SlideShare ist ein Scribd-Unternehmen logo
1 von 21
Downloaden Sie, um offline zu lesen
Carl Åge Bjørgan
Scandinavian Rail Development Conference - Oslo April 29th 2014
”Ensuring ERTMS development in the Nordic countries”
ALSTOM Transport in Nordic’s
Page 2
A complete portfolio of ERTMS solutions
From individual products to global solutions
Track side
Products
Integrated
Security,
Passenger
Information &
Telecom
Interlocking Integrated Control
Centres
(ATS, SCADA)
Route Control Security and Control SmartsysMainline
On board
systems
Urban
Integrated
Signalling
Solutions
ATLASTM URBALISTM
SMARTLOCKTM
VPITM
SMARTWAYTM ICONISTM PACISTM (*)
A complete Service offer - Signaling
Programme is a System Endeavour
ERTMS
onboard
ERTMS
trackside
Interlocking
Track Products
TMS
Technical / Product
Project Management
Overall System
Integration
Evolution / upgrades
Deployment
Immobilization
Change Management
Operational Performance
ERTMS: Major TRACKSIDE Projects
NETHERLANDS
Betuweroute A15
L2 2007
BELGIUM
L3 High Speed Line
L1/L2
2009
2009
BELGIUM
L4 High Speed Line
L1/L2
2009
2010
NEW
SWITZERLAND
Mattstetten Rothrist
L2
2006
ITALY
Bologna Firenze High
Speed Line
L2 2009
Turkey
Eskisehir-Balikesir
L1-2
2014
SPAIN
Zaragoza - Huesca
L 1
2008
FRANCE
RFF
Corridors C& D
L 1 2012
GREECE
2004
Athens suburban
L1
SPAIN
2011
Castellbisbal – Can
Tunis
L 1
SPAIN
2011
Girona-Figueres
L 1
2008
NETHERLANDS
Havenspoorlijn
L1 2009
ITALY
Rome Naples
High Speed Line
L2 2005
ITALY
Bologna Passante
High Speed Line
L2 2012
In commercial service with
ETCS
Trackside Projects
* Date: commercial service
Completed
NEW
Romania
Curtici Arad
L2 2014
NEW
Spain
Albacente Alicante
L2
2014
NETHERLANDS
2012
Hanzelijn
L 2
GERMANY
Wuppertal Monorail
L3
2014
NEWDENMARK
Resignalling Program
L2
2016
NEW
Outlook for Onboard – Nordic region
416 TS & 184
Loc
Bl 23oD
SWSTM 2.3.0.D
Bl 3
SWSTM 2.3.0.D
Bl 3
STM 3
From 2016-
From 2016
111 TS
+ 60 TS
Cross border
From + 2018
From 2016
• Norway will request a baseline 3 and Sweden will in the short-run
go with a baseline 2.3.0.D, where it will be essential to deliver a
full retro-convertible system.
• Delivery and Timing of solutions to avoid any baselines gaps and
to support a ”harmonised” plan between the infrastructure
Managers.
155TS & +90
Loc
Bl 3
FISTM 2.3.0.D
From 2019
+470 TS & +142
Loc
Outlook for Trackside – Nordic region
Bl 23oD
Bl 3
Bl 3
Roll-out 2016 - 2030
Cross border
From + 2018
• The Nordic Trackside marked is developing.
• Denmark has chooesen a full country approach and split the
country into East & west contracts.
• Norway planning for ERTMS L2.
• Sweden are doing a partial ERTMS roll-out based on line pr. line
approach
Bl 3
2.100 km
+200 stations
4.100 km
+350 stations
+11.000 km
+350 stations
Roll-out 2012 - 2030
Roll-out 2016 - 2021
Experience from Denmark
• An old signaling system that needs to be
renewed also the situation in Norway
• Signal systems from the 50’s 60’s and 70’s
• Decline in punctuality due to the old
signaling program
• Expensive maintenance cost
• New system needed before 2020
• Difficult Interface between different
technologies
• Monopolistic marked situation – high entry
barriers
• Compliant with EU -> ERTMS level 2
8
Experience from Denmark:
A total renewal of the system
Total renewal of the system proved better than running renewal because:
• Cheaper and faster implementation
• Provides higher train punctuality and capacity
• Most benefits for the passengers
• Benefits are achieved faster
2006: Strategic political decision of total renewal
2007-08: Plans and budget for a total renewal program
January 2009: Final political decision for a fully financed total renewal program was decided by the
Danish parliament
Political vision:
− Doubling number of Passengers in 2030 (from 2011)
− Strengthen conditions for collective transport
− Decrease in CO2 emission
• Improved regularity in regional/local trains from 84 % to 94 %
• The new signaling program will mean savings of 1.2 BE. Compared to a modernization strategy.
• Government approved budget for the Signal Program 3.2 BE.
• As a result of the increased competitiveness and dialog with suppliers through the tender stage the
Signal Program performed savings of 0.7BE
• Inreased capacity after national roll-out 2021.
Experience from Denmark:
Benefits of to replacement strategy (less interfaces)
Passenger requires a high punctual
level
The Signal Program contract setup:
Design Build Maintain contracts – up to 25 years of maintenance
1. 2 Contracts on main & regional lines (East and West), with option to take over other contract
2. 1 Contract on the S-bane (S-train around CPH) including rolling stock
3. 1 Contract for on-board main & regional rolling stock
4. GSM-R data included in GSM-R tender starting now
Framework type contracts that allow fitting of new lines
Possible option for ERTMS regional
The 4 contracts are harmonised with
the overall project plan and timetable
for the Signal Program
(2.3 B€)
Banedanmark Signal Program
Experience from Denmark:
Full-country roll-out split in East and West
P 12
• It will take 10- 12 years to carry out the total
renewal
• Contracts:
− Two contracts for the Trackside (East and West)
• To be awarded to different Suppliers
• West contract must contain an option for East part, so
in case the awarded company for West contract can’t
fulfill its project it can be cancelled and re-assigned to
the winner of the East part (and viceversa)
− One framework contract for on-board equipment
• Track side contracts interface at Lillebælt
Total replacement concept
Page 13
How :
 Manage and coordinate system
integration and migration
process
 Have a high level of Stakeholder
involvement and satisfaction
 Minimal disruption during
migration of the on-board system
Delivery of :
 Proven solutions
 Product maturity
 Short delivery time and
operational cost reduction
Success criterias – Take-aways from the DK experience
Meet the schedule
With minimal disruption
during migration
… to improve service
… with excellent Life Cycle Costover
25+ years
NTL project some figures
• The state owned national railway network are managed
by eight traffic control centres
• To increase safety and efficiency Trafikverket initiated
2012 an public procurement process, to buy a new,
nation-wide Centralized Traffic Control (CTC) system
for the Swedish railway network
• Number of stations: 718
• Number of point machines: 5894
• At least 400 active simultaneous users, and must be scalable.
• At least 1.200 interlockings and RBCs, and must be scalable.
• At least 150.000 field objects, and must be scalable.
• At least 10.000 trains per day, and must be scalable.
• At least 2.500 actively controlled authority areas
(system managed areas of railway infrastructure), and must be scalable.
• At least 1.500 simultaneous running trains, and must be scalable.
Alstom’s ICONIS TMS solution provides
Based on a technical advanced product,
knowledge about the local conditions, a
strong local presence, succesful references
and large synergies with Danish TMS
project, Alstom are able to offer:
• A well tested and mature solution
• High degree of automatic planning and
disturbance management
• High flexibility and scalability
• Well-developed task management and
system for follow-up of incidents
• User-friendliness and intuitive solution in
focus
SL X60B - Delivery overview
 71 X60 trains
delivered from 2005 to 2008
 12 additional X60-A trains
delivered in 2012
 46 additional X60-B trains
to be delivered 2016 + 2017
Atlas: Nordic Onboard Solution used for X60B
• Alstom ETCS BL3 developed for Denmark
and reused for X60B
• ETCS Certified and DoC issued in December
2014
• STM provided from Ansaldo
• Certified and DoC issued in 2012
• Homologation in Sweden 2015
• Includes test on Swedish ATC and ERTMS track
Atlas: Nordic Onboard Solution
• Alstom is currently able to deliver an ERTMS Onboard Solution for
seamless operation throughout Norway, Sweden and Denmark
• ETCS BL3 is able to operate on any ERTMS track in Norway, Sweden and Denmark
• Operation on ATC track in Norway and Sweden is secured by STM from Ansaldo.
Currently integrated as part of contract with SL (X60B)
• Operation on ATP track in Denmark is secured by STM from Siemens
Currently integrated as part of contract with BDK.
… and Norway is full speed on the way to ERTMS implementation
www.alstom.com

