Thermal Imaging Report
Inspection Ref. TI ELECTRICAL TRENDING DEMO-2 (ELECTRICAL)
TI LTD / TI ELECTRICAL TRENDING DEMO
1 Jun 2012st
Client TI LTD
Site TI ELECTRICAL TRENDING DEMO
Trident Court,
1 Oakcroft Road
Chessington
Surrey
KT9 1BD
Contacts Richard Wallace
richard@thermalimaging.co.uk
0203 0442940
Inspection Data
Reason for Survey PERIODIC THERMOGRAPHIC INSPECTION OF ELECTRICAL
INFRASTRUCTURE AND ASSOCIATED COMPONENTS FOR
THE PURPOSE OF ON-GOING RISK MANAGEMENT
Purpose of Survey RISK MANAGEMENT INSPECTION OF ELECTRICAL
INFRASTRUCTURE IN ORDER TO UNCOVER ANOMALOUS
COMPONENT TEMPERATURES AND TO OFFER ROOT CAUSE
AND REMEDIAL SUGGESTIONS
Inspection
Commencing
N/A
Applicable Formulas YES - LOAD CORRECTION
Camera FLIR THERMACAM P640
Camera Calibration CALIBRATION CHECKED
Thermographer Cert
and ID
RICHARD WALLACE - LEVEL 2 THERMOGRAPHY - 49595
Software TICOR™ ANDROID DATA CAPTURE AND REPORTING
APPLICATION LINKED TO WEBCOR™ ONLINE CAMPAIGN
MANAGER - ELECTRICAL MODULE
Ambient Temp (C) N/A
Humidity (%) N/A
Summary
Problems found
during this
inspection
N/A
Remedial
Recommendations
for problems found
during this
inspection
N/A
Introduction to your Ti Thermal Imaging LTD risk management thermographic
inspection
This electrical and visual thermographic inspection has been carried out using a FLIR
Professional thermal imaging camera with data input onto our purpose built tablet platform
TICOR for instantaneous results and report generation. Our WEBCOR campaign and
inspection management system houses all data that is permanently accessible over the
internet allowing the user to track, monitor and adjust repair status of problems found during the
inspection. Crucially it also trends component temperatures between periodic inspections
offering a true predictive maintenance platform so that components, particularly with problems,
can be monitored and remedial campaigns can be created around planned downtime rather
than invasive unplanned shutdowns. Ultimately this approach will keep the assets running
without interuptive power outages which can prevent production and cost company revenue.
Our TICOR and WEBCOR System sync's together to ensure all data is held centrally and
updated upon internet connection.
This is a guide which should help you to fully understand how the inspection was performed
and how the results were achieved
The framework to this inspection can either be generated onsite during the inspection,
building the list during the survey or a list exported to MS Excel can be imported into the
Android tablet to provide comprehensive information such as item locations, tag numbers,
work orders etc.
Images are captured of all online items and a record is kept of temperature data to enable
a trending programme to begin. Subsequent inspections will see the addition of a new
image for each inspection so that temperatures can be monitored.
Trending images and anomalous pieces of equipment have been recorded as one of two
types of inspection:
Thermal – This covers temperature related anomalies
Visual – This covers all visual findings only
All component trending images are taken under normal load conditions.
Panels have been removed where safe and possible to do so and where covered by the
Permit To Work system. In addition load readings have been captured using a clamp
meter only where covered by the Permit to Work system and where safe to do so. In some
cases load readings have not been taken so these are left as blank intentionally so that
the normalised graph will function correctly. If a 0 value is inserted then a fictitious
reading will be obtained. An explanation of the Normalization graph is listed later.
A complete inventory will be built of the equipment giving Test Status at the time of the
inspection allowing transparency to the inspection and what occurred with each piece of
equipment. These Test Status include:
TBT To Be Tested These appear in bold on the thermographers tablet
to identify which items are still to be tested
T Tested Marked as Tested once images and faults have
been documented
NTLO Not Tested Locked Out Selected if the item could not be opened safely
NTNL Not Tested No Load Selected if the item was offline at the time of
inspection and could not be started
NTNA Not Tested Not Available Selected if the item is no longer available
NTNS Not Tested Not Specified Selected if an item is found to be unspecified
NTUR Not Tested Under Repair Selected if an item is currently under a repair
procedure
NSFI Not Scheduled For
Inspection
Selected if an item is not due or needed to be
tested
NTTC Not Tested Time Constraint Selected if the inspection has not been allocated
enough time or access problems have cause it to
overrun.
Each piece of equipment has been allocated a priority to operation taken from the following
non-changeable list:
Essential to
Operation
Equipment is required for the
site to run effectively: This may
include main power, machinery
and other essential items that
would effect site productivity
Non-Essential
To Operation
Equipment is not required for
the site to run effectively: This
may include items which would
not effect site productivity
Emissivity is the value in which an object emits it’s infra-red radiation and is also directly
proportional to it’s reflectivity. For example if an item had 0.9 emissivity then it’s
reflectivity would be 0.1. This inspection uses an emissivity set between 0.9 and 0.96
because this is found to be suitable when assessing the temperatures of most electrical
components due to them usually being housed in plastic or rubber which has a similar
emissivity value. Emissivity is only changed were absolutely necessary. An example of
this would be copper busbar with no electrical tape/labels attached.
Anomalous components are assessed in one of two ways.
1. With the use of Reference components operating under similar conditions: These would
include using line/load sides or different phases with similar load patterns to compare an
anomalous component with another which has a more normal temperature gradient.
2. The use of load correction formulas which results in the following values:
Estimated fault component temp at full load (°C) – This estimates the temperature that
the component would be running at if it was loaded at 100%. This value has been arrived
at using a formula correction using anomalous and ambient temperatures, measured and
maximum load.
The value of 75°C has been taken from the British Standard BS7671 (*.*). This value is
the recommended cable temperatures of between 65-85C at full load.
Using this value it is possible to use a fault rating system to grade the severity of the fault.
The following fault ratings and colour coding have been used:
Fault Ratings Minor Important Serious Critical
100% Load
corrected temp -
75°C
0-7 8-15 16-32 33+
This value of 75°C is also used as a threshold temperature for the captured baseline
images. In certain circumstances, this value has either been increased to 100°C or
decreased to 50°C. The value has been increased to 100°C where the thermographer
deems this a more appropriate value due to an elevated cubicle ambient or where
components are tightly arranged together causing uplift in operating temperature. The
value has been decreased to 50°C where the thermographer deems this a more
appropriate value due to panel covers not being able to be removed and only the surface
of the component can be seen and not the actual connections. In certain circumstances
where SP2 Reference temperature cannot be suitably obtained, the value has been set
from the BS Ref of 75°C as the SP2 reference temp.
The normalization graph simulates temperature at 0, 50% and 100% load and is
designed to assist the prediction of component operating temperature where a reference
component has been used. According to Ohms law P=I²R but the graph is designed as a
quick glance tool to assist in viewing the potential that a problem may become.
Where anomalous components are found, a knowledge base library is used to house
specific statements that ensure synergy between inspections for faults, root causes and
recommended remedial actions.
Formulas:
Name Formula
T load
corrected
Let (Tm – Tamb) = Trise ; I meas / I full = LF (Load factor)
Then:
Tcorr = (((1/ LF)^1.68+(1/ LF)^1.46)/2)*Trise + Tamb
Summary
The Infrared Inspection was performed by TI Thermal Imaging, by a certified infrared
Thermographer. All of the items inspected are listed in this TICOR report. Any anomalies are
listed in order of priority based on the component's temperature rise, as measured from a
reference component of equal type and load at the time of the inspection. TI Thermal Imaging
assumes no liability directly or indirectly as a result of this inspection.
Priority Current Inspection Prior Inspection Percent of Change
Thermal
Not Specified 1 = 100% 2 = 100% -50%
Minor 0 = 0% 0 = 0% N/A
Important 0 = 0% 0 = 0% N/A
Serious 0 = 0% 0 = 0% N/A
Critical 0 = 0% 0 = 0% N/A
Visual
Not Specified 0 0 N/A
Minor 0 0 N/A
Important 0 0 N/A
Serious 0 0 N/A
Critical 0 0 N/A
Ultrasonic
Not Specified 0 0 N/A
Minor 0 0 N/A
Important 0 0 N/A
Serious 0 0 N/A
Critical 0 0 N/A
