The document summarizes the budget allocation and implementation of the West Kalimantan Provincial Police (Polda Kalbar) operations for 2009. Some key points:
- The total budget for Polda Kalbar in 2009 was Rp516.956 billion, a 18.4% increase from 2008.
- The budget was allocated to 8 programs, with the largest allocation to the Public Order and Security program (Rp394.8 billion).
- As of the reporting period, Rp115.347 billion or 30.05% of the budget had been realized, with the remaining Rp401.609 billion unspent.
- Most of the unspent budget was under the Public Security
3. Kalender Giat Gelar Opsnal Polda Kalbar Tahun 2009
direncanakan setiap Tri Wulan Tahun Anggaran 2009
Nota Dinas Karo Ops Polda Kalbar No. Pol : B / ND -
155 / IV / 2009 / Ro Ops Tanggal 16 April 2009 Ttg
Usulan Pelaks Giat Gelar Opsnal Polda Kalbar TW.I
Tahun 2009
Surat Telegram Kapolda Kalbar No. Pol : STR / 244 / IV
/ 2009 tanggal 27 April 2009 Ttg Pemberitahuan
Pelaksanaan Giat Gelar Opsnal Polda Kalbar TW. I
Tahun 2009
4.
5.
6. VISUALISASI ANGGARAN 2005 – 2009
PAGU INDIKATIF POLRI TA. 2010
POLRI 25,6 TRILYUN
PAGU USULAN POLDA KALBAR
24,64
TRILYUN TA. 2010 : 764,5 MILYAR
23,34
TRILYUN
20,77
TRILYUN
16,77
TRILYUN
POLDA KALBAR
11,16
TRILYUN
516,0
459,1 MILYAR
MILYAR
379,4
MILYAR
296,1
MILYAR RUTIN = 475 M
0 PAM PEMILU = 41 M
210,9
MILYAR
. .
10. DIPA TA. 2009
POINTER
KENAIKAN NAIK 18,4 %
DIPA DR DIPA 2008
TA. 2009
KENAIKAN PADA BELANJA PEGAWAI
POLRI & PNS SEBESAR 9,7 %
KENAIKAN PADA BELANJA BARANG
SEBESAR
8,7 %
( PADA DUK GAR PAM PEMILU '09 )
11. PAGU DEFINITIF 8 PROG KEPOL TA. 2009 POLDA KALBAR
1. PROG. PNRPN KPMRTH YG BAIK Rp. 394.839.209,0
( DALAM RIBUAN )
2. PROG. BANG SDM KEPOL Rp. 1.512.529,0
3. PROG. BANG SARPRAS KEPOL Rp. 2.424.515,0
4. PROG. BANG STRAKAMTIB Rp. 1.352.121,0
5. PROG. BERDAYA POTKAM Rp. 4.566.083,0
6. PROG. HARKAMTIBMAS Rp. 98.802.194,0
7. PROG. LIDIK SIDIK TP Rp. 12.933.450,0
8. PROG. KERMA KAMTIB Rp. 526.000,0
Rp. 516.956.901,0
JUMLAH
( PER BELANJA )
NO JENIS BELANJA JUMLAH KET
1. BEL. PEGAWAI 378.900.641,0
2. BEL. BARANG 136.795.474,0
3. BEL. MODAL 1.260.786,0
PAGU DEFINITIF
516.956.901,0 JUMLAH 516.956.901,0
21. Pagu
8000
Serap
6000
Sisa
4000
2000
0
No KEGIATAN KUAT ( ORG ) PAGU SERAP SISA KET
1 LAT PRA OPS ( 4 HR ) 6.506 1.284.352.000 1.284.352.000 0
2 GELAR PASUKAN ( 1 HR ) 6.506 178.913.000 178.913.000
DS (SPIM & RES SGU )
3 KAMPANYE ( 21 HR ) 6.506 6.694.674.000 6.613.952.000 80.722.000
DS (SPIM )
4 MASA TENANG ( 3 HR ) 3.253 478.191.000 465.609.000 12.582.000
