SlideShare ist ein Scribd-Unternehmen logo
1 von 30
Diploma Project Management
       Captain Cook College
                Sharon Boyle
   Attempted Activity 1, 2 & 3
   Discussed results for all Activities
   Started ? all four assessment items
   All Risk Unit assessment items MUST be in by
    2 November
   The biggest & most complex area of Diploma
   Big money = big potential problems
   Some projects rely heavily on procurements –
    others not so much
   Egs
    ◦ construction & engineering HUGE issue
    ◦ Events = critical issue but perhaps not so much
    ◦ Community based events = not much money lesser
      problem
    ◦ IT = entirely about procurement – think RBH &
      computers
   Workshopped results in class
   University of Southern Queensland – full
    policy list including purchasing
   https://policy.usq.edu.au/policy/files/procur
    ement%20and%20purchasing.htm#id13
   Queensland Government Procurement Plan
   North Carolina Information Technology
    Procurement Office
   University of Southern Queensland
    Purchasing & policies
1.   Determine procurement requirements
2.   Establish agreed procurement processes
3.   Conduct contracting and procurement
     activities
4.   Implement contract and/or procurement
5.   Manage contract and procurement
     finalisation procedures
   1.1.     Identify procurement requirements
    with input from stakeholders as the basis for
    procurement planning and contracts
   1.2.     Establish & maintain, within
    delegated authority, an agreed procurement
    management plan
   What will the procurement management plan
    need to align with?
   2.1. Obtain information from established
    sources capable of fulfilling procurement
    requirements
   2.2. Adopt established selection processes
    and selection criteria, including occupational
    health and safety (OHS) requirements,
   2.3. Obtain approvals for procurement
    processes
   Workshopped results in class.
   Signatures – yes, but

   Stakeholder input
   Development of processes
   Management understanding of processes

   3.1.     Communicate agreed proposals
    prospective contractors or suppliers
   3.2.     Evaluate responses and select
    preferred contractors or suppliers in
    accordance with current legal requirements &
    agreed selection processes
   3.3.     Conduct negotiations with preferred
    contractor or supplier, with guidance of
    higher project authority if necessary, to agree
    on contract terms and conditions, establish
    common goals and minimise uncertainty
   Lunch
   Processes
   http://www.capital.health.vic.gov.au/capdev/
    PlanningEvaluation/EngagementConsultants/
    ConsultantSelectionProcess/


Number of Quotes Additional
                        Project Value
                                        Required         Information
Bigger job more
processes required                                          Due diligence is
Victorian Health Dept                                       required. Proposal
                                                            must be
                        $0 - $25,000    1 written tender
                                                            consistent with
                                                            current market
                                                            prices.


                        $25,000 -       3 written tenders
                        $150,000        minimum



                                        3 Tenderers from    The process
                                        a list of pre-      should incorporate
                        $150,000 and    qualified           activities set out in
                        over            consultants or      Table: Consultancy
                                        inviting public     Appointment
                                        tenders             Flowchart
   Victorian
    Health
    Department
   Bigger jobs
Communication During Selection Process – Internal and External



                                                              Selection Com.
  Strategy
                                                                  Debrief


                   Selection                                  Debrief Losing      Contract
Service Needs
                    Criteria                                      Firms          Negotiations
                                                                                 Independent
                                                                                 Fee Estimate
  Selection        Develop                Evaluate              Interview/
 Committee         RFQ/RFP              and Shortlist         Final Selection      Scoping
   Please watch – you will need this for 1st
    assessment item…..
   Workshopped results in class.
1. Procurement Statement
Describe, in general terms, what products or services are being considered for procurement:
2. Estimated Cost
Provide an estimated total cost of all procurements in this project. Include confidence limits for your estim
plus/minus dollars or percent of estimate). Example: $1,567,000 +/- 20%
3. Vendor Selection
Describe what approach the project team will take to select a product or vendor (e.g. RFI, RFP, IFB).
1. Procurement Definition
Describe, in specific terms, what items will be procured and under what conditions:
2. Selection Process & Criteria
Describe the selection process. List selection criteria. Describe any analytical selection tool that you will use.
3. Project Procurement Team
List all stakeholders who are involved in the Procurement Process, along with contact information and a description
of their Procurement Role. Enter an [ X ] next to each project team member who is authorized to enter into contract
agreements or purchase for the Team (insert rows as needed):
 X      Name:                     Phone / email:                 Procurement Role:
here

[ ]

[ ]

[ ]

[ ]
4. Contract Type
Document which types of contract(s) will be used and the actions required to initiate the contract.




5. Contract Standards
Provide the standards for documentation that will be used for each contract.
6. Vendor Management
Describe what steps the project team will take to ensure that the vendor provides all of the products and/or services
(and only the products and/or services) that were agreed upon, and that appropriate levels of quality are
maintained.

1.
2.
3.
4.
7. Links to related planning documents
Provide hyperlinks to related documents, such as the Change Request Management Plan, Vendor Paym
etc., or attach as addenda.

Change Request Management Plan,
Vendor Payment Plan,
8. Project Procurement Plan / Signatures

  Project Name:

  Project Manager:

  I have reviewed the information contained in this Project Procurement Plan and agree:




              Name                                  Role                                  Signature                Date
                                                                                                             (MM/DD/YYYY)




The signatures above indicate an understanding of the purpose and content of this document by those signing it. By signing this document, they agree to this as
 Powerpoint presentation Introduction to
  Procurement & contracts
Morning Tea
 Continued Powerpoint presentation Introduction
  to Procurement & contracts
 Reference to policies & procedures USQ
 Consultant selection processes
Lunch
 Assessment items for unit
 Procurement management plan
 Agree date & time for Role play
 Presentation Richard VH – procurement in the
  engineering industry
 Time for reading & Activities 1,2,3,4 & 5.
Morning Tea
 Revision of yesterday’s terms
Lunch
 Answers & discussion Activities 1, 2,3
 Complete Fred’s Shed procurement plan
 Assessments completed

Weitere ähnliche Inhalte

Was ist angesagt?

Sourcing And Procurement Practice 5 2011
Sourcing And Procurement Practice 5 2011Sourcing And Procurement Practice 5 2011
Sourcing And Procurement Practice 5 2011Michael Eckstut
 
Management contract..
Management contract..Management contract..
Management contract..Arpit Sem
 
Procurement Mgmt Supplement1
Procurement Mgmt Supplement1Procurement Mgmt Supplement1
Procurement Mgmt Supplement1zfr71
 
Raffles International Institute_Procurement methods
Raffles International  Institute_Procurement methodsRaffles International  Institute_Procurement methods
Raffles International Institute_Procurement methodsSandra Draskovic
 
Project procuremenet contract in ethiopia
Project procuremenet contract in ethiopiaProject procuremenet contract in ethiopia
Project procuremenet contract in ethiopiaGuta Mengesha
 
The best value for procurement
The best value for procurementThe best value for procurement
The best value for procurementmohamed Ismail
 
Contract management
Contract managementContract management
Contract managementNishant Rai
 
Wb consultant 2a
Wb consultant 2aWb consultant 2a
Wb consultant 2aJoy Irman
 
Procurement Methods and their Application.
Procurement Methods and their Application.Procurement Methods and their Application.
Procurement Methods and their Application.Lilian Nwachukwu
 
Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701Peter Soetevent
 
Guide to BS8534 British Standard on Procurement
Guide to BS8534 British Standard on ProcurementGuide to BS8534 British Standard on Procurement
Guide to BS8534 British Standard on ProcurementSarah Fox
 
Cp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qumes manandhar
 
Importance of Contract Management Training Courses
Importance of Contract Management Training CoursesImportance of Contract Management Training Courses
Importance of Contract Management Training Coursestraningservices
 
Vendor Management and Contract Negotiations
Vendor Management and Contract NegotiationsVendor Management and Contract Negotiations
Vendor Management and Contract NegotiationsButlerRubin
 
Project Management-Project procurement Management
Project Management-Project procurement ManagementProject Management-Project procurement Management
Project Management-Project procurement ManagementYogender Singh Rana
 
Contract Management - Generating Real Value from your Contracts
Contract Management - Generating Real Value from your ContractsContract Management - Generating Real Value from your Contracts
Contract Management - Generating Real Value from your ContractsTejari
 
IT Strategic Vendor Management
IT Strategic Vendor ManagementIT Strategic Vendor Management
IT Strategic Vendor ManagementBill Whetstone
 
Walls_Resume_Mar_2016
Walls_Resume_Mar_2016Walls_Resume_Mar_2016
Walls_Resume_Mar_2016Rob Walls
 

Was ist angesagt? (20)

Contract Management
Contract ManagementContract Management
Contract Management
 
Sourcing And Procurement Practice 5 2011
Sourcing And Procurement Practice 5 2011Sourcing And Procurement Practice 5 2011
Sourcing And Procurement Practice 5 2011
 
Management contract..
Management contract..Management contract..
Management contract..
 
Procurement Mgmt Supplement1
Procurement Mgmt Supplement1Procurement Mgmt Supplement1
Procurement Mgmt Supplement1
 
Raffles International Institute_Procurement methods
Raffles International  Institute_Procurement methodsRaffles International  Institute_Procurement methods
Raffles International Institute_Procurement methods
 
Contracts & procurement
Contracts & procurementContracts & procurement
Contracts & procurement
 
Project procuremenet contract in ethiopia
Project procuremenet contract in ethiopiaProject procuremenet contract in ethiopia
Project procuremenet contract in ethiopia
 
The best value for procurement
The best value for procurementThe best value for procurement
The best value for procurement
 
Contract management
Contract managementContract management
Contract management
 
Wb consultant 2a
Wb consultant 2aWb consultant 2a
Wb consultant 2a
 
Procurement Methods and their Application.
Procurement Methods and their Application.Procurement Methods and their Application.
Procurement Methods and their Application.
 
Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701
 
Guide to BS8534 British Standard on Procurement
Guide to BS8534 British Standard on ProcurementGuide to BS8534 British Standard on Procurement
Guide to BS8534 British Standard on Procurement
 
Cp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post q
 
Importance of Contract Management Training Courses
Importance of Contract Management Training CoursesImportance of Contract Management Training Courses
Importance of Contract Management Training Courses
 
Vendor Management and Contract Negotiations
Vendor Management and Contract NegotiationsVendor Management and Contract Negotiations
Vendor Management and Contract Negotiations
 
Project Management-Project procurement Management
Project Management-Project procurement ManagementProject Management-Project procurement Management
Project Management-Project procurement Management
 
Contract Management - Generating Real Value from your Contracts
Contract Management - Generating Real Value from your ContractsContract Management - Generating Real Value from your Contracts
Contract Management - Generating Real Value from your Contracts
 
IT Strategic Vendor Management
IT Strategic Vendor ManagementIT Strategic Vendor Management
IT Strategic Vendor Management
 
Walls_Resume_Mar_2016
Walls_Resume_Mar_2016Walls_Resume_Mar_2016
Walls_Resume_Mar_2016
 

Ähnlich wie Procurement part 1.

Webinar consulting services rfp
Webinar consulting services rfpWebinar consulting services rfp
Webinar consulting services rfpDemand Metric
 
Project procurement Management.ppt
Project procurement Management.pptProject procurement Management.ppt
Project procurement Management.pptMUST
 
Procurement management-plan template
Procurement management-plan templateProcurement management-plan template
Procurement management-plan templateVivek Srivastava
 
Procurement seminar
Procurement seminarProcurement seminar
Procurement seminarshabbirjaved
 
Procurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptx
Procurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptxProcurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptx
Procurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptxs2022027028
 
The Art of Planning and Writing Specs and Requirements--ISM 2010 Tanel
The Art of Planning and Writing Specs and Requirements--ISM 2010 TanelThe Art of Planning and Writing Specs and Requirements--ISM 2010 Tanel
The Art of Planning and Writing Specs and Requirements--ISM 2010 TanelThomas Tanel
 
Procurement Management TemplateProcurement Management Plan.docx
Procurement Management TemplateProcurement Management Plan.docxProcurement Management TemplateProcurement Management Plan.docx
Procurement Management TemplateProcurement Management Plan.docxbriancrawford30935
 