I hereby certify the project was inspected by myself or under my direction and that the enclosed
data is the result of this inspection.
TICOR
Wallace, Rich
Inventory
Equipment
Description Item ID
PM Work
Order Operation Priority
Problem
#s Status
BOILER ROOM
BOILER CP2 BOILER CP NOT
ISSUED
ESSENTIAL TO
OPERATION
T
BOILER ROOM
CP
BOILER
ROOM CP
NOT
ISSUED
ESSENTIAL TO
OPERATION
1 T
PLANTROOM
DBLB DBLB NOT
ISSUED
ESSENTIAL TO
OPERATION
T
DBLW DBLW NOT
ISSUED
ESSENTIAL TO
OPERATION
T
RISER 1A
DB1AL DB1AL NOT
ISSUED
ESSENTIAL TO
OPERATION
T
DB1PA DB1PA NOT
ISSUED
ESSENTIAL TO
OPERATION
T
DB1ACA DB1ACA NOT
ISSUED
ESSENTIAL TO
OPERATION
T
RISER 1B
DB1BL DB1BL NOT
ISSUED
ESSENTIAL TO
OPERATION
T
DB1PB DB1PB NOT
ISSUED
ESSENTIAL TO
OPERATION
T
DB1ACB DB1ACB NOT
ISSUED
ESSENTIAL TO
OPERATION
T
RISER A
DBGAL DBGAL NOT
ISSUED
ESSENTIAL TO
OPERATION
T
DBGPA DBGPA NOT
ISSUED
ESSENTIAL TO
OPERATION
T
DBGACA DBGACA NOT
ISSUED
ESSENTIAL TO
OPERATION
T
RISER B
DBGBL DBGBL NOT
ISSUED
ESSENTIAL TO
OPERATION
T
DBGPB DBGPB NOT
ISSUED
ESSENTIAL TO
OPERATION
T
DBGACB DBGACB NOT
ISSUED
ESSENTIAL TO
OPERATION
T
SWITCHROOM
MAIN LV
DBM DBM NOT
ISSUED
ESSENTIAL TO
OPERATION
T
DB1M DB1M NOT
ISSUED
ESSENTIAL TO
OPERATION
T
DBGA DBGA NOT
ISSUED
ESSENTIAL TO
OPERATION
T
DBLD DBLD NOT
ISSUED
ESSENTIAL TO
OPERATION
T
DBL&P DBL&P NOT
ISSUED
ESSENTIAL TO
OPERATION
T
DBLD2 DBLD2 NOT
ISSUED
ESSENTIAL TO
OPERATION
T
MAIN ACB
INCOMER
MAIN ACB NOT
ISSUED
ESSENTIAL TO
OPERATION
T
Problems
Problem
# Equipment Item ID
PM
Work
Order
Temp.
Rise
Over
Ambient
Load
Factor Type
Fault
Rating Status
1 BOILER
ROOM -
BOILER
ROOM CP
Component:
CB1FD -L2
BOILER
ROOM
CP
NOT
ISSUED
114.0 °
C
0.7 % THERMAL NO
ISSUE
OPEN
1 RISER B -
DBGACB
Component:
NEUTRAL
DBGACB NOT
ISSUED
5.0 °C 0.1 % THERMAL NO
ISSUE CLOSED
2 BOILER
ROOM -
BOILER CP2
Component:
BURNER
CONTROLLER
BOILER
CP
NOT
ISSUED
100.0 °
C
0.6 % THERMAL NO
ISSUE CLOSED
Fault Pages
Client Asset
Report
Date
Problem
#
Problem
Type
Fault
Rating
Problem
Status
TI
LTD
TI ELECTRICAL
TRENDING DEMO
20/04/2015 1 THERMAL NO
ISSUE
OPEN
File:
IR_26155A.jpg
Photo Date:
08/03/2014
Location/Equipment Information
Location BOILER ROOM
Component BOILER ROOM CP
Item ID BOILER ROOM CP
Status T
PM Work Order NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
Fault
Item/Description
CB1FD -L2
Problem
Item CONTACTORS
Type 100A
Manufacturer MERLIN GERIN
Anomaly INDICATED HIGHER
TEMPERATURE THAN
EXPECTED
File:
DC_26156.jpg
Photo Date:
08/03/2014
Trending Data
Measured Temp. 138 °C
Ambient Temp. 24 °C
Nominal Maximum Current 100.0
AMPS
Measured Current 68.0
AMPS
Reference Temp. (BS7671 ref
cable temp 65-85°C)
75 °C
Temp. Rise Over Ambient 114.0
°C
Load Factor 0.7 %
Temperature Load Corrected 233.1
°C
Excess of Ref Temp. 158.6
°C
Max Load To Safely Apply
Remaining Beneath Ref Temp.
40.7
AMPS
Voltage 412
Root Cause SUSPECTED LOOSE,
DETERIORATED OR
INADEQUATE
CONNECTION
Remedial CHECK, CLEAN & RE-
MAKE CONNECTION
TO PRESCRIBED
STANDARD
VOLTS
L1 Load 62
AMPS
L2 Load 68
AMPS
L3 Load 66
AMPS
Neutral Load AMPS
Ultrasonic Reading DBUV
Load (%)
Temperature(°C)
Reference
0 20 40 60 80 100
100
200
0
300
Fault Pages
Client Asset
Report
Date
Problem
#
Problem
Type
Fault
Rating
Problem
Status
TI
LTD
TI ELECTRICAL
TRENDING DEMO
20/04/2015 1 THERMAL NO
ISSUE CLOSED
File:
IR_8511A.jpg
Photo Date:
10/03/2014
Location/Equipment Information
Location RISER B
Component DBGACB
Item ID DBGACB
Status T
PM Work Order NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
Fault
Item/Description
NEUTRAL
Problem
Item MINI CIRCUIT
BREAKERS
Type 100A
Manufacturer MERLIN GERIN
Anomaly NEUTRAL
CONDUCTOR
DISPLAYING
File:
DC_8512.jpg
Photo Date:
10/03/2014
Trending Data
Measured Temp. 29.0
°C
Ambient Temp. 24.0
°C
Nominal Maximum Current 100.0
AMPS
Measured Current 12.0
AMPS
Reference Temp. (BS7671 ref
cable temp 65-85°C)
75.0
°C
Temp. Rise Over Ambient 5.0 °C
Load Factor 0.1 %
Temperature Load Corrected 215.8
°C
Excess of Ref Temp. 141.3
°C
Max Load To Safely Apply
Remaining Beneath Ref Temp.
53.3
AMPS
DISPLAYING
UNEXPECTED
TEMPERATURE
ANOMALY
Root Cause SUSPECTED LOOSE,
DETERIORATED OR
INADEQUATE
CONNECTION
Remedial CHECK, CLEAN & RE-
MAKE CONNECTION
TO PRESCRIBED
STANDARD
Voltage 240.0
VOLTS
L1 Load 12.0
AMPS
L2 Load 0.0
AMPS
L3 Load 0.0
AMPS
Neutral Load 12.0
AMPS
Ultrasonic Reading DBUV
Load (%)
Temperature(°C)
Reference
0 20 40 60 80 100
100
200
0
300
Fault Pages
Client Asset
Report
Date
Problem
#
Problem
Type
Fault
Rating
Problem
Status
TI
LTD
TI ELECTRICAL
TRENDING DEMO
20/04/2015 2 THERMAL NO
ISSUE CLOSED
File:
IR_26157A.jpg
Photo Date:
08/03/2014
Location/Equipment Information
Location BOILER ROOM
Component BOILER CP2
Item ID BOILER CP
Status T
PM Work Order NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
Fault
Item/Description
BURNER
CONTROLLER
Problem
Item CONTACTORS
Type 63A
Manufacturer MERLIN GERIN
Anomaly INDICATED HIGHER
TEMPERATURE THAN
EXPECTED
File:
DC_26158.jpg
Photo Date:
08/03/2014
Trending Data
Measured Temp. 121.0
°C
Ambient Temp. 21.0
°C
Nominal Maximum Current 63.0
AMPS
Measured Current 36.0
AMPS
Reference Temp. (BS7671 ref
cable temp 65-85°C)
75.0
°C
Temp. Rise Over Ambient 100.0
°C
Load Factor 0.6 %
Temperature Load Corrected 244.4
°C
Excess of Ref Temp. 169.9
°C
Max Load To Safely Apply 24.3
Root Cause SUSPECTED LOOSE
OR DETERIORATED
CONNECTION
Remedial CHECK, CLEAN & RE-
MAKE CONNECTION
TO PRESCRIBED
STANDARD
Remaining Beneath Ref Temp. AMPS
Voltage 415.0
VOLTS
L1 Load 36.0
AMPS
L2 Load 42.0
AMPS
L3 Load 41.0
AMPS
Neutral Load 0.0
AMPS
Ultrasonic Reading DBUV
Load (%)
Temperature(°C)
Reference
0 20 40 60 80 100
100
200
300
0
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 1
Item ID DBGA
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7006.jpg
SWITCHROOM > MAIN LV - DBGA
File: IR_2461.jpg
Photo Date: 10/03/2014
File: IR_8505.jpg
Photo Date: 10/03/2014
File: IR_7005.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
34 °C
(+2)
24 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
32 °C
(+3)
23 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
29 °C (0) 24 °C 75 °C °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 2
Item ID DBM
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7010.jpg
SWITCHROOM > MAIN LV - DBM
File: IR_2465.jpg
Photo Date: 10/03/2014
File: IR_8500.jpg
Photo Date: 10/03/2014
File: IR_7009.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
32 °C
(+1)
25 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
31 °C (-7) 24 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
38 °C (0) 25 °C 75 °C °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 3
Item ID DBLD
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7012.jpg
SWITCHROOM > MAIN LV - DBLD
File: IR_2463.jpg
Photo Date: 10/03/2014
File: IR_8501.jpg
Photo Date: 10/03/2014
File: IR_7011.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
26 °C
(+1)
23 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
25 °C (-2) 23 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
27 °C (0) 24 °C 75 °C °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 4
Item ID MAIN ACB
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7014.jpg
SWITCHROOM > MAIN LV - MAIN ACB INCOMER
File: IR_2460.jpg
Photo Date: 10/03/2014
File: IR_7013.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
27 °C
(+1)
24 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
26 °C (0) 24 °C 75 °C °C DBUV
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 5
Item ID DB1M
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7016.jpg
SWITCHROOM > MAIN LV - DB1M
File: IR_2464.jpg
Photo Date: 10/03/2014
File: IR_8504.jpg
Photo Date: 10/03/2014
File: IR_7015.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
28 °C
(+3)
24 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
25 °C (-2) 23 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
27 °C (0) 25 °C 75 °C °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 6
Item ID DBL&P
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7018.jpg
SWITCHROOM > MAIN LV - DBL&P
File: IR_2459.jpg
Photo Date: 10/03/2014
File: IR_8508.jpg
Photo Date: 10/03/2014
File: IR_7017.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
32 °C (-1) 24 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
33 °C
(+1)
24 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
32 °C (0) 25 °C 75 °C 36.0 °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 7
Item ID DBLD2
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7020.jpg
SWITCHROOM > MAIN LV - DBLD2
File: IR_2457.jpg
Photo Date: 10/03/2014
File: IR_8510.jpg
Photo Date: 10/03/2014
File: IR_7019.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
30 °C
(+2)
25 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
28 °C
(+3)
24 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
25 °C (0) 24 °C 75 °C °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 8
Item ID BOILER ROOM CP
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_26154.jpg
BOILER ROOM - BOILER ROOM CP
File: IR_26153.jpg
Photo Date: 10/03/2014
File: IR_26153.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2
0
100
200
300
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
68 °C (-
70)
35 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
138 °C
(0)
