2011 Chairman’s Quality Award
1
Logistics Strategy to the
Supply of ISF to Brazilian OEMs
Belt: Thales de Toledo Verga
EBU Mid Range Brazil
3/22/2
016
7:06:5
2 PM2
DFSS Project Review
Project Name: Define Logistics to Import ISF from China to Brazil.
Green Belt: Thales de Toledo Verga
Sponsor: Luis C. Faraj
Program Name: Hawkeye / Veneto
Program Leader: Thales T. Verga
DFSS MBB: Ana Paulo Marimoto
Team Members: Luis Chain - Mktg & Sales Exec. Manager
Lucio Nubile - Operations Director
Airton Cardoso - Quality Exec. Manager
Sonia Fanhani - Controler
Sidclei Silva - Finance Manager
Eneida Trichtl - Order Entry & Materials Mngr
Adilson Carvalho - Logistics Supervisor
Alexandre Balista - Tax Planning Supervisor
Ricardo Schalch - Sales Manager
Rosane Rodrigues - IT Manager
Andre B Campos - Product Engineer
Adriano Rishi - Engineering Director
Ana Paula Marimoto - DFSS MBB
Objective:
Ensure the ISF logistics from China to Brazil will be profitable to CMI and meet OEM´s expectations in
terms of competitiveness, firm period and inventory (safety stock) prompt availability.
Belt: Thales Verga Type: DFSS
Sub-BU: Midrange Entity: Midrange
Days to Close: 58 Project Avoidance: $42 M
Major Improvements:
– Transfer pricing avoidance to import ISF from China to Brazil: $ 620 / engine (average);
– Firm period reduced in 60% (from 12 to 5 weeks);
– Inventory (safety stock) transfered from China to Brazil (prompt availability);
– Mitigation of risks w/ both Customs strikes and in transit delays (delivery on time);
– Reduction of exposure to ex-rate volatility (prices firmed in USD, not in local currency R$).
Project Background
Those are the issues for CBL to supply ISF to the Brazilian OEMs:
Transfer Pricing: The Brazilian importer (in this case CBL) must earn a minimum mark-up of
60% on each product subjected to manufacturing. Therefore, transfer pricing in Brazil (PRL60)
eliminates the pricing competitiveness for ISF.
– The 1st target of this Project is to eliminate transfer pricing applicability by using a bonded
warehouse in Brazilwith the OEM as a formal importer of the ISF.
Inventory availability: Brazilian OEMs require inventory of engines in Brazil to avoid shortage of
engines in their assembly lines. To avoid shortage of ISF (made in China), OEMs are requiring 4 –
5 weeks inventory in Brazil (due to potential Customs strikes, in transit delays, etc...).
– The 2nd target of this Project is to transfer inventory from China to Brazil by using a bonded
warehouse in Brazil.
Project Background
Those are the issues for CBL to supply ISF to the Brazilian OEMs:
Firm period: Brazilian OEMs accept a firm period of 5 weeks for engines produced in Brazil. ISF
imported from China would require at least 12 weeks due to the additional 8 - 9 weeks for sea
freight and Customs clearance. CBL´s competitors produce engine in Brazil and they can offer the
4 weeks firm period. Therefore, OEMs do not accept 12 weeks firm period for the ISF.
– The 3rd target of this Project is to reduce firm period for ISF to achieve 5 weeks
by using a bonded warehouse in Brazil.
Measure Phase
Concept Generation: define logistics options available to import ISF
Cause & Effect Matrix: evaluate logistics options & impact over business
Pugh Concept: select the best logistics option
Measure Phase
Process Map: definition of the best logistics option chosen
FMEA to the best logistics option chosen
Analyze Phase
The best logistics option is the one when “OEM imports ISF from China by
using a bonded warehouse and upfit is supplied by BFCEC.
DO´s DONT´s
Transfer Pricing (PRL60) is not
applicable.
OEM must be involved in the import
process as the formal importer.
Inventory belongs to the OEM after
localization.
Inventory belongs to CMI until ISF is
cleared by the OEM in the bonded
warehouse.
CMI safety stock (inventory) is
based in the bonded warehouse in
Brazil (quick availability)
OEM has to open a branch in the
bonded warehouse (CNPJ) for
clearance at Customs.
Firm period and lead time reduced
to meet OEM expectations.
Get from CMI approval for a bonded
warehouse (it is necessary to the
import process).
Price: in USD for engine, avoiding
exposure to ex-rate (conversion
from USD to Real).
Negotiate w/ OEM approval to this
new logistics process (OEM
becomes the formal importer).
There is an extra-cost in the engine
to include bonded warehouse in the
process (USD200 / engine).
Analyze Phase
Cost avoidance: USD 42 M from 2012 to 2015 (estimated).
Annual cost avoidance: USD 10.5 average (estimated).
Avoidance to the transfer pricing per Shop Order
(USD 620 average)
Control Plan
• MAN: bonded warehouse implemented in Jan/12;
• Agrale: bonded warehouse to be implemented in Aug/12.
Find control plan below for the bonded warehouse implementation to Agrale.
Lessons Learned / Shared
The inclusion of the Brazilian bonded warehouse in the ISF logistics flow from China to Brazil is
the best choice to meet local OEM’s requirements while bringing the best positive financial return
to Cummins.
it eliminates the transfer price applicability (sales price w/ 60% mark-up over cost) and
therefore leverage the ISF competitiveness in Brazil from a cost standpoint;
it reduces Cummins exposure to ex-rate volatility because OEM pays for the ISF in USD
(price does not have to be converted from US to the local currency - Real);
it enables Cummins to reduce the firm period from 12 to 5 weeks, which is the same firm
period offered by competitors with engines made in Brazil;
it transfers the iventory (safety stock) from China to Brazil, giving to the local OEMs the
same reliability offered by Cummins´competitors with engines made in Brazil.
it mitigates potential delivery delays associated to risks like Customs strikes and in transit
delays because safety stock is based in Brazil.

