SlideShare ist ein Scribd-Unternehmen logo
1 von 35
Downloaden Sie, um offline zu lesen
Developments in Internal Analysis
  Technology for Enhanced IRM of
Hydrated or Blocked Subsea Pipelines

                Presented by:

             Fernando Hernandez
          Subsea Operations Manager

    Wright’s Well Control Ser ices
                          Services


                    1 of 4
Introduction
Today I will describe a three-pronged approach to the
      y                 three-p   g    pp
Inspection, Repair and Maintenance of hydrated or blocked
pipelines. This strategy encompasses the WWCS Hybrid
Valve Pack with the inclusion of Nucleonic Testing for
inspection, and the WWCS Hydrate Remediation System
for repair.

I will also touch on how all three technologies can
integrate for enhanced overall pipeline maintenance and
hydrate/blockage prevention.


                           2 of 4
Subsea Inspection

Determining Factors for Inspection – Pressure Differential
 Th emergence of a pressure differential b
  The               f           diff   i l between two or more
  transducers/sensors within the same circuit serves as a strong indicator of
  the formation of a blockage
 Examples of such locations are on a:
   • PLET                              • FLET
   • Pipeline                          • PLEM
   • Riser                             • Other Subsea Assets



Note: M lti l hydrates
N t Multiple h d t can f
                       form within a single circuit
                             ithi     i l i it




                                    3 of 4
Subsea Inspection

Determining Factors for Inspection – Loss of Continuity
 Loss of continuity within the same subsea assets will reveal that there
  is no longer a path from which product can flow interrupted.
 Complete loss of production, well no longer able to produce due to
  complete isolation and inability to flow to intended location

 P
  Pressure builds up when medium in pipeline i fl i i an i l t d
            b ild       h      di    i i li is flowing in       isolated
  region. Source of pressure can be attributed to a well, or operator
  attempting to flow through pipeline.




                                   4 of 4
Inspection Equipment:
                 WWCS Hybrid Valve Pack

Technical Details:
 Builds on existing valve pack design that is used directly on ROVs and
  for ROV tooling
 Valves used to control thrusters and ROV functions have been
  replaced with d th compensated and 1 atmosphere pressure
     l   d ith depth             t d d       t      h
  transducers designed specifically for interpretation of pipeline internals
 In addition the HVP accommodates a digital flow meter for chemical
  injection
 Equipped to read in absolute pressure and to register pressure
  differential in pipeline independent of hydrostatic p
                  pp           p           y          pressure




                                     5 of 4
HVP Integrated with ROV Porch




              6 of 4
Inspection Equipment:
               WWCS Hybrid Valve Pack
                      y
How It Works:
 Internal/internal system, meaning the pipeline is accessed internally
                    system
  to gather data on the internals of the pipeline
 Minimum foot print is required allowing an ROV to remain completely
  outfitted with other tools that may be needed for simultaneous
     f                                          f
  operations
 HVP does not have to travel to surface due to real time and logging
                                                                gg g
  capabilities as well as recorded charts
 Data can be transmitted back to land via e-mail for additional analysis
                                           e-




                                   7 of 4
Inspection Equipment:
WWCS Hybrid Valve Pack
       y




         8 of 4
Hybrid Valve Pack Deployment
           Internal/Internal Inspection

Deployment to access points on pipeline and assets
 HVP will interface with connection points of interest
 Intent is to compare pressure readings of as many sections as
  possible to log pressure differentials and points of equalization
  where applicable
 L
  Logging d t t register i t
      i data to    i t internals of pipeline
                              l f i li




                                   9 of 4
Hybrid Valve Pack Deployment
               Internal/Internal Inspection
Quantifying rig/topside facilities sensor interpretation
 By using the HVP readings registered on surface via sensors that
               HVP,
  communicate back to a topside facility can be verified and cross
  referenced to determine accuracy
 This highly beneficial approach will finalize and determine if pressure
  differential that a topside facility is encountering is due to a faulty
  transducer
 Functions as a mobile transducer station where a topside facility may
  have loss all communications with subsea pressure sensors




                                   10 of 4
Hybrid Valve Pack Deployment
               Internal/Internal Inspection

Zeroing in on affected area
 Carrying out inspection with a HVP will allow for greater accuracy in
  determining where blockage(s) are located
 Eliminates having to interface at access points that will not yield high
  results due to data gathered




                                    11 of 4
HVP Schematic




     12 of 4
Inspection Equipment
           Nucleonic Testing Hybridization
Technical Details
 External/Internal data will give you readings that were acquired externally
  to interpret and identify blockages not designed to register pressure
 Utilizes nucleonic measurement to aid in locating blockages
 Radioactivity allows for the scanning of pipelines to recover data