24 °C 75 °C 233.1 °C DBUV
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 9
Item ID BOILER CP
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_26154.jpg
BOILER ROOM - BOILER CP2
File: IR_8485.jpg
Photo Date: 10/03/2014
File: IR_26153.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2
0
100
200
300
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
°C (-121) °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
121.0 °C
(0)
21.0 °C 75.0 °C 244.4 °C DBUV
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 10
Item ID DBGACA
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7029.jpg
RISER A - DBGACA
File: IR_2469.jpg
Photo Date: 10/03/2014
File: IR_7028.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
28 °C (-2) 24 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
30 °C (0) 23 °C 75 °C 34.0 °C DBUV
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 11
Item ID DBGPA
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7031.jpg
RISER A - DBGPA
File: IR_2470.jpg
Photo Date: 10/03/2014
File: IR_8516.jpg
Photo Date: 10/03/2014
File: IR_7030.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
37 °C
(+2)
25 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
35 °C
(+10)
25 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
25 °C (0) 23 °C 75 °C °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 12
Item ID DBGAL
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7033.jpg
RISER A - DBGAL
File: IR_2471.jpg
Photo Date: 10/03/2014
File: IR_8517.jpg
Photo Date: 10/03/2014
File: IR_7032.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
34 °C
(+3)
24 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
31 °C
(+6)
24 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
25 °C (0) 23 °C 75 °C °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 13
Item ID DBGACB
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7036.jpg
RISER B - DBGACB
File: IR_2468.jpg
Photo Date: 10/03/2014
File: IR_8511.jpg
Photo Date: 10/03/2014
File: IR_7035.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
100
200
300
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
29.0 °C
(+1)
26.0 °C 75.0 °C 141.1 °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
29.0 °C
(0)
24.0 °C 75.0 °C 215.8 °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
28 °C (0) 24 °C 75 °C °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 14
Item ID DBGBL
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7038.jpg
RISER B - DBGBL
File: IR_2469.jpg
Photo Date: 10/03/2014
File: IR_8513.jpg
Photo Date: 10/03/2014
File: IR_7037.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
28 °C
(+2)
24 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
26 °C (0) 24 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
26 °C (0) 24 °C 75 °C °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 15
Item ID DBGPB
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7040.jpg
RISER B - DBGPB
File: IR_2466.jpg
Photo Date: 10/03/2014
File: IR_8514.jpg
Photo Date: 10/03/2014
File: IR_7039.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
29 °C
(+3)
25 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
26 °C
(+1)
24 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
25 °C (0) 24 °C 75 °C °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 16
Item ID DB1ACB
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7043.jpg
RISER 1B - DB1ACB
File: IR_2454.jpg
Photo Date: 10/03/2014
File: IR_8486.jpg
Photo Date: 10/03/2014
File: IR_7042.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
32 °C
(+5)
29 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
27 °C (-4) 25 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
31 °C (0) 25 °C 75 °C 38.4 °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 17
Item ID DB1PB
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7045.jpg
RISER 1B - DB1PB
File: IR_2455.jpg
Photo Date: 10/03/2014
File: IR_8487.jpg
Photo Date: 10/03/2014
File: IR_7044.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
35 °C (0) 28 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
35 °C
(+8)
25 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
27 °C (0) 25 °C 75 °C °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 18
Item ID DB1BL
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7047.jpg
RISER 1B - DB1BL
File: IR_2456.jpg
Photo Date: 10/03/2014
File: IR_8488.jpg
Photo Date: 10/03/2014
File: IR_7046.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
45 °C
(+18)
21 °C 75 °C 74.6 °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
27 °C (0) 25 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
27 °C (0) 25 °C 75 °C °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 19
Item ID DB1ACA
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7052.jpg
RISER 1A - DB1ACA
File: IR_2449.jpg
Photo Date: 10/03/2014
File: IR_8495.jpg
Photo Date: 10/03/2014
File: IR_7051.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
32 °C
(+2)
26 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
30 °C
(+2)
24 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
28 °C (0) 25 °C 75 °C °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 20
Item ID DB1PA
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7054.jpg
RISER 1A - DB1PA
File: IR_2450.jpg
Photo Date: 10/03/2014
File: IR_8496.jpg
Photo Date: 10/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
32 °C
(+1)
26 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
31 °C (0) 24 °C 75 °C °C DBUV
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 21
Item ID DB1AL
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7056.jpg
RISER 1A - DB1AL
File: IR_2451.jpg
Photo Date: 10/03/2014
File: IR_8497.jpg
Photo Date: 10/03/2014
File: IR_7055.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
44 °C (-2) 28 °C 75 °C 69.0 °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
46 °C
(+3)
25 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
43 °C (0) 25 °C 75 °C 48.2 °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 22
Item ID DBLW
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7060.jpg
PLANTROOM - DBLW
File: IR_2474.jpg
Photo Date: 10/03/2014
File: IR_8484.jpg
Photo Date: 10/03/2014
File: IR_7059.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
30 °C
(+4)
27 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
26 °C (-1) 21 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
27 °C (0) 23 °C 75 °C °C DBUV
th
th
th
Trending Data
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Item No 23
Item ID DBLB
Status T
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
th
File: DC_7063.jpg
PLANTROOM - DBLB
File: IR_2473.jpg
Photo Date: 10/03/2014
File: IR_8482.jpg
Photo Date: 10/03/2014
File: IR_7062.jpg
Photo Date: 08/03/2014
Trend Data Graph
Measured Temp. Ambient Temp.
Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected
Ultrasonic Reading
Insp. TI ELECTRICAL
TRENDING DEMO
Insp. TI ELECTRICAL
TRENDING DEMO-2
Insp. TI ELECTRICAL
TRENDING DEMO-3
0
50
100
Inspection History
Inspection
Reference
Date
Inspected
Measured
Temp.
Ambient
Temp.
Reference
Temp.
(BS7671
ref cable
temp 65-
85°C)
Temperature
Load
Corrected
Ultrasonic
Reading
TI
ELECTRICAL
TRENDING
DEMO-3
10 Mar
2014
28 °C
(+5)
26 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO-2
10 Mar
2014
23 °C (-5) 20 °C 75 °C °C DBUV
TI
ELECTRICAL
TRENDING
DEMO
8 Mar
2014
28 °C (0) 22 °C 75 °C 39.9 °C DBUV
th
th
th
Work Order Forms
Current
Inspection No
TI ELECTRICAL
TRENDING DEMO-2
Report Date 20 Apr 2015
Work Order #
Corrective
Work Order #
PLEASE ADD CORRECTIVE WORK
ORDER ABOVE
Location/Equipment Information
Location BOILER ROOM
Component BOILER ROOM CP
Item ID BOILER ROOM CP
PM Work
Order
NOT ISSUED
Operation
Priority
ESSENTIAL TO
OPERATION
Problem CB1FD -L2
th
Thermal Information
Measured Temp. 138 °C
Ambient Temp. 24 °C
Nominal Maximum Current 100.0
AMPS
Measured Current 68.0
AMPS
Reference Temp. (BS7671 ref
cable temp 65-85°C)
75 °C
Temp. Rise Over Ambient 114.0
°C
Load Factor 0.7 %
Temperature Load Corrected 233.1
°C
Excess of Ref Temp. 158.6
°C
Max Load To Safely Apply
Remaining Beneath Ref Temp.
40.7
AMPS
Voltage 412
VOLTS
L1 Load 62
AMPS
L2 Load 68
AMPS
L3 Load 66
AMPS
Neutral Load AMPS
Ultrasonic Reading DBUV
File:
IR_26155A.jpg
Photo Date:
08/03/2014
File:
DC_26156.jpg
Photo Date:
08/03/2014
Repair Information
Loss to Production
Yes No Unknown
Consequences of Failure
dewdwedewf
Repair Date Repaired By
Parts Req. Before Failure Root Cause
Parts Req. After Failure Repair Procedure
Repair Recommendation Repair Action
14/08/2014
Client Work Appraisal
We are continually trying to improve our service and ensure that our inspections are carried out
to the highest standards. Please use the form below to add your comments, anonymously if you
prefer, and send back to us at the address above or:
Email: richard@thermalimaging.co.uk
Service Excellent Good Mediocre Poor Comments
Office
Response time to enquiry
Content of information sent on
enquiry
Telephone and email manner
Price
Value
Engineer
Time keeping
Appearance
Code of conduct
Subject knowledge
Method of work
Engineer flexibility
Inspection Specification
Equipment and software
Report content
Report delivery time
Report retrieval
Other comments