Weitere ähnliche Inhalte

Was ist angesagt?

DavidReid Revised Resume 2
DavidReid Revised Resume 2DavidReid Revised Resume 2
DavidReid Revised Resume 2DAVID REID
 
How operational excellence through lean
How operational excellence through lean How operational excellence through lean
How operational excellence through lean globalsevensteps
 
CV for Consultant - Supply Chain Management
CV for Consultant - Supply Chain ManagementCV for Consultant - Supply Chain Management
CV for Consultant - Supply Chain ManagementChirag Dabhee
 
Tim Tunnecliffe New Resume
Tim Tunnecliffe New ResumeTim Tunnecliffe New Resume
Tim Tunnecliffe New ResumeTim Tunnecliffe
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectSumit K Jha
 
Fmq lqos introduction npi rev 2
Fmq  lqos introduction npi rev 2Fmq  lqos introduction npi rev 2
Fmq lqos introduction npi rev 2amitsonuksms
 
Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron Sagar Sangam Sahu
 
Retail warehouse mgmt
Retail warehouse mgmtRetail warehouse mgmt
Retail warehouse mgmtFerry Man
 
Logistics WCM Presentation Final - Converted (2)
Logistics WCM Presentation Final - Converted (2)Logistics WCM Presentation Final - Converted (2)
Logistics WCM Presentation Final - Converted (2)Ashley Smith
 

Was ist angesagt? (13)

Projects
ProjectsProjects
Projects
 
DavidReid Revised Resume 2
DavidReid Revised Resume 2DavidReid Revised Resume 2
DavidReid Revised Resume 2
 
How operational excellence through lean
How operational excellence through lean How operational excellence through lean
How operational excellence through lean
 
CV for Consultant - Supply Chain Management
CV for Consultant - Supply Chain ManagementCV for Consultant - Supply Chain Management
CV for Consultant - Supply Chain Management
 
