SlideShare ist ein Scribd-Unternehmen logo
1 von 16
Downloaden Sie, um offline zu lesen
“Works in Progress to the“Works in Progress to the
Football World CupFootball World Cup –– Brazil 2014”Brazil 2014”
AIRPORT INFRASTRUCTURE
FIFA WORLD CUP 2014
August 2011
Eng. Márcio Eduardo Rodrigues Kuntz
INFRAERO
Airports Pavement Seminar & VI FAA Airport
Pavement Workshop, I Short Course of Airfield
Pavements Maintenance
Airports – FIFA WORLD CUP 2014
• Belo Horizonte (Confins) - MG
1. Tancredo Neves International Airport– Confins
2. Belo Horizonte, Pampulha Airport – Carlos Drummond de Andrade
• Brasília - DF
3. Brasília International Airport – Presidente Juscelino Kubitschek
• Cuiabá - MT
4. Marechal Rondon International Airport - Cuiabá
• Curitiba - PR
5. Afonso Pena International Airport - Curitiba
• Fortaleza - CE
6. Pinto Martins International Airport - Fortaleza
• Manaus - AM
7. Eduardo Gomes International Airport – Manaus
• Natal - RN
8. São Gonçalo do Amarante International Airport – Natal
CuiabáCuiabá
Brasília
Recife
Natal
Confins
Santos Dumont
Galeão
Porto Alegre
Manaus
Curitiba
Salvador
Guarulhos
Fortaleza
Congonhas
Pampulha
Campinas
• Porto Alegre - RS
9. Salgado Filho International Airport – Porto Alegre
• Recife - PE
10. Recife – Guararapes International Airport – Gilberto Freire
• Rio de Janeiro - RJ
11. Rio de Janeiro,Galeão International Airport – Antonio Carlos Jobim – Rio de Janeiro
12. Santos Dumont Airport – Rio de Janeiro
• Salvador - BA
13. Salvador International Airport – Deputado Luis Eduardo Magalhães
• São Paulo, Guarulhos e Campinas - SP
14. Congonhas Airport - São Paulo
15. São Paulo,Guarulhos International Airport – Gov. André Franco Montoro
16. Viracopos,Campinas International Airport - Campinas
Airports - FIFA WORLD CUP 2014
Host Citys FIFA WORLD CUP
Investiments ‐ 2010 to 2014
Ord City Airport
Value (R$ million) 2010 (mi) 2014 (mi)
Ca Dem Ca Dem
1 São Paulo Guarulhos 1.229,36 24,9 26,8 52,7 38,9
Congonhas ‐ 12,0  13,7  15,0  15,0 
Campinas 804,1  6,8  5,4  24,0  9,5 
2 Rio de Janeiro Galeão 697,30 17,4  12,3  44,0  18,7 
Santos Dumont ‐ 8,5  3,6  8,5  5,4 
3 Belo Horizonte Confins 505,65 10,2  7,2 16,5  13,0 
Pampulha ‐ 1,5  0,6  1,5  0,9 
4 Brasília Brasília 563,24  14,0 14,3 26,5 21,30
5 Porto Alegre Porto Alegre 711,35 11,2 6,6 15,2 8,8
6 Curitiba Curitiba 242,36 7,8 5,7  14,6 7,6 
7 Recife Recife 24,60 16,7 5,9 16,7 7,8 
8 Salvador Salvador 47,61  12,9 7,6 12,9 10,2
9 Fortaleza Fortaleza 347,78  6,2 5,0  8,6 7,0 
10 Manaus Manaus 393,51  6,4 2,6 13,5 3,8
11 Cuiabá Cuiabá 91,33 1,9 2,1 5,7 3,1
12 Natal São Gonçalo do Amarante 506,32 ‐ ‐ 5,9 2,9
Totais 5,658,19  158,40 119,40 275,90 171,0 
Legend:  Ca – Capacity of Airport Terminal 
Dem ‐ Demand of passengers(boarding,  landing and connection).
Airports Investiments- FIFA WORLD CUP2014
Overview
FIFA WORLD CUP 2014
Investiments 2011-2014
R$ 505,65 million
Operational Data 2010 2014
Airport Terminal (m²): 60.305 67.675
Airport Terminal Capacity (pax,year): 10,28 million 16,5 million
Airport Passenger Demands,Year: 7,26 million 13,0 million
Airport Apron(m²): 114.240 306.640
City: Belo Horizonte
Airport: Int. Tancredo Neves - Confins
1 AIRPORT TERMINAL RENOVATION AND ROAD SYSTEM
ADEQUACY
Scheduled Start: September,2011
Scheduled Conclusion: December,2013
Total Planned Investment: R$ 236,65 million
2RUNWAY AND APRON RENOVATION AND EXPANSION
Scheduled Start: September,2012
Scheduled Conclusion: December,2013
Total Planned Investment: R$ 169,00 million
City: Belo Horizonte
Airport: Int. Tancredo Neves - Confins
3 NEW REMOT AIRPORT TERMINAL, PARK, AIRPORT CARGO
TERMINAL EXPANSION AND ROAD SYSTEM ADEQUACY
Scheduled Start: March,2012
Scheduled Conclusion: March,2013
Total Planned Investment: R$ 100,00 million
City:Brasília
Airport: Int. Pres. Juscelino Kubitschek
FIFA WORLD CUP 2014
Investiments 2011-2014
R$ 563,24 million
Operational Data 2010 2014
Airport Terminal (m²): 81.200 175.000
Airport Terminal Capacity (pax,year): 12,00 million 26,50 million
Airport Passenger Demands,Year: 14,34 million 21,34 million
Airport Apron(m²): 181.000 403.000
City:Brasília
Airport: Int. Pres. Juscelino Kubitschek
1 AIRPORT TERMINAL EXPANSION - TEMPORARY
Scheduled Start: August,2011
Scheduled Conclusion: November,2011
Total Planned Investment: R$ 4,63 million
2 AIRPORT TERMINAL RENOVATION
Start: April2011
Scheduled Conclusion: January,2012
Total Planned Investment: R$ 4,9 million
3 AIRPORT TERMINAL RENOVATION, APRON
EXPANSION, ROAD SISTEM AND NEW BUI/LDINGS
COMPLEMENTARY
Scheduled Start: February,2012
Scheduled Conclusion: December,2013
