Diploma Project Management
       Captain Cook College
                Sharon Boyle
   Activity 1 & 2
   Discuss results for Activity 1 & 2
   Written & Oral sections
   Discussed outstanding assessments
   Discussed & began Communications
    Assessment Item due 19 October
   Complete outstanding assessments   ?
 All seems Ok – keep up good work
 Just read the question carefully
   1. Determine project risks
   2. Monitor and control project risks
   3. Assess risk management outcomes
   Identify, document and analyse risks, in consultation
    with stakeholders and higher project authority
   Use established risk management techniques &
    tools, within delegated authority, to
    ◦ analyse risks,
    ◦ assess options
    ◦ recommend preferred risk approaches
   Develop risk management plans, secure agreement of
    stakeholders and communicate plans
   Establish designated risk management processes
    and procedures
   personal experience
   subject matter experts
   conducting or supervising qualitative and/or
    quantitative
   risk analysis,
    ◦   schedule simulation – using multiple Gantt charts
    ◦   decision analysis
    ◦   contingency planning – what if?
    ◦   alternative strategy development – what if?
    ◦   using specialist risk analysis tools
   What are they?
    ◦ – think what might happen
   For each risk - How likely is it to happen?
    ◦ Hit by meteor
    ◦ Vs
    ◦ getting sleepy tonight
   What are the consequences of this thing
    happening?
    ◦ Hit by meteor – possibly end of world as we know it
    ◦ Vs
    ◦ Getting a good night’s sleep
   Hit by Meteor
    ◦ Likelihood – extremely low
    ◦ Consequence – Catastrophic – end of world


   Getting sleepy tonight
    ◦ Likelihood – extremely high
    ◦ Consequence – Insignificant

   Risk assessment is a way of sorting and
    prioritizing risks or events or hazards
Risk Assessment
            1. Determining the Level of Risk
 This worksheet can be used to identify the level of risk and help to prioritize any interventions or control measures.

Consider the consequences and likelihood for each of the identified risks and use the matrix* below to establish a risk level.

                                  NB: This workbook will record the quality of your planning process - it will not ensure it.
                                                                       Consequence Criteria
                                               The "area of consideration" example used below is injury to people.
                                          You should copy this template and adjust these criteria for each "thing you value".
                           1–                      2–                     3–                        4 – Major                        5–
                       Insignifica                Minor                 Moderate                                                 Catastrophic
                           nt
                       Dealt with by              Medical                Significant                 Extensive                  Death. Permanent
                       in-house first               help                     non-                permanent injury               disabling injury (eg
                          aid, etc                needed.               permanent               (eg loss of finger/s)            blindness, loss of
                                                 Treatment             injury.Overni                 Extended                         hand/s,
                                                 by medical                   ght                 hospitalisation                   quadriplegia)
                                                 profession            hospitalisatio
                                                 al/hospital            n (inpatient)
                                                 outpatient,
                                                     etc




 Almost
certain to
 occur in               Medium
                                                 High (H)                High (H)               Very High (VH)                  Very High (VH)
   most                  (M)
circumst
  ances



Likely to
  occur                 Medium                   Medium
                                                                         High (H)                   High (H)                    Very High (VH)
frequentl                (M)                      (M)
    y



Possible
and likely
                                                 Medium
 to occur                Low (L)                                         High (H)                   High (H)                        High (H)
                                                  (M)
 at some
   time




Unlikely
to occur                                                                 Medium
                         Low (L)                  Low (L)                                         Medium (M)                        High (H)
but could                                                                 (M)
 happen




   May
occur but
 only in
rare and                                                                 Medium
                         Low (L)                  Low (L)                                         Medium (M)                        High (H)
exceptio                                                                  (M)
   nal
circumst
 ances
Risk Assessment
            1. Determining the Level of Risk
 This worksheet can be used to identify the level of risk and help to prioritize any interventions or control measures.

Consider the consequences and likelihood for each of the identified risks and use the matrix* below to establish a risk level.

