Reclamation Plan
       July 2007
Presented May 17, 2010
Reclamation Standards


     !   Forest Service Requirements
     !   Arizona Mined Land
         Reclamation Requirements
     !   Aquifer Protection Permit
         Requirements
Forest Service Standards

 “Reclamation objectives and requirements
 and the resulting standards are developed
 through the NEPA analysis and implemented
 by inclusion in the approved POO.”
!  The “standards” address the issues
!  Rosemont Reclamation Plan developed to
   address issues
!  Applicable standards addressed
Forest Service Issues List

!   Interim Operations   !   Stability
    and Maintenance      ! Revegetation
!   Hazmat               !   Mitigation
!   Demolition           !   Monitoring/
!   Facility Design          Maintenance
!   Water Quality        !   Safety
!   Landform             !   Permitting
                         !   Financial Assurance
Arizona State Requirements
!  Pubic Safety Standards
!  Erosion Control and Topographic Contouring
!  Roads
! Revegetation
!  Soil Conservation
!  Financial Assurance
Rosemont Post-Mining Land Uses

!  Recreation
!  Ranching
!  Wildlife Habitat
Aquifer Protection Permit
             Requirements
!  Closure Strategy
!  Complete Closure Plan include specific
   elements
!  Clean Closure or Post-Closure Monitoring
   Maintenance
!  Financial Assurance
Rosemont Plan Elements
!   Begin with the End in Mind
!   Construct Outer Buttress
!   Concurrent Reclamation
!   Blend into Existing Topography
!   Constrain to Barrel Canyon
!   Minimize Hydrologic Disturbance
!   Minimize Environmental Impacts
!   Salvage Soil and Vegetation Resources
!   Closure Costing
Forest Service
                       Issues

!  Interim Operations and Maintenance
 “Controls necessary to ensure the integrity of the facilities at
 Rosemont whose failure could potential endanger human
 health and the environment.”

 •  Facilities designed to be more robust
    than regulatory requirements
 •  Layout keeps facilities internal to
    buttresses
Interim Operations and Maintenance
Interim Operations and Maintenance
Forest Service
                      Issues

!  Hazmat
 “Isolation, removal, treatment, or control of hazardous or
 toxic materials.”

 •  Solutions managed in appropriate
    containments during operations
 •  Bulk chemical delivery
 •  At closure materials are sold or
    disposed off-site
Hazmat Management at Closure

!    Petroleum – return to vendors/sale
!    Sulfuric acid – return to vendors/sale
!    Leaching solutions – evaporation/sale
!    Filter water – evaporation
!    Blasting agents – return to contractor
!    Lab wastes – disposal
!    Facility/equipment mtce - disposal
Forest Service
                     Issues

!  Demolition
 “Removal/disposal of non-contaminated facilities, equipment
 and materials (buildings, concrete foundations, etc.)”

  •  Constructed facilities removed
  •  Some necessary facilities remain in
     place (i.e. culverts, ponds, diversions, etc.)
Forest Service
                       Issues

!  Facility Design
 “Facilities remaining have design standards so that facilities
 will perform as designed over the long term to protect
 human health and the environment. (i.e. covers, caps,
 liners, diversions, etc.)”

  •  Facilities designed to meet or exceed
     required standards
  •  Storms, stability, diversion, cover, etc.
Forest Service
                      Issues

!  Water Quality
 “Water quality standards (federal and state) which should be
 met by project discharges.”

 •  Requirement to maintain groundwater
    quality – APP permit
 •  No degredation standard for surface
    water - AZPES
Water Quality

!  Meet or exceed Arizona BADCT standards
   to protect groundwater
!  Liners or double liners with leak detection
!  Stormwater capture to maintain quality
!  No exposed process solutions/areas
!  Pit contained
!  Waste rock shell over all
Forest Service
                     Issues

!  Landform
 “Acceptable post-mining land slopes, drainages and
 contours.”

 •    Slopes are set at 3:1 (18°)
 •    Dendritic (ridge and valley) pattern
 •    Intermittent areas to hold water - riparian
 •    Variable slopes covers including talus
      slopes to present habitat mosaic
Landform




July 2007      March 2010
Forest Service
                       Issues

!  Stability
  “Standards for physical and chemical stability of project
  components.”