Total Planned Investment: R$ 4,9 million
4 2º AIRPORT VIADUCT
Scheduled Start: January,2012
Scheduled Conclusion: October,2012
Total Planned Investment: R$ 116,24 million
City: Cuiabá
Airport: Int. Marechal Rondon
FIFA WORLD CUP 2014
Investiments 2011-2014
R$ 91,33 million
Operational Data 2010 2014
Airport Terminal (m²): 5.460 13.200
Airport Terminal Capacity (pax,year): 1,98 million 5,7 million
Airport Passenger Demands,Year: 2,1 million 3,1 million
Airport Apron(m²): 38.800 38.800
Airport Park (m²): 9.450 13.785
Aiport Park Capacity (un): 405 517
1.533
City: Cuiabá
Airport: Int. Marechal Rondon
1 AIRPORT TERMINAL RENOVATION AND EXPANSION,
ROAD SYSTEM ADEQUACY END NEW PARK
Scheduled Start: April,2012
Scheduled Conclusion: July,2013
Total Planned Investment: R$ 88,43million
ESTACIONAMENTO
VEÍCULOS
2AIRPORT TERMINAL EXPANSION - TEMPORARY
Start: June,2011
Scheduled Conclusion: November,2011
Total Planned Investment: R$ 2,90 million
City: Curitiba
Airport: Int. Afonso Pena
FIFA WORLD CUP 2014
Investiments 2011-2014
R$ 242,36 million
Operational Data 2010 2014
Airport Terminal (m²): 45.000 62.445
Airport Terminal Capacity (pax,year): 7,8 million 14,6 million
Airport Passenger Demands,Year: 5,7 million 7,6 million
Airport Apron(m²): 84.062 143.941
City: Curitiba
Airport: Int. Afonso Pena
1 RUNWAY AND TAXIWAY SISTEM EXPANSION
Start: July,2011
Scheduled Conclusion: April,2013
Total Planned Investment: R$ 1,69 million
2 AIRPORT TERMINAL AND ROAD SISTEM
EXPANSION
Scheduled Start: April,2012
Scheduled Conclusion: October,2013
Total Planned Investment: R$ 41,30 million
3 AIRPORT CARGO TERMINAL EXPANSION
Start: December,2010
Scheduled Conclusion: March,2013
Total Planned Investment: R$ 17,78 million
4 THIRD RUNWAY PROJECT
Scheduled Start: January,2013
Scheduled Conclusion: December,2013
Total Planned Investment: R$ 14,28 million
City: Fortaleza
Airport: Int. Pinto Martins
FIFA WORLD CUP 2014
Investiments 2011-2014
R$ 347,78 million
Operational Data 2010 2014
Airport Terminal (m²): 38.500 61.964
Airport Terminal Capacity (pax,year): 6,22 million 8,7 million
Airport Passenger Demands,Year: 5,07 million 6,5 million
Airport Apron(m²): 38.000 76.000
City: Fortaleza
Airport: Int. Pinto Martins
PÁTIO of AERONAVES
1 AIRPORT TERMINAL RENOVATION AND EXPANSION
AND ROAD SYSTEM ADEQUACY
Scheduled Start: January,2012
Scheduled Conclusion: December,2013
Total Planned Investment: R$ 347,78 million
City: Manaus
Airport: Int. Eduardo Gomes
FIFA WORLD CUP 2014
Investiments 2011-2014
R$ 393,51 million
Operational Data 2010 2014
Airport Terminal (m²): 43.000 80.000
Airport Terminal Capacity (pax,year): 6,4 million 13,5 million
Airport Passenger Demands,Year: 2,6 million 3,8 million
Airport Apron(m²): 45.000 45.000
City: Manaus
Airport: Int. Eduardo Gomes
PÁTIO of AERONAVES
PISTA of POUSO,ofCOLAGEM
1 AIRPORT TERMINAL RENOVATION AND
EXPANSION AND ROAD SYSTEM ADEQUACY
Scheduled Start: November,2011
Scheduled Conclusion: December,2013
Total Planned Investment: R$ 393,51 million
City: Natal
Airport: São Gonçalo do Amarante
FIFA WORLD CUP 2014
Investiments 2010-2014
R$ 506,32 million
Operational Data 2010 2014
Airport Terminal (m²): - 5,9 million
Airport Terminal Capacity (pax,year): - 2,9 million
Airport Apron(m²): 200.400 200.400
City: Natal
Airport: São Gonçalo do Amarante
1NEW TAXIWAY AND APRON
Start: May,2011
Scheduled Conclusion: November,2013
Total Planned Investment: R$ 98,32 million
2 AIRPORT TERMINAL CONSTRUCTION
Scheduled Start: August,2011
Scheduled Conclusion: -
Total Planned Investment: R$ 408,00 million
City: Porto Alegre
Airport: Int. Salgado Filho
FIFA WORLD CUP2014
Investiments 2010-2014
R$ 711,35 million
Operational Data 2010 2014
Airport Terminal (m²): 37.600 104.304
Airport Terminal Capacity (pax,year): 11,24 million 15,24 million
Airport Passenger Demands,Year: 6,6 million 8,8 million
Airport Apron(m²): 92.567 130.587
Airport Park (vehicles) (m²): 54.837 130.000
Airport Park Capacity (vehicles) (un): 2.031 4.653
Airport Park Demands (vehicles) (un): 2.667 4.000
City: Porto Alegre
Airport: Int. Salgado Filho
1 AIPORT TERMINAL AND APRON RENOVATION
AND EXPANSION
Scheduled Start: September,2011
Scheduled Conclusion: December,2013
Total Planned Investment: R$ 345,80 million
2 RUNWAY AND TAXIWAY EXPANSION
Scheduled Start: February,2012
Scheduled Conclusion: November,2013
Total Planned Investment: R$ 223,20 million
3 NEW AIRPORT CARGO TERMINAL
Start: November,2010
Scheduled Conclusion: October,2012
Total Planned Investment: R$ 137,15 million
4 AIRPORT TERMINAL EXPANSION
Start: May,2011
Scheduled Conclusion: November,2011
Total Planned Investment: R$ 5,20 million
City:Recife
Airport: Int. Gilberto Freire
FIFA WORLD CUP 2014
Investiments 2010-2014
R$ 24,60 million
Operational Data 2010 2014
Airport Terminal (m²): 52.000 52.000
Airport Terminal Capacity (pax,year): 8,0 million 8,0 million
Airport Passenger Demands,Year: 4,7 million 7,3 million
Airport Apron(m²): 132.000 132.000
City:Recife
Airport: Int. Gilberto Freire
1 NEW AIRPORT CONTROL TOWER
Scheduled Start: February,2012
Scheduled Conclusion: December,2013
Total Planned Investment: R$ 18,47 million
2 NEW CONECTOR
Finished
Total Planned Investment: R$ 6,13 million
City: Rio de Janeiro
Airport: Int. Antônio Carlos Jobim
FIFA WORLD CUP 2014
Investiments 2010-2014
R$ 697,30 million
Operational Data 2010 2014
Airport Terminal (m²): 150.000 150.000
Airport Terminal Capacity (pax,year): 17,4 million 44,03 million
Airport Passenger Demands,Year: 12,3 million 18,7 million
Airport Apron(m²): 666.400 666.400
City: Rio de Janeiro
Airport: Int. Antônio Carlos Jobim
1AIRPORT TERMINAL 1 RENOVATION
Scheduled Start: January, 2012
Scheduled Conclusion: July ,2013
Total Planned Investment: R$ 254,10 million
2 AIRPORT TERMINAL 2 RENOVATION
Start: November, 2008
Scheduled Conclusion: October,2013
Total Planned Investment: R$ 316,53 million
3 RUNWAY AND APRON SISTEM
RENOVATION
Scheduled Start: September,2011
Scheduled Conclusion: October,2013
Total Planned Investment: R$ 103,43 million
4 AIRPORT CARGO TERMINAL RENOVATION
Start: September,2009
Scheduled Conclusion: December,2011
Total Planned Investment: R$ 23,24 million
City: Salvador
Airport: Int. Luís Eduardo Magalhães
FIFA WORLD CUP 2014
Investiments 2010-2014
R$ 47,61million
Operational Data 2010 2014
Airport Terminal (m²): 69.750 69.750
Airport Terminal Capacity (pax,year): 12,96 million 12,96 million
Airport Passenger Demands,Year: 7,69 million 10,28 million
Airport Apron(m²): 79.645 91.395
City: Salvador
Airport: Int. Luís Eduardo Magalhães
PISTA of POUSO,ofCOLAGEM
1 AIRPORT TERMINAL RENOVATION AND
ADEQUACY AND APRON EXPANSION
Scheduled Start: March,2012
Scheduled Conclusion: July ,2013
Total Planned Investment: R$ 32,17 million
2 NEW AIRPORT CONTROL TOWER
Scheduled Start: January,2012
Scheduled Conclusion: November,2013
Total Planned Investment: R$ 15,44 million
City: Guarulhos
Airport: Int. Gov. André Franco Montoro
FIFA WORLD CUP2014
Investiments 2010-2014
R$ 1,229 Billion
Operational Data 2010 2014
Airport Terminal (m²): 175.000 290.000
Airport Terminal Capacity (pax,year): 24,97 million 52,74 million
Airport Passenger Demands,Year: 26,8 million 38,91 million
Airport Apron(m²): 650.747,73 768.547,73
City: Guarulhos
Airport: Int. Gov. André Franco Montoro
1THIRD AIRPORT TERMINAL PROJECT
Start: May,2011
Scheduled Conclusion: November,2012
Total Planned Investment: R$ 752,91 million
2 RUNWAY AND APRON SISTEM
EXPANSION
Start: May,2010
Scheduled Conclusion: October,2013 Total
Planned Investment: R$ 307,05 million
3NEW TAXIWAY
Scheduled Start: January,2012
Scheduled Conclusion: March,2013
Total Planned Investment: R$ 57,34 million
4 AIRPORT TERMINAL NEW EXPANSION -
TEMPORARY
Start: July,2011
Scheduled Conclusion: January,2012
Total Planned Investment: R$ 86 million
5 AIRPORT TERMINAL NEW EXPANSION -
TEMPORARY
Scheduled Start: April,2012
Scheduled Conclusion: December,2012
Total Planned Investment: R$ 23,20
million
City: Campinas
Airport: Int. Viracopos
FIFA WORLD CUP2014
Investiments 2009-2013
R$ 804,10 million
Operational Data 2009 2014
Airport Terminal (m²): 25.215 25.215
Airport Terminal Capacity (pax,year): 6,8 million 17,26 million
Airport Passenger Demands,Year: 5,4 million 9,53 million
City: Campinas
Airport: Int. Viracopos
1 AIRPORT TERMINAL NEW EXPANSION -
TEMPORARY
Start: October,2010
Scheduled Conclusion: August,2011
Total Planned Investment: R$ 7,0 million
2 AIRPORT TERMINAL ADEQUACY
Scheduled Start: July,2012
Scheduled Conclusion: October,2013
Total Planned Investment: R$ 48,06 million
3 NEW AIRPORT TERMINAL AND APRON
Scheduled Start: June,2012
Scheduled Conclusion: December,2013
Total Planned Investment: R$ 664,61 million
4 SECOND RUNWAY
Start: June,2011
Scheduled Conclusion: May,2012
Total Planned Investment: R$ 5,0 million
5 TAXIWAYS WITH FILLETS FOR A380 ADAPTATION , AIRPORT
CARGO TERMINAL EXPANSION, NEW APRON AND RUNWAY
RESURFACING
Scheduled Start: February,2012
Scheduled Conclusion: December,2013
Total Planned Investment: R$ 79,43 million
Thank You!
Eng. Márcio Eduardo Rodrigues Kuntz
INFRAERO
Superintendence of Works
marcio_kuntz@infraero.gov.br
(55 61) 3312-2568

