SlideShare ist ein Scribd-Unternehmen logo
1 von 27
Downloaden Sie, um offline zu lesen
Haulton Constructions (Aust) Pty Ltd

              Overview

             January 2010
                            Haulton Constructions (Aust) Pty Ltd
                            ACN137 110 228 ABN 44 381 952 277 REC. 19694 PIC. 43892 QEC. 27038
                            26 Malvern Street, BAYSWATER, Victoria, Australia, 3153
                            Ph: +61 3 9729 0866    Fax: +61 3 9729 0877
                            Email: admin@haulton.com.au
BACKGROUND



Haulton is an Australian owned, multi-skilled company:
     •   Established in 1992 - Civil/Structural contractor
     •   2000 - Pipeline construction division established
     •   2001 - Electrical Services division established
     •   2004 - Water Systems division established
     •   2005 - Pollution Control division established
                    • Acquisition of           ®   effluent and pollution control
     • 2009 - Restructured to create H.C.A.
                    • With separation of the Pipeline construction division
FULL RANGE OF
                SERVICES



       Electrical                Civil
      Engineering             Engineering


              Comprehensive
                design &
               construction
Mechanical      capability             Water
Engineering                           Systems



                    Effluent &
                     Pollution
                    Engineering
CLIENT PROJECT
                           SUMMARY


Over the last 5 years Haulton has completed projects valued in excess of
$50m
Successful projects executed for major organizations including:
   Melbourne Water
   Yarra Valley
   South East Water
   Wannon Water
   Goulburn Valley Water
   North East Water
   Central Highlands
   NSW Dept of Commerce
PROJECT
                         MANAGEMENT
                          PROCESSES


Detailed project scheduling to track all significant activities and key
interdependencies
Progressive O&M documentation as each project develops so they
are available at project completion
Clear project/site responsibility with up to date OH&S handbooks
Comprehensive “Project Management Plans” to ISO9001
Commitment to ongoing training and standards compliance
The cross disciplinary management that exists between the divisions
ensures efficient project execution (nothing falls between the cracks!)
CIVIL/
    MECHANICAL
     Overview

                        Pressure Reducing Stations

                        Plant room Construction

                        Pump Station re-furbishing

                        Specialised Concreting

                        Flowmeter installation




KALKALLO PUMP STATION
STRUCTURAL/
   MECHANICAL
     Overview

                          Pump Station Construction

                          Bridge Construction

                          Plant Room Construction

                          Treatment Plant
                        construction & furbishing

                          General Concrete D&C

                         OH&S compliant
                        Mech.D&C
KALKALLO PUMP STATION
PLANT &
     EQUIPMENT

                    Tray Truck

                    Backhoes

                    Rollers

                    Excavators

                    Mobile Generator / Welder

                    Company Fleet


PRV INSTALLATIONS
ELECTRICAL
           SERVICES
           Overview

                             Switchboard and System
                           design and fabrication

                             Instrumentation and Control

                             PLC programming

                             SCADA and Telemetry

                             High Voltage D&C

                              Install, commissioning and
CRAIGIEBURN PUMP STATION   trouble shooting
POLLUTION
                 CONTROL
                 Overview

                              Gross Pollutant Traps

                              Odour Control Systems

                              First Flush diversion

                              Site containment systems

                              Vehicle Wash diversion

                              Storm water isolation

                              After sales Service and
    STORMWATER ISOLATION    Technical Support


®
WATER SYSTEMS
                   Overview

                                      Water and Wastewater
                                    Treatment Process D&C

                                      Project Management

                                      Plant upgrades

                                       Membrane, Ultraviolet,
                                    Media and Chemical
                                    treatment

                                      Process Risk and Cost
                                    analysis
WATER TREATMENT PLANT and PROCESS
WATER SYSTEMS
   Project #1

            Sawmill Settlement WTP

            D&C 1.0ML/day submerged
            UF WTP and ancillary
            equipment

            Goulburn Valley Water
            Authority
WATER SYSTEMS
   Project #2

            Wangaratta and Wodonga
            WTP’s

            D&C Fluorosilicic Acid
            Storage and Dosing facility


            North East Water

            May 2007
ELECTRICAL
 Project #1

              Alex Fraser

              D&C High Voltage (HV –
              22kV) Sub-station and
              distribution


              Alex Fraser

              May 2008
ELECTRICAL
 Project #2

              Deakin University – Geelong
              Campus

              D&C High Voltage (HV –
              22kV) Sub-station and
              distribution

              Deakin University

              January 2010
MECHANICAL
 Project #1

              O’Shannesy Reservoir Plug

              D&C 1200mm diameter plug

              Melbourne Water

              January 2009
CIVIL
Project #1

             Catchment Area Bridge
             Works

             Construction and
             replacement of burnt out
             bridges

             Melbourne Water

             November 2009
CIVIL
Project #2

             Building Construction

             D&C Concrete slabs and
             buildings

             Yarra Valley Water

             December 2007
POLLUTION
 CONTROL
 Project #1

              Wetlands protection

              D&C Stormwater and Spill
              isolation and control for
              Wetlands protection

              Murray Goulburn Co-
              Operative - Leongatha

              December 2009
POLLUTION
 CONTROL
 Project #2

              Spill Containment

              D&C Effluent Control and
              Management

              Victorian Racing Club –
              Flemington Racecourse

              December 2007
COMMERCIAL
                           DISCIPLINES


A comprehensive Project filter has been developed to ensure we
effectively bid for projects with a strong correlation to our skills and
experience
Weekly management review meetings are held to clearly plan and
communicate project resources and priorities
Strong financial controls have been implemented with the specific
focus of the Commercial Manager on compliance with AS2124 and
AS4000 including AS4300
Tenders are efficiently managed with a dedicated tender
management team
COMPANY
                                                            STRUCTURE

                                                                     Board of Directors

                                                                 Exécutive Chairman –
                                                                   Richard Llewellyn
    Commercial Manager           General Manager                                                        Admin/Accounts            Tender Management
       Steve Fracaro               George Holt                  Director – Jane Hoddinott                 Ann Holmes                  Roger Beck
                                                                                                                                       Nick Holt




   Civil/Mech.            Struct./Mech.                Plant/Equip.                       Electrical         Pollution Control           Water Systems

  George Holt                 Bodo                     George Holt                   Randhir Kumar            Rick Maffescioni           Rick Maffescioni
                           Siemenowicz




- Pressure               - Pump Station            -   Tray Truck                   - Switchboard            - Gross Pollutant          - Membrane MF,
Reducing Stations        Construction              -   Backhoes                     design and               Traps                      UF & RO
- Plant room             - Bridge                  -   Rollers                      fabrication              - Odour Control            - Chemical
Construction             Construction              -   Excavators                   - Control System         Systems                    clarification
-Pump Station re-        - Plant Room              -   Company Fleet                design                   - First Flush              - Media & Cart.
furbishing               Construction                                               - MCC’s                  diversion                  Filtration
- Specialised            - Treatment Plant                                          - Instrumentation        - Site containment         - UV Sterilisation
Concreting               construction &                                             - PLC                    systems                    - Process Risk
-Flowmeter               furbishing                                                 programming              -Vehicle Wash              analysis
installation             - General                                                  - Telemetry              diversion                  - Chlorination/
                         Concrete D&C                                               -Install,                -Stormwater                Chloramination
                         - OH&S compliant                                           commissioning            isolation                  - Chemical
                         Mech. D&C                                                  and trouble              -After sales               Conditioning
                                                                                    shooting                 Service and                -Plant upgrades
                                                                                    -High Voltage            Technical Support
                                                                                    Design &
                                                                                    Construct
KEY PEOPLE


Executive Chairman – Richard Llewellyn
 Over 35 years experience as a CEO and investment banker
 Foundation Fellow Australian Institute of Company Directors
 Fellow of Australian Institute of management
 Australian Securities License Holder 230680
 Serves on many private and public company boards


Director – Jane Hoddinott
 Broad commercial experience as a company director and administrator
 35 years experience building and running various businesses
 25 years experience as a Media Manager/PR consultant & Events Manager
 Active involvement in the Water industry since 1992, involving the promotion of
  products and services to its members
KEY PEOPLE


General Manager/
Construction & Fabrication Manager – George Holt
 18 years experience as the manager of a Water Industry infrastructure company
  40 years trade & design engineering experience
  Extensive knowledge of steel & concrete structural design and construction
 Certified Welding Inspector/Certified Welding Supervisor


Commercial Manager – Steve Fracaro
 Broad knowledge and extensive experience with major financial firms
 15 years in Commercial Banking & Finance
 8 years in Financial Management and Corporate Restructuring positions
 Extensive knowledge of finance and accounting processes
KEY PEOPLE


Water Systems & Pollution Control
Divisional Manager – Rick Maffescioni

 Joined Haulton in 2004
 Environmental, Manufacturing and Service Engineering experience
 Over 16 years water industry experience
 Business Development, Design and Project Management

Electrical Services Divisional Manager – Randhir Kumar
 Joined Haulton in 2003
 Electrical engineer with Electrical Engineering & Power Systems background
 More than 17 years Heavy Industry experience including High Voltage Power
 generation, distribution, control systems and systems commissioning
 Business development, Design & Project Management
KEY PEOPLE


Civil Design & Mechanical
Divisional Manager – Bodo Siemenowicz
 Civil & Mechanical Engineer –MEI Aust. CP Eng and
 Registered building Practitioner (RBP)
 38 years extensive Design & Project experience in the Water Industry
 Specialist in providing innovative design solutions for complex Water Industry problems


Tender Manager – Roger Beck
 Mechanical & Civil construction specialist
 Active member of the Water Industry since 1995
 Wide range and depth of experience as Tender Manager/Project Manager on major
Australian & NZ construction projects
BENEFITS
                                 SUMMARY


Haulton has over 18 years of experience and offers a complete multi-disciplinary
engineering team that ensures timely execution
We creatively approach difficult problems and innovatively design and construct the
required (or better) result more quickly and cost effectively
Project management is “hands on” and not profit driven
There is minimal use of sub-contractors (and only where long standing relationships
exist) to avoid “turf wars”
The successful execution of our many projects clearly indicates that management are
directly involved and the whole team “cares” about the outcome
In house multidisciplinary commissioning, and hand over team ensures that the delivered
product is thoroughly tested utilising plans prepared to ISO 9001

Weitere ähnliche Inhalte

Andere mochten auch (8)

Tadp Book
Tadp BookTadp Book
Tadp Book
 
Рунивермаг: развитие интернет торговли
Рунивермаг: развитие интернет торговлиРунивермаг: развитие интернет торговли
Рунивермаг: развитие интернет торговли
 
Cambiar Cabecera Del Blog
Cambiar Cabecera Del BlogCambiar Cabecera Del Blog
Cambiar Cabecera Del Blog
 
2010 Hc Corp Cred
2010 Hc Corp Cred2010 Hc Corp Cred
2010 Hc Corp Cred
 
Alunos da 2ª fase do 1º ciclo
Alunos da 2ª fase do 1º cicloAlunos da 2ª fase do 1º ciclo
Alunos da 2ª fase do 1º ciclo
 
Huldiging Lobke Berkhout en Lisa Westerhof in Olympisch Stadion
Huldiging Lobke Berkhout en Lisa Westerhof in Olympisch StadionHuldiging Lobke Berkhout en Lisa Westerhof in Olympisch Stadion
Huldiging Lobke Berkhout en Lisa Westerhof in Olympisch Stadion
 
Womensports In The Olympic Stadium
Womensports In The Olympic StadiumWomensports In The Olympic Stadium
Womensports In The Olympic Stadium
 
100122 Hca Overview
100122 Hca Overview100122 Hca Overview
100122 Hca Overview
 

Ähnlich wie 100122 Hca Overview

CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
Rommel Siasat
 
TONY HERCEGl resume
TONY  HERCEGl resumeTONY  HERCEGl resume
TONY HERCEGl resume
Tony Herceg
 
Link Capabilities Statement 2012
Link Capabilities Statement 2012Link Capabilities Statement 2012
Link Capabilities Statement 2012
nbelmon
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016
Raymond Guo
 
Summertraining l&t
Summertraining l&tSummertraining l&t
Summertraining l&t
Kundan Giri
 
Summer training l&t
Summer training l&tSummer training l&t
Summer training l&t
Kundan Giri
 

Ähnlich wie 100122 Hca Overview (20)

Link Resources Capabilities Statement 2013
Link Resources Capabilities Statement 2013Link Resources Capabilities Statement 2013
Link Resources Capabilities Statement 2013
 
Ken Edgar CV
Ken Edgar CVKen Edgar CV
Ken Edgar CV
 
Onshore Windfarm Part 2
Onshore Windfarm Part 2Onshore Windfarm Part 2
Onshore Windfarm Part 2
 