  •  Geotechnical investigations
  •  Facility stability meets AZ standards
    (1.5 static and 1.1 dynamic)
  •  Geochemical investigations
  •  NNP is positive (acid consuming)
Forest Service
                     Issues

! Revegetation
 “Acceptable vegetative communities and ground cover
 requirements.”

 •  Greenhouse Tests
 •  Reclamation Test Plots
 •  Agave Salvage
Revegetation




        Area 3 – Upper Test Plot
Forest Service
                      Issues

!  Mitigation
  “Mitigation compensates for damage that cannot be avioded
  this involves construction techniques related to stream
  channels, wildlife habitat, recreation, cultural or other
  resources.”
  •  Planned for full development during the NEPA
     process.
  •  Included diversions, dendritic patterns, roadway
     replacement, slopes, trails, etc.
Forest Service
                     Issues

!  Monitoring/Maintenance
 “Reclamation protection and monitoring requirements.”

 •  Concurrent reclamation allows for early
    management of facilities
 •  Water sampling required by APP
 •  Strategic access to facilities for repair
Forest Service
                      Issues

!  Safety
 “Includes all public related safety requirements including
 fencing, signs, berms, adit closures, etc.”

  •  Fencing and signage of the open pit
  •  Facility removal
  •  Stable landform at 3:1 or flatter
Forest Service
                     Issues

!  Permitting
 “Forest Service responsibility to meet state or federal
 requirements if forced to assume reclamation and closure
 responsibilities.”

  •  Permits will be in place
Forest Service

!  Financial Assurance
 “The direct cost of reclamation is based upon
 the details of the closure and reclamation
 work outlined in the approved POO.”
 •  Rosemont estimated bond based on MPO
 •  Bids, Davis-Bacon Wage Scales, Cat
    Handbook, etc. used to determine amounts
Financial Assurance

!  Rosemont estimate
  •  Annual estimate for 20 year operating period as
     well as closure
  •  Walk-away scenario as well as regular
     operations scenario
  •  Roadways not addressed pending NEPA
     determinations
  •  Modeled after other bonding calculations in
     Arizona for the FS
Rosemont Documents
!  Mine Plan of Operations
!  Reclamation Plan
!  Supplemented by:
  •    Geotechnical Reports
  •    Geochemical Reports
  •    Aquifer Protection Permit Application
  •    Facility Design Reports
  •    Groundwater Protection Plan
  •    Soil Salvage Reports
  •    Reclamation Concept Update
  •    Site Water Management Plan and Update

Weitere ähnliche Inhalte

Was ist angesagt?

Organic Soil and Water Management at the Arlington Agricultural Research Station
Organic Soil and Water Management at the Arlington Agricultural Research StationOrganic Soil and Water Management at the Arlington Agricultural Research Station
Organic Soil and Water Management at the Arlington Agricultural Research StationUniversity of Wisconsin-Madison
 
Barter Final Capstone Presentation
Barter Final Capstone PresentationBarter Final Capstone Presentation
Barter Final Capstone PresentationRebecca Barter
 
Stephan_Daniel_Ault_Resume
Stephan_Daniel_Ault_ResumeStephan_Daniel_Ault_Resume
Stephan_Daniel_Ault_ResumeStephan Ault
 
Thesis Presentation
Thesis PresentationThesis Presentation
Thesis Presentationgawump
 
Using VAST to inform the development regional environmental accounts
Using VAST to inform the development regional environmental accountsUsing VAST to inform the development regional environmental accounts
Using VAST to inform the development regional environmental accountsRichard Thackway
 
Site 25 Update to Moffett RAB May 10, 2012
Site 25 Update to Moffett RAB May 10, 2012Site 25 Update to Moffett RAB May 10, 2012
Site 25 Update to Moffett RAB May 10, 2012Steve Williams
 
ICAR - National Bureau of Soil Survey and Land Use Planning
 ICAR - National Bureau of Soil Survey and Land Use Planning ICAR - National Bureau of Soil Survey and Land Use Planning
ICAR - National Bureau of Soil Survey and Land Use PlanningExternalEvents
 
Haramut 2015 CV Summary (Rev00)
Haramut 2015 CV Summary (Rev00)Haramut 2015 CV Summary (Rev00)
Haramut 2015 CV Summary (Rev00)John Haramut
 
Canada: BC: Infiltration Rain Garden
Canada: BC: Infiltration Rain GardenCanada: BC: Infiltration Rain Garden
Canada: BC: Infiltration Rain GardenSotirakou964
 