5 SERPAS ( 1 GIAT / PP ) - 1.210.200.000 997.995.000 212.205.000 SPIM & RES SKW
6 PUNGUT SUARA ( 1 HR ) 6.506 318.794.000 310.424.000 8.370.000 DS ( SPIM )
7 HITUNG SUARA ( 14 HR ) 3.253 2.231.558.000 2.172.842.000 58.716.000 DS ( SPIM )
JUMLAH ( 44 HR ) 14.817.382.000 12.024.927.000 2.792.455.000
22. PROGRAM LIDIK SIDIK
NO SATKER %
PAGU PENYERAPAN SISA
1 RESKRIM 1.216.236.000 111.048.950 1.105.187.050 9,13
2 NARKOBA 814.750.000 125.738.500 689.011.500 15,43
3 SAMAPTA 14.000.000 - 14.000.000 -
4 DIT POL AIR 202.040.000 2.933.000 199.107.000 1,45
5 POLTABES 1.701.488.000 404.337.000 1.297.151.000 23,76
6 RES PTK 845.501.000 45.331.000 800.170.000 5,36
7 RES SMBS 975.909.000 147.935.200 827.973.800 15,16
8 RES SANGGAU 780.154.000 79.935.000 700.219.000 10,25
9 RES SINTANG 782.279.000 31.327.500 750.951.500 4,00
10 RES KAPUAS HULU 908.264.000 212.218.300 696.045.700 23,37
11 RES KETAPANG 780.184.000 143.439.000 636.745.000 18,39
12 RES LANDAK 688.654.000 185.341.000 503.313.000 26,91
13 RES BENGKAYANG 776.779.000 21.958.000 754.821.000 2,83
14 RES SINGKAWANG 975.634.000 159.962.900 815.671.100 16,40
15 RES SEKADAU 771.564.000 139.919.500 631.644.500 18,13
16 RES MELAWI 700.014.000 - 700.014.000 -
JUMLAH 12.933.450.000 1.811.424.850 11.122.025.150 14,01
23. PROGRAM KERMA
NO SATKER %
PAGU PENYERAPAN SISA
1 SPIM 301.800.000 - 301.800.000 -
2 POLTABES - - - -
3 RES PTK - - - -
4 RES SMBS 45.000.000 - 45.000.000 -
5 RES SANGGAU 45.000.000 - 45.000.000 -
6 RES SINTANG 45.000.000 - 45.000.000 -
7 RES KAPUAS HULU 45.000.000 - 45.000.000 -
8 RES KETAPANG - - - -
9 RES LANDAK - - - -
10 RES BENGKAYANG 45.000.000 - 45.000.000 -
11 RES SINGKAWANG - - - -
12 RES SEKADAU - - - -
13 RES MELAWI - - - -
JUMLAH 526.800.000 - 526.800.000 -
24. 1. SRT KAPOLDA KALBAR NO. POL : B / 194 / I / 2009 / RO
RENBANG TGL 28 JAN 2009 TTG REVISI PENGGUNAAN
DUKUNGAN BBM DLM RANGKA DUK GIAT OPS MANTAP BRATA
2008
2. SRT KAPOLDA KALBAR NO. POL : B / 448 / II / 2009 TGL
27 FEB 2009 TTG PETUNJUK PENGGUNAAN DUKUNGAN
ANGGARAN PAM PEMILU TAHUN 2009
3. SRT KAPOLDA KALBAR NO. POL : B / 663 / III/
2009 TGL 30 MAR 2009 TTG PETUNJUK
PENGGUNAAN ANGGARAN DUK OPS SATKER
TA. 2009
4. SRT KAPOLDA KALBAR NO. POL : B / 695 / III /
2009 TGL 31 MAR 2009 TTG PETUNJUK
PENGGUNAAN ANGGARAN SERPAS PAM
PEMILU TH. 2009
5. SRT KAPOLDA KALBAR NO.POL : B / 8000 /
IV / 2009 / RO RENBANG TGL 15 APRIL
2009 TTG PETUNJUK PENGGUNAAN
DUKUNGAN ANGGARAN PAM PEMILU
TAHUN 2009
6. SRT KAPOLDA KALBAR NO. POL : B / 817 / IV /
2009 / RO RENBANG TGL 17 APRL 2009 TTG
PENGGUNAAN ANGGARAN KONTINJENSI TA. 2009
25.
