JUST –IN- TIME
                                                           BY: SRIBATSA PATTANAYAK

                                                               M.B.A,ABA, BALASORE

                             INTRODUCTION
WITH THE INCREASED COMPETITION AT THE GLOBAL LEVEL, MORE & MORE ORGANIZATIONS
ARE BECOMING CONSCIOUS & HAVE STARTED FOCUSING ON VARIOUS ASPECTS , SUCH AS :

BETTER QUALITY.

ZERO DEFECT.

NEW PRODUCT DEVELOPMENT.

ELIMINATION OF WASTAGE.

CONTINUOUS IMPROVEMENT , ETC.

A VERY HIGH EMPHASIS ON QUALITY BOTH FOR PRODUCTS & SERVICES HAS GENERATED A
NEW CONCEPT KNOWN AS JUST- IN –TIME . THIS SYSTEM IS A PRIMARY EXAMPLE OF A LEAN
SYSTEMS, I.E, A OPERATION SYSTEM WHICH INCLUDES A TOTAL SYSTEMS PROSPECTIVE, SUCH
AS : OPERATIONS STRATEGIES, PROCESSES, TECHNOLOGY, QUALITY, CAPACITY, LAYOUT,
INVENTORY & RESOURCE PLANNING ETC.

JUST-IN-TIME/JIT IS AN APPROACH WHICH SEEKS TO ELIMINATE ALL SOURCES OF WASTE,
ANYTHING WHICH DOESN’T ADD VALUE IN PRODUCTION ACTIVITIES, BY PROVIDING THE
RIGHT PART AT THE RIGHT PLACE AT THE RIGHT TIME .

                  JIT - BACKGROUND AND HISTORY
JIT IS A JAPANESE MANAGEMENT PHILOSOPHY WHICH HAS BEEN APPLIED IN PRACTICE SINCE
THE EARLY 1970S IN MANY JAPANESE MANUFACTURING ORGANISATIONS. IT WAS FIRST
DEVELOPED AND PERFECTED WITHIN THE TOYOTA MANUFACTURING PLANTS BY TAIICHI
OHNO AS A MEANS OF MEETING CONSUMER DEMANDS WITH MINIMUM DELAYS . TAIICHI
OHNO IS FREQUENTLY REFERRED TO AS THE FATHER OF JIT.

TOYOTA REALISED THAT JIT WOULD ONLY BE SUCCESSFUL IF EVERY INDIVIDUAL WITHIN THE
ORGANISATION WAS INVOLVED AND COMMITTED TO IT, IF THE PLANT AND PROCESSES WERE
ARRANGED FOR MAXIMUM OUTPUT AND EFFICIENCY, AND IF QUALITY AND PRODUCTION
PROGRAMS WERE SCHEDULED TO MEET DEMANDS EXACTLY.
SEVEN WASTES


JIT ALWAYS INSISTED ON ELIMINATION OF WASTES. SHIGCO SHINGO, A JAPANESE JIT
AUTHORITY IDENTIFIES 7 WASTES. TO HIM BY ATTENDING TO THESE WASTE, THE
IMPROVEMENT IS ACHIEVED. THOSE 7 KINDS OF WASTAGES ARE:

  1. WASTE OF STOCKS.

  2. WASTE OF WAITING.

  3. WASTE OF PROCESSING.

  4. WASTE OF DEFECTIVE PRODUCTION.

  5. WASTE OF OVER PRODUCTION.

  6. WASTE OF MOTION.

  7. WASTE OF TRANSPORTATION.



                            KEY ELEMENTS OF JIT


  1. TO HAVE A FLEXIBLE WORKFORCE CAPABLE OF USING MULTIPLE SKILLS.

  2. INSIST FOR DEFECT FREE MATERIALS & SUPPLIES BE DELIVERED WHEN NEEDED.

  3. STRIVES FOR REDUCED SET-UP TIMES & SMALL LOT SIZES.

  4. THERE SHOULD BE RELIABLE VENDORS, EMPLOYEE INVOLVEMENT & CO-OPERATION
     WITH TOTAL PRODUCTIVE MAINTENANCE.

  AS A CONCEPT JIT MEANS THAT, VIRTUALLY NO INVENTORIES ARE HELD AT ANY STAGE OF
PRODUCTION AND THAT THE EXACT NUMBER OF UNITS ARE BROUGHT TO EACH SUCCESSIVE
STAGES OF PRODUCTION AT THE RIGHT TIME.