Tim Tunnecliffe New Resume
Tim Tunnecliffe New ResumeTim Tunnecliffe New Resume
Tim Tunnecliffe New Resume
 
.Resume
.Resume.Resume
.Resume
 
Resume # 9
Resume # 9Resume # 9
Resume # 9
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt project
 
Kanakappa Hallikeri_Resume
Kanakappa Hallikeri_ResumeKanakappa Hallikeri_Resume
Kanakappa Hallikeri_Resume
 
Fmq lqos introduction npi rev 2
Fmq  lqos introduction npi rev 2Fmq  lqos introduction npi rev 2
Fmq lqos introduction npi rev 2
 
Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron
 
Retail warehouse mgmt
Retail warehouse mgmtRetail warehouse mgmt
Retail warehouse mgmt
 
Logistics WCM Presentation Final - Converted (2)
Logistics WCM Presentation Final - Converted (2)Logistics WCM Presentation Final - Converted (2)
Logistics WCM Presentation Final - Converted (2)
 

Ähnlich wie Six Sigma 2011 PowerPoint template AWARD (Thales de Toledo Verg

just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturingAkhil Bhatia
 
Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)pratik negi
 
Supply Chain Presentation BIPL.
Supply Chain Presentation BIPL.Supply Chain Presentation BIPL.
Supply Chain Presentation BIPL.Farrukh Hasnain
 
Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...
Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...
Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...Institut Lean France
 
Vikram_Resume_5 Years_PPC_B Tech_NIT K
Vikram_Resume_5 Years_PPC_B Tech_NIT KVikram_Resume_5 Years_PPC_B Tech_NIT K
Vikram_Resume_5 Years_PPC_B Tech_NIT KVikram Sengar
 
Resource partnership case study
Resource partnership   case studyResource partnership   case study
Resource partnership case studyZubin Poonawalla
 
Resource partnership case study
Resource partnership   case studyResource partnership   case study
Resource partnership case studyZubin Poonawalla
 
Curriculum_vitae
Curriculum_vitaeCurriculum_vitae
Curriculum_vitaeKiran Gp
 
Supply Chain in an Evolving World: Disruptive Technologies, New Business Mod...
Supply Chain in an Evolving World:  Disruptive Technologies, New Business Mod...Supply Chain in an Evolving World:  Disruptive Technologies, New Business Mod...
Supply Chain in an Evolving World: Disruptive Technologies, New Business Mod...The Boeing Center
 
Middle East Logistics Research Project
Middle East Logistics Research ProjectMiddle East Logistics Research Project
Middle East Logistics Research ProjectSreemoy Das
 
Industry Mobilty Solutions
Industry Mobilty SolutionsIndustry Mobilty Solutions
Industry Mobilty Solutionsindusaviation
 
Starting kick off meeting
Starting kick   off meetingStarting kick   off meeting
Starting kick off meetingJitesh Gaurav
 
Starting kick off meeting
Starting kick   off meetingStarting kick   off meeting
Starting kick off meetingJitesh Gaurav
 
Bakery PDM Form 2016 Nick
Bakery PDM Form 2016 NickBakery PDM Form 2016 Nick
Bakery PDM Form 2016 NickNick Sharp
 
Management Repot
Management RepotManagement Repot
Management Repot113068
 

Ähnlich wie Six Sigma 2011 PowerPoint template AWARD (Thales de Toledo Verg (20)

just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturing
 
Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)
 
Supply_Chain_PP MOD
Supply_Chain_PP MODSupply_Chain_PP MOD
Supply_Chain_PP MOD
 
Supply Chain Presentation BIPL.
Supply Chain Presentation BIPL.Supply Chain Presentation BIPL.
Supply Chain Presentation BIPL.
 
Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...
Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...
Making knowledge work visible by Angela Crone, Bombardier at the Lean IT Summ...
 