                                    13 of 4
Inspection Equipment
           Nucleonic Testing Hybridization
How It Works:
 Attaches and integrates with an ROV
                   g
 Small foot print and quick installation due to its compact size
 Tethers to a ROV due to scanning components being housed in a frame
                                 g    p           g
  external to the pipeline
 In lengthy pipelines/circuits the scans conducted by this system are
  segmented and done in sections, however scans of the entire system
                            sections however,
  are highly beneficial, but time consuming




                                     14 of 4
Nucleonic Testing Hybridization Deployment
       External/Internal Inspection
 Zeroing in on affected area:
  Not dependent on pipeline hydrate and/or pressure
   access points
  Enhances detection
    • Designed to locate an isolated and singular blockage
    • Can d t t a single bl k
      C detect     i l blockage th t h di l d d and partitioned
                                that has dislodged d   titi   d
    • Fully capable of scanning and locating multiple blockages in a
      pp
      pipeline




                                 15 of 4
Nucleonic Testing Hybridization Deployment
       External/Internal Inspection




                   16 of 4
Subsea Asset Repair
       WWCS Hydrate Remediation System
Wright’s designed and built the system in 18 months for a major energy
company in response to a hydrate blockage.
On this first deployment, the Wright’s system:
 cleared 15 miles of 12” pipeline in 7,200’ WD
                      12              7,200
 removed 9000 barrels of hydrocarbons, condensate and other fluids
On a subsequent job, the system:
 cleared an asphaltene and paraffin blockage mixed with hydrates in 4,200’
  WD




                                   17 of 4
How the Wright’s Hydrate Remediation
       System Works – Pump Skid
 Self-contained system with redundant pump skid and motor assembly
  Self-
  placed on the mud line utilizing skirted steel mud mats
 Powered by filtered seawater from the surface via coiled tubing from a
  Multi-
  Multi-Service Vessel or rig or left on the ocean floor for later use
                          rig,
 Not limited by a Remotely Operated Vehicle’s (ROV) hydraulic energy
 Has a discharge rate of 1 bpm (designed to pump up to 2 bpm)
 Generates a suction that can bring pipeline pressure down to -12psi
 Can pump both fluids solids (10% sand) and gases with no damage
                   fluids,
  to the pipeline asset or the pump




                                 18 of 4
How The Wright’s Hydrate Remediation
     System Works – Gas Separator

 Deployed in a modular fashion as a independent system that is
  designed to interface on the top of the hydrate pump skid, and
  separates gas from the fluids
 The first coiled tubing line sends gas free
  flowing to a surface gas separator and/or
  flare boom
 The second coiled tubing return line
  receives the processed hydrocarbons and
  other fluids to the surface for additional
  processing and containment




                                  19 of 4
How The Wright’s Hydrate Remediation System
             Works – Gas Separator

 A methanol injection panel prevents the formation of additional hydrates
 Several injection points throughout the hydrate skid and separator are
  able to receive methanol
 A ball check in the stack prevents fluid from filling the gas line
 The gas separator has a built in sand trap




                                     20 of 4
3rd Party WWCS Systems Integration

The skid, gas separator and HVP are fully capable of
accommodating the following, as they adhere to API
                     following
standards:
 Additional ROV tooling/equipment:
                         g q p
 Can compliment or work in conjunction with any other methodology in
  regards to tooling or systems that a client may want to use
 Interfaces with clients subsea assets/infrastructures:
                  clients’
 Operates with any API specification for hot stabs, connectors and
  connection systems




                                 21 of 4
Develop Repair Strategy

Repair/Remediation Strategy – Identify which Hydrate
  p                      gy          y        y
Access Point to Engage
 Determined by accessibility
 Establish root cause analysis for hydrate and review associated data with
  operator
 Di
  Driven by which HAP will b i a b tt result and i closer t th
         b hi h        ill bring better   lt d is l       to the
  blockage




                                   22 of 4
HAP Engagement Via ROV




         23 of 4
Blockage Repair Engagement

Employing the HVP will provide the clearest picture of the
hydrate d/ blockage. Addi i nucleonic t ti will
h d t and/or bl k          Adding in     l   i testing ill
further improve the analysis leading to the best overall
strategy for the repair engagement.



Result: The three prong approach to IRM for hydrate
remediation in action




                            24 of 4
Three Repair Engagement Scenarios

Scenario 1 (Single Blockage)
 This is an ideal situation for engagement where the blockage is small
  and removed as one unit. The valve pack will identify HAP pressure
  compared to the opposite side of the blockage
 The WWCS Hydrate Remediation System will continue to pull a
  vacuum until HAP pressure equals pressure reading on the other
  side




                                 25 of 4
Three Repair Engagement Scenarios
 Before I discuss split or multiple blockages is it important to
  note that the trapped energy/pressure behind the most
  immediate blockage can not be quantified until it is removed
                                                        removed.
 Once this is accomplished the pressure/energy formally on
  the other side blockage will affect pressure at the HAP
                                                      HAP.
 If the trapped energy volume and pressure is higher than
  HAP pressure, this will immediately show a pressure spike
  in the HVP charts.
 If the trapped energy/volume is lower, this will decrease
            pp       gy                ,
  pressure reading due to energy now being distributed over a
  larger area with lower pressure.