  THAT’S WHY THE JIT CONCCEPT IS OTHERWISE KNOWN AS : ZIPS (ZERO INVENTORY
PRODUCTION SYSTEM), ZIN (ZERO INVENTORIES), MAN ( MATERIALS AS NEEDED), NOT (NICK
OF TIME).
BENEFITS OF JIT


•   PRODUCT COST: THE COST OF PRODUCTION IS GREATLY REDUCED DUE TO REDUCTION
    OF MANUFACTURING CYCLE TIME, REDUCTION OF WASTES & ELIMINATION OF NON-
    VALUE ADDED OPERATIONS.

•   QUALITY: QUALITY IS IMPROVED BECAUSE OF CONTINIOUS QUALITY IMPROVEMENT
    PROGRAMMES.

•   DESIGN: DUE TO QUICK RESPONSE OF TECHNICAL CHANGE, ALTERNATIVE DESIGNS CAN
    BE QUICKLY BROUGHT ON THE SHOP FLOOR.

•   PRODUCTIVITY IMPROVE MENT: UNDER JIT SYSTEM SUPPLIERS SUPPLIES HIGH
    QUALITY MATERIALS AND THE USE OF AUTOMATED ROBOTICS WITH PREVENTIVE
    INTENSIVE MAINTENANCE PROGRAMMES, WHICH PREVENTS MACHINARY
    BREAKDOWNS ETC. ENSURES HIGH & PERFECT PRODUCT QUALITY.

•   HIGH FLEXIBILITY: IN JIT WORKERS ARE MULTI- SKILLED AND EMPHASISES ON ZERO
    DEFECT BEFORE THEY ARE PASSED TO THE NEXT OPERATION, HENCE PRODUCTION
    OPERATION BECOMES MORE FLEXIBLE.



                       DISADVANTAGES OF JIT


•   JIT REQUIRES SPECIAL TRAININGS WITH REORGANISATIONS OF POLICIES AND
    PROCEDURE.

•   RESISTANCE TO CHANGE: JIT INVOLVES A CHANGE THROUGH OUT THE WHOLE
    ORGANISATIONS, BUT HUMAN NATURE RESISTS CHANGE.

•   JIT REQUIRES MULTI-SKILLED WORKERS WITH FLEXIBILITY TO CHANGE. AND IT IS VERY
    HARD TO FIND THOSE WORKERS.
Are Indian Companies Ready for Just-In-Time?



IN INDIA, ATTEMPTS WERE MADE TO APPLY CONCEPTS SUCH AS QUALITY CIRCLES AS EARLY
AS THE 80’S. THERE HAVE BEEN ATTEMPTS TO IMPLEMENT JIT PRINCIPLES AS WELL. THE
EXPERIENCE SO FAR SEEMS TO SUGGEST THAT PROGRESS, AS YET, HAS NOT BEEN
SATISFACTORY.THERE HAS BEEN LITTLE OR NO DOCUMENTATION OF THE EXPERIENCES OF
MANUFACTURING FIRMS THAT INITIATED THE IMPLEMENTATION OF THE JIT PROGRAMMES
WITH THE RESULT THAT OTHER FIRMS ARE NOT AWARE OF THE POTENTIAL BENEFITS AND
PROBLEMS ASSOCIATED WITH JIT PHILOSOPHY.

SEVERAL INDIAN FIRMS HAVE EITHER INITIATED STEPS TOWARDS JIT IMPLEMENTATION OR
CLAIM TO HAVE ALREADY IMPLEMENTED MANY ASPECTS OF JIT. MOST OF THE FIRMS WITH
SOME JIT EFFORTS REPORTED STARTING THEIR EFFORTS ONLY RECENTLY. THOSE WITH MAJOR
JIT PROGRAMMES HAD STARTED THEIR EFFORTS AS EARLY AS IN 1986. 22 COMPANIES HAD
UNDERTAKEN JIT EFFORTS AT THE TIME OF THE STUDY. WHILE 13 OF THEM REPORTED SOME
EFFORTS SUCH AS EXPERIMENTAL AND AD HOC MODIFICATION OF SYSTEMS, 9 REPORTED
MAJOR JIT EFFORTS IN PLACE.

