How to Survive an Audit
S. Scott Sittner
ANSI-ASME Certified Lead Auditor, Certified Auditor Trainer, Chief Engineer, Quality Point of Contact
China Offshore Oil Engineering Co
Tanggu Fabrication Yard
Tanggu, China
2Quality
Why is product Quality important?
Accountability is a Mandate of Law.
It takes a long time for a company to build up
a reputation for reliability, and only a short
time to be branded as "unreliable."
Continual evaluation of product reliability and
ongoing control of Quality are critical
necessities in today's competitive business
arena.
3Quality
Bohai-Penglai Quality Road Map
We have considerable
expectations placed
upon us.
This Road Map
illustrates some of the
requirements we are
expected to meet.
QA Road MapQA Road Map
Project QualityProject Quality
AssuranceAssurance
Implementing ProceduresImplementing Procedures
Contract
Clauses
Project ProceduresProject Procedures
International Law
Desk InstructionsDesk Instructions
Client QAProgram
ISOISO
Technical
Specifications
Regulatory
Guides
Internal
Audits
Process
Improvements
C A N
W E
D O IT
B ETT ER
?
Management
Assessments
good
Ex c ellent
problem!
G ood
C ould be
better
O U TSTAN D IN G
GuidesGuides
External Audits
Industry
Baseline
4Quality
An Audit Is
A documented activity, performed in
accordance with written procedures or
checklists to verify, by examination and
evaluation of objective evidence, that
applicable elements of the Quality Program
are effectively implemented per specified
requirements.
5Quality
An Auditor Will
 Find out what you are doing.
 Analyze what you did.
 Evaluate what you did.
 Record your response.
6Quality
Before the Audit You Should
 Prepare for the Audit.
 Review all pertinent procedures.
 Review what you are required to do
according to procedure.
 Determine the scope of the Audit and inform
necessary participants.
 Review old Audit Reports.
7Quality
During the Audit You Should
 Take Notes.
 Let the Auditor set the pace and direction of
the interface.
 Be cooperative.
 Minimize disruption.
 Verify your information.
8Quality
During the Audit You Should
 Do not say, “I don’t know.”
 Rather refer the Auditor to a person who
knows.
 Provide feedback to Management.
 Solicit the Auditor’s thoughts.
9Quality
After the Audit You Should
 Meet with the Auditor(s)
 Listen to the findings.
 Respond – Clarify any misunderstandings and
correct errors.
 Request a draft written statement of any
findings.
10Quality
If possible you should.
 Permit the auditor an opportunity to propose
corrective actions.
 Attempt to get a commitment from the
Auditor regarding corrective action proposals.
 Find out the issue date of the formal report
and your response time.
11Quality
Sample Auditor Questions
1. What procedure governs your activities?
2. What kind of documented training have you had to do your
job?
3. How often are proficiency evaluations performed?
4. What activity do you perform that affects QA?
5. Where is a copy of your last audit?
6. Does your group maintain any controlled documents?
7. How is your training documented?
8. Where is your master list of procedures?
9. How do you handle major changes?
10. What do you do if you find a problem which needs fixed?
12Quality
Sample Auditor Questions
11. How do you preserve records?
12. Show me the procedure you use to preserve records.
13. Are you aware of Quality Objectives?
14. I would like to see the evaluation of performance of a
particular supplier over a period of time.
15. Can you pull one up?
16. Who assures the performance on other suppliers?
17. How would I know if the suppliers are satisfactory?
18. What statutory/regulatory requirements do you have and how
are they handled?
19. What measures do you have in place to tell if the job is
performed right?
20. Explain your office/area activities.
13Quality
Traditional Audit Process Steps
1. QA Manager Selects a qualified Lead Auditor as the Audit Team Leader (ATL).
2. ATL Schedules the audit verbally or telecon and notifies the audited organization in
writing of the scope, audit team (AT) makeup and proposed audit dates.
3. Engineering Provide technical input relative to products or services for external audits.
4. Engineering Provide critical characteristics of commercial grade items for commercial grade
surveys.
5. ATL Initiates an Audit Plan
6. QA Manager Approves the Audit Plan.
7. ATL Provides an orientation to the audit team members including: Scope of the
audit, Lines of communication to be used by the audit team, Pertinent policies,
procedures, standards, instructions, codes and regulatory requirements, Results of
prior audit reports, Audit checklist to be used.
8. ATL Signs the audit plan indicating completion of team orientation.
9. ATL Provides detailed checklists delineating procedural requirements, follow-up items and
requirements unique to the organization being audited. Note: For commercial grade
surveys the checklists shall include functional areas of the suppliers documented
quality program necessary to control the acceptability of the critical characteristics
identified by Engineering.
10. ATL Conducts a pre-audit conference with management of the audited organization
addressing: Confirmation of audit scope, Items to be audited, Introduction of the
audit team and identification of their corresponding counterparts, Establishment of
communication channels, Establishment of daily audit schedule. Sample Questions:
General
14Quality
Traditional Audit Process Steps
11. ATL/AT Conducts the audit in accordance with the checklist provided. Note:
The checklist questions or format should not prevent the auditors from
examining applicable processes or problems found outside the specific
scope of the checklist question, to their successful conclusion.
12. ATL/AT Examines objective evidence to the depth necessary to determine
acceptable implementation and compliance with QA program
requirements and records the documentation reviewed in the audit
checklist.
13. ATL/AT Identifies deficiencies on Audit Finding Reports (AFR), for external audits, and on
Corrective Action Reports (CARs), in accordance with the procedural “Corrective
Action Process” for internal audits. The deficiency shall be documented in sufficient
detail to assure that corrective action can be effectively carried out by the audited
organization.Notes: For internal audits, no further action is required other than CAR
initiation. For Commercial Grade Surveys, AFRs are only initiated when
implementation is not in accordance with the written quality program
requirements. Quality requirements not acceptably implemented by the supplier, but
not required by the supplier’s quality program, are addressed by contractually
imposed conditions/restrictions.
14. ATL/AT Investigates the cause and effect of identified AFRs to determine the extent of the
corrective action needed.
15. ATL Notifies the audited organization immediately of any conditions determined to
require immediate corrective action.
16. ATL Conducts a post-audit conference at the conclusion of the audit to present the
results, identify deficiencies, and clarify any misunderstanding or questions.
15Quality
Traditional Audit Process Steps
17. ATL Documents the results of the audit in an audit report that provides the following
information:a) Date of audit and pre and post-audit conferences,b) Description of
the audit scope,c) Identification of the auditors,d) Identification of persons contacted
during pre and post audit conferences and audit activities,e) A summary of the audit
results, including an evaluation statement regarding the effectiveness of the quality
assurance program elements that were audited,f) A summary description of each
identified deficiencies.g) A description of any conditions or restrictions required to
compensate for Identified deficiencies.
18. ATL Issues an ATL signed copy of the audit report to the QA Manager allowing sufficient
time for approval within 30 days of the post-audit conference.
19. QA Mgr. Approves and signs the audit report, within 30 days of the post-audit conference,
and the Evaluation of Supplier Quality Form.
20. QA Admin Distributes the audit report to the management of the audited organization as
follows: External Audits QA Manager Appropriate Supplier Quality Assurance
Representative Managers of Projects, Fab/Construction and/or Engineering, as
applicable to the work. Internal Audits President, Vice-President, Cognizant
Managers
21. ATL Performs follow-up for identified AFRs to assure the receipt of a written response
within 30 days of issuance of the audit report.
22. ATL Reviews the AFRs to determine the adequacy of the response, including cause and
the corrective action to prevent recurrence, and that corrective action is identified
and scheduled for each finding.
23. ATL Contacts the audited organization if no response is received within 30 days and
establishes a new due date.
16Quality
Traditional Audit Process Steps
24. ATL Verifies that acceptable corrective action has been implemented by review of
supplied documentation or re-audit, as appropriate to the identified deficiency.
25. ATL Signs the AFR and routes the AFR to the QA Manager for approval.
26. QA Mgr. Reviews and approves the AFR.
27. QA Admin Files audit records and completed AFRs in accordance with procedure.

Weitere ähnliche Inhalte

Was ist angesagt?

Qms auditing powerpoint
Qms auditing powerpointQms auditing powerpoint
Qms auditing powerpointPat Kilbane
 
Quality management review template
Quality management review templateQuality management review template
Quality management review templateselinasimpson2801
 
How to Perform a Successful Internal Quality Audit
How to Perform a Successful Internal Quality AuditHow to Perform a Successful Internal Quality Audit
How to Perform a Successful Internal Quality AuditGreenlight Guru
 
Head, Quality Assurance with about 21 years experience in Manufacturing and Q...
Head, Quality Assurance with about 21 years experience in Manufacturing and Q...Head, Quality Assurance with about 21 years experience in Manufacturing and Q...
Head, Quality Assurance with about 21 years experience in Manufacturing and Q...Suresh Kumar Yalavarthi
 
Gray areas of vda 6.3 process auditors
Gray areas of vda 6.3 process auditors Gray areas of vda 6.3 process auditors
Gray areas of vda 6.3 process auditors Kiran Walimbe
 
ISO 9001-2008 Project Gap Analysis ANTIFRAGILITY
ISO 9001-2008 Project Gap Analysis ANTIFRAGILITYISO 9001-2008 Project Gap Analysis ANTIFRAGILITY
ISO 9001-2008 Project Gap Analysis ANTIFRAGILITYJose Agustin Gonzalez
 
Techno excel ao cs stage1
Techno excel   ao cs stage1Techno excel   ao cs stage1
Techno excel ao cs stage1divya
 
Qualification & Validation Concept & Terminology
Qualification & Validation Concept & TerminologyQualification & Validation Concept & Terminology
Qualification & Validation Concept & TerminologyMuhammad Luqman Ikram
 
Interna audit module
Interna  audit moduleInterna  audit module
Interna audit moduleMinda Mallare
 
Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer
 
Iso 9001 2015 audit checklist
Iso 9001 2015 audit checklistIso 9001 2015 audit checklist
Iso 9001 2015 audit checklistHamid Ali
 
Quality Management and Audit Process in Aviation Organizations
Quality Management and Audit Process in Aviation OrganizationsQuality Management and Audit Process in Aviation Organizations
Quality Management and Audit Process in Aviation OrganizationsEsraKurtulu
 
Iso Internal Auditor
Iso Internal AuditorIso Internal Auditor
Iso Internal AuditorDanyah Hejaij
 

Was ist angesagt? (20)

Vda process auditing
Vda process auditingVda process auditing
Vda process auditing
 
Qa qc
Qa qcQa qc
Qa qc
 
MRM - Management Review Meeting Presentation
MRM - Management Review Meeting PresentationMRM - Management Review Meeting Presentation
MRM - Management Review Meeting Presentation
 
Qms auditing powerpoint
Qms auditing powerpointQms auditing powerpoint
Qms auditing powerpoint
 
Quality management review template
Quality management review templateQuality management review template
Quality management review template
 
Quality plan
Quality planQuality plan
Quality plan
 
How to Perform a Successful Internal Quality Audit
How to Perform a Successful Internal Quality AuditHow to Perform a Successful Internal Quality Audit
How to Perform a Successful Internal Quality Audit
 
Head, Quality Assurance with about 21 years experience in Manufacturing and Q...
Head, Quality Assurance with about 21 years experience in Manufacturing and Q...Head, Quality Assurance with about 21 years experience in Manufacturing and Q...
Head, Quality Assurance with about 21 years experience in Manufacturing and Q...
 
Gray areas of vda 6.3 process auditors
Gray areas of vda 6.3 process auditors Gray areas of vda 6.3 process auditors
Gray areas of vda 6.3 process auditors
 
ISO 9001-2008 Project Gap Analysis ANTIFRAGILITY
ISO 9001-2008 Project Gap Analysis ANTIFRAGILITYISO 9001-2008 Project Gap Analysis ANTIFRAGILITY
ISO 9001-2008 Project Gap Analysis ANTIFRAGILITY
 
Techno excel ao cs stage1
Techno excel   ao cs stage1Techno excel   ao cs stage1
Techno excel ao cs stage1
 
Qualification & Validation Concept & Terminology
Qualification & Validation Concept & TerminologyQualification & Validation Concept & Terminology
Qualification & Validation Concept & Terminology
 
CVDEC14
CVDEC14CVDEC14
CVDEC14
 
Interna audit module
Interna  audit moduleInterna  audit module
Interna audit module
 
Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015
 
Tamil_Updated_Resume
Tamil_Updated_ResumeTamil_Updated_Resume
Tamil_Updated_Resume
 
Iso 9001 2015 audit checklist
Iso 9001 2015 audit checklistIso 9001 2015 audit checklist
Iso 9001 2015 audit checklist
 
Quality Management and Audit Process in Aviation Organizations
Quality Management and Audit Process in Aviation OrganizationsQuality Management and Audit Process in Aviation Organizations
Quality Management and Audit Process in Aviation Organizations
 
Iso Internal Auditor
Iso Internal AuditorIso Internal Auditor
Iso Internal Auditor
 
106 quality assurance
106 quality assurance106 quality assurance
106 quality assurance
 

Andere mochten auch

5.4.3 demonstrasi
5.4.3 demonstrasi5.4.3 demonstrasi
5.4.3 demonstrasiFarah Husna
 
Ley universal j2 2
Ley universal j2 2Ley universal j2 2
Ley universal j2 2fomtv
 
Emiliano soldi’s update to an agile SAFe mind map
Emiliano soldi’s update to an agile SAFe mind mapEmiliano soldi’s update to an agile SAFe mind map
Emiliano soldi’s update to an agile SAFe mind mapSteven Brovero
 
Ulasan Jurnal - Tiga wajah julius caesar
Ulasan Jurnal - Tiga wajah julius caesar Ulasan Jurnal - Tiga wajah julius caesar
Ulasan Jurnal - Tiga wajah julius caesar Hamia Sani
 
Dialectica2
Dialectica2Dialectica2
Dialectica2fomtv
 
Platform cooperativism in australia darren sharp november 2016 final
Platform cooperativism in australia darren sharp november 2016 finalPlatform cooperativism in australia darren sharp november 2016 final
Platform cooperativism in australia darren sharp november 2016 finalDarren Sharp
 
QNBFS Daily Technical Trader - Qatar November 21, 2016
QNBFS Daily Technical Trader - Qatar November 21, 2016QNBFS Daily Technical Trader - Qatar November 21, 2016
QNBFS Daily Technical Trader - Qatar November 21, 2016QNB Group
 
Conciencia de sí mismo 2
Conciencia de sí mismo 2Conciencia de sí mismo 2
Conciencia de sí mismo 2fomtv
 

Andere mochten auch (18)

5.4.3 demonstrasi
5.4.3 demonstrasi5.4.3 demonstrasi
5.4.3 demonstrasi
 
Ley universal j2 2
Ley universal j2 2Ley universal j2 2
Ley universal j2 2
 
Actividad 2
Actividad 2Actividad 2
Actividad 2
 
Unidad 3
Unidad 3Unidad 3
Unidad 3
 
Practica 15
Practica 15Practica 15
Practica 15
 
touchpad
touchpadtouchpad
touchpad
 
Practica 20
Practica 20Practica 20
Practica 20
 
Double Page Spread Analysis
Double Page Spread AnalysisDouble Page Spread Analysis
Double Page Spread Analysis
 
4verdades
4verdades4verdades
4verdades
 
Emiliano soldi’s update to an agile SAFe mind map
Emiliano soldi’s update to an agile SAFe mind mapEmiliano soldi’s update to an agile SAFe mind map
Emiliano soldi’s update to an agile SAFe mind map
 
Practica 18
Practica 18Practica 18
Practica 18
 
Ulasan Jurnal - Tiga wajah julius caesar
Ulasan Jurnal - Tiga wajah julius caesar Ulasan Jurnal - Tiga wajah julius caesar
Ulasan Jurnal - Tiga wajah julius caesar
 
Ej. marcadores
Ej. marcadoresEj. marcadores
Ej. marcadores
 
Dialectica2
Dialectica2Dialectica2
Dialectica2
 
Platform cooperativism in australia darren sharp november 2016 final
Platform cooperativism in australia darren sharp november 2016 finalPlatform cooperativism in australia darren sharp november 2016 final
Platform cooperativism in australia darren sharp november 2016 final
 
QNBFS Daily Technical Trader - Qatar November 21, 2016
QNBFS Daily Technical Trader - Qatar November 21, 2016QNBFS Daily Technical Trader - Qatar November 21, 2016
QNBFS Daily Technical Trader - Qatar November 21, 2016
 
Unidad 7
Unidad 7Unidad 7
Unidad 7
 
Conciencia de sí mismo 2
Conciencia de sí mismo 2Conciencia de sí mismo 2
Conciencia de sí mismo 2
 

Ähnlich wie How to Survive an Audit

6 step guide for certification
6 step guide for certification6 step guide for certification
6 step guide for certificationTRAIB CERT LIMITED
 
Quality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal AuditQuality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal AuditDinar Surtikarani
 
Auditing in pharmacutical industries
Auditing in pharmacutical industriesAuditing in pharmacutical industries
Auditing in pharmacutical industriesPriyanka Kandhare
 
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptxAUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptxShankar Maind Patil
 
Top gun aerospace website presentation
Top gun aerospace website presentationTop gun aerospace website presentation
Top gun aerospace website presentationseanzeeeee
 
Quality assurance documentation
Quality assurance documentationQuality assurance documentation
Quality assurance documentationImran Jamil
 
presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxAhmedAltantawi
 
ISO 9001 executive brief
ISO 9001 executive briefISO 9001 executive brief
ISO 9001 executive briefTim Gollner
 
ARC 1-19^J 1-5(12marks).pptx
ARC 1-19^J 1-5(12marks).pptxARC 1-19^J 1-5(12marks).pptx
ARC 1-19^J 1-5(12marks).pptxSohailSheikh62
 
idoc.pub_iatf-auditor-guidepdf.pdf
idoc.pub_iatf-auditor-guidepdf.pdfidoc.pub_iatf-auditor-guidepdf.pdf
idoc.pub_iatf-auditor-guidepdf.pdfUlhasKavathekar
 
ISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
ISO 9001:2008 Internal Auditing of Quality Management Systems - IntroductionISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
ISO 9001:2008 Internal Auditing of Quality Management Systems - IntroductionKanriConsulting
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdfAddisu15
 
Aerospace pre registration tips
Aerospace pre registration tipsAerospace pre registration tips
Aerospace pre registration tipsIntertek CE
 
As9100 interpretations
As9100 interpretationsAs9100 interpretations
As9100 interpretationsoziel2015
 
QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1Thomas Wilson
 

Ähnlich wie How to Survive an Audit (20)

6 step guide for certification
6 step guide for certification6 step guide for certification
6 step guide for certification
 
Qsm guidelines
Qsm guidelinesQsm guidelines
Qsm guidelines
 
Auditing Principles
Auditing PrinciplesAuditing Principles
Auditing Principles
 
Quality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal AuditQuality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal Audit
 
Auditing in pharmacutical industries
Auditing in pharmacutical industriesAuditing in pharmacutical industries
Auditing in pharmacutical industries
 
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptxAUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
 
Top gun aerospace website presentation
Top gun aerospace website presentationTop gun aerospace website presentation
Top gun aerospace website presentation
 
Quality assurance documentation
Quality assurance documentationQuality assurance documentation
Quality assurance documentation
 
presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptx
 
Quality Assurance
Quality AssuranceQuality Assurance
Quality Assurance
 
ISO 9001 executive brief
ISO 9001 executive briefISO 9001 executive brief
ISO 9001 executive brief
 
ARC 1-19^J 1-5(12marks).pptx
ARC 1-19^J 1-5(12marks).pptxARC 1-19^J 1-5(12marks).pptx
ARC 1-19^J 1-5(12marks).pptx
 
idoc.pub_iatf-auditor-guidepdf.pdf
idoc.pub_iatf-auditor-guidepdf.pdfidoc.pub_iatf-auditor-guidepdf.pdf
idoc.pub_iatf-auditor-guidepdf.pdf
 
ISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
ISO 9001:2008 Internal Auditing of Quality Management Systems - IntroductionISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
ISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
 
Cqe preparation | supplier management
Cqe preparation | supplier managementCqe preparation | supplier management
Cqe preparation | supplier management
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
 
Aerospace pre registration tips
Aerospace pre registration tipsAerospace pre registration tips
Aerospace pre registration tips
 
Quality Audit
Quality AuditQuality Audit
Quality Audit
 
As9100 interpretations
As9100 interpretationsAs9100 interpretations
As9100 interpretations
 
QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1
 

Mehr von SCOTT SITTNER

2.3 SITTNER NRC REQUIREMENTS RELATED TO INSPECTION OF COMMERCIAL GRADE DEDICA...
2.3 SITTNER NRC REQUIREMENTS RELATED TO INSPECTION OF COMMERCIAL GRADE DEDICA...2.3 SITTNER NRC REQUIREMENTS RELATED TO INSPECTION OF COMMERCIAL GRADE DEDICA...
2.3 SITTNER NRC REQUIREMENTS RELATED TO INSPECTION OF COMMERCIAL GRADE DEDICA...SCOTT SITTNER
 
2.2 SITTNER NRC REQUIREMENTS 10 CFR 21
2.2 SITTNER NRC REQUIREMENTS 10 CFR 212.2 SITTNER NRC REQUIREMENTS 10 CFR 21
2.2 SITTNER NRC REQUIREMENTS 10 CFR 21SCOTT SITTNER
 
1.11 SITTNER PANTEX PERFORMANCE BASED ASSESSMENT PROGRAM ELEMENTS SAMPLE
1.11 SITTNER PANTEX PERFORMANCE BASED ASSESSMENT PROGRAM ELEMENTS SAMPLE1.11 SITTNER PANTEX PERFORMANCE BASED ASSESSMENT PROGRAM ELEMENTS SAMPLE
1.11 SITTNER PANTEX PERFORMANCE BASED ASSESSMENT PROGRAM ELEMENTS SAMPLESCOTT SITTNER
 
1.0 RESUME S SITTNER 2017
1.0 RESUME S SITTNER 20171.0 RESUME S SITTNER 2017
1.0 RESUME S SITTNER 2017SCOTT SITTNER
 
9.0 SITTNER REFERENCE CARL ENGEL
9.0 SITTNER REFERENCE CARL ENGEL9.0 SITTNER REFERENCE CARL ENGEL
9.0 SITTNER REFERENCE CARL ENGELSCOTT SITTNER
 
8.0 SITTNER EDUCATION DEGREE CERTIFICATES
8.0  SITTNER EDUCATION DEGREE CERTIFICATES8.0  SITTNER EDUCATION DEGREE CERTIFICATES
8.0 SITTNER EDUCATION DEGREE CERTIFICATESSCOTT SITTNER
 

Mehr von SCOTT SITTNER (6)

2.3 SITTNER NRC REQUIREMENTS RELATED TO INSPECTION OF COMMERCIAL GRADE DEDICA...
2.3 SITTNER NRC REQUIREMENTS RELATED TO INSPECTION OF COMMERCIAL GRADE DEDICA...2.3 SITTNER NRC REQUIREMENTS RELATED TO INSPECTION OF COMMERCIAL GRADE DEDICA...
2.3 SITTNER NRC REQUIREMENTS RELATED TO INSPECTION OF COMMERCIAL GRADE DEDICA...
 
2.2 SITTNER NRC REQUIREMENTS 10 CFR 21
2.2 SITTNER NRC REQUIREMENTS 10 CFR 212.2 SITTNER NRC REQUIREMENTS 10 CFR 21
2.2 SITTNER NRC REQUIREMENTS 10 CFR 21
 
1.11 SITTNER PANTEX PERFORMANCE BASED ASSESSMENT PROGRAM ELEMENTS SAMPLE
1.11 SITTNER PANTEX PERFORMANCE BASED ASSESSMENT PROGRAM ELEMENTS SAMPLE1.11 SITTNER PANTEX PERFORMANCE BASED ASSESSMENT PROGRAM ELEMENTS SAMPLE
1.11 SITTNER PANTEX PERFORMANCE BASED ASSESSMENT PROGRAM ELEMENTS SAMPLE
 
1.0 RESUME S SITTNER 2017
1.0 RESUME S SITTNER 20171.0 RESUME S SITTNER 2017
1.0 RESUME S SITTNER 2017
 
9.0 SITTNER REFERENCE CARL ENGEL
9.0 SITTNER REFERENCE CARL ENGEL9.0 SITTNER REFERENCE CARL ENGEL
9.0 SITTNER REFERENCE CARL ENGEL
 
8.0 SITTNER EDUCATION DEGREE CERTIFICATES
8.0  SITTNER EDUCATION DEGREE CERTIFICATES8.0  SITTNER EDUCATION DEGREE CERTIFICATES
8.0 SITTNER EDUCATION DEGREE CERTIFICATES
 

How to Survive an Audit

  • 1. 1Quality ConocoPhillips China China National Offshore Oil Co How to Survive an Audit S. Scott Sittner ANSI-ASME Certified Lead Auditor, Certified Auditor Trainer, Chief Engineer, Quality Point of Contact China Offshore Oil Engineering Co Tanggu Fabrication Yard Tanggu, China
  • 2. 2Quality Why is product Quality important? Accountability is a Mandate of Law. It takes a long time for a company to build up a reputation for reliability, and only a short time to be branded as "unreliable." Continual evaluation of product reliability and ongoing control of Quality are critical necessities in today's competitive business arena.
  • 3. 3Quality Bohai-Penglai Quality Road Map We have considerable expectations placed upon us. This Road Map illustrates some of the requirements we are expected to meet. QA Road MapQA Road Map Project QualityProject Quality AssuranceAssurance Implementing ProceduresImplementing Procedures Contract Clauses Project ProceduresProject Procedures International Law Desk InstructionsDesk Instructions Client QAProgram ISOISO Technical Specifications Regulatory Guides Internal Audits Process Improvements C A N W E D O IT B ETT ER ? Management Assessments good Ex c ellent problem! G ood C ould be better O U TSTAN D IN G GuidesGuides External Audits Industry Baseline
  • 4. 4Quality An Audit Is A documented activity, performed in accordance with written procedures or checklists to verify, by examination and evaluation of objective evidence, that applicable elements of the Quality Program are effectively implemented per specified requirements.
  • 5. 5Quality An Auditor Will  Find out what you are doing.  Analyze what you did.  Evaluate what you did.  Record your response.
  • 6. 6Quality Before the Audit You Should  Prepare for the Audit.  Review all pertinent procedures.  Review what you are required to do according to procedure.  Determine the scope of the Audit and inform necessary participants.  Review old Audit Reports.
  • 7. 7Quality During the Audit You Should  Take Notes.  Let the Auditor set the pace and direction of the interface.  Be cooperative.  Minimize disruption.  Verify your information.
  • 8. 8Quality During the Audit You Should  Do not say, “I don’t know.”  Rather refer the Auditor to a person who knows.  Provide feedback to Management.  Solicit the Auditor’s thoughts.
  • 9. 9Quality After the Audit You Should  Meet with the Auditor(s)  Listen to the findings.  Respond – Clarify any misunderstandings and correct errors.  Request a draft written statement of any findings.
  • 10. 10Quality If possible you should.  Permit the auditor an opportunity to propose corrective actions.  Attempt to get a commitment from the Auditor regarding corrective action proposals.  Find out the issue date of the formal report and your response time.
  • 11. 11Quality Sample Auditor Questions 1. What procedure governs your activities? 2. What kind of documented training have you had to do your job? 3. How often are proficiency evaluations performed? 4. What activity do you perform that affects QA? 5. Where is a copy of your last audit? 6. Does your group maintain any controlled documents? 7. How is your training documented? 8. Where is your master list of procedures? 9. How do you handle major changes? 10. What do you do if you find a problem which needs fixed?
  • 12. 12Quality Sample Auditor Questions 11. How do you preserve records? 12. Show me the procedure you use to preserve records. 13. Are you aware of Quality Objectives? 14. I would like to see the evaluation of performance of a particular supplier over a period of time. 15. Can you pull one up? 16. Who assures the performance on other suppliers? 17. How would I know if the suppliers are satisfactory? 18. What statutory/regulatory requirements do you have and how are they handled? 19. What measures do you have in place to tell if the job is performed right? 20. Explain your office/area activities.
  • 13. 13Quality Traditional Audit Process Steps 1. QA Manager Selects a qualified Lead Auditor as the Audit Team Leader (ATL). 2. ATL Schedules the audit verbally or telecon and notifies the audited organization in writing of the scope, audit team (AT) makeup and proposed audit dates. 3. Engineering Provide technical input relative to products or services for external audits. 4. Engineering Provide critical characteristics of commercial grade items for commercial grade surveys. 5. ATL Initiates an Audit Plan 6. QA Manager Approves the Audit Plan. 7. ATL Provides an orientation to the audit team members including: Scope of the audit, Lines of communication to be used by the audit team, Pertinent policies, procedures, standards, instructions, codes and regulatory requirements, Results of prior audit reports, Audit checklist to be used. 8. ATL Signs the audit plan indicating completion of team orientation. 9. ATL Provides detailed checklists delineating procedural requirements, follow-up items and requirements unique to the organization being audited. Note: For commercial grade surveys the checklists shall include functional areas of the suppliers documented quality program necessary to control the acceptability of the critical characteristics identified by Engineering. 10. ATL Conducts a pre-audit conference with management of the audited organization addressing: Confirmation of audit scope, Items to be audited, Introduction of the audit team and identification of their corresponding counterparts, Establishment of communication channels, Establishment of daily audit schedule. Sample Questions: General
  • 14. 14Quality Traditional Audit Process Steps 11. ATL/AT Conducts the audit in accordance with the checklist provided. Note: The checklist questions or format should not prevent the auditors from examining applicable processes or problems found outside the specific scope of the checklist question, to their successful conclusion. 12. ATL/AT Examines objective evidence to the depth necessary to determine acceptable implementation and compliance with QA program requirements and records the documentation reviewed in the audit checklist. 13. ATL/AT Identifies deficiencies on Audit Finding Reports (AFR), for external audits, and on Corrective Action Reports (CARs), in accordance with the procedural “Corrective Action Process” for internal audits. The deficiency shall be documented in sufficient detail to assure that corrective action can be effectively carried out by the audited organization.Notes: For internal audits, no further action is required other than CAR initiation. For Commercial Grade Surveys, AFRs are only initiated when implementation is not in accordance with the written quality program requirements. Quality requirements not acceptably implemented by the supplier, but not required by the supplier’s quality program, are addressed by contractually imposed conditions/restrictions. 14. ATL/AT Investigates the cause and effect of identified AFRs to determine the extent of the corrective action needed. 15. ATL Notifies the audited organization immediately of any conditions determined to require immediate corrective action. 16. ATL Conducts a post-audit conference at the conclusion of the audit to present the results, identify deficiencies, and clarify any misunderstanding or questions.
  • 15. 15Quality Traditional Audit Process Steps 17. ATL Documents the results of the audit in an audit report that provides the following information:a) Date of audit and pre and post-audit conferences,b) Description of the audit scope,c) Identification of the auditors,d) Identification of persons contacted during pre and post audit conferences and audit activities,e) A summary of the audit results, including an evaluation statement regarding the effectiveness of the quality assurance program elements that were audited,f) A summary description of each identified deficiencies.g) A description of any conditions or restrictions required to compensate for Identified deficiencies. 18. ATL Issues an ATL signed copy of the audit report to the QA Manager allowing sufficient time for approval within 30 days of the post-audit conference. 19. QA Mgr. Approves and signs the audit report, within 30 days of the post-audit conference, and the Evaluation of Supplier Quality Form. 20. QA Admin Distributes the audit report to the management of the audited organization as follows: External Audits QA Manager Appropriate Supplier Quality Assurance Representative Managers of Projects, Fab/Construction and/or Engineering, as applicable to the work. Internal Audits President, Vice-President, Cognizant Managers 21. ATL Performs follow-up for identified AFRs to assure the receipt of a written response within 30 days of issuance of the audit report. 22. ATL Reviews the AFRs to determine the adequacy of the response, including cause and the corrective action to prevent recurrence, and that corrective action is identified and scheduled for each finding. 23. ATL Contacts the audited organization if no response is received within 30 days and establishes a new due date.
  • 16. 16Quality Traditional Audit Process Steps 24. ATL Verifies that acceptable corrective action has been implemented by review of supplied documentation or re-audit, as appropriate to the identified deficiency. 25. ATL Signs the AFR and routes the AFR to the QA Manager for approval. 26. QA Mgr. Reviews and approves the AFR. 27. QA Admin Files audit records and completed AFRs in accordance with procedure.