Development of a Modern Scale House 
at The City of Calgary’s Shepard Waste 
Management Facility

Presented by:

Chuck Smith, P. Eng.      John Leszkowicz, P. Eng.
Prime Consultant          Project Delivery Leader
CH2M HILL (Canada) Ltd.   Waste & Recycling Services
                          The City of Calgary




                                                       1
2
City of Calgary
Waste & Recycling
Services Facilities
Locations




                      3
Shepard Landfill




                         52nd St. SE




                                       68th St. SE
Orthophoto
October 22, 2009
                   114th Av.SE




                   130th Av.SE




                                                     4
The Old Scale House




                      5
Timeline for Shepard Landfill New Entrance, Scale
    House & Thrown Go Project              9       09
                                                                              08                                       09              /0                   /
     /0
          6                 7                  08                8                                /0
                                                                                                       8
                                                                                                                                    1                  6                               10
                        l/0             ay
                                           /
                                                             l/0         v/                     ec                b/             v                 v 1                          pr
                                                                                                                                                                                   /
N ov               Ju                  M                Ju             No                   D                  Fe              No                No                         A



                                                                                   Tender Contract 2  
                                                                                   Scales and              Contract #2 
                                                                                   Building Facilities     Structures 
                                                                                                           Starts
                                                                                                                            Launch 
                                                                                                                            Communications 
                                                                                                                            Campaign          52nd Street 
                                                                                                                                              Widening 
                                                                     By Nov 30 Grading  
                                                                                                                                              closes old scale
                                                                     Substantially Completed
                                                                                                                                              New Scale  
                                                                                                                                              Operational
                                                    Contract 
                                                    #1 Started
                                                                                                                                                                     All systems in, 
                                Tender Contract 1                                                                                                                    troubleshooti
                                Grading & Earth                                                                                                                      ng, staff 
                                Works                                                                                                                                orientation 
                                                                                                                                                                     and SOPs 
                                                                                                                                                                     development

              Preliminary 
              Design Starts


    RFP ‐06‐6911
    Consultant Selection                                                                                                                             Last Updated: April12/09


                                                                                                                                                                                6
Location Selected for New Shepard Scale House
                                                Old Scale / Throw & Go
            Shepard Landfill Site               (Via 52nd ST SE)



                            Landfill Wetland
                                                                LFG Plant



                            New Scale House / Throw
                            & Go Location Selected
             68
               th
               St.
                  SE




                                                       SE
                                                 thAve
                                               114


                                                                            7
Site Design
                            Approach lanes




 Scale House




               Throw & Go




                                     8
Site Layout

 Ent
    r an
        ce




                                    To T
                                         hro
                                            w   &G
                                                  o
                  Throw & Go Site
New Scale House
                                                 To L
                                                     a   ndf
                                                            ill




                                                                  9
Scale House Building Design Features

•   Design Basis Included
       4 scales and 2 controlled access bypass lanes
       Fully-contained / serviced building
       Scale building canopy
       2 manned / un-manned scales with kiosks
       Scale room with large work area (up to 3 work stations)
       Office, lunch/meeting room, kitchen, washroom, server room
       Barrier-free access
       Ergonomic work stations
       Security




                                                                     10
Scale House Entrance




                       11
Scale House Floor Plan




                         12
Kiosks -
Scales 1 & 4




               13
Scale Room




             14
Design Features - Operation

•   Static Scale System
•   GEOWARE System – 4 traffic control stations
•   Barrier Arm Gates and Traffic Lights
•   Intercom system all lanes with card access on bypass lanes
•   Overhead lane electronic signage
•   RFID – Lanes 1 & 4
•   Portal radiation Detection System (I/B lanes 1 & 2)
•   Security and license plate cameras
•   City Server
•   UPS / Battery backup system
•   Emergency standby power generator set
Devices and Controls
                                          Security Camera




                       Electronic          RFID
                       Lane Signs

                                Signals




                                    License Plate
                                    Cameras
                                                    Barrier Arm
                                                    Gate and
                                                    Intercom




                                                                  16
Devices and Controls

              Traffic Controller
                                              Drivers Printer
                                              Terminal




Barrier Arm Gate Controls          Ergonomic Work Work Station
                                    Scale Operator Station
                                                          17
Portal Radiation Monitors




                            18
Coordination of City Business Units / Services

•   W&RS
•   Corporate Properties
•   Calgary Roads
•   City IT – and integration with Geoware System
•   Transportation Network Planning
•   Corporate Security
•   Water Resources
•   TELUS / ENMAX / ATCO Gas




                                                    19
Throw & Go

•   Design Basis
    – Large surface area for drop-off
      and storage

    – Ease of access from scale and
      site

    – Adaptability to City’s 80/20 by
      2020 diversion strategy

    – Expandability for roll-off bins

    – Pre-engineered heated storage
      building with covered drop-off
      area for used oil, HHW, batteries,
      etc.

