SlideShare ist ein Scribd-Unternehmen logo
1 von 40
Downloaden Sie, um offline zu lesen
Joint Meeting of Gloucester County
School Board and Board of Supervisors
October 27, 2011

Page Middle School Discussion

RRMM

A R C H ITE C T S
Since our meeting on September 20, 2011…




Option A1 – New 800 Student Middle School on Walker Road Site (6-8)
Option A2 - New 800 Student Middle School on Walker Road Site (6-8)
Option B – New 800 Student Middle School on Page Site (6-8)






RRMM

Add-Ons
 9th Grade House @ Walker Road Site
 Geothermal Option
 Administration and Operations Center @ Page Site
 New Football Field @ Walker Road Site
 New Softball Field @ Walker Road Site

Option C – 800 Student Renovation and Addition on Page Site (6-8)
Backup Data for Each Cost Model and Add-On
Basis of Cost (No Deductions Shown for Insurance Settlement)

A R C H ITE C T S
PAGE MIDDLE SCHOOL
COST OPTION SUMMARY

Title

Brief Description

Probable Total Project Cost

Option A1

6-8 Middle School on Walker Rd for 800
students.

$28,169,690

Option A2

6-8 Middle School on Walker Rd for 800
students.

$27,937,322

Option B

6-8 Middle School on Page Site for 800
students.

$26,703,772

Add-on 1

9th Grade House at Walker Road Site

$11,742,000

Add-on 2

Geothermal Option

Add-on 3

High School A-Wing Renovations

Add-on 4

Administration and Operations Center
@ Page

Add-on 5

New Football Field @ Walker Road

600,000

Replaces football field at Page Site. Includes lights and 25
additional parking spaces.

Add-on 6

New Softball Field @ Walker Road

185,000

Replaces softball fields at Page Site. Includes lights and 25
additional parking spaces.

Option C

6-8 Middle School Renovation/Addition
on Page Site for 800 students

RRMM

A R C H ITE C T S

Comments

Slightly better location for utilities than A1 and better
opportunity for future high school connection.

$750,000
$2,132,100
$14,220,365

$22,193,780

Includes renovation of existing auditorium, gym, lobby.

Assumes SF/student, on-site and off-site improvements
comparable to Option B.
Date:

Option A1
Construction Costs (Hard Costs)

Option B

New 6-8 for 800 Walker Road Site

10/27/2011

New 6-8 for 800 Page Site

Factors

Unit

Costs

Factors

Unit

Costs

Exceptional Site Costs Allowance (site demo: A- note 1; B- note 2)

1

LS

$343,600

1

LS

$154,750

Exceptional Site Costs Allowance (Bldg. demo & hazmat removal)

1

LS

$-00

1

LS

$361,073

General Site Costs (Pkg, pav'g, walks, baseball, track, tennis, etc.)
Exceptional Site Costs Allowance (signalization)

1
1

LS
LS

$1,953,576
$200,000

1
1

LS
LS

$1,967,218
$200,000

LS
LS
LS
$ 150.00

$505,000
$800,000
$979,840
$17,760,000
$22,542,016

1
1
1
118,400

LS
LS
LS
$ 150.00

$505,000
$-00
$135,000
$17,760,000
$21,083,041

5%

PCT

$1,127,101
$23,669,117

6%

PCT

$1,264,982
$22,348,023

7%
1
1

PCT
LS
LS

$1,577,941
$1,964,446
$137,710
$3,680,097

7%
1
1

PCT
LS
LS

$1,475,813
$1,964,446
$137,710
$3,577,969

Exceptional Site Costs Allowance (Turn lanes & off-site imp., etc.)
Exceptional Site Costs Allowance (Road Widening of TC Walker)
Exceptional Site Costs Allowance (Water and Sewer)
New Middle School Building (148 SF/P x 800 students)**
Total Construction Cost
Contingency Factor
Construction Cost Grand Total (w/ Contingency)

1
1
1
118,400

Soft Costs

Prof. Services (A/E, Commissioning, Surveys, Borings, LEED, etc.)
Furnishings/Fixtures/Equipment and Technology Allowance
Construction Testing/Inspection, Adv./Reprod.
Miscellaneous Soft Costs Total
Total Project Cost
Total Project Cost with 3% Escalation

$27,349,214
$28,169,690

Version A2 (incl. conting., soft costs & escalation)

$27,937,322

RRMM

A R C H ITE C T S

$25,925,992
$26,703,772
Potential Additional Costs

9th Grade House + Core Increase to Accommodate Growth*
Sitework for 9th Grade House
Construction Contingency @ 5%
Soft Costs at app. 15%
Subtotal w/ 3% escalation
Geothermal Option

1

HS A-Wing Renovation Allowance
Soft Costs at app. 15%
Subtotal w/ 3% escalation
Administration and Operations Center Project
Exceptional Site (turn lane allowance)
Exceptional Site (Bldg. demo less gym/audit/main hall.)
Site Work
Renovate Existing Gym, Auditorium, Lobby
New Administration & Operations Bldg + Transportation
Convert Transportation Bldg to Grounds
Hazmat Removal (incl. in bldg. demo)
Construction Contingency (5%)
Soft Costs
Total Project Cost w/ 3% escalation
Replace Page Football Field @ Walker Rd. Site (w/ lights)
Replace Page Softball Field @ Walker Rd. Site (w/ lights)
*Increase incl. auditorium exp. 400 to 800 (4,450), 9th Gr. House (31,082), Admin
(600), Media Ctr Core (200), Special Programs (3,100) + efficiency factor.
**Basis for Costs - See Attachment

RRMM

50,000 $ 165.00
1
LS
1
LS
1
LS

A R C H ITE C T S

LS

30,000 $

$8,250,000
$1,250,000
$475,000
$1,425,000
$11,742,000
$750,000

60.00

LS

$1,800,000
$270,000
$2,132,100

1
LS
1
LS
1
LS
17,536 $ 50.00
67,444 $ 120.00
1
LS
1
LS
1
LS
1
LS

1

$50,000
$291,981
$1,348,880
$876,800
$8,093,280
$383,109
$-00
$558,161
$2,204,221
$14,220,625

1
1

LS
LS

$600,000
$185,000

Note 1 - Walker Road site demo primarily clearing and grubbing of timber.
Note 2 - Page site includes general clearing/demo but not the $361,073 for
demo of main building noted on the next line.

$750,000
Site Plan

Option A1

RRMM

A R C H ITE C T S
Site Plan

Option A1

RRMM

A R C H ITE C T S
Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs
Option A1 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch)
Based on preliminary analysis, the following improvements are anticipated:

Existing George Washington Highway/TC Walker Road intersection
New traffic signal ($200,000)
Extend northbound right-turn lane to 200’ taper, 300’ storage ($50,000)
Extend southbound left-turn lane to 200’ taper, 300’ storage ($50,000)
New westbound right turn lane - 200’ taper, 200’ storage ($125,000)

RRMM

A R C H ITE C T S
Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option A1 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch)
Based on preliminary analysis, the following improvements are anticipated:

Existing TC Walker Road
New westbound right turn lane at the proposed main school entrance – 200’
taper, 200’ storage ($125,000)
New westbound right turn lane at the proposed bus entrance – 200’ taper, 200’
storage ($125,000)
School Zone Advance Warning Speed Limit Signage Assembly and Flashing
Beacons ($30,000)
Subtotal Turn Lane Improvements - $505,000
Widen existing 2-lane road to new 3-lane road for approximately 0.3 mile.
Widened road would include left turn lanes into two proposed site entrances.
($800,000)

RRMM

A R C H ITE C T S
Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option A1 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch)
Based on preliminary analysis, the following improvements are anticipated:

Water








3,000’ of new 8” or 10” fire service from site service entrance to George Washington Hwy.
($225,000)
Bore and jack 80’ under George Washington Hwy. northbound lanes ($30,000)
Tap existing 12” water main ($40,000)
Double check detector and vault ($15,000)
3” water meter and vault ($5,000)
Tap fee – County ($25,200)
Tap fee – HRSD ($59,140)

RRMM

A R C H ITE C T S
Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option A1 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch)
Based on preliminary analysis, the following improvements are anticipated:

Sewer


3,000’ of new 4” or 6” force main from site service entrance to George Washington Hwy.
($225,000)
 Tap existing 18” HRSD force main ($75,000)
 New on-site pump station ($250,000)
 Tap fee – County ($30,500)
Water and Sewer Subtotal - $979,840
Construction Cost Opinion = $2,484,840
(Does not include soft costs for surveying and design fees, right-of-way acquisition, or permit
fees)

RRMM

A R C H ITE C T S
Onsite Costs Improvements
Preliminary Opinion of Construction Costs

Option A1 - New 800 Student School on TC Walker Road Site
Section Descriptions

Qty

Unit

24,200
30

CY
ACRE

Cost per Unit

Total

Section Total Cost

Site Demolition:
Earthwork (Cut/Fill/Dispose)
Clear & Grub

$
$

8.00
5,000.00

$
$

193,600
150,000

Total Site Demolition

$ 193,600.00
$ 150,000.00

$ 343,600.00

New Sitework:
Practice Field/Track
Practice Field
Track Running Surface/Striping

175,000
48,000

SF
SF

$
$

1.00
5.00

$
$

175,000
240,000

$

415,000

Baseball Field
Field Base Fill/Drain/Surface
Dug-Outs Bating Areas
Fencing

1
2,200
200

Field
SF
LF

$
$
$

25,000.00
3.00
35.00

$
$
$

25,000
6,600
7,000

$

38,600

Hard Surface Play Area
Base Pad/Asphalt Surfacing

10,800

SF

$

6.00

$

64,800

$

64,800

Court
Court
LF
Poles

$
$
$
$

45,000.00
3,500.00
25.00
5,500.00

$
$
$
$

90,000
7,000
11,500
22,000

$

130,500

Tennis Courts
Base/Surfacing
Striping/Posts/Netting
Fencing/Gates
Lighting

RRMM

A R C H ITE C T S

2
2
460
4
Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)

Option A1 - New 800 Student School on TC Walker Road Site
Section Descriptions

Qty

Unit

Cost per Unit

Total

Section Total Cost

Fitness Development
Soft Mulch Workout Area Pad

1,500

SF

$

10.00

$

15,000

$

15,000

3,889

SY

$

30.00

$

116,667

$

181,867

Heavy Duty Asphalt Drive Lanes

667

SY

$

30.00

$

20,000

Striping

480

LF

$

0.50

$

240

18

EA

$

95.00

$

1,710

1,700

LF

$

20.00

$

34,000

10

EA

$

125.00

$

1,250

4

EA

$

2,000.00

$

8,000

Bus Parking/Loop with Drive Lanes
Heavy Duty Asphalt Parking

Symbols/Directional Arrows
Curb & Gutters
Signage
Site Lighting

RRMM

A R C H ITE C T S
Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)

