SlideShare ist ein Scribd-Unternehmen logo
1 von 6
Downloaden Sie, um offline zu lesen
STEVE SINDIONG – PROJECT EXAMPLE




                                                                              	
  



Auburn Transportation Plan (Auburn, WA) – Steve managed	
  the Auburn Transportation Plan,
which was updated as a result of two recent annexations to the City. As part of this effort, he
oversaw the inventorying of pedestrian and bicycle facilities within the annexation areas, using
GIS technology. He also led a public outreach process that was used to identify transportation
issues and needs, including non-motorized needs. Steve oversaw the identification of roadway
and other transportation needs based on future (2030) population and land use projections, and
Synchro traffic modeling analysis, identified transportation solutions to meet the future needs,
and oversaw the preparation of planning level cost estimates for proposed projects.
STEVE SINDIONG – PROJECT EXAMPLE




                                                                                  	
  


Lynnwood Non-Motorized Skeleton System Plan (Lynnwood, WA) – Steve managed	
   this
study that developed a pedestrian and bicycle system to serve schools, parks, transit and other
major activity centers within Lynnwood, and provide connectivity to systems in adjacent
communities. A “skeleton system” for both pedestrians and bicycles was developed based upon
a review of the systems using established evaluation criteria. GIS was used to help evaluate
and prioritize system segments. Planning level cost estimates were prepared for all of the
skeleton system segments and a priority list of projects was identified based on the evaluation
and other data.
STEVE SINDIONG – PROJECT EXAMPLES




                                                                                                       	
  

	
  

SE Redmond Area Transportation Study (Redmond, WA) – Steve was the lead planner for
this study that examined long-term transportation needs for the southeast part of Redmond,
WA, one of the fastest growing areas of the City. Steve had a significant role in planning and
facilitating public outreach, evaluating existing conditions, identifying multi-modal transportation
needs, developing project concepts and evaluating projects. As part of the analysis, Steve
identified existing and planned pedestrian facilities within the congested area of SR 520 near
Redmond Way, and made recommendations for future pedestrian facilities, as shown above, to
improve connectivity across Redmond Way, and between downtown Redmond and southeast
Redmond, as well as to the future planned light rail station and park & ride facility adjacent to
SR 520.
STEVE SINDIONG – PROJECT EXAMPLE




 A new north-south non-motorized facility could connect     Channelization improvements on all legs and dual turn lanes to the
 to the future office area north of Richards Road and the   I-90 Onramp are recommended at the intersection of 150th Ave SE at
 Mountains to Sound Greenway and other uses south of        SE 37th Street.
 I-90.
                                                            	
  

Eastgate Preliminary Screening Analysis (Bellevue, WA) – A number of significant changes
have occurred in the Eastgate area since completion of the Eastgate/I-90 Corridor Study in
2003, including construction of the Eastgate Park-and-Ride expansion, direct access ramps to
142nd Place SE, expansion of Bellevue College, new commercial and office development, and
transit service revisions. The Eastgate/ I-90 Corridor Study had a planning horizon of 2020.

The City plans to conduct an Eastgate Mixed-Use Employment Center Study that will examine
land use, transportation, urban design, and annexation issues and make recommendations for
land use / zoning changes and multi-modal transportation improvements. The study will have a
2030 planning horizon, and is anticipated to begin in early 2010. The City will be considering
annexation of a large unincorporated residential area south of I-90 on a parallel timetable.

Steve managed a preliminary screening analysis that was needed prior to the Employment
Center Study to determine whether additional land uses, and of what magnitude, would be
feasible in the Eastgate area. The study conducted traffic operations analysis (using Synchro) to
analyze the traffic operations at area intersections, for two land use alternatives, for the AM and
PM peak periods. Potential optimization strategies were identified for the intersections based on
the analysis. In addition, transit and non-motorized strategies were explored, and order of
magnitude costs were prepared for those improvements identified as feasible solutions. Steve
prepared the above graphics to easily convey to staff some of the proposed solutions.
STEVE SINDIONG – PROJECT EXAMPLE