Weitere ähnliche Inhalte

Was ist angesagt?

ERTMS Solutions TVMLifeCheck - Technical presentation
ERTMS Solutions TVMLifeCheck - Technical presentationERTMS Solutions TVMLifeCheck - Technical presentation
ERTMS Solutions TVMLifeCheck - Technical presentationERTMS Solutions
 
ERTMS Solutions : TrackCircuit LifeCheck
ERTMS Solutions : TrackCircuit LifeCheckERTMS Solutions : TrackCircuit LifeCheck
ERTMS Solutions : TrackCircuit LifeCheckERTMS Solutions
 
Controller Area Network (CAN) Training
Controller Area Network (CAN) TrainingController Area Network (CAN) Training
Controller Area Network (CAN) TrainingBryan Len
 
SMRT Internship Sharing_V2
SMRT Internship Sharing_V2SMRT Internship Sharing_V2
SMRT Internship Sharing_V2Ethan Chia
 
For a New Data Link Service Provision Model in Europe By Patrick Geurts, Seni...
For a New Data Link Service Provision Model in Europe By Patrick Geurts, Seni...For a New Data Link Service Provision Model in Europe By Patrick Geurts, Seni...
For a New Data Link Service Provision Model in Europe By Patrick Geurts, Seni...SITA
 
Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011Jian Shen
 
ERTMS ETCS Limited supervision LS
ERTMS ETCS Limited supervision LSERTMS ETCS Limited supervision LS
ERTMS ETCS Limited supervision LSPoul Froesig
 
An OSGi Environment for FlexibleService Concepts - Detlef Kuck, Teamleader Te...
An OSGi Environment for FlexibleService Concepts - Detlef Kuck, Teamleader Te...An OSGi Environment for FlexibleService Concepts - Detlef Kuck, Teamleader Te...
An OSGi Environment for FlexibleService Concepts - Detlef Kuck, Teamleader Te...mfrancis
 
CPDLC - Data Link Services in Brazil
CPDLC -   Data Link Services in BrazilCPDLC -   Data Link Services in Brazil
CPDLC - Data Link Services in BrazilCarlos Pera
 
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...LTC @ CSUSB
 
Controller Area Network (CAN) Training
Controller Area Network (CAN) TrainingController Area Network (CAN) Training
Controller Area Network (CAN) TrainingTonex
 
