SlideShare a Scribd company logo
1 of 16
Download to read offline
Leveraging AMI for Outage
Management

Executive summary
Only 8–12% of customers report a power outage to their
utility. Utilities that integrate Automated Metering
Systems (AMI) data into outage management systems
receive faster and more accurate reports about power
outages, can better predict the extent of the outage, and
more reliably verify service restoration. This paper
discusses practical considerations when integrating AMI
for outage management, including compliance testing,
data quantity and quality, analysis issues, and best
practices learned from experience.

998-2095-06-06-12AR0
Summary
Executive Summary . ................................................................................... p	 1
Introduction ................................................................................................. p 	4
Integration enables faster response and restoration ..................................... p 	6
Achieving full-function AMI/OMS interoperability . ......................................... p 	7
Consider your analysis goals and solutions................................................... p 	9
Factors affecting performance ..................................................................... p 	10
Lessons learned .......................................................................................... p 	11
Develop a strategy ....................................................................................... p 	12
Conclusion................................................................................................... p 13
Leveraging AMI for Outage Management

Executive summary
The Smart Grid uses network data — from real-time to historical — to improve
operational and business processes across the utility. The Advanced Metering
Infrastructure (AMI) that is integrated with the Outage Management System (OMS)
can provide valuable data that enables much faster and more reliable reporting of
power outage events than from customers calls.
Further, the robust OMS can leverage AMI data to predict the extent of the
outage, and identify downstream nested outages, as well as verify restoration and
save costs associated with field crews and truck rolls.
To achieve simplified deployment, maintenance, and upgrades, compliance with
interoperability standards is necessary. Performance testing will demonstrate
whether the AMI communication system meets expected data management
performance and if the OMS can consistently process the high throughput of data
associated with large-scale outages. The OMS needs an accurate network model
and enhanced analysis capabilities to determine missing or delayed data, predict
outage extent and discern partial power and power quality events.
Utilities targeting such an interactive and powerful AMI/OMS integrated solution
must consider a system that can accommodate AMI upgrades and component
updates and replacement. They will want to consider a staged implementation
and vendor experience, both of which contribute to successful deployment of the
AMI/OMS solution.
The interoperable OMS can put AMI data to work, to visualize, analyze, validate
and report. The utility realizes faster, more accurate incident location, faster job
completion, and improved customer service and satisfaction — and maximized
return on its AMI investment.

White paper | 01
Leveraging AMI for Outage Management

Introduction
As utilities deploy Automated Metering Infrastructure (AMI) systems, they are
looking to extend the value of their investment through integration with other
Smart Grid information systems. This approach delivers business benefits
throughout the enterprise, including the mission-essential activity of network
operations. One such integration that is gaining popularity is linking AMI with
Outage Management Systems (OMS), exemplifying how system interoperability
helps utilities leverage the most from their distribution system projects. AMI and
OMS integration can create operational intelligence that significantly increases the
accuracy and efficiency of outage detection and restoration verification.
This paper details the tangible benefits realized by extending AMI to the control
room; such benefits include reduced outage times, efficient crew management,
nested outage detection and more accurate reliability reporting. This paper
also identifies the issues a utility must consider to achieve successful AMI/
OMS interoperability: system performance, standards-based messaging, event
validation, network analysis and visual awareness. It will become clear that outage
management augmented with AMI represents a unity that enhances all of the
benefits utilities have come to expect from successfully deployed OMS solutions.

White paper on Energy Efficiency | 02
Leveraging AMI for Outage
Management
Leveraging AMI for Outage Management

Integration enables faster response
and restoration
Let’s take a look at the anticipated returns from integrating AMI and OMS. Seamless interoperability between
the AMI and OMS allows the OMS to put better information to work — faster, to enhance overall response and
restoration.

Identify incident locations faster, more accurately
Automatic meter notification is more reliable than

engine and advanced prediction algorithms can

customer notifications. For many utilities, an average

maximize the value from an increase in data that

of only eight to 12 percent of customers will call to

varies in reliability.

report a power problem. While this low call-in rate
is often due to customers not being present at the

The ability to identify, validate and properly correlate

affected location, customers quite commonly do not

event data that is duplicate, delayed, missing or

report electric outages because they presume the

out of order significantly aids in the efficiency and

utility is aware of the issue. Historically, depending

accuracy of managing network-related issues. An

on the location and size of the affected area, utilities

OMS testing/training tool that allows the utility to

have not had direct awareness of customer network

simulate the irregularities and inconsistencies that

problems.

can occur in meter communications can best prepare
system operators, dispatchers and administrative

Enter the era of AMI systems that offer last gasp

staff — see Figure 1.

— the ability to automatically communicate ‘no
power’ events, which makes event reporting more
immediate, reliable and available. This is certainly
welcome data for system operators and dispatchers,
and reflects one more step towards a smarter grid.
But AMI technology and communication
infrastructures have limitations. Communication
network bandwidth constraints can limit a percentage
of ‘no power’ messages from reaching the enterprise

Figure 1. OMS simulates AMI event data for testing and training

in a timely manner — or at all. While AMI is SCADAlike in some ways, communication of data is not

An OMS should be able to utilize all relevant

as rapid or reliable — thus the need for enhanced

outage and non-outage information for tracing and

processing. An OMS with an AMI event validation

prediction analysis of a near-real-time distribution

White paper | 04
Leveraging AMI for Outage Management

network model. AMI systems cannot do this on their
own, since the topologies of AMI communication
networks have limited knowledge of the power
distribution network, let alone the current state of
network devices and power sources. Leveraging
the utility’s geographic information system (GIS) as a
representation of the as-built state of the network, the
OMS maintains the as-operated state, providing utility
staff with a geospatial view of network activity — see
Figure 2.
A robust OMS also can take advantage of AMI

Figure 2. The OMS map view displays AMI meter event status

solutions that also provide event notification
from devices higher on the network. The OMS can
prioritize these events to identify incident locations
more rapidly. Prioritization of upstream events allows
the OMS to simply associate related downstream
events, reducing the amount of processing required.
The OMS also can process information from AMI
solutions that report partial power and power qualityrelated events.

