Utility-Scale Solar Power on Federal Lands
U.S. Creates Clean Energy Jobs with Historic Project Permits
Overview
Some of the best solar resources in the world are located in the western United States on public land overseen by the
federal government. Federal agencies developed extensive processes to authorize use of these lands for a variety of
purposes, including recreation, grazing, mining and energy development. From initial application to final Right-of-Way
grant, the current process for a utility-scale solar project requires between three and five years to complete. In contrast,
federal agencies approved over 74,000 permits to drill for oil and gas on public lands in the last 20 years.1 New initiatives
undertaken in 2009 led to the first-ever permits for utility-scale solar projects on public lands in 2010. Today, BLM has
permitted 16 projects, which will provide nearly 6,058 megawatts of generating capacity, enough to power approximately
1.2 million homes.


The Bureau of Land Management Permitting Process
The Bureau of Land Management (BLM), within the U.S. Department of the Interior, manages 258 million acres of land in the
West. The BLM is responsible for authorizing utility-scale solar energy developments through a Right-of-Way (ROW) permit
under Title V of the Federal Land Policy and Management Act (FLPMA) of 1976.

The Right-of-Way Approval Process
Solar energy developers must complete the following process to secure a Right-of-Way permit
allowing them to develop a project on public lands:                                                       Notice of Intent

Step 1: Submit Right-of-Way grant application (0-30 days)

   • Upon submission of an application by the solar developer, BLM determines an appropriate             Scoping Process
     processing fee, which must be paid by developer prior to processing.
Step 2: Submit Plan of Development (BLM’s goal is 60 days, but may take 4-6 months)
                                                                                                             Draft EIS
   • Once payment has been received for the application fees, BLM notifies the applicant in
     writing and requests a comprehensive Plan of Development.
                                                                                                        Agency and Public
   • Applications are generally processed in the order they are received. Processing may be            Review & Comment
     delayed as BLM specialists complete required inventories or consult with other agencies.
Step 3: Conduct environmental review (24-48 months)                                                          Final EIS

   • BLM publishes Notice of Intent to prepare an Environmental Impact Statement (EIS) in the
     Federal Register.                                                                                  Record of Decision

   • A National Environmental Policy Act (NEPA) review is conducted by BLM with input from the U.S. Fish and Wildlife
     Service, state, and local authorities. The process requires months of detailed surveys and analyses of the project site
     to identify any potential impacts. Multiple public meetings are scheduled for community input. The EIS concludes
     with the issuance of a Final Environmental Impact Statement. (See the NEPA Review Process above.)

1
SEIA | www.seia.org                                                                                              May 31, 2012
Step 4: Issue Record of Decision (ROD)

   • Following the successful completion of the environmental review process, inventories, and reports, the BLM will issue
     a Record of Decision, either granting or denying the ROW application. If granted, the applicant also receives a Notice
     to Proceed (NTP), allowing the construction phase to begin.
Step 5: After a ROW grant is issued

   • ROW holders pay an annual rent to the United States Treasury based on the BLM’s solar rent formula.2

Fast-Track Projects
In mid‐2009, Secretary of the Interior Ken Salazar announced a “Fast‐Track” initiative for solar project application
demonstrating the most promise to complete the necessary environmental reviews.3 “Fast‐track” projects do not forego
environmental review requirements necessary to receive a Right‐of‐Way permit, but receive priority processing.




                                  About the Solar Energy Industries Association®
Established in 1974, the Solar Energy Industries Association is the national trade association of the U.S. solar energy
industry. Through advocacy and education, SEIA® and its 1,100 member companies are building a strong solar industry to
power America. As the voice of the industry, SEIA works to make solar a mainstream and significant energy source by
expanding markets, removing market barriers, strengthening the industry and educating the public on the benefits of solar
energy.
                                      For more information, please visit www.seia.org.




2
SEIA | www.seia.org                                                                                           May 31, 2012
1
  “Number of APDs approved by Year on Federal Lands.” 2009. U.S. Bureau of Land Management. Accessed online 26 March 2010.
http://www.blm.gov/pgdata/etc/medialib/blm/wo/MINERALS__REALTY__AND_RESOURCE_PROTECTION_/energy/oil___gas_statistics.P
ar.5146.File.dat/chart_2009_07.pdf
2
  “Solar Energy Interim Rental Policy.” 10 June 2010. U.S. Bureau of Land Management. Accessed Online 1 August 2010.
http://www.blm.gov/wo/st/en/info/regulations/Instruction_Memos_and_Bulletins/national_instruction/2010/IM_2010-141.html
3
  For more information on “Fast-Track” solar projects, please visit: http://www.blm.gov/wo/st/en/prog/energy/renewable_energy/fast-
track_renewable.html




3
SEIA | www.seia.org                                                                                                  May 31, 2012

Weitere ähnliche Inhalte

Was ist angesagt?

