospectus
Dorian LPG IPO prospectusDorian LPG IPO prospectus
Dorian LPG IPO prospectus
 
Ship Finance International Q1 2014 results presentation
Ship Finance International Q1 2014 results presentationShip Finance International Q1 2014 results presentation
Ship Finance International Q1 2014 results presentation
 
Olympic Shipping investor presentation 27 May 2014
Olympic Shipping investor presentation 27 May 2014Olympic Shipping investor presentation 27 May 2014
Olympic Shipping investor presentation 27 May 2014
 
Siem Offshore presentation
Siem Offshore presentationSiem Offshore presentation
Siem Offshore presentation
 
Hoegh LNG Q1 2014 results presentation
Hoegh LNG Q1 2014 results presentationHoegh LNG Q1 2014 results presentation
Hoegh LNG Q1 2014 results presentation
 
The Near Future of CSS
The Near Future of CSSThe Near Future of CSS
The Near Future of CSS
 
Classroom Management Tips for Kids and Adolescents
Classroom Management Tips for Kids and AdolescentsClassroom Management Tips for Kids and Adolescents
Classroom Management Tips for Kids and Adolescents
 
The Buyer's Journey - by Chris Lema
The Buyer's Journey - by Chris LemaThe Buyer's Journey - by Chris Lema
The Buyer's Journey - by Chris Lema
 
The Presentation Come-Back Kid
The Presentation Come-Back KidThe Presentation Come-Back Kid
The Presentation Come-Back Kid
 

Ähnlich wie Teekay Offshore Partners Q2 2013 results presentation

Teekay Corporation Fourth Quarter and Fiscal 2013 Earnings Presentation
Teekay Corporation Fourth Quarter and Fiscal 2013 Earnings PresentationTeekay Corporation Fourth Quarter and Fiscal 2013 Earnings Presentation
Teekay Corporation Fourth Quarter and Fiscal 2013 Earnings PresentationTeekay Corporation
 
Teekay Offshore Partners First Quarter 2013 Earnings Presentation
Teekay Offshore Partners First Quarter 2013 Earnings PresentationTeekay Offshore Partners First Quarter 2013 Earnings Presentation
Teekay Offshore Partners First Quarter 2013 Earnings PresentationAltera Infrastructure
 
Teekay Offshore Partners Q1 2013 presentation
Teekay Offshore Partners Q1 2013 presentationTeekay Offshore Partners Q1 2013 presentation
Teekay Offshore Partners Q1 2013 presentationTradeWindsnews
 
Teekay Offshore Partners Third Quarter 2014 Earnings Presentation
Teekay Offshore Partners Third Quarter 2014 Earnings PresentationTeekay Offshore Partners Third Quarter 2014 Earnings Presentation
Teekay Offshore Partners Third Quarter 2014 Earnings PresentationAltera Infrastructure
 
Teekay Corporation Third Quarter 2013 Earnings Presentation
Teekay Corporation Third Quarter 2013 Earnings PresentationTeekay Corporation Third Quarter 2013 Earnings Presentation
Teekay Corporation Third Quarter 2013 Earnings PresentationTeekay Corporation
 
2013 NAPTP MLP Conference Presentation
2013 NAPTP MLP Conference Presentation2013 NAPTP MLP Conference Presentation
2013 NAPTP MLP Conference PresentationAltera Infrastructure
 
2013 NAPTP MLP Conference Presentation
2013 NAPTP MLP Conference Presentation2013 NAPTP MLP Conference Presentation
2013 NAPTP MLP Conference PresentationTeekay Corporation
 
Teekay Group Presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group Presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Group Presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group Presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Corporation
 
Teekay Corporation Third Quarter 2014 Earnings Presentation
Teekay Corporation Third Quarter 2014 Earnings PresentationTeekay Corporation Third Quarter 2014 Earnings Presentation
Teekay Corporation Third Quarter 2014 Earnings PresentationTeekay Corporation
 
Teekay Offshore Partners Q1-2015 Earnings Presentation
Teekay Offshore Partners Q1-2015 Earnings PresentationTeekay Offshore Partners Q1-2015 Earnings Presentation
Teekay Offshore Partners Q1-2015 Earnings PresentationAltera Infrastructure
 
Teekay LNG Partners Second Quarter 2013 Earnings Presentation
Teekay LNG Partners Second Quarter 2013 Earnings PresentationTeekay LNG Partners Second Quarter 2013 Earnings Presentation
Teekay LNG Partners Second Quarter 2013 Earnings PresentationTeekay LNG Partners L.P.
 