                                  NB: This workbook will record the quality of your planning process - it will not ensure it.
                                                                       Consequence Criteria
                                               The "area of consideration" example used below is injury to people.
                                          You should copy this template and adjust these criteria for each "thing you value".
                           1–                      2–                     3–                        4 – Major                        5–
                       Insignifica                Minor                 Moderate                                                 Catastrophic
                           nt
                       Dealt with by              Medical                Significant                 Extensive                  Death. Permanent
                       in-house first               help                     non-                permanent injury               disabling injury (eg
                          aid, etc                needed.               permanent               (eg loss of finger/s)            blindness, loss of
                                                 Treatment             injury.Overni                 Extended                         hand/s,
                                                 by medical                   ght                 hospitalisation                   quadriplegia)
                                                 profession            hospitalisatio
                                                 al/hospital            n (inpatient)
                                                 outpatient,
                                                     etc




 Almost
certain to   Getting
             sleepy
 occur in               Medium
                                                 High (H)                High (H)               Very High (VH)                  Very High (VH)
   most                  (M)
circumst
  ances



Likely to
  occur                 Medium                   Medium
                                                                         High (H)                   High (H)                    Very High (VH)
frequentl                (M)                      (M)
    y



Possible
and likely
                                                 Medium
 to occur                Low (L)                                         High (H)                   High (H)                        High (H)
                                                  (M)
 at some
   time




Unlikely
to occur                                                                 Medium
                         Low (L)                  Low (L)                                         Medium (M)                        High (H)
but could                                                                 (M)
 happen




   May
occur but

                                                                                                                        Meteor
 only in
rare and                                                                 Medium
                         Low (L)                  Low (L)                                         Medium (M)                        High (H)
exceptio                                                                  (M)
   nal
circumst
 ances
1. Project Risk Register


             Reference - Issue No. : and/or                                           Issue Date:                                                                                                      Future Review date:



               Identified                                                                                                                             Existing controls described &
                 Risks                                                   Analysis & Evaluation                                                                  evaluated                                                Further Actions
                                                                                                                                                                           Effe
                                                                                                                                                                           ctiv
                                                                                                                                                                           ene                                              Further
             Risk
                                                                                                                                                                           ss




                                                       Consequence




                                                                                                                                  Risk level
                                                                                                   Likelihood
             Statement                                                                                                                                                                                                 Action Needed




                                                                                                                                                                                                                                                       Revised Risk level
                                                                                                                                                                           of




                                                                                                                                                                                   Accept Risk (Yes or No)
             (e.g.                                                                                                                                                         our                                                 &
             description of                                                                                                                                                stra                                         Opportunities




                                                                                                                                                                                                                                         Assigned To
             each specific                                                                                                                                                 tegi
                                                                                                                                                                           es
                                                                                                                                                                                                                              for




                                                                                                                                                                                                                                                                 M, H or VH - see Sheet 1)
             risk scenario                                                                                                                           What we               (                                           improvement -
             with regard to


                                                                             or E - see Sheet 1)
                                                                                                                                                    are doing                                                              Include
                                    5 - see Sheet 1)




                                                                                                                 - see Sheet 1)
             people,                                                                                                                                 now to
             information,                                                                                                                                                                                              milestone(s) &
                                                                                                                                                   manage this
             physical                                                                                                                                                                                                   target date(s)
                                                                                                                                                       risk.
             assets,
             finances,
             reputation,                                                                                                                                                                                     No

                                                                                                                                  (L, M, H or VH
             and any other                                                                                                                                                                                              Opportunities
                                                       (1, 2, 3, 4, or




             "things you
                                                                                                   (A, B, C, D




                                                                                                                                                                                                                             for
             value")
                                                                                                                                                                                                                        improvement




                                                                                                                                                                                                                                                                          (L,
             Record by rows                                                                                                                   VH                                                             No                                                                              V
             and cells as
             necessary.                                                                                                                                                                                                                                                                      H
                                                                                                                                              VH                                                             No                                                                              V
                                                                                                                                                                                                                                                                                             H


Note re effectiveness
N = Not generally applied or only applied in isolated situations for example in less than 20% of cases;
P = Partially applied, not usually documented or applied in less than 50% of cases;
L = Largely applied, formally documented and largely repeatable or applied in up to 85% of cases;
F = Fully applied, formally documented and fully repeatable or applied in more than 85% of cases.)


