MASONRY WALL
CONCRETE FOOTING
CONCRETE WALL
W8x10
L
STEEL BEAM
STEEL LINTEL (SEE SCHEDULE)
INDICATE LEDGER ANGLE (SEE DETAIL)
BENT STEEL FRAMING
SHEAR CONNECTION
MOMENT CONNECTION
EMBEDDED PLATE CONNECTION (SEE SHED.)
BEAM POCKET IN MASONRY (SEE SCHED.)
BP: INDICATES STANDARD BEAM POCKET
AP: INDICATES ACOUSTICALLY ISOLATED BEAM POCKET
STEEL COLUMN
STEEL COLUMN BELOW
INDICATES COLUMN TRANSFER
TR
X-# SLAB (SEE SCHED.) ARROW INDICATES SPAN
DIRECTION OF SLAB
INDICATES TOP OF FOOTING ELEVATION
COLUMN LINE
(##'-##")
#
LEGEND
EP-#
BP-#
MASONRY SHEAR WALL
PCi t e c t s
Dwg Title
East 138th Street LLC
334-336 East 110th Street
New York, N.Y. 10029
443 Park Avenue South
New York, NY 10016
T: 212|689|7070
F: 212|545|1687
info@MHGArch.com
www.MHGArch.com
Client/Developer
MHG Architects
443 Park Avenue South
New York, N.Y. 10016
Architect
Abel Bainnson Butz, LLP
80 8th Avenue, Suite 1105
New York, N.Y. 10011
Landscape Architect
88 University Place
New York, N.Y. 10003
Structural Engineer
Ettinger Engineering
Associates
508 Eighth Avenue
New York, N.Y. 10018
Mechanical/Electrical/Plumbing Engineer
Scale
Job No.
Date
Dwg No
Seal
NYC DOB Number
1522
255 East 138th Street
Robert Silman Associates
1/8" = 1'-0"
GENERAL NOTES
05/08/2013
13892
S-001.00
GENERAL REQUIREMENTS
01. GENERAL
1. All structural work shall be coordinated with other Project team
consultants' drawings, including but not limited to Architectural,
Civil, Mechanical, Electrical, Plumbing, Fire Alarm, and Landscape,
and shall conform to the project specifications.
2. Contractor shall provide temporary shoring, bracing, sheeting and
make safe all floors, roofs, walls and adjacent property as project
conditions require. Shoring and sheeting shall be designed by a
registered professional engineer licensed in the project jurisdiction
hired by the contractor, who shall submit shop drawings and
calculations for the owner's review.
3. Dimensions and elevations of existing construction given in
structural drawings are based on information contained in various
original design and construction documents provided by the owner,
and limited field observations and measurements. The contractor
shall verify all information pertaining to existing conditions by actual
measurement and observation at the site. All discrepancies
between actual conditions and those shown in the contract
documents shall be reported to the engineer of record for his/her
evaluation before the affected construction is put in place.
Unless otherwise noted on plans and/or elevations, concrete
block unit strength shall be 1900 psi min. Note: concrete
block with unit strength higher than 1900 psi require longer
delivery lead times.
3. All mortar shall be ASTM C270, type S.
4. All grout for filling cells shall be ASTM C476 with minimum
compressive strength of 2000 psi but not less than the
compressive strength of the masonry assembly, f'm. Where
grout cells do not exceed 4" diameter, fine grout shall be
used.
5. All block dimensions indicated on structural plans are
nominal dimensions.
6. All concrete block below grade shall be filled solid with grout.
7. Concrete block below beam or truss bearing points shall be
filled solid for a minimum of two courses in depth and a
minimum of 32" in width, U.N.O.
8. Install heavy duty ladder joint reinforcement at 16" O.C.
(spaced vertically).
9. Unless noted otherwise, all masonry walls shall be reinforced
with #4@48" O.C. vertical. Grout all reinforced cells solid.
Provide dowels to match vertical reinforcing at foundation.
04. CONCRETE BLOCK
1. All concrete block work shall conform to the American
Concrete Institute (ACI) "Building Code Requirements for
Masonry Structures" (530-02).
2. Concrete block shall be of lightweight aggregate and conform
to the following standards: solid/hollow block: ASTM C90,
grade N1.
NET AREA COMPRESSIVE
STRENGTH OF
CONCRETE MASONRY
UNIT, PSI
NET AREA COMPRESSIVE
STRENGTH OF MASONRY
ASSEMBLY, F'm, PSI USING TYPE
S MORTAR
1900 1500
2800 2000
3750 2500
4800 3000
05. STRUCTURAL STEEL
1. All structural steel work shall conform to the following
governing standards:
a. AISC "Load and Resistance Factor Design Specification
for Structural Steel Buildings," (1999).
b. The American Welding Society (AWS D1.1-00) "Structural
Welding Code - Steel."
2. All structural steel shall conform to the following ASTM
specifications:
a. Wide flange beams, columns and structural tees: ASTM
A992
b. Hollow structural sections: ASTM A500, Grade B
c. Structural pipe sections: ASTM A53, Grade B.
d. Channels, angles and plates: ASTM A36 unless otherwise
noted
e Structural steel plate shall be ASTM A572 Grade 50
having a minimum yield point of 50,000 psi. Grade 42
having a minimum yield point of 42,000 psi for thickness
greater than 4".
f. Bolted connections of beams/ girders are to be designed
as follows:
a. Standard beam to beam/girder: A325 or A490
bearing type bolts (3/4" diameter minimum with hardened
washers).
b. Beam/girder to column connections: A325-SC or
A490-SC type bolts (3/4" diameter minimum with
hardened washers).
g. Anchor bolts: ASTM F1554, Grade 36.
3. Steel connections shall be standard AISC framed beam
connections.
a. For non-composite members, provide connections based
on reaction as determined from AISC uniform load table.
(unless otherwise noted on plans.)
b. For composite members, provide connections based on
1.5 x reaction from AISC uniform load table. (unless
otherwise noted on plans.)
c. Reinforcing is to be provided at connections where cuts
reduce the shear or moment capacity below that required
to sustain the reaction. flanges and web are to be
reinforced where the local capacity to sustain connection
load is inadequate.
d. Connections shall be designed for shear and eccentricity,
considering that the connection is an extension of the
beam and girders.
4. Minimum weld size is 1/4" fillet unless noted otherwise.
5. All beams except cantilever beams shall be fabricated
and installed with natural camber up. Cantilever beams
shall be fabricated and installed so that natural camber
raises cantilever end.
6. Field cutting or burning of steel is prohibited except with
the express written approval of the structural engineer of
record.
7. Welding shall be performed by certified licensed,
AWS-qualified welders. electrodes shall be AWS 5.1,
Class E70XX (use low hydrogen electrodes for A572,
Grade 50 steel).
8. Shop paint exposed steel members, steel members not
encased in concrete or spray fireproofed, and all steel
members at the exterior wall with Tnemec #10-99. Field
paint all exposed members with Tnemec 530 omnithane
or approved equal.
9. Lintels shall be installed over all openings in masonry
walls as follows:
a. 3-1/2" legs are horizontal
b. Provide one angle for each 4" of wall thickness
c. Provide L5x5x5/16 angles for 6" thick walls and partitions
with openings up to 6'-0".
d. Provide minimum 6" bearing at each end.
e. Lintels over 4'-0" shall be fireproofed. [4'-0" for NYC only /
6'-0" for IBC]
10. Shop and erection drawings shall be submitted to the
structural engineer for review and approval. No
fabrication of steel shall commence without approved
shop drawings.
11. Provide mechanically galvanized bolts for exterior
applications.
Mansory Opening Lintel
4'-0" or less L4" x 3 1/2" x 5/16"
4'-1" to 7'-0" L6" x 3 1/2" x 5/16
08. SPECIAL INSPECTIONS
1. Inspections required by the local jurisdiction shall
be performed by a testing agency provided by the
owner for the following items:
a. Flood zone compliance
b. Structural steel - welding (BC 1704.3.1)
c. Structural steel - erection and bolting (BC
1704.3.2, 1704.3.3)
d. Concrete - cast-in-place (BC 1704.4)
e. Concrete - precast (BC 1704.4)
f. Masonry (BC 1704.5)
g. Soils - site preparation (BC 1704.7.1)
h. Soils - fill placement & in-place density (BC
1704.7.2, 1704.7.3)
i. Soils - investigations (borings/test pits) (BC
1704.7.4)
j. Pile foundations & drilled pier installation (BC
1704.8)
k. Structural safety - structural stability (BC 1704.19)
l. Excavation - sheeting, shoring, and bracing (BC
1704.19, 3304.4.1)
m. Concrete test cylinders - TR-2 (BC 1905.6)
n. Concrete design mix - TR-3 (BC 1905.3)
o. Adhesive anchorage (BB 2009.019)
p. Expansion anchorage (2010.005)
The testing agency for the inspections shall file all
appropriate forms with the building department.
02. FOUNDATIONS
1. The building foundations have been designed based on the
recommendations stated in "Subsurface Exploration and
Foundation Engineering Report" dated March 9, 2011
prepared by GZA GeoEnvironmental of New York. The full
report shall be referenced for construction recommendations.
2. The deep foundation system consists of #18 threaded bars,
Grade 75, encased in 5000 psi grout within 9.625" outside
diameter steel casings with 0.472" wall thickness. The piles
are designed for the following allowable loads:
Compression = 110 tons (220 kips)
Uplift Resistance = 80 tons (160 kips)
Lateral Resistance = 1.5 tons (3 kips)
3. The contractor shall examine the site and boring logs as well
as all available subsurface information. The contractor shall,
on his own judgment, order the appropriate length of pile to
obtain the required minimum length and capacity. Before start
of pile production, the contractor may, at their own expense,
drive test piles to determine the ordering lengths required.
4. A pile identification plan with all piles numbered
chronologically shall be prepared by the contractor and shall
be submitted to the engineer for approval.
5. The piles shall be drilled into the weathered rock stratum to
approximate tip elevation -65 to -80 (based on Bronx datum)
to achieve the required compressive load.
6. Piles shall be installed in order to ensure a minimum capacity
previously specified, and in accordance with criteria
established by approved load test(s) as documented and filed
with the New York City Building Department. The load test(s)
shall be directed by a licensed professional engineer who
shall certify the pile installation and testing.
7. No pile shall be more than 3" (inches) from its design
location, nor out of plumb more than 2% of its length. These
tolerances shall be applied after pile cut-off elevation.
8. No more than one splice shall be permitted per pile. Splices
shall be made with couplers, refer to FNA details. The length
of pile to be spliced shall be secured in proper alignment prior
to coupling and in such a manner that no eccentricity or angle
develops between the axis of the two lengths to be spliced.
Sections of pile shall be spliced to develop full strength of
section. Pile splices shall not be located within 10 feet of pile
cut-off.
9. Pile drilling shall be under the supervision of a license
professional engineer retained by the contractor and
approved by the engineer. All piling work is subject to
controlled inspection as required by the New York City
Building Code.
10. The contractor shall use whatever means necessary to obtain
adequate pile capacity including jetting, spudding,
pre-augering, rock drilling, socketing etc.
11. A survey and drawing shall be prepared of the location of
each pile as drilled and together with the pile log shall be
submitted to the engineer for determination of corrective
measures, or for approval. Pile cut-off shall also be indicated
for each pile.
12. The drawing shall be signed and sealed by a licensed
professional engineer retained by the contractor.
13. For temporary support of excavation system refer to drawings
prepared by FNA.
06. PRECAST CONCRETE PLANK
1. All precast concrete plank work shall conform to
the "Prestressed Concrete Institute Specification",
latest edition.
2. Precast concrete plank manufacturer shall retain
the services of a professional engineer licensed in
the project jurisdiction who shall certify to the
Architect and Engineer and assume responsibility
as follows:
a. The design of the planks is safe for the loads
specified in the loading schedule.
b. The strength of the concrete is as called for in the
design submitted.
c. The plank was fabricated in accordance with the
design practice.
d. The plank was erected in accordance with the
design as well as acceptable standards of
concrete and engineering practice.
e. File "Statement B" with the local Department of
Buildings for plank work.
3. Precast concrete plank manufacturer shall submit
shop drawings to the architect for approval before
proceeding with fabrication.
4. All openings in the plank must shop detailed first.
Plank parallel and adjacent to the outside wall
shall be full width.
5. Grouting of plank keys and under bearing wall
above shall be non shrink, nonmetallic grout
3000psi at 28 days. Grout before bearing walls
above are started.
6. The minimum compressive strength of the
concrete used for concrete plank shall be 5000
psi at 28 days and made and tested as per
ASTM C31 and C39. Inspection and concrete
reports shall be filed with the local Department of
Buildings.
7. Testing and product verification shall be available
for distribution.
8. Openings and inserts in plank required by field
conditions shall be approved by plank
manufacturer.
9. All bearing pads to be Korolath. Masonite
bearing pads shall not be used.
07. POST INSTALLED ADHESIVE AND
MECHANICAL ANCHORS
1. Post installed anchorage shall be installed per
manufacturer technical data to intact base
material. Notify engineer of record prior to
installation if base material condition deviates
from structural drawings or manufacturer
technical data.
2. Manufacturer data for alternate anchorage
proposed by contractor shall be submitted to
engineer of record for review and approval.
Submittal shall include ICC evaluation service
report with ICC tested capacity meeting or
exceeding capacity of anchorage specified in
contract documents.
3. Unless otherwise indicated, post intalled
anchorage shall be adhesive type Hilti HIT-RE
500-SD into concrete or stone base material or
Hilti HIT-HY 70 into brick masonry base material.
4. All concrete members to which post-installed
anchors are to be installed shall be x-rayed or use
ground penetrating radar prior to installation to
determine location of in-situ reinforcing steel.
Structural engineer of record shall be notified of
any conflicts so revised details can be proposed.
RSA STANDARD
ABBREVIATIONS
I.D. Inside diameter
I.F. Inside face
I.J. Isolation joint
INFO. Information
INTR. Interior
JT. Joint
K Kips
LB. Pound
L.L. Live load
LLH Long leg horizontal
LLV Long leg vertical
L-W Long way
MAX Maximum
MECH. Mechanical
MEP. Mech., Elec., Plumbing, & F.P.
MFR. Manufacturer
MIN. Minimum
MISC. Miscellaneous
M.O. Masonry opening
N.A. not aplicable
N.F. Near face
N.I.C. Not in contract
NO. Number
N.S. Near side
N.T.S. Not to scale
O.C. On center
O.D. Outside diameter
O.F. Outside face
OPNG. Opening
OPP. Opposite
PC. Piece
P/C Precast concrete
PED Pedestal
PERP. Perpendicular
PL. Plate
PLF. Pounds per linear foot
PREFAB. Prefabricated
PSF. Pounds per square foot
PSI Pounds per square inch
P-T Post-tensioned
REINF. Reinforce(d), reinforcement
REQ'D Required
REV. Revision
RM. Room
SCHED. Schedule
SEC. Section
SIM. Similar
S.I.F. Step in footing
S.O.G. Slab on grade
SPEC. Specification
S.S. Stainless steel
STD. Standard
STIFF. Stiffener
STIP. Stirrup
STL. Steel
STRUCT. Structural
S-W Short way
SYM. Symmetric
T/ Top of
T & B Top & bottom
TEMP Temporary
THK. Thick or thickness
TR. Transfer
TYP. Typical
U.N.O. Unless noted otherwise
VERT. Vertical
W/ With
W.P. Work point
W-P Water point
W.W.F. Welded wire fabric
X.STR. Extra strong
X.X. STR. Double extra strong
# Number/size
Ø Diameter
RSA STANDARD
ABBREVIATIONS
ANC. Anchor
ADD'L Additional
ADJ. Adjacent
ALT. Alternate
APPROX. Approximate
ARCH. Architectural/Architect
B/ Bottom of
BLDG. Building
BM. Beam
BOT. Bottom
BRG. Bearing
BSMT. Basement
CANT. Cantilever
CFS. Cold formed steel
C.I.P. Cast in place
C.J. Control joint
CLG. Ceiling
CLR. Clear
CMU Concrete masonry unit
COL. Column
COMPS. Composite
CONC. Concrete
CONST. Construction
CONT. Continuos
COORD. Coordinate
CONTR. Contractor
COTR Contracting officer's techinal
representative
CTR. Center
DBL. Double
DEMO Demolition
DTL. Detail
DIA. Diameter
DIAG. Diagonal
DIM. Dimension
D.L. Dead load
DN. Down
DO Ditto
DWG(S) Drawings
DWL. Dowel
EA. Each
E/ Edge of
E.F. Each face
E.J. Expansion joint
E. Elevation
ELEC. Electrical
ELEV. Elevator
EMBED. Embedment
ENGR. Engineer
E.O.R. Engineer of record
EQ. Equal
E.S. Each side
EXP. Expansion
EXT. Exterior
E.W. Each way
FDN. Foundation
FIN. Finish
FLR. Floor
FRMG. Framing
F.S. Far side
FT. Feet
FTG. Footing
F.P. Fire protection
GA. Gage
GALV. Galvanized
G.B. Grade beam
G.C. General contractor
HDR. Header
HGR. Hanger
HORIZ. Horizontal
H.P. High point
HT. Height
HVAC Heating, ventilation, & air
conditioning
DESIGN LOAD AND PARAMETER TABLE
GOVERNING CODE: 2008 NEW YORK CITY BUILDING CODE
BUILDING CATEGORY: M, R-2, S-1, S-2
LIVE LOADS:
40 PSF (1) APARTMENTS
80 PSF CORRIDORS ABOVE FIRST FLOOR
100 PSF / 1000 LBS FIRST FLOOR CORRIDOR & PUBLIC SPACES
40 PSF PARKING
150 PSF (2) / 2000LBS PENTHOUSE MECHANICAL
30 PSF ROOF
100 PSF STAIRS
(1) SLL 15PSF PARTITIONS ALSO APPLIED AS LIVE LOAD
(2) USED IN ABSENCE OF ACTUAL WEIGHT OF
MECHANICAL EQUIPMENT AND INCLUDES MIN. FLAT
ROOF SNOW LOAD OF 30 PSF
SNOW LOADS:
25 PSF Pg GROUND SNOW LOAD
20 PSF Pf FLAT ROOF SNOW LAOD
B Ce SNOW EXPOSURE
1.0 Is SNOW LOAD IMPORTANCE FACTOR
1.0 Ct THERMAL FACTOR
WIND LOAD:
110 MPH V BASIC WIND SPEED (3 SEC. GUST)
1.0 Iw WIND IMPORTANCE FACTOR
B WIND EXPOSURE
+/- 0.018 INTERNAL PRESSURE COEFFICIENT
C&C VELOCITY PRESSURE AT MEAN ROOF HEIGHT
SEISMIC DESIGN DATA:
1.00 I SEISMIC IMPORTANCE FACTOR
I SEISMIC USE GROUP
0.365g Ss SHORT PERIOD MAPPED SPECTRAL RESPONSE
ACCELERATION
0.071g S1 1 SECOND PERIOD MAPPED SPECTRAL RESPONSE
ACCELERATION
E SITE CLASS
0.518g S(ds) SHORT PERIOD SPECTRAL RESPONSE ACCELERATION
0.166g S(d1) 1 SECOND PERIOD SPECTRAL RESPONSE ACCELERATION
C SEISMIC DESIGN CATEGORY
Ordinary Reinforced
Masonry Shear
Walls/Ordinary Reinforced
Concrete Walls
BASIC SEISMIC-FORCE RESISTING SYSTEM(S)
1750 KIPS DESIGN BASE SHEAR
0.139 Cs SEISMIC RESPONSE COEFFICIENT
2.5/4.0 R RESPONSE MODIFICATION FACTOR
Equivalent lateral force ANALYSIS PROCEDURE
5. Provide minimum shrinkage and temperature
reinforcement, as required by ACI 318, in all slabs and
walls where reinforcement is not indicated on drawings.
6. Coordinate size and location of all openings and pipe
sleeves with architectural, MEP, and other consultants
drawings. Minimum concrete between sleevs shall be 6".
Core drilling of walls and slabs shall not be permitted
without prior approval from engineer of record.
7. All grout shall be non-shrink, non-metallic with a
minimum compressive strength of 5000 psi at 28 days.
8. Provide clearance from face of concrete to reinforcement
as follows:
- Cast against and permanently exposed to earth: 3"
- Exposed to earth of weather: 2" for #6 and larger, 1-1/2"
for #5 and smaller
- Not exposed to weather nor in contact with ground:
Slabs and walls: 3/4"
Beams and columns: 1-1/2"
9. Shop drawings shall be submitted to the structural
engineer for review and approval. No concrete work shall
commence without approved shop drawings.
10. Clean and roughen to 1/4" amplitude all existing concrete
surfaces to receive new concrete prior to placement.
11. See other drawings in this project for size and location of
equipment pads, inserts, and embedded items.
12. Reinforcing dowels, waterstops, and other embedded
items shall be installed and secured prior to concrete
placement. "Wet-setting" of embedded items is not
permitted.
13. Chamfer all exposed formed corners of concrete ¾” x ¾”.
14. Provide plastic tipped bolsters and chairs where bolsters
or chairs rest against formwork.
15. Contractor shall locate in-situ reinforcing steel prior to
drilling concrete for post-installed anchors or
penetrations.
03 CONCRETE
1. All concrete work shall conform to the American Concrete
Institutue (ACI) "Building Code Requirements for
Structural Concrete" (318-02).
2. All concrete shall be normalweight and have minimum
compressive 28 day strength as follows:
- Pilecaps: 4000 psi
- Columns: 6000 psi
- Slabs and beams: 6000 psi
- Walls: 4000 psi
3. Reinforcing steel shall be deformed bars conforming to
ASTM A615, Grade 60. Reinforcing steel shall be
detailed according to the ACI "Details and Detailing of
Concrete Reinforcement" (315-99)
4. Welded wire fabric (WWF) shall conform to ASTM A185,
with a minimum yield strength of 65,000 psi.
NORTH
R e v . D a t e D e s c r i p t i o n
0 5 / 2 9 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T
0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
PCi t e c t s
Dwg Title
East 138th Street LLC
334-336 East 110th Street
New York, N.Y. 10029
443 Park Avenue South
New York, NY 10016
T: 212|689|7070
F: 212|545|1687
info@MHGArch.com
www.MHGArch.com
Client/Developer
MHG Architects
443 Park Avenue South
New York, N.Y. 10016
Architect
Abel Bainnson Butz, LLP
80 8th Avenue, Suite 1105
New York, N.Y. 10011
Landscape Architect
88 University Place
New York, N.Y. 10003
Structural Engineer
Ettinger Engineering
Associates
508 Eighth Avenue
New York, N.Y. 10018
Mechanical/Electrical/Plumbing Engineer
Scale
Job No.
Date
Dwg No
Seal
NYC DOB Number
1522
255 East 138th Street
Robert Silman Associates
GENERAL NOTES -
NYCTA
05/08/2013
13892
S-002.00
R e v . D a t e D e s c r i p t i o n
0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
NEW YORK CITY TRANSIT GENERAL NOTES
34. STATION AREAS OR STAIRWAY/CLOSINGS: THE GENERAL REQUIREMENTS FOR STATION
AREAS OR STAIRWAY/CLOSINGS ARE AS FOLLOWS:
A) ONLY ONE STAIRWAY AT EACH STATION WILL BE PERMITTED TO BE CLOSED AT THE SAME
TIME. APPROVALS FOR CLOSING ANY STAIRWAY MUST BE OBTAINED FROM THE DIVISION
OF STATION OPERATIONS AT LEAST THREE WEEKS IN ADVANCE.
ONLY ONE STAIRWAY AT EACH STATION WILL BE PERMITTED TO BE CLOSED AT THE SAME
TIME. APPROVALS FOR
CLOSING ANY STAIRWAY MUST BE OBTAINED FROM THE DIVISION OF STATION
OPERATIONS AT LEAST THREE WEEKS
IN ADVANCE.
B) MR. ASHOK PATEL, DIRECTOR, OFFICE OF STATION PROGRAMS; TELEPHONE 718/694-1695
OF THE DIVISION OF STATIONS MUST BE NOTIFIED ONE WEEK PRIOR TO THE ACTUAL
CLOSING AND REOPENING OF THE ENTRANCE.
C) AMPLE SIGNAGE MUST BE SUPPLIED AND POSTED AT LEAST ONE WEEK IN ADVANCE,
ADVISING THE PUBLIC OF THE PROPOSED SUBWAY STAIR CLOSING.
D) THE STREET ENTRANCE STAIRWAY SHOULD NOT BE CLOSED UNLESS MANPOWER AND
MATERIALS ARE AVAILABLE TO COMMENCE WORK ON DATES PERMITTED.
E) ONCE THE CLOSING IS EFFECTED, CONSTRUCTION SIGNS MUST BE PLACED AT
APPROPRIATE LOCATIONS ON THE BARRICADES AT THE STREET AND MEZZANINE
LEVELS, STATING THE CONTRACTOR’S NAME, 24 HOUR EMERGENCY TELEPHONE
NUMBER, CONTRACT NUMBER, THE DURATION OF THE CLOSING, DIRECTION TO AN
ALTERNATE ENTRANCE/EXIT, AND AN APOLOGY FOR THE INCONVENIENCE TO OUR
CUSTOMERS.
F) EXISTING STATION SIGNAGE MUST BE ADJUSTED TO REFLECT ANY CHANGES IN
ACCESS/EGRESS.
G) BARRICADES ARE TO BE PAINTED AND KEPT GRAFFITI FREE AT ALL TIMES. THE
CONTRACTOR MUST MAINTAIN THE BARRICADED AREA CLEAN OF ALL DEBRIS.
H) ALL MATERIALS ARE TO BE PROPERLY STORED AND SECURED AWAY FROM PASSENGER
TRAFFIC.
I) THE CONTRACTOR MUST REMOVE ALL WASTE MATERIAL AND BARRICADES FROM ALL
STATION AREAS WHEN CONSTRUCTION IS COMPLETED.
J) INSPECTION OF THE AREA UNDER CONSTRUCTION BY AUTHORIZED STATION
DEPARTMENT EMPLOYEES SHALL NOT BE INHIBITED.
K) IF STREETLIGHTS ON THE SIDEWALKS ARE AFFECTED, TEMPORARY LIGHTS SHALL BE
PROVIDED.
35. IF NEW CONCRETE CONSTRUCTION IS JOINED TO EXISTING CONCRETE, DOWELS AND
KEYWAYS ARE TO BE USED IN ACCORDANCE WITH NYCT STANDARDS.
36. IF THE PROJECT INVOLVES CONSTRUCTION OR ALTERATION OF A SUBWAY FACILITY ON
PRIVATE PROPERTY, THE PROPERTY OWNERS WILL BE REQUIRED TO ENTER INTO AN
AGREEMENT WITH NYCT PERTAINING TO ALL WORK AFFECTING THE TRANSIT FACILITIES
AND CLEARLY DEFINING LIMITS AND RESPONSIBILITY FOR MAINTENANCE AND LIABILITY.
37. WHEREVER A NEW SIDEWALK IS BEING PLACED ADJACENT TO NYCT STRUCTURES THE
FOLLOWING WILL BE REQUIRED:
A) THE TOP OF THE NEW SIDEWALK SHALL BE FLUSH WITH THE SUBWAY VENT GRATINGS,
HATCHES AND EMERGENCY
EXITS.
B) THE SLOPE OF THE NEW SIDEWALK SHALL BE SUCH THAT THE DRAINAGE BE AWAY FROM
THESE STRUCTURES.
C) A 1/2" PRE-MOLDED FILLER SHALL BE INSTALLED BETWEEN THE NEW SIDEWALK AND
NYCT STRUCTURE.
D) WHERE SIDEWALK ELEVATIONS ARE BEING CHANGED DETAILS OF PROPOSED WORK
AROUND NYCT STRUCTURES ARE TO BE SUBMITTED FOR APPROVAL.
38. BEFORE ENTERING NYCT PROPERTY, CONTRACTOR OR SUBCONTRACTOR'S PERSONNEL
SHALL HAVE ATTENDED NYCT TRACK SAFETY TRAINING AND EXPECT TO FOLLOW NYCT
RULES AND REGULATIONS AS PER TRAIING AND ENGINEER INSTRUCTIONS.
39. BEFORE THE START OF ANY WORK, THE CONTRACTOR SWTHALL MAKE AN EXAMINATION,
IN THE PRESENCE OF NYCT’S ENGINEER, OF THE INTERIOR AND EXTERIOR OF NYCT
SUBWAY OR OTHER STRUCTURE ADJACENT TO THE PROPOSED WORK. THE PERSON OR
PERSONS AUTHORIZED BY THE CONTRACTOR TO MAKE THESE EXAMINATIONS SHALL BE
APPROVED BY THE ENGINEER. THE CONTRACTOR SHALL TAKE ALL PHOTOGRAPHS AS
MAY BE NECESSARY OR ORDERED TO INDICATE THE EXISTING CONDITION OF NYCT
STRUCTURE. ONE COPY OF EACH PHOTOGRAPH, EIGHT INCHES BY TEN INCHES IN SIZE,
AND THE NEGATIVE IS TO BE SUBMITTED TO MR. JOHN MALVASIO, P.E., DIRECTOR,
DEPARTMENT OF MAINTENANCE-OF-WAY, 130 LIVINGSTON STREET, ROOM 8044D,
BROOKLYN, NEW YORK 11201, TELEPHONE 718/694-1358 BEFORE THE START OF
CONSTRUCTION.
40. ALL ARCHITECTURAL DETAILS (TOKEN BOOTHS, RAILINGS, DOORS, ETC.) ARE TO
CONFORM TO THE LATEST NYCT STANDARDS. THESE STANDARDS ARE AVAILABLE AT
NYCT.
41. STANDARD NYCT INSURANCE CLAUSES ARE TO BE MADE PART OF THE PROJECT'S
CONTRACT DRAWINGS. PROOF THAT THE NECESSARY INSURANCE IS IN EFFECT WILL BE
REQUIRED BEFORE WORK CAN COMMENCE.
42. AT THE CLOSE OF ANY PROJECT INVOLVING CONSTRUCTION OR ALTERATIONS TO
TRANSIT FACILITIES, ONE SET OF VELLUMS OR MYLARS, FIVE SETS OF 35MM MICROFILM,
AND ELECTRONIC COPIES COMPLYING TO MICROSTATION.DGN FORMAT OF “APPROVED
AS-BUILTS” MUST BE PROVIDED TO NYCT FOR ITS RECORDS. FOR DETAILS OF SPECIFIC
REQUIREMENTS CONTACT NYCT OUTSIDE PROJECTS.
43. AT LEAST SEVEN WORKING DAYS PRIOR TO THE START OF CONSTRUCTION OPERATIONS,
NOTIFICATION MUST BE GIVEN TO MR. JOHN MALVASIO, P.E., DIRECTOR, DEPARTMENT OF
MAINTENANCE-OF-WAY, AT 718/694-1358. THE CONTRACTOR TO PROVIDE TEMPORARY
QUARTERS NEAR THE JOB SITE FOR NYCT INSPECTORS CONTAINING A DESK AND
TELEPHONE.
NEW YORK CITY TRANSIT GENERAL NOTES
1. THE NYC TRANSIT (NYCT) RESERVES THE RIGHT TO PLACE INSPECTORS, FLAGMEN OR
OTHER PERSONNEL IN THE SUBWAY STRUCTURES DURING CONSTRUCTION OF THE
PROJECT LINKED BY A TELEPHONE SYSTEM, IF DEEMED NECESSARY, TO OBSERVE THE
EFFECTS OF THE CONSTRUCTION ON THE TRANSIT FACILITIES. IT IS EXPECTED THAT
SUCH PERSONNEL WILL BE NECESSARY WHEN THE CONSTRUCTION COMES WITHIN
TWENTY-FIVE FEET OF THE SUBWAY STRUCTURE. HOWEVER, NYCT FURTHER RESERVES
THE RIGHT TO PLACE SUCH PERSONNEL WHENEVER, IN ITS OPINION, THE PROJECT
CONDITIONS WARRANT SUCH PLACEMENT, REGARDLESS OF DISTANCE. THE COST OF
SUCH PERSONNEL, TELEPHONE INSTALLATION AND ANY RE-ROUTES, DIVERSIONS OF
SERVICE, WORK TRAINS, ETC., MADE NECESSARY BY THE PROJECT, MUST BE BORNE BY
THE PROJECT OR THE RESPONSIBLE NEW YORK CITY/STATE AGENCY.
2. ALL ROCK EXCAVATION ADJACENT TO THE TRANSIT STRUCTURE IS TO BE CHANNEL
DRILLED TWO FEET BELOW SUBGRADE.
3. IF TOP OF ROCK IS FOUND BELOW SUBWAY STRUCTURE, THE SUBWAY STRUCTURE MUST
BE UNDERPINNED IN ACCORDANCE WITH DRAWINGS TO BE SUBMITTED TO NYCT FOR
APPROVAL.
4. IF ROCK IS SOFT OR SEAMY, LATERAL SUPPORTS MUST BE PROVIDED BELOW THE
SUBWAY STRUCTURE IN ACCORDANCE WITH DRAWINGS TO BE SUBMITTED TO NYCT FOR
APPROVAL.
5. BLASTING WILL BE PERMITTED ONLY WITH LIGHT CHARGES SUBJECT TO THE APPROVAL
OF NYCT’S ENGINEER AND IN ACCORDANCE WITH THE REGULATIONS OF THE FIRE
DEPARTMENT. THE CONTRACTOR SHALL PROVIDE A DETAILED MONITORING PLAN,
PROVIDING FOR MEASUREMENTS OF BOTH PARTICLE VELOCITY AND DISPLACEMENTS AT
CRITICAL LOCATIONS OF THE NYCT STRUCTURE. THE MONITORING PLAN SHALL INCLUDE
THRESHOLD AND UPSET LEVELS OF BOTH PARTICLE VELOCITY AND SETTLEMENT
TOGETHER WITH AN ACTION PLAN FOR THEIR IMPLEMENTATION. THE CONTRACTOR
SHALL SECURE AN APPROVED SEISMOLOGIST TO INSTALL AND OPERATE SUITABLE
VELOCITY GAUGES TO CONTINUOUSLY MONITOR PARTICLE VELOCITY AND AN
INDEPENDENT LICENSED SURVEYOR TO MONITOR DISPLACEMENTS. THE THRESHOLD
MAXIMUM PARTICLE VELOCITY ABOVE AMBIENT CAUSED BY THE BLASTING WILL BE 0.5
INCH PER SECOND. VALUES EXCEEDING THIS LEVEL WILL BE REVIEWED AND EVALUATED
BY NYCT’S ENGINEER. IN NO CASE WILL PARTICLE VELOCITIES EXCEED THE UPSET
LEVEL OF 2.0 INCHES PER SECOND.
6. BEFORE PLACING CONCRETE, THE SUBGRADE OF THE FOUNDATIONS IN THE VICINITY OF
THE SUBWAY STRUCTURE IS TO BE INSPECTED AND APPROVED BY NYCT'S ENGINEER.
7. F ANY PORTION OF THE SUBWAY STRUCTURE OR FINISH IS DAMAGED, IT SHALL BE
REPAIRED OR REPLACED WITH THE SAME MATERIALS IN PLACE, SUBJECT TO THE
APPROVAL OF NYCT’S ENGINEER AND AT THE EXPENSE OF THE PROJECT.
8. EXCAVATION EMBANKMENTS ARE TO BE SHORED AND BRACED. DRAWINGS INDICATING A
SUGGESTED METHOD OF CONSTRUCTION ARE TO BE SUBMITTED TO NYCT FOR
APPROVAL IN CONJUNCTION WITH THE PROJECT’S CONTRACT DRAWINGS. IN CASE OF
EXCAVATION UNDERMINING THE SUBWAY STRUCTURE, UNDERPINNING MAY BE
REQUIRED. DRAWINGS FOR UNDERPINNING ARE TO BE SUBMITTED TO NYCT FOR
APPROVAL.
9. TEMPORARY SHORING MAY BE PLACED IN DIRECT CONTACT WITH NYCT STRUCTURES
ONLY IF THE NYCT STRUCTURE IS SHOWN TO BE ABLE TO SUPPORT ALL ANTICIPATED
LOADS THAT CAN BE TRANSFERRED THROUGH THE TEMPORARY STRUCTURES WITHOUT
DAMAGING THE EXISTING STRUCTURE. AT THE COMPLETION OF THE PROJECT, THESE
TEMPORARY SHORING AND BRACING SYSTEMS ARE TO BE REMOVED OR CUT-OFF AS
APPROVED BY NYCT.
10. WHEN PILES ARE TO BE DRIVEN ADJACENT TO THE SUBWAY STRUCTURE, BORING DATA,
PILE LAYOUTS, SPECIFICATIONS AND INSTALLATION PROCEDURES ARE TO BE
SUBMITTED TO NYCT FOR APPROVAL. VELOCITY METERS ARE TO BE INSTALLED IN THE
SUBWAY TUNNEL AT CRITICAL LOCATIONS TO MONITOR INDUCED VIBRATIONS. INDUCED
DISPLACEMENTS ALONG THE TUNNEL STRUCTURE AND TRACK INVERT ARE TO BE
MONITORED DURING DRIVING. THE THRESHOLD MAXIMUM PARTICLE VELOCITY ABOVE
AMBIENT CAUSED BY THE DRIVING WILL BE 0.5 INCH PER SECOND. VALUES EXCEEDING
THIS LEVEL WILL BE REVIEWED AND EVALUATED BY NYCT’S ENGINEER. IN NO CASE WILL
PARTICLE VELOCITIES EXCEED THE UPSET LEVEL OF 2.0 INCHES PER SECOND.
11. NO PILES ARE PERMITTED TO BE INSTALLED BY ANY METHOD WITHIN THREE FEET OF
SUBWAY STRUCTURE, MEASURED FROM THE EDGE OF THE PILE OR CASING TO THE
WALL. CLOSED-END PILES WILL NOT BE PERMITTED TO BE DRIVEN WITHIN TEN FEET OF
THE SUBWAY STRUCTURE.
12. ALL PILES ARE TO BE PLACED WITHIN A PREAUGERED CASED HOLE TO THE INFLUENCE
LINE. THE CASING SHALL BE CLEANED WITHOUT DISTURBING THE SOIL OUTSIDE THE
CASING AND THE PILE TO BE PLACED WITHIN THE CASING FOR INSTALLATION. THE PILES
MAY THEN BE DRIVEN BEYOND THE INFLUENCE LINE WITHIN THE CASING.
13. THE INFLUENCE LINE SHALL START AT THE BOTTOM OF THE SUBWAY STRUCTURE AND
EXTEND AT A 1:1 SLOPE. FOR PILES INSTALLED WITHIN TEN FEET OF THE SUBWAY
STRUCTURE, THE CASING SHALL BE EXTENDED UP TO THE BOTTOM OF THE SUBWAY