Option A1 - New 800 Student School on TC Walker Road Site
Section Descriptions

Qty

Unit

Cost per Unit

Total

Section Total Cost

Vehicular Parking with Drive Lanes
Light Duty Asphalt Parking

7,778

SY

$

25.00

$

194,444

Light Duty Asphalt Drive Lanes

3,000

SY

$

25.00

$

75,000

Striping

3,750

LF

$

0.50

$

1,875

10

EA

$

95.00

$

950

2,000

LF

$

20.00

$

40,000

Signage

15

EA

$

125.00

$

1,875

Site Lighting

10

EA

$

2,000.00

$

20,000

Heavy Duty Asphalt Drive Lanes

4,000

SY

$

30.00

$

120,000

Striping

1,000

LF

$

0.50

$

500

10

EA

$

95.00

$

950

1,300

LF

$

20.00

$

26,000

Signage

5

EA

$

125.00

$

625

Site Lighting

5

EA

$

2,000.00

$

10,000

Symbols/Directional Arrows
Curb & Gutters

$

334,144

$

158,075

Entry Drive Lanes

Symbols/Directional Arrows
Curb & Gutters

RRMM

A R C H ITE C T S
Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)

Option A1 - New 800 Student School on TC Walker Road Site
Section Descriptions

Qty

Unit

Cost per Unit

Total

Section Total Cost

Landscaping/Seeding
Large Trees

13

EA

$

350.00

$

4,550

Medium Trees

24

EA

$

245.00

$

5,880

Small Trees

10

EA

$

125.00

$

1,250

Shrubs

50

EA

$

45.00

$

2,250

Groundcover

250

EA

$

15.00

$

3,750

Mulch Beds

10

CY

$

40.00

$

400

12

EA

$

134.00

$

1,608

2

EA

$

125.00

$

250

6,500

SF

$

4.00

$

26,000

LOC

$

1,500.00

$

7,500

1,000

SF

$

5.00

$

5,000

Erosion Control

5,000

LF

$

3.00

$

15,000

Cut/Fill/Dispose

14,520

CY

$

8.00

$

116,160

7,500

CY

$

18.00

$

135,000

435,600

SF

$

0.07

$

30,492

$

18,080

$

1,858

$

38,500

$

296,652

Site Signage
Fire Lane Signs
Stop/Directional/Info Signs
Concrete Walks/Pads
Concrete Walks
HC Ramps/Walk Features
Pads

5

Earthwork

BMP w/Control Measures
Stabilization/Seeding

RRMM

A R C H ITE C T S
Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)

Option A1 - New 800 Student School on TC Walker Road Site
Section Descriptions

Qty

Storm System w/Structures

3,000

LF

$

60.00

$

180,000

$

180,000

500

LF

$

40.00

$

20,000

$

20,000

Sanitary Sewer System w/Structures

Unit

Cost per Unit

Total

Section Total Cost

Water System w/ Vault/Meter (in off site)

$

-

$

-

$

-

Water System w/ Vault/Meter

$

-

$

-

$

-

(incl. w/ off site work)
Fire Line System w/ Structures

500

LF

Offsite Utility Allowance (incl. in off site)

$
$

35.00
-

$
$

17,500
-

$
$

17,500
-

Gas Service

1

LS

$

8,000.00

$

8,000

$

8,000

Power Service / Transformers

1

LS

$

35,000.00

$

35,000

$

35,000

Total New Sitework

RRMM

A R C H ITE C T S

$ 1,953,576
Site Plan

Option A2

RRMM

A R C H ITE C T S
Site Plan

Option A2

RRMM

A R C H ITE C T S
Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs – Version A2
Option A2 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch)
Based on preliminary analysis, the following improvements are anticipated:

Existing George Washington Highway/TC Walker Road Intersection
New

Traffic Signal ($200,00)
New Northbound right-turn lane to 200’ taper, 300’ storage ($50,000)
Extend Southbound left-turn lane to 200’ taper, 300’ storage ($50,000)
New Westbound right-turn lane – 200’ taper, 200’ storage ($125,000)

RRMM

A R C H ITE C T S
Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs – Version A2 (cont’d)
Option A2 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch)
Based on preliminary analysis, the following improvements are anticipated:

Existing TC Walker Road
Widen

existing 2-lane road to 3-lane road 500’ on either side of the easement entrance,
approximately 1,000’. Widened road would include left turn lane into proposed site entrance.
($550,000)
Assume 15,000 sf of wetlands impacts with road widening. Based on $180,000 per acre mitigation
cost (2:1 ratio), wetlands mitigation fee approximated at $62,000.
New Westbound right-turn lane at the proposed main school entrance – 200’ taper, 200’ storage
($125,000)
School Zone Advance Warning Speed Limit Signage Assembly and Flashing Beacons ($30,000)

Construction Cost Opinion = $1,317,000
(Does not include soft costs for surveying and design fees, right-of-way acquisition, or permit and
impact (fees)

RRMM

A R C H ITE C T S
Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs – Version A2 (cont’d)
Option A2 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch)
Based on preliminary analysis, the following improvements are anticipated:

Water
•
•
•
•
•
•
•

800’ of new 8” or 10” fire service from site service entrance to George Washington Hwy.
($60,000)
Bore and jack 80’ under George Washington Hwy. northbound lanes ($30,000)
Tap existing 12” water main ($40,000)
Double check detector and vault ($15,000)
3” water meter and vault ($5,000)
Tap fee – County ($25,200)
Tap fee – HRSD ($59,140)

RRMM

A R C H ITE C T S
Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs – Version A2 (cont’d)
Option A2 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch)
Based on preliminary analysis, the following improvements are anticipated:

Sewer
•

800’ of new 4” or 6” force main from site service entrance to George Washington Hwy.
($60,000)
• Tap existing 18” or 24” HRSD force main ($75,000)
• New on-site pump station ($250,000)
• Tap fee – County ($30,500)
Construction Cost Opinion = $979,840
(Does not include soft costs for surveying and design fees, right-of-way acquisition, or permit fees)

Total Option A2 = $2,296,840 or $188,000 less than A1. $188,000 x 1.05 contingency = $197,400.
$197,400 + $28,200 soft costs = $225,600. $225,600 x 1.03 escalation = $232,368. Thus bottom line
of Option A2 is $28,244,391.

RRMM

A R C H ITE C T S
Site Plan

Option B

RRMM

A R C H ITE C T S
Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs
Option B – New 800 Student School on Existing Page MS Site (Per attached RRMM Sketch)
Based on preliminary analysis, the following improvements are anticipated:

Proposed George Washington Highway/TC Walker Road bus entrance





New traffic signal ($200,000)
New northbound left-turn lane – 200’ taper, 300’ storage ($150,000)
New southbound right-turn lane – 200’ taper, 300’ storage ($150,000)

Existing George Washington Highway/Page MS entrance



Extend northbound left-turn lane to 200’ taper, 200’ storage ($50,000)
New south bound right-turn lane – 200’ taper, 200’ storage ($125,000)

RRMM

A R C H ITE C T S
Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option B – New 800 Student School on Existing Page MS Site (Per attached RRMM Sketch)
Based on preliminary analysis, the following improvements are anticipated:

Existing George Washington Highway


Replace Existing School Zone Advance Warning Speed Limit Signage Assembly
and Flashing Beacons ($30,000)
Subtotal Turn Lane Improvements – ($505,000)

Water



New 8” fire service required for new school’s sprinkler system ($60,000)
Assume existing domestic water service is adequate

RRMM

A R C H ITE C T S
Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option B – New 800 Student School on Existing Page MS Site (Per attached RRMM Sketch)
Based on preliminary analysis, the following improvements are anticipated:

Sewer




Assume existing pump station requires upgrading ($50,000)
Assume existing force main is requires relocation on site ($25,000)
Water and Sewer Subtotal – ($135,000)

Construction Cost Opinion = $840,000
(Does not include soft costs for surveying and design fees, right-of-way
acquisition, or permit and impact fees)

RRMM

A R C H ITE C T S
Onsite Costs Improvements
Preliminary Opinion of Construction Costs

Option B - New 800 Student School on Existing Page MS Site
Section Descriptions

Qty

Unit

Cost per Unit

Total

Section Total Cost

Site Demolition:
Existing Tennis Courts

2

EA

$

1,200.00

$

2,400

$

2,400

Existing Roadway Pavement

10

Loads

$

500.00

$

5,000

$

5,000

Existing Parking Pavement

20

Loads

$

500.00

$

10,000

$

10,000

CY

$

6.00

$

72,600

$

117,600

2,500.00

$

45,000

Earthwork (Cut/Fill/Dispose)

12,100

Clear & Grub

18

ACRE

$

Signage

-

EA

$

-

$

-

$

-

Misc. Existing Building Pads and Structures-Heavy Equipment Removal-Disposal
Other Pads and Structures

Loads

$

500.00

$

5,000

Fencing

1

Loads

$

500.00

$

500

Bleachers

1

Loads

$

500.00

$

500

Tanks/Vaults

RRMM

10

1

Loads

$

500.00

$

500

A R C H ITE C T S

$

6,500
Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)

Option B - New 800 Student School on Existing Page MS Site
Section Descriptions

Unforeseen Underground Services

Qty

1

Unit

LS

Utility Removal (Disposal Costs)

Cost per Unit

$

Total

Section Total Cost

5,000.00

$

5,000

$

5,000

$

3,500

`

Storm

5

Load

$

500.00

$

2,500

Sanitary

1

Load

$

500.00

$

500

Water

1

Load

$

500.00

$

500

Site Lighting

18

Pole

$

250.00

$

4,500

$

4,500

Landscaping

1

LS

$

250.00

$

250

$

250

Total Site Demolition $ 154,750.00

Main School Structure Demo (incl. Hazmat)

RRMM

A R C H ITE C T S

91643 $

3.94

$

361,073

$

361,073
Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)