Verify outages and restorations
Automatic or manual pinging of unreported

over-prediction by acquiring AMI confirmation of

meters can be used to help validate results of

power status. Pinging is only appropriate for those

restoration activity, as well as prediction analysis.

meters that have not reported activity, yet are

Pinging meters following a restoration event can

predicted as part of an incident.

aid in identifying nested outages that might exist
downstream from field crew activity. The OMS can

There is a strong business benefit in these validation

create a new incident for the nested outage while

activities: utilities have reported significant financial

crews are on site, helping to reduce outage duration,

savings associated with improved efficiency of truck

customer calls, customer service costs and additional

rolls due to AMI and OMS integration.

trips to the field.
Pinging of meters for outage status also can be
beneficial for validating predicted incident locations in
advance of assigning crews. The utility can prevent

White paper | 05
Leveraging AMI for Outage Management

Increase customer support
In addition to getting customers’ power restored
faster, many utilities consider it a significant benefit to
be able to proactively communicate power problems,
crew status and estimated time to restoration (ETR)
to their customers. Regardless of the medium of
communication, a customer can be notified that the
utility is aware of a power problem at their location,
based on an AMI-reported event. Even without
this proactive communication, the enhanced visual
awareness provided by the OMS lets the user confirm
knowledge of a power problem to a customer at the
time they call in to report it — see Figure 3. And with
quicker identification of incident locations, utilities can
more rapidly and accurately assign crews and specify
ETRs.

Figure 3. The OMS call entry screen shows customer meter
status

Improve reliability reporting
The utility’s performance indexes are more

Better current and historical data enables improved

accurate. OMS can leverage the reported outage

analyses to help mitigate future events and optimize

and restoration times from AMI to improve reliability

information shared with regulators, customers, media

reporting and other forms of statistical analysis. The

and other stakeholders.

most common reliability reports require outage and
restoration times for both customer-level and systemlevel analysis:
•  ustomer Average Interruption Duration Index
C
(CAIDI)
• System Average Interruption Duration Index (SAIDI)
•  ustomer Average Interruption Frequency Index
C
(CAIFI)
•  ystem Average Interruption Frequency Index
S
(SAIFI)
•  omentary Average Interruption Frequency Index
M
(MAIFI)

White paper | 06
Leveraging AMI for Outage Management

Achieving full-function AMI/OMS
interoperability
Integration standards and compliance testing
Utilities, vendors and consultants have worked

Interfacing AMI with an OMS that meets open-

together for several years to create the IEC 61968

standards interoperability is the best way to facilitate

Common Information Model (CIM). Most recently,

deployment and ongoing maintenance and avoid the

there has been increased momentum to support

risk of future incompatibility. Further, an OMS with a

the growth in Smart Grid projects, and AMI

services-oriented architecture (SOA), making software

interoperability has been receiving extra attention as

components available via methods such as Web

more and more utilities deploy solutions. The AMI

services, enables scalability and extensibility as the

Enterprise Task Force (OpenSG) and other working

use and functionality of AMI technology evolves.

groups are focusing on improving standardization that
will enable the use of relevant AMI data throughout
the utility enterprise.

Defining data management goals
While adherence to interoperability standards
aids in AMI solutions successfully integrating with
external systems, there are many other important
considerations for integration deployment.
AMI solutions implement varying means of
communications, such as RF, WiFi, WiMAX, cellular,
PLC and fiber; consequently, they cannot be
expected to operate or perform the same. Each form

Recent milestones in
interoperability testing
•  011 – IEC 61968 part three testing
2
demonstrated interoperability for network
operations, including many systems such as
AMI, OMS, and DMS

of communication will have a unique effect on AMI
system performance that may further vary depending
on device concentration and location. The utility will
want to establish clear thresholds or criteria for the
system’s data handling capabilities, and test the
integrated system before deployment.

Data quantity
Unlike a traditional OMS deployment, which typically
only receives calls from approximately 10 percent
of affected customers, the AMI-integrated OMS
must be able to handle communication from all
affected customer meters. The utility will want to
know the system can receive high message bursts
and process high-sustained rates of meter event
messages, particularly for large-scale events.

•  010 – IEC 61968 part nine testing
2
demonstrated interoperability specific
for meter outage and restoration events,
while CIM interoperability testing verified
harmonization of the latest updates to the
AMI Enterprise Reference Model
•  009 – Inaugural testing for adherence to
2
the AMI Enterprise (OpenSG User Group)
Reference Model based on IEC 61968 – the
CIM standard for utility distribution modeling
and message exchange
Utilities are encouraged to participate in
working groups focused on interoperability,
to help ensure development of practical and
effective standards.

Performance testing, to demonstrate that the OMS
can consistently process a relatively high number

White paper | 07
Leveraging AMI for Outage Management

of events per hour, ensures an environment that
can manage large-scale outage situations without
impairing the workflow of dispatcher and operators.
For a large utility, this rate could be hundreds of
thousands of events in a very short time frame.
Instead of finding ways to limit the quantity of

Reasons to send all AMI
operational data to OMS
•  MI events related to a specific incident can
A
be aggregated, and unrelated events filtered,
prior to prediction analysis.

AMI events that are sent to the OMS solution, an
ideal approach is to ensure that the OMS has an
abstracted AMI event-processing engine that will limit
the performance impacts to the core OMS engine.
This design will allow a utility to send all relevant AMI
data to the OMS for pre- and post-event processing,
while not jeopardizing the stability and usability of

•  omentary events may not require creation 	
M
of work, but could be beneficial for OMS
historical analysis.
•  emote disconnect events are important to
R
the OMS for prioritizing outage events and
classifying affected customers appropriately.

the system. It will also allow the operational system
of record — the OMS — to track and manage all
network event data as desired.

Data quality
While AMI is like a network supervisory control and
data acquisition (SCADA) system that collects data
from remote devices, it is not nearly as reliable or
efficient. Natural filtering in the AMI network will result
in somewhat delayed and inconsistent data delivered
to the OMS, which must be able to accurately
define events from duplicate, missing, delayed
and momentary data and data, delivered out of
chronological order.

Corollary event data
The OMS should receive not only power failure and
power restoration events, but also partial power
and power quality events, communication status,
meter disconnects and upstream device events.
Power quality events, such as low voltage, can
signal an isolated or area-wide voltage issue that
may or may not be a precursor to an outage event.
A “no communication” status event would serve
as notification to the OMS that a given meter is not
reachable, and that analysis functions should be

How will you report
outage times?
Keep in mind: the AMI will record an event
time with a time stamp, but the OMS might
experience a delay in receiving that event.
The utility will need to consider which time it
reports to a regulatory body for purposes of
documenting outages and response efficiency.

adjusted accordingly. Upstream device events can
be prioritized by the OMS since related downstream
events would not require analysis.