Weitere ähnliche Inhalte

Andere mochten auch

Carte creative e developpment center
Carte creative e developpment centerCarte creative e developpment center
Carte creative e developpment centerFedearri
 
Fifa%20 sponsors
Fifa%20 sponsorsFifa%20 sponsors
Fifa%20 sponsorsStudiesfree
 
Media coursework
Media courseworkMedia coursework
Media courseworkleyland1
 
So you want to learn how to navigate the internet
So you want to learn how to navigate the internetSo you want to learn how to navigate the internet
So you want to learn how to navigate the internetcandih1981
 
Manual CPE User guide
Manual CPE User guideManual CPE User guide
Manual CPE User guideturcao667
 
Kidblog: A great instructional tool for today's students
Kidblog: A great instructional tool for today's studentsKidblog: A great instructional tool for today's students
Kidblog: A great instructional tool for today's studentsdcornwell
 
Fifa%20 world%20cup%20rights%20deals
Fifa%20 world%20cup%20rights%20dealsFifa%20 world%20cup%20rights%20deals
Fifa%20 world%20cup%20rights%20dealsStudiesfree
 
Chapter6 stiffness method
Chapter6 stiffness methodChapter6 stiffness method
Chapter6 stiffness methodashish2002319
 
Copa 2010 jogos_pnt
Copa 2010 jogos_pntCopa 2010 jogos_pnt
Copa 2010 jogos_pntStudiesfree
 

Andere mochten auch (11)

Carte creative e developpment center
Carte creative e developpment centerCarte creative e developpment center
Carte creative e developpment center
 
Fifa%20 sponsors
Fifa%20 sponsorsFifa%20 sponsors
Fifa%20 sponsors
 
Media coursework
Media courseworkMedia coursework
Media coursework
 
So you want to learn how to navigate the internet
So you want to learn how to navigate the internetSo you want to learn how to navigate the internet
So you want to learn how to navigate the internet
 
Manual CPE User guide
Manual CPE User guideManual CPE User guide
Manual CPE User guide
 
Kidblog: A great instructional tool for today's students
Kidblog: A great instructional tool for today's studentsKidblog: A great instructional tool for today's students
Kidblog: A great instructional tool for today's students
 
Modul android
Modul android Modul android
Modul android
 
Fifa%20 world%20cup%20rights%20deals
Fifa%20 world%20cup%20rights%20dealsFifa%20 world%20cup%20rights%20deals
Fifa%20 world%20cup%20rights%20deals
 
Fcbarcelona
FcbarcelonaFcbarcelona
Fcbarcelona
 
Chapter6 stiffness method
Chapter6 stiffness methodChapter6 stiffness method
Chapter6 stiffness method
 
Copa 2010 jogos_pnt
Copa 2010 jogos_pntCopa 2010 jogos_pnt
Copa 2010 jogos_pnt
 

Ähnlich wie Infraero copa alacpa_2011

EffectiveAirportManagement-Diffs-Sols-191213.ppt
EffectiveAirportManagement-Diffs-Sols-191213.pptEffectiveAirportManagement-Diffs-Sols-191213.ppt
EffectiveAirportManagement-Diffs-Sols-191213.pptSURAJ SINGH SAINI
 
2010 Central City Forum main presentation - part 2
2010 Central City Forum main presentation - part 22010 Central City Forum main presentation - part 2
2010 Central City Forum main presentation - part 2Mike Perk
 
2010 Central City Forum main presentation - part 1
2010 Central City Forum main presentation - part 12010 Central City Forum main presentation - part 1
2010 Central City Forum main presentation - part 1Mike Perk
 
Forecasting and Managing Passenger Growth
Forecasting and Managing Passenger GrowthForecasting and Managing Passenger Growth
Forecasting and Managing Passenger GrowthLockheed-Martin
 
Washington Dulles International Airport and Reagan National Airport Spring 20...
Washington Dulles International Airport and Reagan National Airport Spring 20...Washington Dulles International Airport and Reagan National Airport Spring 20...
Washington Dulles International Airport and Reagan National Airport Spring 20...MarketPlaceDevelopment
 
Institutional presentation
Institutional presentationInstitutional presentation
Institutional presentationMarcopolo
 
Newsletter Volume7_Number1_2013
Newsletter Volume7_Number1_2013Newsletter Volume7_Number1_2013
Newsletter Volume7_Number1_2013Nickolis Landgraff
 
Brazilian Outlook 2010
Brazilian Outlook 2010Brazilian Outlook 2010
Brazilian Outlook 2010MarceloMello
 
Presentation for fgv aug14
Presentation for fgv aug14Presentation for fgv aug14
Presentation for fgv aug14Tami Vivas
 
Improving airport performance_Case Mikkeli City airport_Kapanen Katja 2014
Improving airport performance_Case Mikkeli City airport_Kapanen Katja 2014Improving airport performance_Case Mikkeli City airport_Kapanen Katja 2014
Improving airport performance_Case Mikkeli City airport_Kapanen Katja 2014Katja Kapanen
 
Sou a vision for sustainable growth
Sou a vision for sustainable growthSou a vision for sustainable growth
Sou a vision for sustainable growthDean Dewhurst
 
Sou a vision for sustainable growth
Sou a vision for sustainable growthSou a vision for sustainable growth
Sou a vision for sustainable growthAmy Le Grange
 

Ähnlich wie Infraero copa alacpa_2011 (20)

Presentation CCR DAY 9
Presentation CCR DAY 9Presentation CCR DAY 9
Presentation CCR DAY 9
 
Ccro3 apresentacao ccr_day10_en
Ccro3 apresentacao ccr_day10_enCcro3 apresentacao ccr_day10_en
Ccro3 apresentacao ccr_day10_en
 