Tukwila Bicycle Friendly Routes and Missing Sidewalks Segments Report (Tukwila, WA)
– Steve managed this project that made recommendations for nearly 40 high priority corridors
within the City of Tukwila, WA. This first stage of the project included the preparation of an
improvement options report, which identified existing conditions, key issues and constraints,
overall context, and alternatives for the pedestrian and bicycle improvements. Upon review by
the City, and selection of a preferred solution, a design report was prepared which included the
preliminary design for each corridor using CAD overlaid on aerials, the proposed cross-section,
project description and order of magnitude costs. Steve also prepared an evaluation of all
corridors based on selected criteria, to identify projects that should be implemented first. Steve
prepared a number of graphics, including the above graphic, to convey various types of
improvements that could be implemented.
STEVE SINDIONG – PROJECT EXAMPLE




Evergreen Way Corridor Revitalization Plan (Everett, WA) – Steve evaluated each of the
SWIFT bus rapid transit station areas to determine existing major activity centers, land uses and
pedestrian facilities. In general, commuters are highly likely to walk within a ¼ mile distance to
transit stops, and a ½ mile distance to high capacity transit, such as BRT. These walking
distances were overlaid with the stations and land uses and pedestrian facilities to determine
gaps or barriers for pedestrians. In addition, potential new pedestrian connections were
identified between activity centers and higher density residential areas to streets served by
transit, where none exist today, or where pedestrians are required to walk long distances. These
pedestrian connections could be in the form multi-use trails through easements, or conditioned
to new development.


	
  

Weitere ähnliche Inhalte

Was ist angesagt?

ΗΛΙΑΣ-ΒΙΟΓΡΑΦΙΚΟ
ΗΛΙΑΣ-ΒΙΟΓΡΑΦΙΚΟΗΛΙΑΣ-ΒΙΟΓΡΑΦΙΚΟ
ΗΛΙΑΣ-ΒΙΟΓΡΑΦΙΚΟILIAS GEORGOUNTZOS
 
Town planner presentation
Town planner presentationTown planner presentation
Town planner presentationLeon Lim
 
Continental mapping projects las vegas water treatment plant
Continental mapping projects   las vegas water treatment plantContinental mapping projects   las vegas water treatment plant
Continental mapping projects las vegas water treatment plantContinental Mapping Consultants
 
Mike Carter's Resume April 6-1, 2016
Mike Carter's Resume April 6-1, 2016Mike Carter's Resume April 6-1, 2016
Mike Carter's Resume April 6-1, 2016Mike Carter
 
Jp Research, Pune sres ppt
Jp Research, Pune sres pptJp Research, Pune sres ppt
Jp Research, Pune sres pptSuraj Puri
 
StreetSeen: Factors Influencing the Desirability of a Street for Bicycling
StreetSeen: Factors Influencing the Desirability of a Street for BicyclingStreetSeen: Factors Influencing the Desirability of a Street for Bicycling
StreetSeen: Factors Influencing the Desirability of a Street for BicyclingJennifer Evans-Cowley
 
Kalendrix Cook - Resume (2016) 4.0
Kalendrix Cook - Resume (2016) 4.0Kalendrix Cook - Resume (2016) 4.0
Kalendrix Cook - Resume (2016) 4.0Kalendrix Cook
 
Jordan Weibel's Resume
Jordan Weibel's ResumeJordan Weibel's Resume
Jordan Weibel's ResumeJordan Weibel
 

Was ist angesagt? (18)

ΗΛΙΑΣ-ΒΙΟΓΡΑΦΙΚΟ
ΗΛΙΑΣ-ΒΙΟΓΡΑΦΙΚΟΗΛΙΑΣ-ΒΙΟΓΡΑΦΙΚΟ
ΗΛΙΑΣ-ΒΙΟΓΡΑΦΙΚΟ
 
Town planner presentation
Town planner presentationTown planner presentation
Town planner presentation
 