Sesar swim master class best in class 2014 flight aware
Sesar swim master class best in class 2014 flight awareSesar swim master class best in class 2014 flight aware
Sesar swim master class best in class 2014 flight awareSESAR Joint Undertaking
 
QoS-Predictable SOA on TSN: Insights from a Case-Study
QoS-Predictable SOA on TSN: Insights from a Case-StudyQoS-Predictable SOA on TSN: Insights from a Case-Study
QoS-Predictable SOA on TSN: Insights from a Case-StudyRealTime-at-Work (RTaW)
 

Was ist angesagt? (20)

ERTMS Solutions TVMLifeCheck - Technical presentation
ERTMS Solutions TVMLifeCheck - Technical presentationERTMS Solutions TVMLifeCheck - Technical presentation
ERTMS Solutions TVMLifeCheck - Technical presentation
 
ERTMS Solutions : TrackCircuit LifeCheck
ERTMS Solutions : TrackCircuit LifeCheckERTMS Solutions : TrackCircuit LifeCheck
ERTMS Solutions : TrackCircuit LifeCheck
 
Controller Area Network (CAN) Training
Controller Area Network (CAN) TrainingController Area Network (CAN) Training
Controller Area Network (CAN) Training
 
SMRT Internship Sharing_V2
SMRT Internship Sharing_V2SMRT Internship Sharing_V2
SMRT Internship Sharing_V2
 
For a New Data Link Service Provision Model in Europe By Patrick Geurts, Seni...
For a New Data Link Service Provision Model in Europe By Patrick Geurts, Seni...For a New Data Link Service Provision Model in Europe By Patrick Geurts, Seni...
For a New Data Link Service Provision Model in Europe By Patrick Geurts, Seni...
 
Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011
 
Ca npp t
Ca npp tCa npp t
Ca npp t
 
ERTMS ETCS Limited supervision LS
ERTMS ETCS Limited supervision LSERTMS ETCS Limited supervision LS
ERTMS ETCS Limited supervision LS
 
An OSGi Environment for FlexibleService Concepts - Detlef Kuck, Teamleader Te...
An OSGi Environment for FlexibleService Concepts - Detlef Kuck, Teamleader Te...An OSGi Environment for FlexibleService Concepts - Detlef Kuck, Teamleader Te...
An OSGi Environment for FlexibleService Concepts - Detlef Kuck, Teamleader Te...
 
CPDLC - Data Link Services in Brazil
CPDLC -   Data Link Services in BrazilCPDLC -   Data Link Services in Brazil
CPDLC - Data Link Services in Brazil
 
Status of Galileo
Status of Galileo Status of Galileo
Status of Galileo
 
Galileo differentiators for mass market
Galileo differentiators for mass marketGalileo differentiators for mass market
Galileo differentiators for mass market
 
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
 
Controller Area Network (CAN) Training
Controller Area Network (CAN) TrainingController Area Network (CAN) Training
Controller Area Network (CAN) Training
 
Sesar swim master class best in class 2014 flight aware
Sesar swim master class best in class 2014 flight awareSesar swim master class best in class 2014 flight aware
Sesar swim master class best in class 2014 flight aware
 
Can Protocol For Automobiles
Can Protocol For AutomobilesCan Protocol For Automobiles
Can Protocol For Automobiles
 
CATS Brochure
CATS BrochureCATS Brochure
CATS Brochure
 
CV_SIG_DES_MG_Dastagir 07_11_2016
CV_SIG_DES_MG_Dastagir 07_11_2016CV_SIG_DES_MG_Dastagir 07_11_2016
CV_SIG_DES_MG_Dastagir 07_11_2016
 
Canbus
CanbusCanbus
Canbus
 
QoS-Predictable SOA on TSN: Insights from a Case-Study
QoS-Predictable SOA on TSN: Insights from a Case-StudyQoS-Predictable SOA on TSN: Insights from a Case-Study
QoS-Predictable SOA on TSN: Insights from a Case-Study
 

Ähnlich wie Carl Åge Bjørgan Scandinavian Rail Development Conference - Ensuring ERTMS development

E2-Per-Erik-Ingels-Poul-FrosigV1
E2-Per-Erik-Ingels-Poul-FrosigV1E2-Per-Erik-Ingels-Poul-FrosigV1
E2-Per-Erik-Ingels-Poul-FrosigV1Poul Froesig
 
Recruitment campaign alstom tis feb14
Recruitment campaign alstom tis feb14Recruitment campaign alstom tis feb14
Recruitment campaign alstom tis feb14Damien Laurelli
 
ROADART - Research On Alternative Diversity Aspects foR Trucks
ROADART - Research On Alternative Diversity Aspects foR TrucksROADART - Research On Alternative Diversity Aspects foR Trucks
ROADART - Research On Alternative Diversity Aspects foR TrucksEuropean Green Vehicle Initiative
 
Using “Big-Data” to improve roadway performance across strategic road network...
Using “Big-Data” to improve roadway performance across strategic road network...Using “Big-Data” to improve roadway performance across strategic road network...
Using “Big-Data” to improve roadway performance across strategic road network...Italo Broggini
 
Recruitment campaign Alstom TIS Spain: 100 positions in Señalización
Recruitment campaign Alstom TIS Spain: 100 positions in SeñalizaciónRecruitment campaign Alstom TIS Spain: 100 positions in Señalización
Recruitment campaign Alstom TIS Spain: 100 positions in SeñalizaciónDamien Laurelli
 