Procurement -conflict_of_interest_guidance_-_template
Procurement  -conflict_of_interest_guidance_-_templateProcurement  -conflict_of_interest_guidance_-_template
Procurement -conflict_of_interest_guidance_-_templatePraveen Kumar
 
Running head CONTRACT CLOSEOUT 1CONTRACT CLOSEOUT 16.docx
Running head CONTRACT CLOSEOUT 1CONTRACT CLOSEOUT 16.docxRunning head CONTRACT CLOSEOUT 1CONTRACT CLOSEOUT 16.docx
Running head CONTRACT CLOSEOUT 1CONTRACT CLOSEOUT 16.docxjoellemurphey
 
Procurement Of The Procurement Management Essay
Procurement Of The Procurement Management EssayProcurement Of The Procurement Management Essay
Procurement Of The Procurement Management EssayCheryl Brown
 
Procurement ops450
Procurement ops450Procurement ops450
Procurement ops450kahogan62
 
Procurement ManagementImportance of Project Procurem
Procurement ManagementImportance of Project ProcuremProcurement ManagementImportance of Project Procurem
Procurement ManagementImportance of Project ProcuremDaliaCulbertson719
 
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATIONCONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATIONChester, Ryan Bourne MSc., MBA, PMP
 
Procurements Chapter 12
Procurements Chapter 12Procurements Chapter 12
Procurements Chapter 12KareemBullard1
 
CRM Consulting Services RFP
CRM Consulting Services RFPCRM Consulting Services RFP
CRM Consulting Services RFPDemand Metric
 
Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016Faid Daoud
 
Conduct procurements
Conduct procurements Conduct procurements
Conduct procurements Shereef Sabri
 
Proforma Contract Bid Requirements
Proforma Contract Bid RequirementsProforma Contract Bid Requirements
Proforma Contract Bid RequirementsGibson Ali Holemba
 
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...ssusered96e2
 

Ähnlich wie Procurement part 1. (20)

Webinar consulting services rfp
Webinar consulting services rfpWebinar consulting services rfp
Webinar consulting services rfp
 
Project procurement Management.ppt
Project procurement Management.pptProject procurement Management.ppt
Project procurement Management.ppt
 
Procurement management-plan template
Procurement management-plan templateProcurement management-plan template
Procurement management-plan template
 
Procurement seminar
Procurement seminarProcurement seminar
Procurement seminar
 
Project procurement management PMBOK Sixth Edition
Project procurement management PMBOK Sixth EditionProject procurement management PMBOK Sixth Edition
Project procurement management PMBOK Sixth Edition
 
Procurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptx
Procurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptxProcurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptx
Procurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptx
 
The Art of Planning and Writing Specs and Requirements--ISM 2010 Tanel
The Art of Planning and Writing Specs and Requirements--ISM 2010 TanelThe Art of Planning and Writing Specs and Requirements--ISM 2010 Tanel
The Art of Planning and Writing Specs and Requirements--ISM 2010 Tanel
 
Procurement Management TemplateProcurement Management Plan.docx
Procurement Management TemplateProcurement Management Plan.docxProcurement Management TemplateProcurement Management Plan.docx
Procurement Management TemplateProcurement Management Plan.docx
 
Procurement -conflict_of_interest_guidance_-_template
Procurement  -conflict_of_interest_guidance_-_templateProcurement  -conflict_of_interest_guidance_-_template
Procurement -conflict_of_interest_guidance_-_template
 
Running head CONTRACT CLOSEOUT 1CONTRACT CLOSEOUT 16.docx
Running head CONTRACT CLOSEOUT 1CONTRACT CLOSEOUT 16.docxRunning head CONTRACT CLOSEOUT 1CONTRACT CLOSEOUT 16.docx
Running head CONTRACT CLOSEOUT 1CONTRACT CLOSEOUT 16.docx
 
Procurement Of The Procurement Management Essay
Procurement Of The Procurement Management EssayProcurement Of The Procurement Management Essay
Procurement Of The Procurement Management Essay
 
Procurement ops450
Procurement ops450Procurement ops450
Procurement ops450
 
Procurement ManagementImportance of Project Procurem
Procurement ManagementImportance of Project ProcuremProcurement ManagementImportance of Project Procurem
Procurement ManagementImportance of Project Procurem
 
