WHO WE ARE


About The Design Partnership

• Founded in 1979
• 45 Employees
• Expertise in Science & Technology, Education,
Healthcare,
  Public, Master Planning
• BIM/Lean / IPD Leadership
• Over $1 Billion Designed in BIM
• Using BIM since 2005; 100% BIM since 2006
• 2008 AIASF Integrated Practice Honor Award
Recipient
REDUCING RISK WITH BIM
1 What is Risk?
2 Technology Introduction
3 Construction Technology
4 Case Study: VA Puget Sound
5 Case Study: Stanford Cath Labs
6 Case Study: Robbins Hall
Renovation
WHAT IS RISK?
                  •          Altering “Risk = Cost” Equation
                  •          Increase in Architect’s Exposure
                  •          Decrease in Contractor’s Risk
                  •          Decrease in Owner’s Risk
                  •          Reduced Risk for All = Reduced
                             Cost




The Design Partnership LLP

Architects + Planners
Increase in Architect’s
                    Exposure
 Unknown Consequences Of Sharing BIM
  Information
 Design Only Information In BIM Model
 Extensive Pre-coordination
 Fabrication From Design Models

 Increased Exposure to Risk

The Design Partnership LLP

Architects + Planners
Decrease in Contractor’s Risk
 Reduced Coordination Errors
 Reduced Unknown Conditions
 More Efficient Workflow
 Cooperation & Collaboration
 Reduced Contingency

 Increased Confidence &  Reduced Risk

The Design Partnership LLP

Architects + Planners
Decrease in Owner’s Risk
 Reduced Bidding Costs Due To Reduced
  Contractor Risks
 Reduced Risk Of
      – Change Orders From Unknown Conditions
      – Coordination Changes
      – Fighting Among AEC Entities
 Reduced User Changes Due To Better
  Pre-visualization And Planning
The Design Partnership LLP

Architects + Planners
Architect’s Exposure 
                                      However
                                 Architect’s Risk 



        Reduced Risk for All = Reduced Cost



The Design Partnership LLP 
Architects + Planners
TECHNOLOGY
                  INTRODUCTION
                  •      Building Information Modeling
                         (BIM)
                  •      Virtual Simulation / Pre-
                         visualization
                  •      3D Laser Survey
                  •      Clash Detection & Coordination


The Design Partnership LLP

Architects + Planners
The Big BIM/IPD/Lean Idea




The Design Partnership LLP

Architects + Planners
Project Delivery Improvement
                    Automatic Document Coordination

                    3D Systems Coordination

                    Virtual Building Simulation

                    Direct Fabrication
The Design Partnership LLP

Architects + Planners
Building Information Modeling
                 (BIM)




The Design Partnership LLP

Architects + Planners
BIM is a 3D Database




The Design Partnership LLP

Architects + Planners
Design Visualization




The Design Partnership LLP

Architects + Planners
Design Visualization




The Design Partnership LLP

Architects + Planners
Virtual Equipment Simulation




The Design Partnership LLP 
Architects + Planners
The Design Partnership LLP 
Architects + Planners
3D Laser Survey




The Design Partnership LLP

Architects + Planners
Clash Detection & Coordination



Structural Plan




                                  Where is the
                               coordination error?
Mechanical Plan

The Design Partnership LLP 
Architects + Planners
Clash Detection & Coordination




The Design Partnership LLP 
Architects + Planners
CONSTRUCTION
                   TECHNOLOGY
                   •           Direct Fabrication
                   •           Prefabrication
                   •           Capabilities




The Design Partnership LLP 
Architects + Planners
Direct Fabrication




The Design Partnership LLP 
Architects + Planners                        Images courtesy of Marelich Mechanical
Direct Fabrication




The Design Partnership LLP 
Architects + Planners
Prefabrication




The Design Partnership LLP 
Architects + Planners
The Design Partnership LLP 
Architects + Planners          Image courtesy of Marelich Mechanical
The Design Partnership LLP 
Architects + Planners
The Design Partnership LLP 
Architects + Planners          Image courtesy of Marelich Mechanical
The Design Partnership LLP 
Architects + Planners
3D Capable Trades
•   HVAC
•   Plumbing
•   Structural Steel
•   Precast Concrete
•   Rebar
•   Steel Stud Walls
•   Curtain Walls, etc.
•   Millwork
•   Unit Restrooms
•   Laboratories

The Design Partnership LLP 
Architects + Planners
Relative Sophistication Disparity
       General Contractors (Very Low to Low)
       Engineers (Very Low to Moderate)
      Architects (Low to Moderate)
       Subcontractors (Varies, some extremely high)