Europe and the Mediterranean - A Range of Initiatives
Europe and the Mediterranean - A Range of InitiativesEurope and the Mediterranean - A Range of Initiatives
Europe and the Mediterranean - A Range of InitiativesClimate_Change_Conference
 
Item 7b ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUND
Item 7b ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUNDItem 7b ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUND
Item 7b ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUNDOECD Environment
 
State action plans on climate change_Preeti Soni, UNDP_15 October 2014
State action plans on climate change_Preeti Soni, UNDP_15 October 2014State action plans on climate change_Preeti Soni, UNDP_15 October 2014
State action plans on climate change_Preeti Soni, UNDP_15 October 2014India Water Portal
 
Slide Presentation For Eecbg For Steering Committee
Slide Presentation For Eecbg For Steering CommitteeSlide Presentation For Eecbg For Steering Committee
Slide Presentation For Eecbg For Steering CommitteeKim Mitchell
 
National action plan on climate change
National action plan on climate changeNational action plan on climate change
National action plan on climate changenihal navin
 
Engaging with Impact in the Talanoa Dialogue: Telling your Climate Story
Engaging with Impact in the Talanoa Dialogue: Telling your Climate StoryEngaging with Impact in the Talanoa Dialogue: Telling your Climate Story
Engaging with Impact in the Talanoa Dialogue: Telling your Climate StoryWorld Resources Institute (WRI)
 
Second Meeting of the Regional Assembly - Georgia
Second Meeting of the Regional Assembly - GeorgiaSecond Meeting of the Regional Assembly - Georgia
Second Meeting of the Regional Assembly - GeorgiaOECD Environment
 
CFHT: 21st Century Science and Mauna Kea 2033 lease renewal
CFHT: 21st Century Science and Mauna Kea 2033 lease renewalCFHT: 21st Century Science and Mauna Kea 2033 lease renewal
CFHT: 21st Century Science and Mauna Kea 2033 lease renewalILOAHawaii
 
How to Engage with the Talanoa Dialogue and Step Up Climate Action in 2018
How to Engage with the Talanoa Dialogue and Step Up Climate Action in 2018How to Engage with the Talanoa Dialogue and Step Up Climate Action in 2018
How to Engage with the Talanoa Dialogue and Step Up Climate Action in 2018World Resources Institute (WRI)
 
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...AnnArborSPARK
 
City of Chico Climate Action Plan
City of Chico Climate Action PlanCity of Chico Climate Action Plan
City of Chico Climate Action PlanGreat Valley Center
 
History of climate negotiation & National Action Plan for Climate Change, india
History of climate negotiation & National Action Plan for Climate Change, indiaHistory of climate negotiation & National Action Plan for Climate Change, india
History of climate negotiation & National Action Plan for Climate Change, indiaAmit Prakash
 
National action plan on climate change
National action plan on climate changeNational action plan on climate change
National action plan on climate changeNitin Nigam
 
Renewable energy country attractiveness indices
Renewable energy country attractiveness indicesRenewable energy country attractiveness indices
Renewable energy country attractiveness indicesProjetoBr
 
At a Glace on Renewable Energy (June 2014)
At a Glace on Renewable Energy (June 2014)At a Glace on Renewable Energy (June 2014)
At a Glace on Renewable Energy (June 2014)DepEd-Bataan
 
Key messages on the status of renewables in 17 selected countries
Key messages on the status of renewables in 17 selected countries Key messages on the status of renewables in 17 selected countries
Key messages on the status of renewables in 17 selected countries OECD Environment
 

Was ist angesagt? (17)

Europe and the Mediterranean - A Range of Initiatives
Europe and the Mediterranean - A Range of InitiativesEurope and the Mediterranean - A Range of Initiatives
Europe and the Mediterranean - A Range of Initiatives
 
Item 7b ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUND
Item 7b ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUNDItem 7b ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUND
Item 7b ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUND
 
