ROLYN CASE STUDY Disaster Recovery | Restoration
Remediation | Decontamination
Case Study | Industrial Property
A 74,000-square-foot warehouse and public market facility at Towne Center in
Virginia Beach suffered heavy fire damage. The fire occurred in a space occupied
by a government contractor that stores and provides sensitive computer and
electronic hardware to the military.
Rolyn personnel immediately provided emergency board up to protect the facility
and contents from further damage and breach of security. Two trailer-mounted
desiccant dehumidifiers were brought in to dry the entire facility. Several Rolyn
teams carefully removed vinyl covered sheetrock walls damaged by water and
smoke, clearing the way for the insurance cause and origin investigation to begin.
Rolyn worked closely with the property owner’s insurance company and engineers
over a three-week period to shore up the building and eliminate life safety issues.
Power generators, lights, and equipment were provided to assist the insurance
evaluation. Storage racks and other unstable internal structures were carefully
dismantled and removed. The intensity of the heat melted steel beams and roof
panels. Rolyn erected girders and I-beams to make the structure sound. A series
of 1’ x 1’ holes were cut into the sagging roof to drain water which had pooled,
creating dangerous excess weight.
The last phase of recovery entailed removing completely damaged sections of the roof and I-beams according to the plans of the insurance
company’s engineer. Rolyn brought in a 380-ton mobile crane, one of the largest of its kind on the east coast, to remove a 6,500-square-foot
section of damaged roof and the twisted I-beams underneath. Within a 36-hour period, large sections of the building were removed, cut,
and hauled off site.
Rolyn provided 24-hour security to protect the highly sensitive, top-secret contents of the building. Continuous power was also provided to
tenants in minimally damaged portions of the building, allowing them to continue business as usual.
Rolyn’s quick response, detailed inventorying of equipment, and technical experience allowed the building to remain safe and secure
throughout the recovery. Rolyn mitigated additional financial loss for the client by providing all the assistance the insurance company
required to complete the investigation and start the reconstruction process as quickly as possible.
Property Type: Public Market Facility
Location: Virginia Beach, Virginia
Loss Type: Fire and Smoke
Project Overview
“Rolyn personnel immediately provided emergency board
up to protect the facility and contents from further damage
and breach of security.”
800.808.1553 www.rolyncompanies.com
ROLYN CASE STUDY Disaster Recovery | Restoration
Remediation | Decontamination
Case Study | Industrial Property
In late January, the Coast Guard performed a routine inspection of a
shipping vessel transporting produce for sale. After the inspection, the
Coast Guard gave a long list of cleaning and maintenance issues to be
addressed before the ship was allowed to leave port. The main engine,
pipes, and generators were all leaking oil, causing a fire hazard. The
ship was placed under detention, and the Coast Guard’s re-inspection
was set for just a couple days later.
The owner of the ship needed immediate action, as every minute of delay
was resulting in lost revenue. The ship was emptied of its inventory and
as long as it was detained, it could not sail to pick up more produce.
Furthermore, the entire time the ship spent in port, fuel was being burned
running the generators to keep the ship “alive.” Crew members still had
to be paid, even though the ship was not making any money.
The site manager called Rolyn, and we were on site within the hour.
Shortly thereafter technicians had begun cleaning. Oil was leaking
primarily into the engine compartment, a room that spanned five stories
of the ship. Rolyn degreased and cleaned all surfaces of the compartment, including the bulkheads, walking planks, and
handrails. Rolyn workers also had to get underneath the engine, into the bilge, to clean. Oil is this location was up to an inch
deep.
Some pipes were cracked and needed to be replaced. The pipes were as big as basketballs, and a ten-foot section of piping
required seven workers just to pick it up and move it. These pipes ran through the ship, carrying water, sewage, and coolant.
Rolyn also repaired hand rails and took care of some other safety measures for the ship.
Crews worked around the clock for the entire weekend in order to meet the short deadline for the Coast Guard re-inspection.
The ship passed its next inspection, and since that time, Rolyn has cleaned several other shipping vessels for the company,
allowing them to get back to business as soon as possible.
Property Type: Shipping Vessel
Location: Galveston, Texas
Loss Type: Restoration
Project Overview
“Crews worked around the clock for the entire weekend
in order to meet the short deadline for the Coast Guard
re-inspection.”
800.808.1553 www.rolyncompanies.com
ROLYN CASE STUDY Disaster Recovery | Restoration
Remediation | Decontamination
Case Study | Industrial Property
A microelectronics manufacturing plant sustained massive fire damage. The
fire started in the chemical plating area of the factory and smoke soon filled
the entire 57,000-square-foot manufacturing facility. The damage, extensive
due to the release of corrosive chlorides and hazardous chemicals such as
cyanide, brought plant operations to a complete shutdown.
