v    8 September 1994

                                                                        TUM




                   Lecture Notes on
                  Project Management

                      Bernd Bruegge
                   Technische Universität München
                Lehrstuhl für Angewandte Softwaretechnik



                          14 July 1998


Bernd Bruegge                Component-Based Software Engineering                 12
Odds and Ends I

v   Book on CBSE Homepage
      w See Post by Allen Duoit on July 13
                u   Chapter 1, Introduction
                u   Chapter 3, Software Lifecycle
                u   Chapter 5, Project Communication
                u   Chapter 6, Requirements Elicitation
                u   Chapter 7, Requirements Analysis
                u   Chapter 9, Design Rationale
      w Chapters available on August 15:
                u   Chapter 8 System Design
                u   Chapter 4 Project Management




Bernd Bruegge                               Component-Based Software Engineering   2
Odds and Ends II

v   Lecture Today:
      w Finish System Design
      w Project Management (No reading available yet)
v   Lecture on Wednesday:
      w Communication & Meeting Management
                u   Reading: Bruegge-Dutoit Ch 5
v   Lecture next Tuesday:
      w Software Lifecycle
                u   Reading: Bruegge-Dutoit Ch 3




Bernd Bruegge                             Component-Based Software Engineering   3
Outline of Lecture

v   Concepts and terminology
v   Purpose of Software Project Management Plans
v   Structure of a Project Management Plan
v   Project responsibilities
v   Team structures
v   Project planning
v   Work breakdown structure
v   Communication Management
v   Dependencies
v   Schedule
v   Project Management Tools

Bernd Bruegge              Component-Based Software Engineering   4
Laws of Project Management
v   Projects progress quickly until they are 90%
    complete. Then they remain at 90% complete forever.

v   When things are going well, something will go
    wrong. When things just can’t get worse, they will.
    When things appear to be going better, you have
    overlooked something.

v   If project content is allowed to change freely, the rate
    of change will exceed the rate of progress.

v   Project teams detest progress reporting because it
    manifests their lack of progress.


Bernd Bruegge                  Component-Based Software Engineering   5
How it should go

          Requirements
            Analysis


                Design


                         Implementation


                                  System Testing


                                         Delivery and Installation


Bernd Bruegge                  Component-Based Software Engineering   6
How it often goes


       Requirements
         Analysis



                D
                      E
                          L
                                     A
                                                      Y
                                                                     Vaporware

Bernd Bruegge                 Component-Based Software Engineering               7
Software Project Management Plan
v   Software Project:
      w All technical and managerial activities required to
        deliver the deliverables to the client.
      w A software project has a specific duration, consumes
        resources and produces work products.
      w Management categories to complete a software project:
          u Tasks, Activities, Functions



v   Software Project Management Plan:
      w The controlling document for a software project.
      w Specifies the technical and managerial approaches to
        develop the software product.
      w Companion document to requirements analysis
        document: Changes in either may imply changes in the
        other document.
      w SPMP may be part of project agreement.
Bernd Bruegge                    Component-Based Software Engineering   8
Project Agreement
v   Document written for a client that defines:
      w the scope, duration, cost and deliverables for the project.
      w the exact items, quantities, delivery dates, delivery location.
v   Client: Individual or organization that specifies the
    requirements and accepts the project deliverables.
v   Can be a contract, a statement of work, a business plan,
    or a project charter.
v   Deliverables (= Work Products that will be delivered to
    the client:
      w   Documents
      w   Demonstrations of function
      w   Demonstration of nonfunctional requirements
      w   Demonstrations of subsystems


Bernd Bruegge                      Component-Based Software Engineering   9
Project Agreement vs Problem Statement

           Client            Manager                                   Project Team
           (Sponsor)




                 Problem
                 Statement                       Software Project
                                                 Management Plan
                  Project
                 Agreement

Bernd Bruegge                   Component-Based Software Engineering                  10
Project: Functions, Activities and Tasks



                                                                                 Function
                               Project
                                                                                 Function


                Activity      Activity               Activity

                  Activity     Activity            Activity


                   Task      Task   Task                Task



Bernd Bruegge                             Component-Based Software Engineering              11
Functions
v    Activity or set of activities that span the duration of the
     project

                                                                      Function
                            Project
                                                                      Function


                Activity   Activity   Activity

                 Activity Activity Activity


                  Task Task Task Task

Bernd Bruegge                         Component-Based Software Engineering       12
Functions

v   Examples:
       w   Project management
       w   Configuration Management
       w   Documentation
       w   Quality Control (Verification and validation)
       w   Training

v   Question: Is system integration a project function?

v   Mapping of terms: Project Functions in the IEEE 1058
    standard are called Integral processes in the IEEE 1074
    standard. We call them cross-development processes


Bernd Bruegge                       Component-Based Software Engineering   13
Tasks
                                                         Function
                   Project
                                                         Function

                                                                      • Smallest unit
    Activity      Activity   Activity                                 of work subject
                                                                      to management
         Activity Activity   Activity
                                                                      • Small enough for
                                                                      adequate planning
            Task Task Task Task
                                                                      and tracking
                                                                      • Large enough
                                                                      to avoid micro
                                                                      management
Bernd Bruegge                  Component-Based Software Engineering                     14
Tasks
v   Smallest unit of management accountability
       w Atomic unit of planning and tracking
       w Finite duration, need resources, produce tangible result
         (documents, code)
v   Specification of a task: Work package
       w   Name, description of work to be done
       w   Preconditions for starting, duration, required resources
       w   Work product to be produced, acceptance criteria for it
       w   Risk involved
v   Completion criteria
       w Includes the acceptance criteria for the work products
         (deliverables) produced by the task.




Bernd Bruegge                        Component-Based Software Engineering   15
Task Sizes

v   Finding the appropriate               v    Tasks must be
    task size is problematic                   decomposed into sizes
      w Todo lists from previous               that allow monitoring
        projects
                                                  w Work package usually
      w During initial planning a                   corresponds to well
        task is necessarily large                   defined work assignment
      w You may not know how to                     for one worker for a week
        decompose the problem                       or a month.
        into tasks at first                       w Depends on nature of
      w Each software                               work and how well task is
        development activitity                      understood.
        identifies more tasks and
        modifies existing ones




Bernd Bruegge                   Component-Based Software Engineering        16
Examples of Tasks

v   Unit test class “Foo”
v   Test subsystem “Bla”
v   Write user manual
v   Write meeting minutes and post them
v   Write a memo on NT vs Unix
v   Schedule the code review
v   Develop the project plan
v   Related tasks are grouped into hierarchical sets of
    functions and activities.
v   Action item



Bernd Bruegge                Component-Based Software Engineering   17
Action Item

v   Definition: A task assigned to a person that has to be
    done within a week or less
v   Action items
       w Appear on the agenda in the Status Section (See lecture on
         communication)
       w Cover: What?, Who?, When?
v   Example of action items:
       w Florian unit tests class “Foo” by next week
       w Marcus develops a project plan before the next meeting
       w Bob posts the next agenda for the Simulation team meeting
         before Sep 10, 12noon.
       w The VIP team develops the project plan by Sep 18



Bernd Bruegge                     Component-Based Software Engineering   18
Activities

                                                                 Function
                       Project
                                                                 Function


       Activity       Activity   Activity                    • Major unit of work
                                                             with precise dates
          Activity Activity Activity
                                                           • Consists of smaller
                                                           activities or tasks
                Task Task Task Task
                                                              • Culminates in project
                                                               milestone.
Bernd Bruegge                    Component-Based Software Engineering           19
Activities

v   Major unit of work                       v     Activitites may be
v   Culminates in major                            grouped into larger
    project milestone:                             activities:
       w Internal checkpoint should                   w Establishes hierarchical
         not be externally visible                      structure for project
                                                        (phase, step, ...)
       w Scheduled event used to
         measure progress                             w Allows separation of
                                                        concerns
v   Milestone often produces                          w Precedence relations often
    baseline:                                           exist among activities
       w formally reviewed work                         (PERT Chart)
         product
       w under change control (change
         requires formal procedures)



Bernd Bruegge                       Component-Based Software Engineering         20
Examples of Activities

v Major         Activities:            v Activities   during
       w Planning                            requirements analysis:
       w Requirements                           w Refine scenarios
         Analysis                               w Define Use Case
       w System Design                            model
       w Object Design                          w Define object model
       w Implementation                         w Define dynamic
                                                  model
       w System Testing
                                                w Design User Interface
       w Delivery




Bernd Bruegge                 Component-Based Software Engineering    21
Structure of a Software Project Management Plan

v   0. Front Matter
v   1. Introduction
v   2. Project Organization
v   3. Managerial Process
v   4. Technical Process
v   5. Work Elements, Schedule, Budget
v   Optional Inclusions




Bernd Bruegge              Component-Based Software Engineering   22
SPMP Part 0: Front Matter

v TitlePage
v Revision sheet (update history)
v Preface: Scope and purpose
v Tables of contents, figures, tables




Bernd Bruegge           Component-Based Software Engineering   23
SPMP Part 1: Introduction

v 1.1           Project Overview
       w Executive summary: description of project, product
         summary
v 1.2           Project Deliverables
       w All items to be delivered, including delivery dates
         and location
v 1.3           Evolution of the SPMP
       w Plans for anticipated and unanticipated change
v 1.4           Reference Materials
       w Complete list of materials referenced in SPMP
v 1.5           Definitions and Acronyms
Bernd Bruegge                      Component-Based Software Engineering   24
SPMP Part 2: Project Organization

v 2.1           Process Model
       w Relationships among project elements
v 2.2           Organizational Structure
       w Internal management, organization chart
v 2.3           Organizational Interfaces
       w Relations with other entities
v 2.4           Project Responsibilities
       w Major functions and activities; nature of each; who’s
         in charge



Bernd Bruegge                     Component-Based Software Engineering   25
Process Model

v Shows         relationships              v Visualization   of
   among                                         process model
       w Functions, activities,            v     Project Management Aids
         tasks                                    w MS Project (Microsoft)
       w Milestones                               w MAC Project (Claris)
       w Baselines                                w EasyTrak (Planning
       w Reviews                                    Control International)
       w Work breakdown
         structure
       w Project deliverables
       w Sign-offs

Bernd Bruegge                     Component-Based Software Engineering   26
Example of an Organization Chart


                Client                 Management                        Consultants




                   Cross-functional Teams           Development Teams



                            Architecture                      Logbook

                               HCI
                                                           Maintenance
                            Web Master

                          Documentation                     Vehicle

                         Configuration Mgt                     Travel


                                                                 VIP


                     Infrastructure Team




Bernd Bruegge                          Component-Based Software Engineering            27
Clients, Managers and Consultants

                               Management
                             Malcolm Bauer
                              Bernd Bruegge
                               Allen Dutoit
                              Brian Cavalier
                               Sam Perman                                   Consultants
                           Isabel Torres-Yebra                           Klaus Eitzenberger
           Client        Alfonso Guerrero- Galan                          Manfred Mueller
       Dieter Hege                                                       Juergen Bortolazzi,
      Brigitte Pihulak                                                    Claus Czymmek

                            Infrastructure Team
                         Stephan Schoenig (CMU)
                          Joyce Johnstone (CMU)
                           Andreas Doerner (DB)
                         Arno Schmackpfeffer (DB)