STRUCTURE.
14. ALL PILES ARE TO BE DRIVEN A MINIMUM OF TEN FEET BELOW THE INTERSECTION OF
THE PILE CENTERLINE AND THE INFLUENCE LINE OF THE SUBWAY STRUCTURE.
15. THE USE OF “DOWN-THE-HOLE -HAMMERS” FOR INSTALLATION OF PILES THROUGH
OVERBURDEN AND FILL WILL BE PERMITTED ONLY TO REMOVE BOULDERS. IT WILL NOT
BE PERMITTED AS A MATTER OF COURSE TO ADVANCE THE HOLE. THEIR USE TO
CONSTRUCT ROCK SOCKETS WILL NOT BE ALLOWED WITHIN 5 FEET OF THE NYCT
STRUCTURE.
16. VIBRATORY HAMMERS WILL NOT BE PERMITTED WITHIN 75 FEET OF SUBWAY
STRUCTURES. HOERAMS WILL NOT BE PERMITTED WITHIN 25 FEET OF SUBWAY
STRUCTURES.
17. DYNAMIC COMPACTION METHODS USING DROPPED HEAVY WEIGHTS CANNOT BE
CONDUCTED WITHIN 1000 FEET OF ANY NYCT STRUCTURE UNLESS IT IS SHOWN THAT
INDUCED SETTLEMENTS AND VIBRATIONS WILL NOT DAMAGE THESE STRUCTURES. A
SUITABLE MONITORING PLAN INCLUDING SETTLEMENT AND VIBRATION MEASUREMENTS
MUST BE APPROVED BY NYCT’S ENGINEER FOR ALL SUCH OPERATIONS WITHIN THESE
DISTANCES.
18. THERE SHALL BE NO MACHINE EXCAVATION WITHIN 3 FEET OF NYCT STRUCTURES,
POWER DUCT LINES, OR ANY OTHER FACILITIES UNTIL THEY HAVE BEEN CAREFULLY
EXPOSED BY HAND EXCAVATION.
19.. ALL DEWATERING OPERATIONS CONDUCTED WITHIN 500 FEET OF THE NYCT STRUCTURE
MUST BE PERFORMED IN ACCORDANCE WITH DRAWINGS AND PROCEDURES SUBMITTED
TO NYCT FOR APPROVAL. THE DISTANCE FROM THE STRUCTURE TO THE DEWATERING
OPERATION CAN BE REDUCED PROVIDED THAT SOIL CONDITIONS AT THE SITE INDICATE
THAT THE RADIUS OF INFLUENCE OF THE DEWATERING IS LESS THAN 500 FEET. FOR
DEWATERING WITHIN THE RADIUS OF INFLUENCE, THE DEWATERING PROGRAM MUST BE
SHOWN TO HAVE NEGLIGIBLE INFLUENCE ON SETTLEMENTS OF THE NYCT STRUCTURE.
20. SUBWAY ENTRANCES (VENTILATORS, ETC.) ARE TO BE UNDERPINNED OR SHORED AND
BRACED IF DIRECTED BY NYCT'S ENGINEER.
21. NYCT, AT ITS DISCRETION, RESERVES THE RIGHT TO REQUIRE THE PROJECT TO CLOSE
OR MAINTAIN AND PROTECT EXISTING SUBWAY ENTRANCES, VENTILATORS, ETC.
ADJACENT TO THE PROJECT DURING CONSTRUCTION. SUCH CONSTRUCTION MAY
INCLUDE UNDERPINNING, SHORING, BRACING AND ERECTION OF SUITABLE BARRICADES
AND/OR CANOPIES AND SHIELDS. SUCH PROTECTION SHALL BE IN ACCORDANCE WITH
DRAWINGS SUBMITTED TO NYCT FOR APPROVAL.
22. IF SHIELDS ARE TO BE INSTALLED TO PROTECT NYCT FACILITIES AND/OR THE PUBLIC,
PLANS SHOWING THE LOCATION, TYPE AND METHOD OF ATTACHMENT TO THE TRANSIT
STRUCTURE MUST BE SUBMITTED TO NYCT FOR APPROVAL.
23. ALL LUMBER AND PLYWOOD USED FOR PROTECTION OF SUBWAY FACILITIES MUST BE
FIRE RETARDANT.
24. SUBWAY EMERGENCY EXITS MUST BE KEPT CLEAR AT ALL TIMES.
25. IN EXCAVATING OVER OR NEAR THE SUBWAY ROOF, SPECIAL CARE SHALL BE EXERCISED
SO THAT THE THIN CONCRETE PROTECTION OF THE SUBWAY WATERPROOFING IS NOT
DAMAGED.
26. BURNING OF, WELDING TO OR DRILLING THROUGH EXISTING STEEL STRUCTURES WILL
NOT BE PERMITTED EXCEPT AS SHOWN ON DRAWINGS APPROVED BY NYCT.
27. HORIZONTAL AND VERTICAL CONTROL SURVEY DATA OF THE EXISTING NYCT
STRUCTURE IS TO BE TAKEN BY A LICENSED LAND SURVEYOR TO MONITOR ANY
MOVEMENTS THAT OCCUR DURING CONSTRUCTION AND TO SHOW THAT THE INDUCED
MOVEMENTS ARE WITHIN ALLOWABLE PROVIDED AND APPROVED BY NYCT’S ENGINEER.
IF ANY MOVEMENTS EXCEED ALLOWABLE, REMEDIATION AS APPROVED BY NYCT SHALL
BE PERFORMED.
28. BUS ROUTES AFFECTED BY THE PROJECT WILL OR MAY REQUIRE BUS DIVERSIONS.
THESE ARRANGEMENTS SHALL BE MADE THROUGH
MS. SARAH WYSS
ACTING DIRECTOR, OPERATIONS PLANNING
NEW YORK CITY TRANSIT
2 BROADWAY, ROOM A17.82
NEW YORK, NEW YORK 10004
TELEPHONE NUMBER 646/252-5517
WHEN IMPACTING ANY BUS STOP, SPECIAL OPERATIONS MUST BE NOTIFIED TWO WEEKS
IN ADVANCE.
29. DUCT LINES MUST BE MAINTAINED AND PROTECTED DURING CONSTRUCTION. ANY
INTERFERENCE WITH DUCT LINES SHOULD BE REPORTED TO NYCT INSPECTOR. WHEN A
DUCT LINE CONTAINING CABLES IS TO BE REMOVED, OR WHEN MASONRY ADJACENT
THERETO IS TO BE REMOVED, PENETRATED, OR DRILLED, THE WORK SHALL BE DONE
WITH HAND LABOR ENTIRELY, USING HAMMER AND CHISEL. JACKHAMMERS, BULL
POINTS OR OTHER POWER EQUIPMENT SHALL NOT BE USED.
30. WHERE MANHOLES ARE ENCOUNTERED:
A) THEY SHALL BE PROTECTED AND RAISED OR LOWERED AS REQUIRED, TO MATCH THE
NEW STREET GRADE.
B) IF MANHOLE COVERS ARE RAISED OR LOWERED, PROTECT CABLES IN MANHOLE BY
WOOD SHEETING OF 2” NOMINAL
THICKNESS.
C) PRIOR TO THE START OF CONSTRUCTION OPERATIONS AFFECTING MANHOLES AND
DUCT LINES, SEVEN DAYS NOTICE MUST BE GIVEN TO MR. JOHN MALVASIO, P.E.,
DIRECTOR, DEPARTMENT OF MAINTENANCE OF WAY, AT 718/694-1358.
31. CONSTRUCTION WORK DONE NEAR VENT GRATINGS AND HATCHES SHALL BE AS
FOLLOWS:
A) UNLESS APPROVED BY THE NYCT’S ENGINEER, ALL VENT GRATINGS AND HATCHES
SHOULD REMAIN OUTSIDE THE CONSTRUCTION SITE, SEPARATED BY A CONSTRUCTION
FENCE. PROTECTIVE SHIELDS MUST BE PROVIDED OVER VENT GRATINGS AS REQUIRED
BY NYCT’S ENGINEER.
B) NO BUILDING MATERIAL, VEHICLES OR CONSTRUCTION EQUIPMENT IS TO BE STORED OR
RUN OVER VENT, GRATINGS, HATCHES OR EMERGENCY EXITS.
C) DETAILS OF SIDEWALK RECONSTRUCTION AROUND VENT GRATINGS, HATCHES AND
EMERGENCY EXITS ARE TO BE SUBMITTED TO NYCT FOR APPROVAL.
32. TRACTORS, CRANES, EXCAVATORS, ETC. USED IN THE VICINITY OF THE ELEVATED
STRUCTURES SHALL BE ISOLATED FROM THE GROUND. SINCE THE ELEVATED
STRUCTURE IS USED AS A NEGATIVE RETURN PATH, WITH A CONSEQUENT POTENTIAL
BETWEEN IT AND THE GROUND, ANY CONTACT BETWEEN THE STRUCTURE AND
GROUNDED EQUIPMENT COULD RESULT IN BURNING OF THE STEEL.
33. TEMPORARY CONSTRUCTION SHEDS, BARRICADES OR PLYWOOD PARTITIONS MUST BE A
MINIMUM OF 5’-0” FROM EDGE OF FINISHED PLATFORM.
NEW YORK CITY TRANSIT OUTSIDE CONTRACT INSURANCE REQUIREMENTS
2. GENERAL REQUIREMENTS APPLICABLE TO INSURANCE POLICIES.
A. ALL OF THE INSURANCE REQUIRED BY THIS ARTICLE SHALL BE WITH COMPANIES
LICENSED OR AUTHORIZED TO DO BUSINESS IN THE STATE OF NEW YORK WITH AN A.M.
BEST COMPANY RATING OF NOT LESS THAN A-/VII OR BETTER ANDREASONABLY
APPROVED BY THE PERMITTOR/MTA AND SHALL DELIVER EVIDENCE OF SUCH POLICIES.
B. EXCEPT FOR WORKERS COMPENSATION, ALL REFERENCES TO FORMS AND COVERAGES
REFERRED TO ABOVE SHALL BE THE MOST RECENT USED BY THE INSURANCE SERVICES
OFFICE, INC. ("ISO") OR EQUIVALENT FORMS APPROVED BY THE INSURANCE
DEPARTMENT OF THE STATE OF NEW YORK, PROVIDED, HOWEVER, THAT EXCESS
COVERAGES MAY BE WRITTEN ON FORMS REASONABLY ACCEPTABLE TO PERMITTOR
CONTAINING PROVISIONS OTHER THAN THOSE CONTAINED IN ISO FORMS BUT
OTHERWISE CONFORMING IN SUBSTANCE TO THE REQUIREMENTS OF THIS ARTICLE.
C. THE PERMITTEE OR ITS CONTRACTOR PERFORMING THE WORK SHALL FURNISH
EVIDENCE OF ALL POLICIES BEFORE ANY WORK IS STARTED TO THE PERMITTOR:
FOR NYCT CONTRACT INSPECTION
C/O MR. JOHN MALVASIO
DIRECTOR, MOW ENGINEERING
130 LIVINGSTON STREET, ROOM 8044F
BROOKLYN, NY 11201
TELEPHONE: (718) 694-1358
THESE POLICIES MUST: (I) BE WRITTEN IN ACCORDANCE WITH THE REQUIREMENTS OF
THE PARAGRAPHS ABOVE, APPLICABLE; (II) BE ENDORSED IN FORM ACCEPTABLE TO
INCLUDE A PROVISION THAT THE POLICY WILL NOT BE CANCELED, MATERIALLY
CHANGED, OR NOT RENEWED, UNLESS OTHERWISE INDICATED HEREIN, AT LEAST THIRTY
(30) DAYS PRIOR WRITTEN NOTICE TO THE PERMITTOR C/O MTA RISK AND INSURANCE
MANAGEMENT DEPARTMENT - STANDARDS, ENFORCEMENT & CLAIMS UNIT, 2 BROADWAY
– 21ST FLOOR, NEW YORK, NY 10004; AND (III) STATE OR BE ENDORSED TO PROVIDE THAT
THE COVERAGE AFFORDED UNDER THE CONTRACTOR’S POLICIES SHALL APPLY ON A
PRIMARY AND NOT ON AN EXCESS OR CONTRIBUTING BASIS WITH ANY POLICIES WHICH
MAY BE AVAILABLE TO THE PERMITTOR/MTA, AND ALSO THAT THE CONTRACTOR’S
POLICIES, PRIMARY AND EXCESS, MUST BE EXHAUSTED BEFORE IMPLICATING ANY
PERMITTOR/MTA POLICY AVAILABLE. (IV) IN ADDITION, CONTRACTOR’S POLICIES SHALL
STATE OR BE ENDORSED TO PROVIDE THAT, IF A SUBCONTRACTOR’S POLICY CONTAINS
ANY PROVISION THAT MAY ADVERSELY AFFECT WHETHER CONTRACTOR’S POLICIES ARE
PRIMARY AND MUST BE EXHAUSTED BEFORE IMPLICATING ANY PERMITTOR/MTA POLICY
AVAILABLE, CONTRACTOR’S AND SUBCONTRACTOR’S POLICIES SHALL NEVERTHELESS
BE PRIMARY AND MUST BE EXHAUSTED BEFORE IMPLICATING ANY PERMITTOR/MTA
POLICY AVAILABLE. EXCEPT FOR PROFESSIONAL LIABILITY, POLICIES WRITTEN ON
CLAIMS MADE BASIS ARE NOT ACCEPTABLE. AT LEAST TWO (2) WEEKS PRIOR TO THE
EXPIRATION OF THE POLICIES, CONTRACTOR SHALL ENDEAVOR TO PROVIDE EVIDENCE
OF RENEWAL OR REPLACEMENT POLICIES OF INSURANCE, WITH TERMS AND LIMITS NO
LESS FAVORABLE THAN THE EXPIRING POLICIES. EXCEPT AS OTHERWISE INDICATED IN
THE DETAILED COVERAGE PARAGRAPHS BELOW, SELF INSURED RETENTIONS AND
POLICY DEDUCTIBLES SHALL NOT EXCEED $100,000, UNLESS SUCH INCREASED
DEDUCTIBLE OR RETENTION IS APPROVED BY PERMITTOR/MTA. THE PERMITTEE SHALL
BE RESPONSIBLE FOR ALL CLAIM EXPENSE AND LOSS PAYMENTS WITHIN THE
DEDUCTIBLE OR SELF-INSURED RETENTION. THE INSURANCE MONETARY LIMITS
REQUIRED HEREIN MAY BE MET THROUGH THE COMBINED USE OF THE INSURED’S
PRIMARY AND UMBRELLA/EXCESS POLICIES.
D. CERTIFICATES OF INSURANCE MAY BE SUPPLIED AS EVIDENCE OF POLICIES OF THE
ABOVE POLICIES, EXCEPT THE RAILROAD PROTECTIVE LIABILITY POLICY, DESIGNATED AS
POLICY D. HOWEVER, IF REQUESTED BY THE PERMITTOR, THE PERMITTEE SHALL
DELIVER TO THE AUTHORITY, WITHIN FORTY-FIVE (45) DAYS OF THE REQUEST, A COPY OF
SUCH POLICIES, CERTIFIED BY THE INSURANCE CARRIER AS BEING TRUE AND
COMPLETE. THE RAILROAD PROTECTIVE LIABILITY INSURANCE POLICY MUST BE
PROVIDED IN THE FORM OF THE ORIGINAL POLICY. A DETAILED INSURANCE BINDER MAY
BE PROVIDED, ACORD OR MANUSCRIPT FORM, PENDING ISSUANCE OF THE ORIGINAL
POLICY. THE ORIGINAL POLICY
E. IF A CERTIFICATE OF INSURANCE IS SUBMITTED, IT MUST: (1) BE PROVIDED ON THE
PERMITTOR CERTIFICATE OF INSURANCE FORM OR MTA CERTIFICATE OF INSURANCE
FORM FOR JOINT AGENCY AGREEMENTS; (2) BE SIGNED BY AN AUTHORIZED
REPRESENTATIVE OF THE INSURANCE CARRIER OR PRODUCER AND NOTARIZED; (3)
DISCLOSE ANY DEDUCTIBLE, SELF-INSURED RETENTION, SUB-LIMIT, AGGREGATE LIMIT
OR ANY EXCLUSIONS TO THE POLICY THAT MATERIALLY CHANGE THE COVERAGE; (4)
INDICATE THE ADDITIONAL INSUREDS AND NAMED INSUREDS AS REQUIRED HEREIN,
ALONG WITH A PHYSICAL COPY OF THE ADDITIONAL INSURED ENDORSEMENT ( I.S.O.
FORM CG 20 26 07/04 VERSION OR EQUIVALENT), AS APPLICABLE AND THE
ENDORSEMENT(S) MUST INCLUDE POLICY NUMBER(S); (5) REFERENCE THE CONTRACT BY
NUMBER ON THE FACE OF THE CERTIFICATE; AND (6) EXPRESSLY REFERENCE THE
INCLUSION OF ALL REQUIRED ENDORSEMENTS.
F. THE MINIMUM AMOUNTS OF INSURANCE REQUIRED IN THE DETAIL DESCRIPTION OF
POLICIES A, B C, AND D ABOVE SHALL NOT BE CONSTRUED TO LIMIT THE EXTENT OF THE
PERMITTEE’S LIABILITY UNDER THIS AGREEMENT.
G. IF, AT ANY TIME DURING THE PERIOD OF THIS AGREEMENT, INSURANCE AS REQUIRED IS
NOT IN EFFECT, OR PROOF THEREOF IS NOT PROVIDED TO THE PERMITTOR, THE
PERMITTOR SHALL HAVE THE OPTIONS TO: (I) DIRECT THE PERMITTEE TO SUSPEND
WORK OR OPERATION WITH NO ADDITIONAL COST OR EXTENSION OF TIME DUE ON
ACCOUNT THEREOF; OR (II) TREAT SUCH FAILURE AS AN EVENT OF DEFAULT.
NEW YORK CITY TRANSIT OUTSIDE CONTRACT INSURANCE REQUIREMENTS
1. THE PERMITTEE AT ITS SOLE COST AND EXPENSE SHALL CARRY OR CAUSE TO CARRIED
AND SHALL MAINTAIN AT ALL TIMES DURING THE PERIOD OF PERFORMANCE UNDER THIS
AGREEMENT POLICIES OF INSURANCE AS HEREIN BELOW SET FORTH BELOW:
A. WORKERS’ COMPENSATION INSURANCE (INCLUDING EMPLOYER'S LIABILITY INSURANCE)
WITH LIMITS OF NOT LESS THAN $2,000,000, WHICH LIMIT MAY BE MET BY A COMBINATION
OF PRIMARY AND EXCESS INSURANCE MEETING THE STATUTORY LIMITS OF NEW YORK
STATE. THE POLICY SHALL BE ENDORSED TO INCLUDE LONGSHOREMAN’S AND HARBOR
WORKERS' COMPENSATION ACT/MARITIME COVERAGE ENDORSEMENT AND/OR JONES
ACT ENDORSEMENT WHEN APPLICABLE.
B. COMMERCIAL GENERAL LIABILITY INSURANCE (I.S.O. 2001 FORM OR EQUIVALENT)
APPROVED BY PERMITTOR IN THE PERMITTEE’S NAME WITH LIMITS OF LIABILITY IN THE
AMOUNT OF AT LEAST $3,000,000 FOR EACH OCCURRENCE ON A COMBINED SINGLE LIMIT
BASIS FOR INJURIES TO PERSONS (INCLUDING DEATH) AN DAMAGE TO PROPERTY,
$3,000,000 GENERAL AGGREGATE AND $3,000,000 IN THE AGGREGATE WITH RESPECT TO
PRODUCTS/COMPLETED OPERATIONS. THE LIMITS MAY BE PROVIDED IN THE FORM OF A
PRIMARY PLICY OR COMBINATION OF PRIMARY AND UMBRELLA/EXCESS POLICY. WHEN
THE MINIMUM CONTRACT AMOUNTS CAN ONLY BE MET WHEN APPLYING THE
UMBRELLA/EXCESS POLICY, THE UMBRELLA/EXCESS POLICY MUST FOLLOW FORM OF
THE UNDERLYING POLICY AND BE EXTENDED TO “DROP DOWN” TO BECOME PRIMARY IN
THE EVENT PRIMARY LIMITS ARE REDUCED OR AGGREGATE LIMITS ARE EXHAUSTED.
SUCH INSURANCE SHALL BE PRIMARY AND NON-CONTRIBUTORY TO ANOTHER VALID AND
COLLECTIBLE INSURANCE AND MUST BE EXHAUSTED BEFORE IMPLICATING ANY
PERMITTOR/MT POLICY AVAILABLE.
SUCH POLICY SHOULD BE WRITTEN ON AN OCCURRENCE FORM, AND SHALL INCLUDE:
* CONTRACTUAL COVERAGE FOR LIABILITY ASSUMED BY THE PERMITTEE UNDER THIS
AGREEMENT;
* PERSONAL AND ADVERTISING INJURY COVERAGE;
* PRODUCTS-COMPLETED OPERATIONS;
* INDEPENDENT CONTRACTORS COVERAGE;
* "XCU" COVERAGE (EXPLOSION, COLLAPSE, AND UNDERGROUND HAZARDS) WHERE
NECESSARY;
* CONTRACTUAL LIABILITY EXCLUSION, APPLICABLE TO CONSTRUCTION OR DEMOLITION
OPERATIONS TO BE PERFORMED WITHIN 50 FEET OF RAILROAD TRACKS, MUST BE
VOIDED, WHERE NECESSARY; AND
* ADDITIONAL INSURED ENDORSEMENT (I.S.O. FORM CG 20 26 07/04 VERSION OR
EQUIVALENT) APPROVED BY THE PERMITTOR NAMING:
** NEW YORK CITY TRANSIT AUTHORITY (NYCTA), THE MANHATTAN AND BRONX SURFACE
TRANSIT OPERATING AUTHORITY (MABSTOA), THE STATEN ISLAND RAPID TRANSIT
OPERATING AUTHORITY (SIRTOA), MTA CAPITAL CONSTRUCTION CO., THE
METROPOLITAN TRANSPORTATION AUTHORITY (MTA) INCLUDING ITS SUBSIDIARIES AND
AFFILIATES, AND THE CITY OF NEW YORK (AS OWNER).
C. BUSINESS AUTOMOBILE LIABILITY INSURANCE POLICY (I.S.O. FORM CA 00 01 10 01 OR
EQUIVALENT) APPROVED BY THE PERMITTOR IS REQUIRED IF PERMITEE'S VEHICLE
ENTERS PERMITTOR PROPERTY. THE INSURANCE MUST BE IN THE NAME OF THE
PERMITTEE OR ITS CONTRACTOR ENTERING THE PERMITTOR PROPERTY WITH LIMITS OF
LIABILITY IN THE AMOUNT OF $2,000,000 EACH ACCIDENT FOR CLAIMS FOR BODILY
INJURIES (INCLUDING DEATH) TO PERSONS AND FOR DAMAGE TO PROPERTY ARISING
OUT OF THE OWNERSHIP, MAINTENANCE OR USE OF ANY OWNED, HIRED OR NON-OWNED
MOTOR VEHICLE.
D. RAILROAD PROTECTIVE LIABILITY INSURANCE (ISO-RIMA OR EQUIVALENT FORM)
APPROVED BY PERMITTOR COVERING THE WORK TO BE PERFORMED AT THE
DESIGNATED JOB SITE AND AFFORDING PROTECTION FOR DAMAGES ARISING OUT OF
BODILY INJURY OR DEATH, PHYSICAL DAMAGE TO OR DESTRUCTION OF PROPERTY,
INCLUDING DAMAGE TO THE INSURED’S OWN PROPERTY AND CONFORMING TO THE
FOLLOWING:
* THE FOLLOWING ARE THE “NAMED INSUREDS” FOR THIS COVERAGE:
** NEW YORK CITY TRANSIT AUTHORITY (NYCTA), THE MANHATTAN AND BRONX SURFACE
TRANSIT OPERATING AUTHORITY (MABSTOA), THE STATEN ISLAND RAPID TRANSIT
OPERATING AUTHORITY (SIRTOA), MTA CAPITAL CONSTRUCTION CO., THE
METROPOLITAN TRANSPORTATION AUTHORITY (MTA) INCLUDING ITS SUBSIDIARIES AND
AFFILIATES, AND THE CITY OF NEW YORK (AS OWNER).
* THE LIMIT OF LIABILITY SHALL BE $2,000,000 AT LEAST EACH OCCURRENCE, SUBJECT TO
A $6,000,000 ANNUAL AGGREGATE;
* POLICY ENDORSEMENT CG 28 31 - POLLUTION EXCLUSION AMENDMENT IS REQUIRED TO
BE ENDORSED ONTO THE POLICY WHEN ENVIRONMENTAL-RELATED WORK AND/OR
EXPOSURES EXIST.
* INDICATE THE NAME AND ADDRESS OF THE CONTRACTOR TO PERFORM THE WORK, THE
CONTRACT # AND THE NAME OF THE RAILROAD PROPERTY WHERE THE WORK IS BEING
PERFORMED AND THE AGENCY PERMIT.
* EVIDENCE OF RAILROAD PROTECTIVE LIABILITY INSURANCE, MUST BE PROVIDED IN THE
FORM OF THE ORIGINAL POLICY. A DETAILED INSURANCE BINDER (ACORD OR
MANUSCRIPT FORM) WILL BE ACCEPTED PENDING ISSUANCE OF THE ORIGINAL POLICY,
WHICH MUST BE PROVIDED WITHIN 30 DAYS OF THE BINDER APPROVAL.
E. ENVIRONMENTAL/POLLUTION EXPOSURES: IN THE EVENT ENVIRONMENTAL OR
POLLUTION EXPOSURES EXIST; THE PERMITTEE SHALL REQUIRE THE ENVIRONMENTAL
CONTRACTOR OR SUB-CONTRACTOR TO PROVIDE THE APPLICABLE INSURANCE
COVERING SUCH EXPOSURE. THE LIMITS AND TYPE OF INSURANCE PROVIDED SHALL BE
SATISFACTORY TO THE PERMITTOR AND WILL BE CONFIRMED TO THE PARTIES PRIOR TO
THE START OF THE WORK.
STRUCTURE
NOTIFY NYCT
ENGINEER STOP WORK
ELEVATED 1/8 INCH 1/4 INCH
SUBWAY 1/4 INCH 1/2 INCH
NEW YORK CITY TRANSIT "NOT FOR BENEFIT" INSURANCE REQUIREMENTS
SECTION C: GENERAL INSURANCE REQUIREMENTS
1. INSURANCE COMPANIES: ALL OF THE INSURANCE REQUIRED BY THIS ARTICLE SHALL BE
WITH COMPANIES LICENSED OR AUTHORIZED TO DO BUSINESS IN THE STATE OF NEW
YORK WITH AN A.M. BEST COMPANY RATING OF NOT LESS THAN A-/VII OR BETTER AND
REASONABLY APPROVED BY THE PERMITTOR/MTA.
2. FORMS: ALL FORMS SHALL COMPLY WITH THE INSURANCE SERVICES OFFICE, INC. ("ISO")
OR ITS EQUIVALENT APPROVED BY THE INSURANCE DEPARTMENT OF THE STATE OF NEW
YORK
3. POLICY DEDUCTIBLE / SELF INSURED RETENTION: INSURANCE MAY CONTAIN A
DEDUCTIBLE AND OR SELF-INSURED RETENTION AND SHALL NOT EXCEED $100,000. THE
PERMITTEE SHALL BE RESPONSIBLE FOR ALL CLAIM EXPENSES AND LOSS PAYMENTS
WITHIN THE DEDUCTIBLE OR SELF-INSURED RETENTION.
4. POLICY TERMS: THESE POLICIES MUST: (I) BE WRITTEN IN ACCORDANCE WITH THE
REQUIREMENTS OF THE PARAGRAPHS ABOVE, AS APPLICABLE; (II) BE ENDORSED IN FORM
ACCEPTABLE TO INCLUDE A PROVISION THAT SHOULD THE POLICY BE CANCELED,
MATERIALLY CHANGED, OR NOT RENEWED, NOTICE SHALL BE DELIVERED IN
ACCORDANCE WITH THE INSURANCE POLICY PROVISIONS TO THE PERMITTOR, AND (III)
STATE OR BE ENDORSED TO PROVIDE THAT THE COVERAGE AFFORDED UNDER THE
PERMITTEE'S POLICIES SHALL APPLY ON A PRIMARY AND NOT ON AN EXCESS OR
CONTRIBUTING BASIS WITH ANY POLICIES WHICH MAY BE AVAILABLE TO THE
PERMITTOR/MTA, AND ALSO THAT THE PERMITTEE'S POLICIES, PRIMARY AND EXCESS,
MUST BE EXHAUSTED BEFORE IMPLICATING ANY PERMITTOR/MTA POLICY AVAILABLE. (IV)
IN ADDITION, PERMITTEE'S POLICIES SHALL STATE OR BE ENDORSED TO PROVIDE THAT,
IF A SUBCONTRACTOR'S POLICY CONTAINS ANY PROVISION THAT MAY ADVERSELY
AFFECT WHETHER PERMITTEE'S POLICIES ARE PRIMARY AND MUST BE EXHAUSTED
BEFORE IMPLICATING ANY PERMITTOR/MTA POLICY AVAILABLE, PERMITTEE'S AND
SUBCONTRACTOR'S POLICIES SHALL NEVERTHELESS BE PRIMARY AND MUST BE
EXHAUSTED BEFORE IMPLICATING ANY PERMITTOR/MTA POLICY AVAILABLE. AT LEAST
TWO (2) WEEKS PRIOR TO THE EXPIRATION OF THE POLICIES, THE PERMITTEE SHALL
ENDEAVOR TO PROVIDE EVIDENCE OF RENEWAL OR REPLACEMENT POLICIES OF
INSURANCE, WITH TERMS AND LIMITS NO LESS FAVORABLE THAN THE EXPIRING POLICIES.
SECTION D: SUBMISSION OF INSURANCE
CERTIFICATES OF INSURANCE MAY BE SUPPLIED AS EVIDENCE OF POLICIES EXCEPT FOR
RAILROAD PROTECTIVE LIABILITY. HOWEVER, IF REQUESTED BY THE PERMITTOR, THE
PERMITTEE SHALL DELIVER TO THE PERMITTOR WITHIN FORTY-FIVE (45) DAYS A COPY OF
SUCH POLICIES, CERTIFIED BY THE INSURANCE CARRIER AS BEING TRUE AND COMPLETE.
IF A CERTIFICATE OF INSURANCE IS SUBMITTED, IT MUST: (1) BE PROVIDED ON THE
PERMITTOR CERTIFICATE OF INSURANCE; (2) BE SIGNED BY AN AUTHORIZED
REPRESENTATIVE OF THE INSURANCE CARRIER OR PRODUCER AND NOTARIZED; (3)
DISCLOSE ANY DEDUCTIBLE, SELF-INSURED RETENTION, SUB-LIMIT, AGGREGATE LIMIT OR
ANY EXCLUSIONS TO THE POLICY THAT MATERIALLY CHANGE THE COVERAGE; (4)
INDICATE THE ADDITIONAL INSUREDS AS REQUIRED HEREIN UNDER SECTION B; THE
PERMITTEE MUST PROVIDE A COPY OF THE ADDITIONAL INSURED ENDORSEMENT (ISO)
FORM CG 20 26 07/04 OR ITS EQUIVALENT AND MUST REFERENCE THE POLICY
INFORMATION; (5) INDICATE PROJECT NAME AND LOCATION ON THE CERTIFICATE; AND (6)
EXPRESSLY REFERENCE THE INCLUSION OF ALL REQUIRED ENDORSEMENTS.
THE PERMITTEE OR ITS CONTRACTOR/SUBCONTRACTOR PERFORMING THE WORK SHALL
FURNISH EVIDENCE OF ALL POLICIES BEFORE ANY WORK IS STARTED TO THE
APPROPRIATE DEPARTMENT:
NEW AGREEMENTS: RENEWAL INSURANCE:
MTA/NYCT MOW ENGINEERING MTA RISK INSURANCE MANAGEMENT
ATTENTION: MR. JOHN MALVASIO ATTENTION: RUTH APOSTOL
130 LIVINGSTON STREET 2 BROADWAY - 21ST FLOOR
BROOKLYN, NY 11201 NEW YORK, NY 10004
SECTION E: NO LIMIT OF LIABILITY
THE MINIMUM AMOUNTS OF INSURANCE REQUIRED IN THE DETAIL DESCRIPTION OF
POLICIES ABOVE SHALL NOT BE CONSTRUED TO LIMIT THE EXTENT OF THE PERMITTEE'S
LIABILITY UNDER THIS AGREEMENT.
SECTION F: RIGHT TO REQUEST ADDITIONAL INSURANCE
PERMITTEE FURTHER AGREES TO PROVIDE, AT PERMITTEE'S SOLE COST AND EXPENSE,
SUCH INCREASED OR EXPANDED INSURANCE COVERAGE AS PERMITTOR MAY FROM TIME
TO TIME AS DEEM APPROPRIATE.
SECTION G: EVENT OF DEFAULT
IF, AT ANY TIME DURING THE PERIOD OF THIS AGREEMENT, INSURANCE AS REQUIRED IS
NOT IN EFFECT, OR PROOF THEREOF IS NOT PROVIDED TO THE PERMITTOR, THE
PERMITTOR SHALL HAVE THE OPTIONS TO: (I) DIRECT THE PERMITTEE TO SUSPEND WORK
OR OPERATION WITH NO ADDITIONAL COST OR EXTENSION OF TIME DUE ON ACCOUNT
THEREOF; OR (II) TREAT SUCH FAILURE AS AN EVENT OF DEFAULT.
SECTION H: NOTICE OF CLAIM
THE PERMITTEE SHALL IMMEDIATELY FILE WITH NYCT/MTA'S TORT DIVISION (WITH A COPY
TO THE PROJECT MANAGER), 130 LIVINGSTON STREET, 11TH FLOOR, BROOKLYN, NEW
YORK 11201, A NOTICE OF ANY OCCURRENCE LIKELY TO RESULT IN A CLAIM AGAINST
NYCT/MTA AND SHALL ALSO FILE WITH THE TORTS DIVISION DETAILED SWORN PROOF OF
INTEREST AND LOSS WITH THE CLAIM. THIS PARAGRAPH SHALL SURVIVE THE EXPIRATION
OR EARLIER TERMINATION OF THE CONTRACT.
NEW YORK CITY TRANSIT "NOT FOR BENEFIT" INSURANCE REQUIREMENTS
SECTION A: INSURANCE REQUIREMENTS
THE PERMITTEE AT ITS SOLE COST AND EXPENSE SHALL CARRY AND MAINTAIN POLICIES
OF INSURANCE AT ALL TIMES DURING THE PERIOD OF PERFORMANCE UNDER THIS
AGREEMENT AS HEREIN SET FORTH BELOW:
1. WORKERS' COMPENSATION: INCLUDING EMPLOYER'S LIABILITY INSURANCE WITH LIMITS
OF LIABILITY NOT LESS THAN $2,000,000 WHICH MAY BE MET BY A COMBINATION OF
PRIMARY AND EXCESS INSURANCE MEETING THE STATUTORY LIMITS OF NEW YORK
STATE.
2. COMMERCIAL GENERAL LIABILITY: (ISO 2001 FORM OR EQUIVALENT) APPROVED BY
PERMITTOR IN THE PERMITTEE'S NAME WITH LIMITS OF LIABILITY IN THE AMOUNT OF NOT
LESS THAN $3,000,000 FOR EACH OCCURRENCE ON A COMBINED SINGLE LIMIT BASIS FOR
INJURIES TO PERSONS (INCLUDING DEATH) AND DAMAGE TO PROPERTY, $3,000,000
GENERAL AGGREGATE AND $3,000,000 IN THE AGGREGATE WITH RESPECT TO
PRODUCTS/COMPLETED OPERATIONS. THE LIMITS MAY BE PROVIDED IN THE FORM OF A
PRIMARY POLICY OR COMBINATION OF PRIMARY AND UMBRELLA/EXCESS POLICY. WHEN
THE MINIMUM CONTRACT AMOUNTS CAN ONLY BE MET WHEN APPLYING THE
UMBRELLA/EXCESS POLICY, THE UMBRELLA/EXCESS POLICY MUST FOLLOW FORM OF THE
UNDERLYING POLICY AND BE EXTENDED TO “DROP DOWN” TO BECOME PRIMARY IN THE
EVENT PRIMARY LIMITS ARE REDUCED OR AGGREGATE LIMITS ARE EXHAUSTED. SUCH
INSURANCE SHALL BE PRIMARY AND NON-CONTRIBUTORY TO ANY OTHER VALID AND
COLLECTIBLE INSURANCE AND MUST BE EXHAUSTED BEFORE IMPLICATING ANY
PERMITTOR/MTA POLICY AVAILABLE.
SUCH POLICY SHOULD BE WRITTEN ON AN OCCURRENCE FORM, AND SHALL INCLUDE THE
FOLLOWING COVERAGES:
* ADDITIONAL INSURED ENDORSEMENT (I.S.O. FORM CG 20 26 07/04) VERSION OR
EQUIVALENT APPROVED BY THE PERMITTOR, SHALL NAME THE INDEMNITEES AS
REFERENCED UNDER SECTION B OF THIS AGREEMENT AS ADDITIONAL INSUREDS.
* CONTRACTUAL LIABILITY ASSUMED BY THE PERMITTEE UNDER THIS AGREEMENT;
* PERSONAL AND ADVERTISING INJURY;
* PRODUCTS-COMPLETED OPERATIONS;
* INDEPENDENT CONTRACTORS;
* "XCU" (EXPLOSION, COLLAPSE, AND UNDERGROUND HAZARDS) WHERE NECESSARY;
* CONTRACTUAL LIABILITY EXCLUSION, APPLICABLE TO CONSTRUCTION OR DEMOLITION
OPERATIONS TO BE PERFORMED WITHIN 50 FEET OF RAILROAD TRACKS, MUST BE
REMOVED, WHERE NECESSARY;
3. BUSINESS AUTOMOBILE LIABILITY: (ISO FORM CA 00 01 10 01 OR EQUIVALENT) APPROVED
BY THE PERMITTOR IS REQUIRED IF PERMITTEE'S VEHICLE ENTERS PERMITTOR'S
PROPERTY. THE INSURANCE MUST BE IN THE NAME OF THE PERMITTEE OR ITS
CONTRACTOR ENTERING THE PERMITTOR PROPERTY WITH LIMITS OF LIABILITY IN THE
AMOUNT OF NOT LESS THAN $2,000,000 EACH ACCIDENT FOR CLAIMS FOR BODILY
INJURIES (INCLUDING DEATH) TO PERSONS AND FOR DAMAGE TO PROPERTY ARISING OUT
OF THE OWNERSHIP, MAINTENANCE OR USE OF ANY OWNED, HIRED OR NON-OWNED
MOTOR VEHICLE.
4. RAILROAD PROTECTIVE LIABILITY: (ISO-RIMA OR EQUIVALENT FORM) APPROVED BY
PERMITTOR COVERING THE WORK TO BE PERFORMED AT THE DESIGNATED JOB SITE AND
AFFORDING PROTECTION FOR DAMAGES ARISING OUT OF BODILY INJURY OR DEATH,
PHYSICAL DAMAGE TO OR DESTRUCTION OF PROPERTY, INCLUDING DAMAGE TO THE
INSURED'S OWN PROPERTY AND CONFORMING TO THE FOLLOWING:
* THE POLICY SHALL BE ISSUED TO THE “NAMED INSUREDS” LISTED UNDER SECTION B
* THE LIMIT OF LIABILITY SHALL BE NOT LESS THAN $2,000,000 PER OCCURRENCE, SUBJECT
TO A $6,000,000 ANNUAL AGGREGATE;
* POLICY MUST BE ENDORSED TO PROVIDE COVERAGE FOR CLAIMS ARISING FROM INJURY
TO EMPLOYEES COVERED BY FEDERAL EMPLOYER'S LIABILITY ACT (FELA).
* INDICATE THE NAME AND ADDRESS OF THE DESIGNATED CONTRACTOR, PROJECT
LOCATION AND DESCRIPTION OF WORK, AND PERMIT NUMBER IF APPLICABLE.
* EVIDENCE OF RAILROAD PROTECTIVE LIABILITY INSURANCE, MUST BE PROVIDED IN THE
FORM OF A POLICY. A DETAILED INSURANCE BINDER (ACORD OR MANUSCRIPT FORM) WILL
BE ACCEPTED PENDING ISSUANCE OF THE POLICY, WHICH MUST BE PROVIDED WITHIN 30
DAYS FROM THE EFFECTIVE DATE.
5. ENVIRONMENTAL INSURANCE: IN THE EVENT ENVIRONMENTAL OR POLLUTION
EXPOSURES EXIST, THE PERMITTEE SHALL REQUIRE THE ENVIRONMENTAL CONTRACTOR
OR SUB-CONTRACTOR TO PROVIDE THE APPLICABLE INSURANCE COVERING SUCH
EXPOSURE. THE LIMITS AND TYPES OF INSURANCE PROVIDED MUST BE SATISFACTORY
TO THE PERMITTOR AND APPROVED PRIOR TO THE START OF THE WORK.
ENVIRONMENTAL INSURANCE: IN THE EVENT ENVIRONMENTAL OR POLLUTION
EXPOSURES EXIST, THE PERMITTEE SHALL REQUIRE THE ENVIRONMENTAL CONTRACTOR
OR SUB-CONTRACTOR TO PROVIDE THE APPLICABLE INSURANCE COVERING SUCH
EXPOSURE. THE LIMITS AND TYPES OF INSURANCE PROVIDED MUST BE SATISFACTORY
TO THE PERMITTOR AND APPROVED PRIOR TO THE START OF THE WORK.
SECTION B: INDEMNITEES (ADDITIONAL INSUREDS / NAMED INSUREDS)
NEW YORK CITY TRANSIT AUTHORITY (“NYCT”), THE MANHATTAN AND BRONX SURFACE
TRANSIT OPERATING AUTHORITY (“MABSTOA”), THE STATEN ISLAND RAPID TRANSIT
OPERATING AUTHORITY (“SIRTOA”), THE METROPOLITAN TRANSPORTATION AUTHORITY
(“MTA”) INCLUDING ITS SUBSIDIARIES AND AFFILIATES, MTA CAPITAL CONSTRUCTION
(“MTACC”), MTA BUS COMPANY (“MTA BUS”), AND THE CITY OF NEW YORK (“CITY” AS
OWNER) AND THE RESPECTIVE AFFILIATES AND SUBSIDIARIES EXISTING CURRENTLY OR
IN THE FUTURE OF AND SUCCESSORS TO EACH INDEMNIFIED PARTIES LISTED HEREIN.
1STORYBRICK&STUCCOBUILDING
4 STORY BRICK BUILDING STUCCO
BUILDING
1 STORY
3 STORY BRICK
BUILDING
BUILDING
3 STORY BRICK
BRICK &
BUILDING
3 STORY
STUCCO
UP
UP
UP
9-#8BOTT.
3-#8 BOTT. 3-#8 BOTT.
3-#8 TOP
3-#8 TOP
3-#8 BOTT. 4-#8 BOTT. 4-#8 BOTT. 3-#8 BOTT. 3-#8 BOTT. 2-#8 BOTT.3-#8 BOTT.
10-#8 BOTT.10-#8 BOTT.4-#8 BOTT.5-#8 BOTT.8-#8 BOTT.5-#8 BOTT.7-#8 BOTT.7-#8 BOTT.
2-#8BOTT.
5-#8BOTT.
4-#8 BOTT.
6-#8BOTT.
14-#8BOTT.
6-#8BOTT.
7-#8BOTT.
7-#8BOTT.
8-#8BOTT.
4-#8TOP
2-#8 TOP
2-#8 TOP
13-#8 BOTT.
8-#8BOTT.
4-#8 BOTT.
5-#8BOTT.
7-#8 BOTT.
6-#8BOTT.
3-#8BOTT.
3-#8BOTT.
3-#8BOTT.
6-#8 BOTT. 3-#8 BOTT.
3-#8BOTT.
3-#8 BOTT.
6-#8 BOTT. 10-#8 BOTT.
10-#8BOTT.
11-#8 BOTT.
7-#8BOTT.
7-#8 BOTT.
6-#8BOTT.
6-#8 BOTT.
4-#8 BOTT.
7-#8BOTT.
1 2 3 4 5 6 7 8 9 10 11
A.3
B
D
E
F
A.1
C
6.2 6.9
A.6
B.3
2.9 3.5
3
S-202
4
S-202
5
S-202
6
S-202
6.6
2.2
5.5
3.6 4.9 7.9
7.5 8.5
8.9
9.5
10.2
B.1
C.1
D.2
D.3
A.2
12
A
1
S-202
2
S-202
PC-4 PC-4 PC-4 PC-4
PC-4 PC-5 PC-5
PC-4
PC-5
PC-5
PC-4 PC-4 PC-5 PC-5
PC-4 PC-4 PC-4 PC-4 PC-4 PC-4
PC-4
PC-4
PC-5
PC-4
PC-4
PC-4
PC-4
PC-2 PC-2 PC-2 PC-2 PC-2 PC-2 PC-2
PC-2 PC-2 PC-2 PC-2 PC-2 PC-2
PC-5
PC-4
PC-4 PC-4
PC-4
PC-5
PC-5 PC-4
PC-5
PC-4
PC-4
PC-4
PC-4PC-2
PC-5
PC-4
W3
W2
W2
W1
W2
W9
W1
W1
D.1
C.2
4645 47 48 49 50 51 52 53 54
55
56
57
58
59
60
42
4140
39
38
37
36
3534
33
32
31
30
20.1
21
22 23
24 25 26
27
19
1817161514
12
3 4 5 6 7 8 9
13
PC-4
RAMP UP
EAST 138TH STREET
THIRDAVENUE
PROPERTY LINE
PROPERTY LINE
PC-4
79"x79"x35" -
PC-4
ELEVATOR
SUMP PIT SEE
PLMB. DWG.
10
18' - 2 3/8" 17' - 7 1/2" 22' - 6" 11' - 0 1/4" 19' - 8" 28' - 10 7/8" 23' - 0" 23' - 0" 20' - 0 7/8" 12' - 4" 12' - 0 5/8"
8'-0"19'-7"20'-0"24'-1"27'-1"
12'-63/4"8"3'-5"1'-1"2"11"16'-21/2"7'-01/2"1'-5"1'-7"2'-5"
S-2
W3
W3
W3
W3
W3 W3 W3 W3 W3 W3
W3
W3W3W3
W3W3W3W3W3W3W3W3
W3
1' - 8 1/2" 2' - 9 1/8" 1' - 10" 8 1/4" 4' - 10 7/8" 3' - 1 1/2" 9" 3' - 5 1/8" 2' - 2"
5 7/8" 10' - 6 1/8" 7' - 8 1/4" 13' - 1 1/2" 9' - 5" 9' - 4 7/8" 9' - 4 7/8"
8
S-307
MF2.0
MF2.0-5' - 0"
W1
W1
W9
W1
W1
W1
W1
W2
W2
W3
W3
W4
W2
W1
79"x79"x35" -
PC-4
79"x79"x35" -
PC-4
PC-6
9
S-307
7
S-307
S-307
1
10
S-307
3
S-307
4
S-307
11
S-307
52°
3' - 0 5/8"
S-302
3
6
S-307
11
S-307
SIM.
SEWAGE
EJECTOR PIT;
SEE PLMB.
DWGS
10
S-300
Sim
MAT SLAB EXTENDED BELOW
RAMP TO DIAGONAL WALL
1
S-308
2
S-308
EXIST. BELOW GRADE
SUBWAY TUNNEL
19'-4"±
30'-10"±
31'-8"±
20' - 0" ±
17' - 10" ±
EDGE OF CURB
AT GRADE
MASONRY WALL
CONCRETE FOOTING
CONCRETE WALL
W8x10
L
STEEL BEAM
STEEL LINTEL (SEE SCHEDULE)
INDICATE LEDGER ANGLE (SEE DETAIL)
BENT STEEL FRAMING
SHEAR CONNECTION
MOMENT CONNECTION
EMBEDDED PLATE CONNECTION (SEE SHED.)
BEAM POCKET IN MASONRY (SEE SCHED.)
BP: INDICATES STANDARD BEAM POCKET
AP: INDICATES ACOUSTICALLY ISOLATED BEAM POCKET
STEEL COLUMN
STEEL COLUMN BELOW
INDICATES COLUMN TRANSFER
TR
X-# SLAB (SEE SCHED.) ARROW INDICATES SPAN
DIRECTION OF SLAB
INDICATES TOP OF FOOTING ELEVATION
COLUMN LINE
(##'-##")
#
LEGEND
EP-#
BP-#
MASONRY SHEAR WALL
PCi t e c t s
Dwg Title
East 138th Street LLC
334-336 East 110th Street
New York, N.Y. 10029
443 Park Avenue South
New York, NY 10016
T: 212|689|7070
F: 212|545|1687
info@MHGArch.com
www.MHGArch.com
Client/Developer
MHG Architects
443 Park Avenue South
New York, N.Y. 10016
Architect
Abel Bainnson Butz, LLP
80 8th Avenue, Suite 1105
New York, N.Y. 10011
Landscape Architect
88 University Place
New York, N.Y. 10003
Structural Engineer
Ettinger Engineering
Associates
508 Eighth Avenue
New York, N.Y. 10018
Mechanical/Electrical/Plumbing Engineer
Scale
Job No.
Date
Dwg No
Seal
NYC DOB Number
1522
255 East 138th Street
Robert Silman Associates
1/8" = 1'-0"
CELLAR PLAN
05/08/2013
13892
S-100.00
1/8" = 1'-0"S-100
1 CELLAR PLAN
NOTES:
1. DATUM ELEVATION 0'-0" IS REFERENCED AS 12.54'
2. TOP OF SLAB ELEVATION IS -13'-3 3/4" UNLESS NOTED THUS (_'-_") ON PLAN.
3. S_ DENOTES CONCRETE SLAB . SEE SCHEDULE ON S-305.00.
4. TOP OF PILE CAPS AND MAT FOUNDATION ARE INTEGRAL WITH SLAB; SEE
DETAILS ON S302.00.
5. REFER TO ARCHITECTURAL DRAWINGS FOR COLUMN HOLD POINTS AND PLAN
DIMENSIONS FROM PROPERTY LINE.
6. MF_ DENOTE REINFORCED CONCRETE MAT FOUNDATION. SEE SCHEDULE ON S-
302.00.
7. W_ DENOTES REINFORCED CONCRETE WALL. SEE SCHEDULE ON S-202.00.
8. MW_ DENOTES REINFORCED CONCRETE MASONRY WALL. SEE WALL
ELEVATIONS ON S-200.00 TO S-203.00.
9. MSW_ DENOTES REINFORCED CONCRETE MASONRY SHEAR WALL. SEE SHEAR
WALL ELEVATIONS ON S-200.00 TO S-203.00.
10. C.J. DENOTES CONTROL JOINTS. SEE DETAIL SHEETS AND GENERAL NOTES.
11. PC_ DENOTE CONCRETE PILE CAP. REFER TO TYPICAL DETAILS ON S-302.00. ALL
PILES SHALL BE DRILLED.
12. REFER TO S-001.00 FOR GENERAL NOTES.
13. GENERAL CONTRACTOR TO VERIFY ELEVATOR PIT DEPTH, HOISTWAY
DIMENSIONS, AND ELEVATOR SUMP PIT DIMENSIONS WITH THE APPROVED
ELEVATOR SHOP DRAWINGS AND WITH ELEVATOR MANUFACTURER. NOTIFY A/E
IF REQUIREMENTS DIFFER FROM PLANS.
14. FOR SUPPORT OF EXCAVATION INFORMATION, INCLUDING PILE DESIGN
INSTALLATION PROCEDURES, SEE FNA DRAWINGS.
15. WHEN REFERRING TO THE SUPPORT OF EXCAVATION DRAWINGS BY FNA, A
VALUE OF 100.00' SHALL BE ADDED TO THE ELEVATIONS SHOWN ON THESE
DRAWINGS FOR COMPARISON WITH BOROUGH PRESIDENT OF BRONX DATUM
ELEVATIONS.
NO
R
TH
R e v . D a t e D e s c r i p t i o n
0 5 / 2 9 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T