                              26 of 4
Three Repair Engagement Scenarios

Scenario 2 (Single/Split Blockage)
           (   g    p          g )
 A larger single-sized blockage is engaged, pressure from HAP is
           single-
  decreased and brought below hydrate curve pressure, and
  increases,
  increases but during vacuum does not affect pressure reading on
  opposite end. This demonstrates that the blockage has partitioned.
 Pumping continues by pulling a vacuum. If pressure drops and
  increases, and fails to equalize with pressure on the opposite end,
  then the hydrate is still present.
 This can become highly repetitive during remediation operations
                                                       operations.
 Remediation is ongoing until pressure equalization occurs thus
  demonstrating blockage has been completely removed


                                 27 of 4
HVP Single & Multiple Blockage
        Screen Shots




Single Blockage             Multiple Blockages

                  28 of 4
Three Repair Engagement Scenarios
 Scenario 3 (Multiple Blockages)
  Situation where scans of pipeline reveal that the p p
                            pp                       pipeline of interest
   has multiple blockages.
  These fragmented blockages are liable to keep breaking in to smaller
   sections.
   sections
  Monitoring of charts is imperative to identify exact points at which
   hydrates are breaking.
  Follow same remediation steps outlined in Scenario 2 (Single/Split
   Blockage).




                                  29 of 4
Blockage Removed
 Use HVP to verify opposite end HAP pressure - to ensure
  complete equalization has occurred
 Upon equalization all data is gathered and centralized for
  presentation to the client
 Final step - flood pipeline with hydrate inhibitors and/or
  nitrogen, or chemical train. This will ensure once pipeline
  is brought back online, there is a safeguard against future
         g                ,               g        g
  hydrates
 Demobilize equipment




                            30 of 4
Maintenance
Assisting the client with flow assurance planning
 Taking preventative measures
 Advising on what access points are most strategic
 Utilizing the data to assist in maintenance of the pipeline via flow
  assurance




                                   31 of 4
The Outlook for Pipeline
               IRM and Flow Assurance
Strategies for the future:
 B utilizing lessons learned, th HVP nucleonic testing and the
  By tili i l         l     d the HVP,        l    i t ti      d th
  Hydrate Remediation System can be used in conjunction to remove
  hydrates or other blockages at the first sign of formation and BEFORE
  the asset is completely shut down
                               down.
 WWCS, in partnership with other service companies, is advising
  operators on the strategic placement of connection/HAP points on their
  pipelines during rehabilitation or new construction.
 These connection points will enable the HVP to provide a clearer
  picture of the hydrate or blockage so the optimal remediation approach
  can promptly be executed.




                                   32 of 4
The Outlook for Pipeline
               IRM and Flow Assurance
Strategies for the future:
 The pump/skid will further be optimized by not having to draw a vacuum
  or inject chemicals from longer distances to attack the blockage.
 WWCS is in discussions with operators domestically and abroad to have
  the
  th pump/skid l d
            / kid lay dormant subsea adjacent t hi h yield assets f even
                            t b       dj     t to high i ld    t for
  prompter deployment - further supporting this proactive maintenance
  strategy.
 When strategic access points, a dormant pump skid, the HVP and other
  testing techniques are used in an integrated approach, pipeline operators
  can shift their resources to a new flow assurance model and away from
  reactive hydrate remediation/blockage removal.




                                   33 of 4
Thank You
               Wright’s Well Control Services
                   Office: 281-446-0273
                           281-446-



                      Technical Contacts:

   Fernando Hernandez                        David Wright
fchernandez@wwcs911.com
fchernandez@wwcs911 com                dcwright@wwcs911.com
                                       dcwright@wwcs911 com

                       Project Managers:

      John Kenny                            Tommy Johnson
jjkenny@wwcs911.com                    thjohnson@wwcc911.com



                             34 of 4
Questions?


    35 of 4

Weitere ähnliche Inhalte

Was ist angesagt?

What subsea control systems low res
What   subsea control systems low resWhat   subsea control systems low res
What subsea control systems low res
Tomásio Leite
 
WorldPipelines-IsolateorShutdown
WorldPipelines-IsolateorShutdownWorldPipelines-IsolateorShutdown
WorldPipelines-IsolateorShutdown
Morgan Swanlund
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray Firsts
MyLast1
 
IWOCS Product Brochure_WAS (2)
IWOCS Product Brochure_WAS (2)IWOCS Product Brochure_WAS (2)
IWOCS Product Brochure_WAS (2)
Saunak Biswas
 
Intelligent well completio nm
Intelligent well completio nmIntelligent well completio nm
Intelligent well completio nm
basil_c
 
Produced water treatment_presentation
Produced water treatment_presentationProduced water treatment_presentation
Produced water treatment_presentation
Sakhr R&D Center
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
ggurudev
 