Working in Brazil, por Leon Cláudio Myssior
Working in Brazil, por Leon Cláudio MyssiorWorking in Brazil, por Leon Cláudio Myssior
Working in Brazil, por Leon Cláudio Myssior
 
EffectiveAirportManagement-Diffs-Sols-191213.ppt
EffectiveAirportManagement-Diffs-Sols-191213.pptEffectiveAirportManagement-Diffs-Sols-191213.ppt
EffectiveAirportManagement-Diffs-Sols-191213.ppt
 
2010 Central City Forum main presentation - part 2
2010 Central City Forum main presentation - part 22010 Central City Forum main presentation - part 2
2010 Central City Forum main presentation - part 2
 
Olympicsbrazil
OlympicsbrazilOlympicsbrazil
Olympicsbrazil
 
2018-19 Budget-in-Brief
2018-19 Budget-in-Brief2018-19 Budget-in-Brief
2018-19 Budget-in-Brief
 
Ccro3 apresentacao ccr_day2016_eng
Ccro3 apresentacao ccr_day2016_engCcro3 apresentacao ccr_day2016_eng
Ccro3 apresentacao ccr_day2016_eng
 
CCR DAY 11_Eng
CCR DAY 11_EngCCR DAY 11_Eng
CCR DAY 11_Eng
 
2010 Central City Forum main presentation - part 1
2010 Central City Forum main presentation - part 12010 Central City Forum main presentation - part 1
2010 Central City Forum main presentation - part 1
 
Forecasting and Managing Passenger Growth
Forecasting and Managing Passenger GrowthForecasting and Managing Passenger Growth
Forecasting and Managing Passenger Growth
 
Washington Dulles International Airport and Reagan National Airport Spring 20...
Washington Dulles International Airport and Reagan National Airport Spring 20...Washington Dulles International Airport and Reagan National Airport Spring 20...
Washington Dulles International Airport and Reagan National Airport Spring 20...
 
Institutional presentation
Institutional presentationInstitutional presentation
Institutional presentation
 
Newsletter Volume7_Number1_2013
Newsletter Volume7_Number1_2013Newsletter Volume7_Number1_2013
Newsletter Volume7_Number1_2013
 
Brazilian Outlook 2010
Brazilian Outlook 2010Brazilian Outlook 2010
Brazilian Outlook 2010
 
Presentation for fgv aug14
Presentation for fgv aug14Presentation for fgv aug14
Presentation for fgv aug14
 
Brazilcs
BrazilcsBrazilcs
Brazilcs
 
Improving airport performance_Case Mikkeli City airport_Kapanen Katja 2014
Improving airport performance_Case Mikkeli City airport_Kapanen Katja 2014Improving airport performance_Case Mikkeli City airport_Kapanen Katja 2014
Improving airport performance_Case Mikkeli City airport_Kapanen Katja 2014
 
Sou a vision for sustainable growth
Sou a vision for sustainable growthSou a vision for sustainable growth
Sou a vision for sustainable growth
 
Sou a vision for sustainable growth
Sou a vision for sustainable growthSou a vision for sustainable growth
Sou a vision for sustainable growth
 

Mehr von Studiesfree

Gestão financeira
Gestão financeiraGestão financeira
Gestão financeiraStudiesfree
 
Tópicos em recursos humanos
Tópicos em recursos humanosTópicos em recursos humanos
Tópicos em recursos humanosStudiesfree
 
Introdução a economia
Introdução a economiaIntrodução a economia
Introdução a economiaStudiesfree
 
Dossiê esporte cap2
Dossiê esporte cap2Dossiê esporte cap2
Dossiê esporte cap2Studiesfree
 
Dossiê esporte cap1
Dossiê esporte cap1Dossiê esporte cap1
Dossiê esporte cap1Studiesfree
 
Pesquisa muitoalemfutebol
Pesquisa muitoalemfutebolPesquisa muitoalemfutebol
Pesquisa muitoalemfutebolStudiesfree
 
Relatorio kpmg-vulcabras-2010-ifrs-01.03.2011
Relatorio kpmg-vulcabras-2010-ifrs-01.03.2011Relatorio kpmg-vulcabras-2010-ifrs-01.03.2011
Relatorio kpmg-vulcabras-2010-ifrs-01.03.2011Studiesfree
 
Visa gastos copa
Visa gastos copaVisa gastos copa
Visa gastos copaStudiesfree
 
Ernest young copa 2014
Ernest young copa 2014Ernest young copa 2014
Ernest young copa 2014Studiesfree
 
Economia copa f gv
Economia copa f gvEconomia copa f gv
Economia copa f gvStudiesfree
 
Brazilian market watch_2011
Brazilian market watch_2011Brazilian market watch_2011
Brazilian market watch_2011Studiesfree
 
Demonstração agnelo piva
Demonstração agnelo pivaDemonstração agnelo piva
Demonstração agnelo pivaStudiesfree
 
Copa do mundo kpmg
Copa do mundo kpmgCopa do mundo kpmg
Copa do mundo kpmgStudiesfree
 

Mehr von Studiesfree (15)

Gestão financeira
Gestão financeiraGestão financeira
Gestão financeira
 
Logistica
LogisticaLogistica
Logistica
 
Tópicos em recursos humanos
Tópicos em recursos humanosTópicos em recursos humanos
Tópicos em recursos humanos
 
Introdução a economia
Introdução a economiaIntrodução a economia
Introdução a economia
 
Dossiê esporte cap2
Dossiê esporte cap2Dossiê esporte cap2
Dossiê esporte cap2
 
Dossiê esporte cap1
Dossiê esporte cap1Dossiê esporte cap1
Dossiê esporte cap1
 
Pesquisa muitoalemfutebol
Pesquisa muitoalemfutebolPesquisa muitoalemfutebol
Pesquisa muitoalemfutebol
 
Relatorio kpmg-vulcabras-2010-ifrs-01.03.2011
Relatorio kpmg-vulcabras-2010-ifrs-01.03.2011Relatorio kpmg-vulcabras-2010-ifrs-01.03.2011
Relatorio kpmg-vulcabras-2010-ifrs-01.03.2011
 