WCM LOGISTICS
WCM LOGISTICSWCM LOGISTICS
WCM LOGISTICS
 
Vikram_Resume_5 Years_PPC_B Tech_NIT K
Vikram_Resume_5 Years_PPC_B Tech_NIT KVikram_Resume_5 Years_PPC_B Tech_NIT K
Vikram_Resume_5 Years_PPC_B Tech_NIT K
 
Resource partnership case study
Resource partnership   case studyResource partnership   case study
Resource partnership case study
 
Resource partnership case study
Resource partnership   case studyResource partnership   case study
Resource partnership case study
 
Curriculum_vitae
Curriculum_vitaeCurriculum_vitae
Curriculum_vitae
 
Supply Chain in an Evolving World: Disruptive Technologies, New Business Mod...
Supply Chain in an Evolving World:  Disruptive Technologies, New Business Mod...Supply Chain in an Evolving World:  Disruptive Technologies, New Business Mod...
Supply Chain in an Evolving World: Disruptive Technologies, New Business Mod...
 
Middle East Logistics Research Project
Middle East Logistics Research ProjectMiddle East Logistics Research Project
Middle East Logistics Research Project
 
Ptak prize supply chain case competition 2014
Ptak prize supply chain case competition 2014Ptak prize supply chain case competition 2014
Ptak prize supply chain case competition 2014
 
Just In Time - JIT
Just In Time - JITJust In Time - JIT
Just In Time - JIT
 
Industry Mobilty Solutions
Industry Mobilty SolutionsIndustry Mobilty Solutions
Industry Mobilty Solutions
 
Starting kick off meeting
Starting kick   off meetingStarting kick   off meeting
Starting kick off meeting
 
Starting kick off meeting
Starting kick   off meetingStarting kick   off meeting
Starting kick off meeting
 
Jups CV (1) (1)
Jups CV (1) (1)Jups CV (1) (1)
Jups CV (1) (1)
 
Bakery PDM Form 2016 Nick
Bakery PDM Form 2016 NickBakery PDM Form 2016 Nick
Bakery PDM Form 2016 Nick
 
