Integrated Works & Procurement Management Solution for
Urban Local Bodies & Public Works Organizations
Presentation and Discussion Document
2
Company Profile – SoftTech
Best practice for
building plan
approval
Ministry of
Urban
Development
Manthan Award
South Asia 2010
e-governance in
“Digital inclusion
for development”
World leadership
Award 2007
Civil &
Architectural
Engineering for
Building Plan &
Approval
Good
Governance
Award 2010
National
Technology
Leadership
e-Maharashtra
2012 Award
Best Urban ICT
Initiative
Proven track record as Software Product Innovators in the AEC domain
> 750 person years of development and implementation experience
Successful track record with Government & Enterprise customers
3
Works Department - Key result areas
Plan and build
infrastructure
assets
Utilize
allocated funds
as per plans
Comply with
policies and
procedures
Procure and
manage
execution of
works
Maintain
infrastructure
assets
4
Urban Infrastructure organizations must deliver sustainable
performance by…
…increasing the value they
generate by
planning, procuring and
maintaining infrastructure
assets
Pull and interpret data
across departments and
applications
Enable cross department
collaboration
Gain insights from
analytics across work
domains
Leveraging
information to make
better decisions
Coordinating
resources to operate
effectively
Anticipating problems
to resolve them
proactively
5
Public Works Process Framework
Plan
Budget
Prepare
Estimate
Manage Work
Orders
Manage
Tenders
Manage
Billing
Manage
Projects
Manage Finance &
Compliance
Maintain
Assets
Manage HR &
Administration
Manage External
Communication
Core Processes
Support Processes
Manage Approvals
PLAN APPROVE PROCURE MONITOR MAINTAIN
6
Issues and Challenges –Budgeting and Estimation
Plan Budget
1. Manual preparation of budget estimates
2. Consolidation of budget requirements from different
offices is time consuming with chances of omission
3. Low accuracy of budgeted amount in the absence of
detailed estimate
4. Little or no automation of business rules and workflows
which lead to bottlenecks in approval stages
Prepare
Estimate
1. Tracking of DSR item rates in estimates with approved
DSR rates is challenging in manual Process
2. Availability of latest SORs and updated circulars may
not be available to all offices resulting into rework and
delays
3. Rate Analysis of Non DSR items may not be available
across the organization hence duplication of efforts and
non uniformity
7
Issues and Challenges –Tendering and Work Orders
Manage
Tenders
1. Manual Preparation of DTP is a time consuming
process
2. Maintaining consistency of data in tender documents is
tedious in case of revisions
3. Lack of transparency, visibility and traceability of
tenders
4. Inadequate capture and qualification of contractor data
5. Subjectivity in bid comparison and evaluation of tenders
Manage Work
Orders
1. Lack of standard formats and check list of Work order
and agreements
2. Little or no traceability of terms and conditions
specified in work order and agreement.
8
Issues and Challenges –Projects and Billing
Manage
Projects
1. Lack of visibility of physical and financial status of the project
across levels
2. Preparation of data for meetings with higher officials time
consuming.
3. At times there are no ways to verify the authenticity of data
4. Engineers lose many hours in data preparation hence very
little time is left with them for quality control at site
Manage
Billing
 Preparation of Abstracts from MBs manually are error prone
and time consuming
 Difficult to handle Part and Reduced rates in manual process.
Chances of omissions are high.
 Difficult to track and recover advances and reconcile material
advances
 Inadequate checks of terms and conditions in Work order and
agreements while preparing bills
 Management of security and other deposits is difficult
 Escalation statements preparation is tedious and time
consuming
9
Issues and Challenges –Asset Maintenance & Management
Manage
Assets
 In the absence of a systematic inventory of Roads,
Buildings and Bridge cards difficult to plan periodic
and preventive maintenance schedules
 No visibility and analytics on maintenance schedules
and cycle
 No analysis on up gradation v/s maintenance cost to
arrive at objective decision
 Complaints Redressal System is ineffective in the
absence of proper asset controls
10
1
The need for Works Departments - An integrated application
• Integrates all functional areas of
Works Management
• Leverages “trusted” data
• Maps the business rules and
workflows to roles and processes
• Provides strategic and operational
intelligence
• Ensures compliance
• Ensures traceability
• Aligns “physical” and “financial”
progress of projects
11
PWIMS – The trusted solution for Works organizations
11
MIS &
Analytics
Standard
Reports
Custom
Reports
Dashboards Scorecards
Core
Modules Pre Tendering
HR & Establishment
Management
Asset Maintenance &
Management
Finance & Accounts
Management
Budget & Estimate
Management
Content & Document
Management
Tendering
Post Tendering
Support
Modules
12
Budget & Estimate Management
1
 Schedule of Rates
Maintains a library of scheduled items along with their description and
rate. Items can be further classified into works and heads. Additionally
items can be further broken into sub items upto any level.
 Rate Analysis
Facilitates analysis of rates of an item based on the coefficient of units
consumed by unit quantity of an item.
 Preliminary Estimate
Facilitates high level estimates of a targeted works used primarily for
budgeting purpose
 Budgeting
Enables preparation of yearly and supplementary budgets considering
major, minor, sub-minor budget heads and schemes
13
Estate Management
1
 Estate management module provides in depth features that
includes different sub modules like Housing, Recovery and Lease
System & Rental Properties.
 The Estate Management module also has an Advertisement sub-
module that will facilitate authorized users to publish the available
properties for lease/rent. The Advertising module includes functions
such as Ad Creation, Search for the relevant property, Query section,
Arrears Register and publishing advertisement etc.
 The Scheme Information Management module under the
PWIMS provides in depth features of Scheme management that
includes all requirements like master creation of scheme, adding
additional projects in a Scheme, Management of existing scheme etc.
14
Estate Management : Housing
Project Unit Master: Process to define the project Unit master
15
Estate Management : Rent & Lease
Property Advertisement: Process to Advertisement of properties.
16
Estate Management : Recovery
Reports showing Recovery Details
17
Estate Management : Scheme Information
Scheme Master :Process to define the Scheme master
18
Works Management: Pre-Tendering
1
 Proposal Approval
Maps the proposal initiation to approval process
 Administrative Approval
Maps administrative process resulting in financial approval
 Technical Sanction
Maps the proposal initiation process and workflow through to their
approval
 Detailed Estimate
Facilitates detailed estimates of a targeted works using DSR and Non
DSR items. Detailed measurements can also be done along with
estimates
 Preparation of DTP
Facilitates preparation of draft tender papers with standard and specific
terms of reference with associated workflow for the approval of the DTP
19
Administrative Approval (AA)
1