Natural Resources Management NAVFAC Atlantic
Natural Resources Management NAVFAC Atlantic Natural Resources Management NAVFAC Atlantic
Natural Resources Management NAVFAC Atlantic BryanHall58
 
Presentation on remote sensing & gis and watershed copy
Presentation on remote sensing & gis and watershed   copyPresentation on remote sensing & gis and watershed   copy
Presentation on remote sensing & gis and watershed copydivya sahgal
 
Tracking sand dune transformation before, during and after sand dune mining,...
Tracking sand dune transformation before, during and after sand dune mining,...Tracking sand dune transformation before, during and after sand dune mining,...
Tracking sand dune transformation before, during and after sand dune mining,...Richard Thackway
 
Korean Soil Information System
Korean Soil Information System Korean Soil Information System
Korean Soil Information System ExternalEvents
 
VAST-2 - Tracking effects of land management on veg condition over time at si...
VAST-2 - Tracking effects of land management on veg condition over time at si...VAST-2 - Tracking effects of land management on veg condition over time at si...
VAST-2 - Tracking effects of land management on veg condition over time at si...Richard Thackway
 
Mark Thomas_A digital soil mapping approach for regolith thickness in the com...
Mark Thomas_A digital soil mapping approach for regolith thickness in the com...Mark Thomas_A digital soil mapping approach for regolith thickness in the com...
Mark Thomas_A digital soil mapping approach for regolith thickness in the com...TERN Australia
 

Was ist angesagt? (20)

Organic Soil and Water Management at the Arlington Agricultural Research Station
Organic Soil and Water Management at the Arlington Agricultural Research StationOrganic Soil and Water Management at the Arlington Agricultural Research Station
Organic Soil and Water Management at the Arlington Agricultural Research Station
 
Barter Final Capstone Presentation
Barter Final Capstone PresentationBarter Final Capstone Presentation
Barter Final Capstone Presentation
 
Stephan_Daniel_Ault_Resume
Stephan_Daniel_Ault_ResumeStephan_Daniel_Ault_Resume
Stephan_Daniel_Ault_Resume
 
Thesis Presentation
Thesis PresentationThesis Presentation
Thesis Presentation
 
Using VAST to inform the development regional environmental accounts
Using VAST to inform the development regional environmental accountsUsing VAST to inform the development regional environmental accounts
Using VAST to inform the development regional environmental accounts
 
Site 25 Update to Moffett RAB May 10, 2012
Site 25 Update to Moffett RAB May 10, 2012Site 25 Update to Moffett RAB May 10, 2012
Site 25 Update to Moffett RAB May 10, 2012
 
ICAR - National Bureau of Soil Survey and Land Use Planning
 ICAR - National Bureau of Soil Survey and Land Use Planning ICAR - National Bureau of Soil Survey and Land Use Planning
ICAR - National Bureau of Soil Survey and Land Use Planning
 
Haramut 2015 CV Summary (Rev00)
Haramut 2015 CV Summary (Rev00)Haramut 2015 CV Summary (Rev00)
Haramut 2015 CV Summary (Rev00)
 
Canada: BC: Infiltration Rain Garden
Canada: BC: Infiltration Rain GardenCanada: BC: Infiltration Rain Garden
Canada: BC: Infiltration Rain Garden
 
Natural Resources Management NAVFAC Atlantic
Natural Resources Management NAVFAC Atlantic Natural Resources Management NAVFAC Atlantic
Natural Resources Management NAVFAC Atlantic
 
Agriculture conservation planning framework tomer
Agriculture conservation planning framework   tomerAgriculture conservation planning framework   tomer
Agriculture conservation planning framework tomer
 
Presentation on remote sensing & gis and watershed copy
Presentation on remote sensing & gis and watershed   copyPresentation on remote sensing & gis and watershed   copy
Presentation on remote sensing & gis and watershed copy
 
georesume r.trainor
georesume r.trainorgeoresume r.trainor
georesume r.trainor
 
Tracking sand dune transformation before, during and after sand dune mining,...
Tracking sand dune transformation before, during and after sand dune mining,...Tracking sand dune transformation before, during and after sand dune mining,...
Tracking sand dune transformation before, during and after sand dune mining,...
 
Korean Soil Information System
Korean Soil Information System Korean Soil Information System
Korean Soil Information System
 
VAST-2 - Tracking effects of land management on veg condition over time at si...
VAST-2 - Tracking effects of land management on veg condition over time at si...VAST-2 - Tracking effects of land management on veg condition over time at si...
VAST-2 - Tracking effects of land management on veg condition over time at si...
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Carolyn White
Carolyn WhiteCarolyn White
Carolyn White
 
Mark Thomas_A digital soil mapping approach for regolith thickness in the com...
Mark Thomas_A digital soil mapping approach for regolith thickness in the com...Mark Thomas_A digital soil mapping approach for regolith thickness in the com...
Mark Thomas_A digital soil mapping approach for regolith thickness in the com...
 

Andere mochten auch

ONSHORE NEARSHORE GEOTECHNICAL
ONSHORE NEARSHORE GEOTECHNICALONSHORE NEARSHORE GEOTECHNICAL
ONSHORE NEARSHORE GEOTECHNICALNardipta Pratama
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Hudbay Minerals Inc.
 
Geotechnical report by Dr. Malek Samdi of GEOTILL
Geotechnical report by Dr. Malek Samdi of GEOTILLGeotechnical report by Dr. Malek Samdi of GEOTILL
Geotechnical report by Dr. Malek Samdi of GEOTILLDr. Malek Smadi
 
How to Get the Most Out of Your Geotechnical Engineer
How to Get the Most Out of Your Geotechnical EngineerHow to Get the Most Out of Your Geotechnical Engineer
How to Get the Most Out of Your Geotechnical Engineerjbreedlove
 
Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Hudbay Minerals Inc.
 
Well Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationWell Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationHudbay Minerals Inc.
 
SITE ANALYSIS - TOPOGRAPHY
SITE ANALYSIS - TOPOGRAPHYSITE ANALYSIS - TOPOGRAPHY
SITE ANALYSIS - TOPOGRAPHYYeeQun
 
OFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTIONOFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTIONNardipta Pratama
 
General Geotechnical Presentation
General Geotechnical PresentationGeneral Geotechnical Presentation
General Geotechnical Presentationandroid9999
 
Soil mechanics-full-course-notes-and-lectures
Soil mechanics-full-course-notes-and-lecturesSoil mechanics-full-course-notes-and-lectures
Soil mechanics-full-course-notes-and-lecturesvlmvv2
 

Andere mochten auch (20)

Baseline Noise Study
Baseline Noise StudyBaseline Noise Study
Baseline Noise Study
 
Baseline Traffic Study
Baseline Traffic StudyBaseline Traffic Study
Baseline Traffic Study
 
ONSHORE NEARSHORE GEOTECHNICAL
ONSHORE NEARSHORE GEOTECHNICALONSHORE NEARSHORE GEOTECHNICAL
ONSHORE NEARSHORE GEOTECHNICAL
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009
 
Geotechnical report by Dr. Malek Samdi of GEOTILL
Geotechnical report by Dr. Malek Samdi of GEOTILLGeotechnical report by Dr. Malek Samdi of GEOTILL
Geotechnical report by Dr. Malek Samdi of GEOTILL
 
Geotechnical Study
Geotechnical StudyGeotechnical Study
Geotechnical Study
 
How to Get the Most Out of Your Geotechnical Engineer
How to Get the Most Out of Your Geotechnical EngineerHow to Get the Most Out of Your Geotechnical Engineer
How to Get the Most Out of Your Geotechnical Engineer
 
Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009
 
Heap Leach Facilities
Heap Leach FacilitiesHeap Leach Facilities
Heap Leach Facilities
 
Well Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationWell Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling Presentation
 
SITE ANALYSIS - TOPOGRAPHY
SITE ANALYSIS - TOPOGRAPHYSITE ANALYSIS - TOPOGRAPHY
SITE ANALYSIS - TOPOGRAPHY
 
1 overview
1 overview1 overview
1 overview
 
Geotechnical engineering ppt 0719
Geotechnical engineering ppt 0719Geotechnical engineering ppt 0719
Geotechnical engineering ppt 0719
 
OFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTIONOFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTION
 
Dry Stack Tailings Overview
Dry Stack Tailings OverviewDry Stack Tailings Overview
Dry Stack Tailings Overview
 