Management Repot
Management RepotManagement Repot
Management Repot
 

Six Sigma 2011 PowerPoint template AWARD (Thales de Toledo Verg

  • 1. 2011 Chairman’s Quality Award 1 Logistics Strategy to the Supply of ISF to Brazilian OEMs Belt: Thales de Toledo Verga EBU Mid Range Brazil
  • 2. 3/22/2 016 7:06:5 2 PM2 DFSS Project Review Project Name: Define Logistics to Import ISF from China to Brazil. Green Belt: Thales de Toledo Verga Sponsor: Luis C. Faraj Program Name: Hawkeye / Veneto Program Leader: Thales T. Verga DFSS MBB: Ana Paulo Marimoto Team Members: Luis Chain - Mktg & Sales Exec. Manager Lucio Nubile - Operations Director Airton Cardoso - Quality Exec. Manager Sonia Fanhani - Controler Sidclei Silva - Finance Manager Eneida Trichtl - Order Entry & Materials Mngr Adilson Carvalho - Logistics Supervisor Alexandre Balista - Tax Planning Supervisor Ricardo Schalch - Sales Manager Rosane Rodrigues - IT Manager Andre B Campos - Product Engineer Adriano Rishi - Engineering Director Ana Paula Marimoto - DFSS MBB
  • 3. Objective: Ensure the ISF logistics from China to Brazil will be profitable to CMI and meet OEM´s expectations in terms of competitiveness, firm period and inventory (safety stock) prompt availability. Belt: Thales Verga Type: DFSS Sub-BU: Midrange Entity: Midrange Days to Close: 58 Project Avoidance: $42 M Major Improvements: – Transfer pricing avoidance to import ISF from China to Brazil: $ 620 / engine (average); – Firm period reduced in 60% (from 12 to 5 weeks); – Inventory (safety stock) transfered from China to Brazil (prompt availability); – Mitigation of risks w/ both Customs strikes and in transit delays (delivery on time); – Reduction of exposure to ex-rate volatility (prices firmed in USD, not in local currency R$).
  • 4. Project Background Those are the issues for CBL to supply ISF to the Brazilian OEMs: Transfer Pricing: The Brazilian importer (in this case CBL) must earn a minimum mark-up of 60% on each product subjected to manufacturing. Therefore, transfer pricing in Brazil (PRL60) eliminates the pricing competitiveness for ISF. – The 1st target of this Project is to eliminate transfer pricing applicability by using a bonded warehouse in Brazilwith the OEM as a formal importer of the ISF. Inventory availability: Brazilian OEMs require inventory of engines in Brazil to avoid shortage of engines in their assembly lines. To avoid shortage of ISF (made in China), OEMs are requiring 4 – 5 weeks inventory in Brazil (due to potential Customs strikes, in transit delays, etc...). – The 2nd target of this Project is to transfer inventory from China to Brazil by using a bonded warehouse in Brazil.
  • 5. Project Background Those are the issues for CBL to supply ISF to the Brazilian OEMs: Firm period: Brazilian OEMs accept a firm period of 5 weeks for engines produced in Brazil. ISF imported from China would require at least 12 weeks due to the additional 8 - 9 weeks for sea freight and Customs clearance. CBL´s competitors produce engine in Brazil and they can offer the 4 weeks firm period. Therefore, OEMs do not accept 12 weeks firm period for the ISF. – The 3rd target of this Project is to reduce firm period for ISF to achieve 5 weeks by using a bonded warehouse in Brazil.
  • 6. Measure Phase Concept Generation: define logistics options available to import ISF Cause & Effect Matrix: evaluate logistics options & impact over business Pugh Concept: select the best logistics option
  • 7. Measure Phase Process Map: definition of the best logistics option chosen FMEA to the best logistics option chosen
  • 8. Analyze Phase The best logistics option is the one when “OEM imports ISF from China by using a bonded warehouse and upfit is supplied by BFCEC. DO´s DONT´s Transfer Pricing (PRL60) is not applicable. OEM must be involved in the import process as the formal importer. Inventory belongs to the OEM after localization. Inventory belongs to CMI until ISF is cleared by the OEM in the bonded warehouse. CMI safety stock (inventory) is based in the bonded warehouse in Brazil (quick availability) OEM has to open a branch in the bonded warehouse (CNPJ) for clearance at Customs. Firm period and lead time reduced to meet OEM expectations. Get from CMI approval for a bonded warehouse (it is necessary to the import process). Price: in USD for engine, avoiding exposure to ex-rate (conversion from USD to Real). Negotiate w/ OEM approval to this new logistics process (OEM becomes the formal importer). There is an extra-cost in the engine to include bonded warehouse in the process (USD200 / engine).
  • 9. Analyze Phase Cost avoidance: USD 42 M from 2012 to 2015 (estimated). Annual cost avoidance: USD 10.5 average (estimated). Avoidance to the transfer pricing per Shop Order (USD 620 average)
  • 10. Control Plan • MAN: bonded warehouse implemented in Jan/12; • Agrale: bonded warehouse to be implemented in Aug/12. Find control plan below for the bonded warehouse implementation to Agrale.
  • 11. Lessons Learned / Shared The inclusion of the Brazilian bonded warehouse in the ISF logistics flow from China to Brazil is the best choice to meet local OEM’s requirements while bringing the best positive financial return to Cummins. it eliminates the transfer price applicability (sales price w/ 60% mark-up over cost) and therefore leverage the ISF competitiveness in Brazil from a cost standpoint; it reduces Cummins exposure to ex-rate volatility because OEM pays for the ISF in USD (price does not have to be converted from US to the local currency - Real); it enables Cummins to reduce the firm period from 12 to 5 weeks, which is the same firm period offered by competitors with engines made in Brazil; it transfers the iventory (safety stock) from China to Brazil, giving to the local OEMs the same reliability offered by Cummins´competitors with engines made in Brazil. it mitigates potential delivery delays associated to risks like Customs strikes and in transit delays because safety stock is based in Brazil.