Administrative Approval is a process to get the financial sanction that begins
with the creation of work. Work area for creating a Docket for the
Administrative Approval which captures various information required for the
Administrative Approval.
Set of Documents required for the
Administrative Approval.
Capture various attributes
related to the work.
20
Cost Estimate for Administrative Approval
2
Cost Estimation process which allows the user to arrive at a cost, breaking the work into
any number of sub estimates. Items can be added from various sources. like Schedule
of Rates (Rates entered into Masters), Block Rates (divided by zones / blocks), Non
SOR Item Library(not a part of the Schedule of Rates), From Template (from one of the
estimates created earlier, direct addition of items which will become the part of Master
data etc.
Various Options for
adding the items for
an Estimate.
21
Schedule of Rates (SOR)
2
The items for creating an Estimate for an Administrative Approval can be added from
Schedule of Rates. The items are divided into various categories called chapters.
Various Chapters are
defined inside
Schedule of Rates.
Edit the
details
22
Rate Analysis (Configuring Resources and Overheads)
2
You can add resources, provide coefficients, add the overheads and complete the Rate Analysis of
an item. You can also copy the Rate analysis from an existing item.
Resources are
added from
Masters
Overheads for
the selected item
can be
configured.
Completed Rate
is calculated.
23
Creation of Administrative Approval Document
2
A Detailed Project Report can be generated out of the selected documents stitched together that
will be reviewed by the Approval Authority.
Selection of
Documents for the
work from Masters.
Creation of a single docket from
the selected documents for
Administrative Approval
24
Administrative Approval Work Flow
2
The Administrative Approval Dockets then flow through various authorities who are configured in
the Administration module based on Nature of work, subtype of work and the financial powers.
The Administrative Approval
Documents will flow among
authorities for Approval.
List of the documents that will
flow for Approval.
25
Technical Sanction (TS) Process
2
Having got the Administrative Approval done, let see how the dockets for Technical Sanction are
prepared.
List of Technical Sanction Dockets
– Detailed Estimate (One of the
Important Documents)
The Technical Sanction
Documents will flow among
authorities for Approval.
26
Creation of Detailed Estimate for Technical Sanction
2
The detailed estimate can be prepared the same way as we did for Administrative Approval. The
work abstract, measurement sheets, item wise cost break up reports can be generated.
The estimate prepared at the time
of Administrative Approval can be
imported directly.
Various Reports like work
abstract, measurement
sheets, item wise cost break up
can be generated.
27
Creation of Draft Tender Papers (DTP)
2
We will now proceed for the procurement of works through the Tender Process. Tender Process
includes Creation of Draft Tender Papers and Notice Inviting Tenders.
The important dates associated
with the Tender Process are
captured.
No. of envelops required to be
submitted in a bid like Pre qualification
forms, Technical forms and
Commercial details.
28
Works Management: Tendering
 Registration of contractors
Captures information on Contractors, maintains the rates of the
Contractors in the past, Bill of Materials, Current schedule of rates
(CSR) items, rate, specifications etc.
 Tendering (e-Tendering & offline Tendering)
Facilitates publishing e-tenders with external interfaces, acceptance of
tender online and offline along with tender price, EMD through ECS and
link the same in compliance with CVC norms. Generate press ads.
Facilitates preparation of evaluation statements (comparative statement)
and parametric analysis based on possible quantity variation.
2
29
Fees & Deposits
2
System has provision to define fees, deposits, Payment terms & Conditions and most importantly
Earnest Money Deposit and Security Deposit for the tender.
Earnest Money Deposit can
be decided.
Security Deposit can be decided.
30
DTP Approval Process
3
The complete set of Draft Tender Papers then flows through various authorities which are
configured in the Administration module based on Nature of work, subtype of work and the financial
powers allocated to that Authority.
Set of documents for the
DTP approval.
Draft Tender Papers Approval
Process.
31
Notice Creation
3
Tender Notice is gets created from the information that we have captured for Draft Tender Papers.
Finalize the dates before
Notice is published.
The notice is generated from the
system.
Approval Flow of the notice
before it is being published.
32
Corrigendum
3
Once the Notice is published, if any changes are to be made in the dates, clauses, documents or
Schedule B, a corrigendum can be issued.
Dates, clauses, documents
or Schedule B can be
changed.
Approval Flow of the
corrigendum as defined in
the system.
33
Tender Submission – PQ Forms and Technical Bid
3
After having the Tender Published, it will be available for the response from the bidders using the
submission interface of the system.
Earnest Money Deposit
details.
Bidder’s Response against
forms enclosed in envelops.
Tender Fees submission.
34
Tender Submission – Online Interface
3
Tender Submission has the options, eTendering and Offline Tendering.
Registered Bidders will login to the system using the Authorized
Digital Certificates.
35
Tender Submission – Online Bidding
3
View Notice Details
Download Tender Document
View Corrigendum
Ask Queries
Respond to Bids, Fill PQ Forms, Technical Forms and Commercial Bids online.
Submission of bids
Online Tender Submission allows Anytime & Anywhere Bidding. It provides various features.
36
Tender Submission – Commercial Bid
3
Commercial / Financial Bid can be submitted by the Bidder. Since the Tender is Percent Type, the
bidder can quote above, below or at par.
Bidder’s Response for
Percent Rate Tender .
List of Items in the Bill of
Quantities.
37
Tender Opening
3
Having received the bids from various bidders, let’s open the Tender.
Tender Committee
Approval is completed.
Approval or Rejection of
Bidders is completed after
evaluation.
Comparative Reports are
provided for evaluation. .
L1 is decided based on the
commercial envelop.
Envelops are opened in a
sequence based on the
evaluation criteria.
38
Works Management: Post-tendering
3
 Contract management
Library of standard templates and clauses for contracts which can be
customized and configured to suit individual PWD needs e.g. Acceptance Letter,
Work Order & Agreement Paper etc.
 Project Monitoring
Facilitates monitoring of project progress across offices
 Quality Control
Quality control templates are maintained in the system with dynamic
configurable attributes. These are associated to the project monitoring and
billing process.
 Measurement Book
System Captures Measurement Books (MBs) electronically which is associated
to Tender BOQ
 RA bills and Final Bills
Facilitates reconciliation of Bills vis-a vis measurement books and any material
recovery, advances given
39
Tender Acceptance
3
Having identified the winning bidder, PWIMS initiates the Tender Acceptance process.
Acceptance Letter to the
Contractor.
Approval Flow for the Tender
Acceptance.
40
Work Order Issuance
4
Upon Acceptance of the bidder and on submission of the Performance Security Deposit, agreement