Option B - New 800 Student School on Existing Page MS Site
Section Descriptions

Qty

Unit

Cost per Unit

Total

Section Total Cost

New Sitework:
Practice Field/Track
Practice Field

175,000

SF

$

1.00

$

175,000

$

415,000

Track Running Surface/Striping

48,000

SF

$

5.00

$

240,000

Field

$

25,000.00

$

25,000

$

38,600

2,200

SF

$

3.00

$

6,600

200

LF

$

35.00

$

7,000

10,800

SF

$

6.00

$

64,800

$

64,800

$

130,500

Baseball Field
Field Base Fill/Drain/Surface
Dug-Outs Bating Areas
Fencing

1

Hard Surface Play Area
Base Pad/Asphalt Surfacing
Tennis Courts

Base/Surfacing

2

Court

$

45,000.00

$

90,000

Striping/Posts/Netting

2

Court

$

3,500.00

$

7,000

LF

$

25.00

$

11,500

Poles

$

5,500.00

$

22,000

Fencing/Gates
Lighting

RRMM

A R C H ITE C T S

460
4
Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)

Option B - New 800 Student School on Existing Page MS Site
Section Descriptions

Qty

Unit

Cost per Unit

Total

Section Total Cost

Fitness Development
Soft Mulch Workout Pad Area

1,500

SF

$

10.00

$

15,000

$

15,000

3,889

SY

$

30.00

$

116,667

$

181,867

Heavy Duty Asphalt Drive Lanes

667

SY

$

30.00

$

20,000

Striping

480

LF

$

0.50

$

240

18

EA

$

95.00

$

1,710

1,700

LF

$

20.00

$

34,000

Signage

10

EA

$

125.00

$

1,250

Site Lighting

4

EA

$

2,000.00

$

8,000

Lite Duty Asphalt Parking

7,778

SY

$

25.00

$

194,444

$

334,144

Lite Duty Asphalt Drive Lanes

3,000

SY

$

25.00

$

75,000

Striping

3,750

LF

$

0.50

$

1,875

10

EA

$

95.00

$

950

2,000

LF

$

20.00

$

40,000

Signage

15

EA

$

125.00

$

1,875

Site Lighting

10

EA

$

2,000.00

$

20,000

Bus Parking/Loop with Drive Lanes
Heavy Duty Asphalt Parking

Symbols/Directional Arrows
Curb & Gutters

Vehicular Parking with Drive Lanes

Symbols/Directional Arrows
Curb & Gutters

RRMM

A R C H ITE C T S
Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)

Option B - New 800 Student School on Existing Page MS Site
Section Descriptions

Qty

Unit

Cost per Unit

Total

Section Total Cost

Entry Drive Lanes
Heavy Duty Asphalt Drive Lanes

4,000

SY

$

30.00

$

120,000

Striping

1,000

LF

$

0.50

$

500

10

EA

$

95.00

$

950

1,300

LF

$

20.00

$

26,000

Signage

5

EA

$

125.00

$

625

Site Lighting

5

EA

$

2,000.00

$

10,000

13,333

SY

$

5.00

$

66,667

2,800

LF

$

0.50

$

1,400

10

EA

$

95.00

$

950

800

LF

$

20.00

$

16,000

5

EA

$

125.00

$

625

Symbols/Directional Arrows
Curb & Gutters

$

158,075

$

85,642

Grounds/Transportation Pavement Rework/Addition
Heavy Duty Asphalt Drive Overlay
Striping
Symbols/Directional Arrows
Curb & Gutters
Signage

RRMM

A R C H ITE C T S
Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)

Option B - New 800 Student School on Existing Page MS Site
Section Descriptions

Landscaping/Seeding
Large Trees
Medium Trees
Small Trees
Shrubs
Groundcover
Mulch Beds

13
24
10
50
250
10

EA
EA
EA
EA
EA
CY

$
$
$
$
$
$

350.00
245.00
125.00
45.00
15.00
40.00

$
$
$
$
$
$

4,550
5,880
1,250
2,250
3,750
400

$

18,080

Site Signage
Fire Lane Signs
Stop/Directional/Info Signs

12
2

EA
EA

$
$

134.00
125.00

$
$

1,608
250

$

1,858

Concrete Walks/Pads
Concrete Walks
HC Ramps/Walk Features
Pads

6,500
5
1,000

SF
LOC
SF

$
$
$

4.00
1,500.00
5.00

$
$
$

26,000
7,500
5,000

$

38,500

Earthwork
Erosion Control
Cut/Fill/Dispose
BMP w/Control Measures
Stabilization/Seeding

RRMM

Qty

5,000
14,520
7,500
435,600

LF
CY
CY
SF

$
$
$
$

3.00
8.00
18.00
0.07

$
$
$
$

15,000
116,160
135,000
30,492

$

296,652

A R C H ITE C T S

Unit

Cost per Unit

Total

Section Total Cost
Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)

Option B - New 800 Student School on Existing Page MS Site
Section Descriptions

Storm System w/Structures

Sanitary Sewer System w/Structures

Qty

Unit

Cost per Unit

Total

Section Total Cost

1,800

LF

$

60.00

$

108,000

$

108,000

500

LF

$

40.00

$

20,000

$

20,000

Water System w/ Vault/Meter

$

-

$

-

$

-

(incl. w/ off site work)

Fire Line System w/ Structures

500

LF

$

35.00

$

17,500

$

17,500

Gas Service

1

LS

$

8,000.00

$

8,000

$

8,000

Power Service / Transformers

1

LS

$

35,000.00

$

35,000

$

35,000

Total New Sitework $ 1,967,218

RRMM

A R C H ITE C T S
Option C
New 6-8 for 800 Page Site

Construction Costs (Hard Costs)
Exceptional Site Costs Allowance (site demo)*
Exceptional Site Costs Allowance (Bldg. demo & hazmat removal)**
General Site Costs (Pkg, pav'g, walks, baseball, track, tennis, etc.)
Exceptional Site Costs Allowance (signalization)
Exceptional Site Costs Allowance (Turn lanes & off-site imp., etc.)
Exceptional Site Costs Allowance (Water and Sewer)
Renovation of Existing Page (hazmat removal in portion to remain)
Renovation of Existing Page
New Middle School Building (148 SF/P x 800 students)***
Total Construction Cost

Contingency Factor
Construction Cost Grand Total (w/ Contingency)
Soft Costs
Prof. Services (A/E, Commissioning, Surveys, Borings, LEED, etc.)
Furnishings/Fixtures/Equipment and Technology Allowance
Construction Testing/Inspection, Adv./Reprod.
Miscellaneous Soft Costs Total

Factors
1
1
1
1
1
1
52,569
52,569
65,831

Unit
LS
LS
LS
LS
LS
LS
$
1.95
$ 70.00
$ 150.00

Costs
$154,750
$153,951
$1,982,218
$200,000
$505,000
$135,000
$102,510
$3,679,830
$9,874,650
$16,787,909

6%

PCT

$1,007,275
$17,795,183

10%
1
1

PCT
LS
LS

$1,678,791
$1,964,446
$108,940
$3,752,176

Total Project Cost
Total Project Cost with 3% Escalation

Geothermal Option

1

*Page Site includes clearing and demo but not the $153,951 for demo of tornado damaged area.
**Based on actual bid + monitoring of 39,074 sf being demo'd. Does not include front bldg. portion.
***Square footage based on 118,400 sf (800 x 148 sf/student) less existing52,569 sf of renovation. Thus,
new addition of est. 65,831 sf.

RRMM

$21,547,359
$22,193,780

A R C H ITE C T S

LS

$750,000
Middle Schools and High Schools – Oct. 2011
Basis of Costs – Costs included below are construction costs (Bid Costs) and
do not include soft costs, construction contingencies, FFE and the like. Bid
prices vary depending on site conditions, required site work, complexity,
quality, size, schedule and many other factors but most importantly the market
activity at the time of bid. Costs shown are averages and tempered by current
market conditions.
Costs are also preliminary and are averages from across the state within
varying economic zones, schedule constraints, quality standards and many
other factors. See attached Dept. of Education cost data used as a resource.

RRMM

A R C H ITE C T S
Middle School




09-10 avg. – $142.17.
6 year avg. costs = $171.91
2011 to date – no projects.

Budget Recommendation –
$175 ($150 building, $25 site) + escalation to bid date (3%)
6 year average SF/Student =148 Recommend 148 sf/student

High School




Office Building

09-10 avg. – $0. No High Schools built.
08-09 avg. - $209.05
5 year avg. costs = $186.16

2011 to date – $210.39
Budget Recommendation - $195 ($165 building, $30 site)
6 year average SF/Student = 152
2011 average SF/Student = 164
Recommend 160 sf/student


RRMM

A R C H ITE C T S

Recommend $140/sf.
(RS Means Construction Cost Data)
RRMM

A R C H ITE C T S
Football and Softball Field Cost Breakdown
Football Field:
Football Field = $150,000
Football Field Lights at 10 LOC/$5,000 EA = $50,000
Bleachers at 2000 Seats = $ 220,000
Parking Spaces at 25 @ $2,000/EA = $50,000
Fencing 8' High at 4,000 LF = $60,000
Total = $530,000
$530,000 x 1.1 for design/contingency = $583,000
$583,000 x 1.03 for escalation = $600,490
App. $600,000

RRMM

A R C H ITE C T S
Football and Softball Field Cost Breakdown (cont’d)
Softball Field:
Softball Field = $25,000
Softball Field Lights at 8 LOC/$5,000 EA = $40,000
Bleachers at 300 Seats = $ 33,000
Parking Spaces at 25 @ $2,000/EA = $50,000
Fencing 8' High at 1,000 LF = $15,000
Total = $163,000
$163,000 x 1.1 for design/contingency = $179,300
$179,300 x 1.03 for escalation = $184,679
App. $185,000

RRMM

A R C H ITE C T S
Joint Meeting of Gloucester County
School Board and Board of Supervisors
October 27, 2011

Page Middle School Discussion

RRMM

A R C H ITE C T S

Weitere ähnliche Inhalte

Was ist angesagt?