More Related Content

What's hot

Bobcat s130 skid steer loader service repair manual instant download (sn a3 k...
Bobcat s130 skid steer loader service repair manual instant download (sn a3 k...Bobcat s130 skid steer loader service repair manual instant download (sn a3 k...
Bobcat s130 skid steer loader service repair manual instant download (sn a3 k...fusjejfkskem
 
Rpp power train dan hidrolik alat berat xi (kusmanto)
Rpp power train dan hidrolik alat berat xi (kusmanto)Rpp power train dan hidrolik alat berat xi (kusmanto)
Rpp power train dan hidrolik alat berat xi (kusmanto)Kusmanto Kusmanto
 
DO_13_Salient_Features - OHSC Orientation.pdf
DO_13_Salient_Features - OHSC Orientation.pdfDO_13_Salient_Features - OHSC Orientation.pdf
DO_13_Salient_Features - OHSC Orientation.pdfwillymina2
 
Assignment Writing Guide Introduction
Assignment Writing Guide IntroductionAssignment Writing Guide Introduction
Assignment Writing Guide IntroductionBrooke Heidt
 
Accident Investigation (1)
Accident Investigation (1)Accident Investigation (1)
Accident Investigation (1)Moon Girl
 
Makalah tune up kendaraan
Makalah tune up kendaraanMakalah tune up kendaraan
Makalah tune up kendaraaniyoes tobing
 

What's hot (11)

Bobcat s130 skid steer loader service repair manual instant download (sn a3 k...
Bobcat s130 skid steer loader service repair manual instant download (sn a3 k...Bobcat s130 skid steer loader service repair manual instant download (sn a3 k...
Bobcat s130 skid steer loader service repair manual instant download (sn a3 k...
 
Emergency Action Plan by NOAO
Emergency Action Plan by NOAOEmergency Action Plan by NOAO
Emergency Action Plan by NOAO
 
Heavy equipments in construction
Heavy equipments in constructionHeavy equipments in construction
Heavy equipments in construction
 
Rpp power train dan hidrolik alat berat xi (kusmanto)
Rpp power train dan hidrolik alat berat xi (kusmanto)Rpp power train dan hidrolik alat berat xi (kusmanto)
Rpp power train dan hidrolik alat berat xi (kusmanto)
 
Job card template
Job card templateJob card template
Job card template
 
DO_13_Salient_Features - OHSC Orientation.pdf
DO_13_Salient_Features - OHSC Orientation.pdfDO_13_Salient_Features - OHSC Orientation.pdf
DO_13_Salient_Features - OHSC Orientation.pdf
 
Lathe safety final
Lathe safety finalLathe safety final
Lathe safety final
 
Assignment Writing Guide Introduction
Assignment Writing Guide IntroductionAssignment Writing Guide Introduction
Assignment Writing Guide Introduction
 
Accident Investigation (1)
Accident Investigation (1)Accident Investigation (1)
Accident Investigation (1)
 
Roles of standby man
Roles of standby manRoles of standby man
Roles of standby man
 
Makalah tune up kendaraan
Makalah tune up kendaraanMakalah tune up kendaraan
Makalah tune up kendaraan
 

Similar to Electrical Thermal Imaging Report TICOR

Analysis of thermal fatigue failure using IoT
Analysis of thermal fatigue failure using IoTAnalysis of thermal fatigue failure using IoT
Analysis of thermal fatigue failure using IoTManupratap Singh Parmar
 
Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panelsPower System Operation
 
Understanding AMS2750E (intermediate) v2
Understanding AMS2750E (intermediate) v2Understanding AMS2750E (intermediate) v2
Understanding AMS2750E (intermediate) v2Peter Sherwin
 
E+H-Transmitter sensor matching improves RTD accuracy
E+H-Transmitter sensor matching improves RTD accuracyE+H-Transmitter sensor matching improves RTD accuracy
E+H-Transmitter sensor matching improves RTD accuracyCarotek
 
Water Temperature
Water TemperatureWater Temperature
Water TemperatureTheju Paul
 
IRJET - Control and Analyze of TCPTF
IRJET -  	  Control and Analyze of TCPTFIRJET -  	  Control and Analyze of TCPTF
IRJET - Control and Analyze of TCPTFIRJET Journal
 
Thermal Analysis of a Linear Voltage Regulator
Thermal Analysis of a Linear Voltage RegulatorThermal Analysis of a Linear Voltage Regulator
Thermal Analysis of a Linear Voltage RegulatorIonela
 
Automated Substation Monitoring with Thermal Imaging
Automated Substation Monitoring with Thermal Imaging Automated Substation Monitoring with Thermal Imaging
Automated Substation Monitoring with Thermal Imaging Power System Operation
 
Research proposal: Thermoelectric cooling in electric vehicles
Research proposal: Thermoelectric cooling in electric vehicles Research proposal: Thermoelectric cooling in electric vehicles
Research proposal: Thermoelectric cooling in electric vehicles KristopherKerames
 
Simplifying Plant Safety Instrumentation
Simplifying Plant Safety InstrumentationSimplifying Plant Safety Instrumentation
Simplifying Plant Safety InstrumentationMiller Energy, Inc.
 