is done and work order is issued.
Work Order is given to the
Contractor.
Approval Flow for the Work
Order.
41
Project Management – Milestones for a work
4
After having finalized the agency and issuing the Work Order, the agency is given milestones to be
completed during the entire work execution cycle which can included as a part of Work Order and
can be tracked through the Project Management Module of PWIMS.
Milestones for the Agency to
complete the work.
42
Project Management – Milestones for a work
4
Let us define the activities to achieve the milestones under Project Scheduling
Define Milestones
Define Activities for each Milestone
Define Duration for activities
Define Weightages
Track the Work Progress
43
Project Management – Activity(Item wise Planning)
4
For each Activity you can select one or multiple items from the BOQ associated with the Activity.
Select Items for the activity
Plan how you are executing
item wise quantities on the
monthly basis.
44
Billing Management : Measurements
4
Based on the Milestones defined in the agreement, the agency gets paid for the work completed.
This is taken care by the Billing Management Module of PWIMS.
Record Entry details
Select Items for the Record Entry
Record the Measurements
Measurement details
45
Billing Management (Item Categorization)
4
Let us categorize the items as BOQ, Extra, Deviated and Not measured Items.
Variation Items: Items whose quantity has
variation from BOQ Quantity
Items whose measurements are not taken
Extra Item: Items which are
executed but not a part of BOQ
Deviated Item: Items whose specification
has changed from BOQ
You can also define the Part Rates for an Item
46
Billing Management – Detailing of Bills
4
Having approved the measurements let us create running bills.
Reimbursements which are not a part of the
contract but expenditure is made by contractor
Add the advance paid to the
contractor against material at site.
Appropriate Taxes to be charged
in the running bill amount.
Apply the recoveries to be made
from the contractor
47
Billing Management – Reports
4
All the relevant reports related to Billing are made readily available.
List of Billing Reports
48
Asset Inventory & Maintenance
 Helps maintain inventory of assets (roads, buildings,
bridges etc.) along with asset details and condition data.
 Helps schedule maintenance - both scheduled and
unscheduled with systemic alerts
 Helps prepare prioritized work schedules
 Generates required reports
4
49
Asset Management (Roads, Bridges & Buildings)
Confidential - SoftTech Engineers Pvt. Ltd. 4
As the work gets completed, it becomes an asset for the organization. The asset inventory helps in
creation of maintenance and inspection plans for the assets.
Categorization of
Roads
Inventory of Roads
Attributes are identified for the
management of Assets
Further Attributes like Carriage
Way, Bridges on the
Road, Footpaths, Drainage are
captured.
GPS Details are captured.
Information required for
Maintenance Plan is also
captured.
Bridge Card provides the information of the Bridge
inventory.
Important attributes related to the Bridges is captured.
History of Previous work
can be recorded.
Inspections can be carried
out for the Assets
Inspections details can be
recorded.
History of Inspections is
maintained in PWIMS.
Maintenance Plans can be
created for the assets.
Maintenance and Inspection
reports can be generated.
50
Finance & Accounts Management
5
 Maintenance of statutory registers
Maintains all statutory reports viz. FORM-80, FORM-5,FORM-46 A,
FORM-74,FORM-64,FORM-61,FORM-79 etc.
 Grants Management
Maintains hierarchy of budget heads
 Cash book & Bank Book
Maintains monthly, quarterly and yearly book of accounts in prescribed
formats for cash and bank transactions
 Expenditure Monitoring
Keeps reports related to grants received vis-à-vis expenditures made
51
HR & Establishment Management
Confidential - SoftTech Engineers Pvt. Ltd. 5
 Personnel Information
Maintains the Service Books and other personnel related information
 Office Asset Information
Maintains inventory of office assets like furniture, offices, equipment
 Court Case Monitoring
Helps track Court cases across divisions, circles and zones
 Response to Queries (Assembly, CMO, Cabinet etc.)
Provides a repository of responses to queries by category with links to
relevant documentation
52
Management Information & Analytics
Confidential - SoftTech Engineers Pvt. Ltd. 5
 Provides industry standard reporting functionalities related to
monitoring physical and financial progress of works as well
as other administrative dimensions
• Dashboards,
• Scorecards
• Static reports
 Drill down to any level
 Extensive visual representation
 Granular permission for viewing reports across authorities
53
Executive Dashboard
54
Content & Document Management
Confidential - SoftTech Engineers Pvt. Ltd. 5
 Best in class Content Management functionality that is
secure and scalable
 Provides multiple level security and permissions
 Provides granular versioning of content
 Provides multiple level Search including wild card
 Check-in / Check-out
 Handles multiple types of content
55
High level application architecture
Public Works Employees Public Works Leadership Subcontractors CitizensCustomers Government
56
Key Customers
Confidential - SoftTech Engineers Pvt. Ltd. 5
57
Customer Speak
Mr. Lianchungnunga
Engineer in Chief PWD,
Mizoram
“ Public Works Department, Mizoram is the first amongst the North
Eastern States to have computerized its works and procurement
management processes. We found a trusted partner in SoftTech
who worked with us from the inception to computerize every
aspect including our schedule of rates, estimation, budgeting and
more. As we work with them we realize that we made the right
choice because they bring in not only technology but significant
domain experience, implementation skills and the commitment to
make things happen ”
“ For a relatively young state, PWD Uttarakhand has taken some
giant strides in setting up state of the art processes and
infrastructure that would help govern its urban infrastructure. One
of the major initiatives was the computerization of its operations
and we found a worthy partner in SoftTech. SoftTech's PWIMS has
helped us to automate our entire
planning, budgeting, procurement and billing processes and we
have gained significant benefits from this initiative. SoftTech with
its deep domain and technology expertise partnered with us to
help us reduce our cycle times and costs in several areas”
Lalit Mohan
Chief Engineer: PWD
Uttarakhand
58
Summary of Key Benefits
1. Aligns roles to workflows and
processes
2. Shifts emphasis from tasks to
outcomes
3. Integrates all functions across the
organization
Improved
Productivity
Reduces
Workload
1. Automates standard processes –
significantly reduces paper based
manual work
2. Generates and tracks
documentation throughout the life
cycle
3. Leverages single source of data
59
Summary of Key Benefits
1. Consolidates information
generated at various
2. Provides operational business
intelligence and management
information through
dashboards.
Increased
Visibility
Increased
Compliance &
Accountability
1. Automates approvals by
designated authorities and
2. Maintains an audit trail of all
changes.
3. Enforces standardization
through templates and
promotes best practices
60
Thank You
SoftTech Engineers Pvt. Limited
The Pentagon, 5A
Shahu College Road
Pune : 411009
Ph: +91-20-24217676
www.softTech-engr.com