Porfolio
PorfolioPorfolio
Porfolio
 
Continental mapping projects las vegas water treatment plant
Continental mapping projects   las vegas water treatment plantContinental mapping projects   las vegas water treatment plant
Continental mapping projects las vegas water treatment plant
 
Mike Carter's Resume April 6-1, 2016
Mike Carter's Resume April 6-1, 2016Mike Carter's Resume April 6-1, 2016
Mike Carter's Resume April 6-1, 2016
 
Geotechnical Engineering
Geotechnical EngineeringGeotechnical Engineering
Geotechnical Engineering
 
CKLaverty_CV
CKLaverty_CVCKLaverty_CV
CKLaverty_CV
 
Jp Research, Pune sres ppt
Jp Research, Pune sres pptJp Research, Pune sres ppt
Jp Research, Pune sres ppt
 
StreetSeen: Factors Influencing the Desirability of a Street for Bicycling
StreetSeen: Factors Influencing the Desirability of a Street for BicyclingStreetSeen: Factors Influencing the Desirability of a Street for Bicycling
StreetSeen: Factors Influencing the Desirability of a Street for Bicycling
 
Adrian Erett Geologist Portfolio 2016
Adrian Erett Geologist Portfolio 2016Adrian Erett Geologist Portfolio 2016
Adrian Erett Geologist Portfolio 2016
 
KA_Rsm_June2016
KA_Rsm_June2016KA_Rsm_June2016
KA_Rsm_June2016
 
New Resume 5-09-14
New Resume 5-09-14New Resume 5-09-14
New Resume 5-09-14
 
Lindsay Minck 2015
Lindsay Minck 2015Lindsay Minck 2015
Lindsay Minck 2015
 
Land Use Surveying
Land Use Surveying Land Use Surveying
Land Use Surveying
 
MDE_Projects_history_2016
MDE_Projects_history_2016MDE_Projects_history_2016
MDE_Projects_history_2016
 
Kalendrix Cook - Resume (2016) 4.0
Kalendrix Cook - Resume (2016) 4.0Kalendrix Cook - Resume (2016) 4.0
Kalendrix Cook - Resume (2016) 4.0
 
Shazia-Resume
Shazia-ResumeShazia-Resume
Shazia-Resume
 
Jordan Weibel's Resume
Jordan Weibel's ResumeJordan Weibel's Resume
Jordan Weibel's Resume
 

Ähnlich wie Sindiong Project Examples.2

Sindiong Project Examples
Sindiong Project ExamplesSindiong Project Examples
Sindiong Project ExamplesSteveSindiong
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj Bharadwaj B
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj Bharadwaj B
 
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...Emmanuel Mongaya
 
MARTA_Makeover_Exec_Summary_FINAL_072715
MARTA_Makeover_Exec_Summary_FINAL_072715MARTA_Makeover_Exec_Summary_FINAL_072715
MARTA_Makeover_Exec_Summary_FINAL_072715Sarah McColley
 
Center City Connector Executive Summary
Center City Connector Executive SummaryCenter City Connector Executive Summary
Center City Connector Executive SummaryZach Shaner
 
Denver Enhanced Transit Corridors
Denver Enhanced Transit CorridorsDenver Enhanced Transit Corridors
Denver Enhanced Transit CorridorsJohn Eric Kramak
 
Complete Streets in New Jersey - Sheree Davis
Complete Streets in New Jersey - Sheree DavisComplete Streets in New Jersey - Sheree Davis
Complete Streets in New Jersey - Sheree Davisnjbikeped
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...EditorIJAERD
 
Rick Hall: Place & Mobility
Rick Hall: Place & MobilityRick Hall: Place & Mobility
Rick Hall: Place & Mobilityguest7106fd
 
Andrew Douglas_Comprehensive
Andrew Douglas_ComprehensiveAndrew Douglas_Comprehensive
Andrew Douglas_ComprehensiveAndrew Douglas
 
19th Ave Transit Study Fall 2013 Presentation and Survey
19th Ave Transit Study Fall 2013 Presentation and Survey19th Ave Transit Study Fall 2013 Presentation and Survey
19th Ave Transit Study Fall 2013 Presentation and SurveySFCTA
 
CV for Nyquist rev bob 2
CV for Nyquist rev bob 2CV for Nyquist rev bob 2
CV for Nyquist rev bob 2Michael Nyquist
 

Ähnlich wie Sindiong Project Examples.2 (20)

Sindiong Project Examples
Sindiong Project ExamplesSindiong Project Examples
Sindiong Project Examples
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj
 
convert_255356
convert_255356convert_255356
convert_255356
 
Scott resume
Scott resumeScott resume
Scott resume
 
STAR_Report_FINAL
STAR_Report_FINALSTAR_Report_FINAL
STAR_Report_FINAL
 
srivaran CV
srivaran CV srivaran CV
srivaran CV
 
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
 
MARTA_Makeover_Exec_Summary_FINAL_072715
MARTA_Makeover_Exec_Summary_FINAL_072715MARTA_Makeover_Exec_Summary_FINAL_072715
MARTA_Makeover_Exec_Summary_FINAL_072715
 
Center City Connector Executive Summary
Center City Connector Executive SummaryCenter City Connector Executive Summary
Center City Connector Executive Summary
 
Denver Enhanced Transit Corridors
Denver Enhanced Transit CorridorsDenver Enhanced Transit Corridors
Denver Enhanced Transit Corridors
 
JoYeeYungFung-CV
JoYeeYungFung-CVJoYeeYungFung-CV
JoYeeYungFung-CV
 
Complete Streets in New Jersey - Sheree Davis
Complete Streets in New Jersey - Sheree DavisComplete Streets in New Jersey - Sheree Davis
Complete Streets in New Jersey - Sheree Davis
 
ToR
ToRToR
ToR
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...
 
Rick Hall: Place & Mobility
Rick Hall: Place & MobilityRick Hall: Place & Mobility
Rick Hall: Place & Mobility
 
Andrew Douglas_Comprehensive
Andrew Douglas_ComprehensiveAndrew Douglas_Comprehensive
Andrew Douglas_Comprehensive
 
Somerville Broadway Streetscape Project, CAPS comments to MassDOT, March 2011
Somerville Broadway Streetscape Project, CAPS comments to MassDOT, March 2011 Somerville Broadway Streetscape Project, CAPS comments to MassDOT, March 2011
Somerville Broadway Streetscape Project, CAPS comments to MassDOT, March 2011
 
19th Ave Transit Study Fall 2013 Presentation and Survey
19th Ave Transit Study Fall 2013 Presentation and Survey19th Ave Transit Study Fall 2013 Presentation and Survey
19th Ave Transit Study Fall 2013 Presentation and Survey
 
CV for Nyquist rev bob 2
CV for Nyquist rev bob 2CV for Nyquist rev bob 2
CV for Nyquist rev bob 2
 

