Agenda
 Industry Challenges
 Valve Operability
 High Risks/Costs of Taking No Action
 Asset Management
 Where To Start/Strategies
 Summary
Industry Challenges
 Aging infrastructure
 Reductions in manpower
 Experience/knowledge loss
 Deferred maintenance
 Funding gaps
 Increasing customer demands
 Supply availability
 Infrastructure security
What Is Valve Operability?
        Definition of Operability

   Initial Operability: Upon arrival, can
   the valve be found and easily operated
   by the crew?

    Right Here, Right Now…
Valve Operability Status Quo
     Based on 750,000 assessments
Low Operability =
Loss of System Control
  (Increases Levels of Risk)
Run to Failure - Strategy
         100%



                Reliability Threshold

                    Pain
Operability




                  Run to Failure
                 Time
Run To Failure
                        (example)
Buy a                   Buy a                     Buy a
CAR                     CAR                       CAR

            Run to Failure             Run to Failure
Reliability Threshold




 $25,000                     $25,000                    $25,000
Default “Run to Failure” A.M. Strategy
 Is easy/requires no action/abdicates
 responsibility
 Is great for awhile but eventually causes service
 disruptions
 Service disruptions cause customer dissatisfaction
 Customer dissatisfaction causes reactive
 responses not planned activities
 Never get caught up/never get control of the
 system
High Risks/Costs of Taking No
Action
 Overtime and repeat visits
 Unnecessary replacements
 Property damage/restoration cost
 Delays in locating valves
 Loss of water
 Loss of life
 Injuries to workers and citizens
 Lawsuits from injured parties (medical and property)
 Continued catastrophic events
High Risks/ Costs of Taking No
Action (cont.)
 Keeps your utility in a reactive mode, chasing
 emergencies, trying to keep up
 Low operability = loss of system control
 Water quality challenges
 Lack of fire protection
 Lack of ability to isolate contamination
 Major break containment issues
 Business interruption/transportation interruption
 Interruption of service/customer complaints
 The current situation is not sustainable
Asset Management
Start by answering five key questions
Five Key Questions
1. What is the current state of my assets?
      What do I own? Where is it?
      What condition is it in?
      What is its remaining useful life?
      What is its remaining economic value?
2. What is my required level of service (LOS)?
      What is the demand for my services by my stakeholders?
      What do regulators require?
      What is my actual performance?
3. Which assets are critical to sustained performance?
      How does it fail? How can it fail?
      What is the likelihood of failure?
      What does it cost to repair/refurbish/replace?
      What are the consequences of failure?
4. What are my best O&M and CIP investment strategies?
      What alternative management options exist?
      Which are most cost effective for my organization?
5. What is my best long-term funding strategy?
What is the
                                                               required level
     What is the current state of my assets?                    of service?

                                 Determine      Determine
   Inventory         Assess                                       Set Target
                                  Residual       RRR $
     Assets         Condition                                        LOS
                                    Life        & Timing




     Assign         Determine     Determine
                                                  Fund
   BRE Rating      Appropriate   Appropriate                     Build the AMP
                                               Your Strategy
   (Criticality)   Maintenance       CIP



Which assets       What are the best O&M         What is the best
are critical to     and CIP strategies?         funding strategy?
   sustain
performance
      ?
Reliability Centered Maintenance
                             (example)
Buy a
                           Oil      Trans
CAR Wipers               Change     Fluid        Tune
                                                 Up
              Air Pressure                                       Flush
                             Wiper Fluid                Struts
                                            Battery



 Reliability Threshold

   100%




                          Sustainability Execution
                             Time
Where to Start/Strategies
     • Total system assessment
         program approach
     • Large & Critical Valves
          core of the system
     • Representative survey
          state of the system
     • Specific areas
         section of the system
Summary
 The time for action is now, before there is an
 emergency
 Look at your system and identify the most critical
 assets in it
 Start by inventorying and rehabilitating those assets
 A long-term approach to valve maintenance will set
 the utility up for future generations
 There are proven solutions
 Solutions fund themselves
 Start with valves
Katie McCain
 Wachs Water Services
    214-707-8120
kmccain@wachsws.com