It was vital for the facility to continue its business operations since a large
portion of their work was U.S. Military related. The facility’s chips were also
used in implantable medical devices such as pacemakers. Rolyn began work
by securing the building in order to protect the employees during the clean up
process. Containment barriers were constructed on site in order to separate
the facility’s office areas from the affected plant operations area. Through the
use of air filtration systems, Rolyn created a positive/negative air exchange to
prevent cross-contamination between the divided areas.
As soon as barriers were erected and the property was stabilized, Rolyn began
to decontaminate the affected area. Simultaneously, Rolyn converted the
office area into a temporary first class computer chip manufacturing facility
with 100 ppm clean rooms, water cooled lasers, chemical fire suppression
systems, orbitally welded stainless steel pipes, explosion proof gas bunkers, and haz mat storage containers. As a result the plant was able
to continue production.
Since the offices were now being used as a temporary manufacturing area, the office staff had to be relocated to the parking lot. Using
portable field trailers, Rolyn set up management offices in the parking areas, allowing the company to reestablish contact with their
customers and bring their operations back online. Acreage adjacent to the plant was used as a temporary parking lot.
The reconstruction of the plant was also a challenge. Due to the sensitivity of the company’s functions, extreme cleanliness was critical.
All plant operations had to perform to semiconductor Class 100 cleanroom protocol. Rolyn arranged for periodic testing by qualified
laboratories to ensure cleanliness standards were met. Once the rebuilding of the plant was completed, all temporary conditions needed
to be reversed. Rolyn moved the employees back into their offices, disassembled the trailers, restored the adjacent acreage, and returned
the plant to one hundred percent production.
Property Type: Manufacturing Plant
Location: Providence, Rhode Island
Loss Type: Fire and Smoke
Project Overview
“Through the use of air filtration systems, Rolyn created a
positive/negative air exchange to prevent cross-contamination
between the divided areas.”
800.808.1553 www.rolyncompanies.com
ROLYN CASE STUDY Disaster Recovery | Restoration
Remediation | Decontamination
Case Study | Industrial Property
In the evening hours, the area of South Hutchinson, Kansas experienced
heavy thunderstorms that included a microburst. A microburst is similar to a
tornado and is caused by a strong downdraft triggering an outburst of
damaging winds at or near the ground. This microburst was estimated to
have winds in excess of 120 miles per hour causing massive damage to one of
the country’s largest school bus manufacturing plants.
When Rolyn arrived on the scene, the severe damage to the approximately
100,000 ft2 manufacturing plant was immediately evident. The facility’s
interior was totally exposed due to crushed walls and major sections of the
roof were missing. Over 1,200 chassis were on the plant floor being produced in time for the start of the school year. Rolyn coordinated
with the company’s president and operations manager to develop a plan of action to reduce production down-time and the associated
losses of revenue.
Rolyn’s first step in the fast-track recovery stage was to provide the client with two, 80-foot office trailers so that all IT functions, phone,
fax and other business continuity needs could resume. Rolyn simultaneously constructed two, 150-foot temporary walls to protect the
collapsed part of the roof and workspace. Based on the Fire Marshall’s request, Rolyn began re-routing and re-hanging the entire facility’s
fire sprinkler system. After testing gas lines throughout the building to discover the location of any leaks, the lines were then re-routed and
replaced as needed. This enabled the restoration of power to the plant’s heaters and paint booths, allowing operations to commence as
quickly as possible.
After recovering the main production areas, permanent reconstruction work began. Rolyn coordinated with the plant’s operations team to
ensure production could continue while workers reconstructed small sections at a time. Rolyn performed demolition throughout the project
including the removal of all drywall and insulation. The company took the opportunity during the rebuild to make the facility stronger.
Cranes removed the damaged roof structure and replaced one section at a time with roof panels made with heavier roof clips. In addition,
they installed stronger steel support columns and the cranes removed and replaced the rooftop heating and air conditioning units.
In the initial stages of the project following the microburst, the client expressed that within one week, Rolyn needed to return their production
output to 8-10 bus fabrications a day. With Rolyn’s experienced team of emergency responders and technicians, the client was back to
producing 18 busses a day after only 8 days following the microburst. Rolyn’s experience responding to severely damaged facilities and
understanding the client’s priorities minimized business disruption throughout the reconstruction process.
Property Type: Bus Manufacturing Plant
Location: South Hutchinson, Kansas
Loss Type: Storm Damage
Project Overview
“With Rolyn’s experienced team of emergency responders and
technicians, the client was back to producing 18 busses a day
after only 8 days following the microburst.”