Challenges for Geotechnical Engineering Education
Challenges for Geotechnical Engineering EducationChallenges for Geotechnical Engineering Education
Challenges for Geotechnical Engineering Education
 
General Geotechnical Presentation
General Geotechnical PresentationGeneral Geotechnical Presentation
General Geotechnical Presentation
 
Geotechnical Investigation
Geotechnical InvestigationGeotechnical Investigation
Geotechnical Investigation
 
Soil mechanics-full-course-notes-and-lectures
Soil mechanics-full-course-notes-and-lecturesSoil mechanics-full-course-notes-and-lectures
Soil mechanics-full-course-notes-and-lectures
 
Regional Groundwater Flow Models
Regional Groundwater Flow ModelsRegional Groundwater Flow Models
Regional Groundwater Flow Models
 

Ähnlich wie Rosemont Reclamation Plan July 2007

Pimple dimples eureka2013
Pimple dimples eureka2013Pimple dimples eureka2013
Pimple dimples eureka2013Greg Gearheart
 
Sage may 18 2017 bennett webinarfinal
Sage may 18 2017 bennett webinarfinalSage may 18 2017 bennett webinarfinal
Sage may 18 2017 bennett webinarfinalRick Bennett
 
120512 Iasi morphology part 2 - Mr Hendrik Havinga
120512 Iasi morphology part 2 - Mr Hendrik Havinga120512 Iasi morphology part 2 - Mr Hendrik Havinga
120512 Iasi morphology part 2 - Mr Hendrik HavingaRESTORE
 
IN: Green Infrastructure and Low Impact Development
IN: Green Infrastructure and Low Impact DevelopmentIN: Green Infrastructure and Low Impact Development
IN: Green Infrastructure and Low Impact DevelopmentSotirakou964
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016Travis Both
 
Implementation of In-Stream, Streambank and Riparian Practices in Conjunction...
Implementation of In-Stream, Streambank and Riparian Practices in Conjunction...Implementation of In-Stream, Streambank and Riparian Practices in Conjunction...
Implementation of In-Stream, Streambank and Riparian Practices in Conjunction...National Institute of Food and Agriculture
 
Aligning Watershed and Habitat Protection for Conservation Success in the Rac...
Aligning Watershed and Habitat Protection for Conservation Success in the Rac...Aligning Watershed and Habitat Protection for Conservation Success in the Rac...
Aligning Watershed and Habitat Protection for Conservation Success in the Rac...rshimoda2014
 
Massachusetts_Ocean_Plan.ppt
Massachusetts_Ocean_Plan.pptMassachusetts_Ocean_Plan.ppt
Massachusetts_Ocean_Plan.pptAdipatiRahmat1
 
Introduction to Mitigation Banking and Functional Assessment in CO/WY and oth...
Introduction to Mitigation Banking and Functional Assessment in CO/WY and oth...Introduction to Mitigation Banking and Functional Assessment in CO/WY and oth...
Introduction to Mitigation Banking and Functional Assessment in CO/WY and oth...RiverSHARED
 
"Green Infrastructure to Manage Combined Sewer Overflows and Flooding" by Emi...
"Green Infrastructure to Manage Combined Sewer Overflows and Flooding" by Emi..."Green Infrastructure to Manage Combined Sewer Overflows and Flooding" by Emi...
"Green Infrastructure to Manage Combined Sewer Overflows and Flooding" by Emi...scenichudson
 
Connecting health to our natural resources
Connecting health to our natural resourcesConnecting health to our natural resources
Connecting health to our natural resourcesgbeltalliance
 
Army Corps of Engineers Report on Restoration Planning in Jamaica bay
Army Corps of Engineers Report on Restoration Planning in Jamaica bayArmy Corps of Engineers Report on Restoration Planning in Jamaica bay
Army Corps of Engineers Report on Restoration Planning in Jamaica bayecowatchers
 

Ähnlich wie Rosemont Reclamation Plan July 2007 (20)

Pimple dimples eureka2013
Pimple dimples eureka2013Pimple dimples eureka2013
Pimple dimples eureka2013
 
South Sound Strategy
South Sound StrategySouth Sound Strategy
South Sound Strategy
 
Clad agm sepa_lorna
Clad agm sepa_lornaClad agm sepa_lorna
Clad agm sepa_lorna
 
Sage may 18 2017 bennett webinarfinal
Sage may 18 2017 bennett webinarfinalSage may 18 2017 bennett webinarfinal
Sage may 18 2017 bennett webinarfinal
 