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATIONCONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
 
Procurements Chapter 12
Procurements Chapter 12Procurements Chapter 12
Procurements Chapter 12
 
CRM Consulting Services RFP
CRM Consulting Services RFPCRM Consulting Services RFP
CRM Consulting Services RFP
 
Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016
 
Conduct procurements
Conduct procurements Conduct procurements
Conduct procurements
 
Proforma Contract Bid Requirements
Proforma Contract Bid RequirementsProforma Contract Bid Requirements
Proforma Contract Bid Requirements
 
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
 

Mehr von Skript

Quality unit 2012 part 1. day 1 - 31 jan
Quality unit 2012   part 1. day 1 - 31 janQuality unit 2012   part 1. day 1 - 31 jan
Quality unit 2012 part 1. day 1 - 31 janSkript
 
Quality unit 2012 part 1. day 1 - 31 jan
Quality unit 2012   part 1. day 1 - 31 janQuality unit 2012   part 1. day 1 - 31 jan
Quality unit 2012 part 1. day 1 - 31 janSkript
 
Cost unit 2013 part 2. 24 jan
Cost unit 2013 part 2. 24 janCost unit 2013 part 2. 24 jan
Cost unit 2013 part 2. 24 janSkript
 
Cost unit 2013 part 1. 18 jan
Cost unit 2013 part 1. 18 janCost unit 2013 part 1. 18 jan
Cost unit 2013 part 1. 18 janSkript
 
Cost unit 2013 part 1. 17 jan
Cost unit 2013 part 1. 17  janCost unit 2013 part 1. 17  jan
Cost unit 2013 part 1. 17 janSkript
 
Hr unit 2012 part 1
Hr unit 2012 part 1 Hr unit 2012 part 1
Hr unit 2012 part 1 Skript
 
Time unit 2012 nov part 2
Time unit 2012 nov part 2 Time unit 2012 nov part 2
Time unit 2012 nov part 2 Skript
 
Hr unit 2
Hr unit 2Hr unit 2
Hr unit 2Skript
 
Time unit 2012 nov part 2.
Time unit 2012 nov part 2.Time unit 2012 nov part 2.
Time unit 2012 nov part 2.Skript
 
Time unit 2012 nov 12 part 1
Time unit 2012 nov 12   part 1 Time unit 2012 nov 12   part 1
Time unit 2012 nov 12 part 1 Skript
 
Quality unit 2012
Quality unit 2012 Quality unit 2012
Quality unit 2012 Skript
 
Table of contents_1_without_questions
Table of contents_1_without_questionsTable of contents_1_without_questions
Table of contents_1_without_questionsSkript
 
Templates without questions
Templates without questionsTemplates without questions
Templates without questionsSkript
 
Table of contents_3_without_questions
Table of contents_3_without_questionsTable of contents_3_without_questions
Table of contents_3_without_questionsSkript
 
Table of contents_2_without_questions
Table of contents_2_without_questionsTable of contents_2_without_questions
Table of contents_2_without_questionsSkript
 
Mail merge 2_without_questions
Mail merge 2_without_questionsMail merge 2_without_questions
Mail merge 2_without_questionsSkript
 
Mail merge 1_without_questions
Mail merge 1_without_questionsMail merge 1_without_questions
Mail merge 1_without_questionsSkript
 
Headers footers without_questions
Headers footers without_questionsHeaders footers without_questions
Headers footers without_questionsSkript
 
Headers footers document_selection_without_questions
Headers footers document_selection_without_questionsHeaders footers document_selection_without_questions
Headers footers document_selection_without_questionsSkript
 
Bullets numbering lists_without_questions
Bullets numbering lists_without_questionsBullets numbering lists_without_questions
Bullets numbering lists_without_questionsSkript
 

Mehr von Skript (20)

Quality unit 2012 part 1. day 1 - 31 jan
Quality unit 2012   part 1. day 1 - 31 janQuality unit 2012   part 1. day 1 - 31 jan
Quality unit 2012 part 1. day 1 - 31 jan
 