Weitere ähnliche Inhalte

Was ist angesagt?

Event Collection in the IBC: An Overview
Event Collection in the IBC: An OverviewEvent Collection in the IBC: An Overview
Event Collection in the IBC: An OverviewCelonis
 
Mobile GIS - Enabling Field Workers and Managers
Mobile GIS - Enabling Field Workers and ManagersMobile GIS - Enabling Field Workers and Managers
Mobile GIS - Enabling Field Workers and ManagersTata Consultancy Services
 
IBM BIM and Maximo: Values for Owners and Operators
IBM BIM and Maximo: Values for Owners and OperatorsIBM BIM and Maximo: Values for Owners and Operators
IBM BIM and Maximo: Values for Owners and OperatorsFMMUG
 
Evolution of IT, AI, and Automation in Intellectual Property Industry
Evolution of IT, AI, and Automation in Intellectual Property IndustryEvolution of IT, AI, and Automation in Intellectual Property Industry
Evolution of IT, AI, and Automation in Intellectual Property IndustrySagacious IP
 
Achieving the Autonomous Terminal
Achieving the Autonomous TerminalAchieving the Autonomous Terminal
Achieving the Autonomous TerminalYokogawa1
 
BPM, SOA and EA for e-government
BPM, SOA and EA for e-government BPM, SOA and EA for e-government
BPM, SOA and EA for e-government Alexander SAMARIN
 
Manage Crew Change Through Coupling of First Principles Simulation, Digital P...
Manage Crew Change Through Coupling of First Principles Simulation, Digital P...Manage Crew Change Through Coupling of First Principles Simulation, Digital P...
Manage Crew Change Through Coupling of First Principles Simulation, Digital P...Yokogawa1
 
Maintenance management and cmms software mobility work
Maintenance management and cmms software   mobility workMaintenance management and cmms software   mobility work
Maintenance management and cmms software mobility workmarc-antoine talva
 
Plotting the Path to Autonomous Operations
Plotting the Path to Autonomous OperationsPlotting the Path to Autonomous Operations
Plotting the Path to Autonomous OperationsYokogawa1
 
Pp presentation acct final project
Pp presentation acct final projectPp presentation acct final project
Pp presentation acct final projecttajakitten
 
Cuna mutual ins. fin controls case_study
Cuna mutual ins. fin controls case_studyCuna mutual ins. fin controls case_study
Cuna mutual ins. fin controls case_studyArvind Rajan
 
Xerox Value+ Summary
Xerox Value+ SummaryXerox Value+ Summary
Xerox Value+ SummaryRina Pattani
 
Contract Metadata Extraction with Artificial Intelligence (AI)
Contract Metadata Extraction with Artificial Intelligence (AI)Contract Metadata Extraction with Artificial Intelligence (AI)
Contract Metadata Extraction with Artificial Intelligence (AI)Aavenir
 
Clearpriority Operational Intelligence Platform
Clearpriority Operational Intelligence PlatformClearpriority Operational Intelligence Platform
Clearpriority Operational Intelligence PlatformClearpriority
 
Cards Center Project Approach May 24 2008
Cards Center Project Approach May 24 2008Cards Center Project Approach May 24 2008
Cards Center Project Approach May 24 2008Saeed A Siddiki
 
Business Architecture Patterns (BPM in Practice conference)
Business Architecture Patterns (BPM in Practice conference)Business Architecture Patterns (BPM in Practice conference)
Business Architecture Patterns (BPM in Practice conference)Alexander SAMARIN
 
Facility management: A process driven approach
Facility management: A process driven approachFacility management: A process driven approach
Facility management: A process driven approachStefan Hermes
 
1.Innova Zurich
1.Innova Zurich1.Innova Zurich
1.Innova ZurichErmando
 
Top Financial Use Cases for Intelligent Document Processing | Use Cases of ID...
Top Financial Use Cases for Intelligent Document Processing | Use Cases of ID...Top Financial Use Cases for Intelligent Document Processing | Use Cases of ID...
Top Financial Use Cases for Intelligent Document Processing | Use Cases of ID...Emagia
 

Was ist angesagt? (20)

Event Collection in the IBC: An Overview
Event Collection in the IBC: An OverviewEvent Collection in the IBC: An Overview
Event Collection in the IBC: An Overview
 
Mobile GIS - Enabling Field Workers and Managers
Mobile GIS - Enabling Field Workers and ManagersMobile GIS - Enabling Field Workers and Managers
Mobile GIS - Enabling Field Workers and Managers
 
Capitalizing on Productivity through integration
Capitalizing on Productivity through integrationCapitalizing on Productivity through integration
Capitalizing on Productivity through integration
 
IBM BIM and Maximo: Values for Owners and Operators
IBM BIM and Maximo: Values for Owners and OperatorsIBM BIM and Maximo: Values for Owners and Operators
IBM BIM and Maximo: Values for Owners and Operators
 
Evolution of IT, AI, and Automation in Intellectual Property Industry
Evolution of IT, AI, and Automation in Intellectual Property IndustryEvolution of IT, AI, and Automation in Intellectual Property Industry
Evolution of IT, AI, and Automation in Intellectual Property Industry
 
Achieving the Autonomous Terminal
Achieving the Autonomous TerminalAchieving the Autonomous Terminal
Achieving the Autonomous Terminal
 
BPM, SOA and EA for e-government
BPM, SOA and EA for e-government BPM, SOA and EA for e-government
BPM, SOA and EA for e-government
 
Manage Crew Change Through Coupling of First Principles Simulation, Digital P...
Manage Crew Change Through Coupling of First Principles Simulation, Digital P...Manage Crew Change Through Coupling of First Principles Simulation, Digital P...
Manage Crew Change Through Coupling of First Principles Simulation, Digital P...
 