Sindiong Project Examples.2

  • 1. STEVE SINDIONG – PROJECT EXAMPLE   Auburn Transportation Plan (Auburn, WA) – Steve managed  the Auburn Transportation Plan, which was updated as a result of two recent annexations to the City. As part of this effort, he oversaw the inventorying of pedestrian and bicycle facilities within the annexation areas, using GIS technology. He also led a public outreach process that was used to identify transportation issues and needs, including non-motorized needs. Steve oversaw the identification of roadway and other transportation needs based on future (2030) population and land use projections, and Synchro traffic modeling analysis, identified transportation solutions to meet the future needs, and oversaw the preparation of planning level cost estimates for proposed projects.
  • 2. STEVE SINDIONG – PROJECT EXAMPLE   Lynnwood Non-Motorized Skeleton System Plan (Lynnwood, WA) – Steve managed   this study that developed a pedestrian and bicycle system to serve schools, parks, transit and other major activity centers within Lynnwood, and provide connectivity to systems in adjacent communities. A “skeleton system” for both pedestrians and bicycles was developed based upon a review of the systems using established evaluation criteria. GIS was used to help evaluate and prioritize system segments. Planning level cost estimates were prepared for all of the skeleton system segments and a priority list of projects was identified based on the evaluation and other data.
  • 3. STEVE SINDIONG – PROJECT EXAMPLES     SE Redmond Area Transportation Study (Redmond, WA) – Steve was the lead planner for this study that examined long-term transportation needs for the southeast part of Redmond, WA, one of the fastest growing areas of the City. Steve had a significant role in planning and facilitating public outreach, evaluating existing conditions, identifying multi-modal transportation needs, developing project concepts and evaluating projects. As part of the analysis, Steve identified existing and planned pedestrian facilities within the congested area of SR 520 near Redmond Way, and made recommendations for future pedestrian facilities, as shown above, to improve connectivity across Redmond Way, and between downtown Redmond and southeast Redmond, as well as to the future planned light rail station and park & ride facility adjacent to SR 520.
  • 4. STEVE SINDIONG – PROJECT EXAMPLE A new north-south non-motorized facility could connect Channelization improvements on all legs and dual turn lanes to the to the future office area north of Richards Road and the I-90 Onramp are recommended at the intersection of 150th Ave SE at Mountains to Sound Greenway and other uses south of SE 37th Street. I-90.   Eastgate Preliminary Screening Analysis (Bellevue, WA) – A number of significant changes have occurred in the Eastgate area since completion of the Eastgate/I-90 Corridor Study in 2003, including construction of the Eastgate Park-and-Ride expansion, direct access ramps to 142nd Place SE, expansion of Bellevue College, new commercial and office development, and transit service revisions. The Eastgate/ I-90 Corridor Study had a planning horizon of 2020. The City plans to conduct an Eastgate Mixed-Use Employment Center Study that will examine land use, transportation, urban design, and annexation issues and make recommendations for land use / zoning changes and multi-modal transportation improvements. The study will have a 2030 planning horizon, and is anticipated to begin in early 2010. The City will be considering annexation of a large unincorporated residential area south of I-90 on a parallel timetable. Steve managed a preliminary screening analysis that was needed prior to the Employment Center Study to determine whether additional land uses, and of what magnitude, would be feasible in the Eastgate area. The study conducted traffic operations analysis (using Synchro) to analyze the traffic operations at area intersections, for two land use alternatives, for the AM and PM peak periods. Potential optimization strategies were identified for the intersections based on the analysis. In addition, transit and non-motorized strategies were explored, and order of magnitude costs were prepared for those improvements identified as feasible solutions. Steve prepared the above graphics to easily convey to staff some of the proposed solutions.
  • 5. STEVE SINDIONG – PROJECT EXAMPLE Tukwila Bicycle Friendly Routes and Missing Sidewalks Segments Report (Tukwila, WA) – Steve managed this project that made recommendations for nearly 40 high priority corridors within the City of Tukwila, WA. This first stage of the project included the preparation of an improvement options report, which identified existing conditions, key issues and constraints, overall context, and alternatives for the pedestrian and bicycle improvements. Upon review by the City, and selection of a preferred solution, a design report was prepared which included the preliminary design for each corridor using CAD overlaid on aerials, the proposed cross-section, project description and order of magnitude costs. Steve also prepared an evaluation of all corridors based on selected criteria, to identify projects that should be implemented first. Steve prepared a number of graphics, including the above graphic, to convey various types of improvements that could be implemented.
  • 6. STEVE SINDIONG – PROJECT EXAMPLE Evergreen Way Corridor Revitalization Plan (Everett, WA) – Steve evaluated each of the SWIFT bus rapid transit station areas to determine existing major activity centers, land uses and pedestrian facilities. In general, commuters are highly likely to walk within a ¼ mile distance to transit stops, and a ½ mile distance to high capacity transit, such as BRT. These walking distances were overlaid with the stations and land uses and pedestrian facilities to determine gaps or barriers for pedestrians. In addition, potential new pedestrian connections were identified between activity centers and higher density residential areas to streets served by transit, where none exist today, or where pedestrians are required to walk long distances. These pedestrian connections could be in the form multi-use trails through easements, or conditioned to new development.