Quality unit 2012 part 1. day 1 - 31 jan
Quality unit 2012   part 1. day 1 - 31 janQuality unit 2012   part 1. day 1 - 31 jan
Quality unit 2012 part 1. day 1 - 31 jan
 
Cost unit 2013 part 2. 24 jan
Cost unit 2013 part 2. 24 janCost unit 2013 part 2. 24 jan
Cost unit 2013 part 2. 24 jan
 
Cost unit 2013 part 1. 18 jan
Cost unit 2013 part 1. 18 janCost unit 2013 part 1. 18 jan
Cost unit 2013 part 1. 18 jan
 
Cost unit 2013 part 1. 17 jan
Cost unit 2013 part 1. 17  janCost unit 2013 part 1. 17  jan
Cost unit 2013 part 1. 17 jan
 
Hr unit 2012 part 1
Hr unit 2012 part 1 Hr unit 2012 part 1
Hr unit 2012 part 1
 
Time unit 2012 nov part 2
Time unit 2012 nov part 2 Time unit 2012 nov part 2
Time unit 2012 nov part 2
 
Hr unit 2
Hr unit 2Hr unit 2
Hr unit 2
 
Time unit 2012 nov part 2.
Time unit 2012 nov part 2.Time unit 2012 nov part 2.
Time unit 2012 nov part 2.
 
Time unit 2012 nov 12 part 1
Time unit 2012 nov 12   part 1 Time unit 2012 nov 12   part 1
Time unit 2012 nov 12 part 1
 
Quality unit 2012
Quality unit 2012 Quality unit 2012
Quality unit 2012
 
Table of contents_1_without_questions
Table of contents_1_without_questionsTable of contents_1_without_questions
Table of contents_1_without_questions
 
Templates without questions
Templates without questionsTemplates without questions
Templates without questions
 
Table of contents_3_without_questions
Table of contents_3_without_questionsTable of contents_3_without_questions
Table of contents_3_without_questions
 
Table of contents_2_without_questions
Table of contents_2_without_questionsTable of contents_2_without_questions
Table of contents_2_without_questions
 
Mail merge 2_without_questions
Mail merge 2_without_questionsMail merge 2_without_questions
Mail merge 2_without_questions
 
Mail merge 1_without_questions
Mail merge 1_without_questionsMail merge 1_without_questions
Mail merge 1_without_questions
 
Headers footers without_questions
Headers footers without_questionsHeaders footers without_questions
Headers footers without_questions
 
Headers footers document_selection_without_questions
Headers footers document_selection_without_questionsHeaders footers document_selection_without_questions
Headers footers document_selection_without_questions
 
Bullets numbering lists_without_questions
Bullets numbering lists_without_questionsBullets numbering lists_without_questions
Bullets numbering lists_without_questions
 

Procurement part 1.