State action plans on climate change_Preeti Soni, UNDP_15 October 2014
State action plans on climate change_Preeti Soni, UNDP_15 October 2014State action plans on climate change_Preeti Soni, UNDP_15 October 2014
State action plans on climate change_Preeti Soni, UNDP_15 October 2014
 
Slide Presentation For Eecbg For Steering Committee
Slide Presentation For Eecbg For Steering CommitteeSlide Presentation For Eecbg For Steering Committee
Slide Presentation For Eecbg For Steering Committee
 
National action plan on climate change
National action plan on climate changeNational action plan on climate change
National action plan on climate change
 
Engaging with Impact in the Talanoa Dialogue: Telling your Climate Story
Engaging with Impact in the Talanoa Dialogue: Telling your Climate StoryEngaging with Impact in the Talanoa Dialogue: Telling your Climate Story
Engaging with Impact in the Talanoa Dialogue: Telling your Climate Story
 
Second Meeting of the Regional Assembly - Georgia
Second Meeting of the Regional Assembly - GeorgiaSecond Meeting of the Regional Assembly - Georgia
Second Meeting of the Regional Assembly - Georgia
 
CFHT: 21st Century Science and Mauna Kea 2033 lease renewal
CFHT: 21st Century Science and Mauna Kea 2033 lease renewalCFHT: 21st Century Science and Mauna Kea 2033 lease renewal
CFHT: 21st Century Science and Mauna Kea 2033 lease renewal
 
How to Engage with the Talanoa Dialogue and Step Up Climate Action in 2018
How to Engage with the Talanoa Dialogue and Step Up Climate Action in 2018How to Engage with the Talanoa Dialogue and Step Up Climate Action in 2018
How to Engage with the Talanoa Dialogue and Step Up Climate Action in 2018
 
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...
 
City of Chico Climate Action Plan
City of Chico Climate Action PlanCity of Chico Climate Action Plan
City of Chico Climate Action Plan
 
History of climate negotiation & National Action Plan for Climate Change, india
History of climate negotiation & National Action Plan for Climate Change, indiaHistory of climate negotiation & National Action Plan for Climate Change, india
History of climate negotiation & National Action Plan for Climate Change, india
 
National action plan on climate change
National action plan on climate changeNational action plan on climate change
National action plan on climate change
 
Eia 2006 vs. eia 2020
Eia 2006 vs. eia 2020Eia 2006 vs. eia 2020
Eia 2006 vs. eia 2020
 
Renewable energy country attractiveness indices
Renewable energy country attractiveness indicesRenewable energy country attractiveness indices
Renewable energy country attractiveness indices
 
At a Glace on Renewable Energy (June 2014)
At a Glace on Renewable Energy (June 2014)At a Glace on Renewable Energy (June 2014)
At a Glace on Renewable Energy (June 2014)
 
Key messages on the status of renewables in 17 selected countries
Key messages on the status of renewables in 17 selected countries Key messages on the status of renewables in 17 selected countries
Key messages on the status of renewables in 17 selected countries
 

Andere mochten auch

Andere mochten auch (6)

EatApp Biz Invest
EatApp Biz InvestEatApp Biz Invest
EatApp Biz Invest
 
Solar.Presentation PV market Germany USA
Solar.Presentation PV market Germany USASolar.Presentation PV market Germany USA
Solar.Presentation PV market Germany USA
 
US Solar Market Insight Report Q1 2012
US Solar Market Insight Report Q1 2012US Solar Market Insight Report Q1 2012
US Solar Market Insight Report Q1 2012
 
The Solar Power Revolution
The Solar Power RevolutionThe Solar Power Revolution
The Solar Power Revolution
 
Issues of Procedure in AD/CVD Cases
Issues of Procedure in AD/CVD CasesIssues of Procedure in AD/CVD Cases
Issues of Procedure in AD/CVD Cases
 
DASH Diet : 100 Recipes
DASH Diet : 100 Recipes DASH Diet : 100 Recipes
DASH Diet : 100 Recipes
 

Ähnlich wie Utility-Scale Solar Power on Federal Lands

Cherrytree group slideshow final
Cherrytree group slideshow finalCherrytree group slideshow final
Cherrytree group slideshow finalWarren Kirshenbaum
 