Breaking Down Conventional Barriers With Managed Pressure Drilling
Breaking Down Conventional Barriers With Managed Pressure DrillingBreaking Down Conventional Barriers With Managed Pressure Drilling
Breaking Down Conventional Barriers With Managed Pressure Drilling
Society of Petroleum Engineers
 
Aqua-Barrier Water Inflated Dams Literature
Aqua-Barrier Water Inflated Dams LiteratureAqua-Barrier Water Inflated Dams Literature
Aqua-Barrier Water Inflated Dams Literature
Darren Miller
 

Was ist angesagt? (20)

What subsea control systems low res
What   subsea control systems low resWhat   subsea control systems low res
What subsea control systems low res
 
Manifold design, verification,_and_validation
Manifold design, verification,_and_validationManifold design, verification,_and_validation
Manifold design, verification,_and_validation
 
WorldPipelines-IsolateorShutdown
WorldPipelines-IsolateorShutdownWorldPipelines-IsolateorShutdown
WorldPipelines-IsolateorShutdown
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray Firsts
 
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow  in Steam-Assisted Gravity Drainage WellsControlling Post-Completion Flow  in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage Wells
 
Application of intelligent well completion in optimizing production
Application of intelligent well completion in optimizing productionApplication of intelligent well completion in optimizing production
Application of intelligent well completion in optimizing production
 
Intelligent well completions
Intelligent well completionsIntelligent well completions
Intelligent well completions
 
IWOCS Product Brochure_WAS (2)
IWOCS Product Brochure_WAS (2)IWOCS Product Brochure_WAS (2)
IWOCS Product Brochure_WAS (2)
 
Intelligent well completio nm
Intelligent well completio nmIntelligent well completio nm
Intelligent well completio nm
 
Intelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field DevelopmentIntelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field Development
 
Hank Rawlins
Hank RawlinsHank Rawlins
Hank Rawlins
 
OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2
 
Life extension of aging petroleum production facilities offshore
Life extension of aging petroleum production facilities offshoreLife extension of aging petroleum production facilities offshore
Life extension of aging petroleum production facilities offshore
 
FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO Redeployment
 
Produced water treatment_presentation
Produced water treatment_presentationProduced water treatment_presentation
Produced water treatment_presentation
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
 
Breaking Down Conventional Barriers With Managed Pressure Drilling
Breaking Down Conventional Barriers With Managed Pressure DrillingBreaking Down Conventional Barriers With Managed Pressure Drilling
Breaking Down Conventional Barriers With Managed Pressure Drilling
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completion
 
Aqua-Barrier Water Inflated Dams Literature
Aqua-Barrier Water Inflated Dams LiteratureAqua-Barrier Water Inflated Dams Literature
Aqua-Barrier Water Inflated Dams Literature
 
Sparrows Point Country Club Irrigation System Evaluation
Sparrows Point Country Club Irrigation System EvaluationSparrows Point Country Club Irrigation System Evaluation
Sparrows Point Country Club Irrigation System Evaluation
 

Andere mochten auch

Trends and news for GIS in petroleum
Trends and news for GIS in petroleumTrends and news for GIS in petroleum
Trends and news for GIS in petroleum
Geodata AS
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Charlie Reith
 
MIDDLE EAST INVESTMENT OPPORTUNITES FOR PRIVATE EQUITY
MIDDLE EAST  INVESTMENT OPPORTUNITES FOR PRIVATE EQUITYMIDDLE EAST  INVESTMENT OPPORTUNITES FOR PRIVATE EQUITY
MIDDLE EAST INVESTMENT OPPORTUNITES FOR PRIVATE EQUITY
santhoshkrish
 
Presentation Of Oil Gas Sector In Middle East
Presentation Of Oil Gas Sector In Middle EastPresentation Of Oil Gas Sector In Middle East
Presentation Of Oil Gas Sector In Middle East
Atul Kumar SRIVASTAVA
 
Part 5 structural design of pipelines
Part 5 structural design of pipelinesPart 5 structural design of pipelines
Part 5 structural design of pipelines
Gasforlife Polysource
 
Tech Venture Looks to Prevent Subsea Production Issues in Mexico's Deepwater ...
Tech Venture Looks to Prevent Subsea Production Issues in Mexico's Deepwater ...Tech Venture Looks to Prevent Subsea Production Issues in Mexico's Deepwater ...
Tech Venture Looks to Prevent Subsea Production Issues in Mexico's Deepwater ...
SubseaTechnology
 
Oil spills prevention
Oil spills preventionOil spills prevention
Oil spills prevention
iqbal_abbas93
 

Andere mochten auch (15)

Trends and news for GIS in petroleum
Trends and news for GIS in petroleumTrends and news for GIS in petroleum
Trends and news for GIS in petroleum
 
Ipe13
Ipe13Ipe13
Ipe13
 
No-Dig World 2011
No-Dig World 2011No-Dig World 2011
No-Dig World 2011
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
 