 Signed:                                                                                                                                                         Signed:


 Date:                                                                                                                                                           Date:
 Project Manager                                                                                                                                                 Project Manager
 Name:                                                                                                                                                           Name:
   Doggy day out
   Draft up a risk management plan
    ◦   the what
    ◦   the how
    ◦   Who we report to
    ◦   How we track
   Scope some risks
   Assess the risks
   Think up some strategies for the high risk
                             See hand out & LMS
   Please fill in and submit
   Talk it over and let’s discuss
   Lunch
   communication with stakeholders, dispute
    resolution & modification procedures
   implementation of risk control trigger mechanisms
   measurement of actual progress against planned
    milestones –
    ◦ remember our baselines (or starting point)?
   recording and reporting of major variance
    ◦ how far are we from the baseline?
   setting key milestones
    ◦ If we have reached this milestone how are our risks?
   Remember you have one in front of you…
   Manage using established project & risk
    management plans to ensure achievement of
    objectives
   Monitor progress against project plans to
    ◦ identify variances
    ◦ recommend responses
   Implement agreed
    ◦ risk responses
    ◦ modify plans to reflect changing
   Review project outcomes to determine
    effectiveness of risk management processes
    and procedures
   Identify & document
    ◦ risk issues and
    ◦ recommend improvements
    ◦ pass on to higher project authority for application
      in future projects
   Powerpoint pres.
    ◦ Last week’s progress & Some feedback re LMS quizzes
    ◦ Introduction to Risk Management & PM
   Determine project risks
   Monitor and control project risks

Morning Tea
Discussion 1. – Great Taste of Manly
    ◦ Structuring a Risk management plan
    ◦ Scoping risks
    ◦ Risk assessment – due 12 October
   Lunch
    ◦ Fred’s Shed RMP – due 2 November
    ◦ Start LMS Activities 1, 2 & 3 only
    ◦ Complete assessment items – do what you haven’t yet finished
   Risk & other components of PMP
   Quality, Scope, Cost, Schedule
   Morning Tea
   Risk Management Plan for Fred’s shed
   Lunch
   Continue Risk Management Plan
   Or
   Activities 1,2 & 3.
   Brainstorming – you are the experts on Fred’s
    Shed

Weitere ähnliche Inhalte

Mehr von Skript

Hr unit 2
Hr unit 2Hr unit 2
Hr unit 2
Skript
 
Time unit 2012 nov part 2.
Time unit 2012 nov part 2.Time unit 2012 nov part 2.
Time unit 2012 nov part 2.
Skript
 
Time unit 2012 nov 12 part 1
Time unit 2012 nov 12   part 1 Time unit 2012 nov 12   part 1
Time unit 2012 nov 12 part 1
Skript
 
Quality unit 2012
Quality unit 2012 Quality unit 2012
Quality unit 2012
Skript
 
Table of contents_1_without_questions
Table of contents_1_without_questionsTable of contents_1_without_questions
Table of contents_1_without_questions
Skript
 
Templates without questions
Templates without questionsTemplates without questions
Templates without questions
Skript
 
Table of contents_3_without_questions
Table of contents_3_without_questionsTable of contents_3_without_questions
Table of contents_3_without_questions
Skript
 
Table of contents_2_without_questions
Table of contents_2_without_questionsTable of contents_2_without_questions
Table of contents_2_without_questions
Skript
 
Mail merge 2_without_questions
Mail merge 2_without_questionsMail merge 2_without_questions
Mail merge 2_without_questions
Skript
 
Mail merge 1_without_questions
Mail merge 1_without_questionsMail merge 1_without_questions
Mail merge 1_without_questions
Skript
 
Headers footers without_questions
Headers footers without_questionsHeaders footers without_questions
Headers footers without_questions
Skript
 