White paper | 08
Leveraging AMI for Outage Management

Consider your analysis goals and
solutions
With AMI delivering much more information to
OMS than previously available, the OMS will require
enhanced analysis in order to best leverage the data.
Outage prediction – with more data, the OMS
will need to address how prediction algorithms will
apply appropriate thresholds and timing to predict
the source of the event and the upstream devices
involved in the outage. In some cases, unique,
configurable prediction might be required, giving the
utility the option of analyzing AMI events differently

Architecture considerations
Keep in mind these architectural components
that might be involved in proper collection,
processing, analysis and storage/recall of AMI
data — part of the framework for facilitating
and optimizing
AMI/OMS integration...
• Message adapter – receiving data

than customer calls.

• Log service – storing events for tracking

Prediction validation – similarly, the utility will have

•  essage queue – handling the influx of
M
mass amounts of data

the ability to initiate on-demand pings, automatic or
manual, to confirm power status and better predict
the incident location.
Nested outage prediction – with integrated AMI/
OMS, the utility will have the ability to directly
communicate with meters to determine where
independent downstream outages, or nested outages
exist. With this information, the OMS creates new

•  vent processor – processing of message
E
events
•  essage export – sharing validated data
M
with other systems
•  ata storage – separate storage of all AMI
D
event data

events and restoration activity as necessary. The
accurate outage timestamps provided by the AMI
identify not only what was restored, but when —

•  MS event creation – prediction analysis of
O
AMI events

information that can yield more accurate restoration
times than those reported by crews — improving
reliability reporting.

Visualization – OMS can geospatially render
validated events prior to and independent of

Various event types – the OMS will need to consider

predicted activity — providing dispatchers with visual

how it will analyze information relating to partial power

awareness in near real time.

and power quality events, and how to differentiate
them from standard outage events.
Upstream devices – data collectors, and other
primary voltage devices that are part of the AMI
network, can be prioritized to provide information that
streamlines outage response.

White paper | 09
Leveraging AMI for Outage Management

Factors affecting performance
Factors that can impact the success and
performance of AMI/OMS integration include...
Quantity and size of outages – substation-level or
high-circuit-level events might not require the need
to analyze all AMI events. Conversely, isolated and
dispersed events, as well as single-premise events
require more processing and analysis, since they
must be treated individually.
Upstream devices – indicators higher in the network
will support more efficient processing of larger scale
events.
AMI communications – the reliability and speed of
various communications systems can vary widely,
making testing in advance highly beneficial.

Proven interoperability – look for product-supported
integration that adheres to the latest standards.

Message batching – bundled AMI messages, where
available, from AMI are an option that can improve

Vendor experience – AMI solutions vary in

performance compared to discrete messaging.

messaging patterns and ability to support data
options; an OMS provider with experience in

Hardware infrastructure – it is important that

integrating the system with various AMI and MDM

infrastructure be sized appropriately to handle the

solutions can be a critical element in project success.

increased processing and data storage requirements.
OMS model quality – a poor or inaccurate OMS
network model will cause inaccurate analysis that will
reduce the level of benefit offered by AMI integration.
High data throughput – the OMS must have the
ability to sustain high bursts and sustained load for
extended periods of time, under varying weather
patterns and AMI network configurations.

White paper | 10
Leveraging AMI for Outage Management

Lessons learned
Experience in working with utilities deploying AMI/
OMS solutions yields these suggestions...
•  ush for standards-based integration and identify
P
the integration mechanism, such as Web services
•  hen planning AMI/OMS integration, ensure
W
that the AMI vendor will support the integration
deployment effort as necessary
•  onsider a staged implementation that utilizes an
C
increasing amount of available AMI data types and
functionality over time
•  un performance tests in advance of the roll out
R
•  o not overload the AMI with unnecessary ping
D
requests, which can slow or prevent access to vital
information
• Remember: AMI is not a SCADA system

White paper | 11
Leveraging AMI for Outage Management

Develop a strategy
A robust integration strategy will lead to robust
functionality
AMI/OMS interoperability is just one tactic of a
comprehensive and successful integration. To fully
realize potential returns and accommodate both
near-term and future Smart Grid goals, utilities
should carefully consider an integration solution built
according to the following principals...
Upgrade path – as AMI solutions evolve, utilities will
need an upgrade path for their AMI/OMS integration
solution.
Enhancements – implement a productized
integration solution that ensures future product
updates and enhancements.
Technical support – strive for a solution that will be
covered under standard product support and not
require custom support.
Input from other utilities – take advantage
of solutions that will evolve with feedback and
requirements from a wide base of utilities.
Standards-based implementation – look for
products designed for ease of deployment and
maintenance.
Layers of component extraction – investigate
systems with components — such as database
engine, queuing mechanism and event logging —
that are flexible in technology and easy to replace and
maintain.

White paper | 12
Leveraging AMI for Outage Management

Conclusion
In summary, AMI and OMS systems are clearly synergistic. Leveraging AMI
integration for operational purposes offers benefits that extend well beyond meter
to cash. An OMS that provides the ability to consume AMI events for validation,
visualization, analysis, and reporting will facilitate enhanced outage management.
This functionality can be instrumental in helping a utility improve customer service
while decreasing operational costs — and getting more value from its AMI
investment.
With the Smart Grid, the road ahead can seem overwhelming. The utility that
implements a proven OMS integration solution designed to leverage the benefits
of AMI will simplify its strategy, and be better prepared for what the future has in
store.

White paper | 13
©2012 Schneider Electric. All rights reserved.