Nidec asi service infrared termography
Nidec asi service infrared termographyNidec asi service infrared termography
Nidec asi service infrared termographyNidec Corporation
 
Automation of temperature variation setup for impedance analyzer using LabVIEW
Automation of temperature variation setup for impedance analyzer using LabVIEWAutomation of temperature variation setup for impedance analyzer using LabVIEW
Automation of temperature variation setup for impedance analyzer using LabVIEWNot yet working. I am still studying
 
GROUP1_INSTRU-SENSORS-CALI_FEEDBACK.pptx
GROUP1_INSTRU-SENSORS-CALI_FEEDBACK.pptxGROUP1_INSTRU-SENSORS-CALI_FEEDBACK.pptx
GROUP1_INSTRU-SENSORS-CALI_FEEDBACK.pptxRyan Cortes
 
4.0 technical reference for monitoring equipment
4.0 technical reference for monitoring equipment4.0 technical reference for monitoring equipment
4.0 technical reference for monitoring equipmentDedi Prayogi
 
Calibrating the Measuring Chain
Calibrating the Measuring ChainCalibrating the Measuring Chain
Calibrating the Measuring ChainTacuna Systems
 

Similar to Electrical Thermal Imaging Report TICOR (20)

Analysis of thermal fatigue failure using IoT
Analysis of thermal fatigue failure using IoTAnalysis of thermal fatigue failure using IoT
Analysis of thermal fatigue failure using IoT
 
Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panels
 
Thermal mass flow meter Operational Manual.pdf
Thermal mass flow meter Operational Manual.pdfThermal mass flow meter Operational Manual.pdf
Thermal mass flow meter Operational Manual.pdf
 
Understanding AMS2750E (intermediate) v2
Understanding AMS2750E (intermediate) v2Understanding AMS2750E (intermediate) v2
Understanding AMS2750E (intermediate) v2
 
E+H-Transmitter sensor matching improves RTD accuracy
E+H-Transmitter sensor matching improves RTD accuracyE+H-Transmitter sensor matching improves RTD accuracy
E+H-Transmitter sensor matching improves RTD accuracy
 
Water Temperature
Water TemperatureWater Temperature
Water Temperature
 
IRJET - Control and Analyze of TCPTF
IRJET -  	  Control and Analyze of TCPTFIRJET -  	  Control and Analyze of TCPTF
IRJET - Control and Analyze of TCPTF
 
Thermal Analysis of a Linear Voltage Regulator
Thermal Analysis of a Linear Voltage RegulatorThermal Analysis of a Linear Voltage Regulator
Thermal Analysis of a Linear Voltage Regulator
 
Automated Substation Monitoring with Thermal Imaging
Automated Substation Monitoring with Thermal Imaging Automated Substation Monitoring with Thermal Imaging
Automated Substation Monitoring with Thermal Imaging
 
Article lior yosef
Article  lior yosefArticle  lior yosef
Article lior yosef
 
Research proposal: Thermoelectric cooling in electric vehicles
Research proposal: Thermoelectric cooling in electric vehicles Research proposal: Thermoelectric cooling in electric vehicles
Research proposal: Thermoelectric cooling in electric vehicles
 
Simplifying Plant Safety Instrumentation
Simplifying Plant Safety InstrumentationSimplifying Plant Safety Instrumentation
Simplifying Plant Safety Instrumentation
 
Nidec asi service infrared termography
Nidec asi service infrared termographyNidec asi service infrared termography
Nidec asi service infrared termography
 
Oep
OepOep
Oep
 
Control system-lab
Control system-labControl system-lab
Control system-lab
 
Automation of temperature variation setup for impedance analyzer using LabVIEW
Automation of temperature variation setup for impedance analyzer using LabVIEWAutomation of temperature variation setup for impedance analyzer using LabVIEW
Automation of temperature variation setup for impedance analyzer using LabVIEW
 
DSC
DSCDSC
DSC
 
GROUP1_INSTRU-SENSORS-CALI_FEEDBACK.pptx
GROUP1_INSTRU-SENSORS-CALI_FEEDBACK.pptxGROUP1_INSTRU-SENSORS-CALI_FEEDBACK.pptx
GROUP1_INSTRU-SENSORS-CALI_FEEDBACK.pptx
 
4.0 technical reference for monitoring equipment
4.0 technical reference for monitoring equipment4.0 technical reference for monitoring equipment
4.0 technical reference for monitoring equipment
 
Calibrating the Measuring Chain
Calibrating the Measuring ChainCalibrating the Measuring Chain
Calibrating the Measuring Chain
 

Recently uploaded

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 

Recently uploaded (20)