       Maximize advantage of sophisticated players
       Enhance process for Subs already using 3D
       Mentor less advanced members
       Integrated Project Delivery


The Design Partnership LLP 
Architects + Planners
CASE STUDY: VA PUGET
                   SOUND
                   •       Design of VA Puget Sound Mental
                           Health & Research Project




The Design Partnership LLP 
Architects + Planners
VA PUGET SOUND CAMPUS PROJECT
Campus expansion of four distinct projects that are linked to
Mental Health Treatment and Research.       Associate Architect


Mental Health & Research Bldg.        $104M        200,000 gsf
Existing Hospital Seismic Upgrade     $28M         162,000 gsf
Parking Structure (1000 stalls)          $37M      400,000 gsf
Site Work                             $8M          367,000 gsf
Total                                 $177M        1,129,000 gsf
VA PUGET SOUND CAMPUS PROJECT
Site Plan



                                            A       B



                                                D

                                        C




A   Mental Health & Research Bldg.
B   Existing Hospital Seismic Upgrade
C   Parking Structure
D   Site Work
VA PUGET SOUND CAMPUS PROJECT
Mental Health & Research Building




Exterior Renderings
STRUCTURAL




             BUILDING SYSTEMS
MECHANICAL




             BUILDING SYSTEMS
MECHANICAL




             BUILDING SYSTEMS
ELECTRICAL




             BUILDING SYSTEMS
TELECOM




          BUILDING SYSTEMS
LABORATORY




             BUILDING SYSTEMS
CASE STUDY: STANFORD CATH
                   LABS
                   •       Comparison of Cath Labs 7, 9, & 10




The Design Partnership LLP 
Architects + Planners
7
7       Cath Lab 7: Siemens Biplane Cath Lab
    Construction Start: 2006
             BIM Use: CAD Only
7




9
9       Cath Lab 9: Siemens Biplane Hybrid OR
    Construction Start: 2009
             BIM Use: Laser Scanning & Modeling to 2”
3D Laser Scanning




The Design Partnership LLP 
Architects + Planners
Existing Conditions Model to 2”




The Design Partnership LLP 
Architects + Planners
New Work Model to 2”




The Design Partnership LLP 
Architects + Planners
Construct




The Design Partnership LLP 
Architects + Planners
7




9



10
10 Construction Start: Siemens Biplane Pediatric Cath Lab
      Cath Lab 10:
                       20010
             BIM Use: Laser Scanning & Modeling Everything
Model Everything




The Design Partnership LLP 
Architects + Planners
Construction Cost
                             BIM Use             $/SF    % from CAD

 Cath Lab 7                  CAD           2,153 $/SF
 Cath Lab 9                  2” Standard   1,829 $/SF      -15.0%
 Cath Lab 10                 Everything    2,065 $/SF       -4.1%
 *All figures in 2010 Relative Value



Change Order Cost
                             BIM Use              $/SF    % of Total

 Cath Lab 7                  CAD            267 $/SF        12.4%
 Cath Lab 9                  2” Standard    148 $/SF         8.1%
 Cath Lab 10                 Everything      16 $/SF        <0.1%
 *All figures in 2010 Relative Value



The Design Partnership LLP 
Architects + Planners
Construction Cost
                           BIM Use          Unit Cost

Cath Lab 7                 CAD Only      2,153 $/SF
Cath Lab 9                 2” Standard   1,613 $/SF
Cath Lab 10                Everything    2,065 $/SF


Change Order Cost
                           BIM Use        Change Rate

Cath Lab 7                 CAD Only          12.4%
Cath Lab 9                 2” Standard         7.8%
Cath Lab 10                Everything        <0.1%


*All figures in 2010 Relative Value
ROBBINS HALL RENOVATION
                   •       BIM Use on UC Davis Robbins Hall
                           Phase 1 Renovation
                             - (E) and (N) Casework Database
                             - Equipment Documentation
                             - Arch/Mech Coordination




The Design Partnership LLP 
Architects + Planners
First Floor Plan - PROJECT PROGRAM




The Design Partnership LLP 
Architects + Planners
Casework Documentation




The Design Partnership LLP 
Architects + Planners
Casework Documentation




The Design Partnership LLP 
Architects + Planners
Casework Documentation




The Design Partnership LLP 
Architects + Planners
First Floor - EQUIPMENT PLAN

                                                              JORGE DUBCOVSKY

                                                              JAN DVORAK

                                                              ABHAYA DANDEKAR

                                                              DAVID NEALE

                                                              JEFFREY IBARRA

                                                              PAM RONALD

                                                              GENERAL EQUIPMENT




The Design Partnership LLP 
Architects + Planners
First Floor - EQUIPMENT AXONOMETRIC
           JORGE DUBCOVSKY