Bernd Bruegge                     Component-Based Software Engineering                         28
Development and Cross-functional Teams
   Logbook Team         Maintenance                    Vehicle Team              Travel Team
   Aaron Wald             Team                              Andrew Wang            Ann Sluzhevsky
                          Arjun Cholkar                     Hoda                   Bin Zhou
   Herbert Stiel
                          Aveek Datta                       Moustapha              Christopher
   Michael Poole          Darren Mauro                      Jaewoo You             Chiappa
   MichaelScheinholtz     Joel Slovacek                     Ognjen                 Gordon Cheng
                          Steve Sprang                      Martinovic             John Doe
   Nathaniel Woods
                          Vincent Mak                       Paul Stadler           Kalyana Prattipati
   Pradip Hari            Yenni Kwek                        Tze Bin Loh            Michael Samuel
   Uhyon Chung                                              William Ferry




VIP Team                HCI Team                         Web Master Team           Configuration
                          Darren Mauro                                               Mgt Team
    Christopher
    Lumb                  Gordon Cheng                   Uhyon Chang               Michael Poole
    Eric Farng            Idan Waisman                      (Logbook)                  (Logbook)
    Idan Waisman          Paul Stadler                                             Darren Mauro
                          Steve Sprang                   Aveek Datta
    Li-Lun Cheng                                            (Maintenance)              (Maintenance)
    Patrick Toole         Tze Bin Loh
                          Yenni Kwek                     Tze Bin Loh               William Ferry
    Phillip Ezolt                                                                      (Simulation)
    Venkatesh                                               (Simulation)
    Natarajan                                            Kalyana Prattipati        Chris Chiappa
                                                            (Travel)                   (Travel)
                                                                                   Eric Farng (VIP)
Bernd Bruegge                             Component-Based Software Engineering                     29
Project Responsibilities

v   Planner                          v     Group leader
v   Analyst                          v     Liaison
v   Designer                         v     Minute Taker
v   Programmer                       v     Project Manager
v   Tester
v   Maintainer
v   Trainer
v   Document Editor
v   Web Master
v   Configuration Manager




Bernd Bruegge               Component-Based Software Engineering   30
Project Management: Hierarchical Project
Organization

                                              Chief Executive


                                                                      Team Leaders




                        Project Members


                       Basis of organization:
     Hierarchical information flow across corporate boundaries

Bernd Bruegge                  Component-Based Software Engineering                  31
Example of Hierchical Organization:
Chief Programmer Team

                          Chief Programmer


                             Assistant
                         Chief Programmer



   Senior Programmer   Librarian               Administration       Tester




   Junior Programmer




Bernd Bruegge                Component-Based Software Engineering            32
Another Project Organization:
Egoless Programming Team(Weinberg)

                                    Analyst




                Tester                                                     Programmer




                         Designer                         Librarian




Bernd Bruegge                       Component-Based Software Engineering                33
Project-Based Project Organization


                                                                             Project
                                                                             Leader


                                                                              Team
                                                                             Leaders
                Subsystem Team   Subsystem Team             Subsystem Team

                                                                              Team
                                                                             Members




                     Basis of organization:
  Nonlinear information flow across dynamically formed units
Bernd Bruegge                         Component-Based Software Engineering             34
Observations on Management Structures
v Egoless       structures don't work well
      w "Ownership" is important

v Hierarchical  information flow does not work
   well with iterative and incremental software
   development process
      w Manager is not necessarily always right

v Project-based      structures
      w Cut down on bureaucracy reduces development time
      w Decisions are expected to be made at each level
      w Hard to manage

Bernd Bruegge                Component-Based Software Engineering   35
Hierarchical Structure

v Projects   with high degree of certainty,
   stability, uniformity and repetition.
       wRequires little communication
       wRole definitions are clear
v When?
       wThe more people on the project, the more
        need for a formal structure
       wCustomer might insist that the test team be
        independent from the design team
       wProject manager insists on a previously
        successful structure
Bernd Bruegge             Component-Based Software Engineering   36
Project-Based Structure

v Project       with degree of uncertainty
       wOpen communication needed among
        members
       wRoles are defined on project basis
v When?
       wRequirements change during development
       wNew technology develops during project




Bernd Bruegge              Component-Based Software Engineering   37
Assigning Responsibilities To People

     Project To Do List
                           Role 1
                                                                    Person A
                • Item 1   Item 1
                • Item 2   Item 2
                           Item 9                                    Role 1
                • Item 3
                • Item 4                       Role 2                Role 2
                                               Item 4
                • Item 5
                                               Item 5
                • Item 6                       Item 7
                                                                    Person B
                • Item 7
                • Item 8
                             Role 3
                • Item 9
                            Item 3                                   Role 3
                            Item 6
                            Item 8



Bernd Bruegge                Component-Based Software Engineering              38
Possible Mappings of ToDos to People

v One-to-One
       w Ideal but often not worth to be called a project
v Many-to-Few
       w Each project member assumes several roles ("hats")
       w Danger of overcommittment
       w Need for load balancing
v Many-to-"Too-Many"
       w Some people don't have significant roles
       w Bystanders
       w Loosing touch with project


Bernd Bruegge                  Component-Based Software Engineering   39
Project Roles: Coach

v Listen  to gripes from individual teams
v Review weekly team reports
v Attend weekly project meetings
v Schedule and prepare meetings with client
v Insist that guidelines are followed
v Assign presentations (in-class project meetings,
  client review, client acceptance test)
v Resolve conflicts if they cannot be resolved
  otherwise


Bernd Bruegge          Component-Based Software Engineering   40
Project Role: Group leader

v Responsible for intra-group communication
   (Meeting Management: Primary Facilitator)
       w Run the weekly project meeting
       w Post agenda before meeting
       w Define and keep track of action items (who, what,
         when)
       w Measure progress (Enforce milestones)
       w Deliver work packages for the tasks to the project
         management
       w Present problems and status of team to project manager
v The   group leader has to be rotated among members
   of the team.
Bernd Bruegge                Component-Based Software Engineering   41
Group Leader: Create an Agenda
v   Purpose of Meeting
v   Desired Outcome
v   Information Sharing
v   Information Processing
v   Meeting Critique

                       Action Items
                     (Check Previous
                        Meeting)


                         Issues
                    (Check Previous
                   Meeting & BBoards)

Bernd Bruegge                 Component-Based Software Engineering   42
Project Role: Group Liason (Architecture, HCI)

v Responsible      for inter-group communication
       w Make available public definitions of subsystem
         developed by the team to the architecture teams
         (ensure consistency, etc)
       w Coordinate tasks spanning more than one group
         with other teams

v Responsible      for team negotiations




Bernd Bruegge                Component-Based Software Engineering   43
Project Role: Planner
v Plans the activities of an individual team and has
  the following responsibilities.
v Define project plan for team:
      w PERT chart, resource table and GANTT chart showing
        work packages
      w Enter project plan into MS Project
v Make project plan available to management
v Report group project status to group leader

  No explicit planner in JAMES. Responsibilities
  assumed by group leaders

Bernd Bruegge              Component-Based Software Engineering   44
Project Role: Document Editor

v Collect,proofread and distribute team
  documentation
v Submit team documentation to Architecture
  team
v Collect agendas
v Take Minutes at meetings




Bernd Bruegge        Component-Based Software Engineering   45
Web Master

v Maintain team home page
v Keep track of meeting history
v Keep track of design rationale




Bernd Bruegge          Component-Based Software Engineering   46
Web Master:
v   Publish Meeting Information on Team Homepage
     w Must contain Agenda, minutes, action items and
       issues
     w Possibilities:
                u   One HTML document per meeting, with anchors
                    (maintained by one role)
                u   Separate HTML documents for Agenda, Minutes, etc
                    (maintained by several roles)
    Date              Agenda      Minutes                 Action Items         Issues


    9/9/96            Agenda      Minutes                 Action Items         Issues


    9/16/96           Agenda      Minutes                 Action Items         Issues

Bernd Bruegge                           Component-Based Software Engineering            47
SPMP Part 3: Managerial Processes

v   3.1 Management Objectives and Priorities
       w Philosophy, goals and priorities
v   3.2 Assumptions, Dependencies, Constraints
       w External factors
v   3.3 Risk Management
       w Identifying, assessing, tracking, contingencies for risks
v   3.4 Monitoring and Controlling Mechanisms
       w Reporting mechanisms and formats, information flows,
         reviews
v   3.5 Staffing Plan
v   Needed skills (what?, how much?, when?)


Bernd Bruegge                      Component-Based Software Engineering   48
Examples of Assumptions
v   There are enough cycles on the development machines
v   Security will not be addressed
v   There are no bugs in the CASE Tool recommended for
    the project
v   A demonstration of the X system will be given by the
    client
v   The CAD Model of the seat will be made available by the
    client




Bernd Bruegge               Component-Based Software Engineering   49
Examples of Dependencies

v   The VIP team depends on the vehicle subsystem
    provided by the vehicle team

v   The automatice code generation facility in the CASE tool
    Rose/Java depends on JDK. The current release of
    Rose/Java supports only JDK 1.0.2




Bernd Bruegge               Component-Based Software Engineering   50
Examples of Constraints

v   The length of the project is 3 months. limited amount of
    time to build the system
v    The project consists of beginners. It will take time to
    learn how to use the tools
v   Not every project member is always up-to-date with
    respect to the project status
v   The use of UML and a CASE tool is required
v   Any new code must be written in Java
v   The system must use Java JDK 1.1




Bernd Bruegge                Component-Based Software Engineering   51
Risk Management

v   Risk: Members in key                   v     Risk: One subsystem
    roles drop the course.                       does not provide the
       w Contingency: Roles are                  functionality needed by
         assigned to somebody else.              another subsystem.
         Functionality of the system                w Contingency: ?
         is renegotiated with the
         client.
                                           v     Risk: Rose will not
v   Risk: The project is                         support JDK 1.1
    falling behind schedule.                        w Contingency: ?
       w Contingency: Extra project
         meetings are scheduled.




Bernd Bruegge                     Component-Based Software Engineering     52
SPMP Part 4: Technical Process

v   4.1 Methods, Tools and Techniques
       w Computing system, development method, team structure, etc.
       w Standards, guidelines, policies.
v   4.2 Software Documentation
       w Documentation plan, including milestones, reviews and
         baselines.
v   4.3 Project Support Functions
       w Plans for functions (quality assurance, configuration
         management).




