Rodolfo Garcia is a 48-year-old civil engineer with over 30 years of experience in construction project management, engineering, teaching, and government service. He has managed a wide range of commercial, industrial and residential building projects in the Philippines and abroad. Currently he is a Project Manager at Freyssinet International Manila Incorporated overseeing infrastructure retrofitting projects.
1. ENGR. RODOLFO M. GARCIA, PICE
REGISTERED CIVIL ENGINEER
E-Mail: rodolfomgarcia@yahoo.com
Cell Phone No.: 0922-4735656 (Sun) and 0927-1463509 (Globe)
PERSONAL:
Nickname: Rod Age : 48 years old Date of Birth: January 2, 1967
Religion : Roman Catholic Weight : 65 Kilograms Height : 1.73 Meters
Philhealth No.: 19-089617824-9 SSS No. : 33-1735941-2 TIN : 201-521265
Passport No. : HH958244 PAG-IBIG No.: 1210-41284977
Home Address : B3 L26 Holy Family Subdivision Gulod Malaya (Ampid), San Mateo Rizal (1850)
Father’s Name : Carlos M. Garcia (+) Former Barangay Councilman, Gulod Malaya
Mother’s Name : Arsenia M. Garcia
EDUCATIONAL:
1) Elementary : Tomas Earnshaw Elementary School, Punta Sta. Ana Manila (March 1979)
2) High School : Roosevelt College Marikina Lamuan, Marikina City (March 1983)
3) College : Technological Institute of the Philippines, Cubao Quezon City (March 1988)
Bachelor of Science in Civil Engineering (BSCE)
GOVERNMENT EXAMINATIONS PASSED:
RATING
1) Civil Engineer’s Licensure Exam 74.10%
2) Career Service Professional Exam 75.20%
3) National Collegiate Entrance Exam (NCEE) 95.00%
SEMINARS:
1. Construction Occupational Safety & Health (COSH) Seminar – Conducted on June 22-26, 2015 (40 hours)
by Synerquest Management Consultancy Services Inc. @ B1 A&M Building Commonwealth Ave., QC.
2. DESIGN OF POST –TENSIONED BUILDINGS with Special reference to Design for Seismic Forces” as
presented on March 3, 2015 by Dr. Bijan Aalami @ Hotel Intercontinental Manila on March 3, 2015
3. Lecture on Developing Personal Excellence by Mr. Francis Kong @ CCF Marikina on April 20, 2013
4. Leadership Training by CCF St. Francis Ortigas Center Pasig City on January 25-26, 2013
5. Lecture on the latest Waterproofing System and Construction Chemicals conducted by Grand Aces
Ventures Inc. on January 12, 2012 at San Mateo Rizal.
6. Team Building Seminar conducted on November 7 – 8, 2003 at the MERALCO Management Leadership
and Development Center in Antipolo Rizal
7. AutoCAD Level 1 (Basic) AUTODESK by Mr. Mario J. Ramirez on November 21-25, 2005 at the MMLDC
Foundation, Inc. Philippines in Antipolo Rizal, other seminars on-file
WORK EXPERIENCE:
EMPLOYER/
(Inclusive Dates)
DESIGNATION/ POSITION HELD
2. 1) 1) FREYSSINET INTERNATIONAL
Manila Incorporated
2) (December 1, 2014 - Present)
3) 2)WESTERN MARKETING
CORPORATION
4) June 2013 – December 31, 2013
5)
6)
3) RS Developer Company
Incorporated (PCAB Category
AAA)
August 2012 – April 2013
Project Manager
Projects (being) handled:
1. Retrofitting works/ Repair of Fire damaged Quezon Bridge, Quiapo
Manila Phase I (PhP 10M) @ North abutment – 100% COMPLETE as of
June 19, 2015
2. Proposed TAM grouting- Magallanes Flyover – UNDER PROCESS
3. Proposed Repair of link slab MNTC North Expressway – UNDER
PROCESS
4. Construction of a Four (4) Storey Capitol Building (ISO-SLAB) Tagbilaran
City, Bohol – UNDER PROCESS
5. Construction of a Nine (9) Storey Residential Building (ISO-SLAB)
Tacloban City – UNDER PROCESS
6. Grand Hyatt Hotel Global Taguig City – Assisted PM/ Installation of
sixteen (16) units Fluid Viscous Dampers (FVD) @ 33rd
Floor -
COMPLETED as of January 5, 2015.