    – Site trailer for outside attendant   20
Throw & Go Features




                        Storage/Expansion


                     Storage Building

                             Throw & Go Drop-off Area
    Site Attendant Trailer

                                roll off bins




                                                        21
Considerations During Construction

•   Future stub-out connection points for City Water and Sewer
    services

•   Conduit for future fibre-optic line

•   Electronic/remote controls for main gate

•   Windbreak for used oil drop off area

•   Paving of entire Throw and Go




                                                                 22
Key Lessons Learned

•   Entire site is relatively flat
      Design for wind and addition of windbreaks

•   Site Services
      Add more redundancy and future service capacity

•   Coordination with City Business Units
      Need to be brought in at the conceptual/initial development
       stage

• Add more flexibility in the sliding transaction service windows



                                                                     23
Next Steps

•   Planting trees in the spring to provide natural wind break for site

•   RFID use for private haulers

•   Development of new scale houses at East Calgary and Spyhill
    landfill site




                                                                          24
25
Thank You

Contact information:




      Chuck Smith - CH2M HILL
      (chuck.smith@ch2m.com)




      John Leszkowicz – The City of Calgary
      (John.Leszkowicz@calgary.ca)


                                              26

Weitere ähnliche Inhalte

Mehr von SWANA Northern Lights Chapter

Compressed natural gas for waste collection vehicles
Compressed natural gas for waste collection vehiclesCompressed natural gas for waste collection vehicles
Compressed natural gas for waste collection vehiclesSWANA Northern Lights Chapter
 
Operating a compost facility to maximize carbon credits
Operating a compost facility to maximize carbon creditsOperating a compost facility to maximize carbon credits
Operating a compost facility to maximize carbon creditsSWANA Northern Lights Chapter
 
Public private partnerships for gas utilization systems in the region of wate...
Public private partnerships for gas utilization systems in the region of wate...Public private partnerships for gas utilization systems in the region of wate...
Public private partnerships for gas utilization systems in the region of wate...SWANA Northern Lights Chapter
 
West edmonton landfill gull control program 2008 2009
West edmonton landfill gull control program 2008 2009West edmonton landfill gull control program 2008 2009
West edmonton landfill gull control program 2008 2009SWANA Northern Lights Chapter
 
Asserting carbon offsets from landfill gas flaring at regina’s landfill site
Asserting carbon offsets from landfill gas flaring at regina’s landfill siteAsserting carbon offsets from landfill gas flaring at regina’s landfill site
Asserting carbon offsets from landfill gas flaring at regina’s landfill siteSWANA Northern Lights Chapter
 

Mehr von SWANA Northern Lights Chapter (8)

Compressed natural gas for waste collection vehicles
Compressed natural gas for waste collection vehiclesCompressed natural gas for waste collection vehicles
Compressed natural gas for waste collection vehicles
 
Swana presentation wichuk 10-04-19
Swana presentation wichuk  10-04-19Swana presentation wichuk  10-04-19
Swana presentation wichuk 10-04-19
 
Swana md biosolid trials pettigrew
Swana md biosolid trials pettigrewSwana md biosolid trials pettigrew
Swana md biosolid trials pettigrew
 
Operating a compost facility to maximize carbon credits
Operating a compost facility to maximize carbon creditsOperating a compost facility to maximize carbon credits
Operating a compost facility to maximize carbon credits
 
Technical document for batch waste
Technical document for batch wasteTechnical document for batch waste
Technical document for batch waste
 
Public private partnerships for gas utilization systems in the region of wate...
Public private partnerships for gas utilization systems in the region of wate...Public private partnerships for gas utilization systems in the region of wate...
Public private partnerships for gas utilization systems in the region of wate...
 
West edmonton landfill gull control program 2008 2009
West edmonton landfill gull control program 2008 2009West edmonton landfill gull control program 2008 2009
West edmonton landfill gull control program 2008 2009
 
Asserting carbon offsets from landfill gas flaring at regina’s landfill site
Asserting carbon offsets from landfill gas flaring at regina’s landfill siteAsserting carbon offsets from landfill gas flaring at regina’s landfill site
Asserting carbon offsets from landfill gas flaring at regina’s landfill site
 

Development of a modern scale house at the city of calgary’s shepard waste management facility

  • 1. Development of a Modern Scale House  at The City of Calgary’s Shepard Waste  Management Facility Presented by: Chuck Smith, P. Eng. John Leszkowicz, P. Eng. Prime Consultant Project Delivery Leader CH2M HILL (Canada) Ltd. Waste & Recycling Services The City of Calgary 1
  • 2. 2
  • 3. City of Calgary Waste & Recycling Services Facilities Locations 3
  • 4. Shepard Landfill 52nd St. SE 68th St. SE Orthophoto October 22, 2009 114th Av.SE 130th Av.SE 4
  • 5. The Old Scale House 5
  • 6. Timeline for Shepard Landfill New Entrance, Scale House & Thrown Go Project 9 09 08 09  /0  / /0 6 7 08 8 /0 8  1 6 10 l/0 ay / l/0 v/ ec b/ v v 1 pr / N ov Ju M Ju No D Fe No No A Tender Contract 2   Scales and  Contract #2  Building Facilities Structures  Starts Launch  Communications  Campaign 52nd Street  Widening  By Nov 30 Grading   closes old scale Substantially Completed New Scale   Operational Contract  #1 Started All systems in,  Tender Contract 1  troubleshooti Grading & Earth  ng, staff  Works orientation  and SOPs  development Preliminary  Design Starts RFP ‐06‐6911 Consultant Selection Last Updated: April12/09 6
  • 7. Location Selected for New Shepard Scale House Old Scale / Throw & Go Shepard Landfill Site (Via 52nd ST SE) Landfill Wetland LFG Plant New Scale House / Throw & Go Location Selected 68 th St. SE SE thAve 114 7
  • 8. Site Design Approach lanes Scale House Throw & Go 8
  • 9. Site Layout Ent r an ce To T hro w &G o Throw & Go Site New Scale House To L a ndf ill 9
  • 10. Scale House Building Design Features • Design Basis Included  4 scales and 2 controlled access bypass lanes  Fully-contained / serviced building  Scale building canopy  2 manned / un-manned scales with kiosks  Scale room with large work area (up to 3 work stations)  Office, lunch/meeting room, kitchen, washroom, server room  Barrier-free access  Ergonomic work stations  Security 10
  • 12. Scale House Floor Plan 12
  • 15. Design Features - Operation • Static Scale System • GEOWARE System – 4 traffic control stations • Barrier Arm Gates and Traffic Lights • Intercom system all lanes with card access on bypass lanes • Overhead lane electronic signage • RFID – Lanes 1 & 4 • Portal radiation Detection System (I/B lanes 1 & 2) • Security and license plate cameras • City Server • UPS / Battery backup system • Emergency standby power generator set
  • 16. Devices and Controls Security Camera Electronic RFID Lane Signs Signals License Plate Cameras Barrier Arm Gate and Intercom 16
  • 17. Devices and Controls Traffic Controller Drivers Printer Terminal Barrier Arm Gate Controls Ergonomic Work Work Station Scale Operator Station 17
  • 19. Coordination of City Business Units / Services • W&RS • Corporate Properties • Calgary Roads • City IT – and integration with Geoware System • Transportation Network Planning • Corporate Security • Water Resources • TELUS / ENMAX / ATCO Gas 19
  • 20. Throw & Go • Design Basis – Large surface area for drop-off and storage – Ease of access from scale and site – Adaptability to City’s 80/20 by 2020 diversion strategy – Expandability for roll-off bins – Pre-engineered heated storage building with covered drop-off area for used oil, HHW, batteries, etc. – Site trailer for outside attendant 20
  • 21. Throw & Go Features Storage/Expansion Storage Building Throw & Go Drop-off Area Site Attendant Trailer roll off bins 21
  • 22. Considerations During Construction • Future stub-out connection points for City Water and Sewer services • Conduit for future fibre-optic line • Electronic/remote controls for main gate • Windbreak for used oil drop off area • Paving of entire Throw and Go 22
  • 23. Key Lessons Learned • Entire site is relatively flat  Design for wind and addition of windbreaks • Site Services  Add more redundancy and future service capacity • Coordination with City Business Units  Need to be brought in at the conceptual/initial development stage • Add more flexibility in the sliding transaction service windows 23
  • 24. Next Steps • Planting trees in the spring to provide natural wind break for site • RFID use for private haulers • Development of new scale houses at East Calgary and Spyhill landfill site 24
  • 25. 25