Want to recieve updates about this study? Fill in your mail here: http://goo.gl/forms/yLv9AljWjG
Process mining in the construction industry presented at the Beyond BIM congres in Ghent. http://www.beyondbim.ugent.be/
4. Complexity in construction
⢠Winch (1987): construction projects are amongst the most complex of all activities.
⢠Gidado (1996): rapid increase in the complexity of construction processes
5. IT in construction to manage processes
Plan
Build
Operate
BIM
Design Support
Systems
Project Information
Systems
Facility Management
Systems
6. Process Mining
⢠Analyse Event Logs to learn from processes
https://www.youtube.com/watch?v=7oat7MatU_U
7. Case studyâs: Construction process mining
Plan
Build
Operate
BIM
Process mining with facility
management data
Construction design
process mining
BIM based process mining
9. Construction design process mining
âProcess mining analytics did us realize that we use our IT
systems to store information, but those systems donât
automatically facilitate an efficient processâ
-Process engineer, contractor
More info? Paper upcomingâŚ
10. Process mining with facility management
data
Errors solved within 3 minutes costed 300 euros each (total
of âŹ723600)
11. Process mining with facility management
data
âWe can better invest in data analytics to save money than
fire our own peopleâ
-Facility manager, Erasmus Hospital
More info? Read:
https://www.dropbox.com/s/66z1tdq48es3j5l/Case%20Stu
dy%20Erasmus%20english%20V1.pdf?dl=0
12. Case study: BIM based process mining
⢠Target: Shorten construction projects
⢠How: Plan, (Autonomous-) Capture, Analyse and Re-use process
data from construction sites
⢠With: Using BIM and Process mining techniques
Plan
CaptureAnalyse
Re-use
13. Case study
⢠Project: Schependomlaan
⢠Projectmanagement:
Hendriks Bouw en
Ontwikkeling
⢠Partners: RAAMAC:
http://raamac.cee.illinois.edu/
14. Case Study: Plan
1. Connect planning to IFC
2. Generate As-Planned models
Plan
CaptureAnalyse
Re-use
15. Case Study: Capture
1. Scan construction site with drones
2. Create As-Built Point cloud model
(Structure from motion)
3. Compare As-Built with As-Planned
4. Merge results with event log
Plan
CaptureAnalyse
Re-use
28. âData explosionâ
⢠More devices,
⢠More sensors,
⢠More cameraâs.
⢠Upcoming: Intelligent ways to register processes
⢠So: more data
32. Conclusion and discussion
1. Current IT systems can be used for process
mining, valuable data in there!
2. Process mining enables fact based problem
identification
3. BIM based process mining is possible
-Use GUIDs to connect information from different tools.
33. Further work
1. Automate process capturing on construction
sites.
2. Combine data from several IT systems.
3. Better/more advanced planning consult
34. Questions?
Want to get updates? Fill in this form: http://goo.gl/forms/yLv9AljWjG
Contact:
LinkedIn: https://nl.linkedin.com/in/stijnvanschaijk
Twitter: @stijnvanschaijk
Mail:s.v.schaijk@student.tue.nl