0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
1STORYBRICK&STUCCOBUILDING
4 STORY BRICK BUILDING STUCCO
BUILDING
1 STORY
3 STORY BRICK
BUILDING
BUILDING
3 STORY BRICK
BRICK &
BUILDING
3 STORY
STUCCO
UP
UP
UP
6-#6
8-#5
6-#66-#6
6-#6
12-#5
6-#66-#6
6-#6
12-#5
8-#6
8-#5
8-#6
8-#6
12-#5
7-#6
14-#6
6-#6
8-#6
8-#6
6-#6
6-#6
6-#6
6-#6
6-#6
6-#6
6-#6 8-#6
16-#5
22-#5
3-#6
4/#6
3-#6
11-#5
3-#6
11-#5 11-#5
8-#5
3-#6
12-#5
3-#63-#6
11-#5
3-#6
6-#6
10-#6
9-#5
6-#5
12-#5
16-#6 16-#6
8-#6
8-#6
16-#6 16-#6
16-#6
16-#5
6-#5
16-#5
5-#6
12-#5
6-#6
?
8-#6
13-#6
17-#5
4-#6
5-#6
7-#6 7-#6
4-#6
8-#5 13-#5
15-#5 9-#5
11-#5 12-#5
12-#5 11-#5
11-#5 11-#5
11-#5
#5 @ 12"
#5 @ 12"
10-#5 10-#5 10-#5
4-#6
10-#6
4-#6
8-#6
8-#6 8-#6 8-#6
12-#5
6-#6
6-#6
6-#6
12-#5
4-#6
12-#66-#6
12-#6
12-#58-#5 12-#5
6-#6
4-#6
6-#5
4-#6
8-#6
6-#5
8-#6
6-#5
6-#6
6-#5
8-#6
6-#5
8-#6
6-#5
8-#6
4-#6
4-#6
8-#6
8-#6
8-#6
5-#6
8-#6
10-#5
7-#6
4-#6
8-#6 12-#6 8-#6 8-#6
6-#66-#66-#66-#66-#6
8-#6
6-#6
8-#6 12-#6
12-#6
12-#6 12-#6
13-#5
9-#6
11-#511-#5 10-#5 10-#510-#5 11-#5
8-#6
12-#6
10-#6
6-#6
6-#6
10-#6
8-#6
8-#6
11-#5
8-#6
6-#5
8-#6
8-#6
12-#5
11-#6
6-#6
8-#6
11-#6
6-#6
8-#6
8-#6
#5 @ 12"
8-#6
#5 @ 12"
12-#6
16-#6
12-#6
6-#6
7-#6
8-#6
13-#6
18-#6
14-#5
11-#6
5-#6
5-#6
8-#5
10-#6 10-#6
9-#6
3-#6
3-#6
8-#5
18-#6
17-#5
5-#6
5-#6
17-#5
12-#6
4-#6
8-#5
7-#6
5-#6
6-#5
10-#5
11-#6
8-#6
12-#5
8-#6
8-#6
8-#6
13-#6
7-#5
4-#6
13-#6
4-#6
12-#5
10-#5
5-#6
11-#5
8-#6
8-#6 6-#6
4-#6
11-#5
16-#5
22-#5
16-#6
7-#56-#5
6-#5
6-#5
6-#5
6-#5
6-#5
6-#5
14-#5
5-#5
7-#5
12-#5
#5 @ 12"
12-#5
4-#6
10-#6
12-#5
11-#6
8-#5
7-#5
7-#6
6-#5
8-#6
2-#5B
2-#5B
2-#5B
2-#5B
2-#5B
2-#5B
2-#5B
4-#5B
5-#6
13-#5
18-#6
8-#5
7-#6
6-#6
6-#5
6-#6
6-#6
6-#6
5-#6
1 2 3 4 5 6 7 8 9 10 11
B
D
E
F
C
B.3
1
S-200
3
S-202
4
S-202
5
S-202
6
S-202
5.5 7.5 8.5 9.5
D.3
12
A
2 3/4"
1
S-202
2
S-202
T.O. SLAB= -2' - 10 3/4"
T.O. SLAB= -0' - 11 3/4"
1
4 5
7 8 9
181614
13.112
10
21 23
24 25
39
35
34
33
28
43
44
45 49
50
51
53 59
19.1
20
T.O. SLAB= +2' - 5"
T.O. S.O.G.= -3' - 9 1/2"
EXISTING BUS SHED
(SEE ARCH.)
EAST 138TH STREET
THIRDAVENUE
15 17
63
52 54
55
56
57
58
60
4241
40
38
36
37
26
2722
30
31 32
46
47
48
19
PROPERTY LINE
PROPERTY LINE
79"x79"x35" -
PC-4
79"x79"x35" -
PC-4
PC-2
13
-0' - 11 3/4"
FILL SLAB
FILL RAMP
DN
18' - 2 3/8" 17' - 7 1/2" 22' - 6" 11' - 0 1/4" 19' - 8" 28' - 10 7/8" 23' - 0" 23' - 0" 20' - 0 7/8" 12' - 4" 12' - 0 5/8"
11' - 11 3/4" 9' - 4 7/8" 10' - 8"
8'-0"19'-7"20'-0"24'-1"27'-1"
9
S-201
11
2
1B1
1B1
1B1
1B1
1B1
1B1
1B1
1B1
1B5
1B2
CANT.
CANT.
CANT.
CANT.
CANT.
CANT.
CANT.
CANT.
CANT.1B1
7'-101/2"5'-5"
S-3
T.O. SLAB= -1' - 9 3/4"
S-3
2
S-306
S-3
S-3
S-3
SLOPEDS.O.G.
S-3
S-3
5
S-307
8
S-307
GB1
W1
W1
W1
W1
W1
W1
W1
1B7MW18
W2W2
W1
W2
W2
W9
W2
MSW1MSW1
MW1
W3
W3
MW1
MW1
W3
MW1
W3MW1
MW30
W3
12-#5
6-#6
19-#5
6-#6
7-#5
8-#6
12-#5
4-#6
6-#6
6-#6
ALONG RAMP ALONG RAMP
3' - 6" 3' - 6"
3'-6"
3' - 6" 3' - 6"
3'-6"3'-6"
3' - 6" 3' - 6"
2 1/4" DROP
2 1/4" DROP 2 1/4" DROP
BEAM BELOW WALL
AT FIRST FLOOR FOR
OPENING BELOW
1B6
1B4
1B4
1B3
1B4
1B51B3
1B5
CANT.
GB1
1B6
1B6
1B4
1B4
1B3
GB2
-3'-4"
FOUNDATION WALL BELOW
FOUNDATION WALL
BELOW
T.O. RAISED
LOADING
DOCK SLAB
@ 0'-6 3/4"
T.O. SLAB= -0' - 11 3/4"
W8X21
9' - 5"
7
S-307
9
S-306
3
S-306
GB2
6
S-307
4
S-306
5
S-306
6
S-306
3
S-306
SIM.
GB3GB1
0"
GB1 GB1 GB1 GB1 GB1 GB1 GB1
GB1 GB1
EXTEND GRADE BM.
TO CURVED WALL
BETWEEN GRIDS D
AND E
24"x60" MECH. OPNG.
3'-6"3'-6"
3' - 6" 3' - 6"
2 1/4" DROP
BELOW
BELOW
S-3
S-3
1
S-308
2
S-308
EXIST. BELOW GRADE
SUBWAY TUNNEL
30'-10"±
31'-8"±
20' - 0" ±
17' - 10" ±
EDGE OF CURB
MASONRY WALL
CONCRETE FOOTING
CONCRETE WALL
W8x10
L
STEEL BEAM
STEEL LINTEL (SEE SCHEDULE)
INDICATE LEDGER ANGLE (SEE DETAIL)
BENT STEEL FRAMING
SHEAR CONNECTION
MOMENT CONNECTION
EMBEDDED PLATE CONNECTION (SEE SHED.)
BEAM POCKET IN MASONRY (SEE SCHED.)
BP: INDICATES STANDARD BEAM POCKET
AP: INDICATES ACOUSTICALLY ISOLATED BEAM POCKET
STEEL COLUMN
STEEL COLUMN BELOW
INDICATES COLUMN TRANSFER
TR
X-# SLAB (SEE SCHED.) ARROW INDICATES SPAN
DIRECTION OF SLAB
INDICATES TOP OF FOOTING ELEVATION
COLUMN LINE
(##'-##")
#
LEGEND
EP-#
BP-#
MASONRY SHEAR WALL
PCi t e c t s
Dwg Title
East 138th Street LLC
334-336 East 110th Street
New York, N.Y. 10029
443 Park Avenue South
New York, NY 10016
T: 212|689|7070
F: 212|545|1687
info@MHGArch.com
www.MHGArch.com
Client/Developer
MHG Architects
443 Park Avenue South
New York, N.Y. 10016
Architect
Abel Bainnson Butz, LLP
80 8th Avenue, Suite 1105
New York, N.Y. 10011
Landscape Architect
88 University Place
New York, N.Y. 10003
Structural Engineer
Ettinger Engineering
Associates
508 Eighth Avenue
New York, N.Y. 10018
Mechanical/Electrical/Plumbing Engineer
Scale
Job No.
Date
Dwg No
Seal
NYC DOB Number
1522
255 East 138th Street
Robert Silman Associates
1/8" = 1'-0"
FIRST FLOOR
FRAMING PLAN
05/08/2013
13892
S-101.00
1/8" = 1'-0"S-101
1 FIRST FLOOR PLAN
NO
R
TH
NOTES:
1. DATUM ELEVATION 0'-0" IS REFERENCED AS 12.54'
2. TOP OF SLAB ELEVATION IS +0'-0" UNLESS NOTED THUS (_'-_") ON PLAN.
3. TOP OF PILE CAP ELEVATION IS 1'-0" BELOW T.O. SLAB; UNLESS NOTED THUS (_'-_")
ON PLAN.
4. REFER TO ARCHITECTURAL DRAWINGS FOR COLUMN HOLD POINTS AND PLAN
DIMENSIONS FROM PROPERTY LINE.
5. S_ DENOTES CONCRETE SLAB . SEE SCHEDULE ON S-305.00.
6. W_ DENOTES REINFORCED CONCRETE WALL. SEE SCHEDULE ON S-202.00.
7. MW_ DENOTES REINFORCED CONCRETE MASONRY WALL. SEE WALL ELEVATIONS
ON S-200.00 TO S-203.00.
8. MSW_ DENOTES REINFORCED CONCRETE MASONRY SHEAR WALL. SEE SHEAR
WALL ELEVATIONS ON S-200.00 TO S-203.00.
9. C.J. DENOTES CONTROL JOINTS. SEE DETAIL SHEETS AND GENERAL NOTES.
10. PC_ DENOTE CONCRETE PILE CAP. REFER TO TYPICAL DETAILS ON S-302.00. ALL
PILES SHALL BE DRILLED.
11. REFER TO S-001.00 FOR GENERAL NOTES.
12. FOR SUPPORT OF EXCAVATION INFORMATION, INCLUDING PILE DESIGN
INSTALLATION PROCEDURES, SEE FNA DRAWINGS.
13. WHEN REFERRING TO THE SUPPORT OF EXCAVATION DRAWINGS BY FNA, A VALUE
OF 100.00' SHALL BE ADDED TO THE ELEVATIONS SHOWN ON THESE DRAWINGS FOR
COMPARISON WITH BOROUGH PRESIDENT OF BRONX DATUM ELEVATIONS.
14. REINFORCEMENT SHOWN IS TOP UNLESS NOTED OTHERWISE. THUS, (_-#_)
INDICATES TOP BARS.
15. REINFORCEMENT SHOWN THUS, (_-#_B), INDICATES ADDITIONAL BOTTOM BARS, SEE
SLAB SCHEDULE FOR BOTTOM REINORCEMENT MAT.
16. REFER TO CONCRETE DETAILS FOR REINFORCEMENT AROUND SLAB OPENINGS.
R e v . D a t e D e s c r i p t i o n
0 5 / 2 9 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T
0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
1 2 3 4 5 6 7 8 9 10 11
B
D
E
F
C
B.3
18' - 2 3/8" 17' - 7 1/2" 22' - 6" 11' - 0 1/4" 19' - 8" 28' - 10 7/8" 23' - 0" 23' - 0" 20' - 0 7/8" 12' - 4" 12' - 0 5/8"
1
S-200
2
S-200 3
S-200
4
S-200
5
S-200
6
S-200
3
S-202
4
S-202
5
S-202
6
S-202
7
S-200
8
S-200
6
S-201
9
S-200
4
S-201
1
S-201
5
S-201
7
S-201
2
S-201
5.5 7.5 8.5 9.5
D.3
12
A
1
S-202
2
S-202
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
S-1S-1S-1S-1S-1S-1S-1S-1S-1S-1S-1S-1S-1S-1 S-1S-1S-1
2B16
2B55
2B39
2B11
2B41
2B21
2B52B5
2B5
2B18
2B27
2B50
2B49
2B57
2B1
2B11 2B11 2B11 2B12 2B12 2B15 2B11
2B472B48
2B36
2B31
2B252B26
2B1
2B522B53
2B57
2B1
2B7
2B7
2B7
2B11
2B11
2B11
2B11
2B9
2B6
2B6
2B7
2B7
2B8 2B8 2B6 2B6 2B6 2B8 2B8 2B7
2B16 2B17
2B11
2B37
2B38
2B24
2B4
2B2
2B44
2B1
2B8
2B3
2B2
2B4
2B4
2B4
2B4
2B13
2B45
2B14
2B1
3
S-201
MSW1
MW2
MSW3
MW4
MSW6
MSW5
MW7
MW8
MW9
MSW10
MW11
MSW13
MSW14
MSW15
MW16
MSW19
MSW22
MSW23
2B7
8'-0"19'-7"20'-0"24'-1"27'-1"
9' - 4 7/8" 10' - 8"
MSW12
MW1
9
S-201
8
S-201
2B10
2B7
2B12
2B11
2B11
2B11
2B11
2B43
2B23
2B46
2B22
2B15
2B1
2B132B42
2B402B13
2B202B19
2B54
2B5
2B28
2B33
CANT.
CANT.
CANT.
CANT.
CANT.
CANT.
CANT.
CANT.
CANT.
CANT.
CANT.
CANT.
CANT.
CANT.
CANT.
CANT.
CANT.CANT.
CANT.
CANT.
CANT.
CANT.
CANT.
2B12B12B12B12B12B12B12B12B1 2B1 2B1
1
S-306
2B34
2B7
2B7
2B1
2B3
2B7
2B6
2B7
2B7
2B11
2B11
2B11 2B11 2B11 2B11
2B12
2B11
2B15
2B29
2B302B32
2B39
2B56
S-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
S-1 S-1
S-1 S-1
S-1 S-1
2B51
2B33
MSW1
W3
MSW3
MW4
MSW5
MSW21
MSW19
MSW20
MSW23
MSW20 MSW20
MW17
MW18
MSW24
MSW12MSW12MSW12MSW12
7'-101/2"5'-5"
7' - 8 1/4"
2B54
MW1
MW1
MW1
MW1
MW1
MW1
MW1MSW14
MW4
MW1
MW1
MW1
MW1
MW1
MW1
MSW24W2
MSW1
MW9
MW11
MW8
MW2
W8
W8 W8
S-1
10
S-303
T.O. SLAB= +17' - 4 1/2"
W8X21
CANT.
CANT.
CANT.
CANT.
2B72B7CANT.
MECH. OPNG. WALL BELOW
2B7
S-102
2
2B35
MASONRY WALL
CONCRETE FOOTING
CONCRETE WALL
W8x10
L
STEEL BEAM
STEEL LINTEL (SEE SCHEDULE)
INDICATE LEDGER ANGLE (SEE DETAIL)
BENT STEEL FRAMING
SHEAR CONNECTION
MOMENT CONNECTION
EMBEDDED PLATE CONNECTION (SEE SHED.)
BEAM POCKET IN MASONRY (SEE SCHED.)
BP: INDICATES STANDARD BEAM POCKET
AP: INDICATES ACOUSTICALLY ISOLATED BEAM POCKET
STEEL COLUMN
STEEL COLUMN BELOW
INDICATES COLUMN TRANSFER
TR
X-# SLAB (SEE SCHED.) ARROW INDICATES SPAN
DIRECTION OF SLAB
INDICATES TOP OF FOOTING ELEVATION
COLUMN LINE
(##'-##")
#
LEGEND
EP-#
BP-#
MASONRY SHEAR WALL
6 7
A
5251
H
SS4X4X3/8
H
SS4X4X3/8
H
SS4X4X3/8
H
SS4X4X3/8
HSS10X4X1/4
HSS10X4X1/4
HSS10X4X1/4
HSS10X4X1/4
HSS10X4X1/4
HSS10X4X1/4
HSS10X4X1/4
HSS10X4X1/4HSS6X4X1/4
HSS6X4X1/4
PCi t e c t s
Dwg Title
East 138th Street LLC
334-336 East 110th Street
New York, N.Y. 10029
443 Park Avenue South
New York, NY 10016
T: 212|689|7070
F: 212|545|1687
info@MHGArch.com
www.MHGArch.com
Client/Developer
MHG Architects
443 Park Avenue South
New York, N.Y. 10016
Architect
Abel Bainnson Butz, LLP
80 8th Avenue, Suite 1105
New York, N.Y. 10011
Landscape Architect
88 University Place
New York, N.Y. 10003
Structural Engineer
Ettinger Engineering
Associates
508 Eighth Avenue
New York, N.Y. 10018
Mechanical/Electrical/Plumbing Engineer
Scale
Job No.
Date
Dwg No
Seal
NYC DOB Number
1522
255 East 138th Street
Robert Silman Associates
As indicated
SECOND FLOOR
FRAMING PLAN
05/08/2013
13892
S-102.00
1/8" = 1'-0"S-102
1 SECOND FLOOR FRAMING PLAN
NO
R
TH
NOTES:
1. DATUM ELEVATION 0'-0" IS REFERENCED AS 12.54'
2. TOP OF SLAB ELEVATION IS +18'-4 1/2" UNLESS NOTED THUS (_'-_") ON PLAN. .
3. S_ DENOTES CONCRETE SLAB . SEE SCHEDULE ON S-202.00.
4. W_ DENOTES REINFORCED CONCRETE WALL. SEE SCHEDULE ON S-303.00.
5. MW_ DENOTES REINFORCED CONCRETE MASONRY WALL. SEE WALL ELEVATIONS ON S-200.00 TO S-203.00.
6. MSW_ DENOTES REINFORCED CONCRETE MASONRY SHEAR WALL. SEE SHEAR WALL ELEVATIONS ON S-200.00 TO S-203.00.
7. REFER TO S001.00 FOR GENERAL NOTES.
8. REFER TO CONCRETE DETAILS FOR REINFORCEMENT AROUND SLAB OPENINGS.
R e v . D a t e D e s c r i p t i o n
0 5 / 2 9 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T
0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
S-102 1/4" = 1'-0"
2 CANOPY FRAMING PLAN (IN PROGRESS)
B CA
NOTES:
1. SEE SCHEDULE 3 FOR MASONRY WALL REINFORCEMENT
UNLESS NOTED ON ELEVATION.
2. SEE PLAN FOR CONCRETE WALL INFORMATION.
B CA
NOTE: SEE SCHEDULE 1 FOR MASONRY WALL REINFORCEMENT
UNLESS NOTED ON ELEVATION.
B CA
NOTE: SEE SCHEDULE 3 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED ON ELEVATION
2ND FLOOR
18' - 4 1/2"
C
3RD FLOOR
27' - 5 1/2"
4TH FLOOR
36' - 6 1/2"
5TH FLOOR
45' - 7 1/2"
6TH FLOOR
54' - 8 1/2"
7TH FLOOR
63' - 9 1/2"
8TH FLOOR
72' - 10 1/2"
ROOF
82' - 2 1/2"
NOTE: SEE SCHEDULE 1 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED ON
ELEVATION
BA
NOTE: SEE SCHEDULE 1 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED ON
ELEVATION
BA
NOTE: SEE SCHEDULE 3 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED ON ELEVATION
BA
NOTE: SEE SCHEDULE 3 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED ON ELEVATION
1ST FLOOR
-0' - 7 1/2"
2ND FLOOR
18' - 4 1/2"
B C
3RD FLOOR
27' - 5 1/2"
4TH FLOOR
36' - 6 1/2"
5TH FLOOR
45' - 7 1/2"
6TH FLOOR
54' - 8 1/2"
7TH FLOOR
63' - 9 1/2"
8TH FLOOR
72' - 10 1/2"
ROOF
82' - 2 1/2"
A
RETAIL "C" & "D"
2' - 5"
NOTES:
1. SEE SCHEDULE 1 FOR MASONRY WALL REINFORCEMENT
UNLESS NOTED ON ELEVATION
2. SEE PLAN FOR CONCRETE WALL INFORMATION
BA
NOTE: SEE SCHEDULE 3 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED ON ELEVATION
PCi t e c t s
Dwg Title
East 138th Street LLC
334-336 East 110th Street
New York, N.Y. 10029
443 Park Avenue South
New York, NY 10016
T: 212|689|7070
F: 212|545|1687
info@MHGArch.com
www.MHGArch.com
Client/Developer
MHG Architects
443 Park Avenue South
New York, N.Y. 10016
Architect
Abel Bainnson Butz, LLP
80 8th Avenue, Suite 1105
New York, N.Y. 10011
Landscape Architect
88 University Place
New York, N.Y. 10003
Structural Engineer
Ettinger Engineering
Associates
508 Eighth Avenue
New York, N.Y. 10018
Mechanical/Electrical/Plumbing Engineer
Scale
Job No.
Date
Dwg No
Seal
NYC DOB Number
1522
255 East 138th Street
Robert Silman Associates
1/8" = 1'-0"
SHEAR WALL
ELEVATIONS
05/08/2013
13892
S-200.00
1/8" = 1'-0"S-200
2 MASONRY WALL MW2
1/8" = 1'-0"S-200
3 MASONRY SHEAR WALL MSW3
1/8" = 1'-0"S-200
4 MASONRY WALL MW4
1/8" = 1'-0"S-200
5 MASONRY SHEAR WALL MSW5
1/8" = 1'-0"S-200
6 MASONRY SHEAR WALL MSW6
1/8" = 1'-0"S-200
7 MASONRY WALL MW7
1/8" = 1'-0"S-200
8 MASONRY WALL MW8
1/8" = 1'-0"S-200
1 MASONRY SHEAR WALL MSW1
1/8" = 1'-0"S-200
9 MASONRY WALL MW9
R e v . D a t e D e s c r i p t i o n
0 5 / 2 9 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T
0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
2ND FLOOR
18' - 4 1/2"
B
3RD FLOOR
27' - 5 1/2"
4TH FLOOR
36' - 6 1/2"
5TH FLOOR
45' - 7 1/2"
6TH FLOOR
54' - 8 1/2"
7TH FLOOR
63' - 9 1/2"
8TH FLOOR
72' - 10 1/2"
ROOF
82' - 2 1/2"
A
NOTE: SEE SCHEDULE 1 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED OTHERWISE
ON ELEVATION.
BOND BEAMS AT EVERY
COURSE REINF. WITH 1-#6
BOND BEAMS AT EVERY
FOURTH COURSE REINF.
WITH 1-#5
BA
NOTE: SEE SCHEDULE 3 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED OTHERWISE ON
ELEVATION.
C
NOTE: SEE SCHEDULE 1 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED OTHERWISE
ON ELEVATION.
DC
3RD FLOOR
27' - 5 1/2"
4TH FLOOR
36' - 6 1/2"
5TH FLOOR
45' - 7 1/2"
6TH FLOOR
54' - 8 1/2"
7TH FLOOR
63' - 9 1/2"
8TH FLOOR
72' - 10 1/2"
ROOF
82' - 2 1/2"
NOTE: SEE SCHEDULE 1 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED OTHERWISE
ON ELEVATION.
C
NOTE: SEE SCHEDULE 1 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED OTHERWISE
ON ELEVATION.
B
NOTE: SEE SCHEDULE 3 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED OTHERWISE ON
ELEVATION.
B DC
NOTE: SEE SCHEDULE 1 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED OTHERWISE
ON ELEVATION.
C
NOTE: SEE SCHEDULE 3 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED OTHERWISE ON
ELEVATION.
C
NOTE: SEE SCHEDULE 3 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED OTHERWISE ON
ELEVATION.
PCi t e c t s
Dwg Title
East 138th Street LLC
334-336 East 110th Street
New York, N.Y. 10029
443 Park Avenue South
New York, NY 10016
T: 212|689|7070
F: 212|545|1687
info@MHGArch.com
www.MHGArch.com
Client/Developer
MHG Architects
443 Park Avenue South
New York, N.Y. 10016
Architect
Abel Bainnson Butz, LLP
80 8th Avenue, Suite 1105
New York, N.Y. 10011
Landscape Architect
88 University Place
New York, N.Y. 10003
Structural Engineer
Ettinger Engineering
Associates
508 Eighth Avenue
New York, N.Y. 10018
Mechanical/Electrical/Plumbing Engineer
Scale
Job No.
Date
Dwg No
Seal
NYC DOB Number
1522
255 East 138th Street
Robert Silman Associates
1/8" = 1'-0"
SHEAR WALL
ELEVATIONS
05/08/2013
13892
S-201.00
1/8" = 1'-0"S-201
1 MASONRY SHEAR WALL MSW10
1/8" = 1'-0"S-201
2 MASONRY WALL MW11
1/8" = 1'-0"S-201
4 MASONRY SHEAR WALL MSW13
1/8" = 1'-0"S-201
5 MASONRY SHEAR WALL MSW14
1/8" = 1'-0"S-201
6 MASONRY SHEAR WALL MSW15
1/8" = 1'-0"S-201
7 MASONRY WALL MW16
1/8" = 1'-0"S-201
3 MASONRY SHEAR WALL MSW12
1/8" = 1'-0"S-201
9 MASONRY WALL MW18
1/8" = 1'-0"S-201
8 MASONRY WALL MW17
R e v . D a t e D e s c r i p t i o n
0 5 / 2 9 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T
0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
1ST FLOOR
-0' - 7 1/2"
2ND FLOOR
18' - 4 1/2"
67
3RD FLOOR
27' - 5 1/2"
CELLAR
-13' - 3 3/4"
4TH FLOOR
36' - 6 1/2"
5TH FLOOR
45' - 7 1/2"
6TH FLOOR
54' - 8 1/2"
7TH FLOOR
63' - 9 1/2"
8TH FLOOR
72' - 10 1/2"
ROOF
82' - 2 1/2"
BULKHEAD
91' - 11"
RETAIL "B"
0' - 0"
NOTE:
1. SEE SCHEDULE 2 FOR MASONRY WALL REINFORCEMENT UNLESS
NOTED ON ELEVATION.
2. SEE PLAN FOR CONCRETE WALL INFORMATION.
CONCRETE WALL;
SEE PLAN
PILE CAP,
SEE PLAN
LB4
LB1
BOND BEAM @
EVERY OTHER
COURSE W/ 1-#6
6
7
LC1
LC1
LC1
LC1
LC1
LC1
LC1
LC1
NOTE:
1. SEE SCHEDULE 2 FOR MASONRY WALL REINFORCEMENT UNLESS
NOTED ON ELEVATION.
2. SEE PLAN FOR CONCRETE WALL INFORMATION.
LB2
LB5
C
NOTE: SEE SCHEDULE 2 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED OTHERWISE ON
ELEVATION.
C
NOTE: SEE SCHEDULE 2 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED OTHERWISE ON
ELEVATION.
LC3 LC3
LC3 LC3
LC3 LC3
LC2 LC2
LC2 LC2
LC2 LC2
LC2 LC2
#5 @ 24"
VERTICAL
BOND BEAMS @
EVERY COURSE
REINF. WITH 1-#4
BOND BEAMS @
EVERY COURSE
REINF. WITH 1-#4
BOND BEAMS @
EVERY COURSE
REINF. WITH 1-#6
BOND BEAMS @
EVERY COURSE
REINF. WITH 1-#4
LB3
LB8LB8
C
NOTE: SEE SCHEDULE 2 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED OTHERWISE ON
ELEVATION.
LC3 LC3
LC3LC3
LC3 LC3
LC4
LC4 LC4
LC4
LC4LC4
LC4LC4
LB6 LB6 LB6
LB3
LB7
C
NOTE: SEE SCHEDULE 2 FOR MASONRY WALL
REINFORCEMENT UNLESS NOTED OTHERWISE ON
ELEVATION.
BOND BEAM
EVERY
COURSE
WITH 1-#6
#5 @ 8"
VERTICAL WITH
BOND BEAM
EVERY THIRD
COURSE REINF.
WITH 1-#6
PCi t e c t s
Dwg Title
East 138th Street LLC
334-336 East 110th Street
New York, N.Y. 10029
443 Park Avenue South
New York, NY 10016
T: 212|689|7070
F: 212|545|1687
info@MHGArch.com
www.MHGArch.com
Client/Developer
MHG Architects
443 Park Avenue South
New York, N.Y. 10016
Architect
Abel Bainnson Butz, LLP
80 8th Avenue, Suite 1105
New York, N.Y. 10011
Landscape Architect
88 University Place
New York, N.Y. 10003
Structural Engineer
Ettinger Engineering
Associates
508 Eighth Avenue
New York, N.Y. 10018
Mechanical/Electrical/Plumbing Engineer
Scale
Job No.
Date
Dwg No
Seal
NYC DOB Number
1522
255 East 138th Street
Robert Silman Associates
1/8" = 1'-0"
SHEAR WALL
ELEVATIONS
05/08/2013
13892
S-202.00
1/8" = 1'-0"S-202
1 MASONRY SHEAR WALL MSW19
1/8" = 1'-0"S-202
2 MASONRY SHEAR WALL MSW20
1/8" = 1'-0"S-202
3 MASONRY SHEAR WALL MSW21
1/8" = 1'-0"S-202
4 MASONRY SHEAR WALL MSW22
1/8" = 1'-0"S-202
5 MASONRY SHEAR WALL MSW23
1/8" = 1'-0"S-202
6 MASONRY SHEAR WALL MSW24
MASONRY STRENGTH AND REINFORCING SCHEDULE 3
FLOOR
NOMINAL
THICKNESS
(U.N.O)
SRENGTH
(PSI) LONGITUDINAL TRUSS TYPE REINFORCEMENT SIZE & GALV. SPACING VERT. REINF.
FOUNDATION 8" 2000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32"
FIRST FLOOR 8" 2000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32"
SECOND FLOOR 8" 4000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32"
THIRD FLOOR 8" 4000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32"
FOURTH FLOOR 8" 3000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32"
FIFTH FLOOR 8" 3000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32"
SIXTH FLOOR 8" 2000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32"
SEVENTH FLOOR 8" 2000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32"
EIGHTH FLOOR 8" 2000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32"
ROOF 8" 2000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32"
MASONRY STRENGTH AND REINFORCING SCHEDULE 2
FLOOR
NOMINAL
THICKNESS
(UNO)
STRENGTH
(PSI) LONGITUDINAL REINFORCEMENT (TRUSS TYPE, GALVANIZED) UNO VERT. REINF.
SECOND FLOOR 8" 4000 BOND BEAM EVERY COURSE REINFORCED WITH 1-#6 #6 @ 8"
THIRD FLOOR 8" 4000 BOND BEAM EVERY THIRD COURSE REINFORCED WITH 1-#6 #6 @ 8"
FOURTH FLOOR 8" 3000 BOND BEAM EVERY OTHER COURSE REINFORCED WITH 1-#6 #5 @ 16"
FIFTH FLOOR 8" 3000 BOND BEAM EVERY OTHER COURSE REINFORCED WITH 1-#6 #5 @ 16"
SIXTH FLOOR 8" 2000 EXTRA HEAVY 3/16" GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY COURSE #4 @ 16"
SEVENTH FLOOR 8" 2000 STANDARD NO. 9 GAGE SIDE RODS NO.9 GAGE CROSS RODS @ EVERY OTHER COURSE #4 @ 32"
EIGHTH FLOOR 8" 2000 STANDARD NO. 9 GAGE SIDE RODS NO.9 GAGE CROSS RODS @ EVERY OTHER COURSE #4 @ 32"
ROOF 8" 2000 STANDARD NO. 9 GAGE SIDE RODS NO.9 GAGE CROSS RODS @ EVERY OTHER COURSE #4 @ 32"
MASONRY STRENGTH AND REINFORCING SCHEDULE #1
FLOOR
NOMINAL
THICKNESS
(U.N.O)
STRENGTH
(PSI) LONGITUDINAL REINFORCEMENT (TRUSS TYPE, GALVANIZED) U.N.O. VERT. REINF.
SECOND FLOOR 8" 4000 BOND BEAM EVERY THIRD COURSE REINFORCED WITH 1-#6 #6 @ 8"
THIRD FLOOR 8" 4000 BOND BEAM EVERY THIRD COURSE REINFORCED WITH 1-#6 #6 @ 16
FOURTH FLOOR 8" 3000 BOND BEAM EVERY THIRD COURSE REINFORCED WITH 1-#5 #5 @ 16"
FIFTH FLOOR 8" 3000 EXTRA HEAVY 3/16" GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY COURSE #5 @ 32"
SIXTH FLOOR 8" 2000 EXTRA HEAVY 3/16" GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY COURSE #4 @ 32"
SEVENTH FLOOR 8" 2000 STANDARD NO. 9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE #4 @ 32"
EIGHTH FLOOR 8" 2000 STANDARD NO. 9 GAGE SIDE RODS NO. 9 GAGE CROSS ROADS @ EVERY OTHER COURSE #4 @ 32"
CONCRETE BEAM LINTEL SCHEDULE
MARK DEPTH (D) WIDTH (T)
REINFORCEMENT
COMMENTSBOTTOM TOP SHEAR
LC1 2' - 0" 0' - 8" 2-#4 2-#4 #3 @ 16"
LC2 2' - 0" 0' - 8" 2-#5 2-#5 #3 @ 8"
LC3 2' - 0" 0' - 8" 1-#4 1-#4 #3 @ 8"
LC4 2' - 0" 0' - 8" 1-#5 1-#5 #3 @ 16"
NOTES:
1. PROVIDE A MINIMUM OF 8" END BEARING FOR LINTELS.
2. LINTEL DIMENSIONS ARE NOMINAL
3. LINTEL STRENGTH TO MATCH WALL STRENGTH
CONCRETE WALL SCHEDULE
MARK WIDTH
REINFORCEMENT
REMARKSVERTICAL HORIZONTAL
W1 0' - 8" #4@12 E.F. #4@12 E.F.
W2 1' - 2" #5@12 E.F. #5@12 E.F. SHEAR WALL 4-#7 VERT. AT WALL ENDS AND CORNERS
W3 1' - 0" #7@8" E.F. #7@8" E.F.
W4 1' - 6" #7@12" E.F. #7@8" E.F.
W8 0' - 8" BY MFR. BY MFR. PRECAST WALL - SEE SCHEDULE ON S-303.00 FOR
LATERAL LOADS
W9 1' - 2" #5@9 E.F. #5@9 E.F. SHEAR WALL 4-#7 VERT. AT WALL ENDS
LINK BEAM SCHEDULE
MARK W D
REINFORCEMENT STIRRUPS
REMARKS
BOTTOM
BARS
TOP
BARS SIZE TYPE
SPACING
(in.)
LB1 1' - 2" 3' - 6" 6-#7 (2L) 6-#7 (2L) #5 CLOSED 9
LB2 1' - 2" 4' - 4" 6-#7 (2L) 6-#7 (2L) #5 CLOSED 9
LB3 0' - 8" 2' - 7" 2-#7 2-#7 #4 CLOSED 12
LB4 1' - 2" 11' - 0" 6-#9 (2L) 6-#9 (2L) #5 CLOSED 9
LB5 1' - 2" 11' - 1" 6-#9 (2L) 6-#9 (2L) #5 CLOSED 9
LB6 0' - 8" 9' - 10" 4-#9 (2L) 4-#9 (2L) #4 CLOSED 12
LB7 0' - 8" 4' - 4" 2-#7 2-#7 #4 CLOSED 12
LB8 0' - 8" 10' - 6" 4-#9 (2L) 4-#9 (2L) #4 CLOSED 12
NOTES:
1. WITHIN SPAN OF LINK BEAMS, USE STIRRUPS NOTED IN LINK BEAM SCHEDULE AND OMIT VERTICAL
WALL REINFORCING STEEL.
2. LONGITUDINAL BARS SHALL BE FULLY DEVELOPED BEYOND EACH SIDE OF WALL OPENINGS.
R e v . D a t e D e s c r i p t i o n
0 5 / 2 9 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T
0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
SLABDEPTHAS
SHOWNONPLANS
SLABDEPTHAS
SHOWNONPLANS
CASTINPLACE
SLAB
CASTINPLACE
SLAB
SEE TYPICAL DETAIL REINF. FOR
NON-LOAD BEARING WALLS
U-SHAPED CLIP. SEE TYPICAL
DETAIL REINF. FOR NON-LOAD
BEARING MASONRY WALLS
AT CAST IN PLACE SLAB
COMPRESSIBLE FILLER
WALL OPENING
REINF. AND DOWELS
PER TABLE
2x (2) #5
ADDITIONAL
EACH SIDE OF
OPENING TYP.
T.O. SLAB T.O. SLAB
REINF. AND DOWELS
PER TABLE
WALL OPENING
2x (2) #5
ADDITIONAL
EACH SIDE OF
OPENING TYP.
SEESCHEDULE
SEESCHEDULE
NOTE: PROVIDE LINTELS AS REQUIRED OVER WALL OPENINGS.
SLAB
SLAB
ANCHOR TOP OF CMU WALL TO UNDERSIDE OF SLAB W/ 3/16"
GALV. STEEL U SHAPED CLIP 3"x BY WALL THICKNESS x 8" LONG @
SPACING TO MATCH AND ALIGN WITH VERTICAL WALL
REINFORCING (PTA 422 BY H & B OR EQUAL) W/ 2-3/8" DIAMETER
EXPANSION BOLTS TO UNDERSIDE OF SLAB. PROVIDE
COMPRESSIBLE PAD BETWEEN TOP OF BLOCK & CLIP
INTERIOR WALLS
NOMINAL CMU
THICKNESS
VERTICAL
REBAR
HORIZONTAL
REBAR
MAXIMUM
HEIGHT (FT)
DOWELS
6"
#4 @ 48"
9 GAGE LADDER
REINFORCING @
16" O.C.
23'-6"
SAME AS
VERTICAL BARS
8" 27'-7"
SAME AS
VERTICAL BARS
#4 @ 48"
9 GAGE LADDER
REINFORCING @
16" O.C.
EXTERIOR WALLS
NOMINAL CMU
THICKNESS
VERTICAL
REBAR
HORIZONTAL
REBAR
MAXIMUM
HEIGHT (FT)
DOWELS
6"
#5 @ 24"
9 GAGE LADDER
REINFORCING @
16" O.C.
14'-6"
SAME AS
VERTICAL BARS
8" 18'-8"
SAME AS
VERTICAL BARS
#5 @ 24"
9 GAGE LADDER
REINFORCING @
16" O.C.
PCi t e c t s
Dwg Title
East 138th Street LLC
334-336 East 110th Street
New York, N.Y. 10029
443 Park Avenue South
New York, NY 10016
T: 212|689|7070
F: 212|545|1687
info@MHGArch.com
www.MHGArch.com
Client/Developer
MHG Architects
443 Park Avenue South
New York, N.Y. 10016
Architect
Abel Bainnson Butz, LLP
80 8th Avenue, Suite 1105
New York, N.Y. 10011
Landscape Architect
88 University Place
New York, N.Y. 10003
Structural Engineer
Ettinger Engineering
Associates
508 Eighth Avenue
New York, N.Y. 10018
Mechanical/Electrical/Plumbing Engineer
Scale
Job No.
Date
Dwg No
Seal
NYC DOB Number
1522
255 East 138th Street
Robert Silman Associates
1" = 1'-0"
MASONRY WALL
DETAILS
05/08/2013
13892
S-203.00
1" = 1'-0"S-203
1 TYPICAL SUPPORT FOR MASONRY PARTITIONS AT SUPPORTED SLAB
1" = 1'-0"S-203
2 TYPICAL REINFORCING FOR NON-LOAD BEARING MASONRY WALLS
R e v . D a t e D e s c r i p t i o n
0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T
0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
PROVIDE PIPE SLEEVE
2" LARGER THAN PIPE
DIA.
MATCH FTG. REINF.
D
D
(M
IN
.)
EA. SIDE
1' - 0" MIN.
CMU/CONC;
(SEE PLAN)
CONC. FOOTING
(SEE PLAN)
PIPE SLEEVE 2"
LARGER THAN PIPE
DIAMETER.
PLUMBING UTILITY LINE
(SEE MECH./CIVIL DWG'S)
FILL PIPE TRENCH W/ CONC. TO BOTTOM OF FTG.
USE LEAN MIX CONCRETE (2,500 PSI)
BEAM WIDTH
BEAMDEPTH
BOTTOM REINFORCING
CLOSED STIRRUPS
TOP REINFORCING
SAW CUT
1-1/2" DEEP
W.W.F.
2
1
2"x3" CONTINUOUS KEY
THICKNESS"t"
SLABONGRADE
THICKNESS"t"
DEPTHOFTHICKNESS
SLAB=1-1/2"TIMESLAB
SAWED CONTROL/CONTRACTION JOINT CONSTRUCTION JOINT
M
IN
.
3"
JOINTS
CONCRETE PIER
OR STEEL COLUMN
(SEE PLAN)
SLAB ON GRADE
ISOLATION JOINT AT COLUMN
SLAB
REINFORCEMENT
(MESH REBAR)
ADDITIONAL REINFORCEMENT
AT ALL RE- ENTRANT CORNERS
SLAB EDGE
2-#4 @ 3"x4'-0"
LONG
ADDITIONAL AT ALL
REENTRANT
CORNERS
CONCRETE SLAB 6"x6" W2.0 x W2.0 W.W.F.
10 MIL POLYETHYLENE
VAPOR BARRIER
NOTES:
1. SLAB ON GRADE SHALL BE PLACED IN ALTERNATING
STRIPS WHERE EACH SINGLE STRIP DOES NO EXCEED 36
TIMES SLAB THICKNESS WIDTH IN INCHES.
2. SAWED CONTRACTION JOINTS SHALL BE LOCATED AT A
MAXIMUM SPACING IN INCHES OF 36 TIMES THE SLAB
THICKNESS. JOINTS SHALL BE SAWED NO LATER THAN 24
HOURS AFTER CONCRETE IS PLACED.
3. GRAVEL OR CRUSHED STONE BASE SHALL BE
COMPACTED TO 95% OF MAXIMUM DENSITY AT OPTIMUM
MOISTURE CONTENT.
1"CLR.
6" GRAVEL OR STONEUNDISTURBED
SOIL OR FILL
SLAB ON GRADE
WATERSTOP
WATERSTOP
..
2" COVER MIN. (OR AS REQ'D
BY WATERSTOP MFR.)
VAPOR BARRIER
6" GRAVEL OR
CRUSHED STONE
UNDISTURBED SOIL
OR FILL
SLAB-ON-GRADE & WALL INTERFACE
SEESCHEDULE
2-#5 CONT.
SLAB ON GRADE
NOTE: SEE TYPICAL SLAB ON GRADE DETAIL FOR ADDITIONAL INFORMATION
3"CL.
#4 @ 48" O.C. DOWELS AND
REINFORCEMENT U.N.O.
1'-0"
4" 4' - 0" MAXIMUM EACH WAY
#4 CONT. @ 12" O.C.
HORZ. LAP 2'-0"
HIGH DENSITY EXTRUDED
POLYSTYRENE HAVING A MIN.
COMPRESSIVE STRENGTH OF
20 PSI
4"x4"-W2.1xW2.1 W.W.F.
(6"x6"-W2.9xW2.9
W.W.F. ALTERNATE)
.
11/2"
3" 4000 PSI NORMINAL
WEIGHT CONCRETE
2'-0"MAX.
#4 @ 12" O.C.
VERT.
4"MIN.
1' - 0" MIN.
2"
3"MIN.
4"4'-0" EACH WAY (TYP.)
2'-0"MAX.
.
RAMP THICKNESS 0" TO 2" USE SIKA DUR 21 LO-
MOD LV OR ARDEX SD-P, FOLLOW ALL
MANUFACTURER RECOMMENDATIONS
INCLUDING ADDED AGGREGATE AND SURFACE
PREP
#4 HILTI HY150 ADHESIVE/ANCHOR
OR APPROVED EQUAL @ 4'-0"
DRILLED INTO EXIST. SLAB (3 BARS
MIN.) W/ 2" EMBED.
4"x4"-W2.1xW2.1 W.W.F.
(6"x6"-W2.9xW2.9 W.W.F.
ALTERNATIVE)
4000 PSI NORMAL
WT. CONCRETE
SEE ARCH'L DWGS
FOR SLOPE OF RAMP
HIGH DENSITY EXTRUDED
POLYSTYRENE HAVING A MIN.
COMPRESSIVE STRENGTH OF
20 PSI
EXISTING
CONCRETE SLAB
2'-0"
11/2"MIN.
#4 CONT. @ 12" O.C.
HORZ. LAP 2'-0"
#4 @ 12" O.C.
VERT.
EXISTING
CONCRETE
SLAB
#4 HILTI HIT HY150 ADHESIVE
ANCHORS @ 4'-0" DRILLED
INTO EXISTING SLAB (3 BARS
MIN.WITH 2" EMBED)
HIGH DENSITY EXTRUDED
POLYSTYRENE HAVING A MIN.
COMPRESSIVE STRENGTH OF
20 PSI
#4 NOSING
BAR CONT.
.
DRAWINGS
SEE ARCH'L
1 1/2" TYP.
MIN.
1' - 0"
4"x4"-W2.1xW2.1 W.W.F.
(6"x6"-W2.9xW2.9
W.W.F. ALTERNATE)
4,000 PSI NORMAL
WT. CONCRETE
11/2"
3"MIN.
2'-0"MAX.
4"
(TYP.)
4' - 0" EACH WAY#4 CONT. @
12" O.C. HORZ.
LAP 2'-0" #4 @ 12" O.C.
VERT.
ROUGHEN TO 1/4" AMPLITUDE
OR COAT CONTACT SURFACE
WITH LATEX BONDING AGENT
DOWEL W/ 1'-0" HOOK,
(SEE NOTE 3)
#3@12" O.C. EACH WAY
12"MAX
AT SLAB ON GRADE
NOTES:
1. FOR SIZE AND LOCATION SEE ARCH'L AND MECH. DWGS.
2. CONCRETE FOR PADS SHALL BE NORMAL WEIGHT WITH f'c = 4000 PSI
3. INSTALL DOWELS @ 18" O.C. W/ HILTI HIT-HY150 ADHESIVE OR APPROVED EQUAL
2
1
2-#4 TOP &
BOT. CONT.
#4 @ 12"
#4 CONT.
T.O. SLAB
EL.(SEE PLAN)
T.O. SLAB
EL. (SEE PLAN)
T.0. SLAB
EL. (SEE PLAN) T.O. SLAB
EL.(SEE PLAN)
.
SEE PLAN FOR
SLAB THICKNESS
(TYP.)
FORDIM.
SEEPLAN
1-#4 CONT.
1' - 0"
STEP LESS THAN OR EQUAL TO SLAB THICKNESS
STEP GREATER THAN SLAB THICKNESS
1' - 0"
#4 @ 12"
1'-6"MAX.
PLAN
SEE
1' - 0"
2' - 6"
"X"=2'-0"
2 "X" MIN.
MIN.
1' - 0"
CONTINUOUS WALL
FOOTING
2
1
STANDARD HOOK.
(TYP)
FOR REINFORCING
SEE WALL SECTION
SLOPE BY CONTRACTOR TO
MAINTAIN SOIL STABILITY, VERIFY
WITH GEOTECHNICAL ENGINEER
ELEVATOR PIT
(SEEPLAN)
PITDEPTH1'-0"
3"CLR.
#5@12" O.C. TYP.
2"x4" KEYWAY
CONT. TOP & BOT.
TYP.
1' - 0"
BENTONITE WATER STOP (TYP.)
#4@12" O.C. TYP.
#5 NOSING BAR ALL AROUND
1' - 4"
11"
3" CLR. 3" CONCRETE MUD SLAB
(ALL AROUND)
3' - 0"
WATERPROOFING ALL AROUND
PROVIDE PROTECTION BOARD
(SEE ARCH'L DWGS.)
3" CONCRETE MUD LINE
1
1
#5 TOP AND BOTTOM EACH WAY
WATERSTOP
#4 @ 12" O.C. VERTICAL
AND HORIZONTAL
#5 @ 12" O.C.
1'-0"SEEPLAN
0"
PITMAT
1'-0"
3"CLR.
SEE PLAN
CONCRETE WALL
1' - 0"
1' - 0"
0".
PCi t e c t s
Dwg Title
East 138th Street LLC
334-336 East 110th Street
New York, N.Y. 10029
443 Park Avenue South
New York, NY 10016
T: 212|689|7070
F: 212|545|1687
info@MHGArch.com
www.MHGArch.com
Client/Developer
MHG Architects
443 Park Avenue South
New York, N.Y. 10016
Architect
Abel Bainnson Butz, LLP
80 8th Avenue, Suite 1105
New York, N.Y. 10011
Landscape Architect
88 University Place
New York, N.Y. 10003
Structural Engineer
Ettinger Engineering
Associates
508 Eighth Avenue
New York, N.Y. 10018
Mechanical/Electrical/Plumbing Engineer
Scale
Job No.
Date
Dwg No
Seal
NYC DOB Number
1522
255 East 138th Street
Robert Silman Associates
As indicated
FOUNDATION
DETAILS
05/08/2013
13892
S-300.00
3/4" = 1'-0"S-300
3 TYPICAL UTILITY PIPE THRU WALL FOOTING DETAIL
1" = 1'-0"S-300
4 TYPICAL UTILITY PIPE UNDER WALL DETAIL
3/4" = 1'-0"S-300
13 TYPICAL GRADE BEAM
1" = 1'-0"S-300
1 TYPICAL DETAILS SLAB ON GRADE
1" = 1'-0"S-300
2 TYPICAL SUPPORT FOR MASONRY PARTITIONS AT SLAB ON GRADE
1" = 1'-0"S-300
6 TYPICAL DETAIL RAISED SLAB
1" = 1'-0"S-300
8 TYPICAL RAISED SLAB WITH RAMP
3/4" = 1'-0"S-300
7 TYPICAL DETAIL OF RAISED SLAB AT STAIR
1" = 1'-0"S-300
5 TYPICAL EQUIPMENT PAD
3/4" = 1'-0"S-300
12 TYPICAL STEP ON SLAB ON GRADE
1" = 1'-0"S-300
11 TYPICAL STEPPED WALL FOOTING
1" = 1'-0"S-300
10 TYPICAL ELEVATOR PIT DETAIL
1" = 1'-0"S-300
9 TYPICAL ELEVATOR SUMP PIT
GRADE BEAM SCHEDULE
MARK
SIZE CONT.
BOTTOM
REINF.
SIDE
REINF.
(EA. FACE)
STIRRUP
SIZE
STIRRUP
SPACING
STIRRUP
TYPE
TOP REINF.
W D
LEFT
END
FULL
LENGTH
RIGHT
END
GB1 1' - 6" 3' - 0" 3-#8 #4 @ 12 #4 12" CLOSED 3-#8
GB2 1' - 6" 4' - 4 1/2" 3-#8 #4 12" CLOSED 3-#8
GB3 1' - 6" 3' - 11" 3-#8 #4 12" CLOSED 3-#8
R e v . D a t e D e s c r i p t i o n
0 5 / 2 9 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A
1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T
0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings

Weitere ähnliche Inhalte

Was ist angesagt?

DESIGNING STEEL STRUCTURES AND PEBs
DESIGNING STEEL STRUCTURES AND PEBsDESIGNING STEEL STRUCTURES AND PEBs
DESIGNING STEEL STRUCTURES AND PEBsAjit Sabnis
 
Architectural structures shear-wall.ppt
Architectural structures shear-wall.pptArchitectural structures shear-wall.ppt
Architectural structures shear-wall.pptMohdAzharNumaniShah
 
Etabs example-rc building seismic load response-
Etabs example-rc building seismic load  response-Etabs example-rc building seismic load  response-
Etabs example-rc building seismic load response-Bhaskar Alapati
 
Ssb04 detailed design of portal frames
Ssb04 detailed design of portal framesSsb04 detailed design of portal frames
Ssb04 detailed design of portal framesMd. Shahadat Hossain
 
Design of lifts & escalators
Design of lifts & escalatorsDesign of lifts & escalators
Design of lifts & escalatorsShubham Arora
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)I'mMiss Lily
 
Hollow block and ribbed slabs
Hollow block and ribbed slabsHollow block and ribbed slabs
Hollow block and ribbed slabsMohamed Mohsen
 
Moment Resisting Frame.pdf
Moment Resisting Frame.pdfMoment Resisting Frame.pdf
Moment Resisting Frame.pdfZeinab Awada
 
Zamil steel design manual
Zamil steel design manualZamil steel design manual
Zamil steel design manualThTrnthqunh
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildingshlksd
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...aarenneoone
 
Modelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Modelling Building Frame with STAAD.Pro & ETABS - Rahul LeslieModelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Modelling Building Frame with STAAD.Pro & ETABS - Rahul LeslieRahul Leslie
 
Column base plates_prof_thomas_murray
Column base plates_prof_thomas_murrayColumn base plates_prof_thomas_murray
Column base plates_prof_thomas_murrayAlberto Rosado
 
Design and construction of auger cast piles by Dr. Malek Smadi of GEOTILL
Design and construction of auger cast piles by Dr. Malek Smadi of GEOTILLDesign and construction of auger cast piles by Dr. Malek Smadi of GEOTILL
Design and construction of auger cast piles by Dr. Malek Smadi of GEOTILLDr. Malek Smadi
 
Design of portal frame structures
Design of portal frame structuresDesign of portal frame structures
Design of portal frame structuresSiddiq Mohammed
 
Steel building design worked example
Steel building design worked exampleSteel building design worked example
Steel building design worked exampleMd. Shahadat Hossain
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 

Was ist angesagt? (20)

DESIGNING STEEL STRUCTURES AND PEBs
DESIGNING STEEL STRUCTURES AND PEBsDESIGNING STEEL STRUCTURES AND PEBs
DESIGNING STEEL STRUCTURES AND PEBs
 
Architectural structures shear-wall.ppt
Architectural structures shear-wall.pptArchitectural structures shear-wall.ppt
Architectural structures shear-wall.ppt
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
Etabs example-rc building seismic load response-
Etabs example-rc building seismic load  response-Etabs example-rc building seismic load  response-
Etabs example-rc building seismic load response-
 
Bracing connections
Bracing connectionsBracing connections
Bracing connections
 
Ssb04 detailed design of portal frames
Ssb04 detailed design of portal framesSsb04 detailed design of portal frames
Ssb04 detailed design of portal frames
 
Design of lifts & escalators
Design of lifts & escalatorsDesign of lifts & escalators
Design of lifts & escalators
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Hollow block and ribbed slabs
Hollow block and ribbed slabsHollow block and ribbed slabs
Hollow block and ribbed slabs
 
Moment Resisting Frame.pdf
Moment Resisting Frame.pdfMoment Resisting Frame.pdf
Moment Resisting Frame.pdf
 
Zamil steel design manual
Zamil steel design manualZamil steel design manual
Zamil steel design manual
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...
 
Design notes for seismic design of building accordance to Eurocode 8
Design notes for seismic design of building accordance to Eurocode 8 Design notes for seismic design of building accordance to Eurocode 8
Design notes for seismic design of building accordance to Eurocode 8
 
Modelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Modelling Building Frame with STAAD.Pro & ETABS - Rahul LeslieModelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Modelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
 
Column base plates_prof_thomas_murray
Column base plates_prof_thomas_murrayColumn base plates_prof_thomas_murray
Column base plates_prof_thomas_murray
 
Design and construction of auger cast piles by Dr. Malek Smadi of GEOTILL
Design and construction of auger cast piles by Dr. Malek Smadi of GEOTILLDesign and construction of auger cast piles by Dr. Malek Smadi of GEOTILL
Design and construction of auger cast piles by Dr. Malek Smadi of GEOTILL
 
Design of portal frame structures
Design of portal frame structuresDesign of portal frame structures
Design of portal frame structures
 
Steel building design worked example
Steel building design worked exampleSteel building design worked example
Steel building design worked example
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 

Andere mochten auch

LiamBaines_Construction_OFFICECORE
LiamBaines_Construction_OFFICECORELiamBaines_Construction_OFFICECORE
LiamBaines_Construction_OFFICECORELiam Baines
 
Conquest Fire Spray V6 2003v
Conquest Fire Spray V6 2003vConquest Fire Spray V6 2003v
Conquest Fire Spray V6 2003vjpattillo
 
Technical data sheet for post-installed rebar according to EC2
Technical data sheet for post-installed rebar according to EC2Technical data sheet for post-installed rebar according to EC2
Technical data sheet for post-installed rebar according to EC2Nguyen The Dzung
 
TechnoSysCon Company Profile
TechnoSysCon Company ProfileTechnoSysCon Company Profile
TechnoSysCon Company ProfileTechnoSysCon
 
Recycled water project draft plans and specifications
Recycled water project draft plans and specificationsRecycled water project draft plans and specifications
Recycled water project draft plans and specificationskristinemassey
 
Maria S3 Roofo.W.S.Jframing
Maria S3 Roofo.W.S.JframingMaria S3 Roofo.W.S.Jframing
Maria S3 Roofo.W.S.Jframingmariacadtech
 
As-Built CAD Floorplans - Santa Monica Cottage
As-Built CAD Floorplans - Santa Monica CottageAs-Built CAD Floorplans - Santa Monica Cottage
As-Built CAD Floorplans - Santa Monica CottageAs-Built CAD Floorplans
 
LGS connectors and fasteners detailing and drawing-Engineers Inc
LGS connectors and fasteners detailing and drawing-Engineers IncLGS connectors and fasteners detailing and drawing-Engineers Inc
LGS connectors and fasteners detailing and drawing-Engineers IncStructural Estimators
 
Atkins BIM journey
Atkins BIM journeyAtkins BIM journey
Atkins BIM journeyLaura Smagin
 
Formation 2012 revit initiation et avance
Formation 2012 revit initiation et avanceFormation 2012 revit initiation et avance
Formation 2012 revit initiation et avanceali lemssefer
 
TechnoSysCon Company Profile 1510
TechnoSysCon Company Profile 1510TechnoSysCon Company Profile 1510
TechnoSysCon Company Profile 1510TechnoSysCon
 
5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single project5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single projectBIM User Day
 
structure drawing
structure  drawing structure  drawing
structure drawing Mark Wagih
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)TechnoSysCon
 

Andere mochten auch (18)

Structural Drawings
Structural DrawingsStructural Drawings
Structural Drawings
 
S-ICTC
S-ICTCS-ICTC
S-ICTC
 
LiamBaines_Construction_OFFICECORE
LiamBaines_Construction_OFFICECORELiamBaines_Construction_OFFICECORE
LiamBaines_Construction_OFFICECORE
 
Conquest Fire Spray V6 2003v
Conquest Fire Spray V6 2003vConquest Fire Spray V6 2003v
Conquest Fire Spray V6 2003v
 
FO-204.PDF
FO-204.PDFFO-204.PDF
FO-204.PDF
 
img075
img075img075
img075
 
Technical data sheet for post-installed rebar according to EC2
Technical data sheet for post-installed rebar according to EC2Technical data sheet for post-installed rebar according to EC2
Technical data sheet for post-installed rebar according to EC2
 
TechnoSysCon Company Profile
TechnoSysCon Company ProfileTechnoSysCon Company Profile
TechnoSysCon Company Profile
 
Recycled water project draft plans and specifications
Recycled water project draft plans and specificationsRecycled water project draft plans and specifications
Recycled water project draft plans and specifications
 
Maria S3 Roofo.W.S.Jframing
Maria S3 Roofo.W.S.JframingMaria S3 Roofo.W.S.Jframing
Maria S3 Roofo.W.S.Jframing
 
As-Built CAD Floorplans - Santa Monica Cottage
As-Built CAD Floorplans - Santa Monica CottageAs-Built CAD Floorplans - Santa Monica Cottage
As-Built CAD Floorplans - Santa Monica Cottage
 
LGS connectors and fasteners detailing and drawing-Engineers Inc
LGS connectors and fasteners detailing and drawing-Engineers IncLGS connectors and fasteners detailing and drawing-Engineers Inc
LGS connectors and fasteners detailing and drawing-Engineers Inc
 
Atkins BIM journey
Atkins BIM journeyAtkins BIM journey
Atkins BIM journey
 
Formation 2012 revit initiation et avance
Formation 2012 revit initiation et avanceFormation 2012 revit initiation et avance
Formation 2012 revit initiation et avance
 
TechnoSysCon Company Profile 1510
TechnoSysCon Company Profile 1510TechnoSysCon Company Profile 1510
TechnoSysCon Company Profile 1510
 
5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single project5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single project
 
structure drawing
structure  drawing structure  drawing
structure drawing
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 

Ähnlich wie 2014-05-12 255 138th Street NYCTA Structural Drawings

STEEL REINFORCE MENT bmcp.pptx
STEEL REINFORCE MENT bmcp.pptxSTEEL REINFORCE MENT bmcp.pptx
STEEL REINFORCE MENT bmcp.pptxDine38
 
14325 connels house drafting (1)
14325 connels house drafting (1)14325 connels house drafting (1)
14325 connels house drafting (1)Yousef Riad
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestationYousef Riad
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITHSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITHSunit Dhingra
 
05120 steel & structure
05120 steel & structure05120 steel & structure
05120 steel & structureVinay Yadav
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabIRJET Journal
 
Design of Elevated Viaduct.pptx
Design of Elevated Viaduct.pptxDesign of Elevated Viaduct.pptx
Design of Elevated Viaduct.pptxAman Khandelwal
 
Pt slab design philosophy with slides and pictures showing benefit
Pt slab design philosophy  with slides and pictures showing benefitPt slab design philosophy  with slides and pictures showing benefit
Pt slab design philosophy with slides and pictures showing benefitPerwez Ahmad
 
Pitched Roof
Pitched RoofPitched Roof
Pitched RoofRishii2i
 

Ähnlich wie 2014-05-12 255 138th Street NYCTA Structural Drawings (20)

STEEL REINFORCE MENT bmcp.pptx
STEEL REINFORCE MENT bmcp.pptxSTEEL REINFORCE MENT bmcp.pptx
STEEL REINFORCE MENT bmcp.pptx
 
14325 connels house drafting (1)
14325 connels house drafting (1)14325 connels house drafting (1)
14325 connels house drafting (1)
 
Telescopic poles nea
Telescopic poles  neaTelescopic poles  nea
Telescopic poles nea
 
2751
27512751
2751
 
Yee s2&s2
Yee s2&s2Yee s2&s2
Yee s2&s2
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestation
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITHSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
 
Chapter19
Chapter19Chapter19
Chapter19
 
05120 steel & structure
05120 steel & structure05120 steel & structure
05120 steel & structure
 
1916
19161916
1916
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor Slab
 
Design of Elevated Viaduct.pptx
Design of Elevated Viaduct.pptxDesign of Elevated Viaduct.pptx
Design of Elevated Viaduct.pptx
 
RCC-.pdf
RCC-.pdfRCC-.pdf
RCC-.pdf
 
Mtd4(5005)
Mtd4(5005)Mtd4(5005)
Mtd4(5005)
 
Casing_Design(1).ppt
Casing_Design(1).pptCasing_Design(1).ppt
Casing_Design(1).ppt
 
Pre Bid Conference
Pre Bid ConferencePre Bid Conference
Pre Bid Conference
 
Pt slab design philosophy with slides and pictures showing benefit
Pt slab design philosophy  with slides and pictures showing benefitPt slab design philosophy  with slides and pictures showing benefit
Pt slab design philosophy with slides and pictures showing benefit
 
Pitched Roof
Pitched RoofPitched Roof
Pitched Roof
 
SAMPLE WORK
SAMPLE WORKSAMPLE WORK
SAMPLE WORK
 
Technical data sheet
Technical data sheetTechnical data sheet
Technical data sheet
 

2014-05-12 255 138th Street NYCTA Structural Drawings

  • 1. MASONRY WALL CONCRETE FOOTING CONCRETE WALL W8x10 L STEEL BEAM STEEL LINTEL (SEE SCHEDULE) INDICATE LEDGER ANGLE (SEE DETAIL) BENT STEEL FRAMING SHEAR CONNECTION MOMENT CONNECTION EMBEDDED PLATE CONNECTION (SEE SHED.) BEAM POCKET IN MASONRY (SEE SCHED.) BP: INDICATES STANDARD BEAM POCKET AP: INDICATES ACOUSTICALLY ISOLATED BEAM POCKET STEEL COLUMN STEEL COLUMN BELOW INDICATES COLUMN TRANSFER TR X-# SLAB (SEE SCHED.) ARROW INDICATES SPAN DIRECTION OF SLAB INDICATES TOP OF FOOTING ELEVATION COLUMN LINE (##'-##") # LEGEND EP-# BP-# MASONRY SHEAR WALL PCi t e c t s Dwg Title East 138th Street LLC 334-336 East 110th Street New York, N.Y. 10029 443 Park Avenue South New York, NY 10016 T: 212|689|7070 F: 212|545|1687 info@MHGArch.com www.MHGArch.com Client/Developer MHG Architects 443 Park Avenue South New York, N.Y. 10016 Architect Abel Bainnson Butz, LLP 80 8th Avenue, Suite 1105 New York, N.Y. 10011 Landscape Architect 88 University Place New York, N.Y. 10003 Structural Engineer Ettinger Engineering Associates 508 Eighth Avenue New York, N.Y. 10018 Mechanical/Electrical/Plumbing Engineer Scale Job No. Date Dwg No Seal NYC DOB Number 1522 255 East 138th Street Robert Silman Associates 1/8" = 1'-0" GENERAL NOTES 05/08/2013 13892 S-001.00 GENERAL REQUIREMENTS 01. GENERAL 1. All structural work shall be coordinated with other Project team consultants' drawings, including but not limited to Architectural, Civil, Mechanical, Electrical, Plumbing, Fire Alarm, and Landscape, and shall conform to the project specifications. 2. Contractor shall provide temporary shoring, bracing, sheeting and make safe all floors, roofs, walls and adjacent property as project conditions require. Shoring and sheeting shall be designed by a registered professional engineer licensed in the project jurisdiction hired by the contractor, who shall submit shop drawings and calculations for the owner's review. 3. Dimensions and elevations of existing construction given in structural drawings are based on information contained in various original design and construction documents provided by the owner, and limited field observations and measurements. The contractor shall verify all information pertaining to existing conditions by actual measurement and observation at the site. All discrepancies between actual conditions and those shown in the contract documents shall be reported to the engineer of record for his/her evaluation before the affected construction is put in place. Unless otherwise noted on plans and/or elevations, concrete block unit strength shall be 1900 psi min. Note: concrete block with unit strength higher than 1900 psi require longer delivery lead times. 3. All mortar shall be ASTM C270, type S. 4. All grout for filling cells shall be ASTM C476 with minimum compressive strength of 2000 psi but not less than the compressive strength of the masonry assembly, f'm. Where grout cells do not exceed 4" diameter, fine grout shall be used. 5. All block dimensions indicated on structural plans are nominal dimensions. 6. All concrete block below grade shall be filled solid with grout. 7. Concrete block below beam or truss bearing points shall be filled solid for a minimum of two courses in depth and a minimum of 32" in width, U.N.O. 8. Install heavy duty ladder joint reinforcement at 16" O.C. (spaced vertically). 9. Unless noted otherwise, all masonry walls shall be reinforced with #4@48" O.C. vertical. Grout all reinforced cells solid. Provide dowels to match vertical reinforcing at foundation. 04. CONCRETE BLOCK 1. All concrete block work shall conform to the American Concrete Institute (ACI) "Building Code Requirements for Masonry Structures" (530-02). 2. Concrete block shall be of lightweight aggregate and conform to the following standards: solid/hollow block: ASTM C90, grade N1. NET AREA COMPRESSIVE STRENGTH OF CONCRETE MASONRY UNIT, PSI NET AREA COMPRESSIVE STRENGTH OF MASONRY ASSEMBLY, F'm, PSI USING TYPE S MORTAR 1900 1500 2800 2000 3750 2500 4800 3000 05. STRUCTURAL STEEL 1. All structural steel work shall conform to the following governing standards: a. AISC "Load and Resistance Factor Design Specification for Structural Steel Buildings," (1999). b. The American Welding Society (AWS D1.1-00) "Structural Welding Code - Steel." 2. All structural steel shall conform to the following ASTM specifications: a. Wide flange beams, columns and structural tees: ASTM A992 b. Hollow structural sections: ASTM A500, Grade B c. Structural pipe sections: ASTM A53, Grade B. d. Channels, angles and plates: ASTM A36 unless otherwise noted e Structural steel plate shall be ASTM A572 Grade 50 having a minimum yield point of 50,000 psi. Grade 42 having a minimum yield point of 42,000 psi for thickness greater than 4". f. Bolted connections of beams/ girders are to be designed as follows: a. Standard beam to beam/girder: A325 or A490 bearing type bolts (3/4" diameter minimum with hardened washers). b. Beam/girder to column connections: A325-SC or A490-SC type bolts (3/4" diameter minimum with hardened washers). g. Anchor bolts: ASTM F1554, Grade 36. 3. Steel connections shall be standard AISC framed beam connections. a. For non-composite members, provide connections based on reaction as determined from AISC uniform load table. (unless otherwise noted on plans.) b. For composite members, provide connections based on 1.5 x reaction from AISC uniform load table. (unless otherwise noted on plans.) c. Reinforcing is to be provided at connections where cuts reduce the shear or moment capacity below that required to sustain the reaction. flanges and web are to be reinforced where the local capacity to sustain connection load is inadequate. d. Connections shall be designed for shear and eccentricity, considering that the connection is an extension of the beam and girders. 4. Minimum weld size is 1/4" fillet unless noted otherwise. 5. All beams except cantilever beams shall be fabricated and installed with natural camber up. Cantilever beams shall be fabricated and installed so that natural camber raises cantilever end. 6. Field cutting or burning of steel is prohibited except with the express written approval of the structural engineer of record. 7. Welding shall be performed by certified licensed, AWS-qualified welders. electrodes shall be AWS 5.1, Class E70XX (use low hydrogen electrodes for A572, Grade 50 steel). 8. Shop paint exposed steel members, steel members not encased in concrete or spray fireproofed, and all steel members at the exterior wall with Tnemec #10-99. Field paint all exposed members with Tnemec 530 omnithane or approved equal. 9. Lintels shall be installed over all openings in masonry walls as follows: a. 3-1/2" legs are horizontal b. Provide one angle for each 4" of wall thickness c. Provide L5x5x5/16 angles for 6" thick walls and partitions with openings up to 6'-0". d. Provide minimum 6" bearing at each end. e. Lintels over 4'-0" shall be fireproofed. [4'-0" for NYC only / 6'-0" for IBC] 10. Shop and erection drawings shall be submitted to the structural engineer for review and approval. No fabrication of steel shall commence without approved shop drawings. 11. Provide mechanically galvanized bolts for exterior applications. Mansory Opening Lintel 4'-0" or less L4" x 3 1/2" x 5/16" 4'-1" to 7'-0" L6" x 3 1/2" x 5/16 08. SPECIAL INSPECTIONS 1. Inspections required by the local jurisdiction shall be performed by a testing agency provided by the owner for the following items: a. Flood zone compliance b. Structural steel - welding (BC 1704.3.1) c. Structural steel - erection and bolting (BC 1704.3.2, 1704.3.3) d. Concrete - cast-in-place (BC 1704.4) e. Concrete - precast (BC 1704.4) f. Masonry (BC 1704.5) g. Soils - site preparation (BC 1704.7.1) h. Soils - fill placement & in-place density (BC 1704.7.2, 1704.7.3) i. Soils - investigations (borings/test pits) (BC 1704.7.4) j. Pile foundations & drilled pier installation (BC 1704.8) k. Structural safety - structural stability (BC 1704.19) l. Excavation - sheeting, shoring, and bracing (BC 1704.19, 3304.4.1) m. Concrete test cylinders - TR-2 (BC 1905.6) n. Concrete design mix - TR-3 (BC 1905.3) o. Adhesive anchorage (BB 2009.019) p. Expansion anchorage (2010.005) The testing agency for the inspections shall file all appropriate forms with the building department. 02. FOUNDATIONS 1. The building foundations have been designed based on the recommendations stated in "Subsurface Exploration and Foundation Engineering Report" dated March 9, 2011 prepared by GZA GeoEnvironmental of New York. The full report shall be referenced for construction recommendations. 2. The deep foundation system consists of #18 threaded bars, Grade 75, encased in 5000 psi grout within 9.625" outside diameter steel casings with 0.472" wall thickness. The piles are designed for the following allowable loads: Compression = 110 tons (220 kips) Uplift Resistance = 80 tons (160 kips) Lateral Resistance = 1.5 tons (3 kips) 3. The contractor shall examine the site and boring logs as well as all available subsurface information. The contractor shall, on his own judgment, order the appropriate length of pile to obtain the required minimum length and capacity. Before start of pile production, the contractor may, at their own expense, drive test piles to determine the ordering lengths required. 4. A pile identification plan with all piles numbered chronologically shall be prepared by the contractor and shall be submitted to the engineer for approval. 5. The piles shall be drilled into the weathered rock stratum to approximate tip elevation -65 to -80 (based on Bronx datum) to achieve the required compressive load. 6. Piles shall be installed in order to ensure a minimum capacity previously specified, and in accordance with criteria established by approved load test(s) as documented and filed with the New York City Building Department. The load test(s) shall be directed by a licensed professional engineer who shall certify the pile installation and testing. 7. No pile shall be more than 3" (inches) from its design location, nor out of plumb more than 2% of its length. These tolerances shall be applied after pile cut-off elevation. 8. No more than one splice shall be permitted per pile. Splices shall be made with couplers, refer to FNA details. The length of pile to be spliced shall be secured in proper alignment prior to coupling and in such a manner that no eccentricity or angle develops between the axis of the two lengths to be spliced. Sections of pile shall be spliced to develop full strength of section. Pile splices shall not be located within 10 feet of pile cut-off. 9. Pile drilling shall be under the supervision of a license professional engineer retained by the contractor and approved by the engineer. All piling work is subject to controlled inspection as required by the New York City Building Code. 10. The contractor shall use whatever means necessary to obtain adequate pile capacity including jetting, spudding, pre-augering, rock drilling, socketing etc. 11. A survey and drawing shall be prepared of the location of each pile as drilled and together with the pile log shall be submitted to the engineer for determination of corrective measures, or for approval. Pile cut-off shall also be indicated for each pile. 12. The drawing shall be signed and sealed by a licensed professional engineer retained by the contractor. 13. For temporary support of excavation system refer to drawings prepared by FNA. 06. PRECAST CONCRETE PLANK 1. All precast concrete plank work shall conform to the "Prestressed Concrete Institute Specification", latest edition. 2. Precast concrete plank manufacturer shall retain the services of a professional engineer licensed in the project jurisdiction who shall certify to the Architect and Engineer and assume responsibility as follows: a. The design of the planks is safe for the loads specified in the loading schedule. b. The strength of the concrete is as called for in the design submitted. c. The plank was fabricated in accordance with the design practice. d. The plank was erected in accordance with the design as well as acceptable standards of concrete and engineering practice. e. File "Statement B" with the local Department of Buildings for plank work. 3. Precast concrete plank manufacturer shall submit shop drawings to the architect for approval before proceeding with fabrication. 4. All openings in the plank must shop detailed first. Plank parallel and adjacent to the outside wall shall be full width. 5. Grouting of plank keys and under bearing wall above shall be non shrink, nonmetallic grout 3000psi at 28 days. Grout before bearing walls above are started. 6. The minimum compressive strength of the concrete used for concrete plank shall be 5000 psi at 28 days and made and tested as per ASTM C31 and C39. Inspection and concrete reports shall be filed with the local Department of Buildings. 7. Testing and product verification shall be available for distribution. 8. Openings and inserts in plank required by field conditions shall be approved by plank manufacturer. 9. All bearing pads to be Korolath. Masonite bearing pads shall not be used. 07. POST INSTALLED ADHESIVE AND MECHANICAL ANCHORS 1. Post installed anchorage shall be installed per manufacturer technical data to intact base material. Notify engineer of record prior to installation if base material condition deviates from structural drawings or manufacturer technical data. 2. Manufacturer data for alternate anchorage proposed by contractor shall be submitted to engineer of record for review and approval. Submittal shall include ICC evaluation service report with ICC tested capacity meeting or exceeding capacity of anchorage specified in contract documents. 3. Unless otherwise indicated, post intalled anchorage shall be adhesive type Hilti HIT-RE 500-SD into concrete or stone base material or Hilti HIT-HY 70 into brick masonry base material. 4. All concrete members to which post-installed anchors are to be installed shall be x-rayed or use ground penetrating radar prior to installation to determine location of in-situ reinforcing steel. Structural engineer of record shall be notified of any conflicts so revised details can be proposed. RSA STANDARD ABBREVIATIONS I.D. Inside diameter I.F. Inside face I.J. Isolation joint INFO. Information INTR. Interior JT. Joint K Kips LB. Pound L.L. Live load LLH Long leg horizontal LLV Long leg vertical L-W Long way MAX Maximum MECH. Mechanical MEP. Mech., Elec., Plumbing, & F.P. MFR. Manufacturer MIN. Minimum MISC. Miscellaneous M.O. Masonry opening N.A. not aplicable N.F. Near face N.I.C. Not in contract NO. Number N.S. Near side N.T.S. Not to scale O.C. On center O.D. Outside diameter O.F. Outside face OPNG. Opening OPP. Opposite PC. Piece P/C Precast concrete PED Pedestal PERP. Perpendicular PL. Plate PLF. Pounds per linear foot PREFAB. Prefabricated PSF. Pounds per square foot PSI Pounds per square inch P-T Post-tensioned REINF. Reinforce(d), reinforcement REQ'D Required REV. Revision RM. Room SCHED. Schedule SEC. Section SIM. Similar S.I.F. Step in footing S.O.G. Slab on grade SPEC. Specification S.S. Stainless steel STD. Standard STIFF. Stiffener STIP. Stirrup STL. Steel STRUCT. Structural S-W Short way SYM. Symmetric T/ Top of T & B Top & bottom TEMP Temporary THK. Thick or thickness TR. Transfer TYP. Typical U.N.O. Unless noted otherwise VERT. Vertical W/ With W.P. Work point W-P Water point W.W.F. Welded wire fabric X.STR. Extra strong X.X. STR. Double extra strong # Number/size Ø Diameter RSA STANDARD ABBREVIATIONS ANC. Anchor ADD'L Additional ADJ. Adjacent ALT. Alternate APPROX. Approximate ARCH. Architectural/Architect B/ Bottom of BLDG. Building BM. Beam BOT. Bottom BRG. Bearing BSMT. Basement CANT. Cantilever CFS. Cold formed steel C.I.P. Cast in place C.J. Control joint CLG. Ceiling CLR. Clear CMU Concrete masonry unit COL. Column COMPS. Composite CONC. Concrete CONST. Construction CONT. Continuos COORD. Coordinate CONTR. Contractor COTR Contracting officer's techinal representative CTR. Center DBL. Double DEMO Demolition DTL. Detail DIA. Diameter DIAG. Diagonal DIM. Dimension D.L. Dead load DN. Down DO Ditto DWG(S) Drawings DWL. Dowel EA. Each E/ Edge of E.F. Each face E.J. Expansion joint E. Elevation ELEC. Electrical ELEV. Elevator EMBED. Embedment ENGR. Engineer E.O.R. Engineer of record EQ. Equal E.S. Each side EXP. Expansion EXT. Exterior E.W. Each way FDN. Foundation FIN. Finish FLR. Floor FRMG. Framing F.S. Far side FT. Feet FTG. Footing F.P. Fire protection GA. Gage GALV. Galvanized G.B. Grade beam G.C. General contractor HDR. Header HGR. Hanger HORIZ. Horizontal H.P. High point HT. Height HVAC Heating, ventilation, & air conditioning DESIGN LOAD AND PARAMETER TABLE GOVERNING CODE: 2008 NEW YORK CITY BUILDING CODE BUILDING CATEGORY: M, R-2, S-1, S-2 LIVE LOADS: 40 PSF (1) APARTMENTS 80 PSF CORRIDORS ABOVE FIRST FLOOR 100 PSF / 1000 LBS FIRST FLOOR CORRIDOR & PUBLIC SPACES 40 PSF PARKING 150 PSF (2) / 2000LBS PENTHOUSE MECHANICAL 30 PSF ROOF 100 PSF STAIRS (1) SLL 15PSF PARTITIONS ALSO APPLIED AS LIVE LOAD (2) USED IN ABSENCE OF ACTUAL WEIGHT OF MECHANICAL EQUIPMENT AND INCLUDES MIN. FLAT ROOF SNOW LOAD OF 30 PSF SNOW LOADS: 25 PSF Pg GROUND SNOW LOAD 20 PSF Pf FLAT ROOF SNOW LAOD B Ce SNOW EXPOSURE 1.0 Is SNOW LOAD IMPORTANCE FACTOR 1.0 Ct THERMAL FACTOR WIND LOAD: 110 MPH V BASIC WIND SPEED (3 SEC. GUST) 1.0 Iw WIND IMPORTANCE FACTOR B WIND EXPOSURE +/- 0.018 INTERNAL PRESSURE COEFFICIENT C&C VELOCITY PRESSURE AT MEAN ROOF HEIGHT SEISMIC DESIGN DATA: 1.00 I SEISMIC IMPORTANCE FACTOR I SEISMIC USE GROUP 0.365g Ss SHORT PERIOD MAPPED SPECTRAL RESPONSE ACCELERATION 0.071g S1 1 SECOND PERIOD MAPPED SPECTRAL RESPONSE ACCELERATION E SITE CLASS 0.518g S(ds) SHORT PERIOD SPECTRAL RESPONSE ACCELERATION 0.166g S(d1) 1 SECOND PERIOD SPECTRAL RESPONSE ACCELERATION C SEISMIC DESIGN CATEGORY Ordinary Reinforced Masonry Shear Walls/Ordinary Reinforced Concrete Walls BASIC SEISMIC-FORCE RESISTING SYSTEM(S) 1750 KIPS DESIGN BASE SHEAR 0.139 Cs SEISMIC RESPONSE COEFFICIENT 2.5/4.0 R RESPONSE MODIFICATION FACTOR Equivalent lateral force ANALYSIS PROCEDURE 5. Provide minimum shrinkage and temperature reinforcement, as required by ACI 318, in all slabs and walls where reinforcement is not indicated on drawings. 6. Coordinate size and location of all openings and pipe sleeves with architectural, MEP, and other consultants drawings. Minimum concrete between sleevs shall be 6". Core drilling of walls and slabs shall not be permitted without prior approval from engineer of record. 7. All grout shall be non-shrink, non-metallic with a minimum compressive strength of 5000 psi at 28 days. 8. Provide clearance from face of concrete to reinforcement as follows: - Cast against and permanently exposed to earth: 3" - Exposed to earth of weather: 2" for #6 and larger, 1-1/2" for #5 and smaller - Not exposed to weather nor in contact with ground: Slabs and walls: 3/4" Beams and columns: 1-1/2" 9. Shop drawings shall be submitted to the structural engineer for review and approval. No concrete work shall commence without approved shop drawings. 10. Clean and roughen to 1/4" amplitude all existing concrete surfaces to receive new concrete prior to placement. 11. See other drawings in this project for size and location of equipment pads, inserts, and embedded items. 12. Reinforcing dowels, waterstops, and other embedded items shall be installed and secured prior to concrete placement. "Wet-setting" of embedded items is not permitted. 13. Chamfer all exposed formed corners of concrete ¾” x ¾”. 14. Provide plastic tipped bolsters and chairs where bolsters or chairs rest against formwork. 15. Contractor shall locate in-situ reinforcing steel prior to drilling concrete for post-installed anchors or penetrations. 03 CONCRETE 1. All concrete work shall conform to the American Concrete Institutue (ACI) "Building Code Requirements for Structural Concrete" (318-02). 2. All concrete shall be normalweight and have minimum compressive 28 day strength as follows: - Pilecaps: 4000 psi - Columns: 6000 psi - Slabs and beams: 6000 psi - Walls: 4000 psi 3. Reinforcing steel shall be deformed bars conforming to ASTM A615, Grade 60. Reinforcing steel shall be detailed according to the ACI "Details and Detailing of Concrete Reinforcement" (315-99) 4. Welded wire fabric (WWF) shall conform to ASTM A185, with a minimum yield strength of 65,000 psi. NORTH R e v . D a t e D e s c r i p t i o n 0 5 / 2 9 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T 0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A 0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
  • 2. PCi t e c t s Dwg Title East 138th Street LLC 334-336 East 110th Street New York, N.Y. 10029 443 Park Avenue South New York, NY 10016 T: 212|689|7070 F: 212|545|1687 info@MHGArch.com www.MHGArch.com Client/Developer MHG Architects 443 Park Avenue South New York, N.Y. 10016 Architect Abel Bainnson Butz, LLP 80 8th Avenue, Suite 1105 New York, N.Y. 10011 Landscape Architect 88 University Place New York, N.Y. 10003 Structural Engineer Ettinger Engineering Associates 508 Eighth Avenue New York, N.Y. 10018 Mechanical/Electrical/Plumbing Engineer Scale Job No. Date Dwg No Seal NYC DOB Number 1522 255 East 138th Street Robert Silman Associates GENERAL NOTES - NYCTA 05/08/2013 13892 S-002.00 R e v . D a t e D e s c r i p t i o n 0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A 0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A NEW YORK CITY TRANSIT GENERAL NOTES 34. STATION AREAS OR STAIRWAY/CLOSINGS: THE GENERAL REQUIREMENTS FOR STATION AREAS OR STAIRWAY/CLOSINGS ARE AS FOLLOWS: A) ONLY ONE STAIRWAY AT EACH STATION WILL BE PERMITTED TO BE CLOSED AT THE SAME TIME. APPROVALS FOR CLOSING ANY STAIRWAY MUST BE OBTAINED FROM THE DIVISION OF STATION OPERATIONS AT LEAST THREE WEEKS IN ADVANCE. ONLY ONE STAIRWAY AT EACH STATION WILL BE PERMITTED TO BE CLOSED AT THE SAME TIME. APPROVALS FOR CLOSING ANY STAIRWAY MUST BE OBTAINED FROM THE DIVISION OF STATION OPERATIONS AT LEAST THREE WEEKS IN ADVANCE. B) MR. ASHOK PATEL, DIRECTOR, OFFICE OF STATION PROGRAMS; TELEPHONE 718/694-1695 OF THE DIVISION OF STATIONS MUST BE NOTIFIED ONE WEEK PRIOR TO THE ACTUAL CLOSING AND REOPENING OF THE ENTRANCE. C) AMPLE SIGNAGE MUST BE SUPPLIED AND POSTED AT LEAST ONE WEEK IN ADVANCE, ADVISING THE PUBLIC OF THE PROPOSED SUBWAY STAIR CLOSING. D) THE STREET ENTRANCE STAIRWAY SHOULD NOT BE CLOSED UNLESS MANPOWER AND MATERIALS ARE AVAILABLE TO COMMENCE WORK ON DATES PERMITTED. E) ONCE THE CLOSING IS EFFECTED, CONSTRUCTION SIGNS MUST BE PLACED AT APPROPRIATE LOCATIONS ON THE BARRICADES AT THE STREET AND MEZZANINE LEVELS, STATING THE CONTRACTOR’S NAME, 24 HOUR EMERGENCY TELEPHONE NUMBER, CONTRACT NUMBER, THE DURATION OF THE CLOSING, DIRECTION TO AN ALTERNATE ENTRANCE/EXIT, AND AN APOLOGY FOR THE INCONVENIENCE TO OUR CUSTOMERS. F) EXISTING STATION SIGNAGE MUST BE ADJUSTED TO REFLECT ANY CHANGES IN ACCESS/EGRESS. G) BARRICADES ARE TO BE PAINTED AND KEPT GRAFFITI FREE AT ALL TIMES. THE CONTRACTOR MUST MAINTAIN THE BARRICADED AREA CLEAN OF ALL DEBRIS. H) ALL MATERIALS ARE TO BE PROPERLY STORED AND SECURED AWAY FROM PASSENGER TRAFFIC. I) THE CONTRACTOR MUST REMOVE ALL WASTE MATERIAL AND BARRICADES FROM ALL STATION AREAS WHEN CONSTRUCTION IS COMPLETED. J) INSPECTION OF THE AREA UNDER CONSTRUCTION BY AUTHORIZED STATION DEPARTMENT EMPLOYEES SHALL NOT BE INHIBITED. K) IF STREETLIGHTS ON THE SIDEWALKS ARE AFFECTED, TEMPORARY LIGHTS SHALL BE PROVIDED. 35. IF NEW CONCRETE CONSTRUCTION IS JOINED TO EXISTING CONCRETE, DOWELS AND KEYWAYS ARE TO BE USED IN ACCORDANCE WITH NYCT STANDARDS. 36. IF THE PROJECT INVOLVES CONSTRUCTION OR ALTERATION OF A SUBWAY FACILITY ON PRIVATE PROPERTY, THE PROPERTY OWNERS WILL BE REQUIRED TO ENTER INTO AN AGREEMENT WITH NYCT PERTAINING TO ALL WORK AFFECTING THE TRANSIT FACILITIES AND CLEARLY DEFINING LIMITS AND RESPONSIBILITY FOR MAINTENANCE AND LIABILITY. 37. WHEREVER A NEW SIDEWALK IS BEING PLACED ADJACENT TO NYCT STRUCTURES THE FOLLOWING WILL BE REQUIRED: A) THE TOP OF THE NEW SIDEWALK SHALL BE FLUSH WITH THE SUBWAY VENT GRATINGS, HATCHES AND EMERGENCY EXITS. B) THE SLOPE OF THE NEW SIDEWALK SHALL BE SUCH THAT THE DRAINAGE BE AWAY FROM THESE STRUCTURES. C) A 1/2" PRE-MOLDED FILLER SHALL BE INSTALLED BETWEEN THE NEW SIDEWALK AND NYCT STRUCTURE. D) WHERE SIDEWALK ELEVATIONS ARE BEING CHANGED DETAILS OF PROPOSED WORK AROUND NYCT STRUCTURES ARE TO BE SUBMITTED FOR APPROVAL. 38. BEFORE ENTERING NYCT PROPERTY, CONTRACTOR OR SUBCONTRACTOR'S PERSONNEL SHALL HAVE ATTENDED NYCT TRACK SAFETY TRAINING AND EXPECT TO FOLLOW NYCT RULES AND REGULATIONS AS PER TRAIING AND ENGINEER INSTRUCTIONS. 39. BEFORE THE START OF ANY WORK, THE CONTRACTOR SWTHALL MAKE AN EXAMINATION, IN THE PRESENCE OF NYCT’S ENGINEER, OF THE INTERIOR AND EXTERIOR OF NYCT SUBWAY OR OTHER STRUCTURE ADJACENT TO THE PROPOSED WORK. THE PERSON OR PERSONS AUTHORIZED BY THE CONTRACTOR TO MAKE THESE EXAMINATIONS SHALL BE APPROVED BY THE ENGINEER. THE CONTRACTOR SHALL TAKE ALL PHOTOGRAPHS AS MAY BE NECESSARY OR ORDERED TO INDICATE THE EXISTING CONDITION OF NYCT STRUCTURE. ONE COPY OF EACH PHOTOGRAPH, EIGHT INCHES BY TEN INCHES IN SIZE, AND THE NEGATIVE IS TO BE SUBMITTED TO MR. JOHN MALVASIO, P.E., DIRECTOR, DEPARTMENT OF MAINTENANCE-OF-WAY, 130 LIVINGSTON STREET, ROOM 8044D, BROOKLYN, NEW YORK 11201, TELEPHONE 718/694-1358 BEFORE THE START OF CONSTRUCTION. 40. ALL ARCHITECTURAL DETAILS (TOKEN BOOTHS, RAILINGS, DOORS, ETC.) ARE TO CONFORM TO THE LATEST NYCT STANDARDS. THESE STANDARDS ARE AVAILABLE AT NYCT. 41. STANDARD NYCT INSURANCE CLAUSES ARE TO BE MADE PART OF THE PROJECT'S CONTRACT DRAWINGS. PROOF THAT THE NECESSARY INSURANCE IS IN EFFECT WILL BE REQUIRED BEFORE WORK CAN COMMENCE. 42. AT THE CLOSE OF ANY PROJECT INVOLVING CONSTRUCTION OR ALTERATIONS TO TRANSIT FACILITIES, ONE SET OF VELLUMS OR MYLARS, FIVE SETS OF 35MM MICROFILM, AND ELECTRONIC COPIES COMPLYING TO MICROSTATION.DGN FORMAT OF “APPROVED AS-BUILTS” MUST BE PROVIDED TO NYCT FOR ITS RECORDS. FOR DETAILS OF SPECIFIC REQUIREMENTS CONTACT NYCT OUTSIDE PROJECTS. 43. AT LEAST SEVEN WORKING DAYS PRIOR TO THE START OF CONSTRUCTION OPERATIONS, NOTIFICATION MUST BE GIVEN TO MR. JOHN MALVASIO, P.E., DIRECTOR, DEPARTMENT OF MAINTENANCE-OF-WAY, AT 718/694-1358. THE CONTRACTOR TO PROVIDE TEMPORARY QUARTERS NEAR THE JOB SITE FOR NYCT INSPECTORS CONTAINING A DESK AND TELEPHONE. NEW YORK CITY TRANSIT GENERAL NOTES 1. THE NYC TRANSIT (NYCT) RESERVES THE RIGHT TO PLACE INSPECTORS, FLAGMEN OR OTHER PERSONNEL IN THE SUBWAY STRUCTURES DURING CONSTRUCTION OF THE PROJECT LINKED BY A TELEPHONE SYSTEM, IF DEEMED NECESSARY, TO OBSERVE THE EFFECTS OF THE CONSTRUCTION ON THE TRANSIT FACILITIES. IT IS EXPECTED THAT SUCH PERSONNEL WILL BE NECESSARY WHEN THE CONSTRUCTION COMES WITHIN TWENTY-FIVE FEET OF THE SUBWAY STRUCTURE. HOWEVER, NYCT FURTHER RESERVES THE RIGHT TO PLACE SUCH PERSONNEL WHENEVER, IN ITS OPINION, THE PROJECT CONDITIONS WARRANT SUCH PLACEMENT, REGARDLESS OF DISTANCE. THE COST OF SUCH PERSONNEL, TELEPHONE INSTALLATION AND ANY RE-ROUTES, DIVERSIONS OF SERVICE, WORK TRAINS, ETC., MADE NECESSARY BY THE PROJECT, MUST BE BORNE BY THE PROJECT OR THE RESPONSIBLE NEW YORK CITY/STATE AGENCY. 2. ALL ROCK EXCAVATION ADJACENT TO THE TRANSIT STRUCTURE IS TO BE CHANNEL DRILLED TWO FEET BELOW SUBGRADE. 3. IF TOP OF ROCK IS FOUND BELOW SUBWAY STRUCTURE, THE SUBWAY STRUCTURE MUST BE UNDERPINNED IN ACCORDANCE WITH DRAWINGS TO BE SUBMITTED TO NYCT FOR APPROVAL. 4. IF ROCK IS SOFT OR SEAMY, LATERAL SUPPORTS MUST BE PROVIDED BELOW THE SUBWAY STRUCTURE IN ACCORDANCE WITH DRAWINGS TO BE SUBMITTED TO NYCT FOR APPROVAL. 5. BLASTING WILL BE PERMITTED ONLY WITH LIGHT CHARGES SUBJECT TO THE APPROVAL OF NYCT’S ENGINEER AND IN ACCORDANCE WITH THE REGULATIONS OF THE FIRE DEPARTMENT. THE CONTRACTOR SHALL PROVIDE A DETAILED MONITORING PLAN, PROVIDING FOR MEASUREMENTS OF BOTH PARTICLE VELOCITY AND DISPLACEMENTS AT CRITICAL LOCATIONS OF THE NYCT STRUCTURE. THE MONITORING PLAN SHALL INCLUDE THRESHOLD AND UPSET LEVELS OF BOTH PARTICLE VELOCITY AND SETTLEMENT TOGETHER WITH AN ACTION PLAN FOR THEIR IMPLEMENTATION. THE CONTRACTOR SHALL SECURE AN APPROVED SEISMOLOGIST TO INSTALL AND OPERATE SUITABLE VELOCITY GAUGES TO CONTINUOUSLY MONITOR PARTICLE VELOCITY AND AN INDEPENDENT LICENSED SURVEYOR TO MONITOR DISPLACEMENTS. THE THRESHOLD MAXIMUM PARTICLE VELOCITY ABOVE AMBIENT CAUSED BY THE BLASTING WILL BE 0.5 INCH PER SECOND. VALUES EXCEEDING THIS LEVEL WILL BE REVIEWED AND EVALUATED BY NYCT’S ENGINEER. IN NO CASE WILL PARTICLE VELOCITIES EXCEED THE UPSET LEVEL OF 2.0 INCHES PER SECOND. 6. BEFORE PLACING CONCRETE, THE SUBGRADE OF THE FOUNDATIONS IN THE VICINITY OF THE SUBWAY STRUCTURE IS TO BE INSPECTED AND APPROVED BY NYCT'S ENGINEER. 7. F ANY PORTION OF THE SUBWAY STRUCTURE OR FINISH IS DAMAGED, IT SHALL BE REPAIRED OR REPLACED WITH THE SAME MATERIALS IN PLACE, SUBJECT TO THE APPROVAL OF NYCT’S ENGINEER AND AT THE EXPENSE OF THE PROJECT. 8. EXCAVATION EMBANKMENTS ARE TO BE SHORED AND BRACED. DRAWINGS INDICATING A SUGGESTED METHOD OF CONSTRUCTION ARE TO BE SUBMITTED TO NYCT FOR APPROVAL IN CONJUNCTION WITH THE PROJECT’S CONTRACT DRAWINGS. IN CASE OF EXCAVATION UNDERMINING THE SUBWAY STRUCTURE, UNDERPINNING MAY BE REQUIRED. DRAWINGS FOR UNDERPINNING ARE TO BE SUBMITTED TO NYCT FOR APPROVAL. 9. TEMPORARY SHORING MAY BE PLACED IN DIRECT CONTACT WITH NYCT STRUCTURES ONLY IF THE NYCT STRUCTURE IS SHOWN TO BE ABLE TO SUPPORT ALL ANTICIPATED LOADS THAT CAN BE TRANSFERRED THROUGH THE TEMPORARY STRUCTURES WITHOUT DAMAGING THE EXISTING STRUCTURE. AT THE COMPLETION OF THE PROJECT, THESE TEMPORARY SHORING AND BRACING SYSTEMS ARE TO BE REMOVED OR CUT-OFF AS APPROVED BY NYCT. 10. WHEN PILES ARE TO BE DRIVEN ADJACENT TO THE SUBWAY STRUCTURE, BORING DATA, PILE LAYOUTS, SPECIFICATIONS AND INSTALLATION PROCEDURES ARE TO BE SUBMITTED TO NYCT FOR APPROVAL. VELOCITY METERS ARE TO BE INSTALLED IN THE SUBWAY TUNNEL AT CRITICAL LOCATIONS TO MONITOR INDUCED VIBRATIONS. INDUCED DISPLACEMENTS ALONG THE TUNNEL STRUCTURE AND TRACK INVERT ARE TO BE MONITORED DURING DRIVING. THE THRESHOLD MAXIMUM PARTICLE VELOCITY ABOVE AMBIENT CAUSED BY THE DRIVING WILL BE 0.5 INCH PER SECOND. VALUES EXCEEDING THIS LEVEL WILL BE REVIEWED AND EVALUATED BY NYCT’S ENGINEER. IN NO CASE WILL PARTICLE VELOCITIES EXCEED THE UPSET LEVEL OF 2.0 INCHES PER SECOND. 11. NO PILES ARE PERMITTED TO BE INSTALLED BY ANY METHOD WITHIN THREE FEET OF SUBWAY STRUCTURE, MEASURED FROM THE EDGE OF THE PILE OR CASING TO THE WALL. CLOSED-END PILES WILL NOT BE PERMITTED TO BE DRIVEN WITHIN TEN FEET OF THE SUBWAY STRUCTURE. 12. ALL PILES ARE TO BE PLACED WITHIN A PREAUGERED CASED HOLE TO THE INFLUENCE LINE. THE CASING SHALL BE CLEANED WITHOUT DISTURBING THE SOIL OUTSIDE THE CASING AND THE PILE TO BE PLACED WITHIN THE CASING FOR INSTALLATION. THE PILES MAY THEN BE DRIVEN BEYOND THE INFLUENCE LINE WITHIN THE CASING. 13. THE INFLUENCE LINE SHALL START AT THE BOTTOM OF THE SUBWAY STRUCTURE AND EXTEND AT A 1:1 SLOPE. FOR PILES INSTALLED WITHIN TEN FEET OF THE SUBWAY STRUCTURE, THE CASING SHALL BE EXTENDED UP TO THE BOTTOM OF THE SUBWAY STRUCTURE. 14. ALL PILES ARE TO BE DRIVEN A MINIMUM OF TEN FEET BELOW THE INTERSECTION OF THE PILE CENTERLINE AND THE INFLUENCE LINE OF THE SUBWAY STRUCTURE. 15. THE USE OF “DOWN-THE-HOLE -HAMMERS” FOR INSTALLATION OF PILES THROUGH OVERBURDEN AND FILL WILL BE PERMITTED ONLY TO REMOVE BOULDERS. IT WILL NOT BE PERMITTED AS A MATTER OF COURSE TO ADVANCE THE HOLE. THEIR USE TO CONSTRUCT ROCK SOCKETS WILL NOT BE ALLOWED WITHIN 5 FEET OF THE NYCT STRUCTURE. 16. VIBRATORY HAMMERS WILL NOT BE PERMITTED WITHIN 75 FEET OF SUBWAY STRUCTURES. HOERAMS WILL NOT BE PERMITTED WITHIN 25 FEET OF SUBWAY STRUCTURES. 17. DYNAMIC COMPACTION METHODS USING DROPPED HEAVY WEIGHTS CANNOT BE CONDUCTED WITHIN 1000 FEET OF ANY NYCT STRUCTURE UNLESS IT IS SHOWN THAT INDUCED SETTLEMENTS AND VIBRATIONS WILL NOT DAMAGE THESE STRUCTURES. A SUITABLE MONITORING PLAN INCLUDING SETTLEMENT AND VIBRATION MEASUREMENTS MUST BE APPROVED BY NYCT’S ENGINEER FOR ALL SUCH OPERATIONS WITHIN THESE DISTANCES. 18. THERE SHALL BE NO MACHINE EXCAVATION WITHIN 3 FEET OF NYCT STRUCTURES, POWER DUCT LINES, OR ANY OTHER FACILITIES UNTIL THEY HAVE BEEN CAREFULLY EXPOSED BY HAND EXCAVATION. 19.. ALL DEWATERING OPERATIONS CONDUCTED WITHIN 500 FEET OF THE NYCT STRUCTURE MUST BE PERFORMED IN ACCORDANCE WITH DRAWINGS AND PROCEDURES SUBMITTED TO NYCT FOR APPROVAL. THE DISTANCE FROM THE STRUCTURE TO THE DEWATERING OPERATION CAN BE REDUCED PROVIDED THAT SOIL CONDITIONS AT THE SITE INDICATE THAT THE RADIUS OF INFLUENCE OF THE DEWATERING IS LESS THAN 500 FEET. FOR DEWATERING WITHIN THE RADIUS OF INFLUENCE, THE DEWATERING PROGRAM MUST BE SHOWN TO HAVE NEGLIGIBLE INFLUENCE ON SETTLEMENTS OF THE NYCT STRUCTURE. 20. SUBWAY ENTRANCES (VENTILATORS, ETC.) ARE TO BE UNDERPINNED OR SHORED AND BRACED IF DIRECTED BY NYCT'S ENGINEER. 21. NYCT, AT ITS DISCRETION, RESERVES THE RIGHT TO REQUIRE THE PROJECT TO CLOSE OR MAINTAIN AND PROTECT EXISTING SUBWAY ENTRANCES, VENTILATORS, ETC. ADJACENT TO THE PROJECT DURING CONSTRUCTION. SUCH CONSTRUCTION MAY INCLUDE UNDERPINNING, SHORING, BRACING AND ERECTION OF SUITABLE BARRICADES AND/OR CANOPIES AND SHIELDS. SUCH PROTECTION SHALL BE IN ACCORDANCE WITH DRAWINGS SUBMITTED TO NYCT FOR APPROVAL. 22. IF SHIELDS ARE TO BE INSTALLED TO PROTECT NYCT FACILITIES AND/OR THE PUBLIC, PLANS SHOWING THE LOCATION, TYPE AND METHOD OF ATTACHMENT TO THE TRANSIT STRUCTURE MUST BE SUBMITTED TO NYCT FOR APPROVAL. 23. ALL LUMBER AND PLYWOOD USED FOR PROTECTION OF SUBWAY FACILITIES MUST BE FIRE RETARDANT. 24. SUBWAY EMERGENCY EXITS MUST BE KEPT CLEAR AT ALL TIMES. 25. IN EXCAVATING OVER OR NEAR THE SUBWAY ROOF, SPECIAL CARE SHALL BE EXERCISED SO THAT THE THIN CONCRETE PROTECTION OF THE SUBWAY WATERPROOFING IS NOT DAMAGED. 26. BURNING OF, WELDING TO OR DRILLING THROUGH EXISTING STEEL STRUCTURES WILL NOT BE PERMITTED EXCEPT AS SHOWN ON DRAWINGS APPROVED BY NYCT. 27. HORIZONTAL AND VERTICAL CONTROL SURVEY DATA OF THE EXISTING NYCT STRUCTURE IS TO BE TAKEN BY A LICENSED LAND SURVEYOR TO MONITOR ANY MOVEMENTS THAT OCCUR DURING CONSTRUCTION AND TO SHOW THAT THE INDUCED MOVEMENTS ARE WITHIN ALLOWABLE PROVIDED AND APPROVED BY NYCT’S ENGINEER. IF ANY MOVEMENTS EXCEED ALLOWABLE, REMEDIATION AS APPROVED BY NYCT SHALL BE PERFORMED. 28. BUS ROUTES AFFECTED BY THE PROJECT WILL OR MAY REQUIRE BUS DIVERSIONS. THESE ARRANGEMENTS SHALL BE MADE THROUGH MS. SARAH WYSS ACTING DIRECTOR, OPERATIONS PLANNING NEW YORK CITY TRANSIT 2 BROADWAY, ROOM A17.82 NEW YORK, NEW YORK 10004 TELEPHONE NUMBER 646/252-5517 WHEN IMPACTING ANY BUS STOP, SPECIAL OPERATIONS MUST BE NOTIFIED TWO WEEKS IN ADVANCE. 29. DUCT LINES MUST BE MAINTAINED AND PROTECTED DURING CONSTRUCTION. ANY INTERFERENCE WITH DUCT LINES SHOULD BE REPORTED TO NYCT INSPECTOR. WHEN A DUCT LINE CONTAINING CABLES IS TO BE REMOVED, OR WHEN MASONRY ADJACENT THERETO IS TO BE REMOVED, PENETRATED, OR DRILLED, THE WORK SHALL BE DONE WITH HAND LABOR ENTIRELY, USING HAMMER AND CHISEL. JACKHAMMERS, BULL POINTS OR OTHER POWER EQUIPMENT SHALL NOT BE USED. 30. WHERE MANHOLES ARE ENCOUNTERED: A) THEY SHALL BE PROTECTED AND RAISED OR LOWERED AS REQUIRED, TO MATCH THE NEW STREET GRADE. B) IF MANHOLE COVERS ARE RAISED OR LOWERED, PROTECT CABLES IN MANHOLE BY WOOD SHEETING OF 2” NOMINAL THICKNESS. C) PRIOR TO THE START OF CONSTRUCTION OPERATIONS AFFECTING MANHOLES AND DUCT LINES, SEVEN DAYS NOTICE MUST BE GIVEN TO MR. JOHN MALVASIO, P.E., DIRECTOR, DEPARTMENT OF MAINTENANCE OF WAY, AT 718/694-1358. 31. CONSTRUCTION WORK DONE NEAR VENT GRATINGS AND HATCHES SHALL BE AS FOLLOWS: A) UNLESS APPROVED BY THE NYCT’S ENGINEER, ALL VENT GRATINGS AND HATCHES SHOULD REMAIN OUTSIDE THE CONSTRUCTION SITE, SEPARATED BY A CONSTRUCTION FENCE. PROTECTIVE SHIELDS MUST BE PROVIDED OVER VENT GRATINGS AS REQUIRED BY NYCT’S ENGINEER. B) NO BUILDING MATERIAL, VEHICLES OR CONSTRUCTION EQUIPMENT IS TO BE STORED OR RUN OVER VENT, GRATINGS, HATCHES OR EMERGENCY EXITS. C) DETAILS OF SIDEWALK RECONSTRUCTION AROUND VENT GRATINGS, HATCHES AND EMERGENCY EXITS ARE TO BE SUBMITTED TO NYCT FOR APPROVAL. 32. TRACTORS, CRANES, EXCAVATORS, ETC. USED IN THE VICINITY OF THE ELEVATED STRUCTURES SHALL BE ISOLATED FROM THE GROUND. SINCE THE ELEVATED STRUCTURE IS USED AS A NEGATIVE RETURN PATH, WITH A CONSEQUENT POTENTIAL BETWEEN IT AND THE GROUND, ANY CONTACT BETWEEN THE STRUCTURE AND GROUNDED EQUIPMENT COULD RESULT IN BURNING OF THE STEEL. 33. TEMPORARY CONSTRUCTION SHEDS, BARRICADES OR PLYWOOD PARTITIONS MUST BE A MINIMUM OF 5’-0” FROM EDGE OF FINISHED PLATFORM. NEW YORK CITY TRANSIT OUTSIDE CONTRACT INSURANCE REQUIREMENTS 2. GENERAL REQUIREMENTS APPLICABLE TO INSURANCE POLICIES. A. ALL OF THE INSURANCE REQUIRED BY THIS ARTICLE SHALL BE WITH COMPANIES LICENSED OR AUTHORIZED TO DO BUSINESS IN THE STATE OF NEW YORK WITH AN A.M. BEST COMPANY RATING OF NOT LESS THAN A-/VII OR BETTER ANDREASONABLY APPROVED BY THE PERMITTOR/MTA AND SHALL DELIVER EVIDENCE OF SUCH POLICIES. B. EXCEPT FOR WORKERS COMPENSATION, ALL REFERENCES TO FORMS AND COVERAGES REFERRED TO ABOVE SHALL BE THE MOST RECENT USED BY THE INSURANCE SERVICES OFFICE, INC. ("ISO") OR EQUIVALENT FORMS APPROVED BY THE INSURANCE DEPARTMENT OF THE STATE OF NEW YORK, PROVIDED, HOWEVER, THAT EXCESS COVERAGES MAY BE WRITTEN ON FORMS REASONABLY ACCEPTABLE TO PERMITTOR CONTAINING PROVISIONS OTHER THAN THOSE CONTAINED IN ISO FORMS BUT OTHERWISE CONFORMING IN SUBSTANCE TO THE REQUIREMENTS OF THIS ARTICLE. C. THE PERMITTEE OR ITS CONTRACTOR PERFORMING THE WORK SHALL FURNISH EVIDENCE OF ALL POLICIES BEFORE ANY WORK IS STARTED TO THE PERMITTOR: FOR NYCT CONTRACT INSPECTION C/O MR. JOHN MALVASIO DIRECTOR, MOW ENGINEERING 130 LIVINGSTON STREET, ROOM 8044F BROOKLYN, NY 11201 TELEPHONE: (718) 694-1358 THESE POLICIES MUST: (I) BE WRITTEN IN ACCORDANCE WITH THE REQUIREMENTS OF THE PARAGRAPHS ABOVE, APPLICABLE; (II) BE ENDORSED IN FORM ACCEPTABLE TO INCLUDE A PROVISION THAT THE POLICY WILL NOT BE CANCELED, MATERIALLY CHANGED, OR NOT RENEWED, UNLESS OTHERWISE INDICATED HEREIN, AT LEAST THIRTY (30) DAYS PRIOR WRITTEN NOTICE TO THE PERMITTOR C/O MTA RISK AND INSURANCE MANAGEMENT DEPARTMENT - STANDARDS, ENFORCEMENT & CLAIMS UNIT, 2 BROADWAY – 21ST FLOOR, NEW YORK, NY 10004; AND (III) STATE OR BE ENDORSED TO PROVIDE THAT THE COVERAGE AFFORDED UNDER THE CONTRACTOR’S POLICIES SHALL APPLY ON A PRIMARY AND NOT ON AN EXCESS OR CONTRIBUTING BASIS WITH ANY POLICIES WHICH MAY BE AVAILABLE TO THE PERMITTOR/MTA, AND ALSO THAT THE CONTRACTOR’S POLICIES, PRIMARY AND EXCESS, MUST BE EXHAUSTED BEFORE IMPLICATING ANY PERMITTOR/MTA POLICY AVAILABLE. (IV) IN ADDITION, CONTRACTOR’S POLICIES SHALL STATE OR BE ENDORSED TO PROVIDE THAT, IF A SUBCONTRACTOR’S POLICY CONTAINS ANY PROVISION THAT MAY ADVERSELY AFFECT WHETHER CONTRACTOR’S POLICIES ARE PRIMARY AND MUST BE EXHAUSTED BEFORE IMPLICATING ANY PERMITTOR/MTA POLICY AVAILABLE, CONTRACTOR’S AND SUBCONTRACTOR’S POLICIES SHALL NEVERTHELESS BE PRIMARY AND MUST BE EXHAUSTED BEFORE IMPLICATING ANY PERMITTOR/MTA POLICY AVAILABLE. EXCEPT FOR PROFESSIONAL LIABILITY, POLICIES WRITTEN ON CLAIMS MADE BASIS ARE NOT ACCEPTABLE. AT LEAST TWO (2) WEEKS PRIOR TO THE EXPIRATION OF THE POLICIES, CONTRACTOR SHALL ENDEAVOR TO PROVIDE EVIDENCE OF RENEWAL OR REPLACEMENT POLICIES OF INSURANCE, WITH TERMS AND LIMITS NO LESS FAVORABLE THAN THE EXPIRING POLICIES. EXCEPT AS OTHERWISE INDICATED IN THE DETAILED COVERAGE PARAGRAPHS BELOW, SELF INSURED RETENTIONS AND POLICY DEDUCTIBLES SHALL NOT EXCEED $100,000, UNLESS SUCH INCREASED DEDUCTIBLE OR RETENTION IS APPROVED BY PERMITTOR/MTA. THE PERMITTEE SHALL BE RESPONSIBLE FOR ALL CLAIM EXPENSE AND LOSS PAYMENTS WITHIN THE DEDUCTIBLE OR SELF-INSURED RETENTION. THE INSURANCE MONETARY LIMITS REQUIRED HEREIN MAY BE MET THROUGH THE COMBINED USE OF THE INSURED’S PRIMARY AND UMBRELLA/EXCESS POLICIES. D. CERTIFICATES OF INSURANCE MAY BE SUPPLIED AS EVIDENCE OF POLICIES OF THE ABOVE POLICIES, EXCEPT THE RAILROAD PROTECTIVE LIABILITY POLICY, DESIGNATED AS POLICY D. HOWEVER, IF REQUESTED BY THE PERMITTOR, THE PERMITTEE SHALL DELIVER TO THE AUTHORITY, WITHIN FORTY-FIVE (45) DAYS OF THE REQUEST, A COPY OF SUCH POLICIES, CERTIFIED BY THE INSURANCE CARRIER AS BEING TRUE AND COMPLETE. THE RAILROAD PROTECTIVE LIABILITY INSURANCE POLICY MUST BE PROVIDED IN THE FORM OF THE ORIGINAL POLICY. A DETAILED INSURANCE BINDER MAY BE PROVIDED, ACORD OR MANUSCRIPT FORM, PENDING ISSUANCE OF THE ORIGINAL POLICY. THE ORIGINAL POLICY E. IF A CERTIFICATE OF INSURANCE IS SUBMITTED, IT MUST: (1) BE PROVIDED ON THE PERMITTOR CERTIFICATE OF INSURANCE FORM OR MTA CERTIFICATE OF INSURANCE FORM FOR JOINT AGENCY AGREEMENTS; (2) BE SIGNED BY AN AUTHORIZED REPRESENTATIVE OF THE INSURANCE CARRIER OR PRODUCER AND NOTARIZED; (3) DISCLOSE ANY DEDUCTIBLE, SELF-INSURED RETENTION, SUB-LIMIT, AGGREGATE LIMIT OR ANY EXCLUSIONS TO THE POLICY THAT MATERIALLY CHANGE THE COVERAGE; (4) INDICATE THE ADDITIONAL INSUREDS AND NAMED INSUREDS AS REQUIRED HEREIN, ALONG WITH A PHYSICAL COPY OF THE ADDITIONAL INSURED ENDORSEMENT ( I.S.O. FORM CG 20 26 07/04 VERSION OR EQUIVALENT), AS APPLICABLE AND THE ENDORSEMENT(S) MUST INCLUDE POLICY NUMBER(S); (5) REFERENCE THE CONTRACT BY NUMBER ON THE FACE OF THE CERTIFICATE; AND (6) EXPRESSLY REFERENCE THE INCLUSION OF ALL REQUIRED ENDORSEMENTS. F. THE MINIMUM AMOUNTS OF INSURANCE REQUIRED IN THE DETAIL DESCRIPTION OF POLICIES A, B C, AND D ABOVE SHALL NOT BE CONSTRUED TO LIMIT THE EXTENT OF THE PERMITTEE’S LIABILITY UNDER THIS AGREEMENT. G. IF, AT ANY TIME DURING THE PERIOD OF THIS AGREEMENT, INSURANCE AS REQUIRED IS NOT IN EFFECT, OR PROOF THEREOF IS NOT PROVIDED TO THE PERMITTOR, THE PERMITTOR SHALL HAVE THE OPTIONS TO: (I) DIRECT THE PERMITTEE TO SUSPEND WORK OR OPERATION WITH NO ADDITIONAL COST OR EXTENSION OF TIME DUE ON ACCOUNT THEREOF; OR (II) TREAT SUCH FAILURE AS AN EVENT OF DEFAULT. NEW YORK CITY TRANSIT OUTSIDE CONTRACT INSURANCE REQUIREMENTS 1. THE PERMITTEE AT ITS SOLE COST AND EXPENSE SHALL CARRY OR CAUSE TO CARRIED AND SHALL MAINTAIN AT ALL TIMES DURING THE PERIOD OF PERFORMANCE UNDER THIS AGREEMENT POLICIES OF INSURANCE AS HEREIN BELOW SET FORTH BELOW: A. WORKERS’ COMPENSATION INSURANCE (INCLUDING EMPLOYER'S LIABILITY INSURANCE) WITH LIMITS OF NOT LESS THAN $2,000,000, WHICH LIMIT MAY BE MET BY A COMBINATION OF PRIMARY AND EXCESS INSURANCE MEETING THE STATUTORY LIMITS OF NEW YORK STATE. THE POLICY SHALL BE ENDORSED TO INCLUDE LONGSHOREMAN’S AND HARBOR WORKERS' COMPENSATION ACT/MARITIME COVERAGE ENDORSEMENT AND/OR JONES ACT ENDORSEMENT WHEN APPLICABLE. B. COMMERCIAL GENERAL LIABILITY INSURANCE (I.S.O. 2001 FORM OR EQUIVALENT) APPROVED BY PERMITTOR IN THE PERMITTEE’S NAME WITH LIMITS OF LIABILITY IN THE AMOUNT OF AT LEAST $3,000,000 FOR EACH OCCURRENCE ON A COMBINED SINGLE LIMIT BASIS FOR INJURIES TO PERSONS (INCLUDING DEATH) AN DAMAGE TO PROPERTY, $3,000,000 GENERAL AGGREGATE AND $3,000,000 IN THE AGGREGATE WITH RESPECT TO PRODUCTS/COMPLETED OPERATIONS. THE LIMITS MAY BE PROVIDED IN THE FORM OF A PRIMARY PLICY OR COMBINATION OF PRIMARY AND UMBRELLA/EXCESS POLICY. WHEN THE MINIMUM CONTRACT AMOUNTS CAN ONLY BE MET WHEN APPLYING THE UMBRELLA/EXCESS POLICY, THE UMBRELLA/EXCESS POLICY MUST FOLLOW FORM OF THE UNDERLYING POLICY AND BE EXTENDED TO “DROP DOWN” TO BECOME PRIMARY IN THE EVENT PRIMARY LIMITS ARE REDUCED OR AGGREGATE LIMITS ARE EXHAUSTED. SUCH INSURANCE SHALL BE PRIMARY AND NON-CONTRIBUTORY TO ANOTHER VALID AND COLLECTIBLE INSURANCE AND MUST BE EXHAUSTED BEFORE IMPLICATING ANY PERMITTOR/MT POLICY AVAILABLE. SUCH POLICY SHOULD BE WRITTEN ON AN OCCURRENCE FORM, AND SHALL INCLUDE: * CONTRACTUAL COVERAGE FOR LIABILITY ASSUMED BY THE PERMITTEE UNDER THIS AGREEMENT; * PERSONAL AND ADVERTISING INJURY COVERAGE; * PRODUCTS-COMPLETED OPERATIONS; * INDEPENDENT CONTRACTORS COVERAGE; * "XCU" COVERAGE (EXPLOSION, COLLAPSE, AND UNDERGROUND HAZARDS) WHERE NECESSARY; * CONTRACTUAL LIABILITY EXCLUSION, APPLICABLE TO CONSTRUCTION OR DEMOLITION OPERATIONS TO BE PERFORMED WITHIN 50 FEET OF RAILROAD TRACKS, MUST BE VOIDED, WHERE NECESSARY; AND * ADDITIONAL INSURED ENDORSEMENT (I.S.O. FORM CG 20 26 07/04 VERSION OR EQUIVALENT) APPROVED BY THE PERMITTOR NAMING: ** NEW YORK CITY TRANSIT AUTHORITY (NYCTA), THE MANHATTAN AND BRONX SURFACE TRANSIT OPERATING AUTHORITY (MABSTOA), THE STATEN ISLAND RAPID TRANSIT OPERATING AUTHORITY (SIRTOA), MTA CAPITAL CONSTRUCTION CO., THE METROPOLITAN TRANSPORTATION AUTHORITY (MTA) INCLUDING ITS SUBSIDIARIES AND AFFILIATES, AND THE CITY OF NEW YORK (AS OWNER). C. BUSINESS AUTOMOBILE LIABILITY INSURANCE POLICY (I.S.O. FORM CA 00 01 10 01 OR EQUIVALENT) APPROVED BY THE PERMITTOR IS REQUIRED IF PERMITEE'S VEHICLE ENTERS PERMITTOR PROPERTY. THE INSURANCE MUST BE IN THE NAME OF THE PERMITTEE OR ITS CONTRACTOR ENTERING THE PERMITTOR PROPERTY WITH LIMITS OF LIABILITY IN THE AMOUNT OF $2,000,000 EACH ACCIDENT FOR CLAIMS FOR BODILY INJURIES (INCLUDING DEATH) TO PERSONS AND FOR DAMAGE TO PROPERTY ARISING OUT OF THE OWNERSHIP, MAINTENANCE OR USE OF ANY OWNED, HIRED OR NON-OWNED MOTOR VEHICLE. D. RAILROAD PROTECTIVE LIABILITY INSURANCE (ISO-RIMA OR EQUIVALENT FORM) APPROVED BY PERMITTOR COVERING THE WORK TO BE PERFORMED AT THE DESIGNATED JOB SITE AND AFFORDING PROTECTION FOR DAMAGES ARISING OUT OF BODILY INJURY OR DEATH, PHYSICAL DAMAGE TO OR DESTRUCTION OF PROPERTY, INCLUDING DAMAGE TO THE INSURED’S OWN PROPERTY AND CONFORMING TO THE FOLLOWING: * THE FOLLOWING ARE THE “NAMED INSUREDS” FOR THIS COVERAGE: ** NEW YORK CITY TRANSIT AUTHORITY (NYCTA), THE MANHATTAN AND BRONX SURFACE TRANSIT OPERATING AUTHORITY (MABSTOA), THE STATEN ISLAND RAPID TRANSIT OPERATING AUTHORITY (SIRTOA), MTA CAPITAL CONSTRUCTION CO., THE METROPOLITAN TRANSPORTATION AUTHORITY (MTA) INCLUDING ITS SUBSIDIARIES AND AFFILIATES, AND THE CITY OF NEW YORK (AS OWNER). * THE LIMIT OF LIABILITY SHALL BE $2,000,000 AT LEAST EACH OCCURRENCE, SUBJECT TO A $6,000,000 ANNUAL AGGREGATE; * POLICY ENDORSEMENT CG 28 31 - POLLUTION EXCLUSION AMENDMENT IS REQUIRED TO BE ENDORSED ONTO THE POLICY WHEN ENVIRONMENTAL-RELATED WORK AND/OR EXPOSURES EXIST. * INDICATE THE NAME AND ADDRESS OF THE CONTRACTOR TO PERFORM THE WORK, THE CONTRACT # AND THE NAME OF THE RAILROAD PROPERTY WHERE THE WORK IS BEING PERFORMED AND THE AGENCY PERMIT. * EVIDENCE OF RAILROAD PROTECTIVE LIABILITY INSURANCE, MUST BE PROVIDED IN THE FORM OF THE ORIGINAL POLICY. A DETAILED INSURANCE BINDER (ACORD OR MANUSCRIPT FORM) WILL BE ACCEPTED PENDING ISSUANCE OF THE ORIGINAL POLICY, WHICH MUST BE PROVIDED WITHIN 30 DAYS OF THE BINDER APPROVAL. E. ENVIRONMENTAL/POLLUTION EXPOSURES: IN THE EVENT ENVIRONMENTAL OR POLLUTION EXPOSURES EXIST; THE PERMITTEE SHALL REQUIRE THE ENVIRONMENTAL CONTRACTOR OR SUB-CONTRACTOR TO PROVIDE THE APPLICABLE INSURANCE COVERING SUCH EXPOSURE. THE LIMITS AND TYPE OF INSURANCE PROVIDED SHALL BE SATISFACTORY TO THE PERMITTOR AND WILL BE CONFIRMED TO THE PARTIES PRIOR TO THE START OF THE WORK. STRUCTURE NOTIFY NYCT ENGINEER STOP WORK ELEVATED 1/8 INCH 1/4 INCH SUBWAY 1/4 INCH 1/2 INCH NEW YORK CITY TRANSIT "NOT FOR BENEFIT" INSURANCE REQUIREMENTS SECTION C: GENERAL INSURANCE REQUIREMENTS 1. INSURANCE COMPANIES: ALL OF THE INSURANCE REQUIRED BY THIS ARTICLE SHALL BE WITH COMPANIES LICENSED OR AUTHORIZED TO DO BUSINESS IN THE STATE OF NEW YORK WITH AN A.M. BEST COMPANY RATING OF NOT LESS THAN A-/VII OR BETTER AND REASONABLY APPROVED BY THE PERMITTOR/MTA. 2. FORMS: ALL FORMS SHALL COMPLY WITH THE INSURANCE SERVICES OFFICE, INC. ("ISO") OR ITS EQUIVALENT APPROVED BY THE INSURANCE DEPARTMENT OF THE STATE OF NEW YORK 3. POLICY DEDUCTIBLE / SELF INSURED RETENTION: INSURANCE MAY CONTAIN A DEDUCTIBLE AND OR SELF-INSURED RETENTION AND SHALL NOT EXCEED $100,000. THE PERMITTEE SHALL BE RESPONSIBLE FOR ALL CLAIM EXPENSES AND LOSS PAYMENTS WITHIN THE DEDUCTIBLE OR SELF-INSURED RETENTION. 4. POLICY TERMS: THESE POLICIES MUST: (I) BE WRITTEN IN ACCORDANCE WITH THE REQUIREMENTS OF THE PARAGRAPHS ABOVE, AS APPLICABLE; (II) BE ENDORSED IN FORM ACCEPTABLE TO INCLUDE A PROVISION THAT SHOULD THE POLICY BE CANCELED, MATERIALLY CHANGED, OR NOT RENEWED, NOTICE SHALL BE DELIVERED IN ACCORDANCE WITH THE INSURANCE POLICY PROVISIONS TO THE PERMITTOR, AND (III) STATE OR BE ENDORSED TO PROVIDE THAT THE COVERAGE AFFORDED UNDER THE PERMITTEE'S POLICIES SHALL APPLY ON A PRIMARY AND NOT ON AN EXCESS OR CONTRIBUTING BASIS WITH ANY POLICIES WHICH MAY BE AVAILABLE TO THE PERMITTOR/MTA, AND ALSO THAT THE PERMITTEE'S POLICIES, PRIMARY AND EXCESS, MUST BE EXHAUSTED BEFORE IMPLICATING ANY PERMITTOR/MTA POLICY AVAILABLE. (IV) IN ADDITION, PERMITTEE'S POLICIES SHALL STATE OR BE ENDORSED TO PROVIDE THAT, IF A SUBCONTRACTOR'S POLICY CONTAINS ANY PROVISION THAT MAY ADVERSELY AFFECT WHETHER PERMITTEE'S POLICIES ARE PRIMARY AND MUST BE EXHAUSTED BEFORE IMPLICATING ANY PERMITTOR/MTA POLICY AVAILABLE, PERMITTEE'S AND SUBCONTRACTOR'S POLICIES SHALL NEVERTHELESS BE PRIMARY AND MUST BE EXHAUSTED BEFORE IMPLICATING ANY PERMITTOR/MTA POLICY AVAILABLE. AT LEAST TWO (2) WEEKS PRIOR TO THE EXPIRATION OF THE POLICIES, THE PERMITTEE SHALL ENDEAVOR TO PROVIDE EVIDENCE OF RENEWAL OR REPLACEMENT POLICIES OF INSURANCE, WITH TERMS AND LIMITS NO LESS FAVORABLE THAN THE EXPIRING POLICIES. SECTION D: SUBMISSION OF INSURANCE CERTIFICATES OF INSURANCE MAY BE SUPPLIED AS EVIDENCE OF POLICIES EXCEPT FOR RAILROAD PROTECTIVE LIABILITY. HOWEVER, IF REQUESTED BY THE PERMITTOR, THE PERMITTEE SHALL DELIVER TO THE PERMITTOR WITHIN FORTY-FIVE (45) DAYS A COPY OF SUCH POLICIES, CERTIFIED BY THE INSURANCE CARRIER AS BEING TRUE AND COMPLETE. IF A CERTIFICATE OF INSURANCE IS SUBMITTED, IT MUST: (1) BE PROVIDED ON THE PERMITTOR CERTIFICATE OF INSURANCE; (2) BE SIGNED BY AN AUTHORIZED REPRESENTATIVE OF THE INSURANCE CARRIER OR PRODUCER AND NOTARIZED; (3) DISCLOSE ANY DEDUCTIBLE, SELF-INSURED RETENTION, SUB-LIMIT, AGGREGATE LIMIT OR ANY EXCLUSIONS TO THE POLICY THAT MATERIALLY CHANGE THE COVERAGE; (4) INDICATE THE ADDITIONAL INSUREDS AS REQUIRED HEREIN UNDER SECTION B; THE PERMITTEE MUST PROVIDE A COPY OF THE ADDITIONAL INSURED ENDORSEMENT (ISO) FORM CG 20 26 07/04 OR ITS EQUIVALENT AND MUST REFERENCE THE POLICY INFORMATION; (5) INDICATE PROJECT NAME AND LOCATION ON THE CERTIFICATE; AND (6) EXPRESSLY REFERENCE THE INCLUSION OF ALL REQUIRED ENDORSEMENTS. THE PERMITTEE OR ITS CONTRACTOR/SUBCONTRACTOR PERFORMING THE WORK SHALL FURNISH EVIDENCE OF ALL POLICIES BEFORE ANY WORK IS STARTED TO THE APPROPRIATE DEPARTMENT: NEW AGREEMENTS: RENEWAL INSURANCE: MTA/NYCT MOW ENGINEERING MTA RISK INSURANCE MANAGEMENT ATTENTION: MR. JOHN MALVASIO ATTENTION: RUTH APOSTOL 130 LIVINGSTON STREET 2 BROADWAY - 21ST FLOOR BROOKLYN, NY 11201 NEW YORK, NY 10004 SECTION E: NO LIMIT OF LIABILITY THE MINIMUM AMOUNTS OF INSURANCE REQUIRED IN THE DETAIL DESCRIPTION OF POLICIES ABOVE SHALL NOT BE CONSTRUED TO LIMIT THE EXTENT OF THE PERMITTEE'S LIABILITY UNDER THIS AGREEMENT. SECTION F: RIGHT TO REQUEST ADDITIONAL INSURANCE PERMITTEE FURTHER AGREES TO PROVIDE, AT PERMITTEE'S SOLE COST AND EXPENSE, SUCH INCREASED OR EXPANDED INSURANCE COVERAGE AS PERMITTOR MAY FROM TIME TO TIME AS DEEM APPROPRIATE. SECTION G: EVENT OF DEFAULT IF, AT ANY TIME DURING THE PERIOD OF THIS AGREEMENT, INSURANCE AS REQUIRED IS NOT IN EFFECT, OR PROOF THEREOF IS NOT PROVIDED TO THE PERMITTOR, THE PERMITTOR SHALL HAVE THE OPTIONS TO: (I) DIRECT THE PERMITTEE TO SUSPEND WORK OR OPERATION WITH NO ADDITIONAL COST OR EXTENSION OF TIME DUE ON ACCOUNT THEREOF; OR (II) TREAT SUCH FAILURE AS AN EVENT OF DEFAULT. SECTION H: NOTICE OF CLAIM THE PERMITTEE SHALL IMMEDIATELY FILE WITH NYCT/MTA'S TORT DIVISION (WITH A COPY TO THE PROJECT MANAGER), 130 LIVINGSTON STREET, 11TH FLOOR, BROOKLYN, NEW YORK 11201, A NOTICE OF ANY OCCURRENCE LIKELY TO RESULT IN A CLAIM AGAINST NYCT/MTA AND SHALL ALSO FILE WITH THE TORTS DIVISION DETAILED SWORN PROOF OF INTEREST AND LOSS WITH THE CLAIM. THIS PARAGRAPH SHALL SURVIVE THE EXPIRATION OR EARLIER TERMINATION OF THE CONTRACT. NEW YORK CITY TRANSIT "NOT FOR BENEFIT" INSURANCE REQUIREMENTS SECTION A: INSURANCE REQUIREMENTS THE PERMITTEE AT ITS SOLE COST AND EXPENSE SHALL CARRY AND MAINTAIN POLICIES OF INSURANCE AT ALL TIMES DURING THE PERIOD OF PERFORMANCE UNDER THIS AGREEMENT AS HEREIN SET FORTH BELOW: 1. WORKERS' COMPENSATION: INCLUDING EMPLOYER'S LIABILITY INSURANCE WITH LIMITS OF LIABILITY NOT LESS THAN $2,000,000 WHICH MAY BE MET BY A COMBINATION OF PRIMARY AND EXCESS INSURANCE MEETING THE STATUTORY LIMITS OF NEW YORK STATE. 2. COMMERCIAL GENERAL LIABILITY: (ISO 2001 FORM OR EQUIVALENT) APPROVED BY PERMITTOR IN THE PERMITTEE'S NAME WITH LIMITS OF LIABILITY IN THE AMOUNT OF NOT LESS THAN $3,000,000 FOR EACH OCCURRENCE ON A COMBINED SINGLE LIMIT BASIS FOR INJURIES TO PERSONS (INCLUDING DEATH) AND DAMAGE TO PROPERTY, $3,000,000 GENERAL AGGREGATE AND $3,000,000 IN THE AGGREGATE WITH RESPECT TO PRODUCTS/COMPLETED OPERATIONS. THE LIMITS MAY BE PROVIDED IN THE FORM OF A PRIMARY POLICY OR COMBINATION OF PRIMARY AND UMBRELLA/EXCESS POLICY. WHEN THE MINIMUM CONTRACT AMOUNTS CAN ONLY BE MET WHEN APPLYING THE UMBRELLA/EXCESS POLICY, THE UMBRELLA/EXCESS POLICY MUST FOLLOW FORM OF THE UNDERLYING POLICY AND BE EXTENDED TO “DROP DOWN” TO BECOME PRIMARY IN THE EVENT PRIMARY LIMITS ARE REDUCED OR AGGREGATE LIMITS ARE EXHAUSTED. SUCH INSURANCE SHALL BE PRIMARY AND NON-CONTRIBUTORY TO ANY OTHER VALID AND COLLECTIBLE INSURANCE AND MUST BE EXHAUSTED BEFORE IMPLICATING ANY PERMITTOR/MTA POLICY AVAILABLE. SUCH POLICY SHOULD BE WRITTEN ON AN OCCURRENCE FORM, AND SHALL INCLUDE THE FOLLOWING COVERAGES: * ADDITIONAL INSURED ENDORSEMENT (I.S.O. FORM CG 20 26 07/04) VERSION OR EQUIVALENT APPROVED BY THE PERMITTOR, SHALL NAME THE INDEMNITEES AS REFERENCED UNDER SECTION B OF THIS AGREEMENT AS ADDITIONAL INSUREDS. * CONTRACTUAL LIABILITY ASSUMED BY THE PERMITTEE UNDER THIS AGREEMENT; * PERSONAL AND ADVERTISING INJURY; * PRODUCTS-COMPLETED OPERATIONS; * INDEPENDENT CONTRACTORS; * "XCU" (EXPLOSION, COLLAPSE, AND UNDERGROUND HAZARDS) WHERE NECESSARY; * CONTRACTUAL LIABILITY EXCLUSION, APPLICABLE TO CONSTRUCTION OR DEMOLITION OPERATIONS TO BE PERFORMED WITHIN 50 FEET OF RAILROAD TRACKS, MUST BE REMOVED, WHERE NECESSARY; 3. BUSINESS AUTOMOBILE LIABILITY: (ISO FORM CA 00 01 10 01 OR EQUIVALENT) APPROVED BY THE PERMITTOR IS REQUIRED IF PERMITTEE'S VEHICLE ENTERS PERMITTOR'S PROPERTY. THE INSURANCE MUST BE IN THE NAME OF THE PERMITTEE OR ITS CONTRACTOR ENTERING THE PERMITTOR PROPERTY WITH LIMITS OF LIABILITY IN THE AMOUNT OF NOT LESS THAN $2,000,000 EACH ACCIDENT FOR CLAIMS FOR BODILY INJURIES (INCLUDING DEATH) TO PERSONS AND FOR DAMAGE TO PROPERTY ARISING OUT OF THE OWNERSHIP, MAINTENANCE OR USE OF ANY OWNED, HIRED OR NON-OWNED MOTOR VEHICLE. 4. RAILROAD PROTECTIVE LIABILITY: (ISO-RIMA OR EQUIVALENT FORM) APPROVED BY PERMITTOR COVERING THE WORK TO BE PERFORMED AT THE DESIGNATED JOB SITE AND AFFORDING PROTECTION FOR DAMAGES ARISING OUT OF BODILY INJURY OR DEATH, PHYSICAL DAMAGE TO OR DESTRUCTION OF PROPERTY, INCLUDING DAMAGE TO THE INSURED'S OWN PROPERTY AND CONFORMING TO THE FOLLOWING: * THE POLICY SHALL BE ISSUED TO THE “NAMED INSUREDS” LISTED UNDER SECTION B * THE LIMIT OF LIABILITY SHALL BE NOT LESS THAN $2,000,000 PER OCCURRENCE, SUBJECT TO A $6,000,000 ANNUAL AGGREGATE; * POLICY MUST BE ENDORSED TO PROVIDE COVERAGE FOR CLAIMS ARISING FROM INJURY TO EMPLOYEES COVERED BY FEDERAL EMPLOYER'S LIABILITY ACT (FELA). * INDICATE THE NAME AND ADDRESS OF THE DESIGNATED CONTRACTOR, PROJECT LOCATION AND DESCRIPTION OF WORK, AND PERMIT NUMBER IF APPLICABLE. * EVIDENCE OF RAILROAD PROTECTIVE LIABILITY INSURANCE, MUST BE PROVIDED IN THE FORM OF A POLICY. A DETAILED INSURANCE BINDER (ACORD OR MANUSCRIPT FORM) WILL BE ACCEPTED PENDING ISSUANCE OF THE POLICY, WHICH MUST BE PROVIDED WITHIN 30 DAYS FROM THE EFFECTIVE DATE. 5. ENVIRONMENTAL INSURANCE: IN THE EVENT ENVIRONMENTAL OR POLLUTION EXPOSURES EXIST, THE PERMITTEE SHALL REQUIRE THE ENVIRONMENTAL CONTRACTOR OR SUB-CONTRACTOR TO PROVIDE THE APPLICABLE INSURANCE COVERING SUCH EXPOSURE. THE LIMITS AND TYPES OF INSURANCE PROVIDED MUST BE SATISFACTORY TO THE PERMITTOR AND APPROVED PRIOR TO THE START OF THE WORK. ENVIRONMENTAL INSURANCE: IN THE EVENT ENVIRONMENTAL OR POLLUTION EXPOSURES EXIST, THE PERMITTEE SHALL REQUIRE THE ENVIRONMENTAL CONTRACTOR OR SUB-CONTRACTOR TO PROVIDE THE APPLICABLE INSURANCE COVERING SUCH EXPOSURE. THE LIMITS AND TYPES OF INSURANCE PROVIDED MUST BE SATISFACTORY TO THE PERMITTOR AND APPROVED PRIOR TO THE START OF THE WORK. SECTION B: INDEMNITEES (ADDITIONAL INSUREDS / NAMED INSUREDS) NEW YORK CITY TRANSIT AUTHORITY (“NYCT”), THE MANHATTAN AND BRONX SURFACE TRANSIT OPERATING AUTHORITY (“MABSTOA”), THE STATEN ISLAND RAPID TRANSIT OPERATING AUTHORITY (“SIRTOA”), THE METROPOLITAN TRANSPORTATION AUTHORITY (“MTA”) INCLUDING ITS SUBSIDIARIES AND AFFILIATES, MTA CAPITAL CONSTRUCTION (“MTACC”), MTA BUS COMPANY (“MTA BUS”), AND THE CITY OF NEW YORK (“CITY” AS OWNER) AND THE RESPECTIVE AFFILIATES AND SUBSIDIARIES EXISTING CURRENTLY OR IN THE FUTURE OF AND SUCCESSORS TO EACH INDEMNIFIED PARTIES LISTED HEREIN.
  • 3. 1STORYBRICK&STUCCOBUILDING 4 STORY BRICK BUILDING STUCCO BUILDING 1 STORY 3 STORY BRICK BUILDING BUILDING 3 STORY BRICK BRICK & BUILDING 3 STORY STUCCO UP UP UP 9-#8BOTT. 3-#8 BOTT. 3-#8 BOTT. 3-#8 TOP 3-#8 TOP 3-#8 BOTT. 4-#8 BOTT. 4-#8 BOTT. 3-#8 BOTT. 3-#8 BOTT. 2-#8 BOTT.3-#8 BOTT. 10-#8 BOTT.10-#8 BOTT.4-#8 BOTT.5-#8 BOTT.8-#8 BOTT.5-#8 BOTT.7-#8 BOTT.7-#8 BOTT. 2-#8BOTT. 5-#8BOTT. 4-#8 BOTT. 6-#8BOTT. 14-#8BOTT. 6-#8BOTT. 7-#8BOTT. 7-#8BOTT. 8-#8BOTT. 4-#8TOP 2-#8 TOP 2-#8 TOP 13-#8 BOTT. 8-#8BOTT. 4-#8 BOTT. 5-#8BOTT. 7-#8 BOTT. 6-#8BOTT. 3-#8BOTT. 3-#8BOTT. 3-#8BOTT. 6-#8 BOTT. 3-#8 BOTT. 3-#8BOTT. 3-#8 BOTT. 6-#8 BOTT. 10-#8 BOTT. 10-#8BOTT. 11-#8 BOTT. 7-#8BOTT. 7-#8 BOTT. 6-#8BOTT. 6-#8 BOTT. 4-#8 BOTT. 7-#8BOTT. 1 2 3 4 5 6 7 8 9 10 11 A.3 B D E F A.1 C 6.2 6.9 A.6 B.3 2.9 3.5 3 S-202 4 S-202 5 S-202 6 S-202 6.6 2.2 5.5 3.6 4.9 7.9 7.5 8.5 8.9 9.5 10.2 B.1 C.1 D.2 D.3 A.2 12 A 1 S-202 2 S-202 PC-4 PC-4 PC-4 PC-4 PC-4 PC-5 PC-5 PC-4 PC-5 PC-5 PC-4 PC-4 PC-5 PC-5 PC-4 PC-4 PC-4 PC-4 PC-4 PC-4 PC-4 PC-4 PC-5 PC-4 PC-4 PC-4 PC-4 PC-2 PC-2 PC-2 PC-2 PC-2 PC-2 PC-2 PC-2 PC-2 PC-2 PC-2 PC-2 PC-2 PC-5 PC-4 PC-4 PC-4 PC-4 PC-5 PC-5 PC-4 PC-5 PC-4 PC-4 PC-4 PC-4PC-2 PC-5 PC-4 W3 W2 W2 W1 W2 W9 W1 W1 D.1 C.2 4645 47 48 49 50 51 52 53 54 55 56 57 58 59 60 42 4140 39 38 37 36 3534 33 32 31 30 20.1 21 22 23 24 25 26 27 19 1817161514 12 3 4 5 6 7 8 9 13 PC-4 RAMP UP EAST 138TH STREET THIRDAVENUE PROPERTY LINE PROPERTY LINE PC-4 79"x79"x35" - PC-4 ELEVATOR SUMP PIT SEE PLMB. DWG. 10 18' - 2 3/8" 17' - 7 1/2" 22' - 6" 11' - 0 1/4" 19' - 8" 28' - 10 7/8" 23' - 0" 23' - 0" 20' - 0 7/8" 12' - 4" 12' - 0 5/8" 8'-0"19'-7"20'-0"24'-1"27'-1" 12'-63/4"8"3'-5"1'-1"2"11"16'-21/2"7'-01/2"1'-5"1'-7"2'-5" S-2 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3W3W3 W3W3W3W3W3W3W3W3 W3 1' - 8 1/2" 2' - 9 1/8" 1' - 10" 8 1/4" 4' - 10 7/8" 3' - 1 1/2" 9" 3' - 5 1/8" 2' - 2" 5 7/8" 10' - 6 1/8" 7' - 8 1/4" 13' - 1 1/2" 9' - 5" 9' - 4 7/8" 9' - 4 7/8" 8 S-307 MF2.0 MF2.0-5' - 0" W1 W1 W9 W1 W1 W1 W1 W2 W2 W3 W3 W4 W2 W1 79"x79"x35" - PC-4 79"x79"x35" - PC-4 PC-6 9 S-307 7 S-307 S-307 1 10 S-307 3 S-307 4 S-307 11 S-307 52° 3' - 0 5/8" S-302 3 6 S-307 11 S-307 SIM. SEWAGE EJECTOR PIT; SEE PLMB. DWGS 10 S-300 Sim MAT SLAB EXTENDED BELOW RAMP TO DIAGONAL WALL 1 S-308 2 S-308 EXIST. BELOW GRADE SUBWAY TUNNEL 19'-4"± 30'-10"± 31'-8"± 20' - 0" ± 17' - 10" ± EDGE OF CURB AT GRADE MASONRY WALL CONCRETE FOOTING CONCRETE WALL W8x10 L STEEL BEAM STEEL LINTEL (SEE SCHEDULE) INDICATE LEDGER ANGLE (SEE DETAIL) BENT STEEL FRAMING SHEAR CONNECTION MOMENT CONNECTION EMBEDDED PLATE CONNECTION (SEE SHED.) BEAM POCKET IN MASONRY (SEE SCHED.) BP: INDICATES STANDARD BEAM POCKET AP: INDICATES ACOUSTICALLY ISOLATED BEAM POCKET STEEL COLUMN STEEL COLUMN BELOW INDICATES COLUMN TRANSFER TR X-# SLAB (SEE SCHED.) ARROW INDICATES SPAN DIRECTION OF SLAB INDICATES TOP OF FOOTING ELEVATION COLUMN LINE (##'-##") # LEGEND EP-# BP-# MASONRY SHEAR WALL PCi t e c t s Dwg Title East 138th Street LLC 334-336 East 110th Street New York, N.Y. 10029 443 Park Avenue South New York, NY 10016 T: 212|689|7070 F: 212|545|1687 info@MHGArch.com www.MHGArch.com Client/Developer MHG Architects 443 Park Avenue South New York, N.Y. 10016 Architect Abel Bainnson Butz, LLP 80 8th Avenue, Suite 1105 New York, N.Y. 10011 Landscape Architect 88 University Place New York, N.Y. 10003 Structural Engineer Ettinger Engineering Associates 508 Eighth Avenue New York, N.Y. 10018 Mechanical/Electrical/Plumbing Engineer Scale Job No. Date Dwg No Seal NYC DOB Number 1522 255 East 138th Street Robert Silman Associates 1/8" = 1'-0" CELLAR PLAN 05/08/2013 13892 S-100.00 1/8" = 1'-0"S-100 1 CELLAR PLAN NOTES: 1. DATUM ELEVATION 0'-0" IS REFERENCED AS 12.54' 2. TOP OF SLAB ELEVATION IS -13'-3 3/4" UNLESS NOTED THUS (_'-_") ON PLAN. 3. S_ DENOTES CONCRETE SLAB . SEE SCHEDULE ON S-305.00. 4. TOP OF PILE CAPS AND MAT FOUNDATION ARE INTEGRAL WITH SLAB; SEE DETAILS ON S302.00. 5. REFER TO ARCHITECTURAL DRAWINGS FOR COLUMN HOLD POINTS AND PLAN DIMENSIONS FROM PROPERTY LINE. 6. MF_ DENOTE REINFORCED CONCRETE MAT FOUNDATION. SEE SCHEDULE ON S- 302.00. 7. W_ DENOTES REINFORCED CONCRETE WALL. SEE SCHEDULE ON S-202.00. 8. MW_ DENOTES REINFORCED CONCRETE MASONRY WALL. SEE WALL ELEVATIONS ON S-200.00 TO S-203.00. 9. MSW_ DENOTES REINFORCED CONCRETE MASONRY SHEAR WALL. SEE SHEAR WALL ELEVATIONS ON S-200.00 TO S-203.00. 10. C.J. DENOTES CONTROL JOINTS. SEE DETAIL SHEETS AND GENERAL NOTES. 11. PC_ DENOTE CONCRETE PILE CAP. REFER TO TYPICAL DETAILS ON S-302.00. ALL PILES SHALL BE DRILLED. 12. REFER TO S-001.00 FOR GENERAL NOTES. 13. GENERAL CONTRACTOR TO VERIFY ELEVATOR PIT DEPTH, HOISTWAY DIMENSIONS, AND ELEVATOR SUMP PIT DIMENSIONS WITH THE APPROVED ELEVATOR SHOP DRAWINGS AND WITH ELEVATOR MANUFACTURER. NOTIFY A/E IF REQUIREMENTS DIFFER FROM PLANS. 14. FOR SUPPORT OF EXCAVATION INFORMATION, INCLUDING PILE DESIGN INSTALLATION PROCEDURES, SEE FNA DRAWINGS. 15. WHEN REFERRING TO THE SUPPORT OF EXCAVATION DRAWINGS BY FNA, A VALUE OF 100.00' SHALL BE ADDED TO THE ELEVATIONS SHOWN ON THESE DRAWINGS FOR COMPARISON WITH BOROUGH PRESIDENT OF BRONX DATUM ELEVATIONS. NO R TH R e v . D a t e D e s c r i p t i o n 0 5 / 2 9 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T 0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A 0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