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NREllo Weits
 
European Gateway Services.pptx
European Gateway Services.pptxEuropean Gateway Services.pptx
European Gateway Services.pptxSoe Min Aung
 
Owen eriksson, trafikverkets e-infratsruktur för detektorinformation och rfid...
Owen eriksson, trafikverkets e-infratsruktur för detektorinformation och rfid...Owen eriksson, trafikverkets e-infratsruktur för detektorinformation och rfid...
Owen eriksson, trafikverkets e-infratsruktur för detektorinformation och rfid...nitauu
 
Acksys Transportation High Speed Train to Ground EN50155 connectivity
Acksys Transportation High Speed Train to Ground EN50155 connectivityAcksys Transportation High Speed Train to Ground EN50155 connectivity
Acksys Transportation High Speed Train to Ground EN50155 connectivityPascal Braconnier
 
Recruitment campaign Alstom TIS Madrid: 100 positions to be covered in Signaling
Recruitment campaign Alstom TIS Madrid: 100 positions to be covered in SignalingRecruitment campaign Alstom TIS Madrid: 100 positions to be covered in Signaling
Recruitment campaign Alstom TIS Madrid: 100 positions to be covered in SignalingDamien Laurelli
 
Pbt article packet-optical-integration_vishal_05-08-12
Pbt article packet-optical-integration_vishal_05-08-12Pbt article packet-optical-integration_vishal_05-08-12
Pbt article packet-optical-integration_vishal_05-08-12Vishal Sharma, Ph.D.
 
2005 RSA Conference: Safe at Any Speed
2005 RSA Conference: Safe at Any Speed2005 RSA Conference: Safe at Any Speed
2005 RSA Conference: Safe at Any SpeedSecurity Innovation
 
Optimising a multi-load container transport corridor in South Africa
Optimising a multi-load container transport corridor in South AfricaOptimising a multi-load container transport corridor in South Africa
Optimising a multi-load container transport corridor in South AfricaRailways and Harbours
 
Next generation of satellite connectivity solutions for railway
Next generation of satellite connectivity solutions for railwayNext generation of satellite connectivity solutions for railway
Next generation of satellite connectivity solutions for railwaytechUK
 
Overview of the FlexPlan project. Focus on EU regulatory analysis and TSO-DSO...
Overview of the FlexPlan project. Focus on EU regulatory analysis and TSO-DSO...Overview of the FlexPlan project. Focus on EU regulatory analysis and TSO-DSO...
Overview of the FlexPlan project. Focus on EU regulatory analysis and TSO-DSO...Leonardo ENERGY
 
2012 02-08 autodesk infrastructure event in stockholm-multiconsult projects
2012 02-08 autodesk infrastructure event in stockholm-multiconsult projects2012 02-08 autodesk infrastructure event in stockholm-multiconsult projects
2012 02-08 autodesk infrastructure event in stockholm-multiconsult projectsÅge Langedrag
 
Eu strategy for ertms deployment j. schlichting and p. buhrsch
Eu strategy for ertms deployment   j. schlichting and p. buhrschEu strategy for ertms deployment   j. schlichting and p. buhrsch
Eu strategy for ertms deployment j. schlichting and p. buhrschEuropean Commission
 

Ähnlich wie Carl Åge Bjørgan Scandinavian Rail Development Conference - Ensuring ERTMS development (20)

E2-Per-Erik-Ingels-Poul-FrosigV1
E2-Per-Erik-Ingels-Poul-FrosigV1E2-Per-Erik-Ingels-Poul-FrosigV1
E2-Per-Erik-Ingels-Poul-FrosigV1
 
Recruitment campaign alstom tis feb14
Recruitment campaign alstom tis feb14Recruitment campaign alstom tis feb14
Recruitment campaign alstom tis feb14
 
GSA Road User Charging Conference 2015
GSA Road User Charging Conference 2015GSA Road User Charging Conference 2015
GSA Road User Charging Conference 2015
 
ROADART - Research On Alternative Diversity Aspects foR Trucks
ROADART - Research On Alternative Diversity Aspects foR TrucksROADART - Research On Alternative Diversity Aspects foR Trucks
ROADART - Research On Alternative Diversity Aspects foR Trucks
 
Using “Big-Data” to improve roadway performance across strategic road network...
Using “Big-Data” to improve roadway performance across strategic road network...Using “Big-Data” to improve roadway performance across strategic road network...
Using “Big-Data” to improve roadway performance across strategic road network...
 
Recruitment campaign Alstom TIS Spain: 100 positions in Señalización
Recruitment campaign Alstom TIS Spain: 100 positions in SeñalizaciónRecruitment campaign Alstom TIS Spain: 100 positions in Señalización
Recruitment campaign Alstom TIS Spain: 100 positions in Señalización
 
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
 
European Gateway Services.pptx
European Gateway Services.pptxEuropean Gateway Services.pptx
European Gateway Services.pptx
 
Intelligent infrastructure and traffic systems
Intelligent infrastructure and traffic systemsIntelligent infrastructure and traffic systems
Intelligent infrastructure and traffic systems
 
ADSS Overview
ADSS OverviewADSS Overview
ADSS Overview
 
Owen eriksson, trafikverkets e-infratsruktur för detektorinformation och rfid...
Owen eriksson, trafikverkets e-infratsruktur för detektorinformation och rfid...Owen eriksson, trafikverkets e-infratsruktur för detektorinformation och rfid...
Owen eriksson, trafikverkets e-infratsruktur för detektorinformation och rfid...
 
Acksys Transportation High Speed Train to Ground EN50155 connectivity
Acksys Transportation High Speed Train to Ground EN50155 connectivityAcksys Transportation High Speed Train to Ground EN50155 connectivity
Acksys Transportation High Speed Train to Ground EN50155 connectivity
 
Recruitment campaign Alstom TIS Madrid: 100 positions to be covered in Signaling
Recruitment campaign Alstom TIS Madrid: 100 positions to be covered in SignalingRecruitment campaign Alstom TIS Madrid: 100 positions to be covered in Signaling
Recruitment campaign Alstom TIS Madrid: 100 positions to be covered in Signaling
 
Pbt article packet-optical-integration_vishal_05-08-12
Pbt article packet-optical-integration_vishal_05-08-12Pbt article packet-optical-integration_vishal_05-08-12
Pbt article packet-optical-integration_vishal_05-08-12
 
2005 RSA Conference: Safe at Any Speed
2005 RSA Conference: Safe at Any Speed2005 RSA Conference: Safe at Any Speed
2005 RSA Conference: Safe at Any Speed
 
Optimising a multi-load container transport corridor in South Africa
Optimising a multi-load container transport corridor in South AfricaOptimising a multi-load container transport corridor in South Africa
Optimising a multi-load container transport corridor in South Africa
 
Next generation of satellite connectivity solutions for railway
Next generation of satellite connectivity solutions for railwayNext generation of satellite connectivity solutions for railway
Next generation of satellite connectivity solutions for railway
 
Overview of the FlexPlan project. Focus on EU regulatory analysis and TSO-DSO...
Overview of the FlexPlan project. Focus on EU regulatory analysis and TSO-DSO...Overview of the FlexPlan project. Focus on EU regulatory analysis and TSO-DSO...
Overview of the FlexPlan project. Focus on EU regulatory analysis and TSO-DSO...
 
2012 02-08 autodesk infrastructure event in stockholm-multiconsult projects
2012 02-08 autodesk infrastructure event in stockholm-multiconsult projects2012 02-08 autodesk infrastructure event in stockholm-multiconsult projects
2012 02-08 autodesk infrastructure event in stockholm-multiconsult projects
 
Eu strategy for ertms deployment j. schlichting and p. buhrsch
Eu strategy for ertms deployment   j. schlichting and p. buhrschEu strategy for ertms deployment   j. schlichting and p. buhrsch
Eu strategy for ertms deployment j. schlichting and p. buhrsch
 

Mehr von Russell Publishing

Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...
Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...
Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...Russell Publishing
 
Robin Forrest, International Relations, SNCF Security
Robin Forrest, International Relations, SNCF SecurityRobin Forrest, International Relations, SNCF Security
Robin Forrest, International Relations, SNCF SecurityRussell Publishing
 
Richard Aaroe, CEO, WaveTrainSystems (WTS)
Richard Aaroe, CEO, WaveTrainSystems (WTS)Richard Aaroe, CEO, WaveTrainSystems (WTS)
Richard Aaroe, CEO, WaveTrainSystems (WTS)Russell Publishing
 
Peter Guy, Operational Security & Continuity Planning Manager, Network Rail
Peter Guy, Operational Security & Continuity Planning Manager, Network RailPeter Guy, Operational Security & Continuity Planning Manager, Network Rail
Peter Guy, Operational Security & Continuity Planning Manager, Network RailRussell Publishing
 
Martyn Guiver, Head of Crime Management, Northern Rail
Martyn Guiver, Head of Crime Management, Northern RailMartyn Guiver, Head of Crime Management, Northern Rail
Martyn Guiver, Head of Crime Management, Northern RailRussell Publishing
 
Marc Pearl, President & CEO, Homeland Security & Defense Business Council
Marc Pearl, President & CEO, Homeland Security & Defense Business CouncilMarc Pearl, President & CEO, Homeland Security & Defense Business Council
Marc Pearl, President & CEO, Homeland Security & Defense Business CouncilRussell Publishing
 
José Pires, Senior Security Advisor, International Union of Railways (UIC)
José Pires, Senior Security Advisor, International Union of Railways (UIC)José Pires, Senior Security Advisor, International Union of Railways (UIC)
José Pires, Senior Security Advisor, International Union of Railways (UIC)Russell Publishing
 
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)Russell Publishing
 
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer Electronic
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer ElectronicDaniel Berchtold, Head Business Unit Rail Automation, Schweizer Electronic
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer ElectronicRussell Publishing
 
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...Russell Publishing
 
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...Russell Publishing
 
Airport IT&T 2013 Panel Discussion
Airport IT&T 2013 Panel DiscussionAirport IT&T 2013 Panel Discussion
Airport IT&T 2013 Panel DiscussionRussell Publishing
 
Airport IT&T 2013 Michael Zaddach
Airport IT&T 2013 Michael ZaddachAirport IT&T 2013 Michael Zaddach
Airport IT&T 2013 Michael ZaddachRussell Publishing
 
Airport IT&T 2013 John McCarthy
Airport IT&T 2013 John McCarthyAirport IT&T 2013 John McCarthy
Airport IT&T 2013 John McCarthyRussell Publishing
 

Mehr von Russell Publishing (20)

Elisabeth sinclair
Elisabeth sinclairElisabeth sinclair
Elisabeth sinclair
 
Elisabeth sinclair
Elisabeth sinclairElisabeth sinclair
Elisabeth sinclair
 
Denis castanet
Denis castanetDenis castanet
Denis castanet
 
Gunther koller
Gunther kollerGunther koller
Gunther koller
 
David thomasson
David thomassonDavid thomasson
David thomasson
 
Johnny sorenson
Johnny sorensonJohnny sorenson
Johnny sorenson
 
Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...
Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...
Stephen Thomas, QPM Assistant Chief Constable, Operations, British Transport ...
 
Robin Forrest, International Relations, SNCF Security
Robin Forrest, International Relations, SNCF SecurityRobin Forrest, International Relations, SNCF Security
Robin Forrest, International Relations, SNCF Security
 
Richard Aaroe, CEO, WaveTrainSystems (WTS)
Richard Aaroe, CEO, WaveTrainSystems (WTS)Richard Aaroe, CEO, WaveTrainSystems (WTS)
Richard Aaroe, CEO, WaveTrainSystems (WTS)
 
Peter Guy, Operational Security & Continuity Planning Manager, Network Rail
Peter Guy, Operational Security & Continuity Planning Manager, Network RailPeter Guy, Operational Security & Continuity Planning Manager, Network Rail
Peter Guy, Operational Security & Continuity Planning Manager, Network Rail
 
Martyn Guiver, Head of Crime Management, Northern Rail
Martyn Guiver, Head of Crime Management, Northern RailMartyn Guiver, Head of Crime Management, Northern Rail
Martyn Guiver, Head of Crime Management, Northern Rail
 
Marc Pearl, President & CEO, Homeland Security & Defense Business Council
Marc Pearl, President & CEO, Homeland Security & Defense Business CouncilMarc Pearl, President & CEO, Homeland Security & Defense Business Council
Marc Pearl, President & CEO, Homeland Security & Defense Business Council
 
José Pires, Senior Security Advisor, International Union of Railways (UIC)
José Pires, Senior Security Advisor, International Union of Railways (UIC)José Pires, Senior Security Advisor, International Union of Railways (UIC)
José Pires, Senior Security Advisor, International Union of Railways (UIC)
 
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)
David Roney, Superintendent, Counter Terrorism, British Transport Police (BTP)
 
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer Electronic
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer ElectronicDaniel Berchtold, Head Business Unit Rail Automation, Schweizer Electronic
Daniel Berchtold, Head Business Unit Rail Automation, Schweizer Electronic
 
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
 
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...
Thomas Kritzer, Head of Security & Service Department, Wiener Linien & Chair,...
 
Airport IT&T 2013 Panel Discussion
Airport IT&T 2013 Panel DiscussionAirport IT&T 2013 Panel Discussion
Airport IT&T 2013 Panel Discussion
 
Airport IT&T 2013 Michael Zaddach
Airport IT&T 2013 Michael ZaddachAirport IT&T 2013 Michael Zaddach
Airport IT&T 2013 Michael Zaddach
 
Airport IT&T 2013 John McCarthy
Airport IT&T 2013 John McCarthyAirport IT&T 2013 John McCarthy
Airport IT&T 2013 John McCarthy
 

Kürzlich hochgeladen

PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.KathleenAnnCordero2
 
Internship Presentation | PPT | CSE | SE
Internship Presentation | PPT | CSE | SEInternship Presentation | PPT | CSE | SE
Internship Presentation | PPT | CSE | SESaleh Ibne Omar
 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationNathan Young
 
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...Henrik Hanke
 
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...漢銘 謝
 
Early Modern Spain. All about this period
Early Modern Spain. All about this periodEarly Modern Spain. All about this period
Early Modern Spain. All about this periodSaraIsabelJimenez
 
Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power
 
Quality by design.. ppt for RA (1ST SEM
Quality by design.. ppt for  RA (1ST SEMQuality by design.. ppt for  RA (1ST SEM
Quality by design.. ppt for RA (1ST SEMCharmi13
 
Chizaram's Women Tech Makers Deck. .pptx
Chizaram's Women Tech Makers Deck.  .pptxChizaram's Women Tech Makers Deck.  .pptx
Chizaram's Women Tech Makers Deck. .pptxogubuikealex
 
Call Girls In Aerocity 🤳 Call Us +919599264170
Call Girls In Aerocity 🤳 Call Us +919599264170Call Girls In Aerocity 🤳 Call Us +919599264170
Call Girls In Aerocity 🤳 Call Us +919599264170Escort Service
 
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATIONRACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATIONRachelAnnTenibroAmaz
 
Engaging Eid Ul Fitr Presentation for Kindergartners.pptx
Engaging Eid Ul Fitr Presentation for Kindergartners.pptxEngaging Eid Ul Fitr Presentation for Kindergartners.pptx
Engaging Eid Ul Fitr Presentation for Kindergartners.pptxAsifArshad8
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxaryanv1753
 
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comSaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comsaastr
 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸mathanramanathan2005
 
proposal kumeneger edited.docx A kumeeger
proposal kumeneger edited.docx A kumeegerproposal kumeneger edited.docx A kumeeger
proposal kumeneger edited.docx A kumeegerkumenegertelayegrama
 
CHROMATOGRAPHY and its types with procedure,diagrams,flow charts,advantages a...
CHROMATOGRAPHY and its types with procedure,diagrams,flow charts,advantages a...CHROMATOGRAPHY and its types with procedure,diagrams,flow charts,advantages a...
CHROMATOGRAPHY and its types with procedure,diagrams,flow charts,advantages a...university
 