Maintenance management and cmms software mobility work
Maintenance management and cmms software   mobility workMaintenance management and cmms software   mobility work
Maintenance management and cmms software mobility work
 
Plotting the Path to Autonomous Operations
Plotting the Path to Autonomous OperationsPlotting the Path to Autonomous Operations
Plotting the Path to Autonomous Operations
 
Pp presentation acct final project
Pp presentation acct final projectPp presentation acct final project
Pp presentation acct final project
 
Cuna mutual ins. fin controls case_study
Cuna mutual ins. fin controls case_studyCuna mutual ins. fin controls case_study
Cuna mutual ins. fin controls case_study
 
Xerox Value+ Summary
Xerox Value+ SummaryXerox Value+ Summary
Xerox Value+ Summary
 
Contract Metadata Extraction with Artificial Intelligence (AI)
Contract Metadata Extraction with Artificial Intelligence (AI)Contract Metadata Extraction with Artificial Intelligence (AI)
Contract Metadata Extraction with Artificial Intelligence (AI)
 
Clearpriority Operational Intelligence Platform
Clearpriority Operational Intelligence PlatformClearpriority Operational Intelligence Platform
Clearpriority Operational Intelligence Platform
 
Cards Center Project Approach May 24 2008
Cards Center Project Approach May 24 2008Cards Center Project Approach May 24 2008
Cards Center Project Approach May 24 2008
 
Business Architecture Patterns (BPM in Practice conference)
Business Architecture Patterns (BPM in Practice conference)Business Architecture Patterns (BPM in Practice conference)
Business Architecture Patterns (BPM in Practice conference)
 
Facility management: A process driven approach
Facility management: A process driven approachFacility management: A process driven approach
Facility management: A process driven approach
 
1.Innova Zurich
1.Innova Zurich1.Innova Zurich
1.Innova Zurich
 
Top Financial Use Cases for Intelligent Document Processing | Use Cases of ID...
Top Financial Use Cases for Intelligent Document Processing | Use Cases of ID...Top Financial Use Cases for Intelligent Document Processing | Use Cases of ID...
Top Financial Use Cases for Intelligent Document Processing | Use Cases of ID...
 

Ähnlich wie PWIMS - Integrated Works & Procurement Management Solution for Urban Local Bodies and Public Works Organizations

IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)jimmcdonaldpmp
 
04.integration management updated
04.integration management updated04.integration management updated
04.integration management updatedShraddha PMP
 
Pmbok 5th executing process group
Pmbok 5th executing process groupPmbok 5th executing process group
Pmbok 5th executing process groupHossam Maghrabi
 
8 Signs You’ve Outgrown Quickbooks!
8 Signs You’ve Outgrown Quickbooks!8 Signs You’ve Outgrown Quickbooks!
8 Signs You’ve Outgrown Quickbooks!Unanet
 
10 me667 chap2 project management
10 me667 chap2 project management10 me667 chap2 project management
10 me667 chap2 project managementPavan Kumar
 
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile Projects
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile ProjectsDOES14 - Pat Reed - Project Labor Cost Accounting for Agile Projects
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile ProjectsGene Kim
 
PMs Role supporting Cloud Acquisition and associated Challenges
PMs Role supporting Cloud Acquisition and associated ChallengesPMs Role supporting Cloud Acquisition and associated Challenges
PMs Role supporting Cloud Acquisition and associated ChallengesMichael Torres
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration managementIrefuser1
 
Presentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectPresentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectSharad Srivastava
 
Project portfolio management
Project portfolio managementProject portfolio management
Project portfolio managementGlen Alleman
 
Ellen DelGreco Resume 092016
Ellen DelGreco Resume 092016Ellen DelGreco Resume 092016
Ellen DelGreco Resume 092016Ellen DelGreco
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET Journal
 
Rick LaBerge Resume
Rick LaBerge ResumeRick LaBerge Resume
Rick LaBerge ResumeRick LaBerge
 
5 itil v3 service transition 5 v1.8
5 itil v3 service transition 5 v1.85 itil v3 service transition 5 v1.8
5 itil v3 service transition 5 v1.8Karthik Arumugham
 
CobiT, Val IT & Balanced Scorecards
CobiT, Val IT & Balanced ScorecardsCobiT, Val IT & Balanced Scorecards
CobiT, Val IT & Balanced ScorecardsMichael Sim
 
Unit 1 Due Date7122015Deliverable Length1–2 pages and projec.docx
Unit 1 Due Date7122015Deliverable Length1–2 pages and projec.docxUnit 1 Due Date7122015Deliverable Length1–2 pages and projec.docx
Unit 1 Due Date7122015Deliverable Length1–2 pages and projec.docxwillcoxjanay
 
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxVoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxjessiehampson
 

Ähnlich wie PWIMS - Integrated Works & Procurement Management Solution for Urban Local Bodies and Public Works Organizations (20)

IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)
 
04.integration management updated
04.integration management updated04.integration management updated
04.integration management updated
 
Kogent approach
Kogent approachKogent approach
Kogent approach
 
Pmbok 5th executing process group
Pmbok 5th executing process groupPmbok 5th executing process group
Pmbok 5th executing process group
 
8 Signs You’ve Outgrown Quickbooks!
8 Signs You’ve Outgrown Quickbooks!8 Signs You’ve Outgrown Quickbooks!
8 Signs You’ve Outgrown Quickbooks!
 
10 me667 chap2 project management
10 me667 chap2 project management10 me667 chap2 project management
10 me667 chap2 project management
 
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile Projects
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile ProjectsDOES14 - Pat Reed - Project Labor Cost Accounting for Agile Projects
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile Projects
 
PMs Role supporting Cloud Acquisition and associated Challenges
PMs Role supporting Cloud Acquisition and associated ChallengesPMs Role supporting Cloud Acquisition and associated Challenges
PMs Role supporting Cloud Acquisition and associated Challenges
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
 
Presentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectPresentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics Project
 
Ps business blueprint
Ps business blueprintPs business blueprint
Ps business blueprint
 
Project portfolio management
Project portfolio managementProject portfolio management
Project portfolio management
 
Ellen DelGreco Resume 092016
Ellen DelGreco Resume 092016Ellen DelGreco Resume 092016
Ellen DelGreco Resume 092016
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
 
Rick LaBerge Resume
Rick LaBerge ResumeRick LaBerge Resume
Rick LaBerge Resume
 
5 itil v3 service transition 5 v1.8
5 itil v3 service transition 5 v1.85 itil v3 service transition 5 v1.8
5 itil v3 service transition 5 v1.8
 
CobiT, Val IT & Balanced Scorecards
CobiT, Val IT & Balanced ScorecardsCobiT, Val IT & Balanced Scorecards
CobiT, Val IT & Balanced Scorecards
 
Unit 1 Due Date7122015Deliverable Length1–2 pages and projec.docx
Unit 1 Due Date7122015Deliverable Length1–2 pages and projec.docxUnit 1 Due Date7122015Deliverable Length1–2 pages and projec.docx
Unit 1 Due Date7122015Deliverable Length1–2 pages and projec.docx
 
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxVoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
 
MainManager Specifications
MainManager SpecificationsMainManager Specifications
MainManager Specifications
 

