Delhi Call Girl Service đ8650700400đJust Call DivyađČ Call Girl In Delhi Nođ°Ad...
Â
2014 07 31 iuss presentation ceasa
1. IUSSGuidelines,NormsandStandards
AninitiativeoftheDepartmentofHealthsupportedbyCSIR
How the new IUSS standard will affect
clinical engineers
Presentation to CEASA AND SAFHE 31 July 2014
Peta de Jager and Riaan van der Watt
National Department of Health
INFRASTRUCTURE UNIT SUPPORT SYSTEMS PROJECT
GUIDELINES NORMS AND STANDARDS
Council for Scientific and
Industrial Research
Development Bank
of Southern Africa
Supported by
Infrastructure Unit 1
2. IUSSGuidelines,NormsandStandards
AninitiativeoftheDepartmentofHealthsupportedbyCSIR Introduction
âWe shape our buildings, thereafter they shape usâ (Churchill)
ï¶ Service delivery in the healthcare sector is profoundly
affected by the built infrastructure provided to support it
NATIONALLY
ï¶ 4122 public healthcare facilities
ï¶ Current replacement of healthcare buildings - 40 Yrs
ï¶ Current replacement value â R312.4 Billion (MERC)
ï¶ Inconsistent quality, budgeting and programming:
ï¶ Inaccurate budgeting, poor spending patterns
ï¶ undermining equity
ï¶ lack of transparency, and
ï¶ lack of confidence
2
3. IUSSGuidelines,NormsandStandards
AninitiativeoftheDepartmentofHealthsupportedbyCSIR Introduction
ï¶ Weak health infrastructure law:
ï¶ SAHNorms (public sector) repealed
ï¶ R158 (private sector) â outdated
ï¶ R187 (WC) and draft regulations (GP, FS)
ï¶ Built environment professionals have no healthcare
specialisation, and vice versa
ï¶ Challenges in line department â implementing communication
ï¶ Initial capital cost: maintenance: service delivery
ï¶ 1 : 5 : 25
3
4. IUSSGuidelines,NormsandStandards
AninitiativeoftheDepartmentofHealthsupportedbyCSIR
4
Overall
enterprise
Demand
Property
management
9.1 Asset
operations
9.3 Occupantsâ
facility
Disposal
End of life Status change
Occupancy and use
Portfolio management
Portfolio
operations
Pre-project
stages
10.4 Decommissioning
10.5 Deconstruction
10.6 Recycling
10.7 Demolition
10.1 Disposal
preparation
10.2 Transfer
10.3 Reinstatement
0.1 Portfolio strategy
0.2 Portfolio requirements
0.3 Project initiation
1 Conception of need
2 Feasibility
3.1 Authorization
3.2 First procurement
Project
delivery
4 Initial or outline
conceptual design
6.1 Detailed
(coordinated) design
5 Preliminary design
7 Production
information
6.2 Construction
procurement
8.1 Construction
8.2 Commissioning
9.5 Change of
functional
use by occupant
administration
9.4 Refurbishment,
adaptation, alteration,
change of use
9.2 Maintenance
and condition
management
[after BSI ISO 15686-10:2010. Buildings and constructed assets - Service life
planning Part 10: When to assess functional performance, 2010. ISBN 978 0
580 54360 9]
⊠sustainable set of
infrastructure guidelines,
norms and standards for
all levels of health care
facilities for all stages of
the health infrastructure
lifecycle
5. 5Clinical services
Adult Inpatient
Services
Laboratories
Mental Health
Adult Critical Care
Emergency Centres
Maternity Care
Facilities
Adult Oncology
Outpatient Services
Paediatric and
Neonatal Facilities
Pharmacy
Primary Health Care
Diagnostic Radiology
Adult Physical
Rehabilitation
Adult Post-acute
Services
Facilities for Surgical
Procedures
TB Services
Support services
Admin & Related
General Hospital
Support
Catering Services
Linen and Laundry
Hospital Mortuary
Services
Nursing Education
Institutions
Health Facility
Residential
Central Sterilising
Services Department
Training and
Resource Centre
Infrastructure
Design for Waste
Management
Healthcare
environment/
crosscutting issues
Generic Room Data
Security
Engineering design
principles
Environment and
Sustainability
Materials and
Finishes
Future healthcare
environments
Healthcare
Technology
Inclusive
environments
Infection prevention
& control
Information
Technology &
Infrastructure
Procurement and
operation
Integrated
infrastructure
planning
Project planning and
briefing
Space guidelines
Cost Guidelines
Innovative Building
Technologies
Commissioning
Maintenance
Decommissioning
Capacity
development
Regulations
9. IUSSGuidelines,NormsandStandards
AninitiativeoftheDepartmentofHealthsupportedbyCSIR
Building
engineering services
ï¶ Policy and service context
described
