Air Curtain Presentation
Air Curtain Fundamentals * Usually mounted over doorway,   alternatively at sides * Reduces outside air entering   building * Creates a warm air stream * Reduces mixing of inside /    outside climates * Energy saving device * Improves internal environment * Can be installed in different   applications
Air Curtain Fundamentals * Usually mounted over doorway,   alternatively at sides * Reduces outside air entering   building * Creates a warm air stream * Reduces mixing of inside /    outside climates * Energy saving device * Improves internal environment * Can be installed in different   applications
Air Curtain Fundamentals * Usually mounted over doorway,   alternatively at sides * Reduces outside air entering   building * Creates a warm air stream * Reduces mixing of inside /    outside climates * Energy saving device * Improves internal environment * Can be installed in different   applications
Air Curtain Fundamentals * Usually mounted over doorway,   alternatively at sides * Reduces outside air entering   building * Creates a warm air stream * Reduces mixing of inside /    outside climates * Energy saving device * Improves internal environment * Can be installed in different   applications
Air Curtain Science * Most efficient leaving air velocity   6.5~7.5 m/s * Optimum leaving air temperature   36~38ºC. * Achieve laminar flow of air stream * Designed to work with ambient air   temperature of between 16~20ºC * Not a barrier, the air stream tempers   incoming infiltration * Can be used throughout Summer &   Winter
Factors Affecting Air Curtain Performance * Building design * Building leakage / extract rates * Surrounding geography * Prevailing weather conditions * Installation of air curtain * Leaving air temperature/velocity * Method of control
Factors Affecting Air Curtain Performance * Building design * Building leakage / extract rates * Surrounding geography * Prevailing weather conditions * Installation of air curtain * Leaving air temperature/velocity * Method of control
Air Curtain Pitfalls * Installed too high. * Leaving air temperature too low * Not covering full width of door  * Used as a primary heat source * Leaving air temperature too high * Inadequate method of control * Incorrectly installed (i.e. too far away   from door opening)
Correct Installation * Cover full width of door opening * Outlet grille as close as possible to    top of door * Install within correct mounting height                                                                                                            * Controls method * Consider aesthetics / environment * Units can be mounted vertically and    horizontally Air curtain not covering full width, air bypass at sides Plan view showing cold air bypass at sides
Scenarios * Air Curtain Operating    Building leakage 5m3/h/m2    Minimal infiltration    Good climate separation * Air Curtain Operating    Building leakage rate increased 20m3/h/m2    Infiltration is at slightly higher level.    Climates still well separated * Air Curtain Switched Off     Building leakage rate 20m3/h/m2    Infiltration rate high, cold spots around    doorway. Climates mixing, thus entrance    cooling. Temperature profile very uneven
BSRIA Study Findings  (BSRIA report  77710/1) * Correct installation is vital. * Outlet grille design is important. * Building design affects the performance. * Building leakage greatly affects    performance. * Too high leaving temperature affects air    stream. * If outside air entering the door way    exceeds 3m/s (13 MPH) the warm air    stream begins to breaks down.
Controls * Manual / stand alone operation * Interface with building     management systems * Door switch / time clocks * Thermostatic control * External sensors * Intelligent controllers ~ latest    technology
“Enetec” Energy Saving Controller  * Enetec intelligent controller (tested by    BSRIA) * Monitors external and internal   temperature, modulates heat output * Heater output regulated proportionally,    instead of staging * Savings of between 30 & 60% have    been recorded. (compared to    standard  air curtain control) * Units can be linked in master / slave    scenario * Links into BMS
Conclusions * Take into account influencing factors * Size units correctly * Consider control options * Ensure correct installation. * Do not be influenced by others
Projects Sports Centre, Bath.   Vertical circular door curtains
Projects Shopping Centre, Basingstoke.    380mm dia circular door curtains
Projects Cargo Village, Heathrow.   Vertical Air Barriers
Projects GLA Building, London.   Vertical circular door curtains
Projects Alpha Matrix, Swansea.    Vertical Elliptical door curtains

Weitere ähnliche Inhalte

Was ist angesagt?