Andrew's GIS Platforms
Andrew's GIS PlatformsAndrew's GIS Platforms
Andrew's GIS Platforms
 
Middle east oilfields and drilling services market report |UAE Oilfield Servi...
Middle east oilfields and drilling services market report |UAE Oilfield Servi...Middle east oilfields and drilling services market report |UAE Oilfield Servi...
Middle east oilfields and drilling services market report |UAE Oilfield Servi...
 
nacap pipeline construction worldwide
nacap pipeline construction worldwidenacap pipeline construction worldwide
nacap pipeline construction worldwide
 
Workforce planning strategies for turbulent times in Oil & Gas: Creating more...
Workforce planning strategies for turbulent times in Oil & Gas: Creating more...Workforce planning strategies for turbulent times in Oil & Gas: Creating more...
Workforce planning strategies for turbulent times in Oil & Gas: Creating more...
 
MIDDLE EAST INVESTMENT OPPORTUNITES FOR PRIVATE EQUITY
MIDDLE EAST  INVESTMENT OPPORTUNITES FOR PRIVATE EQUITYMIDDLE EAST  INVESTMENT OPPORTUNITES FOR PRIVATE EQUITY
MIDDLE EAST INVESTMENT OPPORTUNITES FOR PRIVATE EQUITY
 
Presentation Of Oil Gas Sector In Middle East
Presentation Of Oil Gas Sector In Middle EastPresentation Of Oil Gas Sector In Middle East
Presentation Of Oil Gas Sector In Middle East
 
Middle East
Middle EastMiddle East
Middle East
 
United Arab Emirates
United Arab EmiratesUnited Arab Emirates
United Arab Emirates
 
Part 5 structural design of pipelines
Part 5 structural design of pipelinesPart 5 structural design of pipelines
Part 5 structural design of pipelines
 
Tech Venture Looks to Prevent Subsea Production Issues in Mexico's Deepwater ...
Tech Venture Looks to Prevent Subsea Production Issues in Mexico's Deepwater ...Tech Venture Looks to Prevent Subsea Production Issues in Mexico's Deepwater ...
Tech Venture Looks to Prevent Subsea Production Issues in Mexico's Deepwater ...
 
Oil spills prevention
Oil spills preventionOil spills prevention
Oil spills prevention
 

Ähnlich wie Subsea Survery Presentation

Leak Detection And Repair
Leak Detection And RepairLeak Detection And Repair
Leak Detection And Repair
Ashutosh Soni
 
The role of open source technology based equipment in developing reliablereli...
The role of open source technology based equipment in developing reliablereli...The role of open source technology based equipment in developing reliablereli...
The role of open source technology based equipment in developing reliablereli...
Paolo Losi
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-final
John Grover
 
Roxar Downhole Brochure
Roxar Downhole BrochureRoxar Downhole Brochure
Roxar Downhole Brochure
Américo Dias
 
An optimised approach for the inspection of aboveground
An optimised approach for the inspection of abovegroundAn optimised approach for the inspection of aboveground
An optimised approach for the inspection of aboveground
Patrick Schüller
 
DPP2008_RaptorsPOSTER (1)
DPP2008_RaptorsPOSTER (1)DPP2008_RaptorsPOSTER (1)
DPP2008_RaptorsPOSTER (1)
Lindsey Parker
 
Westbay Nova Product Brochure 2015
Westbay Nova Product Brochure 2015Westbay Nova Product Brochure 2015
Westbay Nova Product Brochure 2015
Nathan Lopez
 

Ähnlich wie Subsea Survery Presentation (20)

Leak Detection And Repair
Leak Detection And RepairLeak Detection And Repair
Leak Detection And Repair
 
361
361361
361
 
361
361361
361
 
The role of open source technology based equipment in developing reliablereli...
The role of open source technology based equipment in developing reliablereli...The role of open source technology based equipment in developing reliablereli...
The role of open source technology based equipment in developing reliablereli...
 
Dual Plumbed Systems and Cross Connection Control (California Department of P...
Dual Plumbed Systems and Cross Connection Control (California Department of P...Dual Plumbed Systems and Cross Connection Control (California Department of P...
Dual Plumbed Systems and Cross Connection Control (California Department of P...
 