THREE MOST IMPORTANT REASONS FOR EMBARKING UPON A JIT IMPLEMENTATION
PROGRAMME WERE GAINING COMPETITIVE ADVANTAGE IN THE MARKET PLACE,
SIMPLIFYING PRODUCTION PLANNING & CONTROL, AND CURBING RISING INVENTORY
LEVELS. BUT PROXIMITY OF SUPPLIERS, STABLE PRODUCTION PLAN, OR HIGH VOLUME
REPETITIVE MANUFACTURING WERE NEVER MENTIONED AMONG THE MAIN REASONS FOR
JIT IMPLEMENTATION.

THE FINDINGS SUGGEST THAT TQM AND VENDOR DEVELOPMENT EFFORTS MUST PRECEDE
THE LAUNCH OF MAJOR JIT PROGRAMMES. MANAGERS NEED TO PRIORITISE TQM
PROGRAMMES AHEAD OF TPM. JIT AND TQM ARE CONSIDERED AS TWO SIDES OF THE SAME
COIN. WHILE JIT PROVIDES AN ORGANISATIONAL FRAMEWORK FOR THE EXPOSURE OF WASTE
AND PROBLEMS, TQM PROGRAMMES PROVIDES AN ORGANISATIONAL FRAMEWORK TO
SOLVE THESE PROBLEMS. HENCE, IT IS IMPORTANT FOR MANAGERS TO UNDERSTAND THAT
NEITHER JIT NOR TQM CAN “STAND ALONE” IN THE LONG RUN.

INDIAN MANAGERS, THE STUDY SUGGESTS, HAVE NOT EXPLOITED THE LEAP FROGGING
EFFECT. MANY OF THESE IDEAS RELATING TO SUCCESSFUL JIT IMPLEMENTATION ARE WELL
KNOWN AND HAVE BECOME COMMON PLACE. DESPITE THIS, THEY SEEM TO TREAD THE SAME
PATH AS SOME OF THE EARLY ENTRANTS TO THIS FIELD ELSEWHERE.
CONCLUSION
JUST-IN-TIME METHOD IS A PHILOSOPHY, WHICH BELIEVES THAT WASTE CAN BE
ELIMINATED BY CUTTING UNNECESSARY INVENTORY AND REMOVING NON
VALUE-ADDED ACTIVITIES IN OPERATIONS. THE GOALS ARE TO PRODUCE GOODS
AND SERVICES AS SPECIFICATIONS AND CONTINUOUS IMPROVEMENT THROUGH
VALUE ADDITIONS.

Weitere ähnliche Inhalte

Was ist angesagt?

Toyota’s kaizen experience
Toyota’s kaizen experienceToyota’s kaizen experience
Toyota’s kaizen experience
Abhinandan Jena
 
Lean production vs mass production
Lean production vs mass productionLean production vs mass production
Lean production vs mass production
Sophie Michelot
 
Kaizen in the indian context a case study
Kaizen in the indian context a case studyKaizen in the indian context a case study
Kaizen in the indian context a case study
iaemedu
 
Kaizen report
Kaizen reportKaizen report
Kaizen report
dqjp
 

Was ist angesagt? (20)

POKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingPOKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake Proofing
 
2012 lean toolbox_4 asq
2012 lean toolbox_4 asq2012 lean toolbox_4 asq
2012 lean toolbox_4 asq
 
Kaizen philosopy
Kaizen philosopyKaizen philosopy
Kaizen philosopy
 
Toyota’s kaizen experience
Toyota’s kaizen experienceToyota’s kaizen experience
Toyota’s kaizen experience
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Lean production vs mass production
Lean production vs mass productionLean production vs mass production
Lean production vs mass production
 
KAIZEN: A Lean Manufacturing Technique
KAIZEN: A Lean Manufacturing TechniqueKAIZEN: A Lean Manufacturing Technique
KAIZEN: A Lean Manufacturing Technique
 
