SlideShare ist ein Scribd-Unternehmen logo
1 von 2
Sanjay Kanzariya
1218A, First Floor,
Maruti Vihar Housing Colony, Chakkarpur,
Gurgaon, HR, India.
Ph: +91-9958582774
Sanjaykanzariya1287@gmail.com
8 Years of total experience in telecom domain
Presently Working In Ericsson India Global Services Pvt. Ltd., Gurgaon, June 2008 - Till Date
Senior Engineer – Microwave Transmission Planning & Optimization
Ericsson Certified (ETCP) – IP Technology (June 2013)
Ericsson Certified (ETCP) – Microwave Transmission (Aug 2015)
Responsibilities:
• Preparing all RAN/MW Optimization Reports for all the six circles of Aircel India.
• Troubleshooting RAN Transport KPI related issues and providing recommendations based on that.
• Troubleshooting and optimizing MW Access Network by both capacity and performance related KPIs.
• Reviewing Microwave Applications from third party vendors for T-Mobile MW Design & Deployment
Project.
• Preparing MW BOMs (Bill Of Materials) for T-Mobile MW Design & Deployment Project.
• Analysis of essential KPIs (Utilization, Rx/Tx errorpkts, E1 configured/E1down) for MLPPP Report
Preparation for Orange Network, Spain serviced by Huawei.
• Microwave Node Allocation Design (Card Level) Update, HW Upgrade, BoQ Preparation, Microwave Link
Capacity Planning.
• Ethernet Design, DCN Design for Microwave Traffic Nodes.
• License Handling Process of Microwave Network Nodes, which includes i) Request/Analyze Mini-Link
Network Inventory for missing licenses ii) Request License Key Files iii) Upload Key Files to the Nodes
through SoEM (NMS).
• End-to-End E1 Routing Planning of 2G sites through Microwave Access Network which also includes
Traffic Shifting when Hop Reroute is planned.
• Site Dependency Count Check, Maintaining the Connectivity of Microwave Network and RBL(E1) Database
for 2G sites.
• Database Update in Mapinfo and Pathloss.
• Experience on LoS Survey (Desktop) on Google Earth and Field Survey Verification, for LARICS Project,
LA, USA.
• Experience on Transport Engineering Document Planning, for MetroPCS Project, USA; which includes
Verification of Connectivity Details, Link Budget Parameters, Ethernet Standard Parameters and VLAN
IDs.
• Experience on Circuit Provisioning Planning for Sprint Network (USA) Which includes T1 Provisioning of
Microwave Site using Network Resource Management Tool.
• Experience on Access Transport Network Design Planning, Microwave Ring Protection Planning and IP
Planning of Node-B for Idea 3G Network.
• Experience on Hardware Installation Document Planning (Power, Cabling and Card Level Document),
Switch Site Survey for Layout Inspection and Integration Script Planning for Ericsson Equipment.
• Experience on RF Cell Site Integration Script Planning, for Vodafone BSS Swap Project, Punjab.
• Excellent Knowledge of Ericsson Hardware and its Architecture (Both BSS and Core Equipment), GSM
Technology.
• Administrative Experience on Handling ASP/ARP Resources while working in Switch Site Engineering,
Aircel PAN India Project.
Tool Used: Pathloss 4.0/5.0, Mapinfo 10.0/12.5, TEMS Link Planner 6.8.2, WINFIOL, PPT-SE, Auto CAD,
Google Earth for LoS, Visio, WinFF 9.0.10, Mentum Ellipse, Business Objects
Languages: C & C++, MATLAB, VB for Microsoft Excel (Macro)
Competency: MW Link Budget Planning, MW BoQ Preparation, IP/ATM Design for a BTS site, MW Network
Capacity Design & Planning & Optimization, BSS, RAN Transport, Microwave, Ethernet/IP
Functionality, DCN Planning for MW Network, LOS Verification on Google Earth, BSS/RAN/CORE
HW Expansion Planning, MW Network Optimization
Region & Customer Supported:
Region South Asia: Aircel/Vodafone/Idea/Bharti India, Airtel Bangladesh.
Region Middle East & Africa: Oman Royal Police, Saudi Arabia Mobily.
Mediterranean Region: Orange Spain
Region North America: Sprint USA, LA-RICS USA, MetroPCS USA.
Training
• Two days training by Ericsson on Evolved IP Network Solution: Microwave Design in Ethernet LRAN.
• Five days training by Ericsson Germany on MLLH Path Planning using WinFF.
• Three days training by Ericsson on Ethernet Backhaul Planning.
• Three days training by Ericsson on Access Transport Network Design.
• Five days’ workshop by Ericsson on GSM BSS Operations and Configuration.
• Five days training by Ericsson on GSM/WCDMA Overview.
• Two days training by Ericsson on IP/ATM Fundamentals.
Education
B. Tech. in Electronics & Communication (7.42 CGPA) from Institute of Technology, Nirma University during
2004-2008
Senior Secondary from G.H.S.E.B. (Gujarat) in the year 2004
Secondary School from G.S.E.B. (Gujarat) in the year 2002
Personal Profile
Date of Birth : 1st February, 1987
Languages known : English, Hindi, Gujarati
Nationality : Indian
Marital Status : Married
Passport No : G9027842
Passport Expiry : 12th June, 2018
Date:
Place: (Sanjay Kanzariya)

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (19)

Kirit RF CV
Kirit RF CVKirit RF CV
Kirit RF CV
 
TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016
 
Devender Kumar_CV
Devender Kumar_CVDevender Kumar_CV
Devender Kumar_CV
 
Chandan Singh_22062015
Chandan Singh_22062015Chandan Singh_22062015
Chandan Singh_22062015
 
ajay awasthi resume.....
ajay awasthi resume.....ajay awasthi resume.....
ajay awasthi resume.....
 
Musahid Resume
Musahid ResumeMusahid Resume
Musahid Resume
 
Devendra kumar tiwari
Devendra kumar tiwari Devendra kumar tiwari
Devendra kumar tiwari
 
Sumeet (Resume)
Sumeet (Resume)Sumeet (Resume)
Sumeet (Resume)
 
RAN_CV_Gyanendra Patel
RAN_CV_Gyanendra PatelRAN_CV_Gyanendra Patel
RAN_CV_Gyanendra Patel
 
Pushpendra_Dhama_CV
Pushpendra_Dhama_CVPushpendra_Dhama_CV
Pushpendra_Dhama_CV
 
Sunil Saini_RF Engineer UPDATED
Sunil Saini_RF Engineer UPDATEDSunil Saini_RF Engineer UPDATED
Sunil Saini_RF Engineer UPDATED
 
Nilesh rai
Nilesh raiNilesh rai
Nilesh rai
 
Ahmet_Ondortoglu Resume
Ahmet_Ondortoglu ResumeAhmet_Ondortoglu Resume
Ahmet_Ondortoglu Resume
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume Updated
 
Harpreet Singh Resume
Harpreet Singh ResumeHarpreet Singh Resume
Harpreet Singh Resume
 
Sandeep_CV_3 Years_Exp
Sandeep_CV_3 Years_ExpSandeep_CV_3 Years_Exp
Sandeep_CV_3 Years_Exp
 
Sunil saini rf engineer updated resume
Sunil saini rf engineer updated resumeSunil saini rf engineer updated resume
Sunil saini rf engineer updated resume
 
Ehab Atta Optimizer
Ehab Atta OptimizerEhab Atta Optimizer
Ehab Atta Optimizer
 
updated resume (1)
updated resume (1)updated resume (1)
updated resume (1)
 

Ähnlich wie CV_Sanjay Kanzariya

Ähnlich wie CV_Sanjay Kanzariya (20)

CV-Harith Zaidan
CV-Harith ZaidanCV-Harith Zaidan
CV-Harith Zaidan
 
Resume
ResumeResume
Resume
 
suresh resume
suresh resumesuresh resume
suresh resume
 
Ousainou Demba ResumeDM
Ousainou Demba ResumeDMOusainou Demba ResumeDM
Ousainou Demba ResumeDM
 
CV_Nitin Awasthi_Sr. RF Engineer_6.7 yrs
CV_Nitin Awasthi_Sr. RF Engineer_6.7 yrsCV_Nitin Awasthi_Sr. RF Engineer_6.7 yrs
CV_Nitin Awasthi_Sr. RF Engineer_6.7 yrs
 
Resume Lelin Kumar singh
Resume Lelin Kumar singhResume Lelin Kumar singh
Resume Lelin Kumar singh
 
Sandeep Sharma_CV
Sandeep Sharma_CVSandeep Sharma_CV
Sandeep Sharma_CV
 
Hadi Tohidlou-CV
Hadi Tohidlou-CVHadi Tohidlou-CV
Hadi Tohidlou-CV
 
Bhashker_sharma_CV
Bhashker_sharma_CVBhashker_sharma_CV
Bhashker_sharma_CV
 
MANISH KUMAR GUPTA.docx
MANISH KUMAR GUPTA.docxMANISH KUMAR GUPTA.docx
MANISH KUMAR GUPTA.docx
 
Venkatesan Thirunavukarasu-RF Planning and Optimization
Venkatesan Thirunavukarasu-RF Planning and OptimizationVenkatesan Thirunavukarasu-RF Planning and Optimization
Venkatesan Thirunavukarasu-RF Planning and Optimization
 
Resume Deepak Pandey Ericsson
Resume  Deepak Pandey EricssonResume  Deepak Pandey Ericsson
Resume Deepak Pandey Ericsson
 
Ahmed AbdelRady
Ahmed AbdelRadyAhmed AbdelRady
Ahmed AbdelRady
 
Bharath R-CV
Bharath R-CVBharath R-CV
Bharath R-CV
 
Hacker Resume IBM
Hacker Resume IBMHacker Resume IBM
Hacker Resume IBM
 
Alia khan1
Alia khan1Alia khan1
Alia khan1
 
Satisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 yearSatisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 year
 
DIPU CV
DIPU CVDIPU CV
DIPU CV
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 

CV_Sanjay Kanzariya

  • 1. Sanjay Kanzariya 1218A, First Floor, Maruti Vihar Housing Colony, Chakkarpur, Gurgaon, HR, India. Ph: +91-9958582774 Sanjaykanzariya1287@gmail.com 8 Years of total experience in telecom domain Presently Working In Ericsson India Global Services Pvt. Ltd., Gurgaon, June 2008 - Till Date Senior Engineer – Microwave Transmission Planning & Optimization Ericsson Certified (ETCP) – IP Technology (June 2013) Ericsson Certified (ETCP) – Microwave Transmission (Aug 2015) Responsibilities: • Preparing all RAN/MW Optimization Reports for all the six circles of Aircel India. • Troubleshooting RAN Transport KPI related issues and providing recommendations based on that. • Troubleshooting and optimizing MW Access Network by both capacity and performance related KPIs. • Reviewing Microwave Applications from third party vendors for T-Mobile MW Design & Deployment Project. • Preparing MW BOMs (Bill Of Materials) for T-Mobile MW Design & Deployment Project. • Analysis of essential KPIs (Utilization, Rx/Tx errorpkts, E1 configured/E1down) for MLPPP Report Preparation for Orange Network, Spain serviced by Huawei. • Microwave Node Allocation Design (Card Level) Update, HW Upgrade, BoQ Preparation, Microwave Link Capacity Planning. • Ethernet Design, DCN Design for Microwave Traffic Nodes. • License Handling Process of Microwave Network Nodes, which includes i) Request/Analyze Mini-Link Network Inventory for missing licenses ii) Request License Key Files iii) Upload Key Files to the Nodes through SoEM (NMS). • End-to-End E1 Routing Planning of 2G sites through Microwave Access Network which also includes Traffic Shifting when Hop Reroute is planned. • Site Dependency Count Check, Maintaining the Connectivity of Microwave Network and RBL(E1) Database for 2G sites. • Database Update in Mapinfo and Pathloss. • Experience on LoS Survey (Desktop) on Google Earth and Field Survey Verification, for LARICS Project, LA, USA. • Experience on Transport Engineering Document Planning, for MetroPCS Project, USA; which includes Verification of Connectivity Details, Link Budget Parameters, Ethernet Standard Parameters and VLAN IDs. • Experience on Circuit Provisioning Planning for Sprint Network (USA) Which includes T1 Provisioning of Microwave Site using Network Resource Management Tool. • Experience on Access Transport Network Design Planning, Microwave Ring Protection Planning and IP Planning of Node-B for Idea 3G Network. • Experience on Hardware Installation Document Planning (Power, Cabling and Card Level Document), Switch Site Survey for Layout Inspection and Integration Script Planning for Ericsson Equipment. • Experience on RF Cell Site Integration Script Planning, for Vodafone BSS Swap Project, Punjab. • Excellent Knowledge of Ericsson Hardware and its Architecture (Both BSS and Core Equipment), GSM Technology. • Administrative Experience on Handling ASP/ARP Resources while working in Switch Site Engineering, Aircel PAN India Project.
  • 2. Tool Used: Pathloss 4.0/5.0, Mapinfo 10.0/12.5, TEMS Link Planner 6.8.2, WINFIOL, PPT-SE, Auto CAD, Google Earth for LoS, Visio, WinFF 9.0.10, Mentum Ellipse, Business Objects Languages: C & C++, MATLAB, VB for Microsoft Excel (Macro) Competency: MW Link Budget Planning, MW BoQ Preparation, IP/ATM Design for a BTS site, MW Network Capacity Design & Planning & Optimization, BSS, RAN Transport, Microwave, Ethernet/IP Functionality, DCN Planning for MW Network, LOS Verification on Google Earth, BSS/RAN/CORE HW Expansion Planning, MW Network Optimization Region & Customer Supported: Region South Asia: Aircel/Vodafone/Idea/Bharti India, Airtel Bangladesh. Region Middle East & Africa: Oman Royal Police, Saudi Arabia Mobily. Mediterranean Region: Orange Spain Region North America: Sprint USA, LA-RICS USA, MetroPCS USA. Training • Two days training by Ericsson on Evolved IP Network Solution: Microwave Design in Ethernet LRAN. • Five days training by Ericsson Germany on MLLH Path Planning using WinFF. • Three days training by Ericsson on Ethernet Backhaul Planning. • Three days training by Ericsson on Access Transport Network Design. • Five days’ workshop by Ericsson on GSM BSS Operations and Configuration. • Five days training by Ericsson on GSM/WCDMA Overview. • Two days training by Ericsson on IP/ATM Fundamentals. Education B. Tech. in Electronics & Communication (7.42 CGPA) from Institute of Technology, Nirma University during 2004-2008 Senior Secondary from G.H.S.E.B. (Gujarat) in the year 2004 Secondary School from G.S.E.B. (Gujarat) in the year 2002 Personal Profile Date of Birth : 1st February, 1987 Languages known : English, Hindi, Gujarati Nationality : Indian Marital Status : Married Passport No : G9027842 Passport Expiry : 12th June, 2018 Date: Place: (Sanjay Kanzariya)