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 

Electrical Thermal Imaging Report TICOR

  • 1. Thermal Imaging Report Inspection Ref. TI ELECTRICAL TRENDING DEMO-2 (ELECTRICAL) TI LTD / TI ELECTRICAL TRENDING DEMO 1 Jun 2012st Client TI LTD Site TI ELECTRICAL TRENDING DEMO Trident Court, 1 Oakcroft Road Chessington Surrey KT9 1BD Contacts Richard Wallace richard@thermalimaging.co.uk 0203 0442940
  • 2. Inspection Data Reason for Survey PERIODIC THERMOGRAPHIC INSPECTION OF ELECTRICAL INFRASTRUCTURE AND ASSOCIATED COMPONENTS FOR THE PURPOSE OF ON-GOING RISK MANAGEMENT Purpose of Survey RISK MANAGEMENT INSPECTION OF ELECTRICAL INFRASTRUCTURE IN ORDER TO UNCOVER ANOMALOUS COMPONENT TEMPERATURES AND TO OFFER ROOT CAUSE AND REMEDIAL SUGGESTIONS Inspection Commencing N/A Applicable Formulas YES - LOAD CORRECTION Camera FLIR THERMACAM P640 Camera Calibration CALIBRATION CHECKED Thermographer Cert and ID RICHARD WALLACE - LEVEL 2 THERMOGRAPHY - 49595 Software TICOR™ ANDROID DATA CAPTURE AND REPORTING APPLICATION LINKED TO WEBCOR™ ONLINE CAMPAIGN MANAGER - ELECTRICAL MODULE Ambient Temp (C) N/A Humidity (%) N/A
  • 4. Introduction to your Ti Thermal Imaging LTD risk management thermographic inspection This electrical and visual thermographic inspection has been carried out using a FLIR Professional thermal imaging camera with data input onto our purpose built tablet platform TICOR for instantaneous results and report generation. Our WEBCOR campaign and inspection management system houses all data that is permanently accessible over the internet allowing the user to track, monitor and adjust repair status of problems found during the inspection. Crucially it also trends component temperatures between periodic inspections offering a true predictive maintenance platform so that components, particularly with problems, can be monitored and remedial campaigns can be created around planned downtime rather than invasive unplanned shutdowns. Ultimately this approach will keep the assets running without interuptive power outages which can prevent production and cost company revenue. Our TICOR and WEBCOR System sync's together to ensure all data is held centrally and updated upon internet connection. This is a guide which should help you to fully understand how the inspection was performed and how the results were achieved The framework to this inspection can either be generated onsite during the inspection, building the list during the survey or a list exported to MS Excel can be imported into the Android tablet to provide comprehensive information such as item locations, tag numbers, work orders etc. Images are captured of all online items and a record is kept of temperature data to enable a trending programme to begin. Subsequent inspections will see the addition of a new image for each inspection so that temperatures can be monitored. Trending images and anomalous pieces of equipment have been recorded as one of two types of inspection: Thermal – This covers temperature related anomalies Visual – This covers all visual findings only All component trending images are taken under normal load conditions. Panels have been removed where safe and possible to do so and where covered by the Permit To Work system. In addition load readings have been captured using a clamp meter only where covered by the Permit to Work system and where safe to do so. In some cases load readings have not been taken so these are left as blank intentionally so that the normalised graph will function correctly. If a 0 value is inserted then a fictitious reading will be obtained. An explanation of the Normalization graph is listed later. A complete inventory will be built of the equipment giving Test Status at the time of the inspection allowing transparency to the inspection and what occurred with each piece of equipment. These Test Status include: TBT To Be Tested These appear in bold on the thermographers tablet to identify which items are still to be tested T Tested Marked as Tested once images and faults have
  • 5. been documented NTLO Not Tested Locked Out Selected if the item could not be opened safely NTNL Not Tested No Load Selected if the item was offline at the time of inspection and could not be started NTNA Not Tested Not Available Selected if the item is no longer available NTNS Not Tested Not Specified Selected if an item is found to be unspecified NTUR Not Tested Under Repair Selected if an item is currently under a repair procedure NSFI Not Scheduled For Inspection Selected if an item is not due or needed to be tested NTTC Not Tested Time Constraint Selected if the inspection has not been allocated enough time or access problems have cause it to overrun. Each piece of equipment has been allocated a priority to operation taken from the following non-changeable list: Essential to Operation Equipment is required for the site to run effectively: This may include main power, machinery and other essential items that would effect site productivity Non-Essential To Operation Equipment is not required for the site to run effectively: This may include items which would not effect site productivity Emissivity is the value in which an object emits it’s infra-red radiation and is also directly proportional to it’s reflectivity. For example if an item had 0.9 emissivity then it’s reflectivity would be 0.1. This inspection uses an emissivity set between 0.9 and 0.96 because this is found to be suitable when assessing the temperatures of most electrical components due to them usually being housed in plastic or rubber which has a similar emissivity value. Emissivity is only changed were absolutely necessary. An example of this would be copper busbar with no electrical tape/labels attached. Anomalous components are assessed in one of two ways. 1. With the use of Reference components operating under similar conditions: These would include using line/load sides or different phases with similar load patterns to compare an
  • 6. anomalous component with another which has a more normal temperature gradient. 2. The use of load correction formulas which results in the following values: Estimated fault component temp at full load (°C) – This estimates the temperature that the component would be running at if it was loaded at 100%. This value has been arrived at using a formula correction using anomalous and ambient temperatures, measured and maximum load. The value of 75°C has been taken from the British Standard BS7671 (*.*). This value is the recommended cable temperatures of between 65-85C at full load. Using this value it is possible to use a fault rating system to grade the severity of the fault. The following fault ratings and colour coding have been used: Fault Ratings Minor Important Serious Critical 100% Load corrected temp - 75°C 0-7 8-15 16-32 33+ This value of 75°C is also used as a threshold temperature for the captured baseline images. In certain circumstances, this value has either been increased to 100°C or decreased to 50°C. The value has been increased to 100°C where the thermographer deems this a more appropriate value due to an elevated cubicle ambient or where components are tightly arranged together causing uplift in operating temperature. The value has been decreased to 50°C where the thermographer deems this a more appropriate value due to panel covers not being able to be removed and only the surface of the component can be seen and not the actual connections. In certain circumstances where SP2 Reference temperature cannot be suitably obtained, the value has been set from the BS Ref of 75°C as the SP2 reference temp. The normalization graph simulates temperature at 0, 50% and 100% load and is designed to assist the prediction of component operating temperature where a reference component has been used. According to Ohms law P=I²R but the graph is designed as a quick glance tool to assist in viewing the potential that a problem may become. Where anomalous components are found, a knowledge base library is used to house specific statements that ensure synergy between inspections for faults, root causes and recommended remedial actions. Formulas: Name Formula T load corrected Let (Tm – Tamb) = Trise ; I meas / I full = LF (Load factor) Then: Tcorr = (((1/ LF)^1.68+(1/ LF)^1.46)/2)*Trise + Tamb
  • 7. Summary The Infrared Inspection was performed by TI Thermal Imaging, by a certified infrared Thermographer. All of the items inspected are listed in this TICOR report. Any anomalies are listed in order of priority based on the component's temperature rise, as measured from a reference component of equal type and load at the time of the inspection. TI Thermal Imaging assumes no liability directly or indirectly as a result of this inspection. Priority Current Inspection Prior Inspection Percent of Change Thermal Not Specified 1 = 100% 2 = 100% -50% Minor 0 = 0% 0 = 0% N/A Important 0 = 0% 0 = 0% N/A Serious 0 = 0% 0 = 0% N/A Critical 0 = 0% 0 = 0% N/A Visual Not Specified 0 0 N/A Minor 0 0 N/A Important 0 0 N/A Serious 0 0 N/A Critical 0 0 N/A Ultrasonic Not Specified 0 0 N/A Minor 0 0 N/A Important 0 0 N/A Serious 0 0 N/A Critical 0 0 N/A I hereby certify the project was inspected by myself or under my direction and that the enclosed data is the result of this inspection. TICOR Wallace, Rich
  • 8. Inventory Equipment Description Item ID PM Work Order Operation Priority Problem #s Status BOILER ROOM BOILER CP2 BOILER CP NOT ISSUED ESSENTIAL TO OPERATION T BOILER ROOM CP BOILER ROOM CP NOT ISSUED ESSENTIAL TO OPERATION 1 T PLANTROOM DBLB DBLB NOT ISSUED ESSENTIAL TO OPERATION T DBLW DBLW NOT ISSUED ESSENTIAL TO OPERATION T RISER 1A DB1AL DB1AL NOT ISSUED ESSENTIAL TO OPERATION T DB1PA DB1PA NOT ISSUED ESSENTIAL TO OPERATION T DB1ACA DB1ACA NOT ISSUED ESSENTIAL TO OPERATION T RISER 1B DB1BL DB1BL NOT ISSUED ESSENTIAL TO OPERATION T DB1PB DB1PB NOT ISSUED ESSENTIAL TO OPERATION T DB1ACB DB1ACB NOT ISSUED ESSENTIAL TO OPERATION T RISER A DBGAL DBGAL NOT ISSUED ESSENTIAL TO OPERATION T DBGPA DBGPA NOT ISSUED ESSENTIAL TO OPERATION T DBGACA DBGACA NOT ISSUED ESSENTIAL TO OPERATION T RISER B