Bernd Bruegge                      Component-Based Software Engineering   53
SPMP Part 5: Work Elements

v   5.1 Work Packages (Work breakdown structure)
       w Project decomposed into tasks; definitions of tasks
v   5.2 Dependencies
       w Precedence relations among functions, activities and tasks
v   5.3 Resource Requirements
       w Estimates for resources such as personnel, computer time,
         special hardware, support software.
v   5.4 Budget and Resource Allocation
       w Connect costs to functions, activities and tasks.
v   5.5 Schedule
       w Deadlines, accounting for dependencies, required milestones



Bernd Bruegge                       Component-Based Software Engineering   54
Creating Work Packages
v   Work Breakdown Structure (WBS) (Section 5.1)
     w Break up project into activities (phases, steps) and tasks.
     w The work breakdown structure does not show the interdependence
       of the tasks




v   WBS identification is an instance of object identification




Bernd Bruegge                  Component-Based Software Engineering   55
WBS Trade-offs

v   Work breakdown structure influences cost and schedule
v   Thresholds for establishing WBS in terms of percentage
    of total effort:
       w Small project (7 person-month): at least 7% or 0.5 PM
       w Medium project (300 person-month): at least 1% or 3 PMs
       w Large project (7000 person-month): at least 0.2 % or 15 PMs
v   Determination of work breakdown structure is
    incremental and iterative
                                                                        Source: Software Engineering
                    WBS                   Schedule                      Economics, Barry W. Boehm
                                                                        p. 47, Prentice Hall, N.J., 1981

                             Cost
                             (Time, $$)


Bernd Bruegge                        Component-Based Software Engineering                          56
Dependencies and Schedule (Section 5.2 + 5.5)

v   An important temporal relation: “must be preceded by”
v   Dependency graphs show dependencies of the tasks
    (hiercharchical and temporal)
       w Activity Graph:
                u   Nodes of the graph are the project milestones
                u   Lines linking the nodes represent the tasks involved
       w Schedule Chart (MS-Project):
                u   Nodes are tasks and milestones
                u   Lines represent temporal dependencies
v   Estimate the duration of each task
v   Label dependency graph with the estimates



Bernd Bruegge                               Component-Based Software Engineering   57
Project Management Tools for Work Packages

v   Visualization Aids for Project Presentation
       w Graphs (Schedule), Trees (WBS)
       w Tables (Resources)
v   Task Timeline
       w Gantt Charts: Shows project activities and tasks in parallel.
         Enables the project manager to understand which tasks can be
         performed concurrently.
v   Schedule Chart (PERT Chart)
       w Cornerstone in many project management tools
       w Graphically shows dependencies of tasks and milestones
                u   PERT: Program Evaluation and Review Technique
                      – A PERT chart assumes normal distribution of tasks durations
                      – Useful for Critical Path Analysis
                u   CPM: Critical Path Method

Bernd Bruegge                             Component-Based Software Engineering   58
GANTT Chart Example for OWL Project

       8/9/96             9/6/96          10/4/96            11/1/96          11/29/96           12/27/96



                  Start


         Planning Phase

                Requirements
                 Analysis Phase
                          System Design Phase

                                   Analysis Review


                                             Object Design

                                            Project Review


                                   Implementation & Unit Testing


                                            Object Design Review


                                                        System Integration


                                                        Internal Project Review


                                                                   Client Acceptance




Bernd Bruegge                                                       Component-Based Software Engineering    59
Project: Building a House

v   Activity 1: Landscaping the lot
     w Task 1.1: Clearing and grubbing
     w Task 1.2: Seeding the Turf
     w Task 1.3: Planting shrubs and trees
v   Activity 2: Building the House
     w Activity 2.1 : Site preparation
     w Activity 2.2: Building the exterior
     w Activity 2.3: Finishing the interior
v   Activity 2.1 : Site preparation
     w Task 2.1.1: Surveying
     w Task 2.1.2: Obtaining permits
     w Task 2.1.3: Excavating
v   Task 2.1.4: Obtaining materials

Bernd Bruegge                    Component-Based Software Engineering   60
Activity 2: Building a House, ctd

v   Activity 2.2: Building the            v     Activity 2.3 : Finishing the
    exterior                                    Interior
     w Task 2.2.1: Foundation                     w Task 2.3.1: Interior
     w Task 2.2.2: Outside Walls                    plumbing
     w Task 2.2.3: Exterior                       w Task 2.3.2: Interior
        plumbing                                    electrical work
     w Task 2.2.4: Exterior                       w Task 2.3.3: Wallboard
        electrical work                           w Task 2.3.4: Interior
     w Task 2.2.5: Exterior siding                  painting
     w Task 2.2.6: Exteror painting               w Task 2.3.5: Floor covering
     w Task 2.2.7: Doors and                      w Task 2.3.6: Doors and
        Fixtures                                    fixtures
     w Task 2.2.8: Roof



Bernd Bruegge                    Component-Based Software Engineering            61
Activity Graph for Activity “Building a House”
                                                                START

                                Build Outside Wall
                                                                Surveying
                                                 1.2     1.1
                                                                Excavation
                                                         1.3
                                                                Buy Materials
                                                         1.4
                                                                Lay Foundation
                                                         2.1
                                                                Build Outside Wall
                     Install Exterior Plumbing           2.2
                                                                         Install Interior Plumbing

                                          2.3                                       3.1
        Install Exterior Electrical                                             Install Interior Electrical
                                          2.4                                3.2
                Install Exterior Siding                                          Install Wallboard
                                          2.5                                3.3
                        Paint Exterior                      Install Flooring         Paint Interior
                                          2.6                                3.4         3.5
                Install Exterior Doors           Install Roofing
                                                                                      Install Interior Doors
                                          2.7         2.8                      3.6


                                                          2.6       FINISH
Bernd Bruegge                                           Component-Based Software Engineering                   62
PERT Chart Example for "Building a House"
                                                                         12/3/94       12/21/94            1/11/95
                                                                                    Install          Install           Install
                                                                                   Interior         Interior          Wallboard
                                                                                   Plumbing        Electrical
                        Building a House:
                                                                              0                0                  0          1/22/95
                                                                              12              15                  9                    Paint
                    MS Project PERTcy
                                                                                                                                      Interior
                    Chart with Duration of
                    Activities (Pfleeger 2.3)                                                                                  0         2/8/95
                                                                                                                              11
                                                                                                                        1/22/95                   Install
                                                                                                                                                 Interior
                                                                                                                                   Install         Doors
                                                                                                                                  Flooring
                                                                                                                                                 0
                                                         10/15/94   11/5/94                                                                      7
     8/27/94         8/27/94 9/17/94        10/1/94                                                                            0                     2/16/95
                                                                 Lay        Build                                             18
                    START     Survey     Excava      Buy                                                         1/19/95                                     FINISH
                                                                Founda     Outside
                                ing       tion      Material
                                                                 tion        Wall                                           Install
                                                   0                                                                        Roofing    1/19/95           0
                0           12         0                       0          0
                0                      10         10                                                                                             Install 0
                            3                                  15        20                                            12
                                                                                                                       9                        Exterior
                                                                                                                                                  Doors
                    8/27/94
                                                                                                                                             15
                            Request                                                                             1/12/95
                                                                                                                                              6
                            Permits                                                                                      Paint
                       0                                                                                                Exterior
                       15                                                                                             12
                                                                                                                      5
                                                                     12/3/94        12/17/94         12/31/94

                                                                               Install         Install           Install
                      Start Time      8/29/94
                                                                              Exterior        Exterior          Exterior
                                                Legend                        Plumbing        Electrical          Siding

                                                                         12              12                12
                       Slack Time       0                                                                  8
                                                                         10              10
                           Duration     0

Bernd Bruegge                                                        Component-Based Software Engineering                                                       63
Slack Time and Critical Path

v   Slack Time
       w Available Time - Estimated (“Real”) Time for a task or activity
       w Or: Latest Start Time - Earliest Start Time
v   Critical Path
       w The path in a project plan for which the slack time at each task
         is zero.


The critical path has no margin for error when performing
  the tasks (activities) along its route.




Bernd Bruegge                      Component-Based Software Engineering   64
How do you become a good project planner?

v   Establish a project plan
       w Start with the plan based on your experience with the last
         project(s)
v   Keep track of activities and their duration
v   Determine difference between planned and actual
    performance
v   Make sure to do a post-mortem
       w Lessons learned
       w Ask developers for feedback
       w Write a document about what could have been improved




Bernd Bruegge                      Component-Based Software Engineering   65
Writing the SPMP

v Example of a full SPMP for the OWL project
   w http://cascade1.se.cs.cmu.edu/15-413/courseDocs/spmpF96.html




Bernd Bruegge                 Component-Based Software Engineering   66
Project Management Heuristics

v   Make sure to be able to revise or dump a project plan
       w Complex system development is a nonlinear activity
v   If project goals are unclear and complex use team-based
    project management. In this case
       w Avoid perfect GANTT charts and PERT charts
       w Don’t look too far into the future
v   Avoid micro management of details
v   Don’t be surprise if current project management tools
    don’t work:
       w They were designed for projects with clear goals and fixed
         organizational structures




Bernd Bruegge                     Component-Based Software Engineering   67
Project Management Summary

v   Get agreement among customers, managers and teams
      w   Problem statement
      w   Software project management plan
      w   Project agreement
      w   Make sure agreement allows for iteration
v   Team Structures
v   Project planning
      w Start with work breakdown structure (WBS)
      w Identify dependencies and structure: Tasks, activities, functions
v   Tools and Techniques
      w GANTT, Dependency graph, Schedule, Critical Path Analysis



Bernd Bruegge                      Component-Based Software Engineering   68
Communication Management

v   Communication in distributed Teams
v   Communication Modes
v   Communication Mechanisms
v   Scheduled Communications
v   Communication workflow
       w Example: Distributed Document Review with Lotus Notes




Bernd Bruegge                   Component-Based Software Engineering   69
A Communication Example

v   "Two missile electrical boxes manufactured by
    different contractors were joined together by a pair of
    wires.




       Box 1              Pair of Wires                             Box 2




Bernd Bruegge                Component-Based Software Engineering           70
A Communication Example ctd


v   Thanks to a particular thorough preflight check, it was
    discovered that the wires had been reversed."




       Box 1                                                       Box 2




Bernd Bruegge               Component-Based Software Engineering           71
After the Crash...

v   ...
v   "The postflight analysis revealed that the contractors
    had indeed corrected the reversed wires as instructed."




Bernd Bruegge               Component-Based Software Engineering   72
“In fact, both of them had.”




       Box 1                                                      Box 2




Bernd Bruegge              Component-Based Software Engineering           73
Communication is Important

v Communication          Mode:
       Type of information exchange that has defined
         objectives and scope
       w Scheduled: Planned Communication
       w Event Driven:Unplanned Communication
v Communication          Mechanism
       Tool or procedure that can be used to transmit or
         receive information
       w Synchronous: Sender and Receiver are available at the
         same time
       w Asynchronous: Sender and Receiver are not
         communicating at the same time.
Bernd Bruegge                 Component-Based Software Engineering   74
Classification of Communication



                  Communication                     supports                              Communication
                     mode                        is supported by                            mechanism




    Scheduled                     Event driven                          Synchronous                       Asynchronous




  Client review               Problem reporting                       Smoke signals                           Fax




Bernd Bruegge                                      Component-Based Software Engineering                             75
Scheduled Modes of Communication
v Problem                Definition
      w Objective: Present Goals & Requirements
        (Functional, Nonfunctional) and Constraints
                u   Problem Statement Presentation (JAMES Example: August 26, 97)

v Project             Review: Focus on System Model
      w Objective: Assess status and review subsystem
        interfaces
                u   Analysis Review (October 16, 1997)
                u   Object Design Review (November 11 & 13, 1997)
                u   Implementation Review (November 25, 1997)

v Client             Review: Focus on Requirements
      w Objective: Brief Client of Progress, Confirm Changes
        in Requirements
                u   System Design Review (October 23, 1997)
Bernd Bruegge                              Component-Based Software Engineering   76
Scheduled Modes of Communication
v Walkthrough                   (Informal)
       w Objective: Increase quality of subsystem
       w Developer presents to team members Informal, peer-
         to-peer
                u   To be scheduled by each team
v   Inspection (Formal)
     w Objective: Compliance with (functional and
       nonfunctional) requirements
     w Developer answers questions from the reviewers
                u   Client Acceptance Test (December 9, 1997)