Public Input - City Streets Maintenance Plan for 2020
Public Input - City Streets Maintenance Plan for 2020Public Input - City Streets Maintenance Plan for 2020
Public Input - City Streets Maintenance Plan for 2020CityofNewBraunfels
 
Online Consultation: Western Alignment and Vehicle Maintenance and Storage Fa...
Online Consultation: Western Alignment and Vehicle Maintenance and Storage Fa...Online Consultation: Western Alignment and Vehicle Maintenance and Storage Fa...
Online Consultation: Western Alignment and Vehicle Maintenance and Storage Fa...Crosstown TO
 
Online Consultation: Western Alignment and Vehicle Maintenance and Storage Fa...
Online Consultation: Western Alignment and Vehicle Maintenance and Storage Fa...Online Consultation: Western Alignment and Vehicle Maintenance and Storage Fa...
Online Consultation: Western Alignment and Vehicle Maintenance and Storage Fa...Crosstown TO
 
Belcrest Road Phasing Program
Belcrest Road Phasing ProgramBelcrest Road Phasing Program
Belcrest Road Phasing ProgramJose Carlos Ayala
 
4 mining road designconstrucion&m cm 2011 thompson sa
4 mining road designconstrucion&m cm 2011 thompson sa4 mining road designconstrucion&m cm 2011 thompson sa
4 mining road designconstrucion&m cm 2011 thompson saSierra Francisco Justo
 
Update trans supporting_documents.pdf 3
Update trans supporting_documents.pdf 3Update trans supporting_documents.pdf 3
Update trans supporting_documents.pdf 3Kenneth Hogge Sr
 
Kennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationKennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationCrosstown TO
 
ROAD NETWORKING AND SURVEYING
ROAD NETWORKING AND SURVEYINGROAD NETWORKING AND SURVEYING
ROAD NETWORKING AND SURVEYINGmanashkedia098
 

Was ist angesagt? (13)

Public Input - City Streets Maintenance Plan for 2020
Public Input - City Streets Maintenance Plan for 2020Public Input - City Streets Maintenance Plan for 2020
Public Input - City Streets Maintenance Plan for 2020
 
SmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network PlanningSmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network Planning
 
2021 Streets Survey
2021 Streets Survey2021 Streets Survey
2021 Streets Survey
 
Street Survey
Street SurveyStreet Survey
Street Survey
 
Online Consultation: Western Alignment and Vehicle Maintenance and Storage Fa...
Online Consultation: Western Alignment and Vehicle Maintenance and Storage Fa...Online Consultation: Western Alignment and Vehicle Maintenance and Storage Fa...
Online Consultation: Western Alignment and Vehicle Maintenance and Storage Fa...
 
Online Consultation: Western Alignment and Vehicle Maintenance and Storage Fa...
Online Consultation: Western Alignment and Vehicle Maintenance and Storage Fa...Online Consultation: Western Alignment and Vehicle Maintenance and Storage Fa...
Online Consultation: Western Alignment and Vehicle Maintenance and Storage Fa...
 
Belcrest Road Phasing Program
Belcrest Road Phasing ProgramBelcrest Road Phasing Program
Belcrest Road Phasing Program
 
4 mining road designconstrucion&m cm 2011 thompson sa
4 mining road designconstrucion&m cm 2011 thompson sa4 mining road designconstrucion&m cm 2011 thompson sa
4 mining road designconstrucion&m cm 2011 thompson sa
 
Update trans supporting_documents.pdf 3
Update trans supporting_documents.pdf 3Update trans supporting_documents.pdf 3
Update trans supporting_documents.pdf 3
 
Kennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationKennedy Mobility Hub Presentation
Kennedy Mobility Hub Presentation
 
ROAD NETWORKING AND SURVEYING
ROAD NETWORKING AND SURVEYINGROAD NETWORKING AND SURVEYING
ROAD NETWORKING AND SURVEYING
 
Unit 4
Unit 4Unit 4
Unit 4
 
Forest hill urban renewal
Forest hill urban renewalForest hill urban renewal
Forest hill urban renewal
 

Andere mochten auch

Planificadorhoy.docx
Planificadorhoy.docxPlanificadorhoy.docx
Planificadorhoy.docxSusanares
 
Contaminación
ContaminaciónContaminación
ContaminaciónAlgaes
 
Archief van koning Boudewijn binnenkort consulteerbaar
Archief van koning Boudewijn binnenkort consulteerbaarArchief van koning Boudewijn binnenkort consulteerbaar
Archief van koning Boudewijn binnenkort consulteerbaarThierry Debels
 
Fenómeno comunicativo
Fenómeno comunicativoFenómeno comunicativo
Fenómeno comunicativoBlanca6748
 
Maggie King 2015
Maggie King 2015Maggie King 2015
Maggie King 2015Maggie King
 
Lipiz dimas slideshow
Lipiz dimas slideshowLipiz dimas slideshow
Lipiz dimas slideshowDimas Lipiz
 
Conditional Sentence 1
Conditional Sentence 1Conditional Sentence 1
Conditional Sentence 1Aldita0292
 
Dynamic Recruitment | 2013 KDChi East Coast Regional Conference
Dynamic Recruitment | 2013 KDChi East Coast Regional ConferenceDynamic Recruitment | 2013 KDChi East Coast Regional Conference
Dynamic Recruitment | 2013 KDChi East Coast Regional Conferenceesteehernandez
 
أنباء الشرق الأوسط لماذا هو ضرورة لبلدان الشرق الأوسط؟
أنباء الشرق الأوسط   لماذا هو ضرورة لبلدان الشرق الأوسط؟أنباء الشرق الأوسط   لماذا هو ضرورة لبلدان الشرق الأوسط؟
أنباء الشرق الأوسط لماذا هو ضرورة لبلدان الشرق الأوسط؟RAIALYOUM
 
ResearchTies: Managing data
ResearchTies: Managing dataResearchTies: Managing data
ResearchTies: Managing datajncrandell
 
Relational Algibra operation
Relational Algibra  operationRelational Algibra  operation
Relational Algibra operationUOB Quetta
 

Andere mochten auch (20)

Welcome
WelcomeWelcome
Welcome
 
Planificadorhoy.docx
Planificadorhoy.docxPlanificadorhoy.docx
Planificadorhoy.docx
 
Contaminación
ContaminaciónContaminación
Contaminación
 
Archief van koning Boudewijn binnenkort consulteerbaar
Archief van koning Boudewijn binnenkort consulteerbaarArchief van koning Boudewijn binnenkort consulteerbaar
Archief van koning Boudewijn binnenkort consulteerbaar
 
CHI-2013054_讓我們一起安全的走
CHI-2013054_讓我們一起安全的走CHI-2013054_讓我們一起安全的走
CHI-2013054_讓我們一起安全的走
 
Resume
ResumeResume
Resume
 
Fenómeno comunicativo
Fenómeno comunicativoFenómeno comunicativo
Fenómeno comunicativo
 
Micro teaching
Micro teachingMicro teaching
Micro teaching
 
Personality development
Personality developmentPersonality development
Personality development
 
Maggie King 2015
Maggie King 2015Maggie King 2015
Maggie King 2015
 
Lipiz dimas slideshow
Lipiz dimas slideshowLipiz dimas slideshow
Lipiz dimas slideshow
 
Conditional Sentence 1
Conditional Sentence 1Conditional Sentence 1
Conditional Sentence 1
 
Dynamic Recruitment | 2013 KDChi East Coast Regional Conference
Dynamic Recruitment | 2013 KDChi East Coast Regional ConferenceDynamic Recruitment | 2013 KDChi East Coast Regional Conference
Dynamic Recruitment | 2013 KDChi East Coast Regional Conference
 
Bacteriological Profile of Burn Wound Infection in a Tertiary Care Hospital i...
Bacteriological Profile of Burn Wound Infection in a Tertiary Care Hospital i...Bacteriological Profile of Burn Wound Infection in a Tertiary Care Hospital i...
Bacteriological Profile of Burn Wound Infection in a Tertiary Care Hospital i...
 
CHI-2013049_垃圾鬼到你家
CHI-2013049_垃圾鬼到你家CHI-2013049_垃圾鬼到你家
CHI-2013049_垃圾鬼到你家
 
أنباء الشرق الأوسط لماذا هو ضرورة لبلدان الشرق الأوسط؟
أنباء الشرق الأوسط   لماذا هو ضرورة لبلدان الشرق الأوسط؟أنباء الشرق الأوسط   لماذا هو ضرورة لبلدان الشرق الأوسط؟
أنباء الشرق الأوسط لماذا هو ضرورة لبلدان الشرق الأوسط؟
 
ResearchTies: Managing data
ResearchTies: Managing dataResearchTies: Managing data
ResearchTies: Managing data
 
Relational Algibra operation
Relational Algibra  operationRelational Algibra  operation
Relational Algibra operation
 
Role of Spiritual Health in Patient Care: A Review
Role of Spiritual Health in Patient Care: A Review Role of Spiritual Health in Patient Care: A Review
Role of Spiritual Health in Patient Care: A Review
 
Lara Technology
Lara TechnologyLara Technology
Lara Technology
 

Ähnlich wie October 27th 2011 RRMM Powerpoint

Matthew_Ruth_Resume_3-15-2016
Matthew_Ruth_Resume_3-15-2016Matthew_Ruth_Resume_3-15-2016
Matthew_Ruth_Resume_3-15-2016Matthew Ruth
 
Exhibit b draft capital improvement program
Exhibit b   draft capital improvement programExhibit b   draft capital improvement program
Exhibit b draft capital improvement programE'ville Eye
 
Canalside board update dec 2015
Canalside board update dec 2015Canalside board update dec 2015
Canalside board update dec 2015MetroPR
 
Actc ashby-i80-interchange-improvements
Actc ashby-i80-interchange-improvementsActc ashby-i80-interchange-improvements
Actc ashby-i80-interchange-improvementsE'ville Eye
 
Public works presentation 9 30final
Public works presentation 9 30finalPublic works presentation 9 30final
Public works presentation 9 30finalCityofEvanston2
 
Designing Airport Whitetopping Projects
Designing Airport Whitetopping ProjectsDesigning Airport Whitetopping Projects
Designing Airport Whitetopping ProjectsJill Reeves
 
Project List 10-31-2016
Project List 10-31-2016Project List 10-31-2016
Project List 10-31-2016Kevin Seyko
 
2016 Emerson Brian Projects List
2016 Emerson Brian Projects List2016 Emerson Brian Projects List
2016 Emerson Brian Projects ListBrian Emerson
 
Community center bid recommendations
Community center bid recommendationsCommunity center bid recommendations
Community center bid recommendationsuniquelyshakopeenews
 
FE Warren AFB Outbrief Kristin Anderson
FE Warren AFB Outbrief   Kristin AndersonFE Warren AFB Outbrief   Kristin Anderson
FE Warren AFB Outbrief Kristin Andersonkanderson111
 
8th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 20158th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 2015City Brandon
 

Ähnlich wie October 27th 2011 RRMM Powerpoint (20)