Schneider Electric USA, Inc.
4701 Royal Vista Circle
Fort Collins, CO 80528
Phone:  -866-537-1091
1
	
+ (34) 91-714-70-02
Fax: 1-970-223-5577
www.schneider-electric.com/us
June 2012

More Related Content

What's hot

Big Data Analytics in Energy & Utilities
Big Data Analytics in Energy & UtilitiesBig Data Analytics in Energy & Utilities
Big Data Analytics in Energy & UtilitiesAnders Quitzau
 
Data Center Architecture Trends
Data Center Architecture TrendsData Center Architecture Trends
Data Center Architecture TrendsPanduit
 
Hybrid Smart Grid System for Renewable energy
Hybrid Smart Grid System for Renewable energyHybrid Smart Grid System for Renewable energy
Hybrid Smart Grid System for Renewable energyALTANAI BISHT
 
Cloud Migration Strategy and Best Practices
Cloud Migration Strategy and Best PracticesCloud Migration Strategy and Best Practices
Cloud Migration Strategy and Best PracticesQBurst
 
Smart energy meter ppt
Smart energy meter   pptSmart energy meter   ppt
Smart energy meter pptRitam Giri
 
Creating an Enterprise AI Strategy
Creating an Enterprise AI StrategyCreating an Enterprise AI Strategy
Creating an Enterprise AI StrategyAtScale
 
e-Business ideas in Telecom
e-Business ideas in Telecome-Business ideas in Telecom
e-Business ideas in Telecomsam_tandon
 
Data center proposal
Data center proposalData center proposal
Data center proposalMuhammad Ahad
 
Cloud Computing Roadmap Public Vs Private Vs Hybrid And SaaS Vs PaaS Vs IaaS ...
Cloud Computing Roadmap Public Vs Private Vs Hybrid And SaaS Vs PaaS Vs IaaS ...Cloud Computing Roadmap Public Vs Private Vs Hybrid And SaaS Vs PaaS Vs IaaS ...
Cloud Computing Roadmap Public Vs Private Vs Hybrid And SaaS Vs PaaS Vs IaaS ...SlideTeam
 
Introduction to Data Center Network Architecture
Introduction to Data Center Network ArchitectureIntroduction to Data Center Network Architecture
Introduction to Data Center Network ArchitectureAnkita Mahajan
 
AI in Telecom: How artificial intelligence is reshaping the vision of telco i...
AI in Telecom: How artificial intelligence is reshaping the vision of telco i...AI in Telecom: How artificial intelligence is reshaping the vision of telco i...
AI in Telecom: How artificial intelligence is reshaping the vision of telco i...Data Driven Innovation
 
Shared Services Customer Satisfaction
Shared Services Customer SatisfactionShared Services Customer Satisfaction
Shared Services Customer SatisfactionScottMadden, Inc.
 
Advanced metering infrastructure (AMI)
Advanced metering infrastructure (AMI)Advanced metering infrastructure (AMI)
Advanced metering infrastructure (AMI)Arul Kumar
 
AI Use-cases in Telecom sector - Part-2.pptx
AI Use-cases in Telecom sector - Part-2.pptxAI Use-cases in Telecom sector - Part-2.pptx
AI Use-cases in Telecom sector - Part-2.pptxSashilReddy1
 
Microsoft Product Licensing
Microsoft Product LicensingMicrosoft Product Licensing
Microsoft Product LicensingMotty Ben Atia
 

What's hot (20)

Big Data Analytics in Energy & Utilities
Big Data Analytics in Energy & UtilitiesBig Data Analytics in Energy & Utilities
Big Data Analytics in Energy & Utilities
 
Data Center Architecture Trends
Data Center Architecture TrendsData Center Architecture Trends
Data Center Architecture Trends
 
Google cloud
Google cloudGoogle cloud
Google cloud
 
Hybrid Smart Grid System for Renewable energy
Hybrid Smart Grid System for Renewable energyHybrid Smart Grid System for Renewable energy
Hybrid Smart Grid System for Renewable energy
 
Cloud Migration Strategy and Best Practices
Cloud Migration Strategy and Best PracticesCloud Migration Strategy and Best Practices
Cloud Migration Strategy and Best Practices
 
Webinar: Digitalization & Energy
Webinar:  Digitalization & EnergyWebinar:  Digitalization & Energy
Webinar: Digitalization & Energy
 
Smart energy meter ppt
Smart energy meter   pptSmart energy meter   ppt
Smart energy meter ppt
 
Creating an Enterprise AI Strategy
Creating an Enterprise AI StrategyCreating an Enterprise AI Strategy
Creating an Enterprise AI Strategy
 
e-Business ideas in Telecom
e-Business ideas in Telecome-Business ideas in Telecom
e-Business ideas in Telecom
 
Data center proposal
Data center proposalData center proposal
Data center proposal
 
Cloud Computing Roadmap Public Vs Private Vs Hybrid And SaaS Vs PaaS Vs IaaS ...
Cloud Computing Roadmap Public Vs Private Vs Hybrid And SaaS Vs PaaS Vs IaaS ...Cloud Computing Roadmap Public Vs Private Vs Hybrid And SaaS Vs PaaS Vs IaaS ...
Cloud Computing Roadmap Public Vs Private Vs Hybrid And SaaS Vs PaaS Vs IaaS ...
 
Introduction to Data Center Network Architecture
Introduction to Data Center Network ArchitectureIntroduction to Data Center Network Architecture
Introduction to Data Center Network Architecture
 
MPPT
MPPTMPPT
MPPT
 
The Smart Grid
The Smart GridThe Smart Grid
The Smart Grid
 
AI in Telecom: How artificial intelligence is reshaping the vision of telco i...
AI in Telecom: How artificial intelligence is reshaping the vision of telco i...AI in Telecom: How artificial intelligence is reshaping the vision of telco i...
AI in Telecom: How artificial intelligence is reshaping the vision of telco i...
 
Shared Services Customer Satisfaction
Shared Services Customer SatisfactionShared Services Customer Satisfaction
Shared Services Customer Satisfaction
 
Advanced metering infrastructure (AMI)
Advanced metering infrastructure (AMI)Advanced metering infrastructure (AMI)
Advanced metering infrastructure (AMI)
 
AI Use-cases in Telecom sector - Part-2.pptx
AI Use-cases in Telecom sector - Part-2.pptxAI Use-cases in Telecom sector - Part-2.pptx
AI Use-cases in Telecom sector - Part-2.pptx
 
Microsoft Product Licensing
Microsoft Product LicensingMicrosoft Product Licensing
Microsoft Product Licensing
 
Cloud Strategy First
 Cloud Strategy First Cloud Strategy First
Cloud Strategy First
 

Similar to Leveraging AMI for Outage Management

Implementing Oracle Utility-Meter Data Management For Power Consumption
Implementing Oracle Utility-Meter Data Management For Power ConsumptionImplementing Oracle Utility-Meter Data Management For Power Consumption
Implementing Oracle Utility-Meter Data Management For Power ConsumptionIJERDJOURNAL
 
Advanced Metering Infrastructure Standards and protocol
Advanced Metering Infrastructure Standards and protocolAdvanced Metering Infrastructure Standards and protocol
Advanced Metering Infrastructure Standards and protocolEklavya Sharma
 