Bernd Bruegge                              Component-Based Software Engineering   77
Scheduled Modes of Communication

v Status        Review:
       w Objective: Find deviations from schedule and
         correct them or identify new issues
       w Part of every team meeting (Status)
v Brainstorming:
       w Objective: Generate and evaluate large number of
         solutions for a problem
       w Part of every team meeting (Discussion)




Bernd Bruegge                Component-Based Software Engineering   78
Meeting as Scheduled and Synchronous
Communication
v   Purpose of Meeting
       w Why do we meet?
v   Desired Outcome
       w What do we want to achieve?
v   Information Sharing
       w Action Items
v   Information Processing
       w Open Issues
                             Action Items
v   Meeting Critique       (From previous
                              meeting)

                               Issues
                           (From previous
                            meetings and
                              BBoards)
Bernd Bruegge                    Component-Based Software Engineering   79
Scheduled Modes of Communication

v Release
       w The result of each software development activity
                u   Software Project Management Plan (SPMP)
                u   Requirements Analysis Document (RAD)
                u   System Design Document (SDD)
                u   Object Design Document (ODD)
                u   Test Manual
                u   User Manual
v Postmortem                  Review
       w Objective: Describe Lessons Learned
                u   Final Homework (December 16, 1997)



Bernd Bruegge                             Component-Based Software Engineering   80
Event-Driven Modes of Communication

v   Request for Clarification
v   Change Request
v   Resolution of Issue




Bernd Bruegge                   Component-Based Software Engineering   81
Synchronous Communication Mechanisms

v   Hallway conversation
       w Unplanned face-to-face meeting
v   Questionaire and structured interviews
v   Meeting
       w Planned Face-to-Face Meeting, Telephone conversation
v   Groupware
       w Same time, different location groupware




Bernd Bruegge                    Component-Based Software Engineering   82
Asynchronous Communication Mechanisms

v   E-Mail
v   Newsgroups
v   Web
v   Lotus Notes




Bernd Bruegge      Component-Based Software Engineering   83
Example of Asynchronous Documentation:
Document Review

v   Fill out a review form
v   Attach document to be reviewed
v   Distribute the review form to reviewers
v   Wait for comments from reviewers
v   Review comments
v   Create action items from selected comments
v   Revise document and post the revised version
v   Iterate the review cycle

    Example:
       w “Review of Documents” Database in JAMES Project


Bernd Bruegge                   Component-Based Software Engineering   84
Review of
Documents
Database




  Bernd Bruegge   Component-Based Software Engineering   85
NewReview Form




Bernd Bruegge    Component-Based Software Engineering   86
Fill out the Review Form

v   Select reviewers
v   Select the document to be reviewed
v   Add comments to reviewers
v   Determine deadline




Bernd Bruegge               Component-Based Software Engineering   87
Reviewer Notification
v   Selected reviewers get e-mail




Bernd Bruegge                Component-Based Software Engineering   88
Status of Document Review




Bernd Bruegge       Component-Based Software Engineering   89
Reviewers
add their
Comments




 Bernd Bruegge   Component-Based Software Engineering   90
Originator Notification




Bernd Bruegge         Component-Based Software Engineering   91
Final Recipient Notification




Bernd Bruegge         Component-Based Software Engineering   92
Document Editor & Web Master Tasks

v   Editor reviews comments
v   Editor selects reviewed comments
v   Web Master posts reviewed document and action items
v   Team members complete their action items
v   Editor integrates changes
v   Editor posts changed document on the review database
    for the next review cycle




Bernd Bruegge              Component-Based Software Engineering   93
Accepted Document w/ Action Items




Bernd Bruegge       Component-Based Software Engineering   94
SPMP Action Items




Bernd Bruegge       Component-Based Software Engineering   95
Summary

v   Communication Modes vs Communication Mechanisms
v   Scheduled Communications
v   Asynchronous Communications
v   Team review of documents with Lotus Notes




Bernd Bruegge            Component-Based Software Engineering   96

Weitere ähnliche Inhalte

Was ist angesagt?

Immutable principles of project management (austin pmi)(v4)(no exercise)
Immutable principles of project management (austin pmi)(v4)(no exercise)Immutable principles of project management (austin pmi)(v4)(no exercise)
Immutable principles of project management (austin pmi)(v4)(no exercise)Glen Alleman
 
Overview Of Project Management - P&MSP2010 (2/11)
Overview Of Project Management - P&MSP2010 (2/11)Overview Of Project Management - P&MSP2010 (2/11)
Overview Of Project Management - P&MSP2010 (2/11)Emanuele Della Valle
 
Immutable principles of project management (fw pmi)(v4)
Immutable principles of project management (fw pmi)(v4)Immutable principles of project management (fw pmi)(v4)
Immutable principles of project management (fw pmi)(v4)Glen Alleman
 
Agile Project Management for elearning development
Agile Project Management for elearning developmentAgile Project Management for elearning development
Agile Project Management for elearning developmentDon Bolen
 
Managing eLearning Projects
Managing eLearning ProjectsManaging eLearning Projects
Managing eLearning ProjectsGus Prestera
 
06 jerome crotteux - 3 e
06   jerome crotteux - 3 e06   jerome crotteux - 3 e
06 jerome crotteux - 3 eLinea Trovata
 
The project will be deemed successful when all the objectives have been met
The project will be deemed successful when all the objectives have been metThe project will be deemed successful when all the objectives have been met
The project will be deemed successful when all the objectives have been metMike Grabill, PMP
 
Vancouver project management presentation
Vancouver project management presentationVancouver project management presentation
Vancouver project management presentationmemberdevmanager
 
Project charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeProject charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeTheodore Van Patten, Jr.
 
Software Project Planning II
Software Project Planning IISoftware Project Planning II
Software Project Planning IIGagan Deep
 
2008 SMEF - Scope management - Sail the seas of change
2008 SMEF - Scope management - Sail the seas of change2008 SMEF - Scope management - Sail the seas of change
2008 SMEF - Scope management - Sail the seas of changeFrank Vogelezang
 
Law.richard
Law.richardLaw.richard
Law.richardNASAPMC
 
Dr. McNatty Webinar: An Introduction to Acumen 360
Dr. McNatty Webinar: An Introduction to Acumen 360Dr. McNatty Webinar: An Introduction to Acumen 360
Dr. McNatty Webinar: An Introduction to Acumen 360Acumen
 

Was ist angesagt? (18)

Immutable principles of project management (austin pmi)(v4)(no exercise)
Immutable principles of project management (austin pmi)(v4)(no exercise)Immutable principles of project management (austin pmi)(v4)(no exercise)
Immutable principles of project management (austin pmi)(v4)(no exercise)
 
Overview Of Project Management - P&MSP2010 (2/11)
Overview Of Project Management - P&MSP2010 (2/11)Overview Of Project Management - P&MSP2010 (2/11)
Overview Of Project Management - P&MSP2010 (2/11)
 
T355
T355T355
T355
 
Immutable principles of project management (fw pmi)(v4)
Immutable principles of project management (fw pmi)(v4)Immutable principles of project management (fw pmi)(v4)
Immutable principles of project management (fw pmi)(v4)
 
T348 Asm Iweb
T348 Asm IwebT348 Asm Iweb
T348 Asm Iweb
 
T343
T343T343
T343
 
57086 03 initiating_a_project
57086 03 initiating_a_project57086 03 initiating_a_project
57086 03 initiating_a_project
 
Agile Project Management for elearning development
Agile Project Management for elearning developmentAgile Project Management for elearning development
Agile Project Management for elearning development
 
Managing eLearning Projects
Managing eLearning ProjectsManaging eLearning Projects
Managing eLearning Projects
 
P&msp2010 04 wbs-and-estimation
P&msp2010 04 wbs-and-estimationP&msp2010 04 wbs-and-estimation
P&msp2010 04 wbs-and-estimation
 
06 jerome crotteux - 3 e
06   jerome crotteux - 3 e06   jerome crotteux - 3 e
06 jerome crotteux - 3 e
 
The project will be deemed successful when all the objectives have been met
The project will be deemed successful when all the objectives have been metThe project will be deemed successful when all the objectives have been met
The project will be deemed successful when all the objectives have been met
 
Vancouver project management presentation
Vancouver project management presentationVancouver project management presentation
Vancouver project management presentation
 
Project charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeProject charter and plan document for millennium upgrade
Project charter and plan document for millennium upgrade
 
Software Project Planning II
Software Project Planning IISoftware Project Planning II
Software Project Planning II
 
2008 SMEF - Scope management - Sail the seas of change
2008 SMEF - Scope management - Sail the seas of change2008 SMEF - Scope management - Sail the seas of change
2008 SMEF - Scope management - Sail the seas of change
 
Law.richard
Law.richardLaw.richard
Law.richard
 
Dr. McNatty Webinar: An Introduction to Acumen 360
Dr. McNatty Webinar: An Introduction to Acumen 360Dr. McNatty Webinar: An Introduction to Acumen 360
Dr. McNatty Webinar: An Introduction to Acumen 360
 

Andere mochten auch

Computer Security (Cryptography) Ch01
Computer Security (Cryptography) Ch01Computer Security (Cryptography) Ch01
Computer Security (Cryptography) Ch01Saif Kassim
 
Bank of Ireland Enterprise Week - Social Media for small business
Bank of Ireland Enterprise Week - Social Media for small businessBank of Ireland Enterprise Week - Social Media for small business
Bank of Ireland Enterprise Week - Social Media for small businessStephen Jio
 
Cryptography and Network Security
Cryptography and Network SecurityCryptography and Network Security
Cryptography and Network SecurityPa Van Tanku
 
Distributed system notes unit I
Distributed system notes unit IDistributed system notes unit I
Distributed system notes unit INANDINI SHARMA
 
TYBSC IT SEM 6 PROJECT MANAGEMENT NOTES
TYBSC IT SEM 6 PROJECT MANAGEMENT NOTESTYBSC IT SEM 6 PROJECT MANAGEMENT NOTES
TYBSC IT SEM 6 PROJECT MANAGEMENT NOTESWE-IT TUTORIALS
 
Business Process Re-engineering
Business Process Re-engineeringBusiness Process Re-engineering
Business Process Re-engineeringrinkimusaddi
 
Bpr business process reengineering ppt excellent
Bpr business process reengineering ppt excellentBpr business process reengineering ppt excellent
Bpr business process reengineering ppt excellentSwaraj
 
Fault tolerance in distributed systems
Fault tolerance in distributed systemsFault tolerance in distributed systems
Fault tolerance in distributed systemssumitjain2013
 
Business Process Reengineering Complete
Business Process Reengineering   CompleteBusiness Process Reengineering   Complete
Business Process Reengineering CompleteRoy Antony Arnold G
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringNeelkamal Sharma
 
Computer Security Lecture 1: Overview
Computer Security Lecture 1: OverviewComputer Security Lecture 1: Overview
Computer Security Lecture 1: OverviewMohamed Loey
 
Distributed computing
Distributed computingDistributed computing
Distributed computingshivli0769
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringKavindra Singh
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringAniket Verma
 
Distributed Systems
Distributed SystemsDistributed Systems
Distributed SystemsRupsee
 
Network Security and Cryptography
Network Security and CryptographyNetwork Security and Cryptography
Network Security and CryptographyAdam Reagan
 

Andere mochten auch (19)