120512 Iasi morphology part 2 - Mr Hendrik Havinga
120512 Iasi morphology part 2 - Mr Hendrik Havinga120512 Iasi morphology part 2 - Mr Hendrik Havinga
120512 Iasi morphology part 2 - Mr Hendrik Havinga
 
16. Abstractions/Hydromorphology
16. Abstractions/Hydromorphology16. Abstractions/Hydromorphology
16. Abstractions/Hydromorphology
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
IN: Green Infrastructure and Low Impact Development
IN: Green Infrastructure and Low Impact DevelopmentIN: Green Infrastructure and Low Impact Development
IN: Green Infrastructure and Low Impact Development
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016
 
Metz Lateral Conservation Project
Metz Lateral Conservation ProjectMetz Lateral Conservation Project
Metz Lateral Conservation Project
 
Implementation of In-Stream, Streambank and Riparian Practices in Conjunction...
Implementation of In-Stream, Streambank and Riparian Practices in Conjunction...Implementation of In-Stream, Streambank and Riparian Practices in Conjunction...
Implementation of In-Stream, Streambank and Riparian Practices in Conjunction...
 
Aligning Watershed and Habitat Protection for Conservation Success in the Rac...
Aligning Watershed and Habitat Protection for Conservation Success in the Rac...Aligning Watershed and Habitat Protection for Conservation Success in the Rac...
Aligning Watershed and Habitat Protection for Conservation Success in the Rac...
 
Massachusetts_Ocean_Plan.ppt
Massachusetts_Ocean_Plan.pptMassachusetts_Ocean_Plan.ppt
Massachusetts_Ocean_Plan.ppt
 
eDeveloping national (bamboo) landscape restoration potential maps in kenya
eDeveloping national (bamboo) landscape restoration potential maps in kenyaeDeveloping national (bamboo) landscape restoration potential maps in kenya
eDeveloping national (bamboo) landscape restoration potential maps in kenya
 
James riverpartnership2003
James riverpartnership2003James riverpartnership2003
James riverpartnership2003
 
Introduction to Mitigation Banking and Functional Assessment in CO/WY and oth...
Introduction to Mitigation Banking and Functional Assessment in CO/WY and oth...Introduction to Mitigation Banking and Functional Assessment in CO/WY and oth...
Introduction to Mitigation Banking and Functional Assessment in CO/WY and oth...
 
"Green Infrastructure to Manage Combined Sewer Overflows and Flooding" by Emi...
"Green Infrastructure to Manage Combined Sewer Overflows and Flooding" by Emi..."Green Infrastructure to Manage Combined Sewer Overflows and Flooding" by Emi...
"Green Infrastructure to Manage Combined Sewer Overflows and Flooding" by Emi...
 
Connecting health to our natural resources
Connecting health to our natural resourcesConnecting health to our natural resources
Connecting health to our natural resources
 
Army Corps of Engineers Report on Restoration Planning in Jamaica bay
Army Corps of Engineers Report on Restoration Planning in Jamaica bayArmy Corps of Engineers Report on Restoration Planning in Jamaica bay
Army Corps of Engineers Report on Restoration Planning in Jamaica bay
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
 

Mehr von Hudbay Minerals Inc.

Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Hudbay Minerals Inc.
 
Rosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockRosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockHudbay Minerals Inc.
 
Reclamation Examples - Before and After
Reclamation Examples - Before and AfterReclamation Examples - Before and After
Reclamation Examples - Before and AfterHudbay Minerals Inc.
 
Mine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelMine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelHudbay Minerals Inc.
 
Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Hudbay Minerals Inc.
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyHudbay Minerals Inc.
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering PresentationHudbay Minerals Inc.
 
Aquifer Protection Permitting: Rosemont Mine
Aquifer Protection Permitting:  Rosemont MineAquifer Protection Permitting:  Rosemont Mine
Aquifer Protection Permitting: Rosemont MineHudbay Minerals Inc.
 
Certificate of Environmental Compliance
Certificate of Environmental ComplianceCertificate of Environmental Compliance
Certificate of Environmental ComplianceHudbay Minerals Inc.
 
Air Quality Issues Affecting Rosemont
Air Quality Issues Affecting RosemontAir Quality Issues Affecting Rosemont
Air Quality Issues Affecting RosemontHudbay Minerals Inc.
 
Rosemont 2008 Baseline Biological Survey
Rosemont 2008 Baseline Biological SurveyRosemont 2008 Baseline Biological Survey
Rosemont 2008 Baseline Biological SurveyHudbay Minerals Inc.
 

Mehr von Hudbay Minerals Inc. (16)

Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872
 
Rosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockRosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine Rock
 
Reclamation Requirements
Reclamation RequirementsReclamation Requirements
Reclamation Requirements
 
Reclamation Examples - Before and After
Reclamation Examples - Before and AfterReclamation Examples - Before and After
Reclamation Examples - Before and After
 
Partial Pit Backfill Alternative
Partial Pit Backfill AlternativePartial Pit Backfill Alternative
Partial Pit Backfill Alternative
 
Mine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelMine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake Model
 
Rosemont Project Orientation
Rosemont Project OrientationRosemont Project Orientation
Rosemont Project Orientation
 
Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water Supply
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering Presentation
 
Aquifer Protection Permitting: Rosemont Mine
Aquifer Protection Permitting:  Rosemont MineAquifer Protection Permitting:  Rosemont Mine
Aquifer Protection Permitting: Rosemont Mine
 
Certificate of Environmental Compliance
Certificate of Environmental ComplianceCertificate of Environmental Compliance
Certificate of Environmental Compliance
 
Dry Stack Tailings Facility
Dry Stack Tailings FacilityDry Stack Tailings Facility
Dry Stack Tailings Facility
 
Air Quality Issues Affecting Rosemont
Air Quality Issues Affecting RosemontAir Quality Issues Affecting Rosemont
Air Quality Issues Affecting Rosemont
 
Research on Mineland Reclamation
Research on Mineland ReclamationResearch on Mineland Reclamation
Research on Mineland Reclamation
 
Rosemont 2008 Baseline Biological Survey
Rosemont 2008 Baseline Biological SurveyRosemont 2008 Baseline Biological Survey
Rosemont 2008 Baseline Biological Survey
 

Kürzlich hochgeladen

DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxMichelleTuguinay1
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...DhatriParmar
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptxAneriPatwari
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesVijayaLaxmi84
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptxmary850239
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxAnupam32727
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 
How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17Celine George
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 

Kürzlich hochgeladen (20)

DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptx
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their uses
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 
How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 

Rosemont Reclamation Plan July 2007

  • 1. Reclamation Plan July 2007 Presented May 17, 2010
  • 2. Reclamation Standards !   Forest Service Requirements !   Arizona Mined Land Reclamation Requirements !   Aquifer Protection Permit Requirements
  • 3. Forest Service Standards “Reclamation objectives and requirements and the resulting standards are developed through the NEPA analysis and implemented by inclusion in the approved POO.” !  The “standards” address the issues !  Rosemont Reclamation Plan developed to address issues !  Applicable standards addressed
  • 4. Forest Service Issues List !   Interim Operations !   Stability and Maintenance ! Revegetation !   Hazmat !   Mitigation !   Demolition !   Monitoring/ !   Facility Design Maintenance !   Water Quality !   Safety !   Landform !   Permitting !   Financial Assurance
  • 5. Arizona State Requirements !  Pubic Safety Standards !  Erosion Control and Topographic Contouring !  Roads ! Revegetation !  Soil Conservation !  Financial Assurance
  • 6. Rosemont Post-Mining Land Uses !  Recreation !  Ranching !  Wildlife Habitat
  • 7. Aquifer Protection Permit Requirements !  Closure Strategy !  Complete Closure Plan include specific elements !  Clean Closure or Post-Closure Monitoring Maintenance !  Financial Assurance
  • 8. Rosemont Plan Elements !   Begin with the End in Mind !   Construct Outer Buttress !   Concurrent Reclamation !   Blend into Existing Topography !   Constrain to Barrel Canyon !   Minimize Hydrologic Disturbance !   Minimize Environmental Impacts !   Salvage Soil and Vegetation Resources !   Closure Costing
  • 9. Forest Service Issues !  Interim Operations and Maintenance “Controls necessary to ensure the integrity of the facilities at Rosemont whose failure could potential endanger human health and the environment.” •  Facilities designed to be more robust than regulatory requirements •  Layout keeps facilities internal to buttresses
  • 10. Interim Operations and Maintenance
  • 11. Interim Operations and Maintenance
  • 12. Forest Service Issues !  Hazmat “Isolation, removal, treatment, or control of hazardous or toxic materials.” •  Solutions managed in appropriate containments during operations •  Bulk chemical delivery •  At closure materials are sold or disposed off-site
  • 13. Hazmat Management at Closure !  Petroleum – return to vendors/sale !  Sulfuric acid – return to vendors/sale !  Leaching solutions – evaporation/sale !  Filter water – evaporation !  Blasting agents – return to contractor !  Lab wastes – disposal !  Facility/equipment mtce - disposal
  • 14. Forest Service Issues !  Demolition “Removal/disposal of non-contaminated facilities, equipment and materials (buildings, concrete foundations, etc.)” •  Constructed facilities removed •  Some necessary facilities remain in place (i.e. culverts, ponds, diversions, etc.)
  • 15. Forest Service Issues !  Facility Design “Facilities remaining have design standards so that facilities will perform as designed over the long term to protect human health and the environment. (i.e. covers, caps, liners, diversions, etc.)” •  Facilities designed to meet or exceed required standards •  Storms, stability, diversion, cover, etc.
  • 16. Forest Service Issues !  Water Quality “Water quality standards (federal and state) which should be met by project discharges.” •  Requirement to maintain groundwater quality – APP permit •  No degredation standard for surface water - AZPES
  • 17. Water Quality !  Meet or exceed Arizona BADCT standards to protect groundwater !  Liners or double liners with leak detection !  Stormwater capture to maintain quality !  No exposed process solutions/areas !  Pit contained !  Waste rock shell over all
  • 18. Forest Service Issues !  Landform “Acceptable post-mining land slopes, drainages and contours.” •  Slopes are set at 3:1 (18°) •  Dendritic (ridge and valley) pattern •  Intermittent areas to hold water - riparian •  Variable slopes covers including talus slopes to present habitat mosaic
  • 19. Landform July 2007 March 2010
  • 20. Forest Service Issues !  Stability “Standards for physical and chemical stability of project components.” •  Geotechnical investigations •  Facility stability meets AZ standards (1.5 static and 1.1 dynamic) •  Geochemical investigations •  NNP is positive (acid consuming)
  • 21. Forest Service Issues ! Revegetation “Acceptable vegetative communities and ground cover requirements.” •  Greenhouse Tests •  Reclamation Test Plots •  Agave Salvage
  • 22. Revegetation Area 3 – Upper Test Plot
  • 23. Forest Service Issues !  Mitigation “Mitigation compensates for damage that cannot be avioded this involves construction techniques related to stream channels, wildlife habitat, recreation, cultural or other resources.” •  Planned for full development during the NEPA process. •  Included diversions, dendritic patterns, roadway replacement, slopes, trails, etc.
  • 24. Forest Service Issues !  Monitoring/Maintenance “Reclamation protection and monitoring requirements.” •  Concurrent reclamation allows for early management of facilities •  Water sampling required by APP •  Strategic access to facilities for repair
  • 25. Forest Service Issues !  Safety “Includes all public related safety requirements including fencing, signs, berms, adit closures, etc.” •  Fencing and signage of the open pit •  Facility removal •  Stable landform at 3:1 or flatter
  • 26. Forest Service Issues !  Permitting “Forest Service responsibility to meet state or federal requirements if forced to assume reclamation and closure responsibilities.” •  Permits will be in place
  • 27. Forest Service !  Financial Assurance “The direct cost of reclamation is based upon the details of the closure and reclamation work outlined in the approved POO.” •  Rosemont estimated bond based on MPO •  Bids, Davis-Bacon Wage Scales, Cat Handbook, etc. used to determine amounts
  • 28. Financial Assurance !  Rosemont estimate •  Annual estimate for 20 year operating period as well as closure •  Walk-away scenario as well as regular operations scenario •  Roadways not addressed pending NEPA determinations •  Modeled after other bonding calculations in Arizona for the FS
  • 29. Rosemont Documents !  Mine Plan of Operations !  Reclamation Plan !  Supplemented by: •  Geotechnical Reports •  Geochemical Reports •  Aquifer Protection Permit Application •  Facility Design Reports •  Groundwater Protection Plan •  Soil Salvage Reports •  Reclamation Concept Update •  Site Water Management Plan and Update