Weitere ähnliche Inhalte

Mehr von B2B Marketing Source, LLC

Certificate HubSpot Marketing Software Certified
Certificate HubSpot Marketing Software CertifiedCertificate HubSpot Marketing Software Certified
Certificate HubSpot Marketing Software Certified
B2B Marketing Source, LLC
 
RadTech Report article powder furniture_marapr2004
RadTech Report article powder furniture_marapr2004RadTech Report article powder furniture_marapr2004
RadTech Report article powder furniture_marapr2004
B2B Marketing Source, LLC
 

Mehr von B2B Marketing Source, LLC (6)

Certificate HubSpot Marketing Software Certified
Certificate HubSpot Marketing Software CertifiedCertificate HubSpot Marketing Software Certified
Certificate HubSpot Marketing Software Certified
 
RadTech Report article powder furniture_marapr2004
RadTech Report article powder furniture_marapr2004RadTech Report article powder furniture_marapr2004
RadTech Report article powder furniture_marapr2004
 
Salesforce_Certified_Pardot_Specialist
Salesforce_Certified_Pardot_SpecialistSalesforce_Certified_Pardot_Specialist
Salesforce_Certified_Pardot_Specialist
 
Acute Healthcare Flyer
Acute Healthcare FlyerAcute Healthcare Flyer
Acute Healthcare Flyer
 
Higher Education Flyer
Higher Education FlyerHigher Education Flyer
Higher Education Flyer
 
The Fusion UV Curing Difference
The Fusion UV Curing DifferenceThe Fusion UV Curing Difference
The Fusion UV Curing Difference
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

Analysis of Sineing Website and how to fix
Analysis of Sineing Website and how to fixAnalysis of Sineing Website and how to fix
Analysis of Sineing Website and how to fix
 
Social Media Marketing Portfolio - Maharsh Benday
Social Media Marketing Portfolio - Maharsh BendaySocial Media Marketing Portfolio - Maharsh Benday
Social Media Marketing Portfolio - Maharsh Benday
 
personal branding kit for music business
personal branding kit for music businesspersonal branding kit for music business
personal branding kit for music business
 
Enhancing Business Visibility PR Firms in San Francisco
Enhancing Business Visibility PR Firms in San FranciscoEnhancing Business Visibility PR Firms in San Francisco
Enhancing Business Visibility PR Firms in San Francisco
 
10 Email Marketing Best Practices to Increase Engagements, CTR, And ROI
10 Email Marketing Best Practices to Increase Engagements, CTR, And ROI10 Email Marketing Best Practices to Increase Engagements, CTR, And ROI
10 Email Marketing Best Practices to Increase Engagements, CTR, And ROI
 
Elevate Your Advertising Game: Introducing Billion Broadcaster Lift Advertising
Elevate Your Advertising Game: Introducing Billion Broadcaster Lift AdvertisingElevate Your Advertising Game: Introducing Billion Broadcaster Lift Advertising
Elevate Your Advertising Game: Introducing Billion Broadcaster Lift Advertising
 
2024 Social Trends Report V4 from Later.com
2024 Social Trends Report V4 from Later.com2024 Social Trends Report V4 from Later.com
2024 Social Trends Report V4 from Later.com
 