Matthew_Ruth_Resume_3-15-2016
Matthew_Ruth_Resume_3-15-2016Matthew_Ruth_Resume_3-15-2016
Matthew_Ruth_Resume_3-15-2016
 
School Facilities Referendum Recommendations
School Facilities Referendum RecommendationsSchool Facilities Referendum Recommendations
School Facilities Referendum Recommendations
 
Trench vs reroute of i 70
Trench vs reroute of i 70Trench vs reroute of i 70
Trench vs reroute of i 70
 
Exhibit b draft capital improvement program
Exhibit b   draft capital improvement programExhibit b   draft capital improvement program
Exhibit b draft capital improvement program
 
Canalside board update dec 2015
Canalside board update dec 2015Canalside board update dec 2015
Canalside board update dec 2015
 
Actc ashby-i80-interchange-improvements
Actc ashby-i80-interchange-improvementsActc ashby-i80-interchange-improvements
Actc ashby-i80-interchange-improvements
 
Public works presentation 9 30final
Public works presentation 9 30finalPublic works presentation 9 30final
Public works presentation 9 30final
 
Designing Airport Whitetopping Projects
Designing Airport Whitetopping ProjectsDesigning Airport Whitetopping Projects
Designing Airport Whitetopping Projects
 
Barron Road-Capstone Drive Realignment
Barron Road-Capstone Drive RealignmentBarron Road-Capstone Drive Realignment
Barron Road-Capstone Drive Realignment
 
Project List 10-31-2016
Project List 10-31-2016Project List 10-31-2016
Project List 10-31-2016
 
2016 Emerson Brian Projects List
2016 Emerson Brian Projects List2016 Emerson Brian Projects List
2016 Emerson Brian Projects List
 
FY18 Budget Workshop Day 2
FY18 Budget Workshop Day 2FY18 Budget Workshop Day 2
FY18 Budget Workshop Day 2
 
Community center bid recommendations
Community center bid recommendationsCommunity center bid recommendations
Community center bid recommendations
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Roadway Impact Fees
Roadway Impact FeesRoadway Impact Fees
Roadway Impact Fees
 
FE Warren AFB Outbrief Kristin Anderson
FE Warren AFB Outbrief   Kristin AndersonFE Warren AFB Outbrief   Kristin Anderson
FE Warren AFB Outbrief Kristin Anderson
 
8th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 20158th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 2015
 
TPO FPC DTPW's South Corridor Preliminary Construction Cost Estimates Comparison
TPO FPC DTPW's South Corridor Preliminary Construction Cost Estimates ComparisonTPO FPC DTPW's South Corridor Preliminary Construction Cost Estimates Comparison
TPO FPC DTPW's South Corridor Preliminary Construction Cost Estimates Comparison
 
FY 20 Bond Issuance Update
FY 20 Bond Issuance UpdateFY 20 Bond Issuance Update
FY 20 Bond Issuance Update
 

Mehr von Chuck Thompson

Virginia minute men militia
Virginia minute men militiaVirginia minute men militia
Virginia minute men militiaChuck Thompson
 
Constitutional Law Your Ironclad Guarantee of Freedom
Constitutional Law   Your Ironclad Guarantee of FreedomConstitutional Law   Your Ironclad Guarantee of Freedom
Constitutional Law Your Ironclad Guarantee of FreedomChuck Thompson
 
The American Judiciary
The American JudiciaryThe American Judiciary
The American JudiciaryChuck Thompson
 
Why climate change science does not matter
Why climate change science does not matterWhy climate change science does not matter
Why climate change science does not matterChuck Thompson
 
Constitutional Law And Meaning
Constitutional Law And MeaningConstitutional Law And Meaning
Constitutional Law And MeaningChuck Thompson
 
Judge Jeffery W Shaw Arrest Legal Filing
Judge Jeffery W Shaw Arrest Legal FilingJudge Jeffery W Shaw Arrest Legal Filing
Judge Jeffery W Shaw Arrest Legal FilingChuck Thompson
 
Business Tax Form, Gloucester, Virginia
Business Tax Form, Gloucester, VirginiaBusiness Tax Form, Gloucester, Virginia
Business Tax Form, Gloucester, VirginiaChuck Thompson
 
Circuit Court Judge Jeffrey W Shaw Lawsuit Update
Circuit Court Judge Jeffrey W Shaw Lawsuit UpdateCircuit Court Judge Jeffrey W Shaw Lawsuit Update
Circuit Court Judge Jeffrey W Shaw Lawsuit UpdateChuck Thompson
 
Internal revenue codes of 1879
Internal revenue codes of 1879Internal revenue codes of 1879
Internal revenue codes of 1879Chuck Thompson
 
Letter of Vice Admiral Lord Viscount Horatio Nelson
Letter of Vice Admiral Lord Viscount Horatio NelsonLetter of Vice Admiral Lord Viscount Horatio Nelson
Letter of Vice Admiral Lord Viscount Horatio NelsonChuck Thompson
 
Homeland Security Building Recommendations
Homeland Security Building RecommendationsHomeland Security Building Recommendations
Homeland Security Building RecommendationsChuck Thompson
 
The Battle of Gettysburg, 1863
The Battle of Gettysburg, 1863The Battle of Gettysburg, 1863
The Battle of Gettysburg, 1863Chuck Thompson
 
Les Miserables, five volumes, complete by victor hugo
Les Miserables, five volumes, complete by victor hugoLes Miserables, five volumes, complete by victor hugo
Les Miserables, five volumes, complete by victor hugoChuck Thompson
 
The Art of Making Whiskey
The Art of Making WhiskeyThe Art of Making Whiskey
The Art of Making WhiskeyChuck Thompson
 
The Practical Distiller
The Practical DistillerThe Practical Distiller
The Practical DistillerChuck Thompson
 

Mehr von Chuck Thompson (20)

Virginia minute men militia
Virginia minute men militiaVirginia minute men militia
Virginia minute men militia
 
Constitutional Law Your Ironclad Guarantee of Freedom
Constitutional Law   Your Ironclad Guarantee of FreedomConstitutional Law   Your Ironclad Guarantee of Freedom
Constitutional Law Your Ironclad Guarantee of Freedom
 
Rules For The Militia
Rules For The MilitiaRules For The Militia
Rules For The Militia
 
The American Judiciary
The American JudiciaryThe American Judiciary
The American Judiciary
 
Fake law fake courts
Fake law fake courts Fake law fake courts
Fake law fake courts
 
Why climate change science does not matter
Why climate change science does not matterWhy climate change science does not matter
Why climate change science does not matter
 
Constitutional Law And Meaning
Constitutional Law And MeaningConstitutional Law And Meaning
Constitutional Law And Meaning
 
Judge Jeffery W Shaw Arrest Legal Filing
Judge Jeffery W Shaw Arrest Legal FilingJudge Jeffery W Shaw Arrest Legal Filing
Judge Jeffery W Shaw Arrest Legal Filing
 
Business Tax Form, Gloucester, Virginia
Business Tax Form, Gloucester, VirginiaBusiness Tax Form, Gloucester, Virginia
Business Tax Form, Gloucester, Virginia
 
Circuit Court Judge Jeffrey W Shaw Lawsuit Update
Circuit Court Judge Jeffrey W Shaw Lawsuit UpdateCircuit Court Judge Jeffrey W Shaw Lawsuit Update
Circuit Court Judge Jeffrey W Shaw Lawsuit Update
 
Internal revenue codes of 1879
Internal revenue codes of 1879Internal revenue codes of 1879
Internal revenue codes of 1879
 
Buccaneers no. 22
Buccaneers no. 22Buccaneers no. 22
Buccaneers no. 22
 
Buccaneers no. 19
Buccaneers no. 19Buccaneers no. 19
Buccaneers no. 19
 
Letter of Vice Admiral Lord Viscount Horatio Nelson
Letter of Vice Admiral Lord Viscount Horatio NelsonLetter of Vice Admiral Lord Viscount Horatio Nelson
Letter of Vice Admiral Lord Viscount Horatio Nelson
 
Homeland Security Building Recommendations
Homeland Security Building RecommendationsHomeland Security Building Recommendations
Homeland Security Building Recommendations
 
The Battle of Gettysburg, 1863
The Battle of Gettysburg, 1863The Battle of Gettysburg, 1863
The Battle of Gettysburg, 1863
 
Daredevil 131
Daredevil 131Daredevil 131
Daredevil 131
 
Les Miserables, five volumes, complete by victor hugo
Les Miserables, five volumes, complete by victor hugoLes Miserables, five volumes, complete by victor hugo
Les Miserables, five volumes, complete by victor hugo
 
The Art of Making Whiskey
The Art of Making WhiskeyThe Art of Making Whiskey
The Art of Making Whiskey
 
The Practical Distiller
The Practical DistillerThe Practical Distiller
The Practical Distiller
 

Kürzlich hochgeladen

11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptUsmanKaran
 
lok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptxlok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptxdigiyvbmrkt
 
13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...The Lifesciences Magazine
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxSasikiranMarri
 
Emerging issues in migration policies.ppt
Emerging issues in migration policies.pptEmerging issues in migration policies.ppt
Emerging issues in migration policies.pptNandinituteja1
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Power in International Relations (Pol 5)
Power in International Relations (Pol 5)Power in International Relations (Pol 5)
Power in International Relations (Pol 5)ssuser583c35
 
12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 

Kürzlich hochgeladen (12)

11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.ppt
 
lok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptxlok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptx
 
13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf
 
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptx
 
Emerging issues in migration policies.ppt
Emerging issues in migration policies.pptEmerging issues in migration policies.ppt
Emerging issues in migration policies.ppt
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf
 
World Economic Forum : The Global Risks Report 2024
World Economic Forum : The Global Risks Report 2024World Economic Forum : The Global Risks Report 2024
World Economic Forum : The Global Risks Report 2024
 
Power in International Relations (Pol 5)
Power in International Relations (Pol 5)Power in International Relations (Pol 5)
Power in International Relations (Pol 5)
 