  • 4. 1STORYBRICK&STUCCOBUILDING 4 STORY BRICK BUILDING STUCCO BUILDING 1 STORY 3 STORY BRICK BUILDING BUILDING 3 STORY BRICK BRICK & BUILDING 3 STORY STUCCO UP UP UP 6-#6 8-#5 6-#66-#6 6-#6 12-#5 6-#66-#6 6-#6 12-#5 8-#6 8-#5 8-#6 8-#6 12-#5 7-#6 14-#6 6-#6 8-#6 8-#6 6-#6 6-#6 6-#6 6-#6 6-#6 6-#6 6-#6 8-#6 16-#5 22-#5 3-#6 4/#6 3-#6 11-#5 3-#6 11-#5 11-#5 8-#5 3-#6 12-#5 3-#63-#6 11-#5 3-#6 6-#6 10-#6 9-#5 6-#5 12-#5 16-#6 16-#6 8-#6 8-#6 16-#6 16-#6 16-#6 16-#5 6-#5 16-#5 5-#6 12-#5 6-#6 ? 8-#6 13-#6 17-#5 4-#6 5-#6 7-#6 7-#6 4-#6 8-#5 13-#5 15-#5 9-#5 11-#5 12-#5 12-#5 11-#5 11-#5 11-#5 11-#5 #5 @ 12" #5 @ 12" 10-#5 10-#5 10-#5 4-#6 10-#6 4-#6 8-#6 8-#6 8-#6 8-#6 12-#5 6-#6 6-#6 6-#6 12-#5 4-#6 12-#66-#6 12-#6 12-#58-#5 12-#5 6-#6 4-#6 6-#5 4-#6 8-#6 6-#5 8-#6 6-#5 6-#6 6-#5 8-#6 6-#5 8-#6 6-#5 8-#6 4-#6 4-#6 8-#6 8-#6 8-#6 5-#6 8-#6 10-#5 7-#6 4-#6 8-#6 12-#6 8-#6 8-#6 6-#66-#66-#66-#66-#6 8-#6 6-#6 8-#6 12-#6 12-#6 12-#6 12-#6 13-#5 9-#6 11-#511-#5 10-#5 10-#510-#5 11-#5 8-#6 12-#6 10-#6 6-#6 6-#6 10-#6 8-#6 8-#6 11-#5 8-#6 6-#5 8-#6 8-#6 12-#5 11-#6 6-#6 8-#6 11-#6 6-#6 8-#6 8-#6 #5 @ 12" 8-#6 #5 @ 12" 12-#6 16-#6 12-#6 6-#6 7-#6 8-#6 13-#6 18-#6 14-#5 11-#6 5-#6 5-#6 8-#5 10-#6 10-#6 9-#6 3-#6 3-#6 8-#5 18-#6 17-#5 5-#6 5-#6 17-#5 12-#6 4-#6 8-#5 7-#6 5-#6 6-#5 10-#5 11-#6 8-#6 12-#5 8-#6 8-#6 8-#6 13-#6 7-#5 4-#6 13-#6 4-#6 12-#5 10-#5 5-#6 11-#5 8-#6 8-#6 6-#6 4-#6 11-#5 16-#5 22-#5 16-#6 7-#56-#5 6-#5 6-#5 6-#5 6-#5 6-#5 6-#5 14-#5 5-#5 7-#5 12-#5 #5 @ 12" 12-#5 4-#6 10-#6 12-#5 11-#6 8-#5 7-#5 7-#6 6-#5 8-#6 2-#5B 2-#5B 2-#5B 2-#5B 2-#5B 2-#5B 2-#5B 4-#5B 5-#6 13-#5 18-#6 8-#5 7-#6 6-#6 6-#5 6-#6 6-#6 6-#6 5-#6 1 2 3 4 5 6 7 8 9 10 11 B D E F C B.3 1 S-200 3 S-202 4 S-202 5 S-202 6 S-202 5.5 7.5 8.5 9.5 D.3 12 A 2 3/4" 1 S-202 2 S-202 T.O. SLAB= -2' - 10 3/4" T.O. SLAB= -0' - 11 3/4" 1 4 5 7 8 9 181614 13.112 10 21 23 24 25 39 35 34 33 28 43 44 45 49 50 51 53 59 19.1 20 T.O. SLAB= +2' - 5" T.O. S.O.G.= -3' - 9 1/2" EXISTING BUS SHED (SEE ARCH.) EAST 138TH STREET THIRDAVENUE 15 17 63 52 54 55 56 57 58 60 4241 40 38 36 37 26 2722 30 31 32 46 47 48 19 PROPERTY LINE PROPERTY LINE 79"x79"x35" - PC-4 79"x79"x35" - PC-4 PC-2 13 -0' - 11 3/4" FILL SLAB FILL RAMP DN 18' - 2 3/8" 17' - 7 1/2" 22' - 6" 11' - 0 1/4" 19' - 8" 28' - 10 7/8" 23' - 0" 23' - 0" 20' - 0 7/8" 12' - 4" 12' - 0 5/8" 11' - 11 3/4" 9' - 4 7/8" 10' - 8" 8'-0"19'-7"20'-0"24'-1"27'-1" 9 S-201 11 2 1B1 1B1 1B1 1B1 1B1 1B1 1B1 1B1 1B5 1B2 CANT. CANT. CANT. CANT. CANT. CANT. CANT. CANT. CANT.1B1 7'-101/2"5'-5" S-3 T.O. SLAB= -1' - 9 3/4" S-3 2 S-306 S-3 S-3 S-3 SLOPEDS.O.G. S-3 S-3 5 S-307 8 S-307 GB1 W1 W1 W1 W1 W1 W1 W1 1B7MW18 W2W2 W1 W2 W2 W9 W2 MSW1MSW1 MW1 W3 W3 MW1 MW1 W3 MW1 W3MW1 MW30 W3 12-#5 6-#6 19-#5 6-#6 7-#5 8-#6 12-#5 4-#6 6-#6 6-#6 ALONG RAMP ALONG RAMP 3' - 6" 3' - 6" 3'-6" 3' - 6" 3' - 6" 3'-6"3'-6" 3' - 6" 3' - 6" 2 1/4" DROP 2 1/4" DROP 2 1/4" DROP BEAM BELOW WALL AT FIRST FLOOR FOR OPENING BELOW 1B6 1B4 1B4 1B3 1B4 1B51B3 1B5 CANT. GB1 1B6 1B6 1B4 1B4 1B3 GB2 -3'-4" FOUNDATION WALL BELOW FOUNDATION WALL BELOW T.O. RAISED LOADING DOCK SLAB @ 0'-6 3/4" T.O. SLAB= -0' - 11 3/4" W8X21 9' - 5" 7 S-307 9 S-306 3 S-306 GB2 6 S-307 4 S-306 5 S-306 6 S-306 3 S-306 SIM. GB3GB1 0" GB1 GB1 GB1 GB1 GB1 GB1 GB1 GB1 GB1 EXTEND GRADE BM. TO CURVED WALL BETWEEN GRIDS D AND E 24"x60" MECH. OPNG. 3'-6"3'-6" 3' - 6" 3' - 6" 2 1/4" DROP BELOW BELOW S-3 S-3 1 S-308 2 S-308 EXIST. BELOW GRADE SUBWAY TUNNEL 30'-10"± 31'-8"± 20' - 0" ± 17' - 10" ± EDGE OF CURB MASONRY WALL CONCRETE FOOTING CONCRETE WALL W8x10 L STEEL BEAM STEEL LINTEL (SEE SCHEDULE) INDICATE LEDGER ANGLE (SEE DETAIL) BENT STEEL FRAMING SHEAR CONNECTION MOMENT CONNECTION EMBEDDED PLATE CONNECTION (SEE SHED.) BEAM POCKET IN MASONRY (SEE SCHED.) BP: INDICATES STANDARD BEAM POCKET AP: INDICATES ACOUSTICALLY ISOLATED BEAM POCKET STEEL COLUMN STEEL COLUMN BELOW INDICATES COLUMN TRANSFER TR X-# SLAB (SEE SCHED.) ARROW INDICATES SPAN DIRECTION OF SLAB INDICATES TOP OF FOOTING ELEVATION COLUMN LINE (##'-##") # LEGEND EP-# BP-# MASONRY SHEAR WALL PCi t e c t s Dwg Title East 138th Street LLC 334-336 East 110th Street New York, N.Y. 10029 443 Park Avenue South New York, NY 10016 T: 212|689|7070 F: 212|545|1687 info@MHGArch.com www.MHGArch.com Client/Developer MHG Architects 443 Park Avenue South New York, N.Y. 10016 Architect Abel Bainnson Butz, LLP 80 8th Avenue, Suite 1105 New York, N.Y. 10011 Landscape Architect 88 University Place New York, N.Y. 10003 Structural Engineer Ettinger Engineering Associates 508 Eighth Avenue New York, N.Y. 10018 Mechanical/Electrical/Plumbing Engineer Scale Job No. Date Dwg No Seal NYC DOB Number 1522 255 East 138th Street Robert Silman Associates 1/8" = 1'-0" FIRST FLOOR FRAMING PLAN 05/08/2013 13892 S-101.00 1/8" = 1'-0"S-101 1 FIRST FLOOR PLAN NO R TH NOTES: 1. DATUM ELEVATION 0'-0" IS REFERENCED AS 12.54' 2. TOP OF SLAB ELEVATION IS +0'-0" UNLESS NOTED THUS (_'-_") ON PLAN. 3. TOP OF PILE CAP ELEVATION IS 1'-0" BELOW T.O. SLAB; UNLESS NOTED THUS (_'-_") ON PLAN. 4. REFER TO ARCHITECTURAL DRAWINGS FOR COLUMN HOLD POINTS AND PLAN DIMENSIONS FROM PROPERTY LINE. 5. S_ DENOTES CONCRETE SLAB . SEE SCHEDULE ON S-305.00. 6. W_ DENOTES REINFORCED CONCRETE WALL. SEE SCHEDULE ON S-202.00. 7. MW_ DENOTES REINFORCED CONCRETE MASONRY WALL. SEE WALL ELEVATIONS ON S-200.00 TO S-203.00. 8. MSW_ DENOTES REINFORCED CONCRETE MASONRY SHEAR WALL. SEE SHEAR WALL ELEVATIONS ON S-200.00 TO S-203.00. 9. C.J. DENOTES CONTROL JOINTS. SEE DETAIL SHEETS AND GENERAL NOTES. 10. PC_ DENOTE CONCRETE PILE CAP. REFER TO TYPICAL DETAILS ON S-302.00. ALL PILES SHALL BE DRILLED. 11. REFER TO S-001.00 FOR GENERAL NOTES. 12. FOR SUPPORT OF EXCAVATION INFORMATION, INCLUDING PILE DESIGN INSTALLATION PROCEDURES, SEE FNA DRAWINGS. 13. WHEN REFERRING TO THE SUPPORT OF EXCAVATION DRAWINGS BY FNA, A VALUE OF 100.00' SHALL BE ADDED TO THE ELEVATIONS SHOWN ON THESE DRAWINGS FOR COMPARISON WITH BOROUGH PRESIDENT OF BRONX DATUM ELEVATIONS. 14. REINFORCEMENT SHOWN IS TOP UNLESS NOTED OTHERWISE. THUS, (_-#_) INDICATES TOP BARS. 15. REINFORCEMENT SHOWN THUS, (_-#_B), INDICATES ADDITIONAL BOTTOM BARS, SEE SLAB SCHEDULE FOR BOTTOM REINORCEMENT MAT. 16. REFER TO CONCRETE DETAILS FOR REINFORCEMENT AROUND SLAB OPENINGS. R e v . D a t e D e s c r i p t i o n 0 5 / 2 9 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T 0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A 0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
  • 5. 1 2 3 4 5 6 7 8 9 10 11 B D E F C B.3 18' - 2 3/8" 17' - 7 1/2" 22' - 6" 11' - 0 1/4" 19' - 8" 28' - 10 7/8" 23' - 0" 23' - 0" 20' - 0 7/8" 12' - 4" 12' - 0 5/8" 1 S-200 2 S-200 3 S-200 4 S-200 5 S-200 6 S-200 3 S-202 4 S-202 5 S-202 6 S-202 7 S-200 8 S-200 6 S-201 9 S-200 4 S-201 1 S-201 5 S-201 7 S-201 2 S-201 5.5 7.5 8.5 9.5 D.3 12 A 1 S-202 2 S-202 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1S-1S-1S-1S-1S-1S-1S-1S-1S-1S-1S-1S-1S-1 S-1S-1S-1 2B16 2B55 2B39 2B11 2B41 2B21 2B52B5 2B5 2B18 2B27 2B50 2B49 2B57 2B1 2B11 2B11 2B11 2B12 2B12 2B15 2B11 2B472B48 2B36 2B31 2B252B26 2B1 2B522B53 2B57 2B1 2B7 2B7 2B7 2B11 2B11 2B11 2B11 2B9 2B6 2B6 2B7 2B7 2B8 2B8 2B6 2B6 2B6 2B8 2B8 2B7 2B16 2B17 2B11 2B37 2B38 2B24 2B4 2B2 2B44 2B1 2B8 2B3 2B2 2B4 2B4 2B4 2B4 2B13 2B45 2B14 2B1 3 S-201 MSW1 MW2 MSW3 MW4 MSW6 MSW5 MW7 MW8 MW9 MSW10 MW11 MSW13 MSW14 MSW15 MW16 MSW19 MSW22 MSW23 2B7 8'-0"19'-7"20'-0"24'-1"27'-1" 9' - 4 7/8" 10' - 8" MSW12 MW1 9 S-201 8 S-201 2B10 2B7 2B12 2B11 2B11 2B11 2B11 2B43 2B23 2B46 2B22 2B15 2B1 2B132B42 2B402B13 2B202B19 2B54 2B5 2B28 2B33 CANT. CANT. CANT. CANT. CANT. CANT. CANT. CANT. CANT. CANT. CANT. CANT. CANT. CANT. CANT. CANT. CANT.CANT. CANT. CANT. CANT. CANT. CANT. 2B12B12B12B12B12B12B12B12B1 2B1 2B1 1 S-306 2B34 2B7 2B7 2B1 2B3 2B7 2B6 2B7 2B7 2B11 2B11 2B11 2B11 2B11 2B11 2B12 2B11 2B15 2B29 2B302B32 2B39 2B56 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 2B51 2B33 MSW1 W3 MSW3 MW4 MSW5 MSW21 MSW19 MSW20 MSW23 MSW20 MSW20 MW17 MW18 MSW24 MSW12MSW12MSW12MSW12 7'-101/2"5'-5" 7' - 8 1/4" 2B54 MW1 MW1 MW1 MW1 MW1 MW1 MW1MSW14 MW4 MW1 MW1 MW1 MW1 MW1 MW1 MSW24W2 MSW1 MW9 MW11 MW8 MW2 W8 W8 W8 S-1 10 S-303 T.O. SLAB= +17' - 4 1/2" W8X21 CANT. CANT. CANT. CANT. 2B72B7CANT. MECH. OPNG. WALL BELOW 2B7 S-102 2 2B35 MASONRY WALL CONCRETE FOOTING CONCRETE WALL W8x10 L STEEL BEAM STEEL LINTEL (SEE SCHEDULE) INDICATE LEDGER ANGLE (SEE DETAIL) BENT STEEL FRAMING SHEAR CONNECTION MOMENT CONNECTION EMBEDDED PLATE CONNECTION (SEE SHED.) BEAM POCKET IN MASONRY (SEE SCHED.) BP: INDICATES STANDARD BEAM POCKET AP: INDICATES ACOUSTICALLY ISOLATED BEAM POCKET STEEL COLUMN STEEL COLUMN BELOW INDICATES COLUMN TRANSFER TR X-# SLAB (SEE SCHED.) ARROW INDICATES SPAN DIRECTION OF SLAB INDICATES TOP OF FOOTING ELEVATION COLUMN LINE (##'-##") # LEGEND EP-# BP-# MASONRY SHEAR WALL 6 7 A 5251 H SS4X4X3/8 H SS4X4X3/8 H SS4X4X3/8 H SS4X4X3/8 HSS10X4X1/4 HSS10X4X1/4 HSS10X4X1/4 HSS10X4X1/4 HSS10X4X1/4 HSS10X4X1/4 HSS10X4X1/4 HSS10X4X1/4HSS6X4X1/4 HSS6X4X1/4 PCi t e c t s Dwg Title East 138th Street LLC 334-336 East 110th Street New York, N.Y. 10029 443 Park Avenue South New York, NY 10016 T: 212|689|7070 F: 212|545|1687 info@MHGArch.com www.MHGArch.com Client/Developer MHG Architects 443 Park Avenue South New York, N.Y. 10016 Architect Abel Bainnson Butz, LLP 80 8th Avenue, Suite 1105 New York, N.Y. 10011 Landscape Architect 88 University Place New York, N.Y. 10003 Structural Engineer Ettinger Engineering Associates 508 Eighth Avenue New York, N.Y. 10018 Mechanical/Electrical/Plumbing Engineer Scale Job No. Date Dwg No Seal NYC DOB Number 1522 255 East 138th Street Robert Silman Associates As indicated SECOND FLOOR FRAMING PLAN 05/08/2013 13892 S-102.00 1/8" = 1'-0"S-102 1 SECOND FLOOR FRAMING PLAN NO R TH NOTES: 1. DATUM ELEVATION 0'-0" IS REFERENCED AS 12.54' 2. TOP OF SLAB ELEVATION IS +18'-4 1/2" UNLESS NOTED THUS (_'-_") ON PLAN. . 3. S_ DENOTES CONCRETE SLAB . SEE SCHEDULE ON S-202.00. 4. W_ DENOTES REINFORCED CONCRETE WALL. SEE SCHEDULE ON S-303.00. 5. MW_ DENOTES REINFORCED CONCRETE MASONRY WALL. SEE WALL ELEVATIONS ON S-200.00 TO S-203.00. 6. MSW_ DENOTES REINFORCED CONCRETE MASONRY SHEAR WALL. SEE SHEAR WALL ELEVATIONS ON S-200.00 TO S-203.00. 7. REFER TO S001.00 FOR GENERAL NOTES. 8. REFER TO CONCRETE DETAILS FOR REINFORCEMENT AROUND SLAB OPENINGS. R e v . D a t e D e s c r i p t i o n 0 5 / 2 9 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T 0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A S-102 1/4" = 1'-0" 2 CANOPY FRAMING PLAN (IN PROGRESS)
  • 6. B CA NOTES: 1. SEE SCHEDULE 3 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED ON ELEVATION. 2. SEE PLAN FOR CONCRETE WALL INFORMATION. B CA NOTE: SEE SCHEDULE 1 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED ON ELEVATION. B CA NOTE: SEE SCHEDULE 3 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED ON ELEVATION 2ND FLOOR 18' - 4 1/2" C 3RD FLOOR 27' - 5 1/2" 4TH FLOOR 36' - 6 1/2" 5TH FLOOR 45' - 7 1/2" 6TH FLOOR 54' - 8 1/2" 7TH FLOOR 63' - 9 1/2" 8TH FLOOR 72' - 10 1/2" ROOF 82' - 2 1/2" NOTE: SEE SCHEDULE 1 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED ON ELEVATION BA NOTE: SEE SCHEDULE 1 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED ON ELEVATION BA NOTE: SEE SCHEDULE 3 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED ON ELEVATION BA NOTE: SEE SCHEDULE 3 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED ON ELEVATION 1ST FLOOR -0' - 7 1/2" 2ND FLOOR 18' - 4 1/2" B C 3RD FLOOR 27' - 5 1/2" 4TH FLOOR 36' - 6 1/2" 5TH FLOOR 45' - 7 1/2" 6TH FLOOR 54' - 8 1/2" 7TH FLOOR 63' - 9 1/2" 8TH FLOOR 72' - 10 1/2" ROOF 82' - 2 1/2" A RETAIL "C" & "D" 2' - 5" NOTES: 1. SEE SCHEDULE 1 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED ON ELEVATION 2. SEE PLAN FOR CONCRETE WALL INFORMATION BA NOTE: SEE SCHEDULE 3 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED ON ELEVATION PCi t e c t s Dwg Title East 138th Street LLC 334-336 East 110th Street New York, N.Y. 10029 443 Park Avenue South New York, NY 10016 T: 212|689|7070 F: 212|545|1687 info@MHGArch.com www.MHGArch.com Client/Developer MHG Architects 443 Park Avenue South New York, N.Y. 10016 Architect Abel Bainnson Butz, LLP 80 8th Avenue, Suite 1105 New York, N.Y. 10011 Landscape Architect 88 University Place New York, N.Y. 10003 Structural Engineer Ettinger Engineering Associates 508 Eighth Avenue New York, N.Y. 10018 Mechanical/Electrical/Plumbing Engineer Scale Job No. Date Dwg No Seal NYC DOB Number 1522 255 East 138th Street Robert Silman Associates 1/8" = 1'-0" SHEAR WALL ELEVATIONS 05/08/2013 13892 S-200.00 1/8" = 1'-0"S-200 2 MASONRY WALL MW2 1/8" = 1'-0"S-200 3 MASONRY SHEAR WALL MSW3 1/8" = 1'-0"S-200 4 MASONRY WALL MW4 1/8" = 1'-0"S-200 5 MASONRY SHEAR WALL MSW5 1/8" = 1'-0"S-200 6 MASONRY SHEAR WALL MSW6 1/8" = 1'-0"S-200 7 MASONRY WALL MW7 1/8" = 1'-0"S-200 8 MASONRY WALL MW8 1/8" = 1'-0"S-200 1 MASONRY SHEAR WALL MSW1 1/8" = 1'-0"S-200 9 MASONRY WALL MW9 R e v . D a t e D e s c r i p t i o n 0 5 / 2 9 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T 0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A 0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
  • 7. 2ND FLOOR 18' - 4 1/2" B 3RD FLOOR 27' - 5 1/2" 4TH FLOOR 36' - 6 1/2" 5TH FLOOR 45' - 7 1/2" 6TH FLOOR 54' - 8 1/2" 7TH FLOOR 63' - 9 1/2" 8TH FLOOR 72' - 10 1/2" ROOF 82' - 2 1/2" A NOTE: SEE SCHEDULE 1 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED OTHERWISE ON ELEVATION. BOND BEAMS AT EVERY COURSE REINF. WITH 1-#6 BOND BEAMS AT EVERY FOURTH COURSE REINF. WITH 1-#5 BA NOTE: SEE SCHEDULE 3 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED OTHERWISE ON ELEVATION. C NOTE: SEE SCHEDULE 1 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED OTHERWISE ON ELEVATION. DC 3RD FLOOR 27' - 5 1/2" 4TH FLOOR 36' - 6 1/2" 5TH FLOOR 45' - 7 1/2" 6TH FLOOR 54' - 8 1/2" 7TH FLOOR 63' - 9 1/2" 8TH FLOOR 72' - 10 1/2" ROOF 82' - 2 1/2" NOTE: SEE SCHEDULE 1 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED OTHERWISE ON ELEVATION. C NOTE: SEE SCHEDULE 1 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED OTHERWISE ON ELEVATION. B NOTE: SEE SCHEDULE 3 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED OTHERWISE ON ELEVATION. B DC NOTE: SEE SCHEDULE 1 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED OTHERWISE ON ELEVATION. C NOTE: SEE SCHEDULE 3 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED OTHERWISE ON ELEVATION. C NOTE: SEE SCHEDULE 3 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED OTHERWISE ON ELEVATION. PCi t e c t s Dwg Title East 138th Street LLC 334-336 East 110th Street New York, N.Y. 10029 443 Park Avenue South New York, NY 10016 T: 212|689|7070 F: 212|545|1687 info@MHGArch.com www.MHGArch.com Client/Developer MHG Architects 443 Park Avenue South New York, N.Y. 10016 Architect Abel Bainnson Butz, LLP 80 8th Avenue, Suite 1105 New York, N.Y. 10011 Landscape Architect 88 University Place New York, N.Y. 10003 Structural Engineer Ettinger Engineering Associates 508 Eighth Avenue New York, N.Y. 10018 Mechanical/Electrical/Plumbing Engineer Scale Job No. Date Dwg No Seal NYC DOB Number 1522 255 East 138th Street Robert Silman Associates 1/8" = 1'-0" SHEAR WALL ELEVATIONS 05/08/2013 13892 S-201.00 1/8" = 1'-0"S-201 1 MASONRY SHEAR WALL MSW10 1/8" = 1'-0"S-201 2 MASONRY WALL MW11 1/8" = 1'-0"S-201 4 MASONRY SHEAR WALL MSW13 1/8" = 1'-0"S-201 5 MASONRY SHEAR WALL MSW14 1/8" = 1'-0"S-201 6 MASONRY SHEAR WALL MSW15 1/8" = 1'-0"S-201 7 MASONRY WALL MW16 1/8" = 1'-0"S-201 3 MASONRY SHEAR WALL MSW12 1/8" = 1'-0"S-201 9 MASONRY WALL MW18 1/8" = 1'-0"S-201 8 MASONRY WALL MW17 R e v . D a t e D e s c r i p t i o n 0 5 / 2 9 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T 0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A 0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
  • 8. 1ST FLOOR -0' - 7 1/2" 2ND FLOOR 18' - 4 1/2" 67 3RD FLOOR 27' - 5 1/2" CELLAR -13' - 3 3/4" 4TH FLOOR 36' - 6 1/2" 5TH FLOOR 45' - 7 1/2" 6TH FLOOR 54' - 8 1/2" 7TH FLOOR 63' - 9 1/2" 8TH FLOOR 72' - 10 1/2" ROOF 82' - 2 1/2" BULKHEAD 91' - 11" RETAIL "B" 0' - 0" NOTE: 1. SEE SCHEDULE 2 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED ON ELEVATION. 2. SEE PLAN FOR CONCRETE WALL INFORMATION. CONCRETE WALL; SEE PLAN PILE CAP, SEE PLAN LB4 LB1 BOND BEAM @ EVERY OTHER COURSE W/ 1-#6 6 7 LC1 LC1 LC1 LC1 LC1 LC1 LC1 LC1 NOTE: 1. SEE SCHEDULE 2 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED ON ELEVATION. 2. SEE PLAN FOR CONCRETE WALL INFORMATION. LB2 LB5 C NOTE: SEE SCHEDULE 2 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED OTHERWISE ON ELEVATION. C NOTE: SEE SCHEDULE 2 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED OTHERWISE ON ELEVATION. LC3 LC3 LC3 LC3 LC3 LC3 LC2 LC2 LC2 LC2 LC2 LC2 LC2 LC2 #5 @ 24" VERTICAL BOND BEAMS @ EVERY COURSE REINF. WITH 1-#4 BOND BEAMS @ EVERY COURSE REINF. WITH 1-#4 BOND BEAMS @ EVERY COURSE REINF. WITH 1-#6 BOND BEAMS @ EVERY COURSE REINF. WITH 1-#4 LB3 LB8LB8 C NOTE: SEE SCHEDULE 2 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED OTHERWISE ON ELEVATION. LC3 LC3 LC3LC3 LC3 LC3 LC4 LC4 LC4 LC4 LC4LC4 LC4LC4 LB6 LB6 LB6 LB3 LB7 C NOTE: SEE SCHEDULE 2 FOR MASONRY WALL REINFORCEMENT UNLESS NOTED OTHERWISE ON ELEVATION. BOND BEAM EVERY COURSE WITH 1-#6 #5 @ 8" VERTICAL WITH BOND BEAM EVERY THIRD COURSE REINF. WITH 1-#6 PCi t e c t s Dwg Title East 138th Street LLC 334-336 East 110th Street New York, N.Y. 10029 443 Park Avenue South New York, NY 10016 T: 212|689|7070 F: 212|545|1687 info@MHGArch.com www.MHGArch.com Client/Developer MHG Architects 443 Park Avenue South New York, N.Y. 10016 Architect Abel Bainnson Butz, LLP 80 8th Avenue, Suite 1105 New York, N.Y. 10011 Landscape Architect 88 University Place New York, N.Y. 10003 Structural Engineer Ettinger Engineering Associates 508 Eighth Avenue New York, N.Y. 10018 Mechanical/Electrical/Plumbing Engineer Scale Job No. Date Dwg No Seal NYC DOB Number 1522 255 East 138th Street Robert Silman Associates 1/8" = 1'-0" SHEAR WALL ELEVATIONS 05/08/2013 13892 S-202.00 1/8" = 1'-0"S-202 1 MASONRY SHEAR WALL MSW19 1/8" = 1'-0"S-202 2 MASONRY SHEAR WALL MSW20 1/8" = 1'-0"S-202 3 MASONRY SHEAR WALL MSW21 1/8" = 1'-0"S-202 4 MASONRY SHEAR WALL MSW22 1/8" = 1'-0"S-202 5 MASONRY SHEAR WALL MSW23 1/8" = 1'-0"S-202 6 MASONRY SHEAR WALL MSW24 MASONRY STRENGTH AND REINFORCING SCHEDULE 3 FLOOR NOMINAL THICKNESS (U.N.O) SRENGTH (PSI) LONGITUDINAL TRUSS TYPE REINFORCEMENT SIZE & GALV. SPACING VERT. REINF. FOUNDATION 8" 2000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32" FIRST FLOOR 8" 2000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32" SECOND FLOOR 8" 4000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32" THIRD FLOOR 8" 4000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32" FOURTH FLOOR 8" 3000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32" FIFTH FLOOR 8" 3000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32" SIXTH FLOOR 8" 2000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32" SEVENTH FLOOR 8" 2000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32" EIGHTH FLOOR 8" 2000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32" ROOF 8" 2000 STANDARD NO.9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE. #4 @ 32" MASONRY STRENGTH AND REINFORCING SCHEDULE 2 FLOOR NOMINAL THICKNESS (UNO) STRENGTH (PSI) LONGITUDINAL REINFORCEMENT (TRUSS TYPE, GALVANIZED) UNO VERT. REINF. SECOND FLOOR 8" 4000 BOND BEAM EVERY COURSE REINFORCED WITH 1-#6 #6 @ 8" THIRD FLOOR 8" 4000 BOND BEAM EVERY THIRD COURSE REINFORCED WITH 1-#6 #6 @ 8" FOURTH FLOOR 8" 3000 BOND BEAM EVERY OTHER COURSE REINFORCED WITH 1-#6 #5 @ 16" FIFTH FLOOR 8" 3000 BOND BEAM EVERY OTHER COURSE REINFORCED WITH 1-#6 #5 @ 16" SIXTH FLOOR 8" 2000 EXTRA HEAVY 3/16" GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY COURSE #4 @ 16" SEVENTH FLOOR 8" 2000 STANDARD NO. 9 GAGE SIDE RODS NO.9 GAGE CROSS RODS @ EVERY OTHER COURSE #4 @ 32" EIGHTH FLOOR 8" 2000 STANDARD NO. 9 GAGE SIDE RODS NO.9 GAGE CROSS RODS @ EVERY OTHER COURSE #4 @ 32" ROOF 8" 2000 STANDARD NO. 9 GAGE SIDE RODS NO.9 GAGE CROSS RODS @ EVERY OTHER COURSE #4 @ 32" MASONRY STRENGTH AND REINFORCING SCHEDULE #1 FLOOR NOMINAL THICKNESS (U.N.O) STRENGTH (PSI) LONGITUDINAL REINFORCEMENT (TRUSS TYPE, GALVANIZED) U.N.O. VERT. REINF. SECOND FLOOR 8" 4000 BOND BEAM EVERY THIRD COURSE REINFORCED WITH 1-#6 #6 @ 8" THIRD FLOOR 8" 4000 BOND BEAM EVERY THIRD COURSE REINFORCED WITH 1-#6 #6 @ 16 FOURTH FLOOR 8" 3000 BOND BEAM EVERY THIRD COURSE REINFORCED WITH 1-#5 #5 @ 16" FIFTH FLOOR 8" 3000 EXTRA HEAVY 3/16" GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY COURSE #5 @ 32" SIXTH FLOOR 8" 2000 EXTRA HEAVY 3/16" GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY COURSE #4 @ 32" SEVENTH FLOOR 8" 2000 STANDARD NO. 9 GAGE SIDE RODS NO. 9 GAGE CROSS RODS @ EVERY OTHER COURSE #4 @ 32" EIGHTH FLOOR 8" 2000 STANDARD NO. 9 GAGE SIDE RODS NO. 9 GAGE CROSS ROADS @ EVERY OTHER COURSE #4 @ 32" CONCRETE BEAM LINTEL SCHEDULE MARK DEPTH (D) WIDTH (T) REINFORCEMENT COMMENTSBOTTOM TOP SHEAR LC1 2' - 0" 0' - 8" 2-#4 2-#4 #3 @ 16" LC2 2' - 0" 0' - 8" 2-#5 2-#5 #3 @ 8" LC3 2' - 0" 0' - 8" 1-#4 1-#4 #3 @ 8" LC4 2' - 0" 0' - 8" 1-#5 1-#5 #3 @ 16" NOTES: 1. PROVIDE A MINIMUM OF 8" END BEARING FOR LINTELS. 2. LINTEL DIMENSIONS ARE NOMINAL 3. LINTEL STRENGTH TO MATCH WALL STRENGTH CONCRETE WALL SCHEDULE MARK WIDTH REINFORCEMENT REMARKSVERTICAL HORIZONTAL W1 0' - 8" #4@12 E.F. #4@12 E.F. W2 1' - 2" #5@12 E.F. #5@12 E.F. SHEAR WALL 4-#7 VERT. AT WALL ENDS AND CORNERS W3 1' - 0" #7@8" E.F. #7@8" E.F. W4 1' - 6" #7@12" E.F. #7@8" E.F. W8 0' - 8" BY MFR. BY MFR. PRECAST WALL - SEE SCHEDULE ON S-303.00 FOR LATERAL LOADS W9 1' - 2" #5@9 E.F. #5@9 E.F. SHEAR WALL 4-#7 VERT. AT WALL ENDS LINK BEAM SCHEDULE MARK W D REINFORCEMENT STIRRUPS REMARKS BOTTOM BARS TOP BARS SIZE TYPE SPACING (in.) LB1 1' - 2" 3' - 6" 6-#7 (2L) 6-#7 (2L) #5 CLOSED 9 LB2 1' - 2" 4' - 4" 6-#7 (2L) 6-#7 (2L) #5 CLOSED 9 LB3 0' - 8" 2' - 7" 2-#7 2-#7 #4 CLOSED 12 LB4 1' - 2" 11' - 0" 6-#9 (2L) 6-#9 (2L) #5 CLOSED 9 LB5 1' - 2" 11' - 1" 6-#9 (2L) 6-#9 (2L) #5 CLOSED 9 LB6 0' - 8" 9' - 10" 4-#9 (2L) 4-#9 (2L) #4 CLOSED 12 LB7 0' - 8" 4' - 4" 2-#7 2-#7 #4 CLOSED 12 LB8 0' - 8" 10' - 6" 4-#9 (2L) 4-#9 (2L) #4 CLOSED 12 NOTES: 1. WITHIN SPAN OF LINK BEAMS, USE STIRRUPS NOTED IN LINK BEAM SCHEDULE AND OMIT VERTICAL WALL REINFORCING STEEL. 2. LONGITUDINAL BARS SHALL BE FULLY DEVELOPED BEYOND EACH SIDE OF WALL OPENINGS. R e v . D a t e D e s c r i p t i o n 0 5 / 2 9 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T 0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A 0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
  • 9. SLABDEPTHAS SHOWNONPLANS SLABDEPTHAS SHOWNONPLANS CASTINPLACE SLAB CASTINPLACE SLAB SEE TYPICAL DETAIL REINF. FOR NON-LOAD BEARING WALLS U-SHAPED CLIP. SEE TYPICAL DETAIL REINF. FOR NON-LOAD BEARING MASONRY WALLS AT CAST IN PLACE SLAB COMPRESSIBLE FILLER WALL OPENING REINF. AND DOWELS PER TABLE 2x (2) #5 ADDITIONAL EACH SIDE OF OPENING TYP. T.O. SLAB T.O. SLAB REINF. AND DOWELS PER TABLE WALL OPENING 2x (2) #5 ADDITIONAL EACH SIDE OF OPENING TYP. SEESCHEDULE SEESCHEDULE NOTE: PROVIDE LINTELS AS REQUIRED OVER WALL OPENINGS. SLAB SLAB ANCHOR TOP OF CMU WALL TO UNDERSIDE OF SLAB W/ 3/16" GALV. STEEL U SHAPED CLIP 3"x BY WALL THICKNESS x 8" LONG @ SPACING TO MATCH AND ALIGN WITH VERTICAL WALL REINFORCING (PTA 422 BY H & B OR EQUAL) W/ 2-3/8" DIAMETER EXPANSION BOLTS TO UNDERSIDE OF SLAB. PROVIDE COMPRESSIBLE PAD BETWEEN TOP OF BLOCK & CLIP INTERIOR WALLS NOMINAL CMU THICKNESS VERTICAL REBAR HORIZONTAL REBAR MAXIMUM HEIGHT (FT) DOWELS 6" #4 @ 48" 9 GAGE LADDER REINFORCING @ 16" O.C. 23'-6" SAME AS VERTICAL BARS 8" 27'-7" SAME AS VERTICAL BARS #4 @ 48" 9 GAGE LADDER REINFORCING @ 16" O.C. EXTERIOR WALLS NOMINAL CMU THICKNESS VERTICAL REBAR HORIZONTAL REBAR MAXIMUM HEIGHT (FT) DOWELS 6" #5 @ 24" 9 GAGE LADDER REINFORCING @ 16" O.C. 14'-6" SAME AS VERTICAL BARS 8" 18'-8" SAME AS VERTICAL BARS #5 @ 24" 9 GAGE LADDER REINFORCING @ 16" O.C. PCi t e c t s Dwg Title East 138th Street LLC 334-336 East 110th Street New York, N.Y. 10029 443 Park Avenue South New York, NY 10016 T: 212|689|7070 F: 212|545|1687 info@MHGArch.com www.MHGArch.com Client/Developer MHG Architects 443 Park Avenue South New York, N.Y. 10016 Architect Abel Bainnson Butz, LLP 80 8th Avenue, Suite 1105 New York, N.Y. 10011 Landscape Architect 88 University Place New York, N.Y. 10003 Structural Engineer Ettinger Engineering Associates 508 Eighth Avenue New York, N.Y. 10018 Mechanical/Electrical/Plumbing Engineer Scale Job No. Date Dwg No Seal NYC DOB Number 1522 255 East 138th Street Robert Silman Associates 1" = 1'-0" MASONRY WALL DETAILS 05/08/2013 13892 S-203.00 1" = 1'-0"S-203 1 TYPICAL SUPPORT FOR MASONRY PARTITIONS AT SUPPORTED SLAB 1" = 1'-0"S-203 2 TYPICAL REINFORCING FOR NON-LOAD BEARING MASONRY WALLS R e v . D a t e D e s c r i p t i o n 0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T 0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A 0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A
  • 10. PROVIDE PIPE SLEEVE 2" LARGER THAN PIPE DIA. MATCH FTG. REINF. D D (M IN .) EA. SIDE 1' - 0" MIN. CMU/CONC; (SEE PLAN) CONC. FOOTING (SEE PLAN) PIPE SLEEVE 2" LARGER THAN PIPE DIAMETER. PLUMBING UTILITY LINE (SEE MECH./CIVIL DWG'S) FILL PIPE TRENCH W/ CONC. TO BOTTOM OF FTG. USE LEAN MIX CONCRETE (2,500 PSI) BEAM WIDTH BEAMDEPTH BOTTOM REINFORCING CLOSED STIRRUPS TOP REINFORCING SAW CUT 1-1/2" DEEP W.W.F. 2 1 2"x3" CONTINUOUS KEY THICKNESS"t" SLABONGRADE THICKNESS"t" DEPTHOFTHICKNESS SLAB=1-1/2"TIMESLAB SAWED CONTROL/CONTRACTION JOINT CONSTRUCTION JOINT M IN . 3" JOINTS CONCRETE PIER OR STEEL COLUMN (SEE PLAN) SLAB ON GRADE ISOLATION JOINT AT COLUMN SLAB REINFORCEMENT (MESH REBAR) ADDITIONAL REINFORCEMENT AT ALL RE- ENTRANT CORNERS SLAB EDGE 2-#4 @ 3"x4'-0" LONG ADDITIONAL AT ALL REENTRANT CORNERS CONCRETE SLAB 6"x6" W2.0 x W2.0 W.W.F. 10 MIL POLYETHYLENE VAPOR BARRIER NOTES: 1. SLAB ON GRADE SHALL BE PLACED IN ALTERNATING STRIPS WHERE EACH SINGLE STRIP DOES NO EXCEED 36 TIMES SLAB THICKNESS WIDTH IN INCHES. 2. SAWED CONTRACTION JOINTS SHALL BE LOCATED AT A MAXIMUM SPACING IN INCHES OF 36 TIMES THE SLAB THICKNESS. JOINTS SHALL BE SAWED NO LATER THAN 24 HOURS AFTER CONCRETE IS PLACED. 3. GRAVEL OR CRUSHED STONE BASE SHALL BE COMPACTED TO 95% OF MAXIMUM DENSITY AT OPTIMUM MOISTURE CONTENT. 1"CLR. 6" GRAVEL OR STONEUNDISTURBED SOIL OR FILL SLAB ON GRADE WATERSTOP WATERSTOP .. 2" COVER MIN. (OR AS REQ'D BY WATERSTOP MFR.) VAPOR BARRIER 6" GRAVEL OR CRUSHED STONE UNDISTURBED SOIL OR FILL SLAB-ON-GRADE & WALL INTERFACE SEESCHEDULE 2-#5 CONT. SLAB ON GRADE NOTE: SEE TYPICAL SLAB ON GRADE DETAIL FOR ADDITIONAL INFORMATION 3"CL. #4 @ 48" O.C. DOWELS AND REINFORCEMENT U.N.O. 1'-0" 4" 4' - 0" MAXIMUM EACH WAY #4 CONT. @ 12" O.C. HORZ. LAP 2'-0" HIGH DENSITY EXTRUDED POLYSTYRENE HAVING A MIN. COMPRESSIVE STRENGTH OF 20 PSI 4"x4"-W2.1xW2.1 W.W.F. (6"x6"-W2.9xW2.9 W.W.F. ALTERNATE) . 11/2" 3" 4000 PSI NORMINAL WEIGHT CONCRETE 2'-0"MAX. #4 @ 12" O.C. VERT. 4"MIN. 1' - 0" MIN. 2" 3"MIN. 4"4'-0" EACH WAY (TYP.) 2'-0"MAX. . RAMP THICKNESS 0" TO 2" USE SIKA DUR 21 LO- MOD LV OR ARDEX SD-P, FOLLOW ALL MANUFACTURER RECOMMENDATIONS INCLUDING ADDED AGGREGATE AND SURFACE PREP #4 HILTI HY150 ADHESIVE/ANCHOR OR APPROVED EQUAL @ 4'-0" DRILLED INTO EXIST. SLAB (3 BARS MIN.) W/ 2" EMBED. 4"x4"-W2.1xW2.1 W.W.F. (6"x6"-W2.9xW2.9 W.W.F. ALTERNATIVE) 4000 PSI NORMAL WT. CONCRETE SEE ARCH'L DWGS FOR SLOPE OF RAMP HIGH DENSITY EXTRUDED POLYSTYRENE HAVING A MIN. COMPRESSIVE STRENGTH OF 20 PSI EXISTING CONCRETE SLAB 2'-0" 11/2"MIN. #4 CONT. @ 12" O.C. HORZ. LAP 2'-0" #4 @ 12" O.C. VERT. EXISTING CONCRETE SLAB #4 HILTI HIT HY150 ADHESIVE ANCHORS @ 4'-0" DRILLED INTO EXISTING SLAB (3 BARS MIN.WITH 2" EMBED) HIGH DENSITY EXTRUDED POLYSTYRENE HAVING A MIN. COMPRESSIVE STRENGTH OF 20 PSI #4 NOSING BAR CONT. . DRAWINGS SEE ARCH'L 1 1/2" TYP. MIN. 1' - 0" 4"x4"-W2.1xW2.1 W.W.F. (6"x6"-W2.9xW2.9 W.W.F. ALTERNATE) 4,000 PSI NORMAL WT. CONCRETE 11/2" 3"MIN. 2'-0"MAX. 4" (TYP.) 4' - 0" EACH WAY#4 CONT. @ 12" O.C. HORZ. LAP 2'-0" #4 @ 12" O.C. VERT. ROUGHEN TO 1/4" AMPLITUDE OR COAT CONTACT SURFACE WITH LATEX BONDING AGENT DOWEL W/ 1'-0" HOOK, (SEE NOTE 3) #3@12" O.C. EACH WAY 12"MAX AT SLAB ON GRADE NOTES: 1. FOR SIZE AND LOCATION SEE ARCH'L AND MECH. DWGS. 2. CONCRETE FOR PADS SHALL BE NORMAL WEIGHT WITH f'c = 4000 PSI 3. INSTALL DOWELS @ 18" O.C. W/ HILTI HIT-HY150 ADHESIVE OR APPROVED EQUAL 2 1 2-#4 TOP & BOT. CONT. #4 @ 12" #4 CONT. T.O. SLAB EL.(SEE PLAN) T.O. SLAB EL. (SEE PLAN) T.0. SLAB EL. (SEE PLAN) T.O. SLAB EL.(SEE PLAN) . SEE PLAN FOR SLAB THICKNESS (TYP.) FORDIM. SEEPLAN 1-#4 CONT. 1' - 0" STEP LESS THAN OR EQUAL TO SLAB THICKNESS STEP GREATER THAN SLAB THICKNESS 1' - 0" #4 @ 12" 1'-6"MAX. PLAN SEE 1' - 0" 2' - 6" "X"=2'-0" 2 "X" MIN. MIN. 1' - 0" CONTINUOUS WALL FOOTING 2 1 STANDARD HOOK. (TYP) FOR REINFORCING SEE WALL SECTION SLOPE BY CONTRACTOR TO MAINTAIN SOIL STABILITY, VERIFY WITH GEOTECHNICAL ENGINEER ELEVATOR PIT (SEEPLAN) PITDEPTH1'-0" 3"CLR. #5@12" O.C. TYP. 2"x4" KEYWAY CONT. TOP & BOT. TYP. 1' - 0" BENTONITE WATER STOP (TYP.) #4@12" O.C. TYP. #5 NOSING BAR ALL AROUND 1' - 4" 11" 3" CLR. 3" CONCRETE MUD SLAB (ALL AROUND) 3' - 0" WATERPROOFING ALL AROUND PROVIDE PROTECTION BOARD (SEE ARCH'L DWGS.) 3" CONCRETE MUD LINE 1 1 #5 TOP AND BOTTOM EACH WAY WATERSTOP #4 @ 12" O.C. VERTICAL AND HORIZONTAL #5 @ 12" O.C. 1'-0"SEEPLAN 0" PITMAT 1'-0" 3"CLR. SEE PLAN CONCRETE WALL 1' - 0" 1' - 0" 0". PCi t e c t s Dwg Title East 138th Street LLC 334-336 East 110th Street New York, N.Y. 10029 443 Park Avenue South New York, NY 10016 T: 212|689|7070 F: 212|545|1687 info@MHGArch.com www.MHGArch.com Client/Developer MHG Architects 443 Park Avenue South New York, N.Y. 10016 Architect Abel Bainnson Butz, LLP 80 8th Avenue, Suite 1105 New York, N.Y. 10011 Landscape Architect 88 University Place New York, N.Y. 10003 Structural Engineer Ettinger Engineering Associates 508 Eighth Avenue New York, N.Y. 10018 Mechanical/Electrical/Plumbing Engineer Scale Job No. Date Dwg No Seal NYC DOB Number 1522 255 East 138th Street Robert Silman Associates As indicated FOUNDATION DETAILS 05/08/2013 13892 S-300.00 3/4" = 1'-0"S-300 3 TYPICAL UTILITY PIPE THRU WALL FOOTING DETAIL 1" = 1'-0"S-300 4 TYPICAL UTILITY PIPE UNDER WALL DETAIL 3/4" = 1'-0"S-300 13 TYPICAL GRADE BEAM 1" = 1'-0"S-300 1 TYPICAL DETAILS SLAB ON GRADE 1" = 1'-0"S-300 2 TYPICAL SUPPORT FOR MASONRY PARTITIONS AT SLAB ON GRADE 1" = 1'-0"S-300 6 TYPICAL DETAIL RAISED SLAB 1" = 1'-0"S-300 8 TYPICAL RAISED SLAB WITH RAMP 3/4" = 1'-0"S-300 7 TYPICAL DETAIL OF RAISED SLAB AT STAIR 1" = 1'-0"S-300 5 TYPICAL EQUIPMENT PAD 3/4" = 1'-0"S-300 12 TYPICAL STEP ON SLAB ON GRADE 1" = 1'-0"S-300 11 TYPICAL STEPPED WALL FOOTING 1" = 1'-0"S-300 10 TYPICAL ELEVATOR PIT DETAIL 1" = 1'-0"S-300 9 TYPICAL ELEVATOR SUMP PIT GRADE BEAM SCHEDULE MARK SIZE CONT. BOTTOM REINF. SIDE REINF. (EA. FACE) STIRRUP SIZE STIRRUP SPACING STIRRUP TYPE TOP REINF. W D LEFT END FULL LENGTH RIGHT END GB1 1' - 6" 3' - 0" 3-#8 #4 @ 12 #4 12" CLOSED 3-#8 GB2 1' - 6" 4' - 4 1/2" 3-#8 #4 12" CLOSED 3-#8 GB3 1' - 6" 3' - 11" 3-#8 #4 12" CLOSED 3-#8 R e v . D a t e D e s c r i p t i o n 0 5 / 2 9 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 0 9 / 1 1 / 2 0 1 3 S U B M I S S I O N T O N Y C T A 1 1 / 2 0 / 2 0 1 3 U P D A T E D B I D S E T 0 3 / 1 4 / 2 0 1 4 S U B M I S S I O N T O N Y C T A 0 5 / 1 2 / 2 0 1 4 S U B M I S S I O N T O N Y C T A