Streamlined Permitting for Renewable Energy Transmission
Streamlined Permitting for Renewable Energy TransmissionStreamlined Permitting for Renewable Energy Transmission
Streamlined Permitting for Renewable Energy Transmissiondlbelin
 
Regulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative EnergyRegulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative EnergyKevin Haroff
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentSonikaPawar
 
Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009 Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009 jlarndt_51
 
K Roek Infocast Sept 2009 Presentation
K Roek Infocast Sept 2009 PresentationK Roek Infocast Sept 2009 Presentation
K Roek Infocast Sept 2009 Presentationkaroek
 
SGIP->GreenButton->GSA ...EPA, HUD, DOT...&more!
SGIP->GreenButton->GSA ...EPA, HUD, DOT...&more!SGIP->GreenButton->GSA ...EPA, HUD, DOT...&more!
SGIP->GreenButton->GSA ...EPA, HUD, DOT...&more!Stan Curtis
 
NEPA and Permitting 101: A Dialogue on the Basics
NEPA and Permitting 101: A Dialogue on the BasicsNEPA and Permitting 101: A Dialogue on the Basics
NEPA and Permitting 101: A Dialogue on the Basicsnado-web
 
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned Lands
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned LandsU.S. Bureau of Land Management New Rules for Fracking on Federally-Owned Lands
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned LandsMarcellus Drilling News
 
Solar Power Analysis and Design Specifications
 Solar Power Analysis and Design Specifications Solar Power Analysis and Design Specifications
Solar Power Analysis and Design SpecificationsCalifornia Free Solar
 
John Marshall, Georgia State University – “Large-scale Disasters and Federal...
 John Marshall, Georgia State University – “Large-scale Disasters and Federal... John Marshall, Georgia State University – “Large-scale Disasters and Federal...
John Marshall, Georgia State University – “Large-scale Disasters and Federal...EERI
 
Thurston County In-Lieu Fee Mitigation Program
Thurston County In-Lieu Fee Mitigation ProgramThurston County In-Lieu Fee Mitigation Program
Thurston County In-Lieu Fee Mitigation ProgramNisqually River Council
 
Opportunities and Compliance Obligations under the Federal Stimulus Package
Opportunities and Compliance Obligations under the Federal Stimulus PackageOpportunities and Compliance Obligations under the Federal Stimulus Package
Opportunities and Compliance Obligations under the Federal Stimulus PackageAndrew Ratzkin
 
How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...
How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...
How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...World Resources Institute (WRI)
 
Soalr Ready NWI: U.S Department Of Energy SunShot Initiative Rooftop Solar Ch...
Soalr Ready NWI: U.S Department Of Energy SunShot Initiative Rooftop Solar Ch...Soalr Ready NWI: U.S Department Of Energy SunShot Initiative Rooftop Solar Ch...
Soalr Ready NWI: U.S Department Of Energy SunShot Initiative Rooftop Solar Ch...South Shore Clean Cities
 
Renewable Energy on Public Lands - NSAA Journal
Renewable Energy on Public Lands - NSAA JournalRenewable Energy on Public Lands - NSAA Journal
Renewable Energy on Public Lands - NSAA Journaldwortman
 
Permitting Geothermal Exploration And Development Projects On Public And Trib...
Permitting Geothermal Exploration And Development Projects On Public And Trib...Permitting Geothermal Exploration And Development Projects On Public And Trib...
Permitting Geothermal Exploration And Development Projects On Public And Trib...awaltner
 

Ähnlich wie Utility-Scale Solar Power on Federal Lands (20)

Cherrytree group slideshow final
Cherrytree group slideshow finalCherrytree group slideshow final
Cherrytree group slideshow final
 
Streamlined Permitting for Renewable Energy Transmission
Streamlined Permitting for Renewable Energy TransmissionStreamlined Permitting for Renewable Energy Transmission
Streamlined Permitting for Renewable Energy Transmission
 
Regulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative EnergyRegulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative Energy
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009 Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009
 
K Roek Infocast Sept 2009 Presentation
K Roek Infocast Sept 2009 PresentationK Roek Infocast Sept 2009 Presentation
K Roek Infocast Sept 2009 Presentation
 
SGIP->GreenButton->GSA ...EPA, HUD, DOT...&more!
SGIP->GreenButton->GSA ...EPA, HUD, DOT...&more!SGIP->GreenButton->GSA ...EPA, HUD, DOT...&more!
SGIP->GreenButton->GSA ...EPA, HUD, DOT...&more!
 
