Campus Master Planning
• Why Utilities Planning is
important
• Utility Planning Considerations
• 2000 Master Plan Successes
– Infrastructure
– Energy Management
• Our ESCO Project
• Failure to Plan Utilities
• Strategies for this Master Plan
Why is Utilities Infrastructure Important?
• Actions #71 and #73 of Educating Illinois; and Goal 3,
Strategy 5 of Ed. Il. 2008-14:
“Complete capital improvement projects that address health and
safety issues as well as adequate and efficient utility support.”
• Age and condition of Utilities and Mechanical Systems
Impact Cost and Scope of MP Facility Improvement
projects.
• Availability, Location, and Capacity of Utilities impact
cost and feasibility of MP new construction sites.
• Utility Planning must take place from the START.
Utility Considerations
• Electrical Power:
– Nearest power station? (Ameren IP)
– High (12.5 KV) vs Low (4.16 KV) voltage ?
– Emergency or Backup generation?
– Potential for Alt. or Renewable Power?
• Heat:
– Steam or Hot water?
– Proximity to Heating plant and tunnel system?
– Capacity/Redundancy of the existing plant(s)?
– Size for future growth/expansion (Piping).
– Independent systems vs District Heating?
(impact on footprint, Mech. Rm. space)
Utility Considerations
• Air Conditioning:
– Proximity to a Chilled Water Plant?
– Building demand? Is there existing capacity? Distribution?
– Cooling Season?
– Size for future growth/expansion?
– Independent system? DX Units? (impact on footprint, Mech. Rm. space)
• Water:
– Access to Town of Normal Water system?
– Storm water run off?
– Risk of flooding or leaking?
• Mechanical Systems: (Chillers, Cooling Towers, Boilers, Air Handlers)
– Type, Size, Capacity?
– Fuel Source? (Elec vs Gas)
– Access for Maintenance and Replacement?
– Location (Basement vs Rooftop?)
– Exterior Presence?
– Budget?
– Sustainability issues?
2000 Master Plan
What have we accomplished?
• Energy Conservation
– Lighting Upgrades
– Boiler operations
– Insulation & Steam traps
• Infrastructure Improvement
– District Cooling
– Boiler Economizers
• Energy Procurement
– 5 School Electric contract
– Natural Gas strategy
District Cooling Plan
Starting Point 2000
New/Good
Marginal
High Risk
Failed
Loop
District Cooling Plan
BSC and Quad Loops
Quad Loop:
SCH
HOV
WMS*
CPA
CVA
COB
McC
DEG
COOK
EDW
FC/MET
SSB
BSC: BSC, Braden,
BBC, Milner
Not:
CE/CW
OU
Wms*
FEL
District Cooling Plan
NE Loop
NE Loop:
SLB
MLT
JUL
FH/FHA
E. Campus
*Replaced CRP
District Cooling Plan
NW & SE Loops
SE Loop:
WAT
STV
WC
NW Loop:
RBA *
HTN*
W. Campus
Linkins
NS
TUR
District Cooling Plan
South Loop
South Loop:
SF&KR
FEL
COB
CFA*
District Cooling Plan
Current Loops
What does good Energy
Management planning Save?
2001 2009 Reduction Rate FY09
Savings
Electricity
(kWhrs)
93,561,596 87,187,011 6,374,585 $ .0792 $504,867
Nat. Gas
(Therms)
6,746,593 6,114,791 631,802 $ .99 $625,483
Water
(Gal *1000)
236,414.7 182,961.7 53,453.0 $7.05 $376,844
$1,507,194
Note: This is enough savings to pay for (fill in the blank) !!
> $10 million in 8 years !!
Energy Services Contract (ESCO)
Why at ISU?
• To do in a single year what has taken us 8!
• Reduce Energy Consumption, Utility Costs, Compound effect of Savings
• Facility infrastructure improvement and systems reliability
• Accelerate the construction period
• Engineer the highest priority projects with greatest payback
• Legislative benefits (110 ILCS 62, Public University Energy Cons. Act)
• Streamlined Procurement
• Guaranteed source of funding
• Single POC for all project functions
• Comprehensive engineering and design approach
• Our Project
• NORESCO
• Schedule
• Facilities (SLB, Milner, HP)
Impacts of Failure to Plan for Utilities
• Feasibility of the Master Plan
• Risk of lack of expansion capabilities
• Lack of flexibility to accommodate Economic,
Natural disaster, other events.
• “Piecemeal” Utilities are expensive, inefficient,
and will need re-design at every phase of the
Master Plan construction.
Utility Strategies for This MP?
• District Heating and Cooling Interconnectivity
• Gregory Street Infrastructure
• Reliability/Efficiency/Conservation (ESCO)
• Metering
• Reduce Deferred Maintenance
• Energy Procurement
• Renewable/Alternative Energy
Energy management presentation

Weitere ähnliche Inhalte

Was ist angesagt?