Managing the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and InformationManaging the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and InformationTESCO - The Eastern Specialty Company
 
Ami introduction demo_2
Ami introduction demo_2Ami introduction demo_2
Ami introduction demo_2IITian Academy
 
Advanced Metering Infrastructure Analytics A Case Study
Advanced Metering Infrastructure Analytics   A Case StudyAdvanced Metering Infrastructure Analytics   A Case Study
Advanced Metering Infrastructure Analytics A Case StudyJoe Osborn
 
Smart distribution system the need of automation & it application in powe...
Smart distribution system the need of automation & it application in powe...Smart distribution system the need of automation & it application in powe...
Smart distribution system the need of automation & it application in powe...SoumyaRanjanDas13
 
Advanced Metering Infrastructure (AMI)
Advanced Metering Infrastructure (AMI)Advanced Metering Infrastructure (AMI)
Advanced Metering Infrastructure (AMI)Naveena Navi
 
sumerian_cost-reduction-white-paper
sumerian_cost-reduction-white-papersumerian_cost-reduction-white-paper
sumerian_cost-reduction-white-paperKelly Moscrop
 
Interoperability with HMI Systems Enables Leaner Asset Management
Interoperability with HMI Systems Enables Leaner Asset ManagementInteroperability with HMI Systems Enables Leaner Asset Management
Interoperability with HMI Systems Enables Leaner Asset ManagementeRPortal Software Group
 
Sat Magazine Service Management Article
Sat Magazine Service Management ArticleSat Magazine Service Management Article
Sat Magazine Service Management ArticlePhillip Howard
 
Smart meter_Advanced metering Infrastructures
Smart meter_Advanced metering InfrastructuresSmart meter_Advanced metering Infrastructures
Smart meter_Advanced metering InfrastructuresDharmendra singh
 
Press Release SELDON SYSTEMS ANNOUNCES AVAILABILITY OF CONTINUITY MOBILE API
Press Release SELDON SYSTEMS ANNOUNCES AVAILABILITY OF CONTINUITY MOBILE APIPress Release SELDON SYSTEMS ANNOUNCES AVAILABILITY OF CONTINUITY MOBILE API
Press Release SELDON SYSTEMS ANNOUNCES AVAILABILITY OF CONTINUITY MOBILE APIMichael Shaw
 
Sat Magazine Article -Hybrid Networks and Customer Expectations Published
Sat Magazine Article -Hybrid Networks and Customer Expectations PublishedSat Magazine Article -Hybrid Networks and Customer Expectations Published
Sat Magazine Article -Hybrid Networks and Customer Expectations PublishedPhillip Howard
 
Best Practices for Creating Your Smart Grid Network Model
Best Practices for Creating Your Smart Grid Network ModelBest Practices for Creating Your Smart Grid Network Model
Best Practices for Creating Your Smart Grid Network ModelSchneider Electric
 

Similar to Leveraging AMI for Outage Management (20)

Implementing Oracle Utility-Meter Data Management For Power Consumption
Implementing Oracle Utility-Meter Data Management For Power ConsumptionImplementing Oracle Utility-Meter Data Management For Power Consumption
Implementing Oracle Utility-Meter Data Management For Power Consumption
 
You Went AMI, Where Will You Go Next?
You Went AMI, Where Will You Go Next?You Went AMI, Where Will You Go Next?
You Went AMI, Where Will You Go Next?
 
Challenges for Meter Shop Operations of the Future
Challenges for Meter Shop Operations of the FutureChallenges for Meter Shop Operations of the Future
Challenges for Meter Shop Operations of the Future
 
Advanced Metering Infrastructure Standards and protocol
Advanced Metering Infrastructure Standards and protocolAdvanced Metering Infrastructure Standards and protocol
Advanced Metering Infrastructure Standards and protocol
 
Managing the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and InformationManaging the Meter Shop of the Future Through Better Tools and Information
Managing the Meter Shop of the Future Through Better Tools and Information
 
Ami introduction demo_2
Ami introduction demo_2Ami introduction demo_2
Ami introduction demo_2
 
SAP AMI
SAP AMISAP AMI
SAP AMI
 
You Went AMI, Where Will You Go Next_Mid-South
You Went AMI, Where Will You Go Next_Mid-SouthYou Went AMI, Where Will You Go Next_Mid-South
You Went AMI, Where Will You Go Next_Mid-South
 
You Went AMI Where Will You Go Next - 5-4-2023
You Went AMI Where Will You Go Next - 5-4-2023You Went AMI Where Will You Go Next - 5-4-2023
You Went AMI Where Will You Go Next - 5-4-2023
 
Advanced Metering Infrastructure Analytics A Case Study
Advanced Metering Infrastructure Analytics   A Case StudyAdvanced Metering Infrastructure Analytics   A Case Study
Advanced Metering Infrastructure Analytics A Case Study
 
Smart distribution system the need of automation & it application in powe...
Smart distribution system the need of automation & it application in powe...Smart distribution system the need of automation & it application in powe...
Smart distribution system the need of automation & it application in powe...
 
Advanced Metering Infrastructure (AMI)
Advanced Metering Infrastructure (AMI)Advanced Metering Infrastructure (AMI)
Advanced Metering Infrastructure (AMI)
 
Amr
AmrAmr
Amr
 
sumerian_cost-reduction-white-paper
sumerian_cost-reduction-white-papersumerian_cost-reduction-white-paper
sumerian_cost-reduction-white-paper
 
Interoperability with HMI Systems Enables Leaner Asset Management
Interoperability with HMI Systems Enables Leaner Asset ManagementInteroperability with HMI Systems Enables Leaner Asset Management
Interoperability with HMI Systems Enables Leaner Asset Management
 
Sat Magazine Service Management Article
Sat Magazine Service Management ArticleSat Magazine Service Management Article
Sat Magazine Service Management Article
 
Smart meter_Advanced metering Infrastructures
Smart meter_Advanced metering InfrastructuresSmart meter_Advanced metering Infrastructures
Smart meter_Advanced metering Infrastructures
 
Press Release SELDON SYSTEMS ANNOUNCES AVAILABILITY OF CONTINUITY MOBILE API
Press Release SELDON SYSTEMS ANNOUNCES AVAILABILITY OF CONTINUITY MOBILE APIPress Release SELDON SYSTEMS ANNOUNCES AVAILABILITY OF CONTINUITY MOBILE API
Press Release SELDON SYSTEMS ANNOUNCES AVAILABILITY OF CONTINUITY MOBILE API
 
Sat Magazine Article -Hybrid Networks and Customer Expectations Published
Sat Magazine Article -Hybrid Networks and Customer Expectations PublishedSat Magazine Article -Hybrid Networks and Customer Expectations Published
Sat Magazine Article -Hybrid Networks and Customer Expectations Published
 
Best Practices for Creating Your Smart Grid Network Model
Best Practices for Creating Your Smart Grid Network ModelBest Practices for Creating Your Smart Grid Network Model
Best Practices for Creating Your Smart Grid Network Model
 

More from Schneider Electric

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design ConsiderationsSchneider Electric
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsSchneider Electric
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing Schneider Electric
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsSchneider Electric
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service ProvidersSchneider Electric
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingSchneider Electric
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSchneider Electric
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingSchneider Electric
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingSchneider Electric
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Schneider Electric
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesSchneider Electric
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Schneider Electric
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.Schneider Electric
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580Schneider Electric
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...Schneider Electric
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTSchneider Electric
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingSchneider Electric
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingSchneider Electric
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingSchneider Electric
 

More from Schneider Electric (20)

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design Considerations
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting Investors
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation Trends
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service Providers
 
Magelis Basic HMI Briefing
Magelis Basic HMI Briefing Magelis Basic HMI Briefing
Magelis Basic HMI Briefing
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay Briefing
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR Briefing
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software Briefing
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive Industries
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoT
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories Briefing
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors Briefing
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches Briefing
 

Recently uploaded

Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024The Digital Insurer
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024SynarionITSolutions
 

Recently uploaded (20)

Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 

Leveraging AMI for Outage Management

  • 1. Leveraging AMI for Outage Management Executive summary Only 8–12% of customers report a power outage to their utility. Utilities that integrate Automated Metering Systems (AMI) data into outage management systems receive faster and more accurate reports about power outages, can better predict the extent of the outage, and more reliably verify service restoration. This paper discusses practical considerations when integrating AMI for outage management, including compliance testing, data quantity and quality, analysis issues, and best practices learned from experience. 998-2095-06-06-12AR0
  • 2. Summary Executive Summary . ................................................................................... p 1 Introduction ................................................................................................. p 4 Integration enables faster response and restoration ..................................... p 6 Achieving full-function AMI/OMS interoperability . ......................................... p 7 Consider your analysis goals and solutions................................................... p 9 Factors affecting performance ..................................................................... p 10 Lessons learned .......................................................................................... p 11 Develop a strategy ....................................................................................... p 12 Conclusion................................................................................................... p 13
  • 3. Leveraging AMI for Outage Management Executive summary The Smart Grid uses network data — from real-time to historical — to improve operational and business processes across the utility. The Advanced Metering Infrastructure (AMI) that is integrated with the Outage Management System (OMS) can provide valuable data that enables much faster and more reliable reporting of power outage events than from customers calls. Further, the robust OMS can leverage AMI data to predict the extent of the outage, and identify downstream nested outages, as well as verify restoration and save costs associated with field crews and truck rolls. To achieve simplified deployment, maintenance, and upgrades, compliance with interoperability standards is necessary. Performance testing will demonstrate whether the AMI communication system meets expected data management performance and if the OMS can consistently process the high throughput of data associated with large-scale outages. The OMS needs an accurate network model and enhanced analysis capabilities to determine missing or delayed data, predict outage extent and discern partial power and power quality events. Utilities targeting such an interactive and powerful AMI/OMS integrated solution must consider a system that can accommodate AMI upgrades and component updates and replacement. They will want to consider a staged implementation and vendor experience, both of which contribute to successful deployment of the AMI/OMS solution. The interoperable OMS can put AMI data to work, to visualize, analyze, validate and report. The utility realizes faster, more accurate incident location, faster job completion, and improved customer service and satisfaction — and maximized return on its AMI investment. White paper | 01
  • 4. Leveraging AMI for Outage Management Introduction As utilities deploy Automated Metering Infrastructure (AMI) systems, they are looking to extend the value of their investment through integration with other Smart Grid information systems. This approach delivers business benefits throughout the enterprise, including the mission-essential activity of network operations. One such integration that is gaining popularity is linking AMI with Outage Management Systems (OMS), exemplifying how system interoperability helps utilities leverage the most from their distribution system projects. AMI and OMS integration can create operational intelligence that significantly increases the accuracy and efficiency of outage detection and restoration verification. This paper details the tangible benefits realized by extending AMI to the control room; such benefits include reduced outage times, efficient crew management, nested outage detection and more accurate reliability reporting. This paper also identifies the issues a utility must consider to achieve successful AMI/ OMS interoperability: system performance, standards-based messaging, event validation, network analysis and visual awareness. It will become clear that outage management augmented with AMI represents a unity that enhances all of the benefits utilities have come to expect from successfully deployed OMS solutions. White paper on Energy Efficiency | 02
  • 5. Leveraging AMI for Outage Management
  • 6. Leveraging AMI for Outage Management Integration enables faster response and restoration Let’s take a look at the anticipated returns from integrating AMI and OMS. Seamless interoperability between the AMI and OMS allows the OMS to put better information to work — faster, to enhance overall response and restoration. Identify incident locations faster, more accurately Automatic meter notification is more reliable than engine and advanced prediction algorithms can customer notifications. For many utilities, an average maximize the value from an increase in data that of only eight to 12 percent of customers will call to varies in reliability. report a power problem. While this low call-in rate is often due to customers not being present at the The ability to identify, validate and properly correlate affected location, customers quite commonly do not event data that is duplicate, delayed, missing or report electric outages because they presume the out of order significantly aids in the efficiency and utility is aware of the issue. Historically, depending accuracy of managing network-related issues. An on the location and size of the affected area, utilities OMS testing/training tool that allows the utility to have not had direct awareness of customer network simulate the irregularities and inconsistencies that problems. can occur in meter communications can best prepare system operators, dispatchers and administrative Enter the era of AMI systems that offer last gasp staff — see Figure 1. — the ability to automatically communicate ‘no power’ events, which makes event reporting more immediate, reliable and available. This is certainly welcome data for system operators and dispatchers, and reflects one more step towards a smarter grid. But AMI technology and communication infrastructures have limitations. Communication network bandwidth constraints can limit a percentage of ‘no power’ messages from reaching the enterprise Figure 1. OMS simulates AMI event data for testing and training in a timely manner — or at all. While AMI is SCADAlike in some ways, communication of data is not An OMS should be able to utilize all relevant as rapid or reliable — thus the need for enhanced outage and non-outage information for tracing and processing. An OMS with an AMI event validation prediction analysis of a near-real-time distribution White paper | 04
  • 7. Leveraging AMI for Outage Management network model. AMI systems cannot do this on their own, since the topologies of AMI communication networks have limited knowledge of the power distribution network, let alone the current state of network devices and power sources. Leveraging the utility’s geographic information system (GIS) as a representation of the as-built state of the network, the OMS maintains the as-operated state, providing utility staff with a geospatial view of network activity — see Figure 2. A robust OMS also can take advantage of AMI Figure 2. The OMS map view displays AMI meter event status solutions that also provide event notification from devices higher on the network. The OMS can prioritize these events to identify incident locations more rapidly. Prioritization of upstream events allows the OMS to simply associate related downstream events, reducing the amount of processing required. The OMS also can process information from AMI solutions that report partial power and power qualityrelated events. Verify outages and restorations Automatic or manual pinging of unreported over-prediction by acquiring AMI confirmation of meters can be used to help validate results of power status. Pinging is only appropriate for those restoration activity, as well as prediction analysis. meters that have not reported activity, yet are Pinging meters following a restoration event can predicted as part of an incident. aid in identifying nested outages that might exist downstream from field crew activity. The OMS can There is a strong business benefit in these validation create a new incident for the nested outage while activities: utilities have reported significant financial crews are on site, helping to reduce outage duration, savings associated with improved efficiency of truck customer calls, customer service costs and additional rolls due to AMI and OMS integration. trips to the field. Pinging of meters for outage status also can be beneficial for validating predicted incident locations in advance of assigning crews. The utility can prevent White paper | 05
  • 8. Leveraging AMI for Outage Management Increase customer support In addition to getting customers’ power restored faster, many utilities consider it a significant benefit to be able to proactively communicate power problems, crew status and estimated time to restoration (ETR) to their customers. Regardless of the medium of communication, a customer can be notified that the utility is aware of a power problem at their location, based on an AMI-reported event. Even without this proactive communication, the enhanced visual awareness provided by the OMS lets the user confirm knowledge of a power problem to a customer at the time they call in to report it — see Figure 3. And with quicker identification of incident locations, utilities can more rapidly and accurately assign crews and specify ETRs. Figure 3. The OMS call entry screen shows customer meter status Improve reliability reporting The utility’s performance indexes are more Better current and historical data enables improved accurate. OMS can leverage the reported outage analyses to help mitigate future events and optimize and restoration times from AMI to improve reliability information shared with regulators, customers, media reporting and other forms of statistical analysis. The and other stakeholders. most common reliability reports require outage and restoration times for both customer-level and systemlevel analysis: • ustomer Average Interruption Duration Index C (CAIDI) • System Average Interruption Duration Index (SAIDI) • ustomer Average Interruption Frequency Index C (CAIFI) • ystem Average Interruption Frequency Index S (SAIFI) • omentary Average Interruption Frequency Index M (MAIFI) White paper | 06