Busty Desi⚡Call Girls in Sector 49 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 49 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 49 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 49 Noida Escorts >༒8448380779 Escort Service
 
The Science of Landing Page Messaging.pdf
The Science of Landing Page Messaging.pdfThe Science of Landing Page Messaging.pdf
The Science of Landing Page Messaging.pdf
 
Unlocking the Mystery of the Voynich Manuscript
Unlocking the Mystery of the Voynich ManuscriptUnlocking the Mystery of the Voynich Manuscript
Unlocking the Mystery of the Voynich Manuscript
 
Social media, ppt. Features, characteristics
Social media, ppt. Features, characteristicsSocial media, ppt. Features, characteristics
Social media, ppt. Features, characteristics
 
Unveiling the Legacy of the Rosetta stone A Key to Ancient Knowledge.pptx
Unveiling the Legacy of the Rosetta stone A Key to Ancient Knowledge.pptxUnveiling the Legacy of the Rosetta stone A Key to Ancient Knowledge.pptx
Unveiling the Legacy of the Rosetta stone A Key to Ancient Knowledge.pptx
 
Alpha Media March 2024 Buyers Guide.pptx
Alpha Media March 2024 Buyers Guide.pptxAlpha Media March 2024 Buyers Guide.pptx
Alpha Media March 2024 Buyers Guide.pptx
 
Rise and fall of Kulula.com, an airline won consumers by different marketing ...
Rise and fall of Kulula.com, an airline won consumers by different marketing ...Rise and fall of Kulula.com, an airline won consumers by different marketing ...
Rise and fall of Kulula.com, an airline won consumers by different marketing ...
 
W.H.Bender Quote 61 -Influential restaurant and food service industry network...
W.H.Bender Quote 61 -Influential restaurant and food service industry network...W.H.Bender Quote 61 -Influential restaurant and food service industry network...
W.H.Bender Quote 61 -Influential restaurant and food service industry network...
 
How consumers use technology and the impacts on their lives
How consumers use technology and the impacts on their livesHow consumers use technology and the impacts on their lives
How consumers use technology and the impacts on their lives
 
Digital-Marketing-Into-by-Zoraiz-Ahmad.pptx
Digital-Marketing-Into-by-Zoraiz-Ahmad.pptxDigital-Marketing-Into-by-Zoraiz-Ahmad.pptx
Digital-Marketing-Into-by-Zoraiz-Ahmad.pptx
 
[Expert Panel] New Google Shopping Ads Strategies Uncovered
[Expert Panel] New Google Shopping Ads Strategies Uncovered[Expert Panel] New Google Shopping Ads Strategies Uncovered
[Expert Panel] New Google Shopping Ads Strategies Uncovered
 
VIP Call Girls Dongri WhatsApp +91-9833363713, Full Night Service
VIP Call Girls Dongri WhatsApp +91-9833363713, Full Night ServiceVIP Call Girls Dongri WhatsApp +91-9833363713, Full Night Service
VIP Call Girls Dongri WhatsApp +91-9833363713, Full Night Service
 
SP Search Term Data Optimization Template.pdf
SP Search Term Data Optimization Template.pdfSP Search Term Data Optimization Template.pdf
SP Search Term Data Optimization Template.pdf
 