Hydrologic Monitoring Network Questionnaire
Hydrologic Monitoring Network QuestionnaireHydrologic Monitoring Network Questionnaire
Hydrologic Monitoring Network Questionnaire
 
Icrc 002-4033
Icrc 002-4033Icrc 002-4033
Icrc 002-4033
 
Level Measurement.pptx
Level Measurement.pptxLevel Measurement.pptx
Level Measurement.pptx
 
Richland co. installer mtg. 12 10-10
Richland co. installer mtg. 12 10-10Richland co. installer mtg. 12 10-10
Richland co. installer mtg. 12 10-10
 
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
 
Fluid mechanics 1 lab assignment of hafiz luqman
Fluid mechanics 1 lab assignment of hafiz luqmanFluid mechanics 1 lab assignment of hafiz luqman
Fluid mechanics 1 lab assignment of hafiz luqman
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-final
 
Introduction to High Performance Liquid Chromatography (HPLC)
Introduction to High Performance Liquid Chromatography (HPLC)Introduction to High Performance Liquid Chromatography (HPLC)
Introduction to High Performance Liquid Chromatography (HPLC)
 
Roxar Downhole Brochure
Roxar Downhole BrochureRoxar Downhole Brochure
Roxar Downhole Brochure
 
PE230516_Flowserve_WC_presentation_FINAL.pdf
PE230516_Flowserve_WC_presentation_FINAL.pdfPE230516_Flowserve_WC_presentation_FINAL.pdf
PE230516_Flowserve_WC_presentation_FINAL.pdf
 
An optimised approach for the inspection of aboveground
An optimised approach for the inspection of abovegroundAn optimised approach for the inspection of aboveground
An optimised approach for the inspection of aboveground
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
 
Pipeline leak detection system
Pipeline leak detection systemPipeline leak detection system
Pipeline leak detection system
 
DPP2008_RaptorsPOSTER (1)
DPP2008_RaptorsPOSTER (1)DPP2008_RaptorsPOSTER (1)
DPP2008_RaptorsPOSTER (1)
 
Westbay Nova Product Brochure 2015
Westbay Nova Product Brochure 2015Westbay Nova Product Brochure 2015
Westbay Nova Product Brochure 2015
 

Kürzlich hochgeladen

Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation deck
tbatkhuu1
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
home
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
tbatkhuu1
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
instagramfab782445
 
DESIGN THINKING in architecture- Introduction
DESIGN THINKING in architecture- IntroductionDESIGN THINKING in architecture- Introduction
DESIGN THINKING in architecture- Introduction
sivagami49
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
amitlee9823
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
amitlee9823
 

Kürzlich hochgeladen (20)

Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation deck
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptx
 
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
 
DESIGN THINKING in architecture- Introduction
DESIGN THINKING in architecture- IntroductionDESIGN THINKING in architecture- Introduction
DESIGN THINKING in architecture- Introduction
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
 