Om lean
Om leanOm lean
Om lean
 
Kaizen in the indian context a case study
Kaizen in the indian context a case studyKaizen in the indian context a case study
Kaizen in the indian context a case study
 
Just in time
Just in timeJust in time
Just in time
 
Shriraam Madanagopal Internship Report
Shriraam Madanagopal Internship ReportShriraam Madanagopal Internship Report
Shriraam Madanagopal Internship Report
 
Kaizen report
Kaizen reportKaizen report
Kaizen report
 
What is-six-sigma
What is-six-sigmaWhat is-six-sigma
What is-six-sigma
 
Seminar report on lean
Seminar report on leanSeminar report on lean
Seminar report on lean
 
Lean manufacturing system (lms) 19-march-sgd
Lean manufacturing system (lms) 19-march-sgdLean manufacturing system (lms) 19-march-sgd
Lean manufacturing system (lms) 19-march-sgd
 
Toyota Production System 14 Management Principles
Toyota Production System 14 Management PrinciplesToyota Production System 14 Management Principles
Toyota Production System 14 Management Principles
 
Lean manufacturing report
Lean manufacturing reportLean manufacturing report
Lean manufacturing report
 
Ch 1-intro-to-lean (1)
Ch 1-intro-to-lean (1)Ch 1-intro-to-lean (1)
Ch 1-intro-to-lean (1)
 
Kaizen
KaizenKaizen
Kaizen
 
14 Management Principles : Toyota Way
14 Management Principles : Toyota Way14 Management Principles : Toyota Way
14 Management Principles : Toyota Way
 

Ähnlich wie J I T

Lean production and jit
Lean production and jitLean production and jit
Lean production and jit
Kusum Parmar
 
Process improvement techniques and its applicability in pharma mfg an overview
Process improvement techniques and its applicability in pharma mfg   an overviewProcess improvement techniques and its applicability in pharma mfg   an overview
Process improvement techniques and its applicability in pharma mfg an overview
VikalpNagori1
 
Coralie_Bailly-Lean_Manufacturing_any_size_company
Coralie_Bailly-Lean_Manufacturing_any_size_companyCoralie_Bailly-Lean_Manufacturing_any_size_company
Coralie_Bailly-Lean_Manufacturing_any_size_company
Coralie Bailly
 

Ähnlich wie J I T (20)

Just In Time Management
Just In Time ManagementJust In Time Management
Just In Time Management
 
Lean production and jit
Lean production and jitLean production and jit
Lean production and jit
 
Just to-time (jit)
Just to-time (jit)Just to-time (jit)
Just to-time (jit)
 
Kaizen1
Kaizen1Kaizen1
Kaizen1
 
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
 
Wcm 5
Wcm 5Wcm 5
Wcm 5
 
Jit report
Jit reportJit report
Jit report
 
Process improvement techniques and its applicability in pharma mfg an overview
Process improvement techniques and its applicability in pharma mfg   an overviewProcess improvement techniques and its applicability in pharma mfg   an overview
Process improvement techniques and its applicability in pharma mfg an overview
 
Just in time concept
Just in time conceptJust in time concept
Just in time concept
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Coralie_Bailly-Lean_Manufacturing_any_size_company
Coralie_Bailly-Lean_Manufacturing_any_size_companyCoralie_Bailly-Lean_Manufacturing_any_size_company
Coralie_Bailly-Lean_Manufacturing_any_size_company
 
Lean management
Lean management Lean management
Lean management
 
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
 
J012145256
J012145256J012145256
J012145256
 
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
 
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
 
Quality engineering and management
Quality engineering and managementQuality engineering and management
Quality engineering and management
 
Lean System
Lean SystemLean System
Lean System
 
How General Electric (GE) Saved 80% in Development Costs
How General Electric (GE) Saved 80% in Development CostsHow General Electric (GE) Saved 80% in Development Costs
How General Electric (GE) Saved 80% in Development Costs
 
Productivity for BMS student
Productivity for BMS studentProductivity for BMS student
Productivity for BMS student
 

Mehr von SRIBATSA PATTANAYAK (13)

Trends In Indian Financial System
Trends In Indian Financial SystemTrends In Indian Financial System
Trends In Indian Financial System
 
T Q M
T Q MT Q M
T Q M
 
P R O D U C T C O N C E P T & P R O D U C T M I X
P R O D U C T  C O N C E P T &  P R O D U C T  M I XP R O D U C T  C O N C E P T &  P R O D U C T  M I X
P R O D U C T C O N C E P T & P R O D U C T M I X
 
Retail marketing & its boom in india
Retail marketing & its boom in indiaRetail marketing & its boom in india
Retail marketing & its boom in india
 
Ganapati Baba
Ganapati BabaGanapati Baba
Ganapati Baba
 
Trends in indian financial system.
Trends in indian financial system.Trends in indian financial system.
Trends in indian financial system.
 
Setu Samudram Ppt
Setu Samudram PptSetu Samudram Ppt
Setu Samudram Ppt
 
Tqm
TqmTqm
Tqm
 
M A N F A C T U R I N G V S
M A N F A C T U R I N G  V SM A N F A C T U R I N G  V S
M A N F A C T U R I N G V S
 
Marketing In 21st Century
Marketing In 21st CenturyMarketing In 21st Century
Marketing In 21st Century
 
Strikes
StrikesStrikes
Strikes
 
Product Life Cycle
Product Life CycleProduct Life Cycle
Product Life Cycle
 
Role Of A Manager In Communication
Role Of A Manager In CommunicationRole Of A Manager In Communication
Role Of A Manager In Communication
 

Kürzlich hochgeladen

Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Kürzlich hochgeladen (20)

Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 

J I T

  • 1. JUST –IN- TIME BY: SRIBATSA PATTANAYAK M.B.A,ABA, BALASORE INTRODUCTION WITH THE INCREASED COMPETITION AT THE GLOBAL LEVEL, MORE & MORE ORGANIZATIONS ARE BECOMING CONSCIOUS & HAVE STARTED FOCUSING ON VARIOUS ASPECTS , SUCH AS : BETTER QUALITY. ZERO DEFECT. NEW PRODUCT DEVELOPMENT. ELIMINATION OF WASTAGE. CONTINUOUS IMPROVEMENT , ETC. A VERY HIGH EMPHASIS ON QUALITY BOTH FOR PRODUCTS & SERVICES HAS GENERATED A NEW CONCEPT KNOWN AS JUST- IN –TIME . THIS SYSTEM IS A PRIMARY EXAMPLE OF A LEAN SYSTEMS, I.E, A OPERATION SYSTEM WHICH INCLUDES A TOTAL SYSTEMS PROSPECTIVE, SUCH AS : OPERATIONS STRATEGIES, PROCESSES, TECHNOLOGY, QUALITY, CAPACITY, LAYOUT, INVENTORY & RESOURCE PLANNING ETC. JUST-IN-TIME/JIT IS AN APPROACH WHICH SEEKS TO ELIMINATE ALL SOURCES OF WASTE, ANYTHING WHICH DOESN’T ADD VALUE IN PRODUCTION ACTIVITIES, BY PROVIDING THE RIGHT PART AT THE RIGHT PLACE AT THE RIGHT TIME . JIT - BACKGROUND AND HISTORY JIT IS A JAPANESE MANAGEMENT PHILOSOPHY WHICH HAS BEEN APPLIED IN PRACTICE SINCE THE EARLY 1970S IN MANY JAPANESE MANUFACTURING ORGANISATIONS. IT WAS FIRST DEVELOPED AND PERFECTED WITHIN THE TOYOTA MANUFACTURING PLANTS BY TAIICHI OHNO AS A MEANS OF MEETING CONSUMER DEMANDS WITH MINIMUM DELAYS . TAIICHI OHNO IS FREQUENTLY REFERRED TO AS THE FATHER OF JIT. TOYOTA REALISED THAT JIT WOULD ONLY BE SUCCESSFUL IF EVERY INDIVIDUAL WITHIN THE ORGANISATION WAS INVOLVED AND COMMITTED TO IT, IF THE PLANT AND PROCESSES WERE ARRANGED FOR MAXIMUM OUTPUT AND EFFICIENCY, AND IF QUALITY AND PRODUCTION PROGRAMS WERE SCHEDULED TO MEET DEMANDS EXACTLY.
  • 2. SEVEN WASTES JIT ALWAYS INSISTED ON ELIMINATION OF WASTES. SHIGCO SHINGO, A JAPANESE JIT AUTHORITY IDENTIFIES 7 WASTES. TO HIM BY ATTENDING TO THESE WASTE, THE IMPROVEMENT IS ACHIEVED. THOSE 7 KINDS OF WASTAGES ARE: 1. WASTE OF STOCKS. 2. WASTE OF WAITING. 3. WASTE OF PROCESSING. 4. WASTE OF DEFECTIVE PRODUCTION. 5. WASTE OF OVER PRODUCTION. 6. WASTE OF MOTION. 7. WASTE OF TRANSPORTATION. KEY ELEMENTS OF JIT 1. TO HAVE A FLEXIBLE WORKFORCE CAPABLE OF USING MULTIPLE SKILLS. 2. INSIST FOR DEFECT FREE MATERIALS & SUPPLIES BE DELIVERED WHEN NEEDED. 3. STRIVES FOR REDUCED SET-UP TIMES & SMALL LOT SIZES. 4. THERE SHOULD BE RELIABLE VENDORS, EMPLOYEE INVOLVEMENT & CO-OPERATION WITH TOTAL PRODUCTIVE MAINTENANCE. AS A CONCEPT JIT MEANS THAT, VIRTUALLY NO INVENTORIES ARE HELD AT ANY STAGE OF PRODUCTION AND THAT THE EXACT NUMBER OF UNITS ARE BROUGHT TO EACH SUCCESSIVE STAGES OF PRODUCTION AT THE RIGHT TIME. THAT’S WHY THE JIT CONCCEPT IS OTHERWISE KNOWN AS : ZIPS (ZERO INVENTORY PRODUCTION SYSTEM), ZIN (ZERO INVENTORIES), MAN ( MATERIALS AS NEEDED), NOT (NICK OF TIME).