Ibobe esportes
Ibobe   esportesIbobe   esportes
Ibobe esportes
 
Visa gastos copa
Visa gastos copaVisa gastos copa
Visa gastos copa
 
Ernest young copa 2014
Ernest young copa 2014Ernest young copa 2014
Ernest young copa 2014
 
Economia copa f gv
Economia copa f gvEconomia copa f gv
Economia copa f gv
 
Brazilian market watch_2011
Brazilian market watch_2011Brazilian market watch_2011
Brazilian market watch_2011
 
Demonstração agnelo piva
Demonstração agnelo pivaDemonstração agnelo piva
Demonstração agnelo piva
 
Copa do mundo kpmg
Copa do mundo kpmgCopa do mundo kpmg
Copa do mundo kpmg
 

Kürzlich hochgeladen

Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 

Kürzlich hochgeladen (20)

Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 

Infraero copa alacpa_2011

  • 1. “Works in Progress to the“Works in Progress to the Football World CupFootball World Cup –– Brazil 2014”Brazil 2014” AIRPORT INFRASTRUCTURE FIFA WORLD CUP 2014 August 2011 Eng. Márcio Eduardo Rodrigues Kuntz INFRAERO Airports Pavement Seminar & VI FAA Airport Pavement Workshop, I Short Course of Airfield Pavements Maintenance
  • 2. Airports – FIFA WORLD CUP 2014 • Belo Horizonte (Confins) - MG 1. Tancredo Neves International Airport– Confins 2. Belo Horizonte, Pampulha Airport – Carlos Drummond de Andrade • Brasília - DF 3. Brasília International Airport – Presidente Juscelino Kubitschek • Cuiabá - MT 4. Marechal Rondon International Airport - Cuiabá • Curitiba - PR 5. Afonso Pena International Airport - Curitiba • Fortaleza - CE 6. Pinto Martins International Airport - Fortaleza • Manaus - AM 7. Eduardo Gomes International Airport – Manaus • Natal - RN 8. São Gonçalo do Amarante International Airport – Natal CuiabáCuiabá Brasília Recife Natal Confins Santos Dumont Galeão Porto Alegre Manaus Curitiba Salvador Guarulhos Fortaleza Congonhas Pampulha Campinas • Porto Alegre - RS 9. Salgado Filho International Airport – Porto Alegre • Recife - PE 10. Recife – Guararapes International Airport – Gilberto Freire • Rio de Janeiro - RJ 11. Rio de Janeiro,Galeão International Airport – Antonio Carlos Jobim – Rio de Janeiro 12. Santos Dumont Airport – Rio de Janeiro • Salvador - BA 13. Salvador International Airport – Deputado Luis Eduardo Magalhães • São Paulo, Guarulhos e Campinas - SP 14. Congonhas Airport - São Paulo 15. São Paulo,Guarulhos International Airport – Gov. André Franco Montoro 16. Viracopos,Campinas International Airport - Campinas Airports - FIFA WORLD CUP 2014
  • 3. Host Citys FIFA WORLD CUP Investiments ‐ 2010 to 2014 Ord City Airport Value (R$ million) 2010 (mi) 2014 (mi) Ca Dem Ca Dem 1 São Paulo Guarulhos 1.229,36 24,9 26,8 52,7 38,9 Congonhas ‐ 12,0  13,7  15,0  15,0  Campinas 804,1  6,8  5,4  24,0  9,5  2 Rio de Janeiro Galeão 697,30 17,4  12,3  44,0  18,7  Santos Dumont ‐ 8,5  3,6  8,5  5,4  3 Belo Horizonte Confins 505,65 10,2  7,2 16,5  13,0  Pampulha ‐ 1,5  0,6  1,5  0,9  4 Brasília Brasília 563,24  14,0 14,3 26,5 21,30 5 Porto Alegre Porto Alegre 711,35 11,2 6,6 15,2 8,8 6 Curitiba Curitiba 242,36 7,8 5,7  14,6 7,6  7 Recife Recife 24,60 16,7 5,9 16,7 7,8  8 Salvador Salvador 47,61  12,9 7,6 12,9 10,2 9 Fortaleza Fortaleza 347,78  6,2 5,0  8,6 7,0  10 Manaus Manaus 393,51  6,4 2,6 13,5 3,8 11 Cuiabá Cuiabá 91,33 1,9 2,1 5,7 3,1 12 Natal São Gonçalo do Amarante 506,32 ‐ ‐ 5,9 2,9 Totais 5,658,19  158,40 119,40 275,90 171,0  Legend:  Ca – Capacity of Airport Terminal  Dem ‐ Demand of passengers(boarding,  landing and connection). Airports Investiments- FIFA WORLD CUP2014 Overview FIFA WORLD CUP 2014 Investiments 2011-2014 R$ 505,65 million Operational Data 2010 2014 Airport Terminal (m²): 60.305 67.675 Airport Terminal Capacity (pax,year): 10,28 million 16,5 million Airport Passenger Demands,Year: 7,26 million 13,0 million Airport Apron(m²): 114.240 306.640 City: Belo Horizonte Airport: Int. Tancredo Neves - Confins
  • 4. 1 AIRPORT TERMINAL RENOVATION AND ROAD SYSTEM ADEQUACY Scheduled Start: September,2011 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 236,65 million 2RUNWAY AND APRON RENOVATION AND EXPANSION Scheduled Start: September,2012 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 169,00 million City: Belo Horizonte Airport: Int. Tancredo Neves - Confins 3 NEW REMOT AIRPORT TERMINAL, PARK, AIRPORT CARGO TERMINAL EXPANSION AND ROAD SYSTEM ADEQUACY Scheduled Start: March,2012 Scheduled Conclusion: March,2013 Total Planned Investment: R$ 100,00 million City:Brasília Airport: Int. Pres. Juscelino Kubitschek FIFA WORLD CUP 2014 Investiments 2011-2014 R$ 563,24 million Operational Data 2010 2014 Airport Terminal (m²): 81.200 175.000 Airport Terminal Capacity (pax,year): 12,00 million 26,50 million Airport Passenger Demands,Year: 14,34 million 21,34 million Airport Apron(m²): 181.000 403.000