Computer Security (Cryptography) Ch01
Computer Security (Cryptography) Ch01Computer Security (Cryptography) Ch01
Computer Security (Cryptography) Ch01
 
Bank of Ireland Enterprise Week - Social Media for small business
Bank of Ireland Enterprise Week - Social Media for small businessBank of Ireland Enterprise Week - Social Media for small business
Bank of Ireland Enterprise Week - Social Media for small business
 
Lecture12
Lecture12Lecture12
Lecture12
 
Cryptography and Network Security
Cryptography and Network SecurityCryptography and Network Security
Cryptography and Network Security
 
Distributed system notes unit I
Distributed system notes unit IDistributed system notes unit I
Distributed system notes unit I
 
TYBSC IT SEM 6 PROJECT MANAGEMENT NOTES
TYBSC IT SEM 6 PROJECT MANAGEMENT NOTESTYBSC IT SEM 6 PROJECT MANAGEMENT NOTES
TYBSC IT SEM 6 PROJECT MANAGEMENT NOTES
 
Business Process Re-engineering
Business Process Re-engineeringBusiness Process Re-engineering
Business Process Re-engineering
 
Bpr business process reengineering ppt excellent
Bpr business process reengineering ppt excellentBpr business process reengineering ppt excellent
Bpr business process reengineering ppt excellent
 
Fault tolerance in distributed systems
Fault tolerance in distributed systemsFault tolerance in distributed systems
Fault tolerance in distributed systems
 
Bpr ppt
Bpr pptBpr ppt
Bpr ppt
 
Distributed Systems
Distributed SystemsDistributed Systems
Distributed Systems
 
Business Process Reengineering Complete
Business Process Reengineering   CompleteBusiness Process Reengineering   Complete
Business Process Reengineering Complete
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Computer Security Lecture 1: Overview
Computer Security Lecture 1: OverviewComputer Security Lecture 1: Overview
Computer Security Lecture 1: Overview
 
Distributed computing
Distributed computingDistributed computing
Distributed computing
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Distributed Systems
Distributed SystemsDistributed Systems
Distributed Systems
 
Network Security and Cryptography
Network Security and CryptographyNetwork Security and Cryptography
Network Security and Cryptography
 

Ähnlich wie Project management

ch11lect-project-management.ppt
ch11lect-project-management.pptch11lect-project-management.ppt
ch11lect-project-management.pptNanoSana
 
ch11lect-project-management.ppt
ch11lect-project-management.pptch11lect-project-management.ppt
ch11lect-project-management.pptsrividyal2
 
Software Engineering Lec 3-project managment
Software Engineering Lec 3-project managmentSoftware Engineering Lec 3-project managment
Software Engineering Lec 3-project managmentTaymoor Nazmy
 
L35_LifecycleModeling_ch15lect1.ppt
L35_LifecycleModeling_ch15lect1.pptL35_LifecycleModeling_ch15lect1.ppt
L35_LifecycleModeling_ch15lect1.pptgarimaarora436394
 
L35_LifecycleModeling_ch15lect1.ppt
L35_LifecycleModeling_ch15lect1.pptL35_LifecycleModeling_ch15lect1.ppt
L35_LifecycleModeling_ch15lect1.pptSaraj Hameed Sidiqi
 
OOSE Ch1 Introduction
OOSE Ch1 IntroductionOOSE Ch1 Introduction
OOSE Ch1 IntroductionBenny Chen
 
Program Mgmt Overview
Program Mgmt OverviewProgram Mgmt Overview
Program Mgmt Overviewsmcasas
 
Software Engineering Lec 2
Software Engineering Lec 2Software Engineering Lec 2
Software Engineering Lec 2Taymoor Nazmy
 
Software Project Management Training
Software Project Management TrainingSoftware Project Management Training
Software Project Management TrainingJason Waterman
 
Valcon Design Robustness Program 2013
Valcon Design Robustness Program 2013Valcon Design Robustness Program 2013
Valcon Design Robustness Program 2013martinebro
 
SWE-401 - 3. Software Project Management
SWE-401 - 3. Software Project ManagementSWE-401 - 3. Software Project Management
SWE-401 - 3. Software Project Managementghayour abbas
 
Infrastructure project and responsibility break down
Infrastructure project and responsibility break downInfrastructure project and responsibility break down
Infrastructure project and responsibility break downBhim Upadhyaya
 
Software Production Layout_Se lect7 btech
Software Production Layout_Se lect7 btechSoftware Production Layout_Se lect7 btech
Software Production Layout_Se lect7 btechIIITA
 

Ähnlich wie Project management (20)

ch11lect-project-management.ppt
ch11lect-project-management.pptch11lect-project-management.ppt
ch11lect-project-management.ppt
 
ch11lect-project-management.ppt
ch11lect-project-management.pptch11lect-project-management.ppt
ch11lect-project-management.ppt
 
Software Engineering Lec 3-project managment
Software Engineering Lec 3-project managmentSoftware Engineering Lec 3-project managment
Software Engineering Lec 3-project managment
 
L35_LifecycleModeling_ch15lect1.ppt
L35_LifecycleModeling_ch15lect1.pptL35_LifecycleModeling_ch15lect1.ppt
L35_LifecycleModeling_ch15lect1.ppt
 
L35_LifecycleModeling_ch15lect1.ppt
L35_LifecycleModeling_ch15lect1.pptL35_LifecycleModeling_ch15lect1.ppt
L35_LifecycleModeling_ch15lect1.ppt
 
OOSE Ch1 Introduction
OOSE Ch1 IntroductionOOSE Ch1 Introduction
OOSE Ch1 Introduction
 
Spm tutorials
Spm tutorialsSpm tutorials
Spm tutorials
 
Lo 11
Lo 11Lo 11
Lo 11
 
Ch03lect1 ud
Ch03lect1 udCh03lect1 ud
Ch03lect1 ud
 
Ch3 proj.mgt
Ch3 proj.mgtCh3 proj.mgt
Ch3 proj.mgt
 
Program Mgmt Overview
Program Mgmt OverviewProgram Mgmt Overview
Program Mgmt Overview
 
Software Engineering Lec 2
Software Engineering Lec 2Software Engineering Lec 2
Software Engineering Lec 2
 
Software Project Management Training
Software Project Management TrainingSoftware Project Management Training
Software Project Management Training
 
Planning Phase - P&MSP2010 (3/11)
Planning Phase - P&MSP2010 (3/11)Planning Phase - P&MSP2010 (3/11)
Planning Phase - P&MSP2010 (3/11)
 
Ch5
Ch5Ch5
Ch5
 
Valcon Design Robustness Program 2013
Valcon Design Robustness Program 2013Valcon Design Robustness Program 2013
Valcon Design Robustness Program 2013
 
SWE-401 - 3. Software Project Management
SWE-401 - 3. Software Project ManagementSWE-401 - 3. Software Project Management
SWE-401 - 3. Software Project Management
 
Infrastructure project and responsibility break down
Infrastructure project and responsibility break downInfrastructure project and responsibility break down
Infrastructure project and responsibility break down
 
Software Production Layout_Se lect7 btech
Software Production Layout_Se lect7 btechSoftware Production Layout_Se lect7 btech
Software Production Layout_Se lect7 btech
 
Health
HealthHealth
Health
 

Mehr von Saumya Sahu

Paper presentation-nano-robots
Paper presentation-nano-robotsPaper presentation-nano-robots
Paper presentation-nano-robotsSaumya Sahu
 
Paper presentation-nano-robots
Paper presentation-nano-robotsPaper presentation-nano-robots
Paper presentation-nano-robotsSaumya Sahu
 
Engineering Symbols
Engineering SymbolsEngineering Symbols
Engineering SymbolsSaumya Sahu
 
Gate-2013(Computer Science) Que_Ans
Gate-2013(Computer Science) Que_AnsGate-2013(Computer Science) Que_Ans
Gate-2013(Computer Science) Que_AnsSaumya Sahu
 
Computer Fundamentals Chapter 16 bdp
Computer Fundamentals Chapter 16 bdpComputer Fundamentals Chapter 16 bdp
Computer Fundamentals Chapter 16 bdpSaumya Sahu
 
Computer Fundamentals Chapter 14 os
Computer Fundamentals Chapter 14 osComputer Fundamentals Chapter 14 os
Computer Fundamentals Chapter 14 osSaumya Sahu
 
Computer Fundamentals Chapter 12 cl
Computer Fundamentals Chapter 12 clComputer Fundamentals Chapter 12 cl
Computer Fundamentals Chapter 12 clSaumya Sahu
 
Computer Fundamentals Chapter 11 pcp
Computer Fundamentals Chapter 11 pcpComputer Fundamentals Chapter 11 pcp
Computer Fundamentals Chapter 11 pcpSaumya Sahu
 
Computer Fundamentals Chapter 09 io devices
Computer Fundamentals Chapter 09 io devicesComputer Fundamentals Chapter 09 io devices
Computer Fundamentals Chapter 09 io devicesSaumya Sahu
 
Computer Fundamentals Chapter 08 secondary storage
Computer Fundamentals Chapter 08 secondary storageComputer Fundamentals Chapter 08 secondary storage
Computer Fundamentals Chapter 08 secondary storageSaumya Sahu
 
Computer Fundamentals Chapter 07 pam
Computer Fundamentals Chapter  07 pamComputer Fundamentals Chapter  07 pam
Computer Fundamentals Chapter 07 pamSaumya Sahu
 
Computer Fundamentals Chapter 01 introduction
Computer Fundamentals Chapter 01 introductionComputer Fundamentals Chapter 01 introduction
Computer Fundamentals Chapter 01 introductionSaumya Sahu
 
Computer Fundamentals_Chapter 02 bco
Computer Fundamentals_Chapter 02 bcoComputer Fundamentals_Chapter 02 bco
Computer Fundamentals_Chapter 02 bcoSaumya Sahu
 
Computer Fundamentals
Computer FundamentalsComputer Fundamentals
Computer FundamentalsSaumya Sahu
 
Computer networks
Computer networksComputer networks
Computer networksSaumya Sahu
 
Computer networks (2)
Computer networks (2)Computer networks (2)
Computer networks (2)Saumya Sahu
 
Software project management
Software project managementSoftware project management
Software project managementSaumya Sahu
 

Mehr von Saumya Sahu (19)

Cloud computing
Cloud computingCloud computing
Cloud computing
 
Paper presentation-nano-robots
Paper presentation-nano-robotsPaper presentation-nano-robots
Paper presentation-nano-robots
 
Paper presentation-nano-robots
Paper presentation-nano-robotsPaper presentation-nano-robots
Paper presentation-nano-robots
 
Engineering Symbols
Engineering SymbolsEngineering Symbols
Engineering Symbols
 
Gate-2013(Computer Science) Que_Ans
Gate-2013(Computer Science) Que_AnsGate-2013(Computer Science) Que_Ans
Gate-2013(Computer Science) Que_Ans
 
Computer Fundamentals Chapter 16 bdp
Computer Fundamentals Chapter 16 bdpComputer Fundamentals Chapter 16 bdp
Computer Fundamentals Chapter 16 bdp
 
Computer Fundamentals Chapter 14 os
Computer Fundamentals Chapter 14 osComputer Fundamentals Chapter 14 os
Computer Fundamentals Chapter 14 os
 
Computer Fundamentals Chapter 12 cl
Computer Fundamentals Chapter 12 clComputer Fundamentals Chapter 12 cl
Computer Fundamentals Chapter 12 cl
 