Clean Ohio Program Year 2020 Applicant Workshop
Clean Ohio Program Year 2020 Applicant WorkshopClean Ohio Program Year 2020 Applicant Workshop
Clean Ohio Program Year 2020 Applicant Workshop
 
NEPA and Permitting 101: A Dialogue on the Basics
NEPA and Permitting 101: A Dialogue on the BasicsNEPA and Permitting 101: A Dialogue on the Basics
NEPA and Permitting 101: A Dialogue on the Basics
 
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned Lands
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned LandsU.S. Bureau of Land Management New Rules for Fracking on Federally-Owned Lands
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned Lands
 
Solar Power Analysis and Design Specifications
 Solar Power Analysis and Design Specifications Solar Power Analysis and Design Specifications
Solar Power Analysis and Design Specifications
 
Houston solar
Houston solarHouston solar
Houston solar
 
43 cfr part3160
43 cfr part316043 cfr part3160
43 cfr part3160
 
John Marshall, Georgia State University – “Large-scale Disasters and Federal...
 John Marshall, Georgia State University – “Large-scale Disasters and Federal... John Marshall, Georgia State University – “Large-scale Disasters and Federal...
John Marshall, Georgia State University – “Large-scale Disasters and Federal...
 
Thurston County In-Lieu Fee Mitigation Program
Thurston County In-Lieu Fee Mitigation ProgramThurston County In-Lieu Fee Mitigation Program
Thurston County In-Lieu Fee Mitigation Program
 
Opportunities and Compliance Obligations under the Federal Stimulus Package
Opportunities and Compliance Obligations under the Federal Stimulus PackageOpportunities and Compliance Obligations under the Federal Stimulus Package
Opportunities and Compliance Obligations under the Federal Stimulus Package
 
How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...
How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...
How Cities Can Maximize Inflation Reduction Act (IRA) Opportunities As Clean ...
 
Soalr Ready NWI: U.S Department Of Energy SunShot Initiative Rooftop Solar Ch...
Soalr Ready NWI: U.S Department Of Energy SunShot Initiative Rooftop Solar Ch...Soalr Ready NWI: U.S Department Of Energy SunShot Initiative Rooftop Solar Ch...
Soalr Ready NWI: U.S Department Of Energy SunShot Initiative Rooftop Solar Ch...
 
Renewable Energy on Public Lands - NSAA Journal
Renewable Energy on Public Lands - NSAA JournalRenewable Energy on Public Lands - NSAA Journal
Renewable Energy on Public Lands - NSAA Journal
 
Permitting Geothermal Exploration And Development Projects On Public And Trib...
Permitting Geothermal Exploration And Development Projects On Public And Trib...Permitting Geothermal Exploration And Development Projects On Public And Trib...
Permitting Geothermal Exploration And Development Projects On Public And Trib...
 

Mehr von Solar Energy Industries Association (6)

Top 10 Solar States Infographic
Top 10 Solar States InfographicTop 10 Solar States Infographic
Top 10 Solar States Infographic
 
Enlisting the sun final-5.14.13-r6
Enlisting the sun final-5.14.13-r6Enlisting the sun final-5.14.13-r6
Enlisting the sun final-5.14.13-r6
 
2012 Year in Review Solar Market Insight
2012 Year in Review Solar Market Insight2012 Year in Review Solar Market Insight
2012 Year in Review Solar Market Insight
 
US Solar Market Insight Report Q3 2012
US Solar Market Insight Report Q3 2012 US Solar Market Insight Report Q3 2012
US Solar Market Insight Report Q3 2012
 
Solar Means Business: Top Commercial Solar Customers in the U.S.
Solar Means Business: Top Commercial Solar Customers in the U.S. Solar Means Business: Top Commercial Solar Customers in the U.S.
Solar Means Business: Top Commercial Solar Customers in the U.S.
 