ï¶ the minimum acceptable standard,
ï¶ recommended best practice,
ï¶ and maximum practical limit
ï¶ Professional services scope:
ï¶ summaries of collated information
ï¶ technical feasibility, benefits & risks
ï¶ regulatory compliance issues
ï¶ financial feasibility and risks
ï¶ consents and approvals lists
ï¶ additional surveys, tests, analyses,
studies and investigations
9
12. IUSSGuidelines,NormsandStandards
AninitiativeoftheDepartmentofHealthsupportedbyCSIR Processes complete/ underway
ï¶ Input into National Core Standards
ï¶ Liaising with National Treasury
ï¶ Representation on SANS Committees
ï¶ SANS 204
ï¶ SANS 1544
ï¶ SANS 10400-O
ï¶ International & national interest groups, including
ï¶ SAFHE, CEASA and SAMED
ï¶ International Union of Architects â Public Health Group
ï¶ Networks and reference material from all continents
ï¶ GUPHA (Global University Programme in Health Architecture)
ï¶ Extensive stakeholder engagement
12
14. 14Clinical services
Adult Inpatient
Services
Laboratories
Mental Health
Adult Critical Care
Emergency Centres
Maternity Care
Facilities
Oncology
Outpatient Services
Paediatric and
Neonatal Facilities
Pharmacy
Primary Health Care
Diagnostic Radiology
Adult Physical
Rehabilitation
Adult Post-acute
Services
Facilities for Surgical
Procedures
TB Services
Support services
Admin & Related
General Hospital
Support
Catering Services
Linen and Laundry
Hospital Mortuary
Services
Nursing Education
Institutions
Health Facility
Residential
Central Sterilising
Services Department
Training and
Resource Centre
Infrastructure
Design for Waste
Management
Healthcare
environment/
crosscutting issues
Generic Room Data
Security
Engineering design
principles
Environment and
Sustainability
Materials and
Finishes
Future healthcare
environments
Healthcare
Technology
Inclusive
environments
Infection prevention
& control
Information
Technology &
Infrastructure
Procurement and
operation
Integrated
infrastructure
planning
Project planning and
briefing
Space guidelines
Cost Guidelines
Innovative Building
Technologies
Commissioning
Maintenance
Decommissioning
Capacity
development
Regulations
X
X
X X
X
Regulations
LEGEND
Gazetted
Guidelines
Toolkits
Position papers
Regulations
X
X
X
15. IUSSGuidelines,NormsandStandards
AninitiativeoftheDepartmentofHealthsupportedbyCSIR Implications for practice
ï¶ Public information
ï¶ Application by provincial departments of health
ï¶ New building projects (incl. adds & alts)
ï¶ Not requiring upgrade of existing facilities
ï¶ Voluntary standard
ï¶ Deviations motivated in IDMS
ï¶ Consultants and professional service providers not absolved of
duties of due diligence
15
27. IUSSGuidelines,NormsandStandards
AninitiativeoftheDepartmentofHealthsupportedbyCSIR Maintenance Schedules
âą Maintenance Schedules (per element) will identify
the:
â Component
â Relative priority (with respect to the component and its
location classification)
â Required work (maintenance tasks)
â Service Interval (per maintenance task)
â Time Tolerance â for reactive maintenance tasks
(performance management)
â Skills requirements
â Materials requirements
â Estimated Budget Requirements (Links to Cost Norms)
28. IUSSGuidelines,NormsandStandards
AninitiativeoftheDepartmentofHealthsupportedbyCSIR
General Policy Issues (Implementation
of Principles)
âą Compilation of Asset Registers
âą Condition Assessments per element
âą Classification of Maintenance into:
â Maintenance Programme
â Rehabilitation Programme
â Replacement
âą Budgeting for scheduled and backlog (deferred)
maintenance
âą Budget allowance to be 3% to 4% of current replacement
cost
âą Target Condition of 4 or above (after backlog is
eradicated) Recording of deferred maintenance
âą Skills Audits, Training, Reporting Lines
âą Supporting systems
37. IUSSGuidelines,NormsandStandards
AninitiativeoftheDepartmentofHealthsupportedbyCSIR
37
Valid replacement criteria
i. Equipment will be replaced only when one of the following valid reasons has been fulfilled:
a. it is worn out beyond repair (has reached the end of its natural life);
b. it is damaged beyond repair;
c. it is unreliable â faulty, old, unsafe;
d. it is clinically or technically obsolete;
e. spare parts are no longer available; and
f. it is no longer economical to repair.
and one of the following valid reasons has also been fulfilled:
g. utilisation statistics are available to show that it is still required; and
h. a demonstrated clinical or operational need still exists.
ii. Equipment will not be replaced simply because:
ï· it is old;
ï· staff do not like it; and
ï· a newer model has arrived on the market.
Judging when it is time to condemn equipment
Senior maintenance staff need to study the equipment, and judge:
ï· whether the equipment fulfils any of the valid replacement criteria (see above);
ï· whether the equipment has outlived its (internationally/locally) advised typical âlifetimeâ;
ï· the equipmentâs track record and state of health, as documented in its service history
records; and
ï· whether it will be necessary to override the average expected lifespan and condemn the
equipment early, or even to extend the lifespan of the equipment.
39. IUSSGuidelines,NormsandStandards
AninitiativeoftheDepartmentofHealthsupportedbyCSIR HT Guideline
âą Part A
â Frame Within Infrastructure Development and Operations
â Focus on durable ME + relate consumables
â Relevance to other national HT Documents
âą Part B
â Planning and budgeting process
â Needs Assessment
â Asset Management
â Budget and Financing
âą Estimate for costing of consumables (as % of OPC)
39
44. What do we need to Maintain?
Standard
Equipment
List (SEL)
L3 â
Hospital
L2 â
Hospital
L1 â
Hospital
CHC
Clinic
NDoH
Province
â1â
L3
Hospitals
L2
Hospitals
Hospital
X
Location
Service
Package
Planning
Units
âŠ..
Province
â2â
âŠ..
Theoretical Combined Asset Register
âGeneric Facility
Layoutâ
MM1
45. Maintenance Model 2 (Who, When, Where, How)
Standard
Equipment
List (SEL)
L3 â
Hospital
L2 â
Hospital
L1 â
Hospital
CHC
Clinic
NDoH
Province
â1â
L3
Hospitals
L2
Hospitals
Hospital
X
Location
Service
Package
Planning
Units
âŠ..
Province
â2â
âŠ..
Theoretical Combined MSI Register
âLimited
to
Maintenan
ce
Significant
Itemsâ
Item 1 â Anaesthetic Delivery Unit
âą Preventive Maintenance Interval â 6 months
âą Mean Time to Service â 2hr
âą Mean Time to Repair â 6hr
âą Technician Skill level â BA 5
Item 2 â Ultrasound Scanner
âą Preventive Maintenance Interval â 6 months
âą Mean Time to Service â 2hr
âą Mean Time to Repair â 4hr
âą Technician Skill level â DI 4
Maintenance Criteria for each item in the SEL
Risk Assessment
for each item in
the SEL
Complete Maintenance Plan with
Resource Requirements (âIdealâ)
Priority Maintenance Plan with Resource
Requirements
Adjusted for Risk
Physical Risk
Functional
Risk
Volume Risk
Maintenance
Intensity
Technology
Intensity
47. IUSSGuidelines,NormsandStandards
AninitiativeoftheDepartmentofHealthsupportedbyCSIR HT - What you canât see!
âą NDOH PMSU â Maintenance Workstream
â Effort to develop a National Maintenance Strategy
â Include both Facilities and HT
â HT Model with HR requirement to national Skills
Development forum
â Maintenance Plans to be developed in each province
47