Handtool Safety Training
Handtool Safety TrainingHandtool Safety Training
Handtool Safety Training
Dan Junkins
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
Chris Morris
 
Guidelines on occupational safety and health act 1994
Guidelines on occupational safety and health act 1994Guidelines on occupational safety and health act 1994
Guidelines on occupational safety and health act 1994
lucadejewa
 

Was ist angesagt? (20)

Quiz warehouse safety
Quiz warehouse safetyQuiz warehouse safety
Quiz warehouse safety
 
Handtool Safety Training
Handtool Safety TrainingHandtool Safety Training
Handtool Safety Training
 
Playing it Safe - Holiday Safety in the Workplace
Playing it Safe - Holiday Safety in the WorkplacePlaying it Safe - Holiday Safety in the Workplace
Playing it Safe - Holiday Safety in the Workplace
 
Awareness on housekeeping and safety measures in work place
Awareness on housekeeping and safety measures in work placeAwareness on housekeeping and safety measures in work place
Awareness on housekeeping and safety measures in work place
 
17 most important questions to ask about health and safety in the workplace
17 most important questions to ask about health and safety in the workplace17 most important questions to ask about health and safety in the workplace
17 most important questions to ask about health and safety in the workplace
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
Project hse plan
Project hse planProject hse plan
Project hse plan
 
ACT&RULE West Bengal.ppt
ACT&RULE West Bengal.pptACT&RULE West Bengal.ppt
ACT&RULE West Bengal.ppt
 
Safe Working during Monsoon- Construction Safety
Safe Working during Monsoon- Construction SafetySafe Working during Monsoon- Construction Safety
Safe Working during Monsoon- Construction Safety
 
Seminar on Cyclone engine ppt
Seminar on Cyclone engine ppt Seminar on Cyclone engine ppt
Seminar on Cyclone engine ppt
 
Dust exposure, effects, limits, control
Dust   exposure, effects, limits, controlDust   exposure, effects, limits, control
Dust exposure, effects, limits, control
 
Leadership Performance in Safety Management Systems.pdf
Leadership Performance in Safety Management Systems.pdfLeadership Performance in Safety Management Systems.pdf
Leadership Performance in Safety Management Systems.pdf
 
Workplace hazards
Workplace hazardsWorkplace hazards
Workplace hazards
 
Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...
Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...
Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...
 
Guidelines on occupational safety and health act 1994
Guidelines on occupational safety and health act 1994Guidelines on occupational safety and health act 1994
Guidelines on occupational safety and health act 1994
 
ENGINEERING CHEMISTRY MODULE 4.pptx
ENGINEERING CHEMISTRY MODULE 4.pptxENGINEERING CHEMISTRY MODULE 4.pptx
ENGINEERING CHEMISTRY MODULE 4.pptx
 
Workshop Safety & Health Powerpoint
Workshop Safety & Health PowerpointWorkshop Safety & Health Powerpoint
Workshop Safety & Health Powerpoint
 
Cause of accident and prevention in construction industry
Cause of accident and prevention in construction industryCause of accident and prevention in construction industry
Cause of accident and prevention in construction industry
 
RedPixel OHS Presentation
RedPixel OHS PresentationRedPixel OHS Presentation
RedPixel OHS Presentation
 
The Health and Safety at Work Act 2015
The Health and Safety at Work Act 2015The Health and Safety at Work Act 2015
The Health and Safety at Work Act 2015
 

Andere mochten auch

Smoke extraction in buildings
Smoke extraction in buildingsSmoke extraction in buildings
Smoke extraction in buildings
vysakhmanohar
 
Pump and cooling tower energy performance
Pump and cooling tower energy performancePump and cooling tower energy performance
Pump and cooling tower energy performance
maulik610
 
Solar Air Conditioner
Solar Air ConditionerSolar Air Conditioner
Solar Air Conditioner
skullcrusher
 
Hvac formulas
Hvac formulasHvac formulas
Hvac formulas
hvactrg1
 

Andere mochten auch (15)

ZAF Enterprise, Mumbai, Air Curtain
ZAF Enterprise, Mumbai, Air CurtainZAF Enterprise, Mumbai, Air Curtain
ZAF Enterprise, Mumbai, Air Curtain
 
House of Game//Play talk: Recent adventures in virtual worlds - some travelle...
House of Game//Play talk: Recent adventures in virtual worlds - some travelle...House of Game//Play talk: Recent adventures in virtual worlds - some travelle...
House of Game//Play talk: Recent adventures in virtual worlds - some travelle...
 