Application of GIS in Landslide Disaster Response.pptx
Application of GIS in Landslide Disaster Response.pptxApplication of GIS in Landslide Disaster Response.pptx
Application of GIS in Landslide Disaster Response.pptxRoquia Salam
 
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRRINDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRRsarwankumar4524
 

Kürzlich hochgeladen (19)

PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
 
Internship Presentation | PPT | CSE | SE
Internship Presentation | PPT | CSE | SEInternship Presentation | PPT | CSE | SE
Internship Presentation | PPT | CSE | SE
 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism Presentation
 
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
 
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
 
Early Modern Spain. All about this period
Early Modern Spain. All about this periodEarly Modern Spain. All about this period
Early Modern Spain. All about this period
 
Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
 
Quality by design.. ppt for RA (1ST SEM
Quality by design.. ppt for  RA (1ST SEMQuality by design.. ppt for  RA (1ST SEM
Quality by design.. ppt for RA (1ST SEM
 
Chizaram's Women Tech Makers Deck. .pptx
Chizaram's Women Tech Makers Deck.  .pptxChizaram's Women Tech Makers Deck.  .pptx
Chizaram's Women Tech Makers Deck. .pptx
 
Call Girls In Aerocity 🤳 Call Us +919599264170
Call Girls In Aerocity 🤳 Call Us +919599264170Call Girls In Aerocity 🤳 Call Us +919599264170
Call Girls In Aerocity 🤳 Call Us +919599264170
 
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATIONRACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
RACHEL-ANN M. TENIBRO PRODUCT RESEARCH PRESENTATION
 
Engaging Eid Ul Fitr Presentation for Kindergartners.pptx
Engaging Eid Ul Fitr Presentation for Kindergartners.pptxEngaging Eid Ul Fitr Presentation for Kindergartners.pptx
Engaging Eid Ul Fitr Presentation for Kindergartners.pptx
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptx
 
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comSaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸
 
proposal kumeneger edited.docx A kumeeger
proposal kumeneger edited.docx A kumeegerproposal kumeneger edited.docx A kumeeger
proposal kumeneger edited.docx A kumeeger
 
CHROMATOGRAPHY and its types with procedure,diagrams,flow charts,advantages a...
CHROMATOGRAPHY and its types with procedure,diagrams,flow charts,advantages a...CHROMATOGRAPHY and its types with procedure,diagrams,flow charts,advantages a...
CHROMATOGRAPHY and its types with procedure,diagrams,flow charts,advantages a...
 
Application of GIS in Landslide Disaster Response.pptx
Application of GIS in Landslide Disaster Response.pptxApplication of GIS in Landslide Disaster Response.pptx
Application of GIS in Landslide Disaster Response.pptx
 
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRRINDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRR
 

Carl Åge Bjørgan Scandinavian Rail Development Conference - Ensuring ERTMS development