26. Revisi POK RKA - KL 2009
RKA - KL PROJA
AKSLRASI
2009
MENDASARI SRT DERENBANG KAPOLRI
8 PROGRAM 19 PROGRAM
NO. POL : B / 45 /I /2009
TGL 30 JANUARI 2009
TTG
PETUNJUK PEMBIAYAAN
23 KEGIATAN 229 SUB PROG
PELAKS PROJA AKSELERASI
TRANSF POLRI YG TDK DI DUKUNG
ANGGR AGAR DI DUKUNG DARI
DUK OPSNAL SATKER/
86 SUB GIAT 574 GIAT
SATWIL DAN KONTINJENSI
Kegiatan Proja Akselerasi Yg Tidak Di Dukung
Anggaran :
1. Fakta integritas.
2. Remunerasi
3. Standar Pelayanan & Kinerja
4. Kerma dengan TNI
27.
28. NO POLRES NASKAH CD KETERANGAN
1 POLTABES PONTIANAK - - BELUM MENGIRIMKAN
TIDAK LENGKAP YANG MENGIRIM HANYA
2 POLRES PONTIANAK - -
BAG BINAMITRA DAN FORMAT SALAH
3 POLRES SAMBAS NASKAH CD
4 POLRES SANGGAU - - FILE VIA E-MAIL
5 POLRES SINTANG NASKAH - FILE VIA E-MAIL
6 POLRES HULU - - FILE VIA E-MAIL
7 POLRES KETAPANG BELUM MENGIRIMKAN
8 POLRES LANDAK NASKAH CD
9 POLRES BENGKAYANG NASKAH CD
TIDAK LENGKAP YANG MENGIRIM HANYA
10 POLRES SINGKAWANG - -
BAG BINAMITRA DAN FORMAT SALAH
11 POLRES SEKADAU NASKAH CD
12 POLRES MELAWI - CD
29. NO SATUAN NASKAH CD KET
1. ITWASDA POLDA KALBAR NASKAH CD -
2. BIRO OPS POLDA KALBAR NASKAH - FILE
3. BIRO RENBANG POLDA KALBAR NASKAH - FILE
4. BIRO BINA MITRA POLDA KALBAR NASKAH CD -
5. BIRO LOGISTIK POLDA KALBAR NASKAH CD -
6. BIRO PERSONEL POLDA KALBAR NASKAH - FILE
7. DIT LANTAS POLDA KALBAR NASKAH CD- -
8. DIT RESKRIM POLDA KALBAR NASKAH CD -
9 DI INTELKAM POLDA KALBAR NASKAH CD -
10. DIT RESERSE NARKOBA POLDA KALBAR NASKAH CD -
11. DIT SAMAPTA POLDA KALBAR - - BELUM MENGIRIMKAN
12. DIT POL AIR POLDA KALBAR NASKAH - FILE VIA EMAIL
13. BID DOKKES POLDA KALBAR NASKAH CD -
14. BID KU POLDA KALBAR NASKAH - FILE
15. BID PROPAM POLDA KALBAR NASKAH - FILE
16. BID TELEMATIKA POLDA KALBAR NASKAH - FILE VIA EMAIL
17. SPN PONTIANAK POLDA KALBAR NASKAH CD -
18. SAT BRIMOB POLDA KALBAR - - BELUM MENGIRIMKAN
19. BID HUMAS POLDA KALBAR - - BELUM MENGIRIMKAN
20. BID BINKUM POLDA KALBAR - - BELUM MENGIRIMKAN
21. DENMA POLDA KALBAR - - TIDAK MELAKSANAKAN
22. SETUM POLDA KALBAR - - TIDAK MELAKSANAKAN
30. JANUARI PEBRUARI MARET
SP2HP SP2HP SP2HP YAN
QUIK YAN RE QUIK YAN RE QUIK RE
NO SATKER
KET
RESPON SSB KRUIT RESPON SSB KRUIT RESPON SSB KRUIT
MAPOLDA
1 LANTAS X X X
2 DIT POL AIR X
3 SAMAPTA
4 RESKRIM
5 RO PERS SUDAH MASUK
NAMUN BELUM
JELAS LAPORAN
PER BULANNYA
SATWIL
1 POLTABES PONTIANAK X X
2 POLRES PONTIANAK X X X X X X X X
3 POLRES SINGKAWANG X X X
4 POLRES SAMBAS
5 POLRES BENGKAYANG
6 POLRES LANDAK
7 POLRES SANGGAU
8 POLRES SINTANG
9 POLRES HULU X X X X X X X X
10 POLRES SEKADAU X X X X X X X X X X X X
11 POLRES MELAWAI X X X X X X X X X X X X
12 POLRES KETAPANG X X X X X X X X X X X X
35. POLTABES PTK Rp. 102.391.350.000,- POLRES STG Rp 1.239.998.000,-
~ Mapolsek Ptk Timur T. 210 ~ Mapolres Sintang T.1.500/ 2 lantai
~ Rumdin T.70 Sek Ptk Tmr /1Unit ~ Mapolsek Dedai T.170 / 1unit.