Computer Fundamentals Chapter 11 pcp
Computer Fundamentals Chapter 11 pcpComputer Fundamentals Chapter 11 pcp
Computer Fundamentals Chapter 11 pcp
 
Chapter 10 cs
Chapter 10 csChapter 10 cs
Chapter 10 cs
 
Computer Fundamentals Chapter 09 io devices
Computer Fundamentals Chapter 09 io devicesComputer Fundamentals Chapter 09 io devices
Computer Fundamentals Chapter 09 io devices
 
Computer Fundamentals Chapter 08 secondary storage
Computer Fundamentals Chapter 08 secondary storageComputer Fundamentals Chapter 08 secondary storage
Computer Fundamentals Chapter 08 secondary storage
 
Computer Fundamentals Chapter 07 pam
Computer Fundamentals Chapter  07 pamComputer Fundamentals Chapter  07 pam
Computer Fundamentals Chapter 07 pam
 
Computer Fundamentals Chapter 01 introduction
Computer Fundamentals Chapter 01 introductionComputer Fundamentals Chapter 01 introduction
Computer Fundamentals Chapter 01 introduction
 
Computer Fundamentals_Chapter 02 bco
Computer Fundamentals_Chapter 02 bcoComputer Fundamentals_Chapter 02 bco
Computer Fundamentals_Chapter 02 bco
 
Computer Fundamentals
Computer FundamentalsComputer Fundamentals
Computer Fundamentals
 
Computer networks
Computer networksComputer networks
Computer networks
 
Computer networks (2)
Computer networks (2)Computer networks (2)
Computer networks (2)
 
Software project management
Software project managementSoftware project management
Software project management
 

Kürzlich hochgeladen

ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxPoojaSen20
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
FILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinoFILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinojohnmickonozaleda
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 

Kürzlich hochgeladen (20)

ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
FILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinoFILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipino
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 