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
 
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 

Subsea Survery Presentation

  • 1. Developments in Internal Analysis Technology for Enhanced IRM of Hydrated or Blocked Subsea Pipelines Presented by: Fernando Hernandez Subsea Operations Manager Wright’s Well Control Ser ices Services 1 of 4
  • 2. Introduction Today I will describe a three-pronged approach to the y three-p g pp Inspection, Repair and Maintenance of hydrated or blocked pipelines. This strategy encompasses the WWCS Hybrid Valve Pack with the inclusion of Nucleonic Testing for inspection, and the WWCS Hydrate Remediation System for repair. I will also touch on how all three technologies can integrate for enhanced overall pipeline maintenance and hydrate/blockage prevention. 2 of 4
  • 3. Subsea Inspection Determining Factors for Inspection – Pressure Differential  Th emergence of a pressure differential b The f diff i l between two or more transducers/sensors within the same circuit serves as a strong indicator of the formation of a blockage  Examples of such locations are on a: • PLET • FLET • Pipeline • PLEM • Riser • Other Subsea Assets Note: M lti l hydrates N t Multiple h d t can f form within a single circuit ithi i l i it 3 of 4
  • 4. Subsea Inspection Determining Factors for Inspection – Loss of Continuity  Loss of continuity within the same subsea assets will reveal that there is no longer a path from which product can flow interrupted.  Complete loss of production, well no longer able to produce due to complete isolation and inability to flow to intended location  P Pressure builds up when medium in pipeline i fl i i an i l t d b ild h di i i li is flowing in isolated region. Source of pressure can be attributed to a well, or operator attempting to flow through pipeline. 4 of 4
  • 5. Inspection Equipment: WWCS Hybrid Valve Pack Technical Details:  Builds on existing valve pack design that is used directly on ROVs and for ROV tooling  Valves used to control thrusters and ROV functions have been replaced with d th compensated and 1 atmosphere pressure l d ith depth t d d t h transducers designed specifically for interpretation of pipeline internals  In addition the HVP accommodates a digital flow meter for chemical injection  Equipped to read in absolute pressure and to register pressure differential in pipeline independent of hydrostatic p pp p y pressure 5 of 4
  • 6. HVP Integrated with ROV Porch 6 of 4
  • 7. Inspection Equipment: WWCS Hybrid Valve Pack y How It Works:  Internal/internal system, meaning the pipeline is accessed internally system to gather data on the internals of the pipeline  Minimum foot print is required allowing an ROV to remain completely outfitted with other tools that may be needed for simultaneous f f operations  HVP does not have to travel to surface due to real time and logging gg g capabilities as well as recorded charts  Data can be transmitted back to land via e-mail for additional analysis e- 7 of 4
  • 8. Inspection Equipment: WWCS Hybrid Valve Pack y 8 of 4
  • 9. Hybrid Valve Pack Deployment Internal/Internal Inspection Deployment to access points on pipeline and assets  HVP will interface with connection points of interest  Intent is to compare pressure readings of as many sections as possible to log pressure differentials and points of equalization where applicable  L Logging d t t register i t i data to i t internals of pipeline l f i li 9 of 4
  • 10. Hybrid Valve Pack Deployment Internal/Internal Inspection Quantifying rig/topside facilities sensor interpretation  By using the HVP readings registered on surface via sensors that HVP, communicate back to a topside facility can be verified and cross referenced to determine accuracy  This highly beneficial approach will finalize and determine if pressure differential that a topside facility is encountering is due to a faulty transducer  Functions as a mobile transducer station where a topside facility may have loss all communications with subsea pressure sensors 10 of 4
  • 11. Hybrid Valve Pack Deployment Internal/Internal Inspection Zeroing in on affected area  Carrying out inspection with a HVP will allow for greater accuracy in determining where blockage(s) are located  Eliminates having to interface at access points that will not yield high results due to data gathered 11 of 4
  • 12. HVP Schematic 12 of 4
  • 13. Inspection Equipment Nucleonic Testing Hybridization Technical Details  External/Internal data will give you readings that were acquired externally to interpret and identify blockages not designed to register pressure  Utilizes nucleonic measurement to aid in locating blockages  Radioactivity allows for the scanning of pipelines to recover data 13 of 4
  • 14. Inspection Equipment Nucleonic Testing Hybridization How It Works:  Attaches and integrates with an ROV g  Small foot print and quick installation due to its compact size  Tethers to a ROV due to scanning components being housed in a frame g p g external to the pipeline  In lengthy pipelines/circuits the scans conducted by this system are segmented and done in sections, however scans of the entire system sections however, are highly beneficial, but time consuming 14 of 4
  • 15. Nucleonic Testing Hybridization Deployment External/Internal Inspection Zeroing in on affected area:  Not dependent on pipeline hydrate and/or pressure access points  Enhances detection • Designed to locate an isolated and singular blockage • Can d t t a single bl k C detect i l blockage th t h di l d d and partitioned that has dislodged d titi d • Fully capable of scanning and locating multiple blockages in a pp pipeline 15 of 4
  • 16. Nucleonic Testing Hybridization Deployment External/Internal Inspection 16 of 4
  • 17. Subsea Asset Repair WWCS Hydrate Remediation System Wright’s designed and built the system in 18 months for a major energy company in response to a hydrate blockage. On this first deployment, the Wright’s system:  cleared 15 miles of 12” pipeline in 7,200’ WD 12 7,200  removed 9000 barrels of hydrocarbons, condensate and other fluids On a subsequent job, the system:  cleared an asphaltene and paraffin blockage mixed with hydrates in 4,200’ WD 17 of 4
  • 18. How the Wright’s Hydrate Remediation System Works – Pump Skid  Self-contained system with redundant pump skid and motor assembly Self- placed on the mud line utilizing skirted steel mud mats  Powered by filtered seawater from the surface via coiled tubing from a Multi- Multi-Service Vessel or rig or left on the ocean floor for later use rig,  Not limited by a Remotely Operated Vehicle’s (ROV) hydraulic energy  Has a discharge rate of 1 bpm (designed to pump up to 2 bpm)  Generates a suction that can bring pipeline pressure down to -12psi  Can pump both fluids solids (10% sand) and gases with no damage fluids, to the pipeline asset or the pump 18 of 4
