Make Time for Good Designx




1   Predesign - 1-2 Weeks               2  Conceptial Design 2-3 Weeks        3 Design Development-1-2 Weeks   4   Contract Documents-2-3 Week2       5  Contract Management/Construction-
                                                                                                                                                         6-8 Weeks
xDefine roles and resoponsibilities of   xNeed Analysis                        xDetailed interiors planning     xConstuction Drawings and              xConstruction admin
 designer and Client                                                                                            Specifications
                                        xFurniture inventory                  xDevelop conceptual design                                              xConstruction
xProject goals objectives and                                                                                  xTender Preparation and Issue
 requiremants                           xConceptural planning and finishes     xCoordinate with Engineering                                            xSite inspections/Deficency walk-thru
                                                                               Consultants                     xBuilding permit submission- Up to 4
xFeasibility studies                    xPreliminary Equipment and Lighting                                     weeks                                 xBudget summary preparation
                                         selection                            xFurniture specification and
xProposed budget and schedule                                                  procurement                     xTender review/ summary preparation



                                                For a 5000sqft space it takes at least 6 months to be able to move into your new space.

Weitere ähnliche Inhalte

Ähnlich wie Make Time For Good Design

Prioritisation - Bob Andrew, NCR
Prioritisation - Bob Andrew, NCRPrioritisation - Bob Andrew, NCR
Prioritisation - Bob Andrew, NCRggarrett123
 
Building Results Oriented Websites: The Method That Ends the Madness
Building Results Oriented Websites: The Method That Ends the MadnessBuilding Results Oriented Websites: The Method That Ends the Madness
Building Results Oriented Websites: The Method That Ends the MadnessTom McCracken
 
David Chan Profile And Experience
David Chan Profile And ExperienceDavid Chan Profile And Experience
David Chan Profile And ExperienceDavid Chan
 
Mavrikis Portfolio Samples_2013
Mavrikis Portfolio Samples_2013Mavrikis Portfolio Samples_2013
Mavrikis Portfolio Samples_2013Penny Mavrikis
 
Graphic Resume Architecture
Graphic Resume ArchitectureGraphic Resume Architecture
Graphic Resume Architecturetwright321
 
ERP Implementation Methodology
ERP Implementation MethodologyERP Implementation Methodology
ERP Implementation MethodologyThanh Nguyen
 
Running successful agile projects
Running successful agile projectsRunning successful agile projects
Running successful agile projectsMartin Aspeli
 
Ravit Danino HP - Roles and Collaboration in Agile
Ravit Danino HP - Roles and Collaboration in AgileRavit Danino HP - Roles and Collaboration in Agile
Ravit Danino HP - Roles and Collaboration in AgileAgileSparks
 
Novkell corporate brochurenew
Novkell corporate brochurenewNovkell corporate brochurenew
Novkell corporate brochurenewNovkell Solutions
 
Novkell corporate Brochure
Novkell corporate BrochureNovkell corporate Brochure
Novkell corporate Brochureguest96a2f4
 
Group11 Bldg6471 Project Presentation
Group11 Bldg6471 Project PresentationGroup11 Bldg6471 Project Presentation
Group11 Bldg6471 Project PresentationSherif Hafez
 
Structure at the velocity of architecture
Structure at the velocity of architectureStructure at the velocity of architecture
Structure at the velocity of architectureKermin Chok
 
Shital_Portfolio
Shital_PortfolioShital_Portfolio
Shital_Portfolioshital koli
 
20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement management20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement managementraymond_wan2005
 
foundation of elementary spatial design
foundation of elementary spatial designfoundation of elementary spatial design
foundation of elementary spatial designevopl
 
Anthony.Rivera.2009 Resume
Anthony.Rivera.2009 ResumeAnthony.Rivera.2009 Resume
Anthony.Rivera.2009 Resumetony_rivera_2009
 