Project management

  • 1. v 8 September 1994 TUM Lecture Notes on Project Management Bernd Bruegge Technische Universität München Lehrstuhl für Angewandte Softwaretechnik 14 July 1998 Bernd Bruegge Component-Based Software Engineering 12
  • 2. Odds and Ends I v Book on CBSE Homepage w See Post by Allen Duoit on July 13 u Chapter 1, Introduction u Chapter 3, Software Lifecycle u Chapter 5, Project Communication u Chapter 6, Requirements Elicitation u Chapter 7, Requirements Analysis u Chapter 9, Design Rationale w Chapters available on August 15: u Chapter 8 System Design u Chapter 4 Project Management Bernd Bruegge Component-Based Software Engineering 2
  • 3. Odds and Ends II v Lecture Today: w Finish System Design w Project Management (No reading available yet) v Lecture on Wednesday: w Communication & Meeting Management u Reading: Bruegge-Dutoit Ch 5 v Lecture next Tuesday: w Software Lifecycle u Reading: Bruegge-Dutoit Ch 3 Bernd Bruegge Component-Based Software Engineering 3
  • 4. Outline of Lecture v Concepts and terminology v Purpose of Software Project Management Plans v Structure of a Project Management Plan v Project responsibilities v Team structures v Project planning v Work breakdown structure v Communication Management v Dependencies v Schedule v Project Management Tools Bernd Bruegge Component-Based Software Engineering 4
  • 5. Laws of Project Management v Projects progress quickly until they are 90% complete. Then they remain at 90% complete forever. v When things are going well, something will go wrong. When things just can’t get worse, they will. When things appear to be going better, you have overlooked something. v If project content is allowed to change freely, the rate of change will exceed the rate of progress. v Project teams detest progress reporting because it manifests their lack of progress. Bernd Bruegge Component-Based Software Engineering 5
  • 6. How it should go Requirements Analysis Design Implementation System Testing Delivery and Installation Bernd Bruegge Component-Based Software Engineering 6
  • 7. How it often goes Requirements Analysis D E L A Y Vaporware Bernd Bruegge Component-Based Software Engineering 7
  • 8. Software Project Management Plan v Software Project: w All technical and managerial activities required to deliver the deliverables to the client. w A software project has a specific duration, consumes resources and produces work products. w Management categories to complete a software project: u Tasks, Activities, Functions v Software Project Management Plan: w The controlling document for a software project. w Specifies the technical and managerial approaches to develop the software product. w Companion document to requirements analysis document: Changes in either may imply changes in the other document. w SPMP may be part of project agreement. Bernd Bruegge Component-Based Software Engineering 8
  • 9. Project Agreement v Document written for a client that defines: w the scope, duration, cost and deliverables for the project. w the exact items, quantities, delivery dates, delivery location. v Client: Individual or organization that specifies the requirements and accepts the project deliverables. v Can be a contract, a statement of work, a business plan, or a project charter. v Deliverables (= Work Products that will be delivered to the client: w Documents w Demonstrations of function w Demonstration of nonfunctional requirements w Demonstrations of subsystems Bernd Bruegge Component-Based Software Engineering 9
  • 10. Project Agreement vs Problem Statement Client Manager Project Team (Sponsor) Problem Statement Software Project Management Plan Project Agreement Bernd Bruegge Component-Based Software Engineering 10
  • 11. Project: Functions, Activities and Tasks Function Project Function Activity Activity Activity Activity Activity Activity Task Task Task Task Bernd Bruegge Component-Based Software Engineering 11
  • 12. Functions v Activity or set of activities that span the duration of the project Function Project Function Activity Activity Activity Activity Activity Activity Task Task Task Task Bernd Bruegge Component-Based Software Engineering 12
  • 13. Functions v Examples: w Project management w Configuration Management w Documentation w Quality Control (Verification and validation) w Training v Question: Is system integration a project function? v Mapping of terms: Project Functions in the IEEE 1058 standard are called Integral processes in the IEEE 1074 standard. We call them cross-development processes Bernd Bruegge Component-Based Software Engineering 13
  • 14. Tasks Function Project Function • Smallest unit Activity Activity Activity of work subject to management Activity Activity Activity • Small enough for adequate planning Task Task Task Task and tracking • Large enough to avoid micro management Bernd Bruegge Component-Based Software Engineering 14
  • 15. Tasks v Smallest unit of management accountability w Atomic unit of planning and tracking w Finite duration, need resources, produce tangible result (documents, code) v Specification of a task: Work package w Name, description of work to be done w Preconditions for starting, duration, required resources w Work product to be produced, acceptance criteria for it w Risk involved v Completion criteria w Includes the acceptance criteria for the work products (deliverables) produced by the task. Bernd Bruegge Component-Based Software Engineering 15
  • 16. Task Sizes v Finding the appropriate v Tasks must be task size is problematic decomposed into sizes w Todo lists from previous that allow monitoring projects w Work package usually w During initial planning a corresponds to well task is necessarily large defined work assignment w You may not know how to for one worker for a week decompose the problem or a month. into tasks at first w Depends on nature of w Each software work and how well task is development activitity understood. identifies more tasks and modifies existing ones Bernd Bruegge Component-Based Software Engineering 16
  • 17. Examples of Tasks v Unit test class “Foo” v Test subsystem “Bla” v Write user manual v Write meeting minutes and post them v Write a memo on NT vs Unix v Schedule the code review v Develop the project plan v Related tasks are grouped into hierarchical sets of functions and activities. v Action item Bernd Bruegge Component-Based Software Engineering 17
  • 18. Action Item v Definition: A task assigned to a person that has to be done within a week or less v Action items w Appear on the agenda in the Status Section (See lecture on communication) w Cover: What?, Who?, When? v Example of action items: w Florian unit tests class “Foo” by next week w Marcus develops a project plan before the next meeting w Bob posts the next agenda for the Simulation team meeting before Sep 10, 12noon. w The VIP team develops the project plan by Sep 18 Bernd Bruegge Component-Based Software Engineering 18
  • 19. Activities Function Project Function Activity Activity Activity • Major unit of work with precise dates Activity Activity Activity • Consists of smaller activities or tasks Task Task Task Task • Culminates in project milestone. Bernd Bruegge Component-Based Software Engineering 19
  • 20. Activities v Major unit of work v Activitites may be v Culminates in major grouped into larger project milestone: activities: w Internal checkpoint should w Establishes hierarchical not be externally visible structure for project (phase, step, ...) w Scheduled event used to measure progress w Allows separation of concerns v Milestone often produces w Precedence relations often baseline: exist among activities w formally reviewed work (PERT Chart) product w under change control (change requires formal procedures) Bernd Bruegge Component-Based Software Engineering 20
  • 21. Examples of Activities v Major Activities: v Activities during w Planning requirements analysis: w Requirements w Refine scenarios Analysis w Define Use Case w System Design model w Object Design w Define object model w Implementation w Define dynamic model w System Testing w Design User Interface w Delivery Bernd Bruegge Component-Based Software Engineering 21
  • 22. Structure of a Software Project Management Plan v 0. Front Matter v 1. Introduction v 2. Project Organization v 3. Managerial Process v 4. Technical Process v 5. Work Elements, Schedule, Budget v Optional Inclusions Bernd Bruegge Component-Based Software Engineering 22
  • 23. SPMP Part 0: Front Matter v TitlePage v Revision sheet (update history) v Preface: Scope and purpose v Tables of contents, figures, tables Bernd Bruegge Component-Based Software Engineering 23
  • 24. SPMP Part 1: Introduction v 1.1 Project Overview w Executive summary: description of project, product summary v 1.2 Project Deliverables w All items to be delivered, including delivery dates and location v 1.3 Evolution of the SPMP w Plans for anticipated and unanticipated change v 1.4 Reference Materials w Complete list of materials referenced in SPMP v 1.5 Definitions and Acronyms Bernd Bruegge Component-Based Software Engineering 24
  • 25. SPMP Part 2: Project Organization v 2.1 Process Model w Relationships among project elements v 2.2 Organizational Structure w Internal management, organization chart v 2.3 Organizational Interfaces w Relations with other entities v 2.4 Project Responsibilities w Major functions and activities; nature of each; who’s in charge Bernd Bruegge Component-Based Software Engineering 25
  • 26. Process Model v Shows relationships v Visualization of among process model w Functions, activities, v Project Management Aids tasks w MS Project (Microsoft) w Milestones w MAC Project (Claris) w Baselines w EasyTrak (Planning w Reviews Control International) w Work breakdown structure w Project deliverables w Sign-offs Bernd Bruegge Component-Based Software Engineering 26
  • 27. Example of an Organization Chart Client Management Consultants Cross-functional Teams Development Teams Architecture Logbook HCI Maintenance Web Master Documentation Vehicle Configuration Mgt Travel VIP Infrastructure Team Bernd Bruegge Component-Based Software Engineering 27
  • 28. Clients, Managers and Consultants Management Malcolm Bauer Bernd Bruegge Allen Dutoit Brian Cavalier Sam Perman Consultants Isabel Torres-Yebra Klaus Eitzenberger Client Alfonso Guerrero- Galan Manfred Mueller Dieter Hege Juergen Bortolazzi, Brigitte Pihulak Claus Czymmek Infrastructure Team Stephan Schoenig (CMU) Joyce Johnstone (CMU) Andreas Doerner (DB) Arno Schmackpfeffer (DB) Bernd Bruegge Component-Based Software Engineering 28
  • 29. Development and Cross-functional Teams Logbook Team Maintenance Vehicle Team Travel Team Aaron Wald Team Andrew Wang Ann Sluzhevsky Arjun Cholkar Hoda Bin Zhou Herbert Stiel Aveek Datta Moustapha Christopher Michael Poole Darren Mauro Jaewoo You Chiappa MichaelScheinholtz Joel Slovacek Ognjen Gordon Cheng Steve Sprang Martinovic John Doe Nathaniel Woods Vincent Mak Paul Stadler Kalyana Prattipati Pradip Hari Yenni Kwek Tze Bin Loh Michael Samuel Uhyon Chung William Ferry VIP Team HCI Team Web Master Team Configuration Darren Mauro Mgt Team Christopher Lumb Gordon Cheng Uhyon Chang Michael Poole Eric Farng Idan Waisman (Logbook) (Logbook) Idan Waisman Paul Stadler Darren Mauro Steve Sprang Aveek Datta Li-Lun Cheng (Maintenance) (Maintenance) Patrick Toole Tze Bin Loh Yenni Kwek Tze Bin Loh William Ferry Phillip Ezolt (Simulation) Venkatesh (Simulation) Natarajan Kalyana Prattipati Chris Chiappa (Travel) (Travel) Eric Farng (VIP) Bernd Bruegge Component-Based Software Engineering 29
  • 30. Project Responsibilities v Planner v Group leader v Analyst v Liaison v Designer v Minute Taker v Programmer v Project Manager v Tester v Maintainer v Trainer v Document Editor v Web Master v Configuration Manager Bernd Bruegge Component-Based Software Engineering 30
  • 31. Project Management: Hierarchical Project Organization Chief Executive Team Leaders Project Members Basis of organization: Hierarchical information flow across corporate boundaries Bernd Bruegge Component-Based Software Engineering 31
  • 32. Example of Hierchical Organization: Chief Programmer Team Chief Programmer Assistant Chief Programmer Senior Programmer Librarian Administration Tester Junior Programmer Bernd Bruegge Component-Based Software Engineering 32
  • 33. Another Project Organization: Egoless Programming Team(Weinberg) Analyst Tester Programmer Designer Librarian Bernd Bruegge Component-Based Software Engineering 33
  • 34. Project-Based Project Organization Project Leader Team Leaders Subsystem Team Subsystem Team Subsystem Team Team Members Basis of organization: Nonlinear information flow across dynamically formed units Bernd Bruegge Component-Based Software Engineering 34
  • 35. Observations on Management Structures v Egoless structures don't work well w "Ownership" is important v Hierarchical information flow does not work well with iterative and incremental software development process w Manager is not necessarily always right v Project-based structures w Cut down on bureaucracy reduces development time w Decisions are expected to be made at each level w Hard to manage Bernd Bruegge Component-Based Software Engineering 35
  • 36. Hierarchical Structure v Projects with high degree of certainty, stability, uniformity and repetition. wRequires little communication wRole definitions are clear v When? wThe more people on the project, the more need for a formal structure wCustomer might insist that the test team be independent from the design team wProject manager insists on a previously successful structure Bernd Bruegge Component-Based Software Engineering 36
  • 37. Project-Based Structure v Project with degree of uncertainty wOpen communication needed among members wRoles are defined on project basis v When? wRequirements change during development wNew technology develops during project Bernd Bruegge Component-Based Software Engineering 37
  • 38. Assigning Responsibilities To People Project To Do List Role 1 Person A • Item 1 Item 1 • Item 2 Item 2 Item 9 Role 1 • Item 3 • Item 4 Role 2 Role 2 Item 4 • Item 5 Item 5 • Item 6 Item 7 Person B • Item 7 • Item 8 Role 3 • Item 9 Item 3 Role 3 Item 6 Item 8 Bernd Bruegge Component-Based Software Engineering 38
  • 39. Possible Mappings of ToDos to People v One-to-One w Ideal but often not worth to be called a project v Many-to-Few w Each project member assumes several roles ("hats") w Danger of overcommittment w Need for load balancing v Many-to-"Too-Many" w Some people don't have significant roles w Bystanders w Loosing touch with project Bernd Bruegge Component-Based Software Engineering 39
  • 40. Project Roles: Coach v Listen to gripes from individual teams v Review weekly team reports v Attend weekly project meetings v Schedule and prepare meetings with client v Insist that guidelines are followed v Assign presentations (in-class project meetings, client review, client acceptance test) v Resolve conflicts if they cannot be resolved otherwise Bernd Bruegge Component-Based Software Engineering 40
  • 41. Project Role: Group leader v Responsible for intra-group communication (Meeting Management: Primary Facilitator) w Run the weekly project meeting w Post agenda before meeting w Define and keep track of action items (who, what, when) w Measure progress (Enforce milestones) w Deliver work packages for the tasks to the project management w Present problems and status of team to project manager v The group leader has to be rotated among members of the team. Bernd Bruegge Component-Based Software Engineering 41
  • 42. Group Leader: Create an Agenda v Purpose of Meeting v Desired Outcome v Information Sharing v Information Processing v Meeting Critique Action Items (Check Previous Meeting) Issues (Check Previous Meeting & BBoards) Bernd Bruegge Component-Based Software Engineering 42
  • 43. Project Role: Group Liason (Architecture, HCI) v Responsible for inter-group communication w Make available public definitions of subsystem developed by the team to the architecture teams (ensure consistency, etc) w Coordinate tasks spanning more than one group with other teams v Responsible for team negotiations Bernd Bruegge Component-Based Software Engineering 43
  • 44. Project Role: Planner v Plans the activities of an individual team and has the following responsibilities. v Define project plan for team: w PERT chart, resource table and GANTT chart showing work packages w Enter project plan into MS Project v Make project plan available to management v Report group project status to group leader No explicit planner in JAMES. Responsibilities assumed by group leaders Bernd Bruegge Component-Based Software Engineering 44
  • 45. Project Role: Document Editor v Collect,proofread and distribute team documentation v Submit team documentation to Architecture team v Collect agendas v Take Minutes at meetings Bernd Bruegge Component-Based Software Engineering 45
  • 46. Web Master v Maintain team home page v Keep track of meeting history v Keep track of design rationale Bernd Bruegge Component-Based Software Engineering 46