Teekay LNG Partners Q2 2013 results presentation
Teekay LNG Partners Q2 2013 results presentationTeekay LNG Partners Q2 2013 results presentation
Teekay LNG Partners Q2 2013 results presentationTradeWindsnews
 
Teekay Offshore Partners Q3-2017 Earnings Presentation
Teekay Offshore Partners Q3-2017 Earnings PresentationTeekay Offshore Partners Q3-2017 Earnings Presentation
Teekay Offshore Partners Q3-2017 Earnings PresentationAltera Infrastructure
 
Teekay Corporation Q1 2017 Earnings Presentation
Teekay Corporation Q1 2017 Earnings PresentationTeekay Corporation Q1 2017 Earnings Presentation
Teekay Corporation Q1 2017 Earnings PresentationTeekay Corporation
 
Teekay Offshore Partners Q2-2015 Earnings Presentation
Teekay Offshore Partners Q2-2015 Earnings PresentationTeekay Offshore Partners Q2-2015 Earnings Presentation
Teekay Offshore Partners Q2-2015 Earnings PresentationAltera Infrastructure
 
Teekay Corp group presentation September 2013
Teekay Corp group presentation September 2013Teekay Corp group presentation September 2013
Teekay Corp group presentation September 2013TradeWindsnews
 
September 2013 Investor Presentation
September 2013 Investor PresentationSeptember 2013 Investor Presentation
September 2013 Investor PresentationAltera Infrastructure
 
Teekay's Q3-2017 Earnings Presentation
Teekay's Q3-2017 Earnings PresentationTeekay's Q3-2017 Earnings Presentation
Teekay's Q3-2017 Earnings PresentationTeekay Corporation
 
Teekay Offshore Partners Q4-2017 Earnings Presentation
Teekay Offshore Partners Q4-2017 Earnings PresentationTeekay Offshore Partners Q4-2017 Earnings Presentation
Teekay Offshore Partners Q4-2017 Earnings PresentationAltera Infrastructure
 

Ähnlich wie Teekay Offshore Partners Q2 2013 results presentation (20)

Teekay Corporation Fourth Quarter and Fiscal 2013 Earnings Presentation
Teekay Corporation Fourth Quarter and Fiscal 2013 Earnings PresentationTeekay Corporation Fourth Quarter and Fiscal 2013 Earnings Presentation
Teekay Corporation Fourth Quarter and Fiscal 2013 Earnings Presentation
 
Teekay Offshore Partners First Quarter 2013 Earnings Presentation
Teekay Offshore Partners First Quarter 2013 Earnings PresentationTeekay Offshore Partners First Quarter 2013 Earnings Presentation
Teekay Offshore Partners First Quarter 2013 Earnings Presentation
 
Teekay Offshore Partners Q1 2013 presentation
Teekay Offshore Partners Q1 2013 presentationTeekay Offshore Partners Q1 2013 presentation
Teekay Offshore Partners Q1 2013 presentation
 
Teekay Offshore Partners Third Quarter 2014 Earnings Presentation
Teekay Offshore Partners Third Quarter 2014 Earnings PresentationTeekay Offshore Partners Third Quarter 2014 Earnings Presentation
Teekay Offshore Partners Third Quarter 2014 Earnings Presentation
 
Teekay Corporation Third Quarter 2013 Earnings Presentation
Teekay Corporation Third Quarter 2013 Earnings PresentationTeekay Corporation Third Quarter 2013 Earnings Presentation
Teekay Corporation Third Quarter 2013 Earnings Presentation
 
2013 NAPTP MLP Conference Presentation
2013 NAPTP MLP Conference Presentation2013 NAPTP MLP Conference Presentation
2013 NAPTP MLP Conference Presentation
 