  • 1. Diploma Project Management Captain Cook College Sharon Boyle
  • 2. Attempted Activity 1, 2 & 3  Discussed results for all Activities  Started ? all four assessment items  All Risk Unit assessment items MUST be in by 2 November
  • 3. The biggest & most complex area of Diploma  Big money = big potential problems  Some projects rely heavily on procurements – others not so much  Egs ◦ construction & engineering HUGE issue ◦ Events = critical issue but perhaps not so much ◦ Community based events = not much money lesser problem ◦ IT = entirely about procurement – think RBH & computers
  • 4. Workshopped results in class
  • 5. University of Southern Queensland – full policy list including purchasing  https://policy.usq.edu.au/policy/files/procur ement%20and%20purchasing.htm#id13
  • 6. Queensland Government Procurement Plan  North Carolina Information Technology Procurement Office  University of Southern Queensland Purchasing & policies
  • 7. 1. Determine procurement requirements 2. Establish agreed procurement processes 3. Conduct contracting and procurement activities 4. Implement contract and/or procurement 5. Manage contract and procurement finalisation procedures
  • 8. 1.1. Identify procurement requirements with input from stakeholders as the basis for procurement planning and contracts  1.2. Establish & maintain, within delegated authority, an agreed procurement management plan
  • 9. What will the procurement management plan need to align with?
  • 10. 2.1. Obtain information from established sources capable of fulfilling procurement requirements  2.2. Adopt established selection processes and selection criteria, including occupational health and safety (OHS) requirements,  2.3. Obtain approvals for procurement processes
  • 11. Workshopped results in class.  Signatures – yes, but  Stakeholder input  Development of processes  Management understanding of processes 
  • 12. 3.1. Communicate agreed proposals prospective contractors or suppliers  3.2. Evaluate responses and select preferred contractors or suppliers in accordance with current legal requirements & agreed selection processes  3.3. Conduct negotiations with preferred contractor or supplier, with guidance of higher project authority if necessary, to agree on contract terms and conditions, establish common goals and minimise uncertainty
  • 13. Lunch
  • 14. Processes  http://www.capital.health.vic.gov.au/capdev/ PlanningEvaluation/EngagementConsultants/ ConsultantSelectionProcess/ 
  • 15. Number of Quotes Additional Project Value Required Information Bigger job more processes required Due diligence is Victorian Health Dept required. Proposal must be $0 - $25,000 1 written tender consistent with current market prices. $25,000 - 3 written tenders $150,000 minimum 3 Tenderers from The process a list of pre- should incorporate $150,000 and qualified activities set out in over consultants or Table: Consultancy inviting public Appointment tenders Flowchart
  • 16. Victorian Health Department  Bigger jobs
  • 17. Communication During Selection Process – Internal and External Selection Com. Strategy Debrief Selection Debrief Losing Contract Service Needs Criteria Firms Negotiations Independent Fee Estimate Selection Develop Evaluate Interview/ Committee RFQ/RFP and Shortlist Final Selection Scoping
  • 18. Please watch – you will need this for 1st assessment item…..  Workshopped results in class.
  • 19. 1. Procurement Statement Describe, in general terms, what products or services are being considered for procurement:
  • 20. 2. Estimated Cost Provide an estimated total cost of all procurements in this project. Include confidence limits for your estim plus/minus dollars or percent of estimate). Example: $1,567,000 +/- 20%
  • 21. 3. Vendor Selection Describe what approach the project team will take to select a product or vendor (e.g. RFI, RFP, IFB).
  • 22. 1. Procurement Definition Describe, in specific terms, what items will be procured and under what conditions:
  • 23. 2. Selection Process & Criteria Describe the selection process. List selection criteria. Describe any analytical selection tool that you will use.
  • 24. 3. Project Procurement Team List all stakeholders who are involved in the Procurement Process, along with contact information and a description of their Procurement Role. Enter an [ X ] next to each project team member who is authorized to enter into contract agreements or purchase for the Team (insert rows as needed): X Name: Phone / email: Procurement Role: here [ ] [ ] [ ] [ ]
  • 25. 4. Contract Type Document which types of contract(s) will be used and the actions required to initiate the contract. 5. Contract Standards Provide the standards for documentation that will be used for each contract.
  • 26. 6. Vendor Management Describe what steps the project team will take to ensure that the vendor provides all of the products and/or services (and only the products and/or services) that were agreed upon, and that appropriate levels of quality are maintained. 1. 2. 3. 4.
  • 27. 7. Links to related planning documents Provide hyperlinks to related documents, such as the Change Request Management Plan, Vendor Paym etc., or attach as addenda. Change Request Management Plan, Vendor Payment Plan,
  • 28. 8. Project Procurement Plan / Signatures Project Name: Project Manager: I have reviewed the information contained in this Project Procurement Plan and agree: Name Role Signature Date (MM/DD/YYYY) The signatures above indicate an understanding of the purpose and content of this document by those signing it. By signing this document, they agree to this as
  • 29.  Powerpoint presentation Introduction to Procurement & contracts Morning Tea  Continued Powerpoint presentation Introduction to Procurement & contracts  Reference to policies & procedures USQ  Consultant selection processes Lunch  Assessment items for unit  Procurement management plan  Agree date & time for Role play
  • 30.  Presentation Richard VH – procurement in the engineering industry  Time for reading & Activities 1,2,3,4 & 5. Morning Tea  Revision of yesterday’s terms Lunch  Answers & discussion Activities 1, 2,3  Complete Fred’s Shed procurement plan  Assessments completed

Hinweis der Redaktion

  1. We only progressed to here on Thursday 11 october