  • 9. DBGBL DBGBL NOT ISSUED ESSENTIAL TO OPERATION T DBGPB DBGPB NOT ISSUED ESSENTIAL TO OPERATION T DBGACB DBGACB NOT ISSUED ESSENTIAL TO OPERATION T SWITCHROOM MAIN LV DBM DBM NOT ISSUED ESSENTIAL TO OPERATION T DB1M DB1M NOT ISSUED ESSENTIAL TO OPERATION T DBGA DBGA NOT ISSUED ESSENTIAL TO OPERATION T DBLD DBLD NOT ISSUED ESSENTIAL TO OPERATION T DBL&P DBL&P NOT ISSUED ESSENTIAL TO OPERATION T DBLD2 DBLD2 NOT ISSUED ESSENTIAL TO OPERATION T MAIN ACB INCOMER MAIN ACB NOT ISSUED ESSENTIAL TO OPERATION T
  • 10. Problems Problem # Equipment Item ID PM Work Order Temp. Rise Over Ambient Load Factor Type Fault Rating Status 1 BOILER ROOM - BOILER ROOM CP Component: CB1FD -L2 BOILER ROOM CP NOT ISSUED 114.0 ° C 0.7 % THERMAL NO ISSUE OPEN 1 RISER B - DBGACB Component: NEUTRAL DBGACB NOT ISSUED 5.0 °C 0.1 % THERMAL NO ISSUE CLOSED 2 BOILER ROOM - BOILER CP2 Component: BURNER CONTROLLER BOILER CP NOT ISSUED 100.0 ° C 0.6 % THERMAL NO ISSUE CLOSED
  • 11. Fault Pages Client Asset Report Date Problem # Problem Type Fault Rating Problem Status TI LTD TI ELECTRICAL TRENDING DEMO 20/04/2015 1 THERMAL NO ISSUE OPEN File: IR_26155A.jpg Photo Date: 08/03/2014 Location/Equipment Information Location BOILER ROOM Component BOILER ROOM CP Item ID BOILER ROOM CP Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION Fault Item/Description CB1FD -L2 Problem Item CONTACTORS Type 100A Manufacturer MERLIN GERIN Anomaly INDICATED HIGHER TEMPERATURE THAN EXPECTED File: DC_26156.jpg Photo Date: 08/03/2014 Trending Data Measured Temp. 138 °C Ambient Temp. 24 °C Nominal Maximum Current 100.0 AMPS Measured Current 68.0 AMPS Reference Temp. (BS7671 ref cable temp 65-85°C) 75 °C Temp. Rise Over Ambient 114.0 °C Load Factor 0.7 % Temperature Load Corrected 233.1 °C Excess of Ref Temp. 158.6 °C Max Load To Safely Apply Remaining Beneath Ref Temp. 40.7 AMPS Voltage 412
  • 12. Root Cause SUSPECTED LOOSE, DETERIORATED OR INADEQUATE CONNECTION Remedial CHECK, CLEAN & RE- MAKE CONNECTION TO PRESCRIBED STANDARD VOLTS L1 Load 62 AMPS L2 Load 68 AMPS L3 Load 66 AMPS Neutral Load AMPS Ultrasonic Reading DBUV Load (%) Temperature(°C) Reference 0 20 40 60 80 100 100 200 0 300
  • 13. Fault Pages Client Asset Report Date Problem # Problem Type Fault Rating Problem Status TI LTD TI ELECTRICAL TRENDING DEMO 20/04/2015 1 THERMAL NO ISSUE CLOSED File: IR_8511A.jpg Photo Date: 10/03/2014 Location/Equipment Information Location RISER B Component DBGACB Item ID DBGACB Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION Fault Item/Description NEUTRAL Problem Item MINI CIRCUIT BREAKERS Type 100A Manufacturer MERLIN GERIN Anomaly NEUTRAL CONDUCTOR DISPLAYING File: DC_8512.jpg Photo Date: 10/03/2014 Trending Data Measured Temp. 29.0 °C Ambient Temp. 24.0 °C Nominal Maximum Current 100.0 AMPS Measured Current 12.0 AMPS Reference Temp. (BS7671 ref cable temp 65-85°C) 75.0 °C Temp. Rise Over Ambient 5.0 °C Load Factor 0.1 % Temperature Load Corrected 215.8 °C Excess of Ref Temp. 141.3 °C Max Load To Safely Apply Remaining Beneath Ref Temp. 53.3 AMPS
  • 14. DISPLAYING UNEXPECTED TEMPERATURE ANOMALY Root Cause SUSPECTED LOOSE, DETERIORATED OR INADEQUATE CONNECTION Remedial CHECK, CLEAN & RE- MAKE CONNECTION TO PRESCRIBED STANDARD Voltage 240.0 VOLTS L1 Load 12.0 AMPS L2 Load 0.0 AMPS L3 Load 0.0 AMPS Neutral Load 12.0 AMPS Ultrasonic Reading DBUV Load (%) Temperature(°C) Reference 0 20 40 60 80 100 100 200 0 300
  • 15. Fault Pages Client Asset Report Date Problem # Problem Type Fault Rating Problem Status TI LTD TI ELECTRICAL TRENDING DEMO 20/04/2015 2 THERMAL NO ISSUE CLOSED File: IR_26157A.jpg Photo Date: 08/03/2014 Location/Equipment Information Location BOILER ROOM Component BOILER CP2 Item ID BOILER CP Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION Fault Item/Description BURNER CONTROLLER Problem Item CONTACTORS Type 63A Manufacturer MERLIN GERIN Anomaly INDICATED HIGHER TEMPERATURE THAN EXPECTED File: DC_26158.jpg Photo Date: 08/03/2014 Trending Data Measured Temp. 121.0 °C Ambient Temp. 21.0 °C Nominal Maximum Current 63.0 AMPS Measured Current 36.0 AMPS Reference Temp. (BS7671 ref cable temp 65-85°C) 75.0 °C Temp. Rise Over Ambient 100.0 °C Load Factor 0.6 % Temperature Load Corrected 244.4 °C Excess of Ref Temp. 169.9 °C Max Load To Safely Apply 24.3
  • 16. Root Cause SUSPECTED LOOSE OR DETERIORATED CONNECTION Remedial CHECK, CLEAN & RE- MAKE CONNECTION TO PRESCRIBED STANDARD Remaining Beneath Ref Temp. AMPS Voltage 415.0 VOLTS L1 Load 36.0 AMPS L2 Load 42.0 AMPS L3 Load 41.0 AMPS Neutral Load 0.0 AMPS Ultrasonic Reading DBUV Load (%) Temperature(°C) Reference 0 20 40 60 80 100 100 200 300 0
  • 17. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 1 Item ID DBGA Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7006.jpg SWITCHROOM > MAIN LV - DBGA File: IR_2461.jpg Photo Date: 10/03/2014 File: IR_8505.jpg Photo Date: 10/03/2014 File: IR_7005.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 18. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 34 °C (+2) 24 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 32 °C (+3) 23 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 29 °C (0) 24 °C 75 °C °C DBUV th th th
  • 19. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 2 Item ID DBM Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7010.jpg SWITCHROOM > MAIN LV - DBM File: IR_2465.jpg Photo Date: 10/03/2014 File: IR_8500.jpg Photo Date: 10/03/2014 File: IR_7009.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 20. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 32 °C (+1) 25 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 31 °C (-7) 24 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 38 °C (0) 25 °C 75 °C °C DBUV th th th
  • 21. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 3 Item ID DBLD Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7012.jpg SWITCHROOM > MAIN LV - DBLD File: IR_2463.jpg Photo Date: 10/03/2014 File: IR_8501.jpg Photo Date: 10/03/2014 File: IR_7011.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 22. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 26 °C (+1) 23 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 25 °C (-2) 23 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 27 °C (0) 24 °C 75 °C °C DBUV th th th
  • 23. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 4 Item ID MAIN ACB Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7014.jpg SWITCHROOM > MAIN LV - MAIN ACB INCOMER File: IR_2460.jpg Photo Date: 10/03/2014 File: IR_7013.jpg Photo Date: 08/03/2014 Trend Data Graph Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History
  • 25. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 5 Item ID DB1M Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7016.jpg SWITCHROOM > MAIN LV - DB1M File: IR_2464.jpg Photo Date: 10/03/2014 File: IR_8504.jpg Photo Date: 10/03/2014 File: IR_7015.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 26. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 28 °C (+3) 24 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 25 °C (-2) 23 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 27 °C (0) 25 °C 75 °C °C DBUV th th th
  • 27. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 6 Item ID DBL&P Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7018.jpg SWITCHROOM > MAIN LV - DBL&P File: IR_2459.jpg Photo Date: 10/03/2014 File: IR_8508.jpg Photo Date: 10/03/2014 File: IR_7017.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 28. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 32 °C (-1) 24 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 33 °C (+1) 24 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 32 °C (0) 25 °C 75 °C 36.0 °C DBUV th th th
  • 29. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 7 Item ID DBLD2 Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7020.jpg SWITCHROOM > MAIN LV - DBLD2 File: IR_2457.jpg Photo Date: 10/03/2014 File: IR_8510.jpg Photo Date: 10/03/2014 File: IR_7019.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 30. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 30 °C (+2) 25 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 28 °C (+3) 24 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 25 °C (0) 24 °C 75 °C °C DBUV th th th
  • 31. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 8 Item ID BOILER ROOM CP Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_26154.jpg BOILER ROOM - BOILER ROOM CP File: IR_26153.jpg Photo Date: 10/03/2014 File: IR_26153.jpg Photo Date: 08/03/2014 Trend Data Graph Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 0 100 200 300 Inspection History
  • 32. Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 68 °C (- 70) 35 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 138 °C (0) 24 °C 75 °C 233.1 °C DBUV th th
  • 33. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 9 Item ID BOILER CP Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_26154.jpg BOILER ROOM - BOILER CP2 File: IR_8485.jpg Photo Date: 10/03/2014 File: IR_26153.jpg Photo Date: 08/03/2014 Trend Data Graph Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 0 100 200 300 Inspection History
  • 34. Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 °C (-121) °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 121.0 °C (0) 21.0 °C 75.0 °C 244.4 °C DBUV th th