2013 NAPTP MLP Conference Presentation
2013 NAPTP MLP Conference Presentation2013 NAPTP MLP Conference Presentation
2013 NAPTP MLP Conference Presentation
 
2013 NAPTP MLP Conference Presentation
2013 NAPTP MLP Conference Presentation2013 NAPTP MLP Conference Presentation
2013 NAPTP MLP Conference Presentation
 
Teekay Group Presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group Presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Group Presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group Presents at the 2013 Citi One-on-One MLP / Midstream Conference
 
Teekay Corporation Third Quarter 2014 Earnings Presentation
Teekay Corporation Third Quarter 2014 Earnings PresentationTeekay Corporation Third Quarter 2014 Earnings Presentation
Teekay Corporation Third Quarter 2014 Earnings Presentation
 
Teekay Offshore Partners Q1-2015 Earnings Presentation
Teekay Offshore Partners Q1-2015 Earnings PresentationTeekay Offshore Partners Q1-2015 Earnings Presentation
Teekay Offshore Partners Q1-2015 Earnings Presentation
 
Teekay LNG Partners Second Quarter 2013 Earnings Presentation
Teekay LNG Partners Second Quarter 2013 Earnings PresentationTeekay LNG Partners Second Quarter 2013 Earnings Presentation
Teekay LNG Partners Second Quarter 2013 Earnings Presentation
 
Teekay LNG Partners Q2 2013 results presentation
Teekay LNG Partners Q2 2013 results presentationTeekay LNG Partners Q2 2013 results presentation
Teekay LNG Partners Q2 2013 results presentation
 
Teekay Offshore Partners Q3-2017 Earnings Presentation
Teekay Offshore Partners Q3-2017 Earnings PresentationTeekay Offshore Partners Q3-2017 Earnings Presentation
Teekay Offshore Partners Q3-2017 Earnings Presentation
 
Teekay Corporation Q1 2017 Earnings Presentation
Teekay Corporation Q1 2017 Earnings PresentationTeekay Corporation Q1 2017 Earnings Presentation
Teekay Corporation Q1 2017 Earnings Presentation
 
Teekay Offshore Partners Q2-2015 Earnings Presentation
Teekay Offshore Partners Q2-2015 Earnings PresentationTeekay Offshore Partners Q2-2015 Earnings Presentation
Teekay Offshore Partners Q2-2015 Earnings Presentation
 
Teekay Corp group presentation September 2013
Teekay Corp group presentation September 2013Teekay Corp group presentation September 2013
Teekay Corp group presentation September 2013
 
September 2013 Investor Presentation
September 2013 Investor PresentationSeptember 2013 Investor Presentation
September 2013 Investor Presentation
 
Teekay's Q3-2017 Earnings Presentation
Teekay's Q3-2017 Earnings PresentationTeekay's Q3-2017 Earnings Presentation
Teekay's Q3-2017 Earnings Presentation
 
Teekay Offshore Partners Q4-2017 Earnings Presentation
Teekay Offshore Partners Q4-2017 Earnings PresentationTeekay Offshore Partners Q4-2017 Earnings Presentation
Teekay Offshore Partners Q4-2017 Earnings Presentation
 

Mehr von TradeWindsnews

Maersk Drilling FY2013 results presentation
Maersk Drilling FY2013 results presentationMaersk Drilling FY2013 results presentation
Maersk Drilling FY2013 results presentationTradeWindsnews
 
GasLog investor day presentation September 2013
GasLog investor day presentation September 2013GasLog investor day presentation September 2013
GasLog investor day presentation September 2013TradeWindsnews
 
Siem Offshore Pareto Securities Oil & Offshore Conferences Sept 2013
Siem Offshore Pareto Securities Oil & Offshore Conferences Sept 2013Siem Offshore Pareto Securities Oil & Offshore Conferences Sept 2013
Siem Offshore Pareto Securities Oil & Offshore Conferences Sept 2013TradeWindsnews
 
SeaBird Exploration Pareto Securities Oil & Offshore Conference Sept 2013
SeaBird Exploration Pareto Securities Oil & Offshore Conference Sept 2013SeaBird Exploration Pareto Securities Oil & Offshore Conference Sept 2013
SeaBird Exploration Pareto Securities Oil & Offshore Conference Sept 2013TradeWindsnews
 