  • 47. Web Master: v Publish Meeting Information on Team Homepage w Must contain Agenda, minutes, action items and issues w Possibilities: u One HTML document per meeting, with anchors (maintained by one role) u Separate HTML documents for Agenda, Minutes, etc (maintained by several roles) Date Agenda Minutes Action Items Issues 9/9/96 Agenda Minutes Action Items Issues 9/16/96 Agenda Minutes Action Items Issues Bernd Bruegge Component-Based Software Engineering 47
  • 48. SPMP Part 3: Managerial Processes v 3.1 Management Objectives and Priorities w Philosophy, goals and priorities v 3.2 Assumptions, Dependencies, Constraints w External factors v 3.3 Risk Management w Identifying, assessing, tracking, contingencies for risks v 3.4 Monitoring and Controlling Mechanisms w Reporting mechanisms and formats, information flows, reviews v 3.5 Staffing Plan v Needed skills (what?, how much?, when?) Bernd Bruegge Component-Based Software Engineering 48
  • 49. Examples of Assumptions v There are enough cycles on the development machines v Security will not be addressed v There are no bugs in the CASE Tool recommended for the project v A demonstration of the X system will be given by the client v The CAD Model of the seat will be made available by the client Bernd Bruegge Component-Based Software Engineering 49
  • 50. Examples of Dependencies v The VIP team depends on the vehicle subsystem provided by the vehicle team v The automatice code generation facility in the CASE tool Rose/Java depends on JDK. The current release of Rose/Java supports only JDK 1.0.2 Bernd Bruegge Component-Based Software Engineering 50
  • 51. Examples of Constraints v The length of the project is 3 months. limited amount of time to build the system v The project consists of beginners. It will take time to learn how to use the tools v Not every project member is always up-to-date with respect to the project status v The use of UML and a CASE tool is required v Any new code must be written in Java v The system must use Java JDK 1.1 Bernd Bruegge Component-Based Software Engineering 51
  • 52. Risk Management v Risk: Members in key v Risk: One subsystem roles drop the course. does not provide the w Contingency: Roles are functionality needed by assigned to somebody else. another subsystem. Functionality of the system w Contingency: ? is renegotiated with the client. v Risk: Rose will not v Risk: The project is support JDK 1.1 falling behind schedule. w Contingency: ? w Contingency: Extra project meetings are scheduled. Bernd Bruegge Component-Based Software Engineering 52
  • 53. SPMP Part 4: Technical Process v 4.1 Methods, Tools and Techniques w Computing system, development method, team structure, etc. w Standards, guidelines, policies. v 4.2 Software Documentation w Documentation plan, including milestones, reviews and baselines. v 4.3 Project Support Functions w Plans for functions (quality assurance, configuration management). Bernd Bruegge Component-Based Software Engineering 53
  • 54. SPMP Part 5: Work Elements v 5.1 Work Packages (Work breakdown structure) w Project decomposed into tasks; definitions of tasks v 5.2 Dependencies w Precedence relations among functions, activities and tasks v 5.3 Resource Requirements w Estimates for resources such as personnel, computer time, special hardware, support software. v 5.4 Budget and Resource Allocation w Connect costs to functions, activities and tasks. v 5.5 Schedule w Deadlines, accounting for dependencies, required milestones Bernd Bruegge Component-Based Software Engineering 54
  • 55. Creating Work Packages v Work Breakdown Structure (WBS) (Section 5.1) w Break up project into activities (phases, steps) and tasks. w The work breakdown structure does not show the interdependence of the tasks v WBS identification is an instance of object identification Bernd Bruegge Component-Based Software Engineering 55
  • 56. WBS Trade-offs v Work breakdown structure influences cost and schedule v Thresholds for establishing WBS in terms of percentage of total effort: w Small project (7 person-month): at least 7% or 0.5 PM w Medium project (300 person-month): at least 1% or 3 PMs w Large project (7000 person-month): at least 0.2 % or 15 PMs v Determination of work breakdown structure is incremental and iterative Source: Software Engineering WBS Schedule Economics, Barry W. Boehm p. 47, Prentice Hall, N.J., 1981 Cost (Time, $$) Bernd Bruegge Component-Based Software Engineering 56
  • 57. Dependencies and Schedule (Section 5.2 + 5.5) v An important temporal relation: “must be preceded by” v Dependency graphs show dependencies of the tasks (hiercharchical and temporal) w Activity Graph: u Nodes of the graph are the project milestones u Lines linking the nodes represent the tasks involved w Schedule Chart (MS-Project): u Nodes are tasks and milestones u Lines represent temporal dependencies v Estimate the duration of each task v Label dependency graph with the estimates Bernd Bruegge Component-Based Software Engineering 57
  • 58. Project Management Tools for Work Packages v Visualization Aids for Project Presentation w Graphs (Schedule), Trees (WBS) w Tables (Resources) v Task Timeline w Gantt Charts: Shows project activities and tasks in parallel. Enables the project manager to understand which tasks can be performed concurrently. v Schedule Chart (PERT Chart) w Cornerstone in many project management tools w Graphically shows dependencies of tasks and milestones u PERT: Program Evaluation and Review Technique – A PERT chart assumes normal distribution of tasks durations – Useful for Critical Path Analysis u CPM: Critical Path Method Bernd Bruegge Component-Based Software Engineering 58
  • 59. GANTT Chart Example for OWL Project 8/9/96 9/6/96 10/4/96 11/1/96 11/29/96 12/27/96 Start Planning Phase Requirements Analysis Phase System Design Phase Analysis Review Object Design Project Review Implementation & Unit Testing Object Design Review System Integration Internal Project Review Client Acceptance Bernd Bruegge Component-Based Software Engineering 59
  • 60. Project: Building a House v Activity 1: Landscaping the lot w Task 1.1: Clearing and grubbing w Task 1.2: Seeding the Turf w Task 1.3: Planting shrubs and trees v Activity 2: Building the House w Activity 2.1 : Site preparation w Activity 2.2: Building the exterior w Activity 2.3: Finishing the interior v Activity 2.1 : Site preparation w Task 2.1.1: Surveying w Task 2.1.2: Obtaining permits w Task 2.1.3: Excavating v Task 2.1.4: Obtaining materials Bernd Bruegge Component-Based Software Engineering 60
  • 61. Activity 2: Building a House, ctd v Activity 2.2: Building the v Activity 2.3 : Finishing the exterior Interior w Task 2.2.1: Foundation w Task 2.3.1: Interior w Task 2.2.2: Outside Walls plumbing w Task 2.2.3: Exterior w Task 2.3.2: Interior plumbing electrical work w Task 2.2.4: Exterior w Task 2.3.3: Wallboard electrical work w Task 2.3.4: Interior w Task 2.2.5: Exterior siding painting w Task 2.2.6: Exteror painting w Task 2.3.5: Floor covering w Task 2.2.7: Doors and w Task 2.3.6: Doors and Fixtures fixtures w Task 2.2.8: Roof Bernd Bruegge Component-Based Software Engineering 61
  • 62. Activity Graph for Activity “Building a House” START Build Outside Wall Surveying 1.2 1.1 Excavation 1.3 Buy Materials 1.4 Lay Foundation 2.1 Build Outside Wall Install Exterior Plumbing 2.2 Install Interior Plumbing 2.3 3.1 Install Exterior Electrical Install Interior Electrical 2.4 3.2 Install Exterior Siding Install Wallboard 2.5 3.3 Paint Exterior Install Flooring Paint Interior 2.6 3.4 3.5 Install Exterior Doors Install Roofing Install Interior Doors 2.7 2.8 3.6 2.6 FINISH Bernd Bruegge Component-Based Software Engineering 62
  • 63. PERT Chart Example for "Building a House" 12/3/94 12/21/94 1/11/95 Install Install Install Interior Interior Wallboard Plumbing Electrical Building a House: 0 0 0 1/22/95 12 15 9 Paint MS Project PERTcy Interior Chart with Duration of Activities (Pfleeger 2.3) 0 2/8/95 11 1/22/95 Install Interior Install Doors Flooring 0 10/15/94 11/5/94 7 8/27/94 8/27/94 9/17/94 10/1/94 0 2/16/95 Lay Build 18 START Survey Excava Buy 1/19/95 FINISH Founda Outside ing tion Material tion Wall Install 0 Roofing 1/19/95 0 0 12 0 0 0 0 10 10 Install 0 3 15 20 12 9 Exterior Doors 8/27/94 15 Request 1/12/95 6 Permits Paint 0 Exterior 15 12 5 12/3/94 12/17/94 12/31/94 Install Install Install Start Time 8/29/94 Exterior Exterior Exterior Legend Plumbing Electrical Siding 12 12 12 Slack Time 0 8 10 10 Duration 0 Bernd Bruegge Component-Based Software Engineering 63
  • 64. Slack Time and Critical Path v Slack Time w Available Time - Estimated (“Real”) Time for a task or activity w Or: Latest Start Time - Earliest Start Time v Critical Path w The path in a project plan for which the slack time at each task is zero. The critical path has no margin for error when performing the tasks (activities) along its route. Bernd Bruegge Component-Based Software Engineering 64
  • 65. How do you become a good project planner? v Establish a project plan w Start with the plan based on your experience with the last project(s) v Keep track of activities and their duration v Determine difference between planned and actual performance v Make sure to do a post-mortem w Lessons learned w Ask developers for feedback w Write a document about what could have been improved Bernd Bruegge Component-Based Software Engineering 65
  • 66. Writing the SPMP v Example of a full SPMP for the OWL project w http://cascade1.se.cs.cmu.edu/15-413/courseDocs/spmpF96.html Bernd Bruegge Component-Based Software Engineering 66
  • 67. Project Management Heuristics v Make sure to be able to revise or dump a project plan w Complex system development is a nonlinear activity v If project goals are unclear and complex use team-based project management. In this case w Avoid perfect GANTT charts and PERT charts w Don’t look too far into the future v Avoid micro management of details v Don’t be surprise if current project management tools don’t work: w They were designed for projects with clear goals and fixed organizational structures Bernd Bruegge Component-Based Software Engineering 67
  • 68. Project Management Summary v Get agreement among customers, managers and teams w Problem statement w Software project management plan w Project agreement w Make sure agreement allows for iteration v Team Structures v Project planning w Start with work breakdown structure (WBS) w Identify dependencies and structure: Tasks, activities, functions v Tools and Techniques w GANTT, Dependency graph, Schedule, Critical Path Analysis Bernd Bruegge Component-Based Software Engineering 68
  • 69. Communication Management v Communication in distributed Teams v Communication Modes v Communication Mechanisms v Scheduled Communications v Communication workflow w Example: Distributed Document Review with Lotus Notes Bernd Bruegge Component-Based Software Engineering 69
  • 70. A Communication Example v "Two missile electrical boxes manufactured by different contractors were joined together by a pair of wires. Box 1 Pair of Wires Box 2 Bernd Bruegge Component-Based Software Engineering 70
  • 71. A Communication Example ctd v Thanks to a particular thorough preflight check, it was discovered that the wires had been reversed." Box 1 Box 2 Bernd Bruegge Component-Based Software Engineering 71
  • 72. After the Crash... v ... v "The postflight analysis revealed that the contractors had indeed corrected the reversed wires as instructed." Bernd Bruegge Component-Based Software Engineering 72
  • 73. “In fact, both of them had.” Box 1 Box 2 Bernd Bruegge Component-Based Software Engineering 73
  • 74. Communication is Important v Communication Mode: Type of information exchange that has defined objectives and scope w Scheduled: Planned Communication w Event Driven:Unplanned Communication v Communication Mechanism Tool or procedure that can be used to transmit or receive information w Synchronous: Sender and Receiver are available at the same time w Asynchronous: Sender and Receiver are not communicating at the same time. Bernd Bruegge Component-Based Software Engineering 74
  • 75. Classification of Communication Communication supports Communication mode is supported by mechanism Scheduled Event driven Synchronous Asynchronous Client review Problem reporting Smoke signals Fax Bernd Bruegge Component-Based Software Engineering 75
  • 76. Scheduled Modes of Communication v Problem Definition w Objective: Present Goals & Requirements (Functional, Nonfunctional) and Constraints u Problem Statement Presentation (JAMES Example: August 26, 97) v Project Review: Focus on System Model w Objective: Assess status and review subsystem interfaces u Analysis Review (October 16, 1997) u Object Design Review (November 11 & 13, 1997) u Implementation Review (November 25, 1997) v Client Review: Focus on Requirements w Objective: Brief Client of Progress, Confirm Changes in Requirements u System Design Review (October 23, 1997) Bernd Bruegge Component-Based Software Engineering 76
  • 77. Scheduled Modes of Communication v Walkthrough (Informal) w Objective: Increase quality of subsystem w Developer presents to team members Informal, peer- to-peer u To be scheduled by each team v Inspection (Formal) w Objective: Compliance with (functional and nonfunctional) requirements w Developer answers questions from the reviewers u Client Acceptance Test (December 9, 1997) Bernd Bruegge Component-Based Software Engineering 77
  • 78. Scheduled Modes of Communication v Status Review: w Objective: Find deviations from schedule and correct them or identify new issues w Part of every team meeting (Status) v Brainstorming: w Objective: Generate and evaluate large number of solutions for a problem w Part of every team meeting (Discussion) Bernd Bruegge Component-Based Software Engineering 78
  • 79. Meeting as Scheduled and Synchronous Communication v Purpose of Meeting w Why do we meet? v Desired Outcome w What do we want to achieve? v Information Sharing w Action Items v Information Processing w Open Issues Action Items v Meeting Critique (From previous meeting) Issues (From previous meetings and BBoards) Bernd Bruegge Component-Based Software Engineering 79
  • 80. Scheduled Modes of Communication v Release w The result of each software development activity u Software Project Management Plan (SPMP) u Requirements Analysis Document (RAD) u System Design Document (SDD) u Object Design Document (ODD) u Test Manual u User Manual v Postmortem Review w Objective: Describe Lessons Learned u Final Homework (December 16, 1997) Bernd Bruegge Component-Based Software Engineering 80
  • 81. Event-Driven Modes of Communication v Request for Clarification v Change Request v Resolution of Issue Bernd Bruegge Component-Based Software Engineering 81
  • 82. Synchronous Communication Mechanisms v Hallway conversation w Unplanned face-to-face meeting v Questionaire and structured interviews v Meeting w Planned Face-to-Face Meeting, Telephone conversation v Groupware w Same time, different location groupware Bernd Bruegge Component-Based Software Engineering 82
  • 83. Asynchronous Communication Mechanisms v E-Mail v Newsgroups v Web v Lotus Notes Bernd Bruegge Component-Based Software Engineering 83
  • 84. Example of Asynchronous Documentation: Document Review v Fill out a review form v Attach document to be reviewed v Distribute the review form to reviewers v Wait for comments from reviewers v Review comments v Create action items from selected comments v Revise document and post the revised version v Iterate the review cycle Example: w “Review of Documents” Database in JAMES Project Bernd Bruegge Component-Based Software Engineering 84
  • 85. Review of Documents Database Bernd Bruegge Component-Based Software Engineering 85
  • 86. NewReview Form Bernd Bruegge Component-Based Software Engineering 86
  • 87. Fill out the Review Form v Select reviewers v Select the document to be reviewed v Add comments to reviewers v Determine deadline Bernd Bruegge Component-Based Software Engineering 87
  • 88. Reviewer Notification v Selected reviewers get e-mail Bernd Bruegge Component-Based Software Engineering 88
  • 89. Status of Document Review Bernd Bruegge Component-Based Software Engineering 89
  • 90. Reviewers add their Comments Bernd Bruegge Component-Based Software Engineering 90
  • 91. Originator Notification Bernd Bruegge Component-Based Software Engineering 91
  • 92. Final Recipient Notification Bernd Bruegge Component-Based Software Engineering 92
  • 93. Document Editor & Web Master Tasks v Editor reviews comments v Editor selects reviewed comments v Web Master posts reviewed document and action items v Team members complete their action items v Editor integrates changes v Editor posts changed document on the review database for the next review cycle Bernd Bruegge Component-Based Software Engineering 93
  • 94. Accepted Document w/ Action Items Bernd Bruegge Component-Based Software Engineering 94
  • 95. SPMP Action Items Bernd Bruegge Component-Based Software Engineering 95
  • 96. Summary v Communication Modes vs Communication Mechanisms v Scheduled Communications v Asynchronous Communications v Team review of documents with Lotus Notes Bernd Bruegge Component-Based Software Engineering 96