Kürzlich hochgeladen

2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...panagenda
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...AliaaTarek5
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 

Kürzlich hochgeladen (20)

2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 

PWIMS - Integrated Works & Procurement Management Solution for Urban Local Bodies and Public Works Organizations

  • 1. Integrated Works & Procurement Management Solution for Urban Local Bodies & Public Works Organizations Presentation and Discussion Document
  • 2. 2 Company Profile – SoftTech Best practice for building plan approval Ministry of Urban Development Manthan Award South Asia 2010 e-governance in “Digital inclusion for development” World leadership Award 2007 Civil & Architectural Engineering for Building Plan & Approval Good Governance Award 2010 National Technology Leadership e-Maharashtra 2012 Award Best Urban ICT Initiative Proven track record as Software Product Innovators in the AEC domain > 750 person years of development and implementation experience Successful track record with Government & Enterprise customers
  • 3. 3 Works Department - Key result areas Plan and build infrastructure assets Utilize allocated funds as per plans Comply with policies and procedures Procure and manage execution of works Maintain infrastructure assets
  • 4. 4 Urban Infrastructure organizations must deliver sustainable performance by… …increasing the value they generate by planning, procuring and maintaining infrastructure assets Pull and interpret data across departments and applications Enable cross department collaboration Gain insights from analytics across work domains Leveraging information to make better decisions Coordinating resources to operate effectively Anticipating problems to resolve them proactively
  • 5. 5 Public Works Process Framework Plan Budget Prepare Estimate Manage Work Orders Manage Tenders Manage Billing Manage Projects Manage Finance & Compliance Maintain Assets Manage HR & Administration Manage External Communication Core Processes Support Processes Manage Approvals PLAN APPROVE PROCURE MONITOR MAINTAIN
  • 6. 6 Issues and Challenges –Budgeting and Estimation Plan Budget 1. Manual preparation of budget estimates 2. Consolidation of budget requirements from different offices is time consuming with chances of omission 3. Low accuracy of budgeted amount in the absence of detailed estimate 4. Little or no automation of business rules and workflows which lead to bottlenecks in approval stages Prepare Estimate 1. Tracking of DSR item rates in estimates with approved DSR rates is challenging in manual Process 2. Availability of latest SORs and updated circulars may not be available to all offices resulting into rework and delays 3. Rate Analysis of Non DSR items may not be available across the organization hence duplication of efforts and non uniformity
  • 7. 7 Issues and Challenges –Tendering and Work Orders Manage Tenders 1. Manual Preparation of DTP is a time consuming process 2. Maintaining consistency of data in tender documents is tedious in case of revisions 3. Lack of transparency, visibility and traceability of tenders 4. Inadequate capture and qualification of contractor data 5. Subjectivity in bid comparison and evaluation of tenders Manage Work Orders 1. Lack of standard formats and check list of Work order and agreements 2. Little or no traceability of terms and conditions specified in work order and agreement.
  • 8. 8 Issues and Challenges –Projects and Billing Manage Projects 1. Lack of visibility of physical and financial status of the project across levels 2. Preparation of data for meetings with higher officials time consuming. 3. At times there are no ways to verify the authenticity of data 4. Engineers lose many hours in data preparation hence very little time is left with them for quality control at site Manage Billing  Preparation of Abstracts from MBs manually are error prone and time consuming  Difficult to handle Part and Reduced rates in manual process. Chances of omissions are high.  Difficult to track and recover advances and reconcile material advances  Inadequate checks of terms and conditions in Work order and agreements while preparing bills  Management of security and other deposits is difficult  Escalation statements preparation is tedious and time consuming
  • 9. 9 Issues and Challenges –Asset Maintenance & Management Manage Assets  In the absence of a systematic inventory of Roads, Buildings and Bridge cards difficult to plan periodic and preventive maintenance schedules  No visibility and analytics on maintenance schedules and cycle  No analysis on up gradation v/s maintenance cost to arrive at objective decision  Complaints Redressal System is ineffective in the absence of proper asset controls
  • 10. 10 1 The need for Works Departments - An integrated application • Integrates all functional areas of Works Management • Leverages “trusted” data • Maps the business rules and workflows to roles and processes • Provides strategic and operational intelligence • Ensures compliance • Ensures traceability • Aligns “physical” and “financial” progress of projects
  • 11. 11 PWIMS – The trusted solution for Works organizations 11 MIS & Analytics Standard Reports Custom Reports Dashboards Scorecards Core Modules Pre Tendering HR & Establishment Management Asset Maintenance & Management Finance & Accounts Management Budget & Estimate Management Content & Document Management Tendering Post Tendering Support Modules
  • 12. 12 Budget & Estimate Management 1  Schedule of Rates Maintains a library of scheduled items along with their description and rate. Items can be further classified into works and heads. Additionally items can be further broken into sub items upto any level.  Rate Analysis Facilitates analysis of rates of an item based on the coefficient of units consumed by unit quantity of an item.  Preliminary Estimate Facilitates high level estimates of a targeted works used primarily for budgeting purpose  Budgeting Enables preparation of yearly and supplementary budgets considering major, minor, sub-minor budget heads and schemes
  • 13. 13 Estate Management 1  Estate management module provides in depth features that includes different sub modules like Housing, Recovery and Lease System & Rental Properties.  The Estate Management module also has an Advertisement sub- module that will facilitate authorized users to publish the available properties for lease/rent. The Advertising module includes functions such as Ad Creation, Search for the relevant property, Query section, Arrears Register and publishing advertisement etc.  The Scheme Information Management module under the PWIMS provides in depth features of Scheme management that includes all requirements like master creation of scheme, adding additional projects in a Scheme, Management of existing scheme etc.
  • 14. 14 Estate Management : Housing Project Unit Master: Process to define the project Unit master
  • 15. 15 Estate Management : Rent & Lease Property Advertisement: Process to Advertisement of properties.
  • 16. 16 Estate Management : Recovery Reports showing Recovery Details
  • 17. 17 Estate Management : Scheme Information Scheme Master :Process to define the Scheme master
  • 18. 18 Works Management: Pre-Tendering 1  Proposal Approval Maps the proposal initiation to approval process  Administrative Approval Maps administrative process resulting in financial approval  Technical Sanction Maps the proposal initiation process and workflow through to their approval  Detailed Estimate Facilitates detailed estimates of a targeted works using DSR and Non DSR items. Detailed measurements can also be done along with estimates  Preparation of DTP Facilitates preparation of draft tender papers with standard and specific terms of reference with associated workflow for the approval of the DTP