Polarcus Pareto Securities Oil & Offshore Conference Sept 2013
Polarcus Pareto Securities Oil & Offshore Conference Sept 2013Polarcus Pareto Securities Oil & Offshore Conference Sept 2013
Polarcus Pareto Securities Oil & Offshore Conference Sept 2013TradeWindsnews
 
Oceanteam Shipping Pareto Securities Oil & Offshore Conference Sept 2013
Oceanteam Shipping Pareto Securities Oil & Offshore Conference Sept 2013Oceanteam Shipping Pareto Securities Oil & Offshore Conference Sept 2013
Oceanteam Shipping Pareto Securities Oil & Offshore Conference Sept 2013TradeWindsnews
 
BW Offshore Pareto Securities Oil & Offshore Conference Sept 2013
BW Offshore Pareto Securities Oil & Offshore Conference Sept 2013BW Offshore Pareto Securities Oil & Offshore Conference Sept 2013
BW Offshore Pareto Securities Oil & Offshore Conference Sept 2013TradeWindsnews
 
Atwood Oceanics Pareto Securities Oil & Offshore conferences Sept 2013
Atwood Oceanics Pareto Securities Oil & Offshore conferences Sept 2013Atwood Oceanics Pareto Securities Oil & Offshore conferences Sept 2013
Atwood Oceanics Pareto Securities Oil & Offshore conferences Sept 2013TradeWindsnews
 
Globus Maritime Q2 2013 results presentation
Globus Maritime Q2 2013 results presentationGlobus Maritime Q2 2013 results presentation
Globus Maritime Q2 2013 results presentationTradeWindsnews
 
Golar LNG Q2 2013 results presentation
Golar LNG Q2 2013 results presentationGolar LNG Q2 2013 results presentation
Golar LNG Q2 2013 results presentationTradeWindsnews
 
Golar LNG Partners Q2 2013 results presentation
Golar LNG Partners Q2 2013 results presentationGolar LNG Partners Q2 2013 results presentation
Golar LNG Partners Q2 2013 results presentationTradeWindsnews
 
Seadrill Q2 2013 results presentation
Seadrill Q2 2013 results presentationSeadrill Q2 2013 results presentation
Seadrill Q2 2013 results presentationTradeWindsnews
 
Lamprell Q2 2013 results presentation
Lamprell Q2 2013 results presentationLamprell Q2 2013 results presentation
Lamprell Q2 2013 results presentationTradeWindsnews
 
Seadrill Partners Q2 2013 results presentation
Seadrill Partners Q2 2013 results presentationSeadrill Partners Q2 2013 results presentation
Seadrill Partners Q2 2013 results presentationTradeWindsnews
 
ASL Marine Q2 2013 results presentation
ASL Marine Q2 2013 results presentationASL Marine Q2 2013 results presentation
ASL Marine Q2 2013 results presentationTradeWindsnews
 
Frontline Q2 2013 results presentation
Frontline Q2 2013 results presentationFrontline Q2 2013 results presentation
Frontline Q2 2013 results presentationTradeWindsnews
 
Ship Finance International Q2 2013 results presentation
Ship Finance International Q2 2013 results presentationShip Finance International Q2 2013 results presentation
Ship Finance International Q2 2013 results presentationTradeWindsnews
 
Hoegh LNG Q2 2013 results presentation
Hoegh LNG Q2 2013 results presentationHoegh LNG Q2 2013 results presentation
Hoegh LNG Q2 2013 results presentationTradeWindsnews
 
KNOT Offshore Partners Q2 2013 results presentation
KNOT Offshore Partners Q2 2013 results presentationKNOT Offshore Partners Q2 2013 results presentation
KNOT Offshore Partners Q2 2013 results presentationTradeWindsnews
 
Star Bulk Carriers Q2 2013 results presentation
Star Bulk Carriers Q2 2013 results presentationStar Bulk Carriers Q2 2013 results presentation
Star Bulk Carriers Q2 2013 results presentationTradeWindsnews
 

Mehr von TradeWindsnews (20)