Rolyn Companies Industrial Client Case Studies

  • 1. Case Studies 800.808.1553 | www.rolyncompanies.com Disaster Recovery | Restoration Remediation | Decontamination
  • 2. 800.808.1553 www.rolyncompanies.com ROLYN CASE STUDY Disaster Recovery | Restoration Remediation | Decontamination Case Study | Industrial Property A 74,000-square-foot warehouse and public market facility at Towne Center in Virginia Beach suffered heavy fire damage. The fire occurred in a space occupied by a government contractor that stores and provides sensitive computer and electronic hardware to the military. Rolyn personnel immediately provided emergency board up to protect the facility and contents from further damage and breach of security. Two trailer-mounted desiccant dehumidifiers were brought in to dry the entire facility. Several Rolyn teams carefully removed vinyl covered sheetrock walls damaged by water and smoke, clearing the way for the insurance cause and origin investigation to begin. Rolyn worked closely with the property owner’s insurance company and engineers over a three-week period to shore up the building and eliminate life safety issues. Power generators, lights, and equipment were provided to assist the insurance evaluation. Storage racks and other unstable internal structures were carefully dismantled and removed. The intensity of the heat melted steel beams and roof panels. Rolyn erected girders and I-beams to make the structure sound. A series of 1’ x 1’ holes were cut into the sagging roof to drain water which had pooled, creating dangerous excess weight. The last phase of recovery entailed removing completely damaged sections of the roof and I-beams according to the plans of the insurance company’s engineer. Rolyn brought in a 380-ton mobile crane, one of the largest of its kind on the east coast, to remove a 6,500-square-foot section of damaged roof and the twisted I-beams underneath. Within a 36-hour period, large sections of the building were removed, cut, and hauled off site. Rolyn provided 24-hour security to protect the highly sensitive, top-secret contents of the building. Continuous power was also provided to tenants in minimally damaged portions of the building, allowing them to continue business as usual. Rolyn’s quick response, detailed inventorying of equipment, and technical experience allowed the building to remain safe and secure throughout the recovery. Rolyn mitigated additional financial loss for the client by providing all the assistance the insurance company required to complete the investigation and start the reconstruction process as quickly as possible. Property Type: Public Market Facility Location: Virginia Beach, Virginia Loss Type: Fire and Smoke Project Overview “Rolyn personnel immediately provided emergency board up to protect the facility and contents from further damage and breach of security.”
  • 3. 800.808.1553 www.rolyncompanies.com ROLYN CASE STUDY Disaster Recovery | Restoration Remediation | Decontamination Case Study | Industrial Property In late January, the Coast Guard performed a routine inspection of a shipping vessel transporting produce for sale. After the inspection, the Coast Guard gave a long list of cleaning and maintenance issues to be addressed before the ship was allowed to leave port. The main engine, pipes, and generators were all leaking oil, causing a fire hazard. The ship was placed under detention, and the Coast Guard’s re-inspection was set for just a couple days later. The owner of the ship needed immediate action, as every minute of delay was resulting in lost revenue. The ship was emptied of its inventory and as long as it was detained, it could not sail to pick up more produce. Furthermore, the entire time the ship spent in port, fuel was being burned running the generators to keep the ship “alive.” Crew members still had to be paid, even though the ship was not making any money. The site manager called Rolyn, and we were on site within the hour. Shortly thereafter technicians had begun cleaning. Oil was leaking primarily into the engine compartment, a room that spanned five stories of the ship. Rolyn degreased and cleaned all surfaces of the compartment, including the bulkheads, walking planks, and handrails. Rolyn workers also had to get underneath the engine, into the bilge, to clean. Oil is this location was up to an inch deep. Some pipes were cracked and needed to be replaced. The pipes were as big as basketballs, and a ten-foot section of piping required seven workers just to pick it up and move it. These pipes ran through the ship, carrying water, sewage, and coolant. Rolyn also repaired hand rails and took care of some other safety measures for the ship. Crews worked around the clock for the entire weekend in order to meet the short deadline for the Coast Guard re-inspection. The ship passed its next inspection, and since that time, Rolyn has cleaned several other shipping vessels for the company, allowing them to get back to business as soon as possible. Property Type: Shipping Vessel Location: Galveston, Texas Loss Type: Restoration Project Overview “Crews worked around the clock for the entire weekend in order to meet the short deadline for the Coast Guard re-inspection.”
  • 4. 800.808.1553 www.rolyncompanies.com ROLYN CASE STUDY Disaster Recovery | Restoration Remediation | Decontamination Case Study | Industrial Property A microelectronics manufacturing plant sustained massive fire damage. The fire started in the chemical plating area of the factory and smoke soon filled the entire 57,000-square-foot manufacturing facility. The damage, extensive due to the release of corrosive chlorides and hazardous chemicals such as cyanide, brought plant operations to a complete shutdown. It was vital for the facility to continue its business operations since a large portion of their work was U.S. Military related. The facility’s chips were also used in implantable medical devices such as pacemakers. Rolyn began work by securing the building in order to protect the employees during the clean up process. Containment barriers were constructed on site in order to separate the facility’s office areas from the affected plant operations area. Through the use of air filtration systems, Rolyn created a positive/negative air exchange to prevent cross-contamination between the divided areas. As soon as barriers were erected and the property was stabilized, Rolyn began to decontaminate the affected area. Simultaneously, Rolyn converted the office area into a temporary first class computer chip manufacturing facility with 100 ppm clean rooms, water cooled lasers, chemical fire suppression systems, orbitally welded stainless steel pipes, explosion proof gas bunkers, and haz mat storage containers. As a result the plant was able to continue production. Since the offices were now being used as a temporary manufacturing area, the office staff had to be relocated to the parking lot. Using portable field trailers, Rolyn set up management offices in the parking areas, allowing the company to reestablish contact with their customers and bring their operations back online. Acreage adjacent to the plant was used as a temporary parking lot. The reconstruction of the plant was also a challenge. Due to the sensitivity of the company’s functions, extreme cleanliness was critical. All plant operations had to perform to semiconductor Class 100 cleanroom protocol. Rolyn arranged for periodic testing by qualified laboratories to ensure cleanliness standards were met. Once the rebuilding of the plant was completed, all temporary conditions needed to be reversed. Rolyn moved the employees back into their offices, disassembled the trailers, restored the adjacent acreage, and returned the plant to one hundred percent production. Property Type: Manufacturing Plant Location: Providence, Rhode Island Loss Type: Fire and Smoke Project Overview “Through the use of air filtration systems, Rolyn created a positive/negative air exchange to prevent cross-contamination between the divided areas.”
  • 5. 800.808.1553 www.rolyncompanies.com ROLYN CASE STUDY Disaster Recovery | Restoration Remediation | Decontamination Case Study | Industrial Property In the evening hours, the area of South Hutchinson, Kansas experienced heavy thunderstorms that included a microburst. A microburst is similar to a tornado and is caused by a strong downdraft triggering an outburst of damaging winds at or near the ground. This microburst was estimated to have winds in excess of 120 miles per hour causing massive damage to one of the country’s largest school bus manufacturing plants. When Rolyn arrived on the scene, the severe damage to the approximately 100,000 ft2 manufacturing plant was immediately evident. The facility’s interior was totally exposed due to crushed walls and major sections of the roof were missing. Over 1,200 chassis were on the plant floor being produced in time for the start of the school year. Rolyn coordinated with the company’s president and operations manager to develop a plan of action to reduce production down-time and the associated losses of revenue. Rolyn’s first step in the fast-track recovery stage was to provide the client with two, 80-foot office trailers so that all IT functions, phone, fax and other business continuity needs could resume. Rolyn simultaneously constructed two, 150-foot temporary walls to protect the collapsed part of the roof and workspace. Based on the Fire Marshall’s request, Rolyn began re-routing and re-hanging the entire facility’s fire sprinkler system. After testing gas lines throughout the building to discover the location of any leaks, the lines were then re-routed and replaced as needed. This enabled the restoration of power to the plant’s heaters and paint booths, allowing operations to commence as quickly as possible. After recovering the main production areas, permanent reconstruction work began. Rolyn coordinated with the plant’s operations team to ensure production could continue while workers reconstructed small sections at a time. Rolyn performed demolition throughout the project including the removal of all drywall and insulation. The company took the opportunity during the rebuild to make the facility stronger. Cranes removed the damaged roof structure and replaced one section at a time with roof panels made with heavier roof clips. In addition, they installed stronger steel support columns and the cranes removed and replaced the rooftop heating and air conditioning units. In the initial stages of the project following the microburst, the client expressed that within one week, Rolyn needed to return their production output to 8-10 bus fabrications a day. With Rolyn’s experienced team of emergency responders and technicians, the client was back to producing 18 busses a day after only 8 days following the microburst. Rolyn’s experience responding to severely damaged facilities and understanding the client’s priorities minimized business disruption throughout the reconstruction process. Property Type: Bus Manufacturing Plant Location: South Hutchinson, Kansas Loss Type: Storm Damage Project Overview “With Rolyn’s experienced team of emergency responders and technicians, the client was back to producing 18 busses a day after only 8 days following the microburst.”