  • 5. City:Brasília Airport: Int. Pres. Juscelino Kubitschek 1 AIRPORT TERMINAL EXPANSION - TEMPORARY Scheduled Start: August,2011 Scheduled Conclusion: November,2011 Total Planned Investment: R$ 4,63 million 2 AIRPORT TERMINAL RENOVATION Start: April2011 Scheduled Conclusion: January,2012 Total Planned Investment: R$ 4,9 million 3 AIRPORT TERMINAL RENOVATION, APRON EXPANSION, ROAD SISTEM AND NEW BUI/LDINGS COMPLEMENTARY Scheduled Start: February,2012 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 4,9 million 4 2º AIRPORT VIADUCT Scheduled Start: January,2012 Scheduled Conclusion: October,2012 Total Planned Investment: R$ 116,24 million City: Cuiabá Airport: Int. Marechal Rondon FIFA WORLD CUP 2014 Investiments 2011-2014 R$ 91,33 million Operational Data 2010 2014 Airport Terminal (m²): 5.460 13.200 Airport Terminal Capacity (pax,year): 1,98 million 5,7 million Airport Passenger Demands,Year: 2,1 million 3,1 million Airport Apron(m²): 38.800 38.800 Airport Park (m²): 9.450 13.785 Aiport Park Capacity (un): 405 517 1.533
  • 6. City: Cuiabá Airport: Int. Marechal Rondon 1 AIRPORT TERMINAL RENOVATION AND EXPANSION, ROAD SYSTEM ADEQUACY END NEW PARK Scheduled Start: April,2012 Scheduled Conclusion: July,2013 Total Planned Investment: R$ 88,43million ESTACIONAMENTO VEÍCULOS 2AIRPORT TERMINAL EXPANSION - TEMPORARY Start: June,2011 Scheduled Conclusion: November,2011 Total Planned Investment: R$ 2,90 million City: Curitiba Airport: Int. Afonso Pena FIFA WORLD CUP 2014 Investiments 2011-2014 R$ 242,36 million Operational Data 2010 2014 Airport Terminal (m²): 45.000 62.445 Airport Terminal Capacity (pax,year): 7,8 million 14,6 million Airport Passenger Demands,Year: 5,7 million 7,6 million Airport Apron(m²): 84.062 143.941
  • 7. City: Curitiba Airport: Int. Afonso Pena 1 RUNWAY AND TAXIWAY SISTEM EXPANSION Start: July,2011 Scheduled Conclusion: April,2013 Total Planned Investment: R$ 1,69 million 2 AIRPORT TERMINAL AND ROAD SISTEM EXPANSION Scheduled Start: April,2012 Scheduled Conclusion: October,2013 Total Planned Investment: R$ 41,30 million 3 AIRPORT CARGO TERMINAL EXPANSION Start: December,2010 Scheduled Conclusion: March,2013 Total Planned Investment: R$ 17,78 million 4 THIRD RUNWAY PROJECT Scheduled Start: January,2013 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 14,28 million City: Fortaleza Airport: Int. Pinto Martins FIFA WORLD CUP 2014 Investiments 2011-2014 R$ 347,78 million Operational Data 2010 2014 Airport Terminal (m²): 38.500 61.964 Airport Terminal Capacity (pax,year): 6,22 million 8,7 million Airport Passenger Demands,Year: 5,07 million 6,5 million Airport Apron(m²): 38.000 76.000
  • 8. City: Fortaleza Airport: Int. Pinto Martins PÁTIO of AERONAVES 1 AIRPORT TERMINAL RENOVATION AND EXPANSION AND ROAD SYSTEM ADEQUACY Scheduled Start: January,2012 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 347,78 million City: Manaus Airport: Int. Eduardo Gomes FIFA WORLD CUP 2014 Investiments 2011-2014 R$ 393,51 million Operational Data 2010 2014 Airport Terminal (m²): 43.000 80.000 Airport Terminal Capacity (pax,year): 6,4 million 13,5 million Airport Passenger Demands,Year: 2,6 million 3,8 million Airport Apron(m²): 45.000 45.000
  • 9. City: Manaus Airport: Int. Eduardo Gomes PÁTIO of AERONAVES PISTA of POUSO,ofCOLAGEM 1 AIRPORT TERMINAL RENOVATION AND EXPANSION AND ROAD SYSTEM ADEQUACY Scheduled Start: November,2011 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 393,51 million City: Natal Airport: São Gonçalo do Amarante FIFA WORLD CUP 2014 Investiments 2010-2014 R$ 506,32 million Operational Data 2010 2014 Airport Terminal (m²): - 5,9 million Airport Terminal Capacity (pax,year): - 2,9 million Airport Apron(m²): 200.400 200.400
  • 10. City: Natal Airport: São Gonçalo do Amarante 1NEW TAXIWAY AND APRON Start: May,2011 Scheduled Conclusion: November,2013 Total Planned Investment: R$ 98,32 million 2 AIRPORT TERMINAL CONSTRUCTION Scheduled Start: August,2011 Scheduled Conclusion: - Total Planned Investment: R$ 408,00 million City: Porto Alegre Airport: Int. Salgado Filho FIFA WORLD CUP2014 Investiments 2010-2014 R$ 711,35 million Operational Data 2010 2014 Airport Terminal (m²): 37.600 104.304 Airport Terminal Capacity (pax,year): 11,24 million 15,24 million Airport Passenger Demands,Year: 6,6 million 8,8 million Airport Apron(m²): 92.567 130.587 Airport Park (vehicles) (m²): 54.837 130.000 Airport Park Capacity (vehicles) (un): 2.031 4.653 Airport Park Demands (vehicles) (un): 2.667 4.000