Maersk Drilling FY2013 results presentation
Maersk Drilling FY2013 results presentationMaersk Drilling FY2013 results presentation
Maersk Drilling FY2013 results presentation
 
GasLog investor day presentation September 2013
GasLog investor day presentation September 2013GasLog investor day presentation September 2013
GasLog investor day presentation September 2013
 
Siem Offshore Pareto Securities Oil & Offshore Conferences Sept 2013
Siem Offshore Pareto Securities Oil & Offshore Conferences Sept 2013Siem Offshore Pareto Securities Oil & Offshore Conferences Sept 2013
Siem Offshore Pareto Securities Oil & Offshore Conferences Sept 2013
 
SeaBird Exploration Pareto Securities Oil & Offshore Conference Sept 2013
SeaBird Exploration Pareto Securities Oil & Offshore Conference Sept 2013SeaBird Exploration Pareto Securities Oil & Offshore Conference Sept 2013
SeaBird Exploration Pareto Securities Oil & Offshore Conference Sept 2013
 
Polarcus Pareto Securities Oil & Offshore Conference Sept 2013
Polarcus Pareto Securities Oil & Offshore Conference Sept 2013Polarcus Pareto Securities Oil & Offshore Conference Sept 2013
Polarcus Pareto Securities Oil & Offshore Conference Sept 2013
 
Oceanteam Shipping Pareto Securities Oil & Offshore Conference Sept 2013
Oceanteam Shipping Pareto Securities Oil & Offshore Conference Sept 2013Oceanteam Shipping Pareto Securities Oil & Offshore Conference Sept 2013
Oceanteam Shipping Pareto Securities Oil & Offshore Conference Sept 2013
 
BW Offshore Pareto Securities Oil & Offshore Conference Sept 2013
BW Offshore Pareto Securities Oil & Offshore Conference Sept 2013BW Offshore Pareto Securities Oil & Offshore Conference Sept 2013
BW Offshore Pareto Securities Oil & Offshore Conference Sept 2013
 
Atwood Oceanics Pareto Securities Oil & Offshore conferences Sept 2013
Atwood Oceanics Pareto Securities Oil & Offshore conferences Sept 2013Atwood Oceanics Pareto Securities Oil & Offshore conferences Sept 2013
Atwood Oceanics Pareto Securities Oil & Offshore conferences Sept 2013
 
Globus Maritime Q2 2013 results presentation
Globus Maritime Q2 2013 results presentationGlobus Maritime Q2 2013 results presentation
Globus Maritime Q2 2013 results presentation
 
Golar LNG Q2 2013 results presentation
Golar LNG Q2 2013 results presentationGolar LNG Q2 2013 results presentation
Golar LNG Q2 2013 results presentation
 
Golar LNG Partners Q2 2013 results presentation
Golar LNG Partners Q2 2013 results presentationGolar LNG Partners Q2 2013 results presentation
Golar LNG Partners Q2 2013 results presentation
 
Seadrill Q2 2013 results presentation
Seadrill Q2 2013 results presentationSeadrill Q2 2013 results presentation
Seadrill Q2 2013 results presentation
 
Lamprell Q2 2013 results presentation
Lamprell Q2 2013 results presentationLamprell Q2 2013 results presentation
Lamprell Q2 2013 results presentation
 
Seadrill Partners Q2 2013 results presentation
Seadrill Partners Q2 2013 results presentationSeadrill Partners Q2 2013 results presentation
Seadrill Partners Q2 2013 results presentation
 
ASL Marine Q2 2013 results presentation
ASL Marine Q2 2013 results presentationASL Marine Q2 2013 results presentation
ASL Marine Q2 2013 results presentation
 
Frontline Q2 2013 results presentation
Frontline Q2 2013 results presentationFrontline Q2 2013 results presentation
Frontline Q2 2013 results presentation
 
Ship Finance International Q2 2013 results presentation
Ship Finance International Q2 2013 results presentationShip Finance International Q2 2013 results presentation
Ship Finance International Q2 2013 results presentation
 
Hoegh LNG Q2 2013 results presentation
Hoegh LNG Q2 2013 results presentationHoegh LNG Q2 2013 results presentation
Hoegh LNG Q2 2013 results presentation
 