15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...
15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...
15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
yousef_cv_mk
yousef_cv_mk yousef_cv_mk
yousef_cv_mk
 
TONY HERCEGl resume
TONY  HERCEGl resumeTONY  HERCEGl resume
TONY HERCEGl resume
 
Link Capabilities Statement 2012
Link Capabilities Statement 2012Link Capabilities Statement 2012
Link Capabilities Statement 2012
 
VMT Company Introduction
VMT Company IntroductionVMT Company Introduction
VMT Company Introduction
 
Enviro Excavations Capability Statement
Enviro Excavations Capability StatementEnviro Excavations Capability Statement
Enviro Excavations Capability Statement
 
Clo2 system l stn 001
Clo2 system l stn 001  Clo2 system l stn 001
Clo2 system l stn 001
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
YVN CV updated
YVN CV  updatedYVN CV  updated
YVN CV updated
 
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
 
TAI Gas & Utility Industries
TAI Gas & Utility IndustriesTAI Gas & Utility Industries
TAI Gas & Utility Industries
 
Water Talks: Pipeline Maintenance
Water Talks: Pipeline MaintenanceWater Talks: Pipeline Maintenance
Water Talks: Pipeline Maintenance
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016
 
Summertraining l&t
Summertraining l&tSummertraining l&t
Summertraining l&t
 
Summer training l&t
Summer training l&tSummer training l&t
Summer training l&t
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)
 

Kürzlich hochgeladen

Acibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin TurkeyAcibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin Turkey
Listing Turkey
 
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
ApartmentWala1
 
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
ApartmentWala1
 
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
ApartmentWala1
 
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor PresentationMEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ - Mainstreet Equity Corp.
 
ACE Terra Yamuna Expressway | 8929888700
ACE Terra Yamuna Expressway | 8929888700ACE Terra Yamuna Expressway | 8929888700
ACE Terra Yamuna Expressway | 8929888700
Truhomes
 
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
delhi24hrs1
 
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
asmaqueen5
 
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
ApartmentWala1
 

Kürzlich hochgeladen (20)

Top tourism places in Dubai - Inch & Brick Realty
Top tourism places in Dubai - Inch & Brick RealtyTop tourism places in Dubai - Inch & Brick Realty
Top tourism places in Dubai - Inch & Brick Realty
 
Eldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdfEldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdf
 
Acibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin TurkeyAcibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin Turkey
 
SVN Live 5.6.24 Weekly Property Broadcast
SVN Live 5.6.24 Weekly Property BroadcastSVN Live 5.6.24 Weekly Property Broadcast
SVN Live 5.6.24 Weekly Property Broadcast
 
Rohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdfRohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdf
 
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune  E-Brochue.pdfYashwin Enchante Uppar Kharadi Pune  E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdf
 
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
 
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
 
Real Estate Finance and Investments (2019).pdf
Real Estate Finance and Investments (2019).pdfReal Estate Finance and Investments (2019).pdf
Real Estate Finance and Investments (2019).pdf
 
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing TurkeyYedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
 
Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024
 
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
 
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor PresentationMEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
 
Nyati Elite NIBM Road Pune E Brochure.pdf
Nyati Elite NIBM Road Pune E Brochure.pdfNyati Elite NIBM Road Pune E Brochure.pdf
Nyati Elite NIBM Road Pune E Brochure.pdf
 
ACE Terra Yamuna Expressway | 8929888700
ACE Terra Yamuna Expressway | 8929888700ACE Terra Yamuna Expressway | 8929888700
ACE Terra Yamuna Expressway | 8929888700
 
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & RequirementsExplore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
 
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
 
Retail Space for Lease - 1221 W. Main St., Sun Prairie, WI
Retail Space for Lease - 1221 W. Main St., Sun Prairie, WIRetail Space for Lease - 1221 W. Main St., Sun Prairie, WI
Retail Space for Lease - 1221 W. Main St., Sun Prairie, WI
 
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
 
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
 

100122 Hca Overview

  • 1. Haulton Constructions (Aust) Pty Ltd Overview January 2010 Haulton Constructions (Aust) Pty Ltd ACN137 110 228 ABN 44 381 952 277 REC. 19694 PIC. 43892 QEC. 27038 26 Malvern Street, BAYSWATER, Victoria, Australia, 3153 Ph: +61 3 9729 0866 Fax: +61 3 9729 0877 Email: admin@haulton.com.au
  • 2. BACKGROUND Haulton is an Australian owned, multi-skilled company: • Established in 1992 - Civil/Structural contractor • 2000 - Pipeline construction division established • 2001 - Electrical Services division established • 2004 - Water Systems division established • 2005 - Pollution Control division established • Acquisition of ® effluent and pollution control • 2009 - Restructured to create H.C.A. • With separation of the Pipeline construction division
  • 3. FULL RANGE OF SERVICES Electrical Civil Engineering Engineering Comprehensive design & construction Mechanical capability Water Engineering Systems Effluent & Pollution Engineering
  • 4. CLIENT PROJECT SUMMARY Over the last 5 years Haulton has completed projects valued in excess of $50m Successful projects executed for major organizations including: Melbourne Water Yarra Valley South East Water Wannon Water Goulburn Valley Water North East Water Central Highlands NSW Dept of Commerce
  • 5. PROJECT MANAGEMENT PROCESSES Detailed project scheduling to track all significant activities and key interdependencies Progressive O&M documentation as each project develops so they are available at project completion Clear project/site responsibility with up to date OH&S handbooks Comprehensive “Project Management Plans” to ISO9001 Commitment to ongoing training and standards compliance The cross disciplinary management that exists between the divisions ensures efficient project execution (nothing falls between the cracks!)
  • 6. CIVIL/ MECHANICAL Overview Pressure Reducing Stations Plant room Construction Pump Station re-furbishing Specialised Concreting Flowmeter installation KALKALLO PUMP STATION
  • 7. STRUCTURAL/ MECHANICAL Overview Pump Station Construction Bridge Construction Plant Room Construction Treatment Plant construction & furbishing General Concrete D&C OH&S compliant Mech.D&C KALKALLO PUMP STATION
  • 8. PLANT & EQUIPMENT Tray Truck Backhoes Rollers Excavators Mobile Generator / Welder Company Fleet PRV INSTALLATIONS
  • 9. ELECTRICAL SERVICES Overview Switchboard and System design and fabrication Instrumentation and Control PLC programming SCADA and Telemetry High Voltage D&C Install, commissioning and CRAIGIEBURN PUMP STATION trouble shooting
  • 10. POLLUTION CONTROL Overview Gross Pollutant Traps Odour Control Systems First Flush diversion Site containment systems Vehicle Wash diversion Storm water isolation After sales Service and STORMWATER ISOLATION Technical Support ®
  • 11. WATER SYSTEMS Overview Water and Wastewater Treatment Process D&C Project Management Plant upgrades Membrane, Ultraviolet, Media and Chemical treatment Process Risk and Cost analysis WATER TREATMENT PLANT and PROCESS
  • 12. WATER SYSTEMS Project #1 Sawmill Settlement WTP D&C 1.0ML/day submerged UF WTP and ancillary equipment Goulburn Valley Water Authority
  • 13. WATER SYSTEMS Project #2 Wangaratta and Wodonga WTP’s D&C Fluorosilicic Acid Storage and Dosing facility North East Water May 2007
  • 14. ELECTRICAL Project #1 Alex Fraser D&C High Voltage (HV – 22kV) Sub-station and distribution Alex Fraser May 2008
  • 15. ELECTRICAL Project #2 Deakin University – Geelong Campus D&C High Voltage (HV – 22kV) Sub-station and distribution Deakin University January 2010
  • 16. MECHANICAL Project #1 O’Shannesy Reservoir Plug D&C 1200mm diameter plug Melbourne Water January 2009
  • 17. CIVIL Project #1 Catchment Area Bridge Works Construction and replacement of burnt out bridges Melbourne Water November 2009
  • 18. CIVIL Project #2 Building Construction D&C Concrete slabs and buildings Yarra Valley Water December 2007
  • 19. POLLUTION CONTROL Project #1 Wetlands protection D&C Stormwater and Spill isolation and control for Wetlands protection Murray Goulburn Co- Operative - Leongatha December 2009
  • 20. POLLUTION CONTROL Project #2 Spill Containment D&C Effluent Control and Management Victorian Racing Club – Flemington Racecourse December 2007
  • 21. COMMERCIAL DISCIPLINES A comprehensive Project filter has been developed to ensure we effectively bid for projects with a strong correlation to our skills and experience Weekly management review meetings are held to clearly plan and communicate project resources and priorities Strong financial controls have been implemented with the specific focus of the Commercial Manager on compliance with AS2124 and AS4000 including AS4300 Tenders are efficiently managed with a dedicated tender management team
  • 22. COMPANY STRUCTURE Board of Directors Exécutive Chairman – Richard Llewellyn Commercial Manager General Manager Admin/Accounts Tender Management Steve Fracaro George Holt Director – Jane Hoddinott Ann Holmes Roger Beck Nick Holt Civil/Mech. Struct./Mech. Plant/Equip. Electrical Pollution Control Water Systems George Holt Bodo George Holt Randhir Kumar Rick Maffescioni Rick Maffescioni Siemenowicz - Pressure - Pump Station - Tray Truck - Switchboard - Gross Pollutant - Membrane MF, Reducing Stations Construction - Backhoes design and Traps UF & RO - Plant room - Bridge - Rollers fabrication - Odour Control - Chemical Construction Construction - Excavators - Control System Systems clarification -Pump Station re- - Plant Room - Company Fleet design - First Flush - Media & Cart. furbishing Construction - MCC’s diversion Filtration - Specialised - Treatment Plant - Instrumentation - Site containment - UV Sterilisation Concreting construction & - PLC systems - Process Risk -Flowmeter furbishing programming -Vehicle Wash analysis installation - General - Telemetry diversion - Chlorination/ Concrete D&C -Install, -Stormwater Chloramination - OH&S compliant commissioning isolation - Chemical Mech. D&C and trouble -After sales Conditioning shooting Service and -Plant upgrades -High Voltage Technical Support Design & Construct
  • 23. KEY PEOPLE Executive Chairman – Richard Llewellyn Over 35 years experience as a CEO and investment banker Foundation Fellow Australian Institute of Company Directors Fellow of Australian Institute of management Australian Securities License Holder 230680 Serves on many private and public company boards Director – Jane Hoddinott Broad commercial experience as a company director and administrator 35 years experience building and running various businesses 25 years experience as a Media Manager/PR consultant & Events Manager Active involvement in the Water industry since 1992, involving the promotion of products and services to its members
  • 24. KEY PEOPLE General Manager/ Construction & Fabrication Manager – George Holt 18 years experience as the manager of a Water Industry infrastructure company 40 years trade & design engineering experience Extensive knowledge of steel & concrete structural design and construction Certified Welding Inspector/Certified Welding Supervisor Commercial Manager – Steve Fracaro Broad knowledge and extensive experience with major financial firms 15 years in Commercial Banking & Finance 8 years in Financial Management and Corporate Restructuring positions Extensive knowledge of finance and accounting processes
  • 25. KEY PEOPLE Water Systems & Pollution Control Divisional Manager – Rick Maffescioni Joined Haulton in 2004 Environmental, Manufacturing and Service Engineering experience Over 16 years water industry experience Business Development, Design and Project Management Electrical Services Divisional Manager – Randhir Kumar Joined Haulton in 2003 Electrical engineer with Electrical Engineering & Power Systems background More than 17 years Heavy Industry experience including High Voltage Power generation, distribution, control systems and systems commissioning Business development, Design & Project Management
  • 26. KEY PEOPLE Civil Design & Mechanical Divisional Manager – Bodo Siemenowicz Civil & Mechanical Engineer –MEI Aust. CP Eng and Registered building Practitioner (RBP) 38 years extensive Design & Project experience in the Water Industry Specialist in providing innovative design solutions for complex Water Industry problems Tender Manager – Roger Beck Mechanical & Civil construction specialist Active member of the Water Industry since 1995 Wide range and depth of experience as Tender Manager/Project Manager on major Australian & NZ construction projects
  • 27. BENEFITS SUMMARY Haulton has over 18 years of experience and offers a complete multi-disciplinary engineering team that ensures timely execution We creatively approach difficult problems and innovatively design and construct the required (or better) result more quickly and cost effectively Project management is “hands on” and not profit driven There is minimal use of sub-contractors (and only where long standing relationships exist) to avoid “turf wars” The successful execution of our many projects clearly indicates that management are directly involved and the whole team “cares” about the outcome In house multidisciplinary commissioning, and hand over team ensures that the delivered product is thoroughly tested utilising plans prepared to ISO 9001