           JAN DVORAK

           ABHAYA DANDEKAR

           DAVID NEALE

           JEFFREY IBARRA

           PAM RONALD

           GENERAL EQUIPMENT




The Design Partnership LLP 
Architects + Planners
Construction Cost
                                        $       %
Change Orders                   $812,438    11.60%
Final Construction Cost        $7,004,281


Change Order Summary
                                        $       %
User Additions                  $230,954     3.30%
Engineering & Operations        $191,182     2.73%
Infrastructure Improvements     $183,337     2.62%
Unforeseen Field Conditions     $122,938     1.76%
A/E Coordination                 $84,027     1.20%


The Design Partnership LLP 
Architects + Planners
Thanks!
              Questions?
Find the slides from this presentation on SlideShare.
            Search for us by name: TheDesignPartnership

Or by our public profile: http://www.slideshare.net/TheDesignPartnership



                      THE DESIGN
                     PA R T N E R S H I P
                 A R C H I T www.dpsf.comL A N N E R S
                             ECTS + P

More Related Content

What's hot

Building Information Modelling Presentation
Building Information Modelling PresentationBuilding Information Modelling Presentation
Building Information Modelling PresentationMotasem Albanna
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information ModellingNemat Syed
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectMANNU KUMAR
 
Intro to BIM and Revit Structure
Intro to BIM and Revit StructureIntro to BIM and Revit Structure
Intro to BIM and Revit StructureMostafa El-Ashmawy
 
Leveraging 3D Scanned Stat in a Biulding Information Model (BIM) by MasterGra...
Leveraging 3D Scanned Stat in a Biulding Information Model (BIM) by MasterGra...Leveraging 3D Scanned Stat in a Biulding Information Model (BIM) by MasterGra...
Leveraging 3D Scanned Stat in a Biulding Information Model (BIM) by MasterGra...Ian Manger, MBA
 
BIM (Building Information Modeling) for digital construction
BIM (Building Information Modeling) for digital constructionBIM (Building Information Modeling) for digital construction
BIM (Building Information Modeling) for digital constructionSailish Cephas
 
Workshop - Build a Graph Solution
Workshop - Build a Graph SolutionWorkshop - Build a Graph Solution
Workshop - Build a Graph SolutionNeo4j
 
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...Dalbir Dugal
 
Revit Basic Introduction
Revit Basic IntroductionRevit Basic Introduction
Revit Basic IntroductionNI BT
 
BIM Execution Plan - Bim Process Model Rview and Procedure
BIM Execution Plan - Bim Process Model Rview and ProcedureBIM Execution Plan - Bim Process Model Rview and Procedure
BIM Execution Plan - Bim Process Model Rview and Procedureanhc5l77 actp84nya
 
Intro revit 9
Intro revit 9Intro revit 9
Intro revit 9divislide
 
Bridging the gap between BIM and GIS
Bridging the gap between BIM and GIS Bridging the gap between BIM and GIS
Bridging the gap between BIM and GIS GIM_nv
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentationryanabarton
 
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and BenefitsBIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and BenefitsUnited-BIM
 
EY: Why graph technology makes sense for fraud detection and customer 360 pro...
EY: Why graph technology makes sense for fraud detection and customer 360 pro...EY: Why graph technology makes sense for fraud detection and customer 360 pro...
EY: Why graph technology makes sense for fraud detection and customer 360 pro...Neo4j
 

What's hot (20)

Building Information Modelling Presentation
Building Information Modelling PresentationBuilding Information Modelling Presentation
Building Information Modelling Presentation
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information Modelling
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
Intro to BIM and Revit Structure
Intro to BIM and Revit StructureIntro to BIM and Revit Structure
Intro to BIM and Revit Structure
 
Leveraging 3D Scanned Stat in a Biulding Information Model (BIM) by MasterGra...
Leveraging 3D Scanned Stat in a Biulding Information Model (BIM) by MasterGra...Leveraging 3D Scanned Stat in a Biulding Information Model (BIM) by MasterGra...
Leveraging 3D Scanned Stat in a Biulding Information Model (BIM) by MasterGra...
 
bim+ Presentation BIM Manager
bim+ Presentation BIM Managerbim+ Presentation BIM Manager
bim+ Presentation BIM Manager
 
BIM (Building Information Modeling) for digital construction
BIM (Building Information Modeling) for digital constructionBIM (Building Information Modeling) for digital construction
BIM (Building Information Modeling) for digital construction
 
Workshop - Build a Graph Solution
Workshop - Build a Graph SolutionWorkshop - Build a Graph Solution
Workshop - Build a Graph Solution
 
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
 
BIM Execution Plan
BIM Execution PlanBIM Execution Plan
BIM Execution Plan
 
Revit Basic Introduction
Revit Basic IntroductionRevit Basic Introduction
Revit Basic Introduction
 
BIM Execution Plan - Bim Process Model Rview and Procedure
BIM Execution Plan - Bim Process Model Rview and ProcedureBIM Execution Plan - Bim Process Model Rview and Procedure
BIM Execution Plan - Bim Process Model Rview and Procedure
 
BIM & Safety
BIM & SafetyBIM & Safety
BIM & Safety
 
Intro revit 9
Intro revit 9Intro revit 9
Intro revit 9
 
Bridging the gap between BIM and GIS
Bridging the gap between BIM and GIS Bridging the gap between BIM and GIS
Bridging the gap between BIM and GIS
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
 
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and BenefitsBIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
 
mep bim ppt.pptx
mep bim ppt.pptxmep bim ppt.pptx
mep bim ppt.pptx
 
BIM
BIMBIM
BIM
 
EY: Why graph technology makes sense for fraud detection and customer 360 pro...
EY: Why graph technology makes sense for fraud detection and customer 360 pro...EY: Why graph technology makes sense for fraud detection and customer 360 pro...
EY: Why graph technology makes sense for fraud detection and customer 360 pro...
 

Viewers also liked

BIM for Risk Management
BIM for Risk ManagementBIM for Risk Management
BIM for Risk ManagementBiswajit Kundu
 
Innovative Detailing and BIM workflows- Reduce risk, compress schedule
Innovative Detailing and BIM workflows- Reduce risk, compress scheduleInnovative Detailing and BIM workflows- Reduce risk, compress schedule
Innovative Detailing and BIM workflows- Reduce risk, compress scheduleBDS VirCon
 
Flevy.com - Collaborative Process Mapping
Flevy.com - Collaborative Process MappingFlevy.com - Collaborative Process Mapping
Flevy.com - Collaborative Process MappingDavid Tracy
 
Au 09 Bi Mmeans Business.1.05.10
Au 09 Bi Mmeans Business.1.05.10Au 09 Bi Mmeans Business.1.05.10
Au 09 Bi Mmeans Business.1.05.10friscozephyr
 
Anthony N Dauginas
Anthony N DauginasAnthony N Dauginas
Anthony N Dauginasdauginas
 
Communication &amp; Coordination on a Construction Project Through Building I...
Communication &amp; Coordination on a Construction Project Through Building I...Communication &amp; Coordination on a Construction Project Through Building I...
Communication &amp; Coordination on a Construction Project Through Building I...muhammad87
 
Trusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project CoordinationTrusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project CoordinationClearEdge3D Inc
 
BIM COORDINATION PORTOFOLIOOO
BIM COORDINATION PORTOFOLIOOOBIM COORDINATION PORTOFOLIOOO
BIM COORDINATION PORTOFOLIOOOMohab Magdy,PMP
 
Bim101 Aec
Bim101 AecBim101 Aec
Bim101 Aecmarybk
 
BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9 BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9 StrucSoft Solutions
 
A Team Plumbing and Drainage Systems
A Team Plumbing and Drainage SystemsA Team Plumbing and Drainage Systems
A Team Plumbing and Drainage SystemsGodwin2012
 
Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01saed saffarini
 
Revit for Small Projects: Is it worth the effort?
Revit for Small Projects: Is it worth the effort?Revit for Small Projects: Is it worth the effort?
Revit for Small Projects: Is it worth the effort?Eric Peabody
 
081204 Virtual Design & Construction
081204 Virtual Design & Construction081204 Virtual Design & Construction
081204 Virtual Design & ConstructionRocio Gonzalez
 
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process PresentationBIM & Coordination Work Process Presentation
BIM & Coordination Work Process PresentationIndranath Sinha
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In ConstructionAB MAKASANA
 

Viewers also liked (20)

BIM for Risk Management
BIM for Risk ManagementBIM for Risk Management
BIM for Risk Management
 
Innovative Detailing and BIM workflows- Reduce risk, compress schedule
Innovative Detailing and BIM workflows- Reduce risk, compress scheduleInnovative Detailing and BIM workflows- Reduce risk, compress schedule
Innovative Detailing and BIM workflows- Reduce risk, compress schedule
 
Flevy.com - Collaborative Process Mapping
Flevy.com - Collaborative Process MappingFlevy.com - Collaborative Process Mapping
Flevy.com - Collaborative Process Mapping
 
Bim Facades.Final
Bim Facades.FinalBim Facades.Final
Bim Facades.Final
 
Au 09 Bi Mmeans Business.1.05.10
Au 09 Bi Mmeans Business.1.05.10Au 09 Bi Mmeans Business.1.05.10
Au 09 Bi Mmeans Business.1.05.10
 
Anthony N Dauginas
Anthony N DauginasAnthony N Dauginas
Anthony N Dauginas
 
Communication &amp; Coordination on a Construction Project Through Building I...
Communication &amp; Coordination on a Construction Project Through Building I...Communication &amp; Coordination on a Construction Project Through Building I...
Communication &amp; Coordination on a Construction Project Through Building I...
 
Trusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project CoordinationTrusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project Coordination
 
BIM COORDINATION PORTOFOLIOOO
BIM COORDINATION PORTOFOLIOOOBIM COORDINATION PORTOFOLIOOO
BIM COORDINATION PORTOFOLIOOO
 
Bim101 Aec
Bim101 AecBim101 Aec
Bim101 Aec
 
BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9 BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9
 
A Team Plumbing and Drainage Systems
A Team Plumbing and Drainage SystemsA Team Plumbing and Drainage Systems
A Team Plumbing and Drainage Systems
 
Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01
 
Revit for Small Projects: Is it worth the effort?
Revit for Small Projects: Is it worth the effort?Revit for Small Projects: Is it worth the effort?
Revit for Small Projects: Is it worth the effort?
 
081204 Virtual Design & Construction
081204 Virtual Design & Construction081204 Virtual Design & Construction
081204 Virtual Design & Construction
 
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process PresentationBIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
BIM, Prefabrication & Design Build
BIM, Prefabrication & Design BuildBIM, Prefabrication & Design Build
BIM, Prefabrication & Design Build
 
HKIBIM Building Information Modelling (BIM) awareness Seminar
HKIBIM Building Information Modelling (BIM) awareness SeminarHKIBIM Building Information Modelling (BIM) awareness Seminar
HKIBIM Building Information Modelling (BIM) awareness Seminar
 
How BIM Enhances the Design Process
How BIM Enhances the Design ProcessHow BIM Enhances the Design Process
How BIM Enhances the Design Process
 

Similar to Reducing Risk with BIM

IFMA Presentation: BIM Making the Facility Manager's Life Easier
IFMA Presentation: BIM Making the Facility Manager's Life EasierIFMA Presentation: BIM Making the Facility Manager's Life Easier
IFMA Presentation: BIM Making the Facility Manager's Life EasierThe Design Partnership
 
BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9Eric Peabody
 
Experimental BIM Use Comparison on Stanford Hospital Cath Labs
Experimental BIM Use Comparison on Stanford Hospital Cath LabsExperimental BIM Use Comparison on Stanford Hospital Cath Labs
Experimental BIM Use Comparison on Stanford Hospital Cath LabsEric Peabody
 
Leaning Project Delivery: Altering the Cost = Risk Equation
Leaning Project Delivery: Altering the Cost = Risk EquationLeaning Project Delivery: Altering the Cost = Risk Equation
Leaning Project Delivery: Altering the Cost = Risk EquationEric Peabody
 
Cc 2009 091202
Cc 2009 091202Cc 2009 091202
Cc 2009 091202apartridge
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahem Naeem
 
Rapier Ecobuild Presentation
Rapier Ecobuild PresentationRapier Ecobuild Presentation
Rapier Ecobuild Presentationmocathe1st
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxcooperapleh
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxeubanksnefen
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxhelzerpatrina
 
Bim Enabled Ipd
Bim Enabled IpdBim Enabled Ipd
Bim Enabled Ipdmarybk
 
BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014Stephen Au
 
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...Virtual ULI
 
Ode Consultants Pvt. Ltd.
Ode Consultants Pvt. Ltd.Ode Consultants Pvt. Ltd.
Ode Consultants Pvt. Ltd.Kushagra Singh
 

Similar to Reducing Risk with BIM (20)

IFMA Presentation: BIM Making the Facility Manager's Life Easier
IFMA Presentation: BIM Making the Facility Manager's Life EasierIFMA Presentation: BIM Making the Facility Manager's Life Easier
IFMA Presentation: BIM Making the Facility Manager's Life Easier
 
BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9
 
Experimental BIM Use Comparison on Stanford Hospital Cath Labs
Experimental BIM Use Comparison on Stanford Hospital Cath LabsExperimental BIM Use Comparison on Stanford Hospital Cath Labs
Experimental BIM Use Comparison on Stanford Hospital Cath Labs
 
Leaning Project Delivery: Altering the Cost = Risk Equation
Leaning Project Delivery: Altering the Cost = Risk EquationLeaning Project Delivery: Altering the Cost = Risk Equation
Leaning Project Delivery: Altering the Cost = Risk Equation
 