Rp. 102.391.360.000,-
~ Rumdin Kanit T.45/2 unit/ 4 Kk ~ Rumdin Sek Dedai T.54/ 1 KK
~ Rumdin Ba Sek Tmr T. 38 / 4KK ~ Rumdin Ba Sek Dedai T.38/4KK
~ Rumdin Waka T.130 / 1unit ~ Mapolsek Kayan Hulu T.170
~ Rumdin Kabag/Kasat T.70 , 8 unit ~ Rumdin Sek Kyn Hl T.54/1KK
~ Rumdin Kapolsek Brt T.70 ~ Rumdin Sek Kyn Hl T.38 / 4 KK
~ Rumdin Ba Sek Barat T.38/4 KK ~ Pospolair T. 46/ 1 unit
~ Poliklinik T.160/ 1 unit
POLRES PTK Rp. 1.314.354.000,-
POLRES KTP Rp. 3.389.048.000,-
~ Mapolsek Segedong T. 170
~ Rumdin T.54 Segedong /1Unit ~ Mapolsek MHU T.170
~ Rumdin Ba T. 38 1 unit / 4 KK ~ Rumdin Sek MHU T.54/1 KK
~ Pagar Depan & Samping Barak ~ Rumdin Ba Polsek MHU T.38/4KK
POLRES BKY Rp. 9.372.090.000 ,- ~ Mapolsek Muara Pawan T.170
~ Rumdin Sek M.Pwn T.54/1 KK
~ Mapolsek Teriak T. 170
~ Rumdin Ba Polsek M.PwnT.38/4KK
~ Rumdin Ba Sek.Teriak T.45/1 unit/2KK
~ Mapolsek Benua Kayong T.170
~ Rumdin Sek Teriak T.54 / 1unit
~ Rumdin Sek BK T.54/1 KK
~ Rumdin Ba Sek Terik T.38/ 1unit / 4 KK
~ Rumdin Ba Polsek BK T.38/4KK
~ Mapolsek Suti Semarang T.170
~ Mapolsek Simpang Dua T.170
~ Rumdin Ba St,SemarangT.45/1 unit/2KK
~ Rumdin Sek S.Dua T. 54 / 1KK
SAT BRIMOB Rp.13.981.641.000,-
RES SKW Rp.15.723.385.000
~ Rumdin Sek St. Semarang T.54 / 1unit
~ Rumdin Ba Polsek S.DuaT.38/4KK
~ Rumdin Ba Sek St.Smrg T.38/ 1unit / 4 KK ~ Mako Sat Brimob T.1.220
~ Mapolres T.1.500/bertingkat
~ Mapolsek Sui. Betung T. 170 POLRES LDK Rp. 1.025.755.000,-
~ Pagar Kompi SKW
~ Gudang Bekum T. 217
~ Rumdin Ba Sui. Betung T.45/1 unit/2KK ~ Pagar Kompi Sintang
~ Ruang RPK T.144 ~ Mapolsek Mpw Hulu T.170
~ Rumdin Sek Sui. Betung T.54 / 1unit ~ Rehab Kompi Teluk Mulus
~ Mapolsek Menjalin T.170
RES SGU Rp.7.338.016.000,-
~ Rumdin Ba Sui. Betung T.38/1unit /4 KK ~ Jalan Cor Beton Sat brimob
~ Mapolsek Jelimpo T.170
~ Mapolsek Lumar T.170
RES SKD Rp.1.812.556.000,-
~ Mapolres T. 1.500 Bertingkat ~ Mapolsek Sompak T.170
~ Rumdin Ba Lumar T.45/1 unit/2KK
~ Mapolsek Tayan Hilir T. 170 ~ Mapolsek Banyuke Hl T.170.