12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 

October 27th 2011 RRMM Powerpoint

  • 1. Joint Meeting of Gloucester County School Board and Board of Supervisors October 27, 2011 Page Middle School Discussion RRMM A R C H ITE C T S
  • 2. Since our meeting on September 20, 2011…    Option A1 – New 800 Student Middle School on Walker Road Site (6-8) Option A2 - New 800 Student Middle School on Walker Road Site (6-8) Option B – New 800 Student Middle School on Page Site (6-8)     RRMM Add-Ons  9th Grade House @ Walker Road Site  Geothermal Option  Administration and Operations Center @ Page Site  New Football Field @ Walker Road Site  New Softball Field @ Walker Road Site Option C – 800 Student Renovation and Addition on Page Site (6-8) Backup Data for Each Cost Model and Add-On Basis of Cost (No Deductions Shown for Insurance Settlement) A R C H ITE C T S
  • 3. PAGE MIDDLE SCHOOL COST OPTION SUMMARY Title Brief Description Probable Total Project Cost Option A1 6-8 Middle School on Walker Rd for 800 students. $28,169,690 Option A2 6-8 Middle School on Walker Rd for 800 students. $27,937,322 Option B 6-8 Middle School on Page Site for 800 students. $26,703,772 Add-on 1 9th Grade House at Walker Road Site $11,742,000 Add-on 2 Geothermal Option Add-on 3 High School A-Wing Renovations Add-on 4 Administration and Operations Center @ Page Add-on 5 New Football Field @ Walker Road 600,000 Replaces football field at Page Site. Includes lights and 25 additional parking spaces. Add-on 6 New Softball Field @ Walker Road 185,000 Replaces softball fields at Page Site. Includes lights and 25 additional parking spaces. Option C 6-8 Middle School Renovation/Addition on Page Site for 800 students RRMM A R C H ITE C T S Comments Slightly better location for utilities than A1 and better opportunity for future high school connection. $750,000 $2,132,100 $14,220,365 $22,193,780 Includes renovation of existing auditorium, gym, lobby. Assumes SF/student, on-site and off-site improvements comparable to Option B.
  • 4. Date: Option A1 Construction Costs (Hard Costs) Option B New 6-8 for 800 Walker Road Site 10/27/2011 New 6-8 for 800 Page Site Factors Unit Costs Factors Unit Costs Exceptional Site Costs Allowance (site demo: A- note 1; B- note 2) 1 LS $343,600 1 LS $154,750 Exceptional Site Costs Allowance (Bldg. demo & hazmat removal) 1 LS $-00 1 LS $361,073 General Site Costs (Pkg, pav'g, walks, baseball, track, tennis, etc.) Exceptional Site Costs Allowance (signalization) 1 1 LS LS $1,953,576 $200,000 1 1 LS LS $1,967,218 $200,000 LS LS LS $ 150.00 $505,000 $800,000 $979,840 $17,760,000 $22,542,016 1 1 1 118,400 LS LS LS $ 150.00 $505,000 $-00 $135,000 $17,760,000 $21,083,041 5% PCT $1,127,101 $23,669,117 6% PCT $1,264,982 $22,348,023 7% 1 1 PCT LS LS $1,577,941 $1,964,446 $137,710 $3,680,097 7% 1 1 PCT LS LS $1,475,813 $1,964,446 $137,710 $3,577,969 Exceptional Site Costs Allowance (Turn lanes & off-site imp., etc.) Exceptional Site Costs Allowance (Road Widening of TC Walker) Exceptional Site Costs Allowance (Water and Sewer) New Middle School Building (148 SF/P x 800 students)** Total Construction Cost Contingency Factor Construction Cost Grand Total (w/ Contingency) 1 1 1 118,400 Soft Costs Prof. Services (A/E, Commissioning, Surveys, Borings, LEED, etc.) Furnishings/Fixtures/Equipment and Technology Allowance Construction Testing/Inspection, Adv./Reprod. Miscellaneous Soft Costs Total Total Project Cost Total Project Cost with 3% Escalation $27,349,214 $28,169,690 Version A2 (incl. conting., soft costs & escalation) $27,937,322 RRMM A R C H ITE C T S $25,925,992 $26,703,772
  • 5. Potential Additional Costs 9th Grade House + Core Increase to Accommodate Growth* Sitework for 9th Grade House Construction Contingency @ 5% Soft Costs at app. 15% Subtotal w/ 3% escalation Geothermal Option 1 HS A-Wing Renovation Allowance Soft Costs at app. 15% Subtotal w/ 3% escalation Administration and Operations Center Project Exceptional Site (turn lane allowance) Exceptional Site (Bldg. demo less gym/audit/main hall.) Site Work Renovate Existing Gym, Auditorium, Lobby New Administration & Operations Bldg + Transportation Convert Transportation Bldg to Grounds Hazmat Removal (incl. in bldg. demo) Construction Contingency (5%) Soft Costs Total Project Cost w/ 3% escalation Replace Page Football Field @ Walker Rd. Site (w/ lights) Replace Page Softball Field @ Walker Rd. Site (w/ lights) *Increase incl. auditorium exp. 400 to 800 (4,450), 9th Gr. House (31,082), Admin (600), Media Ctr Core (200), Special Programs (3,100) + efficiency factor. **Basis for Costs - See Attachment RRMM 50,000 $ 165.00 1 LS 1 LS 1 LS A R C H ITE C T S LS 30,000 $ $8,250,000 $1,250,000 $475,000 $1,425,000 $11,742,000 $750,000 60.00 LS $1,800,000 $270,000 $2,132,100 1 LS 1 LS 1 LS 17,536 $ 50.00 67,444 $ 120.00 1 LS 1 LS 1 LS 1 LS 1 $50,000 $291,981 $1,348,880 $876,800 $8,093,280 $383,109 $-00 $558,161 $2,204,221 $14,220,625 1 1 LS LS $600,000 $185,000 Note 1 - Walker Road site demo primarily clearing and grubbing of timber. Note 2 - Page site includes general clearing/demo but not the $361,073 for demo of main building noted on the next line. $750,000
  • 6. Site Plan Option A1 RRMM A R C H ITE C T S
  • 7. Site Plan Option A1 RRMM A R C H ITE C T S
  • 8. Offsite Transportation & Utility Improvements Preliminary Opinion of Construction Costs Option A1 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch) Based on preliminary analysis, the following improvements are anticipated: Existing George Washington Highway/TC Walker Road intersection New traffic signal ($200,000) Extend northbound right-turn lane to 200’ taper, 300’ storage ($50,000) Extend southbound left-turn lane to 200’ taper, 300’ storage ($50,000) New westbound right turn lane - 200’ taper, 200’ storage ($125,000) RRMM A R C H ITE C T S
  • 9. Offsite Transportation & Utility Improvements Preliminary Opinion of Construction Costs (cont’d) Option A1 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch) Based on preliminary analysis, the following improvements are anticipated: Existing TC Walker Road New westbound right turn lane at the proposed main school entrance – 200’ taper, 200’ storage ($125,000) New westbound right turn lane at the proposed bus entrance – 200’ taper, 200’ storage ($125,000) School Zone Advance Warning Speed Limit Signage Assembly and Flashing Beacons ($30,000) Subtotal Turn Lane Improvements - $505,000 Widen existing 2-lane road to new 3-lane road for approximately 0.3 mile. Widened road would include left turn lanes into two proposed site entrances. ($800,000) RRMM A R C H ITE C T S
  • 10. Offsite Transportation & Utility Improvements Preliminary Opinion of Construction Costs (cont’d) Option A1 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch) Based on preliminary analysis, the following improvements are anticipated: Water        3,000’ of new 8” or 10” fire service from site service entrance to George Washington Hwy. ($225,000) Bore and jack 80’ under George Washington Hwy. northbound lanes ($30,000) Tap existing 12” water main ($40,000) Double check detector and vault ($15,000) 3” water meter and vault ($5,000) Tap fee – County ($25,200) Tap fee – HRSD ($59,140) RRMM A R C H ITE C T S
  • 11. Offsite Transportation & Utility Improvements Preliminary Opinion of Construction Costs (cont’d) Option A1 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch) Based on preliminary analysis, the following improvements are anticipated: Sewer  3,000’ of new 4” or 6” force main from site service entrance to George Washington Hwy. ($225,000)  Tap existing 18” HRSD force main ($75,000)  New on-site pump station ($250,000)  Tap fee – County ($30,500) Water and Sewer Subtotal - $979,840 Construction Cost Opinion = $2,484,840 (Does not include soft costs for surveying and design fees, right-of-way acquisition, or permit fees) RRMM A R C H ITE C T S
  • 12. Onsite Costs Improvements Preliminary Opinion of Construction Costs Option A1 - New 800 Student School on TC Walker Road Site Section Descriptions Qty Unit 24,200 30 CY ACRE Cost per Unit Total Section Total Cost Site Demolition: Earthwork (Cut/Fill/Dispose) Clear & Grub $ $ 8.00 5,000.00 $ $ 193,600 150,000 Total Site Demolition $ 193,600.00 $ 150,000.00 $ 343,600.00 New Sitework: Practice Field/Track Practice Field Track Running Surface/Striping 175,000 48,000 SF SF $ $ 1.00 5.00 $ $ 175,000 240,000 $ 415,000 Baseball Field Field Base Fill/Drain/Surface Dug-Outs Bating Areas Fencing 1 2,200 200 Field SF LF $ $ $ 25,000.00 3.00 35.00 $ $ $ 25,000 6,600 7,000 $ 38,600 Hard Surface Play Area Base Pad/Asphalt Surfacing 10,800 SF $ 6.00 $ 64,800 $ 64,800 Court Court LF Poles $ $ $ $ 45,000.00 3,500.00 25.00 5,500.00 $ $ $ $ 90,000 7,000 11,500 22,000 $ 130,500 Tennis Courts Base/Surfacing Striping/Posts/Netting Fencing/Gates Lighting RRMM A R C H ITE C T S 2 2 460 4