  • 19. 19 Administrative Approval (AA) 1 Administrative Approval is a process to get the financial sanction that begins with the creation of work. Work area for creating a Docket for the Administrative Approval which captures various information required for the Administrative Approval. Set of Documents required for the Administrative Approval. Capture various attributes related to the work.
  • 20. 20 Cost Estimate for Administrative Approval 2 Cost Estimation process which allows the user to arrive at a cost, breaking the work into any number of sub estimates. Items can be added from various sources. like Schedule of Rates (Rates entered into Masters), Block Rates (divided by zones / blocks), Non SOR Item Library(not a part of the Schedule of Rates), From Template (from one of the estimates created earlier, direct addition of items which will become the part of Master data etc. Various Options for adding the items for an Estimate.
  • 21. 21 Schedule of Rates (SOR) 2 The items for creating an Estimate for an Administrative Approval can be added from Schedule of Rates. The items are divided into various categories called chapters. Various Chapters are defined inside Schedule of Rates. Edit the details
  • 22. 22 Rate Analysis (Configuring Resources and Overheads) 2 You can add resources, provide coefficients, add the overheads and complete the Rate Analysis of an item. You can also copy the Rate analysis from an existing item. Resources are added from Masters Overheads for the selected item can be configured. Completed Rate is calculated.
  • 23. 23 Creation of Administrative Approval Document 2 A Detailed Project Report can be generated out of the selected documents stitched together that will be reviewed by the Approval Authority. Selection of Documents for the work from Masters. Creation of a single docket from the selected documents for Administrative Approval
  • 24. 24 Administrative Approval Work Flow 2 The Administrative Approval Dockets then flow through various authorities who are configured in the Administration module based on Nature of work, subtype of work and the financial powers. The Administrative Approval Documents will flow among authorities for Approval. List of the documents that will flow for Approval.
  • 25. 25 Technical Sanction (TS) Process 2 Having got the Administrative Approval done, let see how the dockets for Technical Sanction are prepared. List of Technical Sanction Dockets – Detailed Estimate (One of the Important Documents) The Technical Sanction Documents will flow among authorities for Approval.
  • 26. 26 Creation of Detailed Estimate for Technical Sanction 2 The detailed estimate can be prepared the same way as we did for Administrative Approval. The work abstract, measurement sheets, item wise cost break up reports can be generated. The estimate prepared at the time of Administrative Approval can be imported directly. Various Reports like work abstract, measurement sheets, item wise cost break up can be generated.
  • 27. 27 Creation of Draft Tender Papers (DTP) 2 We will now proceed for the procurement of works through the Tender Process. Tender Process includes Creation of Draft Tender Papers and Notice Inviting Tenders. The important dates associated with the Tender Process are captured. No. of envelops required to be submitted in a bid like Pre qualification forms, Technical forms and Commercial details.
  • 28. 28 Works Management: Tendering  Registration of contractors Captures information on Contractors, maintains the rates of the Contractors in the past, Bill of Materials, Current schedule of rates (CSR) items, rate, specifications etc.  Tendering (e-Tendering & offline Tendering) Facilitates publishing e-tenders with external interfaces, acceptance of tender online and offline along with tender price, EMD through ECS and link the same in compliance with CVC norms. Generate press ads. Facilitates preparation of evaluation statements (comparative statement) and parametric analysis based on possible quantity variation. 2
  • 29. 29 Fees & Deposits 2 System has provision to define fees, deposits, Payment terms & Conditions and most importantly Earnest Money Deposit and Security Deposit for the tender. Earnest Money Deposit can be decided. Security Deposit can be decided.
  • 30. 30 DTP Approval Process 3 The complete set of Draft Tender Papers then flows through various authorities which are configured in the Administration module based on Nature of work, subtype of work and the financial powers allocated to that Authority. Set of documents for the DTP approval. Draft Tender Papers Approval Process.
  • 31. 31 Notice Creation 3 Tender Notice is gets created from the information that we have captured for Draft Tender Papers. Finalize the dates before Notice is published. The notice is generated from the system. Approval Flow of the notice before it is being published.
  • 32. 32 Corrigendum 3 Once the Notice is published, if any changes are to be made in the dates, clauses, documents or Schedule B, a corrigendum can be issued. Dates, clauses, documents or Schedule B can be changed. Approval Flow of the corrigendum as defined in the system.
  • 33. 33 Tender Submission – PQ Forms and Technical Bid 3 After having the Tender Published, it will be available for the response from the bidders using the submission interface of the system. Earnest Money Deposit details. Bidder’s Response against forms enclosed in envelops. Tender Fees submission.
  • 34. 34 Tender Submission – Online Interface 3 Tender Submission has the options, eTendering and Offline Tendering. Registered Bidders will login to the system using the Authorized Digital Certificates.
  • 35. 35 Tender Submission – Online Bidding 3 View Notice Details Download Tender Document View Corrigendum Ask Queries Respond to Bids, Fill PQ Forms, Technical Forms and Commercial Bids online. Submission of bids Online Tender Submission allows Anytime & Anywhere Bidding. It provides various features.
  • 36. 36 Tender Submission – Commercial Bid 3 Commercial / Financial Bid can be submitted by the Bidder. Since the Tender is Percent Type, the bidder can quote above, below or at par. Bidder’s Response for Percent Rate Tender . List of Items in the Bill of Quantities.
  • 37. 37 Tender Opening 3 Having received the bids from various bidders, let’s open the Tender. Tender Committee Approval is completed. Approval or Rejection of Bidders is completed after evaluation. Comparative Reports are provided for evaluation. . L1 is decided based on the commercial envelop. Envelops are opened in a sequence based on the evaluation criteria.
  • 38. 38 Works Management: Post-tendering 3  Contract management Library of standard templates and clauses for contracts which can be customized and configured to suit individual PWD needs e.g. Acceptance Letter, Work Order & Agreement Paper etc.  Project Monitoring Facilitates monitoring of project progress across offices  Quality Control Quality control templates are maintained in the system with dynamic configurable attributes. These are associated to the project monitoring and billing process.  Measurement Book System Captures Measurement Books (MBs) electronically which is associated to Tender BOQ  RA bills and Final Bills Facilitates reconciliation of Bills vis-a vis measurement books and any material recovery, advances given
  • 39. 39 Tender Acceptance 3 Having identified the winning bidder, PWIMS initiates the Tender Acceptance process. Acceptance Letter to the Contractor. Approval Flow for the Tender Acceptance.