Air-Curtain Based Car Cooling Project
Air-Curtain Based Car Cooling ProjectAir-Curtain Based Car Cooling Project
Air-Curtain Based Car Cooling Project
 
Hvac basics
Hvac basicsHvac basics
Hvac basics
 
Air Conditioning System by Air Magnet Engineering, Mumbai
Air Conditioning System by Air Magnet Engineering, MumbaiAir Conditioning System by Air Magnet Engineering, Mumbai
Air Conditioning System by Air Magnet Engineering, Mumbai
 
Chapter 12
Chapter 12Chapter 12
Chapter 12
 
Smoke extraction in buildings
Smoke extraction in buildingsSmoke extraction in buildings
Smoke extraction in buildings
 
Pump and cooling tower energy performance
Pump and cooling tower energy performancePump and cooling tower energy performance
Pump and cooling tower energy performance
 
Solar Air Conditioner
Solar Air ConditionerSolar Air Conditioner
Solar Air Conditioner
 
cooling towers
cooling towerscooling towers
cooling towers
 
Topic 3 District Cooling System
Topic 3 District Cooling SystemTopic 3 District Cooling System
Topic 3 District Cooling System
 
Solar Air Conditioner
Solar Air ConditionerSolar Air Conditioner
Solar Air Conditioner
 
Cooling tower cell h daily work report
Cooling tower cell h daily work reportCooling tower cell h daily work report
Cooling tower cell h daily work report
 
Hvac formulas
Hvac formulasHvac formulas
Hvac formulas
 
Presentation on cooling tower
Presentation on cooling towerPresentation on cooling tower
Presentation on cooling tower
 

Ähnlich wie Air Curtain CPD Presentation Envirotec Ltd V4

building services
building servicesbuilding services
building services
szelun
 
Airius Brochure - V2.0 - Low Res
Airius Brochure - V2.0 - Low ResAirius Brochure - V2.0 - Low Res
Airius Brochure - V2.0 - Low Res
Alan Baker
 
naturalventilation-170528094952.pdf
naturalventilation-170528094952.pdfnaturalventilation-170528094952.pdf
naturalventilation-170528094952.pdf
BossGold
 

Ähnlich wie Air Curtain CPD Presentation Envirotec Ltd V4 (20)

Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Lecture 7 passive ventilation system
Lecture 7 passive ventilation systemLecture 7 passive ventilation system
Lecture 7 passive ventilation system
 
AIR CONDITIONING
AIR CONDITIONINGAIR CONDITIONING
AIR CONDITIONING
 
Air Curtains for revolving doors Catalogue
Air Curtains for revolving doors CatalogueAir Curtains for revolving doors Catalogue
Air Curtains for revolving doors Catalogue
 
Presentation finland
Presentation finlandPresentation finland
Presentation finland
 
Ventilation
VentilationVentilation
Ventilation
 
Rittal Isı Değiştiricileri 104 129
Rittal Isı Değiştiricileri 104 129Rittal Isı Değiştiricileri 104 129
Rittal Isı Değiştiricileri 104 129
 
building services
building servicesbuilding services
building services
 
Building Services - Efficient Energy Ventilation System
Building Services - Efficient Energy Ventilation SystemBuilding Services - Efficient Energy Ventilation System
Building Services - Efficient Energy Ventilation System
 
Air Conditioning Systems and Refrigerant R22
Air Conditioning Systems and Refrigerant R22Air Conditioning Systems and Refrigerant R22
Air Conditioning Systems and Refrigerant R22
 
Airius Brochure - V2.0 - Low Res
Airius Brochure - V2.0 - Low ResAirius Brochure - V2.0 - Low Res
Airius Brochure - V2.0 - Low Res
 
S3 Supply Air Duct System Assignment
S3 Supply Air Duct System AssignmentS3 Supply Air Duct System Assignment
S3 Supply Air Duct System Assignment
 
ecbc codes for hvuc
ecbc codes for hvucecbc codes for hvuc
ecbc codes for hvuc
 
Lecture 4 natural ventilation
Lecture 4   natural ventilationLecture 4   natural ventilation
Lecture 4 natural ventilation
 
Rittal - İklimlendirme ve Soğutma Ürünleri 144 161
Rittal - İklimlendirme ve Soğutma Ürünleri 144 161 Rittal - İklimlendirme ve Soğutma Ürünleri 144 161
Rittal - İklimlendirme ve Soğutma Ürünleri 144 161
 
Webinar: Designing a Greenhouse for Cannabis Cultivation
Webinar: Designing a Greenhouse for Cannabis CultivationWebinar: Designing a Greenhouse for Cannabis Cultivation
Webinar: Designing a Greenhouse for Cannabis Cultivation
 
Finding The Best Wall Mounted Air Conditioning Unit For Your Space.pdf
Finding The Best Wall Mounted Air Conditioning Unit For Your Space.pdfFinding The Best Wall Mounted Air Conditioning Unit For Your Space.pdf
Finding The Best Wall Mounted Air Conditioning Unit For Your Space.pdf
 
naturalventilation-170528094952.pdf
naturalventilation-170528094952.pdfnaturalventilation-170528094952.pdf
naturalventilation-170528094952.pdf
 
Natural ventilation
Natural ventilationNatural ventilation
Natural ventilation
 
Ventilation System
Ventilation System Ventilation System
Ventilation System
 

Air Curtain CPD Presentation Envirotec Ltd V4

  • 2. Air Curtain Fundamentals * Usually mounted over doorway, alternatively at sides * Reduces outside air entering building * Creates a warm air stream * Reduces mixing of inside / outside climates * Energy saving device * Improves internal environment * Can be installed in different applications
  • 3. Air Curtain Fundamentals * Usually mounted over doorway, alternatively at sides * Reduces outside air entering building * Creates a warm air stream * Reduces mixing of inside / outside climates * Energy saving device * Improves internal environment * Can be installed in different applications
  • 4. Air Curtain Fundamentals * Usually mounted over doorway, alternatively at sides * Reduces outside air entering building * Creates a warm air stream * Reduces mixing of inside / outside climates * Energy saving device * Improves internal environment * Can be installed in different applications
  • 5. Air Curtain Fundamentals * Usually mounted over doorway, alternatively at sides * Reduces outside air entering building * Creates a warm air stream * Reduces mixing of inside / outside climates * Energy saving device * Improves internal environment * Can be installed in different applications
  • 6. Air Curtain Science * Most efficient leaving air velocity 6.5~7.5 m/s * Optimum leaving air temperature 36~38ºC. * Achieve laminar flow of air stream * Designed to work with ambient air temperature of between 16~20ºC * Not a barrier, the air stream tempers incoming infiltration * Can be used throughout Summer & Winter
  • 7. Factors Affecting Air Curtain Performance * Building design * Building leakage / extract rates * Surrounding geography * Prevailing weather conditions * Installation of air curtain * Leaving air temperature/velocity * Method of control
  • 8. Factors Affecting Air Curtain Performance * Building design * Building leakage / extract rates * Surrounding geography * Prevailing weather conditions * Installation of air curtain * Leaving air temperature/velocity * Method of control
  • 9. Air Curtain Pitfalls * Installed too high. * Leaving air temperature too low * Not covering full width of door * Used as a primary heat source * Leaving air temperature too high * Inadequate method of control * Incorrectly installed (i.e. too far away from door opening)
  • 10. Correct Installation * Cover full width of door opening * Outlet grille as close as possible to top of door * Install within correct mounting height * Controls method * Consider aesthetics / environment * Units can be mounted vertically and horizontally Air curtain not covering full width, air bypass at sides Plan view showing cold air bypass at sides
  • 11. Scenarios * Air Curtain Operating Building leakage 5m3/h/m2 Minimal infiltration Good climate separation * Air Curtain Operating Building leakage rate increased 20m3/h/m2 Infiltration is at slightly higher level. Climates still well separated * Air Curtain Switched Off Building leakage rate 20m3/h/m2 Infiltration rate high, cold spots around doorway. Climates mixing, thus entrance cooling. Temperature profile very uneven
  • 12. BSRIA Study Findings (BSRIA report 77710/1) * Correct installation is vital. * Outlet grille design is important. * Building design affects the performance. * Building leakage greatly affects performance. * Too high leaving temperature affects air stream. * If outside air entering the door way exceeds 3m/s (13 MPH) the warm air stream begins to breaks down.
  • 13. Controls * Manual / stand alone operation * Interface with building management systems * Door switch / time clocks * Thermostatic control * External sensors * Intelligent controllers ~ latest technology
  • 14. “Enetec” Energy Saving Controller * Enetec intelligent controller (tested by BSRIA) * Monitors external and internal temperature, modulates heat output * Heater output regulated proportionally, instead of staging * Savings of between 30 & 60% have been recorded. (compared to standard air curtain control) * Units can be linked in master / slave scenario * Links into BMS
  • 15. Conclusions * Take into account influencing factors * Size units correctly * Consider control options * Ensure correct installation. * Do not be influenced by others
  • 16. Projects Sports Centre, Bath. Vertical circular door curtains
  • 17. Projects Shopping Centre, Basingstoke. 380mm dia circular door curtains
  • 18. Projects Cargo Village, Heathrow. Vertical Air Barriers
  • 19. Projects GLA Building, London. Vertical circular door curtains
  • 20. Projects Alpha Matrix, Swansea. Vertical Elliptical door curtains