HOP Load Lines At  Indiana Army Ammunition Plant (INAAP) Copyright 2011. FormerMilitarySites.com All rights reserved Charlestown, Indiana
Copyright 2011 FormerMilitarySites.com There were 8 Load Line and 4 Igniter Lines built in 1941 as part of the  Hoosier Operating Plant (HOP). These facilities were constructed to load bagged charges for large caliber artillery The Igniter Lines were used to load the igniter charges for artillery, and mortar  charges   The artillery igniters contain  black powder and the mortars contain a nitroglycerin based material, both of which are more sensitive than single base propellant.   For these reasons, the  igniter lines are significantly smaller than the load lines.  There is an igniter in each round, the purpose of which is to ignite the  propelling charge. When these photos were taken (2008), all igniter lines had already been removed and Load Line 2 was the last of the original load lines still standing.   All of the original Load Lines were exactly alike.
LL2b – July 2008 Copyright 2011 FormerMilitarySites.com
Copyright 2011 FormerMilitarySites.com Load Lines were built in a modified “W” configuration.  When viewed from the canteen, as in the next photo, the left leg of the “W”  was called the “a” side; the right leg was called the “b” side of the line.   Each side was a mirror image of the other. Each side had a receiving magazine for propellant which was located at the top end of each side of our “W”.   A covered walkway led to the loading wing. An igniter service magazine was located between the propellant magazine and the loading wing  Powder was moved in drums to the loading wing.  It went past the Foreman’s Office on the corner to an elevator for transport  to the second floor of the loading wing. Safety was a primary concern.  Signs posted in each area defined the  type and quantity of powder and the maximum number of personnel  allowed there at any one time.
Shipping Magazine Receiving Magazine Receiving Magazine Crating Shed Igniter Service Magazine Igniter  Service Magazine Loading Covered Walkways Loading Assembly Assembly Canteen Copyright 2011. FormerMilitarySites.com
LL2b - Igniter Magazine Copyright 2011 FormerMilitarySites.com
LL2b - Walkway – Receiving Magazine to LL Copyright 2011 FormerMilitarySites.com
LL2b – Foreman’s Office Copyright 2011 FormerMilitarySites.com
Copyright 2008. All rights reserved LL2b Elevator Copyright 2011 FormerMilitarySites.com
Copyright 2008. All rights reserved Limits Copyright 2011 FormerMilitarySites.com
Copyright 2011. FormerMilitarySites.com When powder reached the second floor it was dumped into a hopper.   The first floor of the load line contained a series of rooms called loading booths. There was one hopper to serve each load  booth. The configuration of the load booths was changed for each type of charge loaded.  Many families of charges (105mm, 155mm) consist of several increments, which  are  individual bags of different sizes that , in total, comprise a single charge. Only one family of charges was produced at one time on a Load Line or Igniter Line. In the event of danger, the operator was told to immediately exit the building and use the escape chute to get to the ground.
Copyright 2008. All rights reserved 2nd Floor Hallway Hopper Copyright 2011 FormerMilitarySites.com
Copyright 2008. All rights reserved LL2b Escape Chute Copyright 2011 FormerMilitarySites.com
LL2b – Second Floor Walkway  and Emergency Exit Copyright 2011 FormerMilitarySites.com
Copyright 2011. FormerMilitarSites.com The first floor of each load line consisted of 8 load booths (rooms). There were 4 load booths on each side of the building, with a center aisle  between the load booths. The load booths would be set up as required for the product being produced.  They typically contained tables, scales, and sewing machines.  In later years a rapid  reacting deluge system was installed. Bags, produced in the Bag Room, were delivered to each booth and filled with powder. The powder was manufactured in the Propellant and Explosives (P&E) manufacturing  area, originally the Indiana Ordnance Works (IOW). The filled increment  was weighed twice and then sewn shut. Great care was taken to prevent the propagation of fire from any area to adjacent  areas in the event of accidental ignition, so a series of interlocking doors with a transfer  surface connected each load booth to the center aisle.  The operator would place a finished charge in the transfer surface and close the door.   This action opened the door in the center aisle, allowing an operator there to remove the  finished charge and place it on a conveyor for transport to the assembly wing.
LL2b – Scales (Storage in Maintenance Shop)) Copyright 2008. All rights reserved LL2 Scales in Storage Copyright 2011 FormerMilitarySites.com
LL2 – Doors to Loading Booths Copyright 2011 FormerMilitarySites.com
LL2 – Load Booth Copyright 2011 FormerMilitarySites.com