  • 13. Onsite Costs Improvements Preliminary Opinion of Construction Costs (cont’d) Option A1 - New 800 Student School on TC Walker Road Site Section Descriptions Qty Unit Cost per Unit Total Section Total Cost Fitness Development Soft Mulch Workout Area Pad 1,500 SF $ 10.00 $ 15,000 $ 15,000 3,889 SY $ 30.00 $ 116,667 $ 181,867 Heavy Duty Asphalt Drive Lanes 667 SY $ 30.00 $ 20,000 Striping 480 LF $ 0.50 $ 240 18 EA $ 95.00 $ 1,710 1,700 LF $ 20.00 $ 34,000 10 EA $ 125.00 $ 1,250 4 EA $ 2,000.00 $ 8,000 Bus Parking/Loop with Drive Lanes Heavy Duty Asphalt Parking Symbols/Directional Arrows Curb & Gutters Signage Site Lighting RRMM A R C H ITE C T S
  • 14. Onsite Costs Improvements Preliminary Opinion of Construction Costs (cont’d) Option A1 - New 800 Student School on TC Walker Road Site Section Descriptions Qty Unit Cost per Unit Total Section Total Cost Vehicular Parking with Drive Lanes Light Duty Asphalt Parking 7,778 SY $ 25.00 $ 194,444 Light Duty Asphalt Drive Lanes 3,000 SY $ 25.00 $ 75,000 Striping 3,750 LF $ 0.50 $ 1,875 10 EA $ 95.00 $ 950 2,000 LF $ 20.00 $ 40,000 Signage 15 EA $ 125.00 $ 1,875 Site Lighting 10 EA $ 2,000.00 $ 20,000 Heavy Duty Asphalt Drive Lanes 4,000 SY $ 30.00 $ 120,000 Striping 1,000 LF $ 0.50 $ 500 10 EA $ 95.00 $ 950 1,300 LF $ 20.00 $ 26,000 Signage 5 EA $ 125.00 $ 625 Site Lighting 5 EA $ 2,000.00 $ 10,000 Symbols/Directional Arrows Curb & Gutters $ 334,144 $ 158,075 Entry Drive Lanes Symbols/Directional Arrows Curb & Gutters RRMM A R C H ITE C T S
  • 15. Onsite Costs Improvements Preliminary Opinion of Construction Costs (cont’d) Option A1 - New 800 Student School on TC Walker Road Site Section Descriptions Qty Unit Cost per Unit Total Section Total Cost Landscaping/Seeding Large Trees 13 EA $ 350.00 $ 4,550 Medium Trees 24 EA $ 245.00 $ 5,880 Small Trees 10 EA $ 125.00 $ 1,250 Shrubs 50 EA $ 45.00 $ 2,250 Groundcover 250 EA $ 15.00 $ 3,750 Mulch Beds 10 CY $ 40.00 $ 400 12 EA $ 134.00 $ 1,608 2 EA $ 125.00 $ 250 6,500 SF $ 4.00 $ 26,000 LOC $ 1,500.00 $ 7,500 1,000 SF $ 5.00 $ 5,000 Erosion Control 5,000 LF $ 3.00 $ 15,000 Cut/Fill/Dispose 14,520 CY $ 8.00 $ 116,160 7,500 CY $ 18.00 $ 135,000 435,600 SF $ 0.07 $ 30,492 $ 18,080 $ 1,858 $ 38,500 $ 296,652 Site Signage Fire Lane Signs Stop/Directional/Info Signs Concrete Walks/Pads Concrete Walks HC Ramps/Walk Features Pads 5 Earthwork BMP w/Control Measures Stabilization/Seeding RRMM A R C H ITE C T S
  • 16. Onsite Costs Improvements Preliminary Opinion of Construction Costs (cont’d) Option A1 - New 800 Student School on TC Walker Road Site Section Descriptions Qty Storm System w/Structures 3,000 LF $ 60.00 $ 180,000 $ 180,000 500 LF $ 40.00 $ 20,000 $ 20,000 Sanitary Sewer System w/Structures Unit Cost per Unit Total Section Total Cost Water System w/ Vault/Meter (in off site) $ - $ - $ - Water System w/ Vault/Meter $ - $ - $ - (incl. w/ off site work) Fire Line System w/ Structures 500 LF Offsite Utility Allowance (incl. in off site) $ $ 35.00 - $ $ 17,500 - $ $ 17,500 - Gas Service 1 LS $ 8,000.00 $ 8,000 $ 8,000 Power Service / Transformers 1 LS $ 35,000.00 $ 35,000 $ 35,000 Total New Sitework RRMM A R C H ITE C T S $ 1,953,576
  • 17. Site Plan Option A2 RRMM A R C H ITE C T S
  • 18. Site Plan Option A2 RRMM A R C H ITE C T S
  • 19. Offsite Transportation & Utility Improvements Preliminary Opinion of Construction Costs – Version A2 Option A2 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch) Based on preliminary analysis, the following improvements are anticipated: Existing George Washington Highway/TC Walker Road Intersection New Traffic Signal ($200,00) New Northbound right-turn lane to 200’ taper, 300’ storage ($50,000) Extend Southbound left-turn lane to 200’ taper, 300’ storage ($50,000) New Westbound right-turn lane – 200’ taper, 200’ storage ($125,000) RRMM A R C H ITE C T S
  • 20. Offsite Transportation & Utility Improvements Preliminary Opinion of Construction Costs – Version A2 (cont’d) Option A2 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch) Based on preliminary analysis, the following improvements are anticipated: Existing TC Walker Road Widen existing 2-lane road to 3-lane road 500’ on either side of the easement entrance, approximately 1,000’. Widened road would include left turn lane into proposed site entrance. ($550,000) Assume 15,000 sf of wetlands impacts with road widening. Based on $180,000 per acre mitigation cost (2:1 ratio), wetlands mitigation fee approximated at $62,000. New Westbound right-turn lane at the proposed main school entrance – 200’ taper, 200’ storage ($125,000) School Zone Advance Warning Speed Limit Signage Assembly and Flashing Beacons ($30,000) Construction Cost Opinion = $1,317,000 (Does not include soft costs for surveying and design fees, right-of-way acquisition, or permit and impact (fees) RRMM A R C H ITE C T S
  • 21. Offsite Transportation & Utility Improvements Preliminary Opinion of Construction Costs – Version A2 (cont’d) Option A2 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch) Based on preliminary analysis, the following improvements are anticipated: Water • • • • • • • 800’ of new 8” or 10” fire service from site service entrance to George Washington Hwy. ($60,000) Bore and jack 80’ under George Washington Hwy. northbound lanes ($30,000) Tap existing 12” water main ($40,000) Double check detector and vault ($15,000) 3” water meter and vault ($5,000) Tap fee – County ($25,200) Tap fee – HRSD ($59,140) RRMM A R C H ITE C T S
  • 22. Offsite Transportation & Utility Improvements Preliminary Opinion of Construction Costs – Version A2 (cont’d) Option A2 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch) Based on preliminary analysis, the following improvements are anticipated: Sewer • 800’ of new 4” or 6” force main from site service entrance to George Washington Hwy. ($60,000) • Tap existing 18” or 24” HRSD force main ($75,000) • New on-site pump station ($250,000) • Tap fee – County ($30,500) Construction Cost Opinion = $979,840 (Does not include soft costs for surveying and design fees, right-of-way acquisition, or permit fees) Total Option A2 = $2,296,840 or $188,000 less than A1. $188,000 x 1.05 contingency = $197,400. $197,400 + $28,200 soft costs = $225,600. $225,600 x 1.03 escalation = $232,368. Thus bottom line of Option A2 is $28,244,391. RRMM A R C H ITE C T S
  • 23. Site Plan Option B RRMM A R C H ITE C T S
  • 24. Offsite Transportation & Utility Improvements Preliminary Opinion of Construction Costs Option B – New 800 Student School on Existing Page MS Site (Per attached RRMM Sketch) Based on preliminary analysis, the following improvements are anticipated: Proposed George Washington Highway/TC Walker Road bus entrance    New traffic signal ($200,000) New northbound left-turn lane – 200’ taper, 300’ storage ($150,000) New southbound right-turn lane – 200’ taper, 300’ storage ($150,000) Existing George Washington Highway/Page MS entrance   Extend northbound left-turn lane to 200’ taper, 200’ storage ($50,000) New south bound right-turn lane – 200’ taper, 200’ storage ($125,000) RRMM A R C H ITE C T S
  • 25. Offsite Transportation & Utility Improvements Preliminary Opinion of Construction Costs (cont’d) Option B – New 800 Student School on Existing Page MS Site (Per attached RRMM Sketch) Based on preliminary analysis, the following improvements are anticipated: Existing George Washington Highway  Replace Existing School Zone Advance Warning Speed Limit Signage Assembly and Flashing Beacons ($30,000) Subtotal Turn Lane Improvements – ($505,000) Water   New 8” fire service required for new school’s sprinkler system ($60,000) Assume existing domestic water service is adequate RRMM A R C H ITE C T S
  • 26. Offsite Transportation & Utility Improvements Preliminary Opinion of Construction Costs (cont’d) Option B – New 800 Student School on Existing Page MS Site (Per attached RRMM Sketch) Based on preliminary analysis, the following improvements are anticipated: Sewer   Assume existing pump station requires upgrading ($50,000) Assume existing force main is requires relocation on site ($25,000) Water and Sewer Subtotal – ($135,000) Construction Cost Opinion = $840,000 (Does not include soft costs for surveying and design fees, right-of-way acquisition, or permit and impact fees) RRMM A R C H ITE C T S
  • 27. Onsite Costs Improvements Preliminary Opinion of Construction Costs Option B - New 800 Student School on Existing Page MS Site Section Descriptions Qty Unit Cost per Unit Total Section Total Cost Site Demolition: Existing Tennis Courts 2 EA $ 1,200.00 $ 2,400 $ 2,400 Existing Roadway Pavement 10 Loads $ 500.00 $ 5,000 $ 5,000 Existing Parking Pavement 20 Loads $ 500.00 $ 10,000 $ 10,000 CY $ 6.00 $ 72,600 $ 117,600 2,500.00 $ 45,000 Earthwork (Cut/Fill/Dispose) 12,100 Clear & Grub 18 ACRE $ Signage - EA $ - $ - $ - Misc. Existing Building Pads and Structures-Heavy Equipment Removal-Disposal Other Pads and Structures Loads $ 500.00 $ 5,000 Fencing 1 Loads $ 500.00 $ 500 Bleachers 1 Loads $ 500.00 $ 500 Tanks/Vaults RRMM 10 1 Loads $ 500.00 $ 500 A R C H ITE C T S $ 6,500