Federal Energy Incentives Fact Sheet
Federal Energy Incentives Fact SheetFederal Energy Incentives Fact Sheet
Federal Energy Incentives Fact Sheet
 

Kürzlich hochgeladen

DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 

Kürzlich hochgeladen (20)

DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 

Utility-Scale Solar Power on Federal Lands

  • 1. Utility-Scale Solar Power on Federal Lands U.S. Creates Clean Energy Jobs with Historic Project Permits Overview Some of the best solar resources in the world are located in the western United States on public land overseen by the federal government. Federal agencies developed extensive processes to authorize use of these lands for a variety of purposes, including recreation, grazing, mining and energy development. From initial application to final Right-of-Way grant, the current process for a utility-scale solar project requires between three and five years to complete. In contrast, federal agencies approved over 74,000 permits to drill for oil and gas on public lands in the last 20 years.1 New initiatives undertaken in 2009 led to the first-ever permits for utility-scale solar projects on public lands in 2010. Today, BLM has permitted 16 projects, which will provide nearly 6,058 megawatts of generating capacity, enough to power approximately 1.2 million homes. The Bureau of Land Management Permitting Process The Bureau of Land Management (BLM), within the U.S. Department of the Interior, manages 258 million acres of land in the West. The BLM is responsible for authorizing utility-scale solar energy developments through a Right-of-Way (ROW) permit under Title V of the Federal Land Policy and Management Act (FLPMA) of 1976. The Right-of-Way Approval Process Solar energy developers must complete the following process to secure a Right-of-Way permit allowing them to develop a project on public lands: Notice of Intent Step 1: Submit Right-of-Way grant application (0-30 days) • Upon submission of an application by the solar developer, BLM determines an appropriate Scoping Process processing fee, which must be paid by developer prior to processing. Step 2: Submit Plan of Development (BLM’s goal is 60 days, but may take 4-6 months) Draft EIS • Once payment has been received for the application fees, BLM notifies the applicant in writing and requests a comprehensive Plan of Development. Agency and Public • Applications are generally processed in the order they are received. Processing may be Review & Comment delayed as BLM specialists complete required inventories or consult with other agencies. Step 3: Conduct environmental review (24-48 months) Final EIS • BLM publishes Notice of Intent to prepare an Environmental Impact Statement (EIS) in the Federal Register. Record of Decision • A National Environmental Policy Act (NEPA) review is conducted by BLM with input from the U.S. Fish and Wildlife Service, state, and local authorities. The process requires months of detailed surveys and analyses of the project site to identify any potential impacts. Multiple public meetings are scheduled for community input. The EIS concludes with the issuance of a Final Environmental Impact Statement. (See the NEPA Review Process above.) 1 SEIA | www.seia.org May 31, 2012
  • 2. Step 4: Issue Record of Decision (ROD) • Following the successful completion of the environmental review process, inventories, and reports, the BLM will issue a Record of Decision, either granting or denying the ROW application. If granted, the applicant also receives a Notice to Proceed (NTP), allowing the construction phase to begin. Step 5: After a ROW grant is issued • ROW holders pay an annual rent to the United States Treasury based on the BLM’s solar rent formula.2 Fast-Track Projects In mid‐2009, Secretary of the Interior Ken Salazar announced a “Fast‐Track” initiative for solar project application demonstrating the most promise to complete the necessary environmental reviews.3 “Fast‐track” projects do not forego environmental review requirements necessary to receive a Right‐of‐Way permit, but receive priority processing. About the Solar Energy Industries Association® Established in 1974, the Solar Energy Industries Association is the national trade association of the U.S. solar energy industry. Through advocacy and education, SEIA® and its 1,100 member companies are building a strong solar industry to power America. As the voice of the industry, SEIA works to make solar a mainstream and significant energy source by expanding markets, removing market barriers, strengthening the industry and educating the public on the benefits of solar energy. For more information, please visit www.seia.org. 2 SEIA | www.seia.org May 31, 2012
  • 3. 1 “Number of APDs approved by Year on Federal Lands.” 2009. U.S. Bureau of Land Management. Accessed online 26 March 2010. http://www.blm.gov/pgdata/etc/medialib/blm/wo/MINERALS__REALTY__AND_RESOURCE_PROTECTION_/energy/oil___gas_statistics.P ar.5146.File.dat/chart_2009_07.pdf 2 “Solar Energy Interim Rental Policy.” 10 June 2010. U.S. Bureau of Land Management. Accessed Online 1 August 2010. http://www.blm.gov/wo/st/en/info/regulations/Instruction_Memos_and_Bulletins/national_instruction/2010/IM_2010-141.html 3 For more information on “Fast-Track” solar projects, please visit: http://www.blm.gov/wo/st/en/prog/energy/renewable_energy/fast- track_renewable.html 3 SEIA | www.seia.org May 31, 2012