  • 9. Leveraging AMI for Outage Management Achieving full-function AMI/OMS interoperability Integration standards and compliance testing Utilities, vendors and consultants have worked Interfacing AMI with an OMS that meets open- together for several years to create the IEC 61968 standards interoperability is the best way to facilitate Common Information Model (CIM). Most recently, deployment and ongoing maintenance and avoid the there has been increased momentum to support risk of future incompatibility. Further, an OMS with a the growth in Smart Grid projects, and AMI services-oriented architecture (SOA), making software interoperability has been receiving extra attention as components available via methods such as Web more and more utilities deploy solutions. The AMI services, enables scalability and extensibility as the Enterprise Task Force (OpenSG) and other working use and functionality of AMI technology evolves. groups are focusing on improving standardization that will enable the use of relevant AMI data throughout the utility enterprise. Defining data management goals While adherence to interoperability standards aids in AMI solutions successfully integrating with external systems, there are many other important considerations for integration deployment. AMI solutions implement varying means of communications, such as RF, WiFi, WiMAX, cellular, PLC and fiber; consequently, they cannot be expected to operate or perform the same. Each form Recent milestones in interoperability testing • 011 – IEC 61968 part three testing 2 demonstrated interoperability for network operations, including many systems such as AMI, OMS, and DMS of communication will have a unique effect on AMI system performance that may further vary depending on device concentration and location. The utility will want to establish clear thresholds or criteria for the system’s data handling capabilities, and test the integrated system before deployment. Data quantity Unlike a traditional OMS deployment, which typically only receives calls from approximately 10 percent of affected customers, the AMI-integrated OMS must be able to handle communication from all affected customer meters. The utility will want to know the system can receive high message bursts and process high-sustained rates of meter event messages, particularly for large-scale events. • 010 – IEC 61968 part nine testing 2 demonstrated interoperability specific for meter outage and restoration events, while CIM interoperability testing verified harmonization of the latest updates to the AMI Enterprise Reference Model • 009 – Inaugural testing for adherence to 2 the AMI Enterprise (OpenSG User Group) Reference Model based on IEC 61968 – the CIM standard for utility distribution modeling and message exchange Utilities are encouraged to participate in working groups focused on interoperability, to help ensure development of practical and effective standards. Performance testing, to demonstrate that the OMS can consistently process a relatively high number White paper | 07
  • 10. Leveraging AMI for Outage Management of events per hour, ensures an environment that can manage large-scale outage situations without impairing the workflow of dispatcher and operators. For a large utility, this rate could be hundreds of thousands of events in a very short time frame. Instead of finding ways to limit the quantity of Reasons to send all AMI operational data to OMS • MI events related to a specific incident can A be aggregated, and unrelated events filtered, prior to prediction analysis. AMI events that are sent to the OMS solution, an ideal approach is to ensure that the OMS has an abstracted AMI event-processing engine that will limit the performance impacts to the core OMS engine. This design will allow a utility to send all relevant AMI data to the OMS for pre- and post-event processing, while not jeopardizing the stability and usability of • omentary events may not require creation M of work, but could be beneficial for OMS historical analysis. • emote disconnect events are important to R the OMS for prioritizing outage events and classifying affected customers appropriately. the system. It will also allow the operational system of record — the OMS — to track and manage all network event data as desired. Data quality While AMI is like a network supervisory control and data acquisition (SCADA) system that collects data from remote devices, it is not nearly as reliable or efficient. Natural filtering in the AMI network will result in somewhat delayed and inconsistent data delivered to the OMS, which must be able to accurately define events from duplicate, missing, delayed and momentary data and data, delivered out of chronological order. Corollary event data The OMS should receive not only power failure and power restoration events, but also partial power and power quality events, communication status, meter disconnects and upstream device events. Power quality events, such as low voltage, can signal an isolated or area-wide voltage issue that may or may not be a precursor to an outage event. A “no communication” status event would serve as notification to the OMS that a given meter is not reachable, and that analysis functions should be How will you report outage times? Keep in mind: the AMI will record an event time with a time stamp, but the OMS might experience a delay in receiving that event. The utility will need to consider which time it reports to a regulatory body for purposes of documenting outages and response efficiency. adjusted accordingly. Upstream device events can be prioritized by the OMS since related downstream events would not require analysis. White paper | 08
  • 11. Leveraging AMI for Outage Management Consider your analysis goals and solutions With AMI delivering much more information to OMS than previously available, the OMS will require enhanced analysis in order to best leverage the data. Outage prediction – with more data, the OMS will need to address how prediction algorithms will apply appropriate thresholds and timing to predict the source of the event and the upstream devices involved in the outage. In some cases, unique, configurable prediction might be required, giving the utility the option of analyzing AMI events differently Architecture considerations Keep in mind these architectural components that might be involved in proper collection, processing, analysis and storage/recall of AMI data — part of the framework for facilitating and optimizing AMI/OMS integration... • Message adapter – receiving data than customer calls. • Log service – storing events for tracking Prediction validation – similarly, the utility will have • essage queue – handling the influx of M mass amounts of data the ability to initiate on-demand pings, automatic or manual, to confirm power status and better predict the incident location. Nested outage prediction – with integrated AMI/ OMS, the utility will have the ability to directly communicate with meters to determine where independent downstream outages, or nested outages exist. With this information, the OMS creates new • vent processor – processing of message E events • essage export – sharing validated data M with other systems • ata storage – separate storage of all AMI D event data events and restoration activity as necessary. The accurate outage timestamps provided by the AMI identify not only what was restored, but when — • MS event creation – prediction analysis of O AMI events information that can yield more accurate restoration times than those reported by crews — improving reliability reporting. Visualization – OMS can geospatially render validated events prior to and independent of Various event types – the OMS will need to consider predicted activity — providing dispatchers with visual how it will analyze information relating to partial power awareness in near real time. and power quality events, and how to differentiate them from standard outage events. Upstream devices – data collectors, and other primary voltage devices that are part of the AMI network, can be prioritized to provide information that streamlines outage response. White paper | 09
  • 12. Leveraging AMI for Outage Management Factors affecting performance Factors that can impact the success and performance of AMI/OMS integration include... Quantity and size of outages – substation-level or high-circuit-level events might not require the need to analyze all AMI events. Conversely, isolated and dispersed events, as well as single-premise events require more processing and analysis, since they must be treated individually. Upstream devices – indicators higher in the network will support more efficient processing of larger scale events. AMI communications – the reliability and speed of various communications systems can vary widely, making testing in advance highly beneficial. Proven interoperability – look for product-supported integration that adheres to the latest standards. Message batching – bundled AMI messages, where available, from AMI are an option that can improve Vendor experience – AMI solutions vary in performance compared to discrete messaging. messaging patterns and ability to support data options; an OMS provider with experience in Hardware infrastructure – it is important that integrating the system with various AMI and MDM infrastructure be sized appropriately to handle the solutions can be a critical element in project success. increased processing and data storage requirements. OMS model quality – a poor or inaccurate OMS network model will cause inaccurate analysis that will reduce the level of benefit offered by AMI integration. High data throughput – the OMS must have the ability to sustain high bursts and sustained load for extended periods of time, under varying weather patterns and AMI network configurations. White paper | 10
  • 13. Leveraging AMI for Outage Management Lessons learned Experience in working with utilities deploying AMI/ OMS solutions yields these suggestions... • ush for standards-based integration and identify P the integration mechanism, such as Web services • hen planning AMI/OMS integration, ensure W that the AMI vendor will support the integration deployment effort as necessary • onsider a staged implementation that utilizes an C increasing amount of available AMI data types and functionality over time • un performance tests in advance of the roll out R • o not overload the AMI with unnecessary ping D requests, which can slow or prevent access to vital information • Remember: AMI is not a SCADA system White paper | 11
  • 14. Leveraging AMI for Outage Management Develop a strategy A robust integration strategy will lead to robust functionality AMI/OMS interoperability is just one tactic of a comprehensive and successful integration. To fully realize potential returns and accommodate both near-term and future Smart Grid goals, utilities should carefully consider an integration solution built according to the following principals... Upgrade path – as AMI solutions evolve, utilities will need an upgrade path for their AMI/OMS integration solution. Enhancements – implement a productized integration solution that ensures future product updates and enhancements. Technical support – strive for a solution that will be covered under standard product support and not require custom support. Input from other utilities – take advantage of solutions that will evolve with feedback and requirements from a wide base of utilities. Standards-based implementation – look for products designed for ease of deployment and maintenance. Layers of component extraction – investigate systems with components — such as database engine, queuing mechanism and event logging — that are flexible in technology and easy to replace and maintain. White paper | 12
  • 15. Leveraging AMI for Outage Management Conclusion In summary, AMI and OMS systems are clearly synergistic. Leveraging AMI integration for operational purposes offers benefits that extend well beyond meter to cash. An OMS that provides the ability to consume AMI events for validation, visualization, analysis, and reporting will facilitate enhanced outage management. This functionality can be instrumental in helping a utility improve customer service while decreasing operational costs — and getting more value from its AMI investment. With the Smart Grid, the road ahead can seem overwhelming. The utility that implements a proven OMS integration solution designed to leverage the benefits of AMI will simplify its strategy, and be better prepared for what the future has in store. White paper | 13
  • 16. ©2012 Schneider Electric. All rights reserved. Schneider Electric USA, Inc. 4701 Royal Vista Circle Fort Collins, CO 80528 Phone: -866-537-1091 1 + (34) 91-714-70-02 Fax: 1-970-223-5577 www.schneider-electric.com/us June 2012