  • 35. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 10 Item ID DBGACA Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7029.jpg RISER A - DBGACA File: IR_2469.jpg Photo Date: 10/03/2014 File: IR_7028.jpg Photo Date: 08/03/2014 Trend Data Graph Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History
  • 36. Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 28 °C (-2) 24 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 30 °C (0) 23 °C 75 °C 34.0 °C DBUV th th
  • 37. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 11 Item ID DBGPA Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7031.jpg RISER A - DBGPA File: IR_2470.jpg Photo Date: 10/03/2014 File: IR_8516.jpg Photo Date: 10/03/2014 File: IR_7030.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 38. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 37 °C (+2) 25 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 35 °C (+10) 25 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 25 °C (0) 23 °C 75 °C °C DBUV th th th
  • 39. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 12 Item ID DBGAL Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7033.jpg RISER A - DBGAL File: IR_2471.jpg Photo Date: 10/03/2014 File: IR_8517.jpg Photo Date: 10/03/2014 File: IR_7032.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 40. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 34 °C (+3) 24 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 31 °C (+6) 24 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 25 °C (0) 23 °C 75 °C °C DBUV th th th
  • 41. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 13 Item ID DBGACB Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7036.jpg RISER B - DBGACB File: IR_2468.jpg Photo Date: 10/03/2014 File: IR_8511.jpg Photo Date: 10/03/2014 File: IR_7035.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 42. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 100 200 300 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 29.0 °C (+1) 26.0 °C 75.0 °C 141.1 °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 29.0 °C (0) 24.0 °C 75.0 °C 215.8 °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 28 °C (0) 24 °C 75 °C °C DBUV th th th
  • 43. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 14 Item ID DBGBL Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7038.jpg RISER B - DBGBL File: IR_2469.jpg Photo Date: 10/03/2014 File: IR_8513.jpg Photo Date: 10/03/2014 File: IR_7037.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 44. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 28 °C (+2) 24 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 26 °C (0) 24 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 26 °C (0) 24 °C 75 °C °C DBUV th th th
  • 45. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 15 Item ID DBGPB Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7040.jpg RISER B - DBGPB File: IR_2466.jpg Photo Date: 10/03/2014 File: IR_8514.jpg Photo Date: 10/03/2014 File: IR_7039.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 46. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 29 °C (+3) 25 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 26 °C (+1) 24 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 25 °C (0) 24 °C 75 °C °C DBUV th th th
  • 47. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 16 Item ID DB1ACB Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7043.jpg RISER 1B - DB1ACB File: IR_2454.jpg Photo Date: 10/03/2014 File: IR_8486.jpg Photo Date: 10/03/2014 File: IR_7042.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 48. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 32 °C (+5) 29 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 27 °C (-4) 25 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 31 °C (0) 25 °C 75 °C 38.4 °C DBUV th th th
  • 49. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 17 Item ID DB1PB Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7045.jpg RISER 1B - DB1PB File: IR_2455.jpg Photo Date: 10/03/2014 File: IR_8487.jpg Photo Date: 10/03/2014 File: IR_7044.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 50. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 35 °C (0) 28 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 35 °C (+8) 25 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 27 °C (0) 25 °C 75 °C °C DBUV th th th
  • 51. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 18 Item ID DB1BL Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7047.jpg RISER 1B - DB1BL File: IR_2456.jpg Photo Date: 10/03/2014 File: IR_8488.jpg Photo Date: 10/03/2014 File: IR_7046.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 52. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 45 °C (+18) 21 °C 75 °C 74.6 °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 27 °C (0) 25 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 27 °C (0) 25 °C 75 °C °C DBUV th th th
  • 53. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 19 Item ID DB1ACA Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7052.jpg RISER 1A - DB1ACA File: IR_2449.jpg Photo Date: 10/03/2014 File: IR_8495.jpg Photo Date: 10/03/2014 File: IR_7051.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 54. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 32 °C (+2) 26 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 30 °C (+2) 24 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 28 °C (0) 25 °C 75 °C °C DBUV th th th
  • 55. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 20 Item ID DB1PA Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7054.jpg RISER 1A - DB1PA File: IR_2450.jpg Photo Date: 10/03/2014 File: IR_8496.jpg Photo Date: 10/03/2014 Trend Data Graph Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History
  • 56. Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 32 °C (+1) 26 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 31 °C (0) 24 °C 75 °C °C DBUV th th
  • 57. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 21 Item ID DB1AL Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7056.jpg RISER 1A - DB1AL File: IR_2451.jpg Photo Date: 10/03/2014 File: IR_8497.jpg Photo Date: 10/03/2014 File: IR_7055.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 58. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 44 °C (-2) 28 °C 75 °C 69.0 °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 46 °C (+3) 25 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 43 °C (0) 25 °C 75 °C 48.2 °C DBUV th th th
  • 59. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 22 Item ID DBLW Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7060.jpg PLANTROOM - DBLW File: IR_2474.jpg Photo Date: 10/03/2014 File: IR_8484.jpg Photo Date: 10/03/2014 File: IR_7059.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 60. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 30 °C (+4) 27 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 26 °C (-1) 21 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 27 °C (0) 23 °C 75 °C °C DBUV th th th
  • 61. Trending Data Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Item No 23 Item ID DBLB Status T PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION th File: DC_7063.jpg PLANTROOM - DBLB File: IR_2473.jpg Photo Date: 10/03/2014 File: IR_8482.jpg Photo Date: 10/03/2014 File: IR_7062.jpg Photo Date: 08/03/2014 Trend Data Graph
  • 62. Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65-85°C) Temperature Load Corrected Ultrasonic Reading Insp. TI ELECTRICAL TRENDING DEMO Insp. TI ELECTRICAL TRENDING DEMO-2 Insp. TI ELECTRICAL TRENDING DEMO-3 0 50 100 Inspection History Inspection Reference Date Inspected Measured Temp. Ambient Temp. Reference Temp. (BS7671 ref cable temp 65- 85°C) Temperature Load Corrected Ultrasonic Reading TI ELECTRICAL TRENDING DEMO-3 10 Mar 2014 28 °C (+5) 26 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO-2 10 Mar 2014 23 °C (-5) 20 °C 75 °C °C DBUV TI ELECTRICAL TRENDING DEMO 8 Mar 2014 28 °C (0) 22 °C 75 °C 39.9 °C DBUV th th th
  • 63. Work Order Forms Current Inspection No TI ELECTRICAL TRENDING DEMO-2 Report Date 20 Apr 2015 Work Order # Corrective Work Order # PLEASE ADD CORRECTIVE WORK ORDER ABOVE Location/Equipment Information Location BOILER ROOM Component BOILER ROOM CP Item ID BOILER ROOM CP PM Work Order NOT ISSUED Operation Priority ESSENTIAL TO OPERATION Problem CB1FD -L2 th Thermal Information Measured Temp. 138 °C Ambient Temp. 24 °C Nominal Maximum Current 100.0 AMPS Measured Current 68.0 AMPS Reference Temp. (BS7671 ref cable temp 65-85°C) 75 °C Temp. Rise Over Ambient 114.0 °C Load Factor 0.7 % Temperature Load Corrected 233.1 °C Excess of Ref Temp. 158.6 °C Max Load To Safely Apply Remaining Beneath Ref Temp. 40.7 AMPS Voltage 412 VOLTS L1 Load 62 AMPS L2 Load 68 AMPS L3 Load 66 AMPS Neutral Load AMPS Ultrasonic Reading DBUV
  • 65. Repair Information Loss to Production Yes No Unknown Consequences of Failure dewdwedewf Repair Date Repaired By Parts Req. Before Failure Root Cause Parts Req. After Failure Repair Procedure Repair Recommendation Repair Action 14/08/2014
  • 66. Client Work Appraisal We are continually trying to improve our service and ensure that our inspections are carried out to the highest standards. Please use the form below to add your comments, anonymously if you prefer, and send back to us at the address above or: Email: richard@thermalimaging.co.uk Service Excellent Good Mediocre Poor Comments Office Response time to enquiry Content of information sent on enquiry Telephone and email manner Price Value Engineer Time keeping Appearance Code of conduct Subject knowledge Method of work Engineer flexibility Inspection Specification Equipment and software Report content Report delivery time Report retrieval Other comments