LL2 – Chutes from Load Booth to Center Aisle Copyright 2011 FormerMilitarySites.com
LL2b - Center Aisle Copyright 2010 FormerMilitarySites.com
Copyright 2011 FormerMilitarySites.com The center aisle conveyor transported finished increments to the assembly wing, located at the bottom of the “W”. There they were assembled into a finished charge and placed into a cans. A drawing of the 155mm M3A1 finished charge is included to illustrate. A covered walkway ran up the center legs of the “W” to the crating shed, with a  conveyor located under the roof but separated from the walkway. The cans were transported to the crating shed on the conveyor where they  were sealed, the air evacuated, leak tested to ensure a good seal, and palletized. Sealed cans were transported to the shipping magazine for pick up. If the finished charges were stored on site instead of shipped out, they were  placed in one of the underground igloos until needed.
Components of a Propelling Charge
LL2b - Assembly Copyright 2011. All rights reserved
LL2b - Assembly Copyright 2011 FormerMilitarySites.com
Copyright 2008. All rights reserved Covered Walkway to Packout Copyright 2011 FormerMilitarySites.com
Copyright 2008. All rights reserved LL2b Finished Charge Walkway Copyright 2010 FormerMilitarySites.com
LL2b – Packout Copyright 2011 FormerMilitarySites.com
LL2 – Vacuum Machine to Evacuate Air from Cans Copyright 2011 FormerMilitarySites.com
LL2 – Shipping Magazine Copyright 2011 FormerMilitarySites.com
Copyright 2011 FormerMilitarySites.com Each side of a load line also had restrooms and a break room. At the bottom center of our “W” was a covered walkway to the canteen which  served both the “a” and “b” sides of the Load Line.  Employees ate their lunch  in the canteen.   The back part of the canteen housed a scale repair shop and the mechanical  Equipment required for the Load Line: boiler, air compressor, etc.
LL2b  – Break Room Copyright 2011 FormerMilitarySites.com
LL2 - Walkway from Canteen to Load Lines Copyright 2011 FormerMilitarySites.com
LL2 – Safety Sign Copyright 2010 FormerMilitarySites.com
LL2 – Safety Sign 2 Copyright 2011 FormerMilitarySites.com
LL2 Canteen Copyright 2011 FormerMilitarySites.com
Copyright 2008. All rights reserved LL2 Air Compressor Copyright 2011 FormerMilitarySites.com
Copyright 2010 FormerMilitarySites.com Explosive facilities are assumed to always be contaminated with explosive particles.  The following categories, which are no longer used, formerly defined explosives  contamination levels and were in effect when the plant was active: • 1X – (X) Substantial contamination (explosive residue) exists. • 3X - (XXX) Cleaning has removed surface contamination, but significant amounts  may remain in less obvious places.  • 5X - (XXXXX) This level applies when no significant amounts of contaminants remain • 0 – (zero) Articles, equipment or buildings were never contaminated, The ground and buildings remains at INAAP are being transferred to the Clark County Reuse Authority.  Before transfer, they must be cleaned to the equivalent  of the former 5X status.  The traditional method for achieving this was to apply  high heat via open flame for an extended period. That method was used on some  facilities; alternate methods are currently being utilized
Copyright 2008. All rights reserved LL3 – Thermal Decontamination Photo courtesy US Army
LL4 – After Decontamination Copyright 2011 FormerMilitarySites.com
LL4 – After Decontamination Copyright 2011 FormerMilitarySites.com
LL4 – After Decontamination Copyright 2011 FormerMilitarySites.com
Copyright 2008. All rights reserved Copyright 2011 FormerMilitarySites.com
There were once many of these facilities in the US.  They produced the materials  used to defeat the Axis powers in World War II.  Creating these facilities necessitated  the displacement of the prior land owners.  They were built on a rapid timetable and required the labor of many workers to build and operate. The IOW and HOP were combined into the Indiana Army Ammunition Plant (INAAP,  Pronounced IN’-app) and produced materials used in WWII, Korea, Vietnam, and  Operation Iraqi Freedom. Many of the materials produced at INAAP are still in the active inventory.  We salute the displaced landowners, the  people that built and operated the facility,  the taxpayers that funded the effort, and most of all the military personnel that  fought our country’s wars to secure and hold our freedom. May we never forget. Copyright 2011. FormerMilitarySites.com
Copyright 2010 FormerMilitarySites.com Large sections of the former load line area have been redeveloped as the  River Ridge Commerce Center.  The following photographs show what the area  looks like today. Thanks to Kerry Dupaquier, David Hackel and the River Ridge Commerce Center.
Copyright 2008. All rights reserved Copyright 2010 FormerMilitarySites.com
Copyright 2008. All rights reserved Copyright 2010 FormerMilitarySites.com