More Related Content

Similar to How Utilities Get Control of Their Distribution Systems

Example Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation SlidesExample Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation SlidesSlideTeam
 
JR Dickens - IWCS 2007
JR Dickens - IWCS 2007JR Dickens - IWCS 2007
JR Dickens - IWCS 2007jrd9234
 
How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"ARMS Reliability
 
Maintenance Reliability_2015
Maintenance Reliability_2015Maintenance Reliability_2015
Maintenance Reliability_2015Ron McGary
 
Audit Efficiency and Effectiveness
Audit Efficiency and EffectivenessAudit Efficiency and Effectiveness
Audit Efficiency and EffectivenessManny Rosenfeld
 
Reliability Will Put your Competition to Rest
Reliability Will Put your Competition to RestReliability Will Put your Competition to Rest
Reliability Will Put your Competition to RestRon McGary
 
Workshop E, Extending the benefits life cycle: ISO 55000 by John Heathcote
Workshop E, Extending the benefits life cycle: ISO 55000 by John HeathcoteWorkshop E, Extending the benefits life cycle: ISO 55000 by John Heathcote
Workshop E, Extending the benefits life cycle: ISO 55000 by John HeathcoteAssociation for Project Management
 
RAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silvermanRAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silvermanAccendo Reliability
 
Group3 operations and information management
Group3 operations and information managementGroup3 operations and information management
Group3 operations and information managementXoliM
 
Maintenance Strategies for SMEs
Maintenance Strategies for SMEs Maintenance Strategies for SMEs
Maintenance Strategies for SMEs Patrick Chester
 
Caveo Corporation 10
Caveo Corporation 10Caveo Corporation 10
Caveo Corporation 10Hans Olo
 
Advanced Maintenance And Reliability (Maintenance and Reliability Best Pract...
Advanced Maintenance And Reliability  (Maintenance and Reliability Best Pract...Advanced Maintenance And Reliability  (Maintenance and Reliability Best Pract...
Advanced Maintenance And Reliability (Maintenance and Reliability Best Pract...Ricky Smith CMRP, CMRT
 
ITIL Practical Guide - Service Transition
ITIL Practical Guide - Service TransitionITIL Practical Guide - Service Transition
ITIL Practical Guide - Service TransitionAxios Systems
 
Reliability Engineering in Biomanufacturing - Presentation by Michael Andrews
Reliability Engineering in Biomanufacturing - Presentation by Michael AndrewsReliability Engineering in Biomanufacturing - Presentation by Michael Andrews
Reliability Engineering in Biomanufacturing - Presentation by Michael AndrewsWPICPE
 
Agile Transformation at Xtrakter
Agile Transformation at XtrakterAgile Transformation at Xtrakter
Agile Transformation at XtrakterValtech UK
 
Management Of Business Operation Components PowerPoint Presentation Slides
Management Of Business Operation Components PowerPoint Presentation SlidesManagement Of Business Operation Components PowerPoint Presentation Slides
Management Of Business Operation Components PowerPoint Presentation SlidesSlideTeam
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFPieter van Asten
 
Customer Experience Metrics
Customer Experience MetricsCustomer Experience Metrics
Customer Experience MetricsClearAction
 

Similar to How Utilities Get Control of Their Distribution Systems (20)

Example Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation SlidesExample Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation Slides
 
JR Dickens - IWCS 2007
JR Dickens - IWCS 2007JR Dickens - IWCS 2007
JR Dickens - IWCS 2007
 
The Journey Towards Asset Management Excellence
The Journey Towards Asset Management ExcellenceThe Journey Towards Asset Management Excellence
The Journey Towards Asset Management Excellence
 
How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"
 
Maintenance Reliability_2015
Maintenance Reliability_2015Maintenance Reliability_2015
Maintenance Reliability_2015
 
Audit Efficiency and Effectiveness
Audit Efficiency and EffectivenessAudit Efficiency and Effectiveness
Audit Efficiency and Effectiveness
 
Reliability Will Put your Competition to Rest
Reliability Will Put your Competition to RestReliability Will Put your Competition to Rest
Reliability Will Put your Competition to Rest
 
Workshop E, Extending the benefits life cycle: ISO 55000 by John Heathcote
Workshop E, Extending the benefits life cycle: ISO 55000 by John HeathcoteWorkshop E, Extending the benefits life cycle: ISO 55000 by John Heathcote
Workshop E, Extending the benefits life cycle: ISO 55000 by John Heathcote
 
TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)
 
RAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silvermanRAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silverman
 
Group3 operations and information management
Group3 operations and information managementGroup3 operations and information management
Group3 operations and information management
 
Maintenance Strategies for SMEs
Maintenance Strategies for SMEs Maintenance Strategies for SMEs
Maintenance Strategies for SMEs
 
Caveo Corporation 10
Caveo Corporation 10Caveo Corporation 10
Caveo Corporation 10
 
Advanced Maintenance And Reliability (Maintenance and Reliability Best Pract...
Advanced Maintenance And Reliability  (Maintenance and Reliability Best Pract...Advanced Maintenance And Reliability  (Maintenance and Reliability Best Pract...
Advanced Maintenance And Reliability (Maintenance and Reliability Best Pract...
 
ITIL Practical Guide - Service Transition
ITIL Practical Guide - Service TransitionITIL Practical Guide - Service Transition
ITIL Practical Guide - Service Transition
 
Reliability Engineering in Biomanufacturing - Presentation by Michael Andrews
Reliability Engineering in Biomanufacturing - Presentation by Michael AndrewsReliability Engineering in Biomanufacturing - Presentation by Michael Andrews
Reliability Engineering in Biomanufacturing - Presentation by Michael Andrews
 
Agile Transformation at Xtrakter
Agile Transformation at XtrakterAgile Transformation at Xtrakter
Agile Transformation at Xtrakter
 
Management Of Business Operation Components PowerPoint Presentation Slides
Management Of Business Operation Components PowerPoint Presentation SlidesManagement Of Business Operation Components PowerPoint Presentation Slides
Management Of Business Operation Components PowerPoint Presentation Slides
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDF
 
Customer Experience Metrics
Customer Experience MetricsCustomer Experience Metrics
Customer Experience Metrics
 

More from Southeast Chapter of Texas AWWA

Hidrologic and water quality modeling of sims bayou watershed using hspf
Hidrologic and water quality modeling of sims bayou watershed using hspfHidrologic and water quality modeling of sims bayou watershed using hspf
Hidrologic and water quality modeling of sims bayou watershed using hspfSoutheast Chapter of Texas AWWA
 
2009-06-25 Luncheon - What a Utility Needs to Consider When Converting a Syst...
2009-06-25 Luncheon - What a Utility Needs to Consider When Converting a Syst...2009-06-25 Luncheon - What a Utility Needs to Consider When Converting a Syst...
2009-06-25 Luncheon - What a Utility Needs to Consider When Converting a Syst...Southeast Chapter of Texas AWWA
 
2009-02-17 Seminar - Next In Line - North Fort Bend Water Authoritys Surface ...
2009-02-17 Seminar - Next In Line - North Fort Bend Water Authoritys Surface ...2009-02-17 Seminar - Next In Line - North Fort Bend Water Authoritys Surface ...
2009-02-17 Seminar - Next In Line - North Fort Bend Water Authoritys Surface ...Southeast Chapter of Texas AWWA
 
2009-02-17 Seminar - Hurricane Ike Galveston Lessons Learned
2009-02-17 Seminar - Hurricane Ike   Galveston Lessons Learned2009-02-17 Seminar - Hurricane Ike   Galveston Lessons Learned
2009-02-17 Seminar - Hurricane Ike Galveston Lessons LearnedSoutheast Chapter of Texas AWWA
 
2009-02-17 Seminar - Challenges In The Design And Construction Of Large Diame...
2009-02-17 Seminar - Challenges In The Design And Construction Of Large Diame...2009-02-17 Seminar - Challenges In The Design And Construction Of Large Diame...
2009-02-17 Seminar - Challenges In The Design And Construction Of Large Diame...Southeast Chapter of Texas AWWA
 

More from Southeast Chapter of Texas AWWA (20)

Setawwa presentation shale as a cost driver
Setawwa presentation   shale as a cost driverSetawwa presentation   shale as a cost driver
Setawwa presentation shale as a cost driver
 
Setawwa presentation 062211
Setawwa presentation 062211Setawwa presentation 062211
Setawwa presentation 062211
 
Surface Water Conversion - City of Sugar Land
Surface Water Conversion - City of Sugar LandSurface Water Conversion - City of Sugar Land
Surface Water Conversion - City of Sugar Land
 
2010 10-21 meeting long term water demands
2010 10-21 meeting long term water demands2010 10-21 meeting long term water demands
2010 10-21 meeting long term water demands
 
2010 10-21 setawwa sponsor list
2010 10-21 setawwa sponsor list2010 10-21 setawwa sponsor list
2010 10-21 setawwa sponsor list
 
2010-08-26 SE Chapter TAWWA Business Meeting
2010-08-26 SE Chapter TAWWA Business Meeting2010-08-26 SE Chapter TAWWA Business Meeting
2010-08-26 SE Chapter TAWWA Business Meeting
 
Setawwa 2010, 29-58 choules
Setawwa   2010, 29-58 choulesSetawwa   2010, 29-58 choules
Setawwa 2010, 29-58 choules
 
Setawwa 2010, 1-29 choules
Setawwa   2010, 1-29 choulesSetawwa   2010, 1-29 choules
Setawwa 2010, 1-29 choules
 
Hidrologic and water quality modeling of sims bayou watershed using hspf
Hidrologic and water quality modeling of sims bayou watershed using hspfHidrologic and water quality modeling of sims bayou watershed using hspf
Hidrologic and water quality modeling of sims bayou watershed using hspf
 
Tom 030810 Setawwa
Tom 030810 SetawwaTom 030810 Setawwa
Tom 030810 Setawwa
 
G Oradat 030810 Setawwa
G Oradat 030810 SetawwaG Oradat 030810 Setawwa
G Oradat 030810 Setawwa
 
M Lowry 030810 Setawwa
M Lowry 030810 SetawwaM Lowry 030810 Setawwa
M Lowry 030810 Setawwa
 
T Bennett 030810 Setawwa
T Bennett 030810 SetawwaT Bennett 030810 Setawwa
T Bennett 030810 Setawwa
 
Wh Espey 021810 Setawwa
Wh Espey 021810 SetawwaWh Espey 021810 Setawwa
Wh Espey 021810 Setawwa
 
2009-08-28 City Operations: Energy Use and Emissions
2009-08-28 City Operations: Energy Use and Emissions2009-08-28 City Operations: Energy Use and Emissions
2009-08-28 City Operations: Energy Use and Emissions
 
2009-06-25 Luncheon - What a Utility Needs to Consider When Converting a Syst...
2009-06-25 Luncheon - What a Utility Needs to Consider When Converting a Syst...2009-06-25 Luncheon - What a Utility Needs to Consider When Converting a Syst...
2009-06-25 Luncheon - What a Utility Needs to Consider When Converting a Syst...
 
2009-02-17 Seminar - Next In Line - North Fort Bend Water Authoritys Surface ...
2009-02-17 Seminar - Next In Line - North Fort Bend Water Authoritys Surface ...2009-02-17 Seminar - Next In Line - North Fort Bend Water Authoritys Surface ...
2009-02-17 Seminar - Next In Line - North Fort Bend Water Authoritys Surface ...
 
2009-02-17 Seminar - Hurricane Ike Galveston Lessons Learned
2009-02-17 Seminar - Hurricane Ike   Galveston Lessons Learned2009-02-17 Seminar - Hurricane Ike   Galveston Lessons Learned
2009-02-17 Seminar - Hurricane Ike Galveston Lessons Learned
 
2009-02-17 Seminar - Challenges In The Design And Construction Of Large Diame...
2009-02-17 Seminar - Challenges In The Design And Construction Of Large Diame...2009-02-17 Seminar - Challenges In The Design And Construction Of Large Diame...
2009-02-17 Seminar - Challenges In The Design And Construction Of Large Diame...
 
2009-02-17 Brine Disposal Alternatives
2009-02-17  Brine Disposal Alternatives2009-02-17  Brine Disposal Alternatives
2009-02-17 Brine Disposal Alternatives
 

Recently uploaded

Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 

Recently uploaded (20)

Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 

How Utilities Get Control of Their Distribution Systems

  • 1. By Katie McCain Wachs Water Services February 22, 2011
  • 2. Agenda Industry Challenges Valve Operability High Risks/Costs of Taking No Action Asset Management Where To Start/Strategies Summary
  • 3. Industry Challenges Aging infrastructure Reductions in manpower Experience/knowledge loss Deferred maintenance Funding gaps Increasing customer demands Supply availability Infrastructure security
  • 4. What Is Valve Operability? Definition of Operability Initial Operability: Upon arrival, can the valve be found and easily operated by the crew? Right Here, Right Now…
  • 5. Valve Operability Status Quo Based on 750,000 assessments
  • 6. Low Operability = Loss of System Control (Increases Levels of Risk)
  • 7. Run to Failure - Strategy 100% Reliability Threshold Pain Operability Run to Failure Time
  • 8. Run To Failure (example) Buy a Buy a Buy a CAR CAR CAR Run to Failure Run to Failure Reliability Threshold $25,000 $25,000 $25,000
  • 9. Default “Run to Failure” A.M. Strategy Is easy/requires no action/abdicates responsibility Is great for awhile but eventually causes service disruptions Service disruptions cause customer dissatisfaction Customer dissatisfaction causes reactive responses not planned activities Never get caught up/never get control of the system
  • 10.
  • 11. High Risks/Costs of Taking No Action Overtime and repeat visits Unnecessary replacements Property damage/restoration cost Delays in locating valves Loss of water Loss of life Injuries to workers and citizens Lawsuits from injured parties (medical and property) Continued catastrophic events
  • 12. High Risks/ Costs of Taking No Action (cont.) Keeps your utility in a reactive mode, chasing emergencies, trying to keep up Low operability = loss of system control Water quality challenges Lack of fire protection Lack of ability to isolate contamination Major break containment issues Business interruption/transportation interruption Interruption of service/customer complaints The current situation is not sustainable
  • 13. Asset Management Start by answering five key questions
  • 14. Five Key Questions 1. What is the current state of my assets? What do I own? Where is it? What condition is it in? What is its remaining useful life? What is its remaining economic value? 2. What is my required level of service (LOS)? What is the demand for my services by my stakeholders? What do regulators require? What is my actual performance? 3. Which assets are critical to sustained performance? How does it fail? How can it fail? What is the likelihood of failure? What does it cost to repair/refurbish/replace? What are the consequences of failure? 4. What are my best O&M and CIP investment strategies? What alternative management options exist? Which are most cost effective for my organization? 5. What is my best long-term funding strategy?
  • 15. What is the required level What is the current state of my assets? of service? Determine Determine Inventory Assess Set Target Residual RRR $ Assets Condition LOS Life & Timing Assign Determine Determine Fund BRE Rating Appropriate Appropriate Build the AMP Your Strategy (Criticality) Maintenance CIP Which assets What are the best O&M What is the best are critical to and CIP strategies? funding strategy? sustain performance ?
  • 16. Reliability Centered Maintenance (example) Buy a Oil Trans CAR Wipers Change Fluid Tune Up Air Pressure Flush Wiper Fluid Struts Battery Reliability Threshold 100% Sustainability Execution Time
  • 17. Where to Start/Strategies • Total system assessment program approach • Large & Critical Valves core of the system • Representative survey state of the system • Specific areas section of the system
  • 18. Summary The time for action is now, before there is an emergency Look at your system and identify the most critical assets in it Start by inventorying and rehabilitating those assets A long-term approach to valve maintenance will set the utility up for future generations There are proven solutions Solutions fund themselves Start with valves
  • 19.
  • 20. Katie McCain Wachs Water Services 214-707-8120 kmccain@wachsws.com