  • 3. BENEFITS OF JIT • PRODUCT COST: THE COST OF PRODUCTION IS GREATLY REDUCED DUE TO REDUCTION OF MANUFACTURING CYCLE TIME, REDUCTION OF WASTES & ELIMINATION OF NON- VALUE ADDED OPERATIONS. • QUALITY: QUALITY IS IMPROVED BECAUSE OF CONTINIOUS QUALITY IMPROVEMENT PROGRAMMES. • DESIGN: DUE TO QUICK RESPONSE OF TECHNICAL CHANGE, ALTERNATIVE DESIGNS CAN BE QUICKLY BROUGHT ON THE SHOP FLOOR. • PRODUCTIVITY IMPROVE MENT: UNDER JIT SYSTEM SUPPLIERS SUPPLIES HIGH QUALITY MATERIALS AND THE USE OF AUTOMATED ROBOTICS WITH PREVENTIVE INTENSIVE MAINTENANCE PROGRAMMES, WHICH PREVENTS MACHINARY BREAKDOWNS ETC. ENSURES HIGH & PERFECT PRODUCT QUALITY. • HIGH FLEXIBILITY: IN JIT WORKERS ARE MULTI- SKILLED AND EMPHASISES ON ZERO DEFECT BEFORE THEY ARE PASSED TO THE NEXT OPERATION, HENCE PRODUCTION OPERATION BECOMES MORE FLEXIBLE. DISADVANTAGES OF JIT • JIT REQUIRES SPECIAL TRAININGS WITH REORGANISATIONS OF POLICIES AND PROCEDURE. • RESISTANCE TO CHANGE: JIT INVOLVES A CHANGE THROUGH OUT THE WHOLE ORGANISATIONS, BUT HUMAN NATURE RESISTS CHANGE. • JIT REQUIRES MULTI-SKILLED WORKERS WITH FLEXIBILITY TO CHANGE. AND IT IS VERY HARD TO FIND THOSE WORKERS.
  • 4. Are Indian Companies Ready for Just-In-Time? IN INDIA, ATTEMPTS WERE MADE TO APPLY CONCEPTS SUCH AS QUALITY CIRCLES AS EARLY AS THE 80’S. THERE HAVE BEEN ATTEMPTS TO IMPLEMENT JIT PRINCIPLES AS WELL. THE EXPERIENCE SO FAR SEEMS TO SUGGEST THAT PROGRESS, AS YET, HAS NOT BEEN SATISFACTORY.THERE HAS BEEN LITTLE OR NO DOCUMENTATION OF THE EXPERIENCES OF MANUFACTURING FIRMS THAT INITIATED THE IMPLEMENTATION OF THE JIT PROGRAMMES WITH THE RESULT THAT OTHER FIRMS ARE NOT AWARE OF THE POTENTIAL BENEFITS AND PROBLEMS ASSOCIATED WITH JIT PHILOSOPHY. SEVERAL INDIAN FIRMS HAVE EITHER INITIATED STEPS TOWARDS JIT IMPLEMENTATION OR CLAIM TO HAVE ALREADY IMPLEMENTED MANY ASPECTS OF JIT. MOST OF THE FIRMS WITH SOME JIT EFFORTS REPORTED STARTING THEIR EFFORTS ONLY RECENTLY. THOSE WITH MAJOR JIT PROGRAMMES HAD STARTED THEIR EFFORTS AS EARLY AS IN 1986. 22 COMPANIES HAD UNDERTAKEN JIT EFFORTS AT THE TIME OF THE STUDY. WHILE 13 OF THEM REPORTED SOME EFFORTS SUCH AS EXPERIMENTAL AND AD HOC MODIFICATION OF SYSTEMS, 9 REPORTED MAJOR JIT EFFORTS IN PLACE. THREE MOST IMPORTANT REASONS FOR EMBARKING UPON A JIT IMPLEMENTATION PROGRAMME WERE GAINING COMPETITIVE ADVANTAGE IN THE MARKET PLACE, SIMPLIFYING PRODUCTION PLANNING & CONTROL, AND CURBING RISING INVENTORY LEVELS. BUT PROXIMITY OF SUPPLIERS, STABLE PRODUCTION PLAN, OR HIGH VOLUME REPETITIVE MANUFACTURING WERE NEVER MENTIONED AMONG THE MAIN REASONS FOR JIT IMPLEMENTATION. THE FINDINGS SUGGEST THAT TQM AND VENDOR DEVELOPMENT EFFORTS MUST PRECEDE THE LAUNCH OF MAJOR JIT PROGRAMMES. MANAGERS NEED TO PRIORITISE TQM PROGRAMMES AHEAD OF TPM. JIT AND TQM ARE CONSIDERED AS TWO SIDES OF THE SAME COIN. WHILE JIT PROVIDES AN ORGANISATIONAL FRAMEWORK FOR THE EXPOSURE OF WASTE AND PROBLEMS, TQM PROGRAMMES PROVIDES AN ORGANISATIONAL FRAMEWORK TO SOLVE THESE PROBLEMS. HENCE, IT IS IMPORTANT FOR MANAGERS TO UNDERSTAND THAT NEITHER JIT NOR TQM CAN “STAND ALONE” IN THE LONG RUN. INDIAN MANAGERS, THE STUDY SUGGESTS, HAVE NOT EXPLOITED THE LEAP FROGGING EFFECT. MANY OF THESE IDEAS RELATING TO SUCCESSFUL JIT IMPLEMENTATION ARE WELL KNOWN AND HAVE BECOME COMMON PLACE. DESPITE THIS, THEY SEEM TO TREAD THE SAME PATH AS SOME OF THE EARLY ENTRANTS TO THIS FIELD ELSEWHERE.
  • 5. CONCLUSION JUST-IN-TIME METHOD IS A PHILOSOPHY, WHICH BELIEVES THAT WASTE CAN BE ELIMINATED BY CUTTING UNNECESSARY INVENTORY AND REMOVING NON VALUE-ADDED ACTIVITIES IN OPERATIONS. THE GOALS ARE TO PRODUCE GOODS AND SERVICES AS SPECIFICATIONS AND CONTINUOUS IMPROVEMENT THROUGH VALUE ADDITIONS.