KNOT Offshore Partners Q2 2013 results presentation
KNOT Offshore Partners Q2 2013 results presentationKNOT Offshore Partners Q2 2013 results presentation
KNOT Offshore Partners Q2 2013 results presentation
 
Star Bulk Carriers Q2 2013 results presentation
Star Bulk Carriers Q2 2013 results presentationStar Bulk Carriers Q2 2013 results presentation
Star Bulk Carriers Q2 2013 results presentation
 

Teekay Offshore Partners Q2 2013 results presentation

  • 1. TEEKAY OFFSHORE Second Quarter 2013 Earnings Presentation August 9, 2013 1
  • 2. TEEKAY OFFSHORE This presentation contains forward-looking statements (as defined in Section 21E of the Securities Exchange Act of 1934, as amended) which reflect management’s current views with respect to certain future events and performance, including statements regarding: the expected contribution of recent acquisitions, vessel deliveries and new contracts to cash flow growth; the timing of the Voyageur Spirit achieving final acceptance and commencing full operations under the E.ON contract; the timing of the Lambada Spirit shuttle tanker commencing its contract with BG; the timing of the HiLoad DP unit commencing its 10-year time-charter contract with Petroleo Brasileiro SA; the potential for the Partnership to acquire future HiLoad projects developed by Remora, including development of the next generation HiLoad DP units with BG Brasil; the timing of and cost of converting the Navion Clipper into an FSO unit and the timing of the commencement of its 10-year charter contract with Salamander; the timing of and cost of converting the Randgrid into an FSO unit and the timing of the commencement of the commencement of its 3-year charter contract with Statoil; the potential for Teekay Corporation to offer additional vessels to the Partnership and the Partnership’s acquisition of any such vessels, including the Petrojarl Foinaven, the Hummingbird Spirit and the newbuilding FPSO unit that will service the Knarr field under contract with BG Norge Limited; the timing of delivery of vessels under construction or conversion; and the potential for the Partnership to acquire other vessels or offshore projects from Teekay Corporation or directly from third parties. The following factors are among those that could cause actual results to differ materially from the forward-looking statements, which involve risks and uncertainties, and that should be considered in evaluating any such statement: vessel operations and oil production volumes; the inability of the Voyageur Spirit FPSO to complete the repair of its compressors, achieve full production and receive final acceptance by E.ON during August 2013; the potential for the loss of revenue under the charter with E.ON from the date of acquisition until final acceptance exceeds Teekay Corporation’s maximum indemnification of $54 million; significant changes in oil prices; variations in expected levels of field maintenance; increased operating expenses; different-than-expected levels of oil production in the North Sea and Brazil offshore fields; potential early termination of contracts; potential delays to the commencement of the BG shuttle tanker time-charters; failure of Teekay Corporation to offer to the Partnership additional vessels; the inability of the joint venture between Teekay Corporation and Odebrecht to secure new Brazil FPSO projects that may be offered for sale to the Partnership; the inability of Remora to develop future HiLoad DP units; failure to obtain required approvals by the Conflicts Committee of Teekay Offshore’s general partner to approve the acquisition of vessels offered from Teekay Corporation, or third parties; the Partnership’s ability to raise adequate financing to purchase additional assets; delays in vessel deliveries or conversions; and other factors discussed in Teekay Offshore’s filings from time to time with the SEC, including its Report on Form 20-F for the fiscal year ended December 31, 2012. The Partnership expressly disclaims any obligation or undertaking to release publicly any updates or revisions to any forward-looking statements contained herein to reflect any change in the Partnership’s expectations with respect thereto or any change in events, conditions or circumstances on which any such statement is based. Forward Looking Statements 2