Headers footers document_selection_without_questions
Headers footers document_selection_without_questionsHeaders footers document_selection_without_questions
Headers footers document_selection_without_questions
Skript
 
Bullets numbering lists_without_questions
Bullets numbering lists_without_questionsBullets numbering lists_without_questions
Bullets numbering lists_without_questions
Skript
 
Backgrounds borders effects_without_questions
Backgrounds borders effects_without_questionsBackgrounds borders effects_without_questions
Backgrounds borders effects_without_questions
Skript
 
Bsbled401 a develop_teams_and_individuals_sah 2012
Bsbled401 a develop_teams_and_individuals_sah 2012Bsbled401 a develop_teams_and_individuals_sah 2012
Bsbled401 a develop_teams_and_individuals_sah 2012
Skript
 
Scope part 2 day 1
Scope part 2 day 1 Scope part 2 day 1
Scope part 2 day 1
Skript
 
Cert iv time unit 1
Cert iv  time unit 1Cert iv  time unit 1
Cert iv time unit 1
Skript
 
Cert iv time unit 1 lms
Cert iv  time unit 1 lmsCert iv  time unit 1 lms
Cert iv time unit 1 lms
Skript
 
Cert iv time unit 2 assessments gantt charts 13 nov
Cert iv  time unit 2 assessments  gantt charts 13 novCert iv  time unit 2 assessments  gantt charts 13 nov
Cert iv time unit 2 assessments gantt charts 13 nov
Skript
 
Cert iv cost part 2
Cert iv  cost part 2Cert iv  cost part 2
Cert iv cost part 2
Skript
 

Mehr von Skript (20)

Hr unit 2
Hr unit 2Hr unit 2
Hr unit 2
 
Time unit 2012 nov part 2.
Time unit 2012 nov part 2.Time unit 2012 nov part 2.
Time unit 2012 nov part 2.
 
Time unit 2012 nov 12 part 1
Time unit 2012 nov 12   part 1 Time unit 2012 nov 12   part 1
Time unit 2012 nov 12 part 1
 
Quality unit 2012
Quality unit 2012 Quality unit 2012
Quality unit 2012
 
Table of contents_1_without_questions
Table of contents_1_without_questionsTable of contents_1_without_questions
Table of contents_1_without_questions
 
Templates without questions
Templates without questionsTemplates without questions
Templates without questions
 
Table of contents_3_without_questions
Table of contents_3_without_questionsTable of contents_3_without_questions
Table of contents_3_without_questions
 
Table of contents_2_without_questions
Table of contents_2_without_questionsTable of contents_2_without_questions
Table of contents_2_without_questions
 
Mail merge 2_without_questions
Mail merge 2_without_questionsMail merge 2_without_questions
Mail merge 2_without_questions
 
Mail merge 1_without_questions
Mail merge 1_without_questionsMail merge 1_without_questions
Mail merge 1_without_questions
 
Headers footers without_questions
Headers footers without_questionsHeaders footers without_questions
Headers footers without_questions
 
Headers footers document_selection_without_questions
Headers footers document_selection_without_questionsHeaders footers document_selection_without_questions
Headers footers document_selection_without_questions
 
Bullets numbering lists_without_questions
Bullets numbering lists_without_questionsBullets numbering lists_without_questions
Bullets numbering lists_without_questions
 
Backgrounds borders effects_without_questions
Backgrounds borders effects_without_questionsBackgrounds borders effects_without_questions
Backgrounds borders effects_without_questions
 
Bsbled401 a develop_teams_and_individuals_sah 2012
Bsbled401 a develop_teams_and_individuals_sah 2012Bsbled401 a develop_teams_and_individuals_sah 2012
Bsbled401 a develop_teams_and_individuals_sah 2012
 
Scope part 2 day 1
Scope part 2 day 1 Scope part 2 day 1
Scope part 2 day 1
 
Cert iv time unit 1
Cert iv  time unit 1Cert iv  time unit 1
Cert iv time unit 1
 
Cert iv time unit 1 lms
Cert iv  time unit 1 lmsCert iv  time unit 1 lms
Cert iv time unit 1 lms
 