  • 11. City: Porto Alegre Airport: Int. Salgado Filho 1 AIPORT TERMINAL AND APRON RENOVATION AND EXPANSION Scheduled Start: September,2011 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 345,80 million 2 RUNWAY AND TAXIWAY EXPANSION Scheduled Start: February,2012 Scheduled Conclusion: November,2013 Total Planned Investment: R$ 223,20 million 3 NEW AIRPORT CARGO TERMINAL Start: November,2010 Scheduled Conclusion: October,2012 Total Planned Investment: R$ 137,15 million 4 AIRPORT TERMINAL EXPANSION Start: May,2011 Scheduled Conclusion: November,2011 Total Planned Investment: R$ 5,20 million City:Recife Airport: Int. Gilberto Freire FIFA WORLD CUP 2014 Investiments 2010-2014 R$ 24,60 million Operational Data 2010 2014 Airport Terminal (m²): 52.000 52.000 Airport Terminal Capacity (pax,year): 8,0 million 8,0 million Airport Passenger Demands,Year: 4,7 million 7,3 million Airport Apron(m²): 132.000 132.000
  • 12. City:Recife Airport: Int. Gilberto Freire 1 NEW AIRPORT CONTROL TOWER Scheduled Start: February,2012 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 18,47 million 2 NEW CONECTOR Finished Total Planned Investment: R$ 6,13 million City: Rio de Janeiro Airport: Int. Antônio Carlos Jobim FIFA WORLD CUP 2014 Investiments 2010-2014 R$ 697,30 million Operational Data 2010 2014 Airport Terminal (m²): 150.000 150.000 Airport Terminal Capacity (pax,year): 17,4 million 44,03 million Airport Passenger Demands,Year: 12,3 million 18,7 million Airport Apron(m²): 666.400 666.400
  • 13. City: Rio de Janeiro Airport: Int. Antônio Carlos Jobim 1AIRPORT TERMINAL 1 RENOVATION Scheduled Start: January, 2012 Scheduled Conclusion: July ,2013 Total Planned Investment: R$ 254,10 million 2 AIRPORT TERMINAL 2 RENOVATION Start: November, 2008 Scheduled Conclusion: October,2013 Total Planned Investment: R$ 316,53 million 3 RUNWAY AND APRON SISTEM RENOVATION Scheduled Start: September,2011 Scheduled Conclusion: October,2013 Total Planned Investment: R$ 103,43 million 4 AIRPORT CARGO TERMINAL RENOVATION Start: September,2009 Scheduled Conclusion: December,2011 Total Planned Investment: R$ 23,24 million City: Salvador Airport: Int. Luís Eduardo Magalhães FIFA WORLD CUP 2014 Investiments 2010-2014 R$ 47,61million Operational Data 2010 2014 Airport Terminal (m²): 69.750 69.750 Airport Terminal Capacity (pax,year): 12,96 million 12,96 million Airport Passenger Demands,Year: 7,69 million 10,28 million Airport Apron(m²): 79.645 91.395
  • 14. City: Salvador Airport: Int. Luís Eduardo Magalhães PISTA of POUSO,ofCOLAGEM 1 AIRPORT TERMINAL RENOVATION AND ADEQUACY AND APRON EXPANSION Scheduled Start: March,2012 Scheduled Conclusion: July ,2013 Total Planned Investment: R$ 32,17 million 2 NEW AIRPORT CONTROL TOWER Scheduled Start: January,2012 Scheduled Conclusion: November,2013 Total Planned Investment: R$ 15,44 million City: Guarulhos Airport: Int. Gov. André Franco Montoro FIFA WORLD CUP2014 Investiments 2010-2014 R$ 1,229 Billion Operational Data 2010 2014 Airport Terminal (m²): 175.000 290.000 Airport Terminal Capacity (pax,year): 24,97 million 52,74 million Airport Passenger Demands,Year: 26,8 million 38,91 million Airport Apron(m²): 650.747,73 768.547,73
  • 15. City: Guarulhos Airport: Int. Gov. André Franco Montoro 1THIRD AIRPORT TERMINAL PROJECT Start: May,2011 Scheduled Conclusion: November,2012 Total Planned Investment: R$ 752,91 million 2 RUNWAY AND APRON SISTEM EXPANSION Start: May,2010 Scheduled Conclusion: October,2013 Total Planned Investment: R$ 307,05 million 3NEW TAXIWAY Scheduled Start: January,2012 Scheduled Conclusion: March,2013 Total Planned Investment: R$ 57,34 million 4 AIRPORT TERMINAL NEW EXPANSION - TEMPORARY Start: July,2011 Scheduled Conclusion: January,2012 Total Planned Investment: R$ 86 million 5 AIRPORT TERMINAL NEW EXPANSION - TEMPORARY Scheduled Start: April,2012 Scheduled Conclusion: December,2012 Total Planned Investment: R$ 23,20 million City: Campinas Airport: Int. Viracopos FIFA WORLD CUP2014 Investiments 2009-2013 R$ 804,10 million Operational Data 2009 2014 Airport Terminal (m²): 25.215 25.215 Airport Terminal Capacity (pax,year): 6,8 million 17,26 million Airport Passenger Demands,Year: 5,4 million 9,53 million
  • 16. City: Campinas Airport: Int. Viracopos 1 AIRPORT TERMINAL NEW EXPANSION - TEMPORARY Start: October,2010 Scheduled Conclusion: August,2011 Total Planned Investment: R$ 7,0 million 2 AIRPORT TERMINAL ADEQUACY Scheduled Start: July,2012 Scheduled Conclusion: October,2013 Total Planned Investment: R$ 48,06 million 3 NEW AIRPORT TERMINAL AND APRON Scheduled Start: June,2012 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 664,61 million 4 SECOND RUNWAY Start: June,2011 Scheduled Conclusion: May,2012 Total Planned Investment: R$ 5,0 million 5 TAXIWAYS WITH FILLETS FOR A380 ADAPTATION , AIRPORT CARGO TERMINAL EXPANSION, NEW APRON AND RUNWAY RESURFACING Scheduled Start: February,2012 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 79,43 million Thank You! Eng. Márcio Eduardo Rodrigues Kuntz INFRAERO Superintendence of Works marcio_kuntz@infraero.gov.br (55 61) 3312-2568