  • 40. 40 Work Order Issuance 4 Upon Acceptance of the bidder and on submission of the Performance Security Deposit, agreement is done and work order is issued. Work Order is given to the Contractor. Approval Flow for the Work Order.
  • 41. 41 Project Management – Milestones for a work 4 After having finalized the agency and issuing the Work Order, the agency is given milestones to be completed during the entire work execution cycle which can included as a part of Work Order and can be tracked through the Project Management Module of PWIMS. Milestones for the Agency to complete the work.
  • 42. 42 Project Management – Milestones for a work 4 Let us define the activities to achieve the milestones under Project Scheduling Define Milestones Define Activities for each Milestone Define Duration for activities Define Weightages Track the Work Progress
  • 43. 43 Project Management – Activity(Item wise Planning) 4 For each Activity you can select one or multiple items from the BOQ associated with the Activity. Select Items for the activity Plan how you are executing item wise quantities on the monthly basis.
  • 44. 44 Billing Management : Measurements 4 Based on the Milestones defined in the agreement, the agency gets paid for the work completed. This is taken care by the Billing Management Module of PWIMS. Record Entry details Select Items for the Record Entry Record the Measurements Measurement details
  • 45. 45 Billing Management (Item Categorization) 4 Let us categorize the items as BOQ, Extra, Deviated and Not measured Items. Variation Items: Items whose quantity has variation from BOQ Quantity Items whose measurements are not taken Extra Item: Items which are executed but not a part of BOQ Deviated Item: Items whose specification has changed from BOQ You can also define the Part Rates for an Item
  • 46. 46 Billing Management – Detailing of Bills 4 Having approved the measurements let us create running bills. Reimbursements which are not a part of the contract but expenditure is made by contractor Add the advance paid to the contractor against material at site. Appropriate Taxes to be charged in the running bill amount. Apply the recoveries to be made from the contractor
  • 47. 47 Billing Management – Reports 4 All the relevant reports related to Billing are made readily available. List of Billing Reports
  • 48. 48 Asset Inventory & Maintenance  Helps maintain inventory of assets (roads, buildings, bridges etc.) along with asset details and condition data.  Helps schedule maintenance - both scheduled and unscheduled with systemic alerts  Helps prepare prioritized work schedules  Generates required reports 4
  • 49. 49 Asset Management (Roads, Bridges & Buildings) Confidential - SoftTech Engineers Pvt. Ltd. 4 As the work gets completed, it becomes an asset for the organization. The asset inventory helps in creation of maintenance and inspection plans for the assets. Categorization of Roads Inventory of Roads Attributes are identified for the management of Assets Further Attributes like Carriage Way, Bridges on the Road, Footpaths, Drainage are captured. GPS Details are captured. Information required for Maintenance Plan is also captured. Bridge Card provides the information of the Bridge inventory. Important attributes related to the Bridges is captured. History of Previous work can be recorded. Inspections can be carried out for the Assets Inspections details can be recorded. History of Inspections is maintained in PWIMS. Maintenance Plans can be created for the assets. Maintenance and Inspection reports can be generated.
  • 50. 50 Finance & Accounts Management 5  Maintenance of statutory registers Maintains all statutory reports viz. FORM-80, FORM-5,FORM-46 A, FORM-74,FORM-64,FORM-61,FORM-79 etc.  Grants Management Maintains hierarchy of budget heads  Cash book & Bank Book Maintains monthly, quarterly and yearly book of accounts in prescribed formats for cash and bank transactions  Expenditure Monitoring Keeps reports related to grants received vis-à-vis expenditures made
  • 51. 51 HR & Establishment Management Confidential - SoftTech Engineers Pvt. Ltd. 5  Personnel Information Maintains the Service Books and other personnel related information  Office Asset Information Maintains inventory of office assets like furniture, offices, equipment  Court Case Monitoring Helps track Court cases across divisions, circles and zones  Response to Queries (Assembly, CMO, Cabinet etc.) Provides a repository of responses to queries by category with links to relevant documentation
  • 52. 52 Management Information & Analytics Confidential - SoftTech Engineers Pvt. Ltd. 5  Provides industry standard reporting functionalities related to monitoring physical and financial progress of works as well as other administrative dimensions • Dashboards, • Scorecards • Static reports  Drill down to any level  Extensive visual representation  Granular permission for viewing reports across authorities
  • 54. 54 Content & Document Management Confidential - SoftTech Engineers Pvt. Ltd. 5  Best in class Content Management functionality that is secure and scalable  Provides multiple level security and permissions  Provides granular versioning of content  Provides multiple level Search including wild card  Check-in / Check-out  Handles multiple types of content
  • 55. 55 High level application architecture Public Works Employees Public Works Leadership Subcontractors CitizensCustomers Government
  • 56. 56 Key Customers Confidential - SoftTech Engineers Pvt. Ltd. 5
  • 57. 57 Customer Speak Mr. Lianchungnunga Engineer in Chief PWD, Mizoram “ Public Works Department, Mizoram is the first amongst the North Eastern States to have computerized its works and procurement management processes. We found a trusted partner in SoftTech who worked with us from the inception to computerize every aspect including our schedule of rates, estimation, budgeting and more. As we work with them we realize that we made the right choice because they bring in not only technology but significant domain experience, implementation skills and the commitment to make things happen ” “ For a relatively young state, PWD Uttarakhand has taken some giant strides in setting up state of the art processes and infrastructure that would help govern its urban infrastructure. One of the major initiatives was the computerization of its operations and we found a worthy partner in SoftTech. SoftTech's PWIMS has helped us to automate our entire planning, budgeting, procurement and billing processes and we have gained significant benefits from this initiative. SoftTech with its deep domain and technology expertise partnered with us to help us reduce our cycle times and costs in several areas” Lalit Mohan Chief Engineer: PWD Uttarakhand
  • 58. 58 Summary of Key Benefits 1. Aligns roles to workflows and processes 2. Shifts emphasis from tasks to outcomes 3. Integrates all functions across the organization Improved Productivity Reduces Workload 1. Automates standard processes – significantly reduces paper based manual work 2. Generates and tracks documentation throughout the life cycle 3. Leverages single source of data
  • 59. 59 Summary of Key Benefits 1. Consolidates information generated at various 2. Provides operational business intelligence and management information through dashboards. Increased Visibility Increased Compliance & Accountability 1. Automates approvals by designated authorities and 2. Maintains an audit trail of all changes. 3. Enforces standardization through templates and promotes best practices
  • 60. 60 Thank You SoftTech Engineers Pvt. Limited The Pentagon, 5A Shahu College Road Pune : 411009 Ph: +91-20-24217676 www.softTech-engr.com