Cert iv time unit 2 assessments gantt charts 13 nov
Cert iv  time unit 2 assessments  gantt charts 13 novCert iv  time unit 2 assessments  gantt charts 13 nov
Cert iv time unit 2 assessments gantt charts 13 nov
 
Cert iv cost part 2
Cert iv  cost part 2Cert iv  cost part 2
Cert iv cost part 2
 

Risk management

  • 1. Diploma Project Management Captain Cook College Sharon Boyle
  • 2. Activity 1 & 2  Discuss results for Activity 1 & 2  Written & Oral sections  Discussed outstanding assessments  Discussed & began Communications Assessment Item due 19 October  Complete outstanding assessments ?
  • 3.  All seems Ok – keep up good work  Just read the question carefully
  • 4. 1. Determine project risks  2. Monitor and control project risks  3. Assess risk management outcomes
  • 5. Identify, document and analyse risks, in consultation with stakeholders and higher project authority  Use established risk management techniques & tools, within delegated authority, to ◦ analyse risks, ◦ assess options ◦ recommend preferred risk approaches  Develop risk management plans, secure agreement of stakeholders and communicate plans  Establish designated risk management processes and procedures
  • 6. personal experience  subject matter experts  conducting or supervising qualitative and/or quantitative  risk analysis, ◦ schedule simulation – using multiple Gantt charts ◦ decision analysis ◦ contingency planning – what if? ◦ alternative strategy development – what if? ◦ using specialist risk analysis tools
  • 7. What are they? ◦ – think what might happen  For each risk - How likely is it to happen? ◦ Hit by meteor ◦ Vs ◦ getting sleepy tonight  What are the consequences of this thing happening? ◦ Hit by meteor – possibly end of world as we know it ◦ Vs ◦ Getting a good night’s sleep
  • 8. Hit by Meteor ◦ Likelihood – extremely low ◦ Consequence – Catastrophic – end of world  Getting sleepy tonight ◦ Likelihood – extremely high ◦ Consequence – Insignificant  Risk assessment is a way of sorting and prioritizing risks or events or hazards
  • 9. Risk Assessment 1. Determining the Level of Risk This worksheet can be used to identify the level of risk and help to prioritize any interventions or control measures. Consider the consequences and likelihood for each of the identified risks and use the matrix* below to establish a risk level. NB: This workbook will record the quality of your planning process - it will not ensure it. Consequence Criteria The "area of consideration" example used below is injury to people. You should copy this template and adjust these criteria for each "thing you value". 1– 2– 3– 4 – Major 5– Insignifica Minor Moderate Catastrophic nt Dealt with by Medical Significant Extensive Death. Permanent in-house first help non- permanent injury disabling injury (eg aid, etc needed. permanent (eg loss of finger/s) blindness, loss of Treatment injury.Overni Extended hand/s, by medical ght hospitalisation quadriplegia) profession hospitalisatio al/hospital n (inpatient) outpatient, etc Almost certain to occur in Medium High (H) High (H) Very High (VH) Very High (VH) most (M) circumst ances Likely to occur Medium Medium High (H) High (H) Very High (VH) frequentl (M) (M) y Possible and likely Medium to occur Low (L) High (H) High (H) High (H) (M) at some time Unlikely to occur Medium Low (L) Low (L) Medium (M) High (H) but could (M) happen May occur but only in rare and Medium Low (L) Low (L) Medium (M) High (H) exceptio (M) nal circumst ances