Cc 2009 091202
Cc 2009 091202Cc 2009 091202
Cc 2009 091202
 
Using an openBim Workflow
Using an openBim WorkflowUsing an openBim Workflow
Using an openBim Workflow
 
Alastair Gardner: BIM Overview
Alastair Gardner: BIM OverviewAlastair Gardner: BIM Overview
Alastair Gardner: BIM Overview
 
Bim
BimBim
Bim
 
Bim
BimBim
Bim
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio
 
AEC Digital Solutions (Retail)
AEC Digital Solutions (Retail)AEC Digital Solutions (Retail)
AEC Digital Solutions (Retail)
 
Rapier Ecobuild Presentation
Rapier Ecobuild PresentationRapier Ecobuild Presentation
Rapier Ecobuild Presentation
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docx
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docx
 
Whats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docxWhats the BIM IdeaWhy does this happenProjec.docx
Whats the BIM IdeaWhy does this happenProjec.docx
 
Bim Enabled Ipd
Bim Enabled IpdBim Enabled Ipd
Bim Enabled Ipd
 
BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014
 
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
 
Ode Consultants Pvt. Ltd.
Ode Consultants Pvt. Ltd.Ode Consultants Pvt. Ltd.
Ode Consultants Pvt. Ltd.
 
AEC Digital Solutions (Scan to BIM)
AEC Digital Solutions (Scan to BIM)AEC Digital Solutions (Scan to BIM)
AEC Digital Solutions (Scan to BIM)
 

More from The Design Partnership

More from The Design Partnership (9)

Collaborative Architecture; Architecture for the Senses
Collaborative Architecture; Architecture for the SensesCollaborative Architecture; Architecture for the Senses
Collaborative Architecture; Architecture for the Senses
 
Achieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSFAchieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSF
 
Shenshen Nanshan Hospital Expansion Competition Jury
Shenshen Nanshan Hospital Expansion Competition JuryShenshen Nanshan Hospital Expansion Competition Jury
Shenshen Nanshan Hospital Expansion Competition Jury
 
Advancing Healing Design to the Next Level
Advancing Healing Design to the Next LevelAdvancing Healing Design to the Next Level
Advancing Healing Design to the Next Level
 
CSHE High-Tech - Old Infrastructure
CSHE High-Tech - Old InfrastructureCSHE High-Tech - Old Infrastructure
CSHE High-Tech - Old Infrastructure
 
Navisworks Clash Course
Navisworks Clash CourseNavisworks Clash Course
Navisworks Clash Course
 
High-Tech vs. Old Infrastruction
High-Tech vs. Old InfrastructionHigh-Tech vs. Old Infrastruction
High-Tech vs. Old Infrastruction
 
Labs 21 BIM & Sustainability
Labs 21 BIM & SustainabilityLabs 21 BIM & Sustainability
Labs 21 BIM & Sustainability
 
Set-Based Concurrent Desgin
Set-Based Concurrent DesginSet-Based Concurrent Desgin
Set-Based Concurrent Desgin
 

Recently uploaded

Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 

Recently uploaded (20)

Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 

Reducing Risk with BIM

  • 1. T H E D E S I G N PA R T N E R S H I P R E D U C I N G R I S K W I T For UC Davis Design & Construction Management O c t o b e r 4 2 0 11
  • 2. WHO WE ARE About The Design Partnership • Founded in 1979 • 45 Employees • Expertise in Science & Technology, Education, Healthcare, Public, Master Planning • BIM/Lean / IPD Leadership • Over $1 Billion Designed in BIM • Using BIM since 2005; 100% BIM since 2006 • 2008 AIASF Integrated Practice Honor Award Recipient
  • 3. REDUCING RISK WITH BIM 1 What is Risk? 2 Technology Introduction 3 Construction Technology 4 Case Study: VA Puget Sound 5 Case Study: Stanford Cath Labs 6 Case Study: Robbins Hall Renovation
  • 4. WHAT IS RISK? • Altering “Risk = Cost” Equation • Increase in Architect’s Exposure • Decrease in Contractor’s Risk • Decrease in Owner’s Risk • Reduced Risk for All = Reduced Cost The Design Partnership LLP  Architects + Planners
  • 5.
  • 6. Increase in Architect’s Exposure  Unknown Consequences Of Sharing BIM Information  Design Only Information In BIM Model  Extensive Pre-coordination  Fabrication From Design Models  Increased Exposure to Risk The Design Partnership LLP  Architects + Planners
  • 7. Decrease in Contractor’s Risk  Reduced Coordination Errors  Reduced Unknown Conditions  More Efficient Workflow  Cooperation & Collaboration  Reduced Contingency  Increased Confidence &  Reduced Risk The Design Partnership LLP  Architects + Planners
  • 8. Decrease in Owner’s Risk  Reduced Bidding Costs Due To Reduced Contractor Risks  Reduced Risk Of – Change Orders From Unknown Conditions – Coordination Changes – Fighting Among AEC Entities  Reduced User Changes Due To Better Pre-visualization And Planning The Design Partnership LLP  Architects + Planners
  • 9. Architect’s Exposure  However Architect’s Risk  Reduced Risk for All = Reduced Cost The Design Partnership LLP  Architects + Planners
  • 10. TECHNOLOGY INTRODUCTION • Building Information Modeling (BIM) • Virtual Simulation / Pre- visualization • 3D Laser Survey • Clash Detection & Coordination The Design Partnership LLP  Architects + Planners
  • 11. The Big BIM/IPD/Lean Idea The Design Partnership LLP  Architects + Planners
  • 12. Project Delivery Improvement Automatic Document Coordination 3D Systems Coordination Virtual Building Simulation Direct Fabrication The Design Partnership LLP  Architects + Planners
  • 13. Building Information Modeling (BIM) The Design Partnership LLP  Architects + Planners
  • 14. BIM is a 3D Database The Design Partnership LLP  Architects + Planners
  • 15. Design Visualization The Design Partnership LLP  Architects + Planners
  • 16. Design Visualization The Design Partnership LLP  Architects + Planners
  • 17. Virtual Equipment Simulation The Design Partnership LLP  Architects + Planners
  • 18. The Design Partnership LLP  Architects + Planners
  • 19. 3D Laser Survey The Design Partnership LLP  Architects + Planners
  • 20. Clash Detection & Coordination Structural Plan Where is the coordination error? Mechanical Plan The Design Partnership LLP  Architects + Planners
  • 21. Clash Detection & Coordination The Design Partnership LLP  Architects + Planners
  • 22. CONSTRUCTION TECHNOLOGY • Direct Fabrication • Prefabrication • Capabilities The Design Partnership LLP  Architects + Planners
  • 23. Direct Fabrication The Design Partnership LLP  Architects + Planners Images courtesy of Marelich Mechanical
  • 24. Direct Fabrication The Design Partnership LLP  Architects + Planners
  • 25. Prefabrication The Design Partnership LLP  Architects + Planners
  • 26. The Design Partnership LLP  Architects + Planners Image courtesy of Marelich Mechanical
  • 27. The Design Partnership LLP  Architects + Planners
  • 28. The Design Partnership LLP  Architects + Planners Image courtesy of Marelich Mechanical
  • 29. The Design Partnership LLP  Architects + Planners
  • 30. 3D Capable Trades • HVAC • Plumbing • Structural Steel • Precast Concrete • Rebar • Steel Stud Walls • Curtain Walls, etc. • Millwork • Unit Restrooms • Laboratories The Design Partnership LLP  Architects + Planners
  • 31. Relative Sophistication Disparity  General Contractors (Very Low to Low)  Engineers (Very Low to Moderate) Architects (Low to Moderate)  Subcontractors (Varies, some extremely high)  Maximize advantage of sophisticated players  Enhance process for Subs already using 3D  Mentor less advanced members  Integrated Project Delivery The Design Partnership LLP  Architects + Planners
  • 32. CASE STUDY: VA PUGET SOUND • Design of VA Puget Sound Mental Health & Research Project The Design Partnership LLP  Architects + Planners