Reilly Studios Financial Retail Design
Reilly Studios Financial Retail DesignReilly Studios Financial Retail Design
Reilly Studios Financial Retail DesignRon Reilly
 

Ähnlich wie Make Time For Good Design (20)

Prioritisation - Bob Andrew, NCR
Prioritisation - Bob Andrew, NCRPrioritisation - Bob Andrew, NCR
Prioritisation - Bob Andrew, NCR
 
Building Results Oriented Websites: The Method That Ends the Madness
Building Results Oriented Websites: The Method That Ends the MadnessBuilding Results Oriented Websites: The Method That Ends the Madness
Building Results Oriented Websites: The Method That Ends the Madness
 
David Chan Profile And Experience
David Chan Profile And ExperienceDavid Chan Profile And Experience
David Chan Profile And Experience
 
Methodology
MethodologyMethodology
Methodology
 
Mavrikis Portfolio Samples_2013
Mavrikis Portfolio Samples_2013Mavrikis Portfolio Samples_2013
Mavrikis Portfolio Samples_2013
 
Graphic Resume Architecture
Graphic Resume ArchitectureGraphic Resume Architecture
Graphic Resume Architecture
 
ERP Implementation Methodology
ERP Implementation MethodologyERP Implementation Methodology
ERP Implementation Methodology
 
Running successful agile projects
Running successful agile projectsRunning successful agile projects
Running successful agile projects
 
Ravit Danino HP - Roles and Collaboration in Agile
Ravit Danino HP - Roles and Collaboration in AgileRavit Danino HP - Roles and Collaboration in Agile
Ravit Danino HP - Roles and Collaboration in Agile
 
Novkell corporate brochurenew
Novkell corporate brochurenewNovkell corporate brochurenew
Novkell corporate brochurenew
 
Novkell corporate Brochure
Novkell corporate BrochureNovkell corporate Brochure
Novkell corporate Brochure
 
Group11 Bldg6471 Project Presentation
Group11 Bldg6471 Project PresentationGroup11 Bldg6471 Project Presentation
Group11 Bldg6471 Project Presentation
 
Structure at the velocity of architecture
Structure at the velocity of architectureStructure at the velocity of architecture
Structure at the velocity of architecture
 
Shital_Portfolio
Shital_PortfolioShital_Portfolio
Shital_Portfolio
 
General dqi for web
General dqi for webGeneral dqi for web
General dqi for web
 
20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement management20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement management
 
foundation of elementary spatial design
foundation of elementary spatial designfoundation of elementary spatial design
foundation of elementary spatial design
 
Anthony.Rivera.2009 Resume
Anthony.Rivera.2009 ResumeAnthony.Rivera.2009 Resume
Anthony.Rivera.2009 Resume
 
Corporate Presentation - Tech Connect
Corporate Presentation - Tech ConnectCorporate Presentation - Tech Connect
Corporate Presentation - Tech Connect
 
Reilly Studios Financial Retail Design
Reilly Studios Financial Retail DesignReilly Studios Financial Retail Design
Reilly Studios Financial Retail Design
 

Make Time For Good Design

  • 1. Make Time for Good Designx 1 Predesign - 1-2 Weeks 2 Conceptial Design 2-3 Weeks 3 Design Development-1-2 Weeks 4 Contract Documents-2-3 Week2 5 Contract Management/Construction- 6-8 Weeks xDefine roles and resoponsibilities of xNeed Analysis xDetailed interiors planning xConstuction Drawings and xConstruction admin designer and Client Specifications xFurniture inventory xDevelop conceptual design xConstruction xProject goals objectives and xTender Preparation and Issue requiremants xConceptural planning and finishes xCoordinate with Engineering xSite inspections/Deficency walk-thru Consultants xBuilding permit submission- Up to 4 xFeasibility studies xPreliminary Equipment and Lighting weeks xBudget summary preparation selection xFurniture specification and xProposed budget and schedule procurement xTender review/ summary preparation For a 5000sqft space it takes at least 6 months to be able to move into your new space.