  • 10. Risk Assessment 1. Determining the Level of Risk This worksheet can be used to identify the level of risk and help to prioritize any interventions or control measures. Consider the consequences and likelihood for each of the identified risks and use the matrix* below to establish a risk level. NB: This workbook will record the quality of your planning process - it will not ensure it. Consequence Criteria The "area of consideration" example used below is injury to people. You should copy this template and adjust these criteria for each "thing you value". 1– 2– 3– 4 – Major 5– Insignifica Minor Moderate Catastrophic nt Dealt with by Medical Significant Extensive Death. Permanent in-house first help non- permanent injury disabling injury (eg aid, etc needed. permanent (eg loss of finger/s) blindness, loss of Treatment injury.Overni Extended hand/s, by medical ght hospitalisation quadriplegia) profession hospitalisatio al/hospital n (inpatient) outpatient, etc Almost certain to Getting sleepy occur in Medium High (H) High (H) Very High (VH) Very High (VH) most (M) circumst ances Likely to occur Medium Medium High (H) High (H) Very High (VH) frequentl (M) (M) y Possible and likely Medium to occur Low (L) High (H) High (H) High (H) (M) at some time Unlikely to occur Medium Low (L) Low (L) Medium (M) High (H) but could (M) happen May occur but Meteor only in rare and Medium Low (L) Low (L) Medium (M) High (H) exceptio (M) nal circumst ances
  • 11. 1. Project Risk Register Reference - Issue No. : and/or Issue Date: Future Review date: Identified Existing controls described & Risks Analysis & Evaluation evaluated Further Actions Effe ctiv ene Further Risk ss Consequence Risk level Likelihood Statement Action Needed Revised Risk level of Accept Risk (Yes or No) (e.g. our & description of stra Opportunities Assigned To each specific tegi es for M, H or VH - see Sheet 1) risk scenario What we ( improvement - with regard to or E - see Sheet 1) are doing Include 5 - see Sheet 1) - see Sheet 1) people, now to information, milestone(s) & manage this physical target date(s) risk. assets, finances, reputation, No (L, M, H or VH and any other Opportunities (1, 2, 3, 4, or "things you (A, B, C, D for value") improvement (L, Record by rows VH No V and cells as necessary. H VH No V H Note re effectiveness N = Not generally applied or only applied in isolated situations for example in less than 20% of cases; P = Partially applied, not usually documented or applied in less than 50% of cases; L = Largely applied, formally documented and largely repeatable or applied in up to 85% of cases; F = Fully applied, formally documented and fully repeatable or applied in more than 85% of cases.) Signed: Signed: Date: Date: Project Manager Project Manager Name: Name:
  • 12. Doggy day out  Draft up a risk management plan ◦ the what ◦ the how ◦ Who we report to ◦ How we track  Scope some risks  Assess the risks  Think up some strategies for the high risk  See hand out & LMS
  • 13.
  • 14. Please fill in and submit  Talk it over and let’s discuss
  • 15. Lunch
  • 16. communication with stakeholders, dispute resolution & modification procedures  implementation of risk control trigger mechanisms  measurement of actual progress against planned milestones – ◦ remember our baselines (or starting point)?  recording and reporting of major variance ◦ how far are we from the baseline?  setting key milestones ◦ If we have reached this milestone how are our risks?
  • 17. Remember you have one in front of you…
  • 18. Manage using established project & risk management plans to ensure achievement of objectives  Monitor progress against project plans to ◦ identify variances ◦ recommend responses  Implement agreed ◦ risk responses ◦ modify plans to reflect changing
  • 19. Review project outcomes to determine effectiveness of risk management processes and procedures  Identify & document ◦ risk issues and ◦ recommend improvements ◦ pass on to higher project authority for application in future projects
  • 20. Powerpoint pres. ◦ Last week’s progress & Some feedback re LMS quizzes ◦ Introduction to Risk Management & PM  Determine project risks  Monitor and control project risks Morning Tea Discussion 1. – Great Taste of Manly ◦ Structuring a Risk management plan ◦ Scoping risks ◦ Risk assessment – due 12 October  Lunch ◦ Fred’s Shed RMP – due 2 November ◦ Start LMS Activities 1, 2 & 3 only ◦ Complete assessment items – do what you haven’t yet finished
  • 21. Risk & other components of PMP  Quality, Scope, Cost, Schedule  Morning Tea  Risk Management Plan for Fred’s shed  Lunch  Continue Risk Management Plan  Or  Activities 1,2 & 3.
  • 22. Brainstorming – you are the experts on Fred’s Shed