College campus energy & climate plan
College campus energy & climate planCollege campus energy & climate plan
College campus energy & climate plan
Robert Cormia
 
Green Campus Conference 4-19-2011 R. Gagne
Green Campus Conference 4-19-2011 R. GagneGreen Campus Conference 4-19-2011 R. Gagne
Green Campus Conference 4-19-2011 R. Gagne
Rob Gagne
 
Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...
Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...
Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...
Craig Heal
 
National grid's energy efficiency programs
National grid's energy efficiency programsNational grid's energy efficiency programs
National grid's energy efficiency programs
TNenergy
 
Avanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon's Energy Management Solutions at work at Engro FertilizerAvanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon
 
Power+Generation+Project+-+Melbourne
Power+Generation+Project+-+MelbournePower+Generation+Project+-+Melbourne
Power+Generation+Project+-+Melbourne
John Rimac
 

Was ist angesagt? (20)

Philadelphia Energy
Philadelphia EnergyPhiladelphia Energy
Philadelphia Energy
 
Geoexchange Presentation: Grand Designs Live 2013
Geoexchange Presentation: Grand Designs Live 2013Geoexchange Presentation: Grand Designs Live 2013
Geoexchange Presentation: Grand Designs Live 2013
 
R callaghan DT774 Energy and Retrofit Presentation
R callaghan DT774 Energy and Retrofit PresentationR callaghan DT774 Energy and Retrofit Presentation
R callaghan DT774 Energy and Retrofit Presentation
 
College campus energy & climate plan
College campus energy & climate planCollege campus energy & climate plan
College campus energy & climate plan
 
Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House InstituteDeep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
 
Session 3A - Gary Krivopapich
Session 3A - Gary KrivopapichSession 3A - Gary Krivopapich
Session 3A - Gary Krivopapich
 
Green Campus Conference 4-19-2011 R. Gagne
Green Campus Conference 4-19-2011 R. GagneGreen Campus Conference 4-19-2011 R. Gagne
Green Campus Conference 4-19-2011 R. Gagne
 
Aci home-mpg-sam nutter-csg
Aci home-mpg-sam nutter-csgAci home-mpg-sam nutter-csg
Aci home-mpg-sam nutter-csg
 
Texas Wesleyan University- Blue + Gold = Green. A Strategic Approach to Susta...
Texas Wesleyan University- Blue + Gold = Green. A Strategic Approach to Susta...Texas Wesleyan University- Blue + Gold = Green. A Strategic Approach to Susta...
Texas Wesleyan University- Blue + Gold = Green. A Strategic Approach to Susta...
 
Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...
Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...
Full Paper- IPWEA Sustainability Conference July 2014 City of Fremantle Paper...
 
National grid's energy efficiency programs
National grid's energy efficiency programsNational grid's energy efficiency programs
National grid's energy efficiency programs
 
Program and Policy Innovations at the Water Energy Nexus
Program and Policy Innovations at the Water Energy NexusProgram and Policy Innovations at the Water Energy Nexus
Program and Policy Innovations at the Water Energy Nexus
 
Avanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon's Energy Management Solutions at work at Engro FertilizerAvanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon's Energy Management Solutions at work at Engro Fertilizer
 
Power+Generation+Project+-+Melbourne
Power+Generation+Project+-+MelbournePower+Generation+Project+-+Melbourne
Power+Generation+Project+-+Melbourne
 
AmericInn
AmericInnAmericInn
AmericInn
 
Carbon Neutral Apartment Retrofits
Carbon Neutral Apartment RetrofitsCarbon Neutral Apartment Retrofits
Carbon Neutral Apartment Retrofits
 
Ithaca Energy Code Supplement
Ithaca Energy Code SupplementIthaca Energy Code Supplement
Ithaca Energy Code Supplement
 
Status of North American CO2 Capture and Storage (CCS) Projects - presentatio...
Status of North American CO2 Capture and Storage (CCS) Projects - presentatio...Status of North American CO2 Capture and Storage (CCS) Projects - presentatio...
Status of North American CO2 Capture and Storage (CCS) Projects - presentatio...
 
Dutch Dresser - Maine Energy Systems - Biomass HVAC Opportunities in Massachu...
Dutch Dresser - Maine Energy Systems - Biomass HVAC Opportunities in Massachu...Dutch Dresser - Maine Energy Systems - Biomass HVAC Opportunities in Massachu...
Dutch Dresser - Maine Energy Systems - Biomass HVAC Opportunities in Massachu...
 
Greenhouse Gas Law and Climate Change: The Clean Air Act 2014
Greenhouse Gas Law and Climate Change: The Clean Air Act 2014Greenhouse Gas Law and Climate Change: The Clean Air Act 2014
Greenhouse Gas Law and Climate Change: The Clean Air Act 2014
 

Ähnlich wie Energy management presentation

resume - Aaron Collard
resume - Aaron Collardresume - Aaron Collard
resume - Aaron Collard
AARON COLLARD
 
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
SayeedHvac
 
Net-Zero Energy Case Studies
Net-Zero Energy Case StudiesNet-Zero Energy Case Studies
Net-Zero Energy Case Studies
aiahouston
 

Ähnlich wie Energy management presentation (20)

Stephen Cook - Renewable Energy
Stephen Cook - Renewable EnergyStephen Cook - Renewable Energy
Stephen Cook - Renewable Energy
 
North Bay Community Resilience Initiative: The Path to Resilience and Sustain...
North Bay Community Resilience Initiative: The Path to Resilience and Sustain...North Bay Community Resilience Initiative: The Path to Resilience and Sustain...
North Bay Community Resilience Initiative: The Path to Resilience and Sustain...
 
Rebecca mills-securing-the-n ts-energy-future
Rebecca mills-securing-the-n ts-energy-futureRebecca mills-securing-the-n ts-energy-future
Rebecca mills-securing-the-n ts-energy-future
 
Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...
Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...
Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...
 
2011 Environmental Symposium- Roundtable 1
2011 Environmental Symposium- Roundtable 12011 Environmental Symposium- Roundtable 1
2011 Environmental Symposium- Roundtable 1
 
Green Needham - Better by design 2012-11-26
Green Needham - Better by design 2012-11-26Green Needham - Better by design 2012-11-26
Green Needham - Better by design 2012-11-26
 
resume - Aaron Collard
resume - Aaron Collardresume - Aaron Collard
resume - Aaron Collard
 
Energy in Schools by John Dolan
Energy in Schools by John DolanEnergy in Schools by John Dolan
Energy in Schools by John Dolan
 
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
 
Angie Jukes, Stockport MBC - Stockport Renewable Energy Experiences
Angie Jukes, Stockport MBC - Stockport Renewable Energy ExperiencesAngie Jukes, Stockport MBC - Stockport Renewable Energy Experiences
Angie Jukes, Stockport MBC - Stockport Renewable Energy Experiences
 
Mark Sandeen MAS 2017
Mark Sandeen MAS 2017Mark Sandeen MAS 2017
Mark Sandeen MAS 2017
 
District Energy in the Township of Langley
District Energy in the Township of LangleyDistrict Energy in the Township of Langley
District Energy in the Township of Langley
 
Power system Planning - Basic Techniques
Power system Planning - Basic TechniquesPower system Planning - Basic Techniques
Power system Planning - Basic Techniques
 
Poster Board_v8
Poster Board_v8Poster Board_v8
Poster Board_v8
 
Energy Optimization
Energy OptimizationEnergy Optimization
Energy Optimization
 
Energy Sustainability on Campus
Energy Sustainability on CampusEnergy Sustainability on Campus
Energy Sustainability on Campus
 
Cold-Climate Research Round-Up
Cold-Climate Research Round-UpCold-Climate Research Round-Up
Cold-Climate Research Round-Up
 
Multifamily Energy Efficiency Webinar
Multifamily Energy Efficiency WebinarMultifamily Energy Efficiency Webinar
Multifamily Energy Efficiency Webinar
 
Donald MacBrayne, Scottish Water Horizons – Commercial Renewable and Energy S...
Donald MacBrayne, Scottish Water Horizons – Commercial Renewable and Energy S...Donald MacBrayne, Scottish Water Horizons – Commercial Renewable and Energy S...
Donald MacBrayne, Scottish Water Horizons – Commercial Renewable and Energy S...
 
Net-Zero Energy Case Studies
Net-Zero Energy Case StudiesNet-Zero Energy Case Studies
Net-Zero Energy Case Studies
 

Mehr von Rishabh Singh (8)

Sheets Metal used in Manufacturing Process
Sheets Metal used in Manufacturing ProcessSheets Metal used in Manufacturing Process
Sheets Metal used in Manufacturing Process
 
Periodic tables
Periodic tablesPeriodic tables
Periodic tables
 
automatic street light
automatic street lightautomatic street light
automatic street light
 
energy management and conservation
energy management and conservationenergy management and conservation
energy management and conservation
 
energy management and conservation
energy management and conservationenergy management and conservation
energy management and conservation
 
global poverty scenario
global poverty scenarioglobal poverty scenario
global poverty scenario
 
energy managment
energy managmentenergy managment
energy managment
 
Energy conservation
Energy conservationEnergy conservation
Energy conservation
 

Kürzlich hochgeladen

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 

Kürzlich hochgeladen (20)

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 

Energy management presentation

  • 1.
  • 2. Presented by Director of Office of Energy Management Ron Kelley
  • 3. Campus Master Planning • Why Utilities Planning is important • Utility Planning Considerations • 2000 Master Plan Successes – Infrastructure – Energy Management • Our ESCO Project • Failure to Plan Utilities • Strategies for this Master Plan
  • 4. Why is Utilities Infrastructure Important? • Actions #71 and #73 of Educating Illinois; and Goal 3, Strategy 5 of Ed. Il. 2008-14: “Complete capital improvement projects that address health and safety issues as well as adequate and efficient utility support.” • Age and condition of Utilities and Mechanical Systems Impact Cost and Scope of MP Facility Improvement projects. • Availability, Location, and Capacity of Utilities impact cost and feasibility of MP new construction sites. • Utility Planning must take place from the START.
  • 5. Utility Considerations • Electrical Power: – Nearest power station? (Ameren IP) – High (12.5 KV) vs Low (4.16 KV) voltage ? – Emergency or Backup generation? – Potential for Alt. or Renewable Power? • Heat: – Steam or Hot water? – Proximity to Heating plant and tunnel system? – Capacity/Redundancy of the existing plant(s)? – Size for future growth/expansion (Piping). – Independent systems vs District Heating? (impact on footprint, Mech. Rm. space)
  • 6. Utility Considerations • Air Conditioning: – Proximity to a Chilled Water Plant? – Building demand? Is there existing capacity? Distribution? – Cooling Season? – Size for future growth/expansion? – Independent system? DX Units? (impact on footprint, Mech. Rm. space) • Water: – Access to Town of Normal Water system? – Storm water run off? – Risk of flooding or leaking? • Mechanical Systems: (Chillers, Cooling Towers, Boilers, Air Handlers) – Type, Size, Capacity? – Fuel Source? (Elec vs Gas) – Access for Maintenance and Replacement? – Location (Basement vs Rooftop?) – Exterior Presence? – Budget? – Sustainability issues?
  • 7. 2000 Master Plan What have we accomplished? • Energy Conservation – Lighting Upgrades – Boiler operations – Insulation & Steam traps • Infrastructure Improvement – District Cooling – Boiler Economizers • Energy Procurement – 5 School Electric contract – Natural Gas strategy
  • 8. District Cooling Plan Starting Point 2000 New/Good Marginal High Risk Failed Loop
  • 9. District Cooling Plan BSC and Quad Loops Quad Loop: SCH HOV WMS* CPA CVA COB McC DEG COOK EDW FC/MET SSB BSC: BSC, Braden, BBC, Milner Not: CE/CW OU Wms* FEL
  • 10. District Cooling Plan NE Loop NE Loop: SLB MLT JUL FH/FHA E. Campus *Replaced CRP
  • 11. District Cooling Plan NW & SE Loops SE Loop: WAT STV WC NW Loop: RBA * HTN* W. Campus Linkins NS TUR
  • 12. District Cooling Plan South Loop South Loop: SF&KR FEL COB CFA*
  • 14. What does good Energy Management planning Save? 2001 2009 Reduction Rate FY09 Savings Electricity (kWhrs) 93,561,596 87,187,011 6,374,585 $ .0792 $504,867 Nat. Gas (Therms) 6,746,593 6,114,791 631,802 $ .99 $625,483 Water (Gal *1000) 236,414.7 182,961.7 53,453.0 $7.05 $376,844 $1,507,194 Note: This is enough savings to pay for (fill in the blank) !! > $10 million in 8 years !!
  • 15. Energy Services Contract (ESCO) Why at ISU? • To do in a single year what has taken us 8! • Reduce Energy Consumption, Utility Costs, Compound effect of Savings • Facility infrastructure improvement and systems reliability • Accelerate the construction period • Engineer the highest priority projects with greatest payback • Legislative benefits (110 ILCS 62, Public University Energy Cons. Act) • Streamlined Procurement • Guaranteed source of funding • Single POC for all project functions • Comprehensive engineering and design approach • Our Project • NORESCO • Schedule • Facilities (SLB, Milner, HP)
  • 16. Impacts of Failure to Plan for Utilities • Feasibility of the Master Plan • Risk of lack of expansion capabilities • Lack of flexibility to accommodate Economic, Natural disaster, other events. • “Piecemeal” Utilities are expensive, inefficient, and will need re-design at every phase of the Master Plan construction.
  • 17. Utility Strategies for This MP? • District Heating and Cooling Interconnectivity • Gregory Street Infrastructure • Reliability/Efficiency/Conservation (ESCO) • Metering • Reduce Deferred Maintenance • Energy Procurement • Renewable/Alternative Energy

Hinweis der Redaktion

  1. Examples of #2: you cannot plan a major remodel project without considering Utilities Infrastructure. In fact our experiences with SCH, STV/TUR, Res. Halls and CDS projects all involved significant mechanical issues. #3: The same applies to new construction COB tunnel for steam and CW, placement of SF&KR impacted the capacity of the Quad chiller and required the S. Plant project to be initiated. Gregory St. will require all new sources of power, heating, and cooling. CFA is a case where all utilities are in place and only minimal utility infrastructure improvements will be necessary.
  2. These are some of the Utility Infrastructure issues Master Planners will need to consider in both the case of new construction and facility upgrades.
  3. This plan has been the Bible for virtually every utility decision made in the past 8 years. As you can see by the condition, it has been either on my desk or in my notebook the entire time. The good news is as you go down the Table of Contents you can see we have completed or made substantial progress in all of the areas. Lighting Upgrades: thanks to almost $900,000 in grants from Il Clean Energy Foundation we have been able to perform T12/Elec ballast upgrades in every building on campus. Every year since 2002 energy savings from the utility budget have been reinvested in not only lighting, but also boiler upgrades, insulation, and steam trap replacement. These are the “low hanging” fruit of the energy conservation projects. District cooling and the installation of 4 boiler economizers have been the primary infrastructure improvements since 2002. In the area of Procurement, the most significant event was the deregulation of the electrical market in 2007. ISU took the leadership role and joined with 4 other state univ (EIU, SIU/SIUE, WIU) to combine our loads and profiles and a joint RFP process to guarantee us favorable rates. Let me walk you through the District cooling progress we have made since 2002.
  4. This is the status of chiller water units in 2001. As you can see most every building had its own chiller unit, and most of these were in marginal or high risk condition. There were no redundant systems, if a chiller broke, the facility went without AC until a repair or replacement was made. The yellow sites mark the beginning of District cooling on our campus. A large chiller was purchased with the construction of CPA and was installed in the HP. Subsequently, the chillers in Cook, Edw, and FC, MET failed and those facilities became the first buildings on the Quad district loop.
  5. Funds from both the COB and SCH projects were used to purchase the second Chiller & Tower and were also installed in the HP. You can see the list of buildings that have been added to the Quad loop as a result of this plan. Left to be added are CE/CW, OU, the remainder of Wms, and FEL. BSC was build with two large redundant chillers. So rather than replace the chiller in Milner, BSC was made into a “notional chiller plant” and now serves BSC, Braden, Milner, and Bowling-Billiards center. Does anyone know where our second “Notional Chiller Plant” is Located?
  6. E. Campus chiller failed. UHS had $1.5M project planned. But…SLB was built with 2 chillers with double capacity so SLB became the NE chiller plant. Soon after, the remainder of the 5 chillers in the CRP failed or were expensive to maintain, so the CRP was scrapped and all of those buildings were added to the NE Loop.
  7. These two chiller plants were constructed simultaneously and opened during the summer of 2008. Next season Linkins DC will be added to the SE Loop and Turner Hall will be added to the NW loop this summer with N/S to follow when its current chiller starts to show signs of old age. With two season under their belts, both of these plants are operating with far less that their anticipated loads which is indicative of even greater efficiencies that used in the design.
  8. The last of the planned chiller loops is the South plant currently under construction to primarily support the SF&KR facility. In addition it will take some of the load off of the Quad chiller system by also cooling COB and FEL immediately, and eventually will extend to Coll of Fine Arts.
  9. Now that these loops are nearly complete, the next goal will be to start incorporating some inter-connectivity between the loops. SW-SLB-SE-South could all be linked. This will significantly increase reliability, redundancy, and will give us the opportunity to exercise some fuel flexibility between the gas chillers in the Quad loop and the electric chillers in the satellite plants.
  10. Might want to mention the Utility issue at U of I as an example of failure to Master Plan.