  • 3. TEEKAY OFFSHORE Recent Highlights • Generated distributable Q2-13 cash flow of $43.0 million • Declared Q2-13 cash distribution of $0.5253 per unit • Completed $744 million of FPSO acquisitions including the Voyageur Spirit FPSO and a 50% interest in Cidade de Itajai FPSO • Took delivery of first two (of four) shuttle tanker newbuildings for long-term charter to BG in Brazil – Financed with new bank facility and a portion of proceeds from $150 million preferred unit offering in April 2013 – Financing for second two vessels with proceeds from $174 million bond private placement which will close just prior to deliveries • Secured Gina Krog FSO project from Statoil • Working on multiple FPSO FEED studies 3
  • 4. TEEKAY OFFSHORE Voyageur Spirit FPSO Operational Start-up Issue • On April 13, 2013, the Voyageur Spirit FPSO unit began production (“first oil”) and was acquired by TOO on May 2, 2013 • Upon achieving first oil, Teekay had a specified time period to receive Certificate of Final Acceptance (full production) from the charterer, E.ON, at which point full revenues would commence under the contract retroactive to first oil • Due to a defective gas compressor on the Voyageur Spirit, the unit was unable to reach full production within the allowable timeframe, resulting in E.ON declaring the unit off- hire from first oil • Given the unit had not achieved final acceptance from E.ON at the date of acquisition, as per the purchase contract, Teekay Corporation, as seller, has agreed to indemnify TOO for lost revenues until final acceptance by E.ON. Indemnification capped at 10%, or $54m • Teekay Corporation’s indemnification effectively treated as a reduction in Teekay Offshore’s May 2013 purchase price of $540m and has no impact on TOO’s distributable cash flow • Indemnification amount for May 2 – June 30, 2013 was ~$12.5m • Since April 2013, Voyageur Spirit has been operating at partial capacity and is expected to reach full production levels during August, following completion of repairs and testing 4
  • 5. TEEKAY OFFSHORE • Signed contract with Statoil to convert an existing shuttle tanker (Randgrid) to an FSO for operation on the Gina Krog field in the North Sea o Initial term of 3 years, commencing Q1-17, plus 12x1-year extension options o Expected project cost: ~$220m o Expected annual avg. CFVO*: ~$45m • Martin Linge FSO project (North Sea) awarded to our competition Current Business Development 5 * Cash flow from vessel operations represents income from vessel operations before depreciation and amortization expense and amortization of deferred gains and in-process revenue contract, loss on sale of vessel and write-down of vessels, includes the realized gains (losses) on the settlement of foreign exchange forward contracts and adjusting for direct financing leases to a cash basis. Cash flow from vessel operations is a non-GAAP financial measure used by certain investors to measure the financial performance of shipping companies. FSO Projects FEED Studies • Currently involved in three front end engineering and design (FEED) studies for potential new FPSO projects • Signed agreement to complete a FEED study to develop the next generation of Remora DP HiLoad offtake units
  • 6. TEEKAY OFFSHORE Project Bond (July 2013): o Priced a $174 million, 4.96% 10-year U.S. project bond for two of the four BG shuttle tanker newbuildings, Bossa Nova Spirit and Sertanejo Spirit o The bonds are rated “BBB-” by Fitch Continuous Offering Program (COP) (May 2013) o In May 2013, TOO commenced selling under a $100 million COP program o To date, TOO has issued 85,508 new units under the COP raising net proceeds of approximately $2.7 million Preferred Units (April 2013) o In April 2013, TOO completed a 6,000,000 unit, $150 million perpetual preferred unit offering with a fixed coupon of 7.25% o Trading on NYSE under the ticker “TOO.PR.A” Financing Update 6