  • 19. How The Wright’s Hydrate Remediation System Works – Gas Separator  Deployed in a modular fashion as a independent system that is designed to interface on the top of the hydrate pump skid, and separates gas from the fluids  The first coiled tubing line sends gas free flowing to a surface gas separator and/or flare boom  The second coiled tubing return line receives the processed hydrocarbons and other fluids to the surface for additional processing and containment 19 of 4
  • 20. How The Wright’s Hydrate Remediation System Works – Gas Separator  A methanol injection panel prevents the formation of additional hydrates  Several injection points throughout the hydrate skid and separator are able to receive methanol  A ball check in the stack prevents fluid from filling the gas line  The gas separator has a built in sand trap 20 of 4
  • 21. 3rd Party WWCS Systems Integration The skid, gas separator and HVP are fully capable of accommodating the following, as they adhere to API following standards:  Additional ROV tooling/equipment: g q p  Can compliment or work in conjunction with any other methodology in regards to tooling or systems that a client may want to use  Interfaces with clients subsea assets/infrastructures: clients’  Operates with any API specification for hot stabs, connectors and connection systems 21 of 4
  • 22. Develop Repair Strategy Repair/Remediation Strategy – Identify which Hydrate p gy y y Access Point to Engage  Determined by accessibility  Establish root cause analysis for hydrate and review associated data with operator  Di Driven by which HAP will b i a b tt result and i closer t th b hi h ill bring better lt d is l to the blockage 22 of 4
  • 23. HAP Engagement Via ROV 23 of 4
  • 24. Blockage Repair Engagement Employing the HVP will provide the clearest picture of the hydrate d/ blockage. Addi i nucleonic t ti will h d t and/or bl k Adding in l i testing ill further improve the analysis leading to the best overall strategy for the repair engagement. Result: The three prong approach to IRM for hydrate remediation in action 24 of 4
  • 25. Three Repair Engagement Scenarios Scenario 1 (Single Blockage)  This is an ideal situation for engagement where the blockage is small and removed as one unit. The valve pack will identify HAP pressure compared to the opposite side of the blockage  The WWCS Hydrate Remediation System will continue to pull a vacuum until HAP pressure equals pressure reading on the other side 25 of 4
  • 26. Three Repair Engagement Scenarios  Before I discuss split or multiple blockages is it important to note that the trapped energy/pressure behind the most immediate blockage can not be quantified until it is removed removed.  Once this is accomplished the pressure/energy formally on the other side blockage will affect pressure at the HAP HAP.  If the trapped energy volume and pressure is higher than HAP pressure, this will immediately show a pressure spike in the HVP charts.  If the trapped energy/volume is lower, this will decrease pp gy , pressure reading due to energy now being distributed over a larger area with lower pressure. 26 of 4
  • 27. Three Repair Engagement Scenarios Scenario 2 (Single/Split Blockage) ( g p g )  A larger single-sized blockage is engaged, pressure from HAP is single- decreased and brought below hydrate curve pressure, and increases, increases but during vacuum does not affect pressure reading on opposite end. This demonstrates that the blockage has partitioned.  Pumping continues by pulling a vacuum. If pressure drops and increases, and fails to equalize with pressure on the opposite end, then the hydrate is still present.  This can become highly repetitive during remediation operations operations.  Remediation is ongoing until pressure equalization occurs thus demonstrating blockage has been completely removed 27 of 4
  • 28. HVP Single & Multiple Blockage Screen Shots Single Blockage Multiple Blockages 28 of 4
  • 29. Three Repair Engagement Scenarios Scenario 3 (Multiple Blockages)  Situation where scans of pipeline reveal that the p p pp pipeline of interest has multiple blockages.  These fragmented blockages are liable to keep breaking in to smaller sections. sections  Monitoring of charts is imperative to identify exact points at which hydrates are breaking.  Follow same remediation steps outlined in Scenario 2 (Single/Split Blockage). 29 of 4
  • 30. Blockage Removed  Use HVP to verify opposite end HAP pressure - to ensure complete equalization has occurred  Upon equalization all data is gathered and centralized for presentation to the client  Final step - flood pipeline with hydrate inhibitors and/or nitrogen, or chemical train. This will ensure once pipeline is brought back online, there is a safeguard against future g , g g hydrates  Demobilize equipment 30 of 4
  • 31. Maintenance Assisting the client with flow assurance planning  Taking preventative measures  Advising on what access points are most strategic  Utilizing the data to assist in maintenance of the pipeline via flow assurance 31 of 4
  • 32. The Outlook for Pipeline IRM and Flow Assurance Strategies for the future:  B utilizing lessons learned, th HVP nucleonic testing and the By tili i l l d the HVP, l i t ti d th Hydrate Remediation System can be used in conjunction to remove hydrates or other blockages at the first sign of formation and BEFORE the asset is completely shut down down.  WWCS, in partnership with other service companies, is advising operators on the strategic placement of connection/HAP points on their pipelines during rehabilitation or new construction.  These connection points will enable the HVP to provide a clearer picture of the hydrate or blockage so the optimal remediation approach can promptly be executed. 32 of 4
  • 33. The Outlook for Pipeline IRM and Flow Assurance Strategies for the future:  The pump/skid will further be optimized by not having to draw a vacuum or inject chemicals from longer distances to attack the blockage.  WWCS is in discussions with operators domestically and abroad to have the th pump/skid l d / kid lay dormant subsea adjacent t hi h yield assets f even t b dj t to high i ld t for prompter deployment - further supporting this proactive maintenance strategy.  When strategic access points, a dormant pump skid, the HVP and other testing techniques are used in an integrated approach, pipeline operators can shift their resources to a new flow assurance model and away from reactive hydrate remediation/blockage removal. 33 of 4
  • 34. Thank You Wright’s Well Control Services Office: 281-446-0273 281-446- Technical Contacts: Fernando Hernandez David Wright fchernandez@wwcs911.com fchernandez@wwcs911 com dcwright@wwcs911.com dcwright@wwcs911 com Project Managers: John Kenny Tommy Johnson jjkenny@wwcs911.com thjohnson@wwcc911.com 34 of 4
  • 35. Questions? 35 of 4