Weitere ähnliche Inhalte

Andere mochten auch

GPS and Weapons Technology
GPS  and Weapons TechnologyGPS  and Weapons Technology
GPS and Weapons Technology
Suchit Moon
 
Msg Overview Aug08
Msg Overview Aug08Msg Overview Aug08
Msg Overview Aug08
lauren_atk
 
Cruise missile technology By shailesh shukla ppt
Cruise missile technology By shailesh shukla pptCruise missile technology By shailesh shukla ppt
Cruise missile technology By shailesh shukla ppt
SHAILESH SHUKLA
 

Andere mochten auch (14)

Indian Missiles
Indian Missiles Indian Missiles
Indian Missiles
 
GPS and Weapons Technology
GPS  and Weapons TechnologyGPS  and Weapons Technology
GPS and Weapons Technology
 
Introduction to Weapon Ammunition
Introduction to Weapon AmmunitionIntroduction to Weapon Ammunition
Introduction to Weapon Ammunition
 
Fundamentals Of Rockets & Missiles
Fundamentals Of Rockets & MissilesFundamentals Of Rockets & Missiles
Fundamentals Of Rockets & Missiles
 
Missile guidance
Missile guidanceMissile guidance
Missile guidance
 
Cruise missile technology.ppt
Cruise missile technology.pptCruise missile technology.ppt
Cruise missile technology.ppt
 
Guided missiles
Guided missilesGuided missiles
Guided missiles
 
Msg Overview Aug08
Msg Overview Aug08Msg Overview Aug08
Msg Overview Aug08
 
Cruise missile technology By shailesh shukla ppt
Cruise missile technology By shailesh shukla pptCruise missile technology By shailesh shukla ppt
Cruise missile technology By shailesh shukla ppt
 
AIRCRAFT WEIGHT AND BALANCE BASIC FOR LOAD CONTROL
AIRCRAFT WEIGHT AND BALANCE BASIC FOR LOAD CONTROLAIRCRAFT WEIGHT AND BALANCE BASIC FOR LOAD CONTROL
AIRCRAFT WEIGHT AND BALANCE BASIC FOR LOAD CONTROL
 
Cruise Missile Technology By Takalikar Mayur ppt
Cruise Missile Technology By Takalikar Mayur pptCruise Missile Technology By Takalikar Mayur ppt
Cruise Missile Technology By Takalikar Mayur ppt
 
PPT ON GUIDED MISSILES
PPT ON GUIDED MISSILESPPT ON GUIDED MISSILES
PPT ON GUIDED MISSILES
 
Missile Technology
Missile TechnologyMissile Technology
Missile Technology
 
Missles flight control systems
Missles flight control systemsMissles flight control systems
Missles flight control systems
 

Kürzlich hochgeladen

Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Kürzlich hochgeladen (20)

Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 

Former militarysites hop

  • 1. HOP Load Lines At Indiana Army Ammunition Plant (INAAP) Copyright 2011. FormerMilitarySites.com All rights reserved Charlestown, Indiana
  • 2. Copyright 2011 FormerMilitarySites.com There were 8 Load Line and 4 Igniter Lines built in 1941 as part of the Hoosier Operating Plant (HOP). These facilities were constructed to load bagged charges for large caliber artillery The Igniter Lines were used to load the igniter charges for artillery, and mortar charges The artillery igniters contain black powder and the mortars contain a nitroglycerin based material, both of which are more sensitive than single base propellant. For these reasons, the igniter lines are significantly smaller than the load lines. There is an igniter in each round, the purpose of which is to ignite the propelling charge. When these photos were taken (2008), all igniter lines had already been removed and Load Line 2 was the last of the original load lines still standing. All of the original Load Lines were exactly alike.
  • 3. LL2b – July 2008 Copyright 2011 FormerMilitarySites.com
  • 4. Copyright 2011 FormerMilitarySites.com Load Lines were built in a modified “W” configuration. When viewed from the canteen, as in the next photo, the left leg of the “W” was called the “a” side; the right leg was called the “b” side of the line. Each side was a mirror image of the other. Each side had a receiving magazine for propellant which was located at the top end of each side of our “W”. A covered walkway led to the loading wing. An igniter service magazine was located between the propellant magazine and the loading wing Powder was moved in drums to the loading wing. It went past the Foreman’s Office on the corner to an elevator for transport to the second floor of the loading wing. Safety was a primary concern. Signs posted in each area defined the type and quantity of powder and the maximum number of personnel allowed there at any one time.
  • 5. Shipping Magazine Receiving Magazine Receiving Magazine Crating Shed Igniter Service Magazine Igniter Service Magazine Loading Covered Walkways Loading Assembly Assembly Canteen Copyright 2011. FormerMilitarySites.com
  • 6. LL2b - Igniter Magazine Copyright 2011 FormerMilitarySites.com
  • 7. LL2b - Walkway – Receiving Magazine to LL Copyright 2011 FormerMilitarySites.com
  • 8. LL2b – Foreman’s Office Copyright 2011 FormerMilitarySites.com
  • 9. Copyright 2008. All rights reserved LL2b Elevator Copyright 2011 FormerMilitarySites.com
  • 10. Copyright 2008. All rights reserved Limits Copyright 2011 FormerMilitarySites.com
  • 11. Copyright 2011. FormerMilitarySites.com When powder reached the second floor it was dumped into a hopper. The first floor of the load line contained a series of rooms called loading booths. There was one hopper to serve each load booth. The configuration of the load booths was changed for each type of charge loaded. Many families of charges (105mm, 155mm) consist of several increments, which are individual bags of different sizes that , in total, comprise a single charge. Only one family of charges was produced at one time on a Load Line or Igniter Line. In the event of danger, the operator was told to immediately exit the building and use the escape chute to get to the ground.
  • 12. Copyright 2008. All rights reserved 2nd Floor Hallway Hopper Copyright 2011 FormerMilitarySites.com
  • 13. Copyright 2008. All rights reserved LL2b Escape Chute Copyright 2011 FormerMilitarySites.com
  • 14. LL2b – Second Floor Walkway and Emergency Exit Copyright 2011 FormerMilitarySites.com
  • 15. Copyright 2011. FormerMilitarSites.com The first floor of each load line consisted of 8 load booths (rooms). There were 4 load booths on each side of the building, with a center aisle between the load booths. The load booths would be set up as required for the product being produced. They typically contained tables, scales, and sewing machines. In later years a rapid reacting deluge system was installed. Bags, produced in the Bag Room, were delivered to each booth and filled with powder. The powder was manufactured in the Propellant and Explosives (P&E) manufacturing area, originally the Indiana Ordnance Works (IOW). The filled increment was weighed twice and then sewn shut. Great care was taken to prevent the propagation of fire from any area to adjacent areas in the event of accidental ignition, so a series of interlocking doors with a transfer surface connected each load booth to the center aisle. The operator would place a finished charge in the transfer surface and close the door. This action opened the door in the center aisle, allowing an operator there to remove the finished charge and place it on a conveyor for transport to the assembly wing.
  • 16. LL2b – Scales (Storage in Maintenance Shop)) Copyright 2008. All rights reserved LL2 Scales in Storage Copyright 2011 FormerMilitarySites.com
  • 17. LL2 – Doors to Loading Booths Copyright 2011 FormerMilitarySites.com
  • 18. LL2 – Load Booth Copyright 2011 FormerMilitarySites.com
  • 19. LL2 – Chutes from Load Booth to Center Aisle Copyright 2011 FormerMilitarySites.com
  • 20. LL2b - Center Aisle Copyright 2010 FormerMilitarySites.com
  • 21. Copyright 2011 FormerMilitarySites.com The center aisle conveyor transported finished increments to the assembly wing, located at the bottom of the “W”. There they were assembled into a finished charge and placed into a cans. A drawing of the 155mm M3A1 finished charge is included to illustrate. A covered walkway ran up the center legs of the “W” to the crating shed, with a conveyor located under the roof but separated from the walkway. The cans were transported to the crating shed on the conveyor where they were sealed, the air evacuated, leak tested to ensure a good seal, and palletized. Sealed cans were transported to the shipping magazine for pick up. If the finished charges were stored on site instead of shipped out, they were placed in one of the underground igloos until needed.
  • 22. Components of a Propelling Charge
  • 23. LL2b - Assembly Copyright 2011. All rights reserved
  • 24. LL2b - Assembly Copyright 2011 FormerMilitarySites.com
  • 25. Copyright 2008. All rights reserved Covered Walkway to Packout Copyright 2011 FormerMilitarySites.com
  • 26. Copyright 2008. All rights reserved LL2b Finished Charge Walkway Copyright 2010 FormerMilitarySites.com
  • 27. LL2b – Packout Copyright 2011 FormerMilitarySites.com
  • 28. LL2 – Vacuum Machine to Evacuate Air from Cans Copyright 2011 FormerMilitarySites.com
  • 29. LL2 – Shipping Magazine Copyright 2011 FormerMilitarySites.com
  • 30. Copyright 2011 FormerMilitarySites.com Each side of a load line also had restrooms and a break room. At the bottom center of our “W” was a covered walkway to the canteen which served both the “a” and “b” sides of the Load Line. Employees ate their lunch in the canteen. The back part of the canteen housed a scale repair shop and the mechanical Equipment required for the Load Line: boiler, air compressor, etc.
  • 31. LL2b – Break Room Copyright 2011 FormerMilitarySites.com
  • 32. LL2 - Walkway from Canteen to Load Lines Copyright 2011 FormerMilitarySites.com
  • 33. LL2 – Safety Sign Copyright 2010 FormerMilitarySites.com
  • 34. LL2 – Safety Sign 2 Copyright 2011 FormerMilitarySites.com
  • 35. LL2 Canteen Copyright 2011 FormerMilitarySites.com
  • 36. Copyright 2008. All rights reserved LL2 Air Compressor Copyright 2011 FormerMilitarySites.com
  • 37. Copyright 2010 FormerMilitarySites.com Explosive facilities are assumed to always be contaminated with explosive particles. The following categories, which are no longer used, formerly defined explosives contamination levels and were in effect when the plant was active: • 1X – (X) Substantial contamination (explosive residue) exists. • 3X - (XXX) Cleaning has removed surface contamination, but significant amounts may remain in less obvious places. • 5X - (XXXXX) This level applies when no significant amounts of contaminants remain • 0 – (zero) Articles, equipment or buildings were never contaminated, The ground and buildings remains at INAAP are being transferred to the Clark County Reuse Authority. Before transfer, they must be cleaned to the equivalent of the former 5X status. The traditional method for achieving this was to apply high heat via open flame for an extended period. That method was used on some facilities; alternate methods are currently being utilized
  • 38. Copyright 2008. All rights reserved LL3 – Thermal Decontamination Photo courtesy US Army
  • 39. LL4 – After Decontamination Copyright 2011 FormerMilitarySites.com
  • 40. LL4 – After Decontamination Copyright 2011 FormerMilitarySites.com
  • 41. LL4 – After Decontamination Copyright 2011 FormerMilitarySites.com
  • 42. Copyright 2008. All rights reserved Copyright 2011 FormerMilitarySites.com
  • 43. There were once many of these facilities in the US. They produced the materials used to defeat the Axis powers in World War II. Creating these facilities necessitated the displacement of the prior land owners. They were built on a rapid timetable and required the labor of many workers to build and operate. The IOW and HOP were combined into the Indiana Army Ammunition Plant (INAAP, Pronounced IN’-app) and produced materials used in WWII, Korea, Vietnam, and Operation Iraqi Freedom. Many of the materials produced at INAAP are still in the active inventory. We salute the displaced landowners, the people that built and operated the facility, the taxpayers that funded the effort, and most of all the military personnel that fought our country’s wars to secure and hold our freedom. May we never forget. Copyright 2011. FormerMilitarySites.com
  • 44. Copyright 2010 FormerMilitarySites.com Large sections of the former load line area have been redeveloped as the River Ridge Commerce Center. The following photographs show what the area looks like today. Thanks to Kerry Dupaquier, David Hackel and the River Ridge Commerce Center.
  • 45. Copyright 2008. All rights reserved Copyright 2010 FormerMilitarySites.com
  • 46. Copyright 2008. All rights reserved Copyright 2010 FormerMilitarySites.com