  • 7. TEEKAY OFFSHORE Adjusted Operating Results for Q2 2013 vs. Q1 2013 (1) See Appendix A to the Partnership's Q2-13 earnings release for description of Appendix A items. (2) Reallocating the realized gains/losses to their respective line as if hedge accounting had applied. Please refer to footnotes (4) and (5) to the Summary Consolidated Statements of Income (Loss) in the Q2-13 earnings release. (3) Removal of Voyageur Spirit FPSO results from April 13, 2013 through May 1, 2013, the period prior to acquisition by the Partnership but while under control of our sponsor, Teekay Corporation, referred to as the “Dropdown Predecessor”. UNAUDITED (in thousands of US dollars) As Reported Appendix A items (1) Reclass for Realized Gains/Losses on Derivatives (2) Net Loss Attributable to Dropdown Predecessor (3) TOO Adjusted Income Statement TOO Adjusted Income Statement NET REVENUES Revenues 222,412 - - 1,090 221,322 212,112 Voyage expenses 23,273 - - - 23,273 22,948 Net revenues 199,139 - - 1,090 198,049 189,164 OPERATING EXPENSES Vessel operating expenses 86,519 - (218) 1,354 84,947 76,971 Time-charter hire expense 14,093 - - - 14,093 14,777 Depreciation and amortization 50,265 - - 1,095 49,170 44,510 General and administrative 10,417 - - 237 10,180 10,331 Restructuring charge 1,395 (1,395) - - - - Total operating expenses 162,689 (1,395) (218) 2,686 158,390 146,589 Income from vessel operations 36,450 1,395 218 (1,596) 39,659 42,575 OTHER ITEMS Interest expense (16,035) - (14,659) (218) (30,476) (25,526) Interest income 1,465 - - - 1,465 195 Realized and unrealized gain on derivative instruments 33,901 (48,755) 14,738 (116) - - Equity income 1,598 (1,185) - - 413 - Foreign exchange gain 3,555 (3,529) (297) (271) - - Loss on bond repurchase - - - - - - Other income – net 260 106 - (24) 390 417 Income tax expense (456) - - - (456) 234 Total other items 24,288 (53,363) (218) (629) (28,664) (24,680) Net income from continuing operations 60,738 (51,968) - (2,225) 10,995 17,895 Net loss from discontinued operations (2,134) 3,302 - - 1,168 2,274 Less: Net income attributable to non-controlling interests (3,274) 808 - - (2,466) (1,307) ADJUSTED NET INCOME ATTRIBUTABLE TO THE PARTNERSHIP 57,555 (47,858) - - 9,697 18,862 June 30, 2013 March 31, 2013 Three Months Ended Three Months Ended 7
  • 8. TEEKAY OFFSHORE Distributable Cash Flow and Cash Distribution Three Months Ended Three Months Ended June 30, 2013 March 31, 2013 (unaudited) (unaudited) Net income 58,604 21,970 Net loss attributable to Dropdown Predecessor 2,225 - 60,829 21,970 Add (subtract): Depreciation and amortization 49,169 44,456 Non-cash items in discontinued operations/write down of vessel 8,179 12,140 Distributions relating to equity financing of newbuilding installments 2,813 2,459 Partnership's share of equity accounted joint ventures' distributable cash flow before estimated maintenance capital expenditures 814 - Equity income (1,598) - Distributions relating to preferred units (1,817) - Foreign exchange and other, net (3,382) 2,598 Estimated maintenance capital expenditures (1) (26,808) (24,620) Indemnification from Teekay Corporation relating to Voyageur Spirit FPSO 12,505 - revenues (May 2, 2013 to June 30, 2013) (1) Unrealized gains on non-designated derivative instruments (50,618) (13,193) Loss on bond repurchase - 1,759 Distributable Cash Flow before Non-Controlling Interest 50,086 47,569 Non-controlling interests’ share of DCF (7,046) (5,813) Distributable Cash Flow 43,040 41,756 Total Distributions 47,639 46,762 Coverage Ratio 0.90x 0.89x (1) Indemnification of the loss of revenues from the Voyageur Spirit FPSO is effectively treated as a reduction to estimated maintenance capital expenditures in the second quarter of 2013, since the indemnification amount received from Teekay Corporation is effectively treated as a reduction to the purchase price of the Voyageur Spirit FPSO. A B =A/B 8
  • 10. TEEKAY OFFSHORE 2013 TOO Drydock Schedule 10 Note: In the case that a vessel drydock straddles between quarters, the drydock has been allocated to the quarter in which the majority of drydock days occur. Entity Segment Vessels Drydocked Total Offhire Days Vessels Drydocked Total Offhire Days Vessels Drydocked Total Offhire Days Vessels Drydocked Total Offhire Days Vessels Drydocked Total Offhire Days Teekay Offshore Conventional Tanker - - - - 1 25 - - 1 25 FSO - - - - - - - - - - Shuttle Tanker 1 32 1 32 2 49 1 32 5 145 1 32 1 32 3 74 1 32 6 170 March 31, 2013 (A) June 30, 2013 (E) September 30, 2013 (E) December 31, 2013 (E) Total 2013