  • 33. VA PUGET SOUND CAMPUS PROJECT Campus expansion of four distinct projects that are linked to Mental Health Treatment and Research. Associate Architect Mental Health & Research Bldg. $104M 200,000 gsf Existing Hospital Seismic Upgrade $28M 162,000 gsf Parking Structure (1000 stalls) $37M 400,000 gsf Site Work $8M 367,000 gsf Total $177M 1,129,000 gsf
  • 34. VA PUGET SOUND CAMPUS PROJECT Site Plan A B D C A Mental Health & Research Bldg. B Existing Hospital Seismic Upgrade C Parking Structure D Site Work
  • 35. VA PUGET SOUND CAMPUS PROJECT Mental Health & Research Building Exterior Renderings
  • 36. STRUCTURAL BUILDING SYSTEMS
  • 37. MECHANICAL BUILDING SYSTEMS
  • 38. MECHANICAL BUILDING SYSTEMS
  • 39. ELECTRICAL BUILDING SYSTEMS
  • 40. TELECOM BUILDING SYSTEMS
  • 41. LABORATORY BUILDING SYSTEMS
  • 42. CASE STUDY: STANFORD CATH LABS • Comparison of Cath Labs 7, 9, & 10 The Design Partnership LLP  Architects + Planners
  • 43.
  • 44. 7
  • 45. 7 Cath Lab 7: Siemens Biplane Cath Lab Construction Start: 2006 BIM Use: CAD Only
  • 46. 7 9
  • 47. 9 Cath Lab 9: Siemens Biplane Hybrid OR Construction Start: 2009 BIM Use: Laser Scanning & Modeling to 2”
  • 48. 3D Laser Scanning The Design Partnership LLP  Architects + Planners
  • 49. Existing Conditions Model to 2” The Design Partnership LLP  Architects + Planners
  • 50. New Work Model to 2” The Design Partnership LLP  Architects + Planners
  • 51. Construct The Design Partnership LLP  Architects + Planners
  • 53. 10 Construction Start: Siemens Biplane Pediatric Cath Lab Cath Lab 10: 20010 BIM Use: Laser Scanning & Modeling Everything
  • 54. Model Everything The Design Partnership LLP  Architects + Planners
  • 55. Construction Cost BIM Use $/SF % from CAD Cath Lab 7 CAD 2,153 $/SF Cath Lab 9 2” Standard 1,829 $/SF -15.0% Cath Lab 10 Everything 2,065 $/SF -4.1% *All figures in 2010 Relative Value Change Order Cost BIM Use $/SF % of Total Cath Lab 7 CAD 267 $/SF 12.4% Cath Lab 9 2” Standard 148 $/SF 8.1% Cath Lab 10 Everything 16 $/SF <0.1% *All figures in 2010 Relative Value The Design Partnership LLP  Architects + Planners
  • 56. Construction Cost BIM Use Unit Cost Cath Lab 7 CAD Only 2,153 $/SF Cath Lab 9 2” Standard 1,613 $/SF Cath Lab 10 Everything 2,065 $/SF Change Order Cost BIM Use Change Rate Cath Lab 7 CAD Only 12.4% Cath Lab 9 2” Standard 7.8% Cath Lab 10 Everything <0.1% *All figures in 2010 Relative Value
  • 57. ROBBINS HALL RENOVATION • BIM Use on UC Davis Robbins Hall Phase 1 Renovation - (E) and (N) Casework Database - Equipment Documentation - Arch/Mech Coordination The Design Partnership LLP  Architects + Planners
  • 58.
  • 59. First Floor Plan - PROJECT PROGRAM The Design Partnership LLP  Architects + Planners
  • 60.
  • 61. Casework Documentation The Design Partnership LLP  Architects + Planners
  • 62. Casework Documentation The Design Partnership LLP  Architects + Planners
  • 63. Casework Documentation The Design Partnership LLP  Architects + Planners
  • 64.
  • 65. First Floor - EQUIPMENT PLAN JORGE DUBCOVSKY JAN DVORAK ABHAYA DANDEKAR DAVID NEALE JEFFREY IBARRA PAM RONALD GENERAL EQUIPMENT The Design Partnership LLP  Architects + Planners
  • 66. First Floor - EQUIPMENT AXONOMETRIC JORGE DUBCOVSKY JAN DVORAK ABHAYA DANDEKAR DAVID NEALE JEFFREY IBARRA PAM RONALD GENERAL EQUIPMENT The Design Partnership LLP  Architects + Planners
  • 67. Construction Cost $ % Change Orders $812,438 11.60% Final Construction Cost $7,004,281 Change Order Summary $ % User Additions $230,954 3.30% Engineering & Operations $191,182 2.73% Infrastructure Improvements $183,337 2.62% Unforeseen Field Conditions $122,938 1.76% A/E Coordination $84,027 1.20% The Design Partnership LLP  Architects + Planners
  • 68. Thanks! Questions? Find the slides from this presentation on SlideShare. Search for us by name: TheDesignPartnership Or by our public profile: http://www.slideshare.net/TheDesignPartnership THE DESIGN PA R T N E R S H I P A R C H I T www.dpsf.comL A N N E R S ECTS + P

Editor's Notes

  1. ADD IMAGEto produce clear documents, showing a buildable design.We use:Again, reliance on a coordinated and integrated team including the Cost Management consultant.And BIM allows us to make our documents fastidiously coordinated and accurate.The BIM model starts with the site and builds from there.The model is shared by all disciplines, and clash detection sessions are regularly scheduled throughout design and document production. We were early implementers of BIM in our industry and began with it 7 years ago.Quantity takeoffs are continuous, estimates revised all the time; major systems updates during design : mechanical &amp; electrical, structural, site, building envelopeAlso take a friendly approach to the constructor to clearly indicate we want him on our team to build a successful project for everyone involved.