~ Rumdin Sek Lumar T.54 / 1unit ~ Mapolsek Blitang T. 170 M2
~ Rumdin Kapolsek Tyn Hlr T.54 ~ Rumdin Ba Polres T.38/ 8 KK
~ Rumdin Ba Sek Lumar T.38/ 1unit / 4 KK ~ Rumdin Sek Blitang T.54
~ Rumdin Ba Sek Jelimpo T.38/8 KK
~ Mapolsek Siding T.170 ~ Rumdin Sek SKD Hulu T.54
POLRES KH Rp. 12.981.329.000,-
~ Rumdin Ba Sek Sompak T.38/8KK
~ Rumdin Sek Siding T.54 / 1unit ~ Rumdin Sek Nanga Tmn T.54
~ Rumdin Ba Menjalin T.38/8 KK
~ Mapolres T.1.500/ bertingkat
~ Rumdin Siding T.45/1 unit/2KK CATATAN :
~ Rumdin Sek Badau T.54/1 KK POLRES MLW Rp. 1.938.143.000,-
~ Rumdin Ba Siding T.38/ 1unit / 4 KK ~ MAPOLRES : 4 UNIT
~ Rumdin Sek EmbauT.54/1KK ~ MAKO SAT : 1 UNIT
RES SAMBAS Rp. 2.812.556.000,-
~ Rumdin Sek Kota Baru T.54/1 KK
~ MAPOLSEK : 21 UNIT
~ Rumdin SeberuangT.54/1KK
~ Mapolsek Jawai Sltn T.170 ~ Rumdin Kanit Sek kota Baru T.45/1KK
~ DERMAGA : 1 pAKET
~ Rumdin Sek Suhaid T.54/1KK
~ Rumdin Sek Jawai Sltan T. 54 ~ Rumdin Kanit Sokan T.45/1KK
~ BARAK/ RUMDIN : 73 UNIT
~ Rumdin Sek Bunut Hl T.54/1KK
~ Rumdin Ba Jawai SltnT.38/ 4KK ~ POSPOL AIR : 1 UNIT ~ Rumdin Ba Sek Sokan T.38/4 KK
~ Rumdin Sek Mentebah T.54/1KK
~ Mapolsek Sajad T. 170 ~ GUDANG : 2 UNIT ~ Rumdin Kanit Sek Manukung T.45/2KK
~ Rumdin Sek Batu Dato’ T.54/1KK
~ Rumdin Sek Sajad T. 54 ~ POLIKLINIK : 1 UNIT ~ Rumdin Ba Sek Manukung T.38/4KK
~ Rumdin sek Embaloh HlT.54/1KK
~ Rumdin Ba Sek Sajad T. 38/ 4 KK ~ PAGAR : 3 PAKET
36. SPIM Rp.170.430.000,-
BIDKU Rp. 169.430.000,-
~ 8 Unit Laptop
~ 30 Unit Mesin hitung uang
~ 30 unit Kalkulator
BIRO LOGISTIK Rp. 5.278.370.000,-
Rp. 20.976.745.000,-
~ 40 Unit Komputer DIT INTELKAM Rp 110.430..000,-
~ 1 Unit Laptop, 3 unit AC
~ 9 unit R.2, 5 unit R4. ~ 1 Unit Portable HP Jammer
~ 6 unit R6 ~ 20 unit Button Spy Cam
~ 3 unit 3G Wirelles Spy Camera
BID TELEMATIKA Rp.1.622.812.000,-
~ 3 unit Spy Ear GSM
~ 1 paket WPA ~ 1 unit Spy Wall
~ 1 paket Wetrack
DIT NARKOBA Rp.1.874.730.000,-
~ 100 unit Instalasi dan regestrasi alat
~ 100 unit induvidual Sound System
~ 5 unit komputer, 1 unit projektor,
~ 1 paket Sound sytem Mapolda
~ 5 unit Laptop, 1 unit Msn Copy
~ 1 unit Power Ampli 3800 watt
~ 4 AC, 1 unit genset
~ 1 unit Mixer 14 chanel
~ 5 unit Lemari FC, 10 unit Meja ½ biro
~ 1 unit Equalizer
~ 35 unit kursi , 1 unit tempat tidur
~ 1 unit Compressor
~ 10 unit Ranmor R2
~ 4 Set salon speaker 15 inci
~ 6 unit Ranmor R4
~ 2 Set Microphone Wireless
~ 2 unit lemari brangkas
DIT LANTAS Rp. 271.689.000,- ~ 1 unit Handy camera, 1 unit camera
~ 1 paket komputer
RES SKD Rp.182.930.000,-
~ 2 unit Laptop
~ 1 Paket Softwere Pusat data Ranmor
~ 15 unit komputer + printer
~ 100 buah traffic cone
~ 3 unit Laptop
~ 789 buah Rambu alat peragaan
DIT POLAIR Rp.6.795.484.000,-
DIT RESKRIM Rp. 4.086.060.000,-
SAT BRIMOB Rp.234.380.000,-
CATATAN :
~ 1 Paket alat SAR
~ 20 unit Komputer, 1 unit projektor, ~ RANMOR R.6 : 7 UNIT
~ 2 unit ambulance, 1 unit Ranmor 6
~ 10 unit Laptop, 1 unit Msn Copy ~ RANMOR R. 4 : 17 UNIT ~ 18 unit komputer
~ 2 unit Ranmor R2, 2 unit Kapal type C
~ 30 Set Printer, 1 unit genset ~ RANMOR R.2 : 41 UNIT ~ 3 unit AC
~ 12 unit Speed boat, 1 unit mesin tempel
~ 3 unit AC, 2 unit Msn Air ~ KAPAL TYPE.C : 2 UNIT ~ 1 unit Mesin Ketik Loyal
~ 5 unit perahu karet, 23 unit generator ~ WPA : 1 PAKET
~ 20 unit Ranmor R2 ~ 18 unit Printer HP
~ 2 unit racun api, 24 unit SSB ~ WETRACK : 102 UNIT
~ 9 unit Ranmor R4 ~ 1 unit Printer PITA
~ 5 unit HP Satelit, 10 Unit HT konvesional ~ SPEED BOAT : 14 UNIT
~ 2 unit Ranair ~ 1 unit Penghancur Kertas
~ 1 unit tower antene, 1 unit handy cam ~ KOMPUTER : 99 UNIT
~ 24 unit HT Motorolla
~ LAPTOP : 39 UNIT
~ 5 unit camera , 100 unit Weapack
~ 3 unit Telp Satelit ~ HP SATELIT : 29 UNIT
37. RES BENGKAYANG
REHAB RUMDIN SEK SAMALANTAN 8 KK
REHAB RUMDIN SEK LEDO 4 KK
(R/TS/03/III/2009 TGL 03-09 )
SPN PONTIANAK
ALSUS /ALINS ALONGINS 1 PAKET
(B/82/IV/2009 TGL 15-04-09)
RANMOR R4 FORD RANGER 1 UNIT
(B/83/IV/2009 TGL 16 -04-09)
SAT BRIMOB
ALAT SAR (PEAHU KARET & MESIN)
(B/449/III/2009 TGL 23-03-09)
RO LOG POLDA KALBAR
PERBAIKAN RUANG TAHANAN POLDA LAMA
(B/ND/140/IVI/2009 TGL 19-04-09)
BIDKU
PERBAIKAN ASPOL HONGGO PRANOTO
(B/503/IIII/2009 TGL 13-03-09)
38. MENDASARI :
1. PERATURAN MENTERI KEUANGAN R.I NOMOR 105 / PMK.02 / 2008 TGL 24 JULI 2008 TTG
PETUNJUK PENYUSUNAN DAN PENELAAHAN RENCANA KERJA KEMENTRIAN LEMBAGA DAN
PENGESAHAN DIPA KEMENTRIAN LEMBAGA
2. PERATURAN MENTERI PEKERJAAN UMUM NOMOR 45 / PRT / M / 2007 TGL 27 DESEMBER 2007
TTG PEDOMAN TEKNIS PEMBANGUNAN BANGUNAN GEDUNG NEGARA
3. PERATURAN MENTERI KEUANGAN R.I NOMOR 01 / PM.2 / 2009 TGL 4 MARET 2009 TTG
STANDAR BIAYA UMUM TAHUN 2010
~ SURAT USULAN / REVISI DARI KASATKER UTK USULAN 2010.
~ BUAT KERANGKA ACUAN KEGIATAN ( TOR ) TTD KASATKER DAN RINCIAN ANGGARAN BIAYA ( RAB )
KHUSUS GIAT BANG MATFAS RAB DISUSUN OLEH KONSULTAN
~ TENTUKAN JUMLAH HARGA BRG / UNIT / BUAH / PKT UTK PENGADAAAN BARANG SESUAI HARGA
TOKO/ PASAR SETEMPAT.
~ TENTUKAN INDEK HARGA SATUAN KEGIATAN SESUAI PEDOMAN DIATAS DAN GIAT BANG MATFAS
SESUAI KETETAPAN HARGA SATUAN KIMPRASWIL SETEMPAT
~ MASUKAN USULAN / REVISI MELALUI POK DAN RKA-KL SATKER
~ MENGIRIMKAN NASKAH POK DAN BACK UP APLIKASI RKA-KL VERSI 5.0 DEPKU RI KPD KAPOLDA
UP KARO RENBANG.
39.
40. 1. PELAKSANAAN PROGRAM DAN ANGGARAN POLDA KALBAR TA. 2009 ( S/D MARET ) DARI
8 PROGRAM KEPOLISIAN DENGAN PAGU SEBESAR Rp. 516.956.901.000,- TELAH
DILAKSANAKAN PENYERAPAN ANGGARAN MENDUKUNG KEGIATAN SEBESAR Rp.
115.347.875.190,- ATAU 30,05 %
2. PELAKSANAAN KEGIATAN PENGAMANAN PEMILU DENGAN DUKUNGAN ANGGARAN SEBESAR
Rp. 41. 125.281.000,- TELAH DILAKSANAKAN PENYERAPAN ANGGARAN MENDUKUNG GIAT
PENGAMANAN S/D TAHAP HITUNG SUARA TERSERAP SEBESAR Rp. 12.024.687.000,- ATAU
29,24 %.
3. SECARA UMUM PELAKSANAAN PROGRAM DAN KEGIATAN POLDA KALBAR TA. 2009 S/D
BULAN MARET 2009 SESUAI DENGAN RENCANA YG TELAH DITETAPKAN DAN RENCANA
PENARIKAN ANGGARAN SEBAGAIMANA TERTUANG DLM DIPA POLDA KALBAR TA. 2009.
4. KHUSUS UTK PELAKSANAAN KEGIATAN PROGRAM PENGEMBANGAN SARPRAS YAKNI
PEMBANGUNAN MATFAS 2 POLSEK PERBATASAN ( POLSEK KETUNGAU TENGAH RES SINTANG
& POLSEK SEKAYAM RES SANGGAU ) DENGAN PAGU ANGGARAN Rp. 1.242.789.000,- SAMPAI
SAAT INI BELUM DAPAT DILAKSANAKAN MENGINGAT POLSEK KETUNGAU TENGAH
MENUNGGU RENCANA REVISI RELOKASI KE POLSEK SIDING POLRES
BENGKAYANG, SEDANGKAN UTK POLSEK SEKAYAM POLRES SANGGAU SAMPAI SAAT INI
BELUM MELAKS TAHAPAN SEBAGAIMANA DIATUR DLM KEPPRES 80 TAHUN 2003 (
PELELANGAN )
5. KHUSUS PELAKSANAAN PROGRAM PENGEMBANGAN SDM KEPOL DIMANA DLM DIPA TA.
2009 POLDA KALBAR TDK DIALOKASIKAN DUKUNGAN ANGGARAN GIAT WERVING PERSONEL
POLRI SHG DUKGAR GIAT DIMAKSUD MASIH MENUNGGU DARI DE SDM MABES POLRI