  • 28. Onsite Costs Improvements Preliminary Opinion of Construction Costs (cont’d) Option B - New 800 Student School on Existing Page MS Site Section Descriptions Unforeseen Underground Services Qty 1 Unit LS Utility Removal (Disposal Costs) Cost per Unit $ Total Section Total Cost 5,000.00 $ 5,000 $ 5,000 $ 3,500 ` Storm 5 Load $ 500.00 $ 2,500 Sanitary 1 Load $ 500.00 $ 500 Water 1 Load $ 500.00 $ 500 Site Lighting 18 Pole $ 250.00 $ 4,500 $ 4,500 Landscaping 1 LS $ 250.00 $ 250 $ 250 Total Site Demolition $ 154,750.00 Main School Structure Demo (incl. Hazmat) RRMM A R C H ITE C T S 91643 $ 3.94 $ 361,073 $ 361,073
  • 29. Onsite Costs Improvements Preliminary Opinion of Construction Costs (cont’d) Option B - New 800 Student School on Existing Page MS Site Section Descriptions Qty Unit Cost per Unit Total Section Total Cost New Sitework: Practice Field/Track Practice Field 175,000 SF $ 1.00 $ 175,000 $ 415,000 Track Running Surface/Striping 48,000 SF $ 5.00 $ 240,000 Field $ 25,000.00 $ 25,000 $ 38,600 2,200 SF $ 3.00 $ 6,600 200 LF $ 35.00 $ 7,000 10,800 SF $ 6.00 $ 64,800 $ 64,800 $ 130,500 Baseball Field Field Base Fill/Drain/Surface Dug-Outs Bating Areas Fencing 1 Hard Surface Play Area Base Pad/Asphalt Surfacing Tennis Courts Base/Surfacing 2 Court $ 45,000.00 $ 90,000 Striping/Posts/Netting 2 Court $ 3,500.00 $ 7,000 LF $ 25.00 $ 11,500 Poles $ 5,500.00 $ 22,000 Fencing/Gates Lighting RRMM A R C H ITE C T S 460 4
  • 30. Onsite Costs Improvements Preliminary Opinion of Construction Costs (cont’d) Option B - New 800 Student School on Existing Page MS Site Section Descriptions Qty Unit Cost per Unit Total Section Total Cost Fitness Development Soft Mulch Workout Pad Area 1,500 SF $ 10.00 $ 15,000 $ 15,000 3,889 SY $ 30.00 $ 116,667 $ 181,867 Heavy Duty Asphalt Drive Lanes 667 SY $ 30.00 $ 20,000 Striping 480 LF $ 0.50 $ 240 18 EA $ 95.00 $ 1,710 1,700 LF $ 20.00 $ 34,000 Signage 10 EA $ 125.00 $ 1,250 Site Lighting 4 EA $ 2,000.00 $ 8,000 Lite Duty Asphalt Parking 7,778 SY $ 25.00 $ 194,444 $ 334,144 Lite Duty Asphalt Drive Lanes 3,000 SY $ 25.00 $ 75,000 Striping 3,750 LF $ 0.50 $ 1,875 10 EA $ 95.00 $ 950 2,000 LF $ 20.00 $ 40,000 Signage 15 EA $ 125.00 $ 1,875 Site Lighting 10 EA $ 2,000.00 $ 20,000 Bus Parking/Loop with Drive Lanes Heavy Duty Asphalt Parking Symbols/Directional Arrows Curb & Gutters Vehicular Parking with Drive Lanes Symbols/Directional Arrows Curb & Gutters RRMM A R C H ITE C T S
  • 31. Onsite Costs Improvements Preliminary Opinion of Construction Costs (cont’d) Option B - New 800 Student School on Existing Page MS Site Section Descriptions Qty Unit Cost per Unit Total Section Total Cost Entry Drive Lanes Heavy Duty Asphalt Drive Lanes 4,000 SY $ 30.00 $ 120,000 Striping 1,000 LF $ 0.50 $ 500 10 EA $ 95.00 $ 950 1,300 LF $ 20.00 $ 26,000 Signage 5 EA $ 125.00 $ 625 Site Lighting 5 EA $ 2,000.00 $ 10,000 13,333 SY $ 5.00 $ 66,667 2,800 LF $ 0.50 $ 1,400 10 EA $ 95.00 $ 950 800 LF $ 20.00 $ 16,000 5 EA $ 125.00 $ 625 Symbols/Directional Arrows Curb & Gutters $ 158,075 $ 85,642 Grounds/Transportation Pavement Rework/Addition Heavy Duty Asphalt Drive Overlay Striping Symbols/Directional Arrows Curb & Gutters Signage RRMM A R C H ITE C T S
  • 32. Onsite Costs Improvements Preliminary Opinion of Construction Costs (cont’d) Option B - New 800 Student School on Existing Page MS Site Section Descriptions Landscaping/Seeding Large Trees Medium Trees Small Trees Shrubs Groundcover Mulch Beds 13 24 10 50 250 10 EA EA EA EA EA CY $ $ $ $ $ $ 350.00 245.00 125.00 45.00 15.00 40.00 $ $ $ $ $ $ 4,550 5,880 1,250 2,250 3,750 400 $ 18,080 Site Signage Fire Lane Signs Stop/Directional/Info Signs 12 2 EA EA $ $ 134.00 125.00 $ $ 1,608 250 $ 1,858 Concrete Walks/Pads Concrete Walks HC Ramps/Walk Features Pads 6,500 5 1,000 SF LOC SF $ $ $ 4.00 1,500.00 5.00 $ $ $ 26,000 7,500 5,000 $ 38,500 Earthwork Erosion Control Cut/Fill/Dispose BMP w/Control Measures Stabilization/Seeding RRMM Qty 5,000 14,520 7,500 435,600 LF CY CY SF $ $ $ $ 3.00 8.00 18.00 0.07 $ $ $ $ 15,000 116,160 135,000 30,492 $ 296,652 A R C H ITE C T S Unit Cost per Unit Total Section Total Cost
  • 33. Onsite Costs Improvements Preliminary Opinion of Construction Costs (cont’d) Option B - New 800 Student School on Existing Page MS Site Section Descriptions Storm System w/Structures Sanitary Sewer System w/Structures Qty Unit Cost per Unit Total Section Total Cost 1,800 LF $ 60.00 $ 108,000 $ 108,000 500 LF $ 40.00 $ 20,000 $ 20,000 Water System w/ Vault/Meter $ - $ - $ - (incl. w/ off site work) Fire Line System w/ Structures 500 LF $ 35.00 $ 17,500 $ 17,500 Gas Service 1 LS $ 8,000.00 $ 8,000 $ 8,000 Power Service / Transformers 1 LS $ 35,000.00 $ 35,000 $ 35,000 Total New Sitework $ 1,967,218 RRMM A R C H ITE C T S
  • 34. Option C New 6-8 for 800 Page Site Construction Costs (Hard Costs) Exceptional Site Costs Allowance (site demo)* Exceptional Site Costs Allowance (Bldg. demo & hazmat removal)** General Site Costs (Pkg, pav'g, walks, baseball, track, tennis, etc.) Exceptional Site Costs Allowance (signalization) Exceptional Site Costs Allowance (Turn lanes & off-site imp., etc.) Exceptional Site Costs Allowance (Water and Sewer) Renovation of Existing Page (hazmat removal in portion to remain) Renovation of Existing Page New Middle School Building (148 SF/P x 800 students)*** Total Construction Cost Contingency Factor Construction Cost Grand Total (w/ Contingency) Soft Costs Prof. Services (A/E, Commissioning, Surveys, Borings, LEED, etc.) Furnishings/Fixtures/Equipment and Technology Allowance Construction Testing/Inspection, Adv./Reprod. Miscellaneous Soft Costs Total Factors 1 1 1 1 1 1 52,569 52,569 65,831 Unit LS LS LS LS LS LS $ 1.95 $ 70.00 $ 150.00 Costs $154,750 $153,951 $1,982,218 $200,000 $505,000 $135,000 $102,510 $3,679,830 $9,874,650 $16,787,909 6% PCT $1,007,275 $17,795,183 10% 1 1 PCT LS LS $1,678,791 $1,964,446 $108,940 $3,752,176 Total Project Cost Total Project Cost with 3% Escalation Geothermal Option 1 *Page Site includes clearing and demo but not the $153,951 for demo of tornado damaged area. **Based on actual bid + monitoring of 39,074 sf being demo'd. Does not include front bldg. portion. ***Square footage based on 118,400 sf (800 x 148 sf/student) less existing52,569 sf of renovation. Thus, new addition of est. 65,831 sf. RRMM $21,547,359 $22,193,780 A R C H ITE C T S LS $750,000
  • 35. Middle Schools and High Schools – Oct. 2011 Basis of Costs – Costs included below are construction costs (Bid Costs) and do not include soft costs, construction contingencies, FFE and the like. Bid prices vary depending on site conditions, required site work, complexity, quality, size, schedule and many other factors but most importantly the market activity at the time of bid. Costs shown are averages and tempered by current market conditions. Costs are also preliminary and are averages from across the state within varying economic zones, schedule constraints, quality standards and many other factors. See attached Dept. of Education cost data used as a resource. RRMM A R C H ITE C T S
  • 36. Middle School    09-10 avg. – $142.17. 6 year avg. costs = $171.91 2011 to date – no projects. Budget Recommendation – $175 ($150 building, $25 site) + escalation to bid date (3%) 6 year average SF/Student =148 Recommend 148 sf/student High School    Office Building 09-10 avg. – $0. No High Schools built. 08-09 avg. - $209.05 5 year avg. costs = $186.16 2011 to date – $210.39 Budget Recommendation - $195 ($165 building, $30 site) 6 year average SF/Student = 152 2011 average SF/Student = 164 Recommend 160 sf/student  RRMM A R C H ITE C T S Recommend $140/sf. (RS Means Construction Cost Data)
  • 37. RRMM A R C H ITE C T S
  • 38. Football and Softball Field Cost Breakdown Football Field: Football Field = $150,000 Football Field Lights at 10 LOC/$5,000 EA = $50,000 Bleachers at 2000 Seats = $ 220,000 Parking Spaces at 25 @ $2,000/EA = $50,000 Fencing 8' High at 4,000 LF = $60,000 Total = $530,000 $530,000 x 1.1 for design/contingency = $583,000 $583,000 x 1.03 for escalation = $600,490 App. $600,000 RRMM A R C H ITE C T S
  • 39. Football and Softball Field Cost Breakdown (cont’d) Softball Field: Softball Field = $25,000 Softball Field Lights at 8 LOC/$5,000 EA = $40,000 Bleachers at 300 Seats = $ 33,000 Parking Spaces at 25 @ $2,000/EA = $50,000 Fencing 8' High at 1,000 LF = $15,000 Total = $163,000 $163,000 x 1.1 for design/contingency = $179,300 $179,300 x 1.03 for escalation = $184,679 App. $185,000 RRMM A R C H ITE C T S
  • 40. Joint Meeting of Gloucester County School Board and Board of Supervisors October 27, 2011 Page Middle School Discussion RRMM A R C H ITE C T S