Engineering Manager (Head)
FIT-OUT, General Construction & Maintenance of ALL WESTERN Branch and
Corporate Facilities
New Branch Constructed
1. Fisher Mall Branch (650 sq.m floor area) located at Roosevelt corner
Quezon Avenue, Quezon City
2. Ayala Fairview Terraces – New site constructed October 2013
Twenty-one (21) Branches/ Corporate Office under Maintenance
(Caloocan, Commonwealth, Pampanga, Trinoma, Subic, Morato/ H.O.,
New Farmer’s Plaza Cubao, P. Tuazon Cubao, P. Tuazon Satellite, NFP
Annex Cubao, Corporate Office (Morato), Anabu Cavite, Batangas
Calicanto, Festival Mall, Las Piñas, Makati, MegaMall, Molino Cavite,
Recto, Greenhills & Sta. Lucia Cainta)
Operations In-Charge/ Technical Consultant / MANCOM Head
Construction Outside Plant and GSM TOWER Projects
1. SMART OSP
Bulacan FITL (367.5 km) Overlay, (133.0 km) Expansion, (67.0 km) CEN and 71.20
km) FTK
Cavite FITL (175.0 km) PH1, (151.0 km) PH2, and (209.0 km) PH3
Ilocos FITL Adams (15.0 km), Ilocos Sur (70.0 km), Tuguegarao POI, and Mt.
Caniao (20.0 km)
Bacolod Kabankalan 144 FOC (138.0 km)
2. SMART GSM
La paz Tarlac (Site ID 586), Santol Arayat (Site ID 5343), Muzon (Site ID 3960),
Guagua 2 – TP (Site ID N49), NCC Sison (Site ID J55), Patling (Site ID 5295) and
Calasiao Buenlag (Site ID N38) COMPLETED as of December 31, 2012
San Fernando Banlic (Site ID 5633), Palauig TP (Site ID 3848), Mayantoc (Site ID
042), Sabangan (Site ID 4968), San Vicente Lubao (Site ID 5348), Matimbo (Site
ID Y94), Mangaldan (Site ID C05) and San Fernando La Union 2 (Site ID N06)
3. Various PLDT Direct award and Globe NPD/DP-Augmentation OSP projects
4. Various Bayantel GSM tower retrofitting works (Mindanao area - Manticao,
Valencia and Magallanes sites & South Luzon area - Labo, Libmanan and Bula
sites)
3. 4) Brilliant Proof Construction
July 2011 – February 2012
5) CCI Construction (PCAB
Category AAA)
March 2011 – July 2011
6) RON DANIELL Construction
Corporation (PCAB Category
AAA)
July 9, 2010 – March 2011
7) Rodriguez (Montalban)
Municipal Government
March 1, 2010 to June 30, 2010
8) ARELLA CARLY General
Construction
August 2008 – February 2010
9) CONSTRIUM Philippines, Inc.
(Pasig City)
Project Manager
Projects handled:
1. Construction of Spouses Doctors Clyde and Teresita Garcia’s Residence
(3 level) Bgy. Fortuna, Marcos Ilocos Norte PhP 15.0M
2. Renovation of Sta. Teresita Hospital, Marcos Ilocos Norte
3. Retrofitting/ Structural works for St. Nicholas Parish Church, San Nicolas
Ilocos Norte PhP 0.60M
4. Various waterproofing works at Black Nazarene Hospital, San Nicolas
Ilocos Norte, Sta. Teresita Hospital, ABOITIZ Building Makati City and a
Five (5) Storey Commercial Building in Laoag Ilocos Norte
5. Designated also as Sales Manager for Waterproofing and Construction
Chemical products
Project Manager
Projects handled:
1. Preparation of several bids for Post Ondoy Projects under DPWH
2. Preparation of Design plans for Mr. Paul Kawsek’s Three (3) Storey
Residence in Ridgemont Executive Village, Taytay Rizal
3. Preparation of Design plans for the Development of Low Cost Housing
for Calauag Quezon under Mayor Luisito Visorte
4. Acted also as Executive Staff to the Chairman/ President
AVP for Operations / Project Manager
Projects handled:
1. Renovation of Bingo Royale (Harrison Plaza, Manila) PhP 1.0M
2. Structural Steel Tower support for Barco LED- Electronic Billboard @
Kalayaan corner EDSA PhP 25.0M
3. Various Magic Float Jetty System installations @ El Nido Palawan,
Busuanga Palawan, Pico de Loro Nasugbu Batangas, Terrazas de Punta
Fuego, Island Cove in Bataan, etc. PhP 8.0M
4. Assist Business Development Team in various government project bid
participation
Administrative Officer (Job Order) – Office of the Municipal Administrator
Project Manager
Projects handled:
1. Site Development of new Marikina Auto Line Transport Corporation
(MALTC) located along Mabini St., front of GoldRiver Ville, Burgos
Rodriguez Rizal
2. Construction of MALTC Dispatcher and Finance Office
3. Construction of MALTC Motorpool shed (floor area = 144sqm) with two
(2) storey office and bodega (floor area = 72sqm)
4. Extension of kitchen and dining area with concrete roof deck (floor area
= 30sqm) at Ph5 Eastwood Village Montalban Rizal
5. Construction of perimeter fence and warehouse at Rancho Estate Ph2
Rodeo corner Wrangler Streets
Sr. Rebar Engineer (QA Department) – Structural and Civil Design
Overseas Projects handled as Senior Analyst while based in Pasig City:
4. December 14, 2007 – July 2008
10) SABAOTH Builders
January 2007 – December 2007
11) ARELLA CARLY General
Construction & Trading
July 2006 – January 2007
12) Landbees Corporation
(Lopez Group of Companies)
Major Client: Manila Electric
Company (MERALCO)
June 2004 – July 2006
January 2004 - May 2004
January 2004 – September 2004
August 2003 -
December 2003
February 2003 –August 2003
May 2002 – February 2003
August 2001 – May 2002
a. 35 Storey Building Al Fattan Tower in Abu Dhabi U.A.E.
b. 35 Storey Plots 12&13 Twin Towers Building in Dubai U.A.E.
c. The WAVE Muscat Townhouses in Oman
d. 8 Storey Building MARINA Resort Hotel Dubai U.A.E.
e. The Palm Water – Jumeirah Golf Estates in Dubai, U. A. E. which includes
Admin/ MDB Electrical Bldg., MCC Electrical Distribution Bldg.,
Generator & Fuel Tank House, Influent Buffer Tank Silo Plant, and
Compact Pre-Treatment Plant
f. The Arte @ Jalan Datoh (Lock Cho) in Singapore – a 2 Block 36-Storey
Condominium Development
g. Tampines Grande in Singapore – a Block of 8-Storey Office Bldg.
h. The Palm Jebel Ali in Dubai, U. A. E. – Construction of Main and Crescent
Bridges
Construction Manager
Project Manager
Head – Logistics Division
Duties:
1. Reports directly to the Vice President (for Operations)
2. Tasked on centralized control, management, implementation and handling
Warehousing, Motor Pool and Support Group.
Member: MANCOM and PERCOM (since August 2001)
Head – Marketing Section
Head - Construction & Allied Maintenance Division
Acting Team Leader – Marketing Section
Duties: Reports directly to the Vice President for Operations & Marketing
Supervising Engineer and Head – Civil & Sanitation Section
Duties: Oversee MERALCO Ortigas Construction Projects
Assistant Head – Civil & Sanitation Section
Team Leader – Technical Services Unit
13) Manila Electric Company
(MERALCO)
February 1993- August 2001
Staff Engineer – Construction Contracts and Project Management (Project
Control Team)
Duties:
1. Report/ Monitoring of Approved Non- Electric Projects (with FIT-OUTS)
2. Establishes control on monetary disbursements based on approved
billings and pre-determined budget.
3. Project engineering and design
14) Precious Steel Craft
Fabricator & Builders
March 1995- December 2000
Part Time – Estimator (Structural & Aesthetics)
5. 15) Roosevelt College,
Sumulong Cainta Rizal
June 1994- March 1995
Instructor IV - College of Civil Engineering
Duties: Taught major subjects such as Route Surveying, Timber Design, Steel
Design and Reinforced Concrete Design (Lecture and Laboratory)
16) E. V. Bernardo Construction
Corporation
Major Client: Manila Electric
Company (MERALCO)
August 1991- February 1993
Supervisor (Substation Civil Engineer)
Duties:
1. Reports to Manila Electric Company (MERALCO) – Substation Division,
Civil Construction Group Ortigas Center, Pasig City.
2. Project Engineering of various MERALCO Substation Electrical Projects
such as Control Houses, construction of concrete mounting pads for
different circuit breakers, potential and power transformers, concrete
pedestals and foundations of A-frames.
17) Caloocan Consortium
Corporation
June 1990- December 1990
Material Control Officer/ Assistant Project Engineer
18) Saint Matthew’s Academy
Paraiso San Mateo
June 1989- April 1990
High School Mathematics Teacher
ORGANIZATION AFFILIATIONS:
Member - Philippine Institute of Civil Engineers (PICE) National Chapter
Member - Rotary Club of Cubao Edsa, Philippines (3780)
Reservist – Armed Forces of the Philippines (AFPRESCOM) MSG (SN ML-A245549-A)
CHARACTER REFERENCES:
Hon. Ma. Rowena M. San Pedro – Judge, RTC Pasig City
Hon. Roberto San Pedro – Elected Municipal Councilor, San Mateo Rizal
Engr. Sonny Rull – President, RS Developers Construction Incorporated
Hon. Jonas J. Cruz – Incumbent Vice Mayor, Rodriguez Rizal
Engr. Jay Robin Borre – Structural Engineer, HILTI Philippines Inc.
I hereby certify that the aforementioned are true & correct to the best of my knowledge.
RODOLFO MARIANO GARCIA, PICE
REGISTERED CIVIL ENGINEER
P.R.C. No. 63280, Republic of the Philippines