  • 1. Carl Åge Bjørgan Scandinavian Rail Development Conference - Oslo April 29th 2014 ”Ensuring ERTMS development in the Nordic countries”
  • 2. ALSTOM Transport in Nordic’s Page 2
  • 3. A complete portfolio of ERTMS solutions From individual products to global solutions Track side Products Integrated Security, Passenger Information & Telecom Interlocking Integrated Control Centres (ATS, SCADA) Route Control Security and Control SmartsysMainline On board systems Urban Integrated Signalling Solutions ATLASTM URBALISTM SMARTLOCKTM VPITM SMARTWAYTM ICONISTM PACISTM (*)
  • 4. A complete Service offer - Signaling Programme is a System Endeavour ERTMS onboard ERTMS trackside Interlocking Track Products TMS Technical / Product Project Management Overall System Integration Evolution / upgrades Deployment Immobilization Change Management Operational Performance
  • 5. ERTMS: Major TRACKSIDE Projects NETHERLANDS Betuweroute A15 L2 2007 BELGIUM L3 High Speed Line L1/L2 2009 2009 BELGIUM L4 High Speed Line L1/L2 2009 2010 NEW SWITZERLAND Mattstetten Rothrist L2 2006 ITALY Bologna Firenze High Speed Line L2 2009 Turkey Eskisehir-Balikesir L1-2 2014 SPAIN Zaragoza - Huesca L 1 2008 FRANCE RFF Corridors C& D L 1 2012 GREECE 2004 Athens suburban L1 SPAIN 2011 Castellbisbal – Can Tunis L 1 SPAIN 2011 Girona-Figueres L 1 2008 NETHERLANDS Havenspoorlijn L1 2009 ITALY Rome Naples High Speed Line L2 2005 ITALY Bologna Passante High Speed Line L2 2012 In commercial service with ETCS Trackside Projects * Date: commercial service Completed NEW Romania Curtici Arad L2 2014 NEW Spain Albacente Alicante L2 2014 NETHERLANDS 2012 Hanzelijn L 2 GERMANY Wuppertal Monorail L3 2014 NEWDENMARK Resignalling Program L2 2016 NEW
  • 6. Outlook for Onboard – Nordic region 416 TS & 184 Loc Bl 23oD SWSTM 2.3.0.D Bl 3 SWSTM 2.3.0.D Bl 3 STM 3 From 2016- From 2016 111 TS + 60 TS Cross border From + 2018 From 2016 • Norway will request a baseline 3 and Sweden will in the short-run go with a baseline 2.3.0.D, where it will be essential to deliver a full retro-convertible system. • Delivery and Timing of solutions to avoid any baselines gaps and to support a ”harmonised” plan between the infrastructure Managers. 155TS & +90 Loc Bl 3 FISTM 2.3.0.D From 2019 +470 TS & +142 Loc
  • 7. Outlook for Trackside – Nordic region Bl 23oD Bl 3 Bl 3 Roll-out 2016 - 2030 Cross border From + 2018 • The Nordic Trackside marked is developing. • Denmark has chooesen a full country approach and split the country into East & west contracts. • Norway planning for ERTMS L2. • Sweden are doing a partial ERTMS roll-out based on line pr. line approach Bl 3 2.100 km +200 stations 4.100 km +350 stations +11.000 km +350 stations Roll-out 2012 - 2030 Roll-out 2016 - 2021
  • 8. Experience from Denmark • An old signaling system that needs to be renewed also the situation in Norway • Signal systems from the 50’s 60’s and 70’s • Decline in punctuality due to the old signaling program • Expensive maintenance cost • New system needed before 2020 • Difficult Interface between different technologies • Monopolistic marked situation – high entry barriers • Compliant with EU -> ERTMS level 2 8
  • 9. Experience from Denmark: A total renewal of the system Total renewal of the system proved better than running renewal because: • Cheaper and faster implementation • Provides higher train punctuality and capacity • Most benefits for the passengers • Benefits are achieved faster 2006: Strategic political decision of total renewal 2007-08: Plans and budget for a total renewal program January 2009: Final political decision for a fully financed total renewal program was decided by the Danish parliament
  • 10. Political vision: − Doubling number of Passengers in 2030 (from 2011) − Strengthen conditions for collective transport − Decrease in CO2 emission • Improved regularity in regional/local trains from 84 % to 94 % • The new signaling program will mean savings of 1.2 BE. Compared to a modernization strategy. • Government approved budget for the Signal Program 3.2 BE. • As a result of the increased competitiveness and dialog with suppliers through the tender stage the Signal Program performed savings of 0.7BE • Inreased capacity after national roll-out 2021. Experience from Denmark: Benefits of to replacement strategy (less interfaces) Passenger requires a high punctual level
  • 11. The Signal Program contract setup: Design Build Maintain contracts – up to 25 years of maintenance 1. 2 Contracts on main & regional lines (East and West), with option to take over other contract 2. 1 Contract on the S-bane (S-train around CPH) including rolling stock 3. 1 Contract for on-board main & regional rolling stock 4. GSM-R data included in GSM-R tender starting now Framework type contracts that allow fitting of new lines Possible option for ERTMS regional The 4 contracts are harmonised with the overall project plan and timetable for the Signal Program (2.3 B€) Banedanmark Signal Program
  • 12. Experience from Denmark: Full-country roll-out split in East and West P 12 • It will take 10- 12 years to carry out the total renewal • Contracts: − Two contracts for the Trackside (East and West) • To be awarded to different Suppliers • West contract must contain an option for East part, so in case the awarded company for West contract can’t fulfill its project it can be cancelled and re-assigned to the winner of the East part (and viceversa) − One framework contract for on-board equipment • Track side contracts interface at Lillebælt
  • 14. How :  Manage and coordinate system integration and migration process  Have a high level of Stakeholder involvement and satisfaction  Minimal disruption during migration of the on-board system Delivery of :  Proven solutions  Product maturity  Short delivery time and operational cost reduction Success criterias – Take-aways from the DK experience Meet the schedule With minimal disruption during migration … to improve service … with excellent Life Cycle Costover 25+ years
  • 15. NTL project some figures • The state owned national railway network are managed by eight traffic control centres • To increase safety and efficiency Trafikverket initiated 2012 an public procurement process, to buy a new, nation-wide Centralized Traffic Control (CTC) system for the Swedish railway network • Number of stations: 718 • Number of point machines: 5894 • At least 400 active simultaneous users, and must be scalable. • At least 1.200 interlockings and RBCs, and must be scalable. • At least 150.000 field objects, and must be scalable. • At least 10.000 trains per day, and must be scalable. • At least 2.500 actively controlled authority areas (system managed areas of railway infrastructure), and must be scalable. • At least 1.500 simultaneous running trains, and must be scalable.
  • 16. Alstom’s ICONIS TMS solution provides Based on a technical advanced product, knowledge about the local conditions, a strong local presence, succesful references and large synergies with Danish TMS project, Alstom are able to offer: • A well tested and mature solution • High degree of automatic planning and disturbance management • High flexibility and scalability • Well-developed task management and system for follow-up of incidents • User-friendliness and intuitive solution in focus
  • 17. SL X60B - Delivery overview  71 X60 trains delivered from 2005 to 2008  12 additional X60-A trains delivered in 2012  46 additional X60-B trains to be delivered 2016 + 2017
  • 18. Atlas: Nordic Onboard Solution used for X60B • Alstom ETCS BL3 developed for Denmark and reused for X60B • ETCS Certified and DoC issued in December 2014 • STM provided from Ansaldo • Certified and DoC issued in 2012 • Homologation in Sweden 2015 • Includes test on Swedish ATC and ERTMS track
  • 19. Atlas: Nordic Onboard Solution • Alstom is currently able to deliver an ERTMS Onboard Solution for seamless operation throughout Norway, Sweden and Denmark • ETCS BL3 is able to operate on any ERTMS track in Norway, Sweden and Denmark • Operation on ATC track in Norway and Sweden is secured by STM from Ansaldo. Currently integrated as part of contract with SL (X60B) • Operation on ATP track in Denmark is secured by STM from Siemens Currently integrated as part of contract with BDK.
  • 20. … and Norway is full speed on the way to ERTMS implementation