   Overcurrent Relays
PLUG SETTING MULTIPLIER (PSM)
  -   On Induction Disc relays current setting is made by
      inserting a plug into a plug bridge

  -   Hence “Plug Setting”

  -   If relay setting and CT ratio are known, can find fault
      current as a multiple of current setting – PSM

  -   Relay characteristics give operating times at
      multiples of current setting (PSM)

  -   Therefore the characteristics can be applied to any
      relay regardless of current setting and nominal
      rating.
EXAMPLE
       CT Ratio = 100/1 A
       Fault Current = 1000 A


Relay current settings are made in % of CT ratings
       Is = 100% of 100 A
       Is = 100 A primary


PSM = If/Is    =      1000/100 = 10


So read off operating time at 10 x current setting
TIME MULTIPLIER SETTING (TMS)
      -      Not a time setting in seconds

      -      Multiplying factor which is applied to the basic
             relay operating time characteristic

For Grading:
Required operating time = TMS x operating time at TMS=1
IDMT RELAYS




      Grade „B‟ with „A‟ at IFMAX
      Both Relays Normal IDMT (3/10)
Relay A
      Current Setting = 5 AMP = 100 AMP (Pr)
      IFMAX = 1400 AMP = 14 x Setting
            PSM = 14
      Relay operating time at 14 x Setting and TMS of 0.05 is 0.13 seconds
Relay B
       Current Setting = 5 AMP = 200 AMP (Pr)


       IFMAX =1400 AMP = 7 x Setting


Relay operating time at 7 x setting and TMS of 1.0 is 3.6 sec.


Required operating time = 0.13 + 0.4 = 0.53 seconds


Therefore required TMS = 0.53/3.6 = 0.147


       Use TMS = 0.15 for relay B
OVERCURRENT RELAY
              CO-ORDINATION




Given: Tap Settings available are: 2, 4, 6, 8
       Take discrimination time = 0.5 sec.
Typical time/current characteristics of 3 seconds standard I.D.M.T.
                     – Available p.s. = 2, 4, 6, 8
Step 1: Start grading from extreme point i.e. load point
                Select the lowest TMS = 0.1




               ∴Select P.S. = 4
For fault at D bus:




       From IDMT curve for PSM 12.5 and TMS 1.0
       Operating time = 2.7 sec.
∴Actual operating time = (2.7)(0.1) = 0.27 sec.
Step 2:
        Relay C:
        For fault at D at 2000A
                Relay C should take (0.27 + 0.5) =0.77 sec.



  ∴Set P.S. for C at 2
  For fault at D:



Operating time from characteristic (TMS =1.0, PSMC 16.67)=2.45 s
       But relay must operate in 0.77 s
For Fault at C:



        ∴From characteristic, op. time = 2.2 s
        ∴ Actual op. time = (2.2)(.314) = 0.69 s
 Step 3: Relay B.
        For Fault of 3000 A (at C)
                  Operate TimeB = 0.69 + 0.5 = 1.19 s
 IL(B)= 100A



∴ Select P.S. = 2
∴ From characteristic → op. time = 2.5 s
         But breaker should operate in 1.19 s



For fault at B:



         ∴ Operating time =2.2 s
            Actual Operating time = 2.2 x 0.476 = 1.05 s

  For Relay at A: IL = 100




                                     ∴ P.S. =2
For fault at B(5000A), relay A should back up = 1.05 + 0.5 = 1.55 s




 ∴ Time to operate from characteristics = 2.32 s
EARTH FAULT PROTECTION

-   Earth fault current may be limited.


-   Sensitivity and speed requirements may not be
    met by overcurrrent relays.


-   Use separate earth fault relays.


-   Connect to measure residual (zero sequence)
    currents.


-   Therefore can be set to values less than full load
    current.
EARTH FAULT CONNECTIONS

Combined with Overcurrent Relays
For Economy, can use 2 x Overcurrent Relays
4-Wire Systems




 Earth Fault relay setting must be greater than “Normal” IN
DIFFERENTIAL PROTECTION
                   (Merz-Price Systems)
                     (Unit Protection)

                    3 Categories of Protection:

           •    Input and Output Terminals are close
                                       → transformer

       •       Where ends are Geographically Separate
                              → overhead/underground cables
                              → pilots at supply frequency used

               •   Very long lines          P.L.C.
                                → end → end signalling achieved
  by                              modulated carrier waveform.

Main difference is in way signals derived & transmitted.
Why needed?:-

      Overcomes application difficulties of simple O.C. Relays
       when applied to complex networks e.g. Co-ordination
          problems and excessive fault clearance times.

                         Principle:-

         Measurement of current at each end of feeder and
      transmission of information between each end of feeder.

Protection should operate for fault inside protected Zone only
                            →Stable for others.

           i.e. Instantaneous Operation Possible!
MERZ-PRICE SYSTEM
       Circulating Current Mode




-   Current confined to series path. No currents in relay




-   Both breakers tripped..
ANALYSIS OF THE MERZ-PRICE UNIT PROTECTION




              Relay operates when IA≠ IB
            but IC = IA- IB              ……… (1)
         ∴ Relay operates when




Let Nr = kNo where o<k<1               ………. (3)

        Sub into (2) equations (1) and (3)
          ∴ From which for threshold we have:
Question:
A 1 100kVA 2400/240V transformer is to be differentially protected.
Choose the C.T. ratios. Determine the ratio Nr/No if the relay is to tolerate
a mismatch in current of up to 20% of primary current (bias).
Solution:
Rated Primary Current of T/F : = 100/2.4 = 41.7 A
               ∴ Rated secondary = 41.7 x 10 = 417 A
                   For C.T. Secondary = 1A
                    Primary C.T. ratio   = 500:5
                    Secondary C.T. ratio = 5000:5

      For 20% mismatch (bias) → Reduction in Sensitivity
                  → IA = 0.8 IB (At threshold)




  or 2 - k = 1.6 + 0.8k          k = 0.222
OVERALL DIFFERENTIAL PROTECTION OF STAR/DELTA
             POWER TRANSFORMER
Recall:
Three-phase connections (Y/d)
For the above:




       Must Consider:       *       Magnetising inrush

         • Phase shift between primary and secondary

                        • Turns ratio

                    • Zero sequence cct.

      These can be compensated for by C.T. Connection

Weitere ähnliche Inhalte

Was ist angesagt?

Transformer overcurrent
Transformer overcurrentTransformer overcurrent
Transformer overcurrentmichaeljmack
 
Busbar protection LEC 2.pptx
Busbar protection LEC 2.pptxBusbar protection LEC 2.pptx
Busbar protection LEC 2.pptxRahaf Waheep
 
Unit 05 Protection of feeders and bus-bars
Unit  05 Protection of feeders and bus-bars Unit  05 Protection of feeders and bus-bars
Unit 05 Protection of feeders and bus-bars PremanandDesai
 
Generator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsGenerator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsPower System Operation
 
Basics of overcurrent protection
Basics of overcurrent protectionBasics of overcurrent protection
Basics of overcurrent protectionSalim Palayi
 
Relays and its types - complete guide
Relays and its types - complete guideRelays and its types - complete guide
Relays and its types - complete guideSlides Hub
 
Fundamentals of transformer inrush
Fundamentals of transformer inrushFundamentals of transformer inrush
Fundamentals of transformer inrushmichaeljmack
 
RELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATIONRELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATIONMd Sarowar Alam
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1Siswoyo Edo
 
Transformers protection, an introduction
Transformers protection, an introductionTransformers protection, an introduction
Transformers protection, an introductionH. Kheir
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level CalculationDinesh Sarda
 
Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settingsmichaeljmack
 
RELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfRELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfJayWin2
 
Over current protection
Over current protectionOver current protection
Over current protectionSHUBHAM KUMAR
 
Per unit representation
Per unit representationPer unit representation
Per unit representationMd. Rimon Mia
 
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)J. FR
 

Was ist angesagt? (20)

Transformer overcurrent
Transformer overcurrentTransformer overcurrent
Transformer overcurrent
 
Busbar protection LEC 2.pptx
Busbar protection LEC 2.pptxBusbar protection LEC 2.pptx
Busbar protection LEC 2.pptx
 
Unit 05 Protection of feeders and bus-bars
Unit  05 Protection of feeders and bus-bars Unit  05 Protection of feeders and bus-bars
Unit 05 Protection of feeders and bus-bars
 
Pilot protection
Pilot protectionPilot protection
Pilot protection
 
Generator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsGenerator Protection Relay Setting Calculations
Generator Protection Relay Setting Calculations
 
Basics of overcurrent protection
Basics of overcurrent protectionBasics of overcurrent protection
Basics of overcurrent protection
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 
Relays and its types - complete guide
Relays and its types - complete guideRelays and its types - complete guide
Relays and its types - complete guide
 
Fundamentals of transformer inrush
Fundamentals of transformer inrushFundamentals of transformer inrush
Fundamentals of transformer inrush
 
RELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATIONRELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATION
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1
 
Unsymmetrical fault
Unsymmetrical faultUnsymmetrical fault
Unsymmetrical fault
 
Transformers protection, an introduction
Transformers protection, an introductionTransformers protection, an introduction
Transformers protection, an introduction
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level Calculation
 
Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settings
 
Introduction to CTs and PTs
Introduction to CTs and PTsIntroduction to CTs and PTs
Introduction to CTs and PTs
 
RELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfRELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdf
 
Over current protection
Over current protectionOver current protection
Over current protection
 
Per unit representation
Per unit representationPer unit representation
Per unit representation
 
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
 

Andere mochten auch

POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION moiz89
 
Protective relay
Protective relay Protective relay
Protective relay Uday Wankar
 
Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protectionBinit Das
 
Directional over current relay
Directional over current relayDirectional over current relay
Directional over current relayCS V
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformerRitesh Verma
 
ECNH 3015 Examples of PU system
ECNH 3015  Examples of PU systemECNH 3015  Examples of PU system
ECNH 3015 Examples of PU systemChandrabhan Sharma
 
Relay coordination
Relay coordinationRelay coordination
Relay coordinationD Målîk
 
FFC-MM Plantsite Power System Protection
FFC-MM Plantsite Power System ProtectionFFC-MM Plantsite Power System Protection
FFC-MM Plantsite Power System Protectionfarazrafi87
 
Over-current-earth-fault-relay-MC-31
 Over-current-earth-fault-relay-MC-31 Over-current-earth-fault-relay-MC-31
Over-current-earth-fault-relay-MC-31Powerway Systems
 
Distance Relay:->Mho relay
Distance Relay:->Mho relayDistance Relay:->Mho relay
Distance Relay:->Mho relaymohan_K_M
 
Switchgear and protection 2
Switchgear and protection 2Switchgear and protection 2
Switchgear and protection 2Md Irshad Ahmad
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protectionashwin fcc
 

Andere mochten auch (20)

ECNG 3015 chapter 1 - Basics
ECNG 3015  chapter 1 - BasicsECNG 3015  chapter 1 - Basics
ECNG 3015 chapter 1 - Basics
 
ECNG 6503 #2
ECNG 6503  #2ECNG 6503  #2
ECNG 6503 #2
 
Overcurrent protection
Overcurrent protectionOvercurrent protection
Overcurrent protection
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
 
Protective relay
Protective relay Protective relay
Protective relay
 
Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protection
 
ECNG 6503 # 3
ECNG 6503 # 3ECNG 6503 # 3
ECNG 6503 # 3
 
Directional over current relay
Directional over current relayDirectional over current relay
Directional over current relay
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformer
 
ECNH 3015 Examples of PU system
ECNH 3015  Examples of PU systemECNH 3015  Examples of PU system
ECNH 3015 Examples of PU system
 
Protection basic
Protection basicProtection basic
Protection basic
 
Relay coordination
Relay coordinationRelay coordination
Relay coordination
 
distance relay
distance relaydistance relay
distance relay
 
FFC-MM Plantsite Power System Protection
FFC-MM Plantsite Power System ProtectionFFC-MM Plantsite Power System Protection
FFC-MM Plantsite Power System Protection
 
Over-current-earth-fault-relay-MC-31
 Over-current-earth-fault-relay-MC-31 Over-current-earth-fault-relay-MC-31
Over-current-earth-fault-relay-MC-31
 
D04522631
D04522631D04522631
D04522631
 
Distance Relay:->Mho relay
Distance Relay:->Mho relayDistance Relay:->Mho relay
Distance Relay:->Mho relay
 
Switchgear and protection 2
Switchgear and protection 2Switchgear and protection 2
Switchgear and protection 2
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protection
 

Ähnlich wie ECNG 3015 - Overcurrent Protection

Transformerprotectionrelaycalculations.doc
Transformerprotectionrelaycalculations.docTransformerprotectionrelaycalculations.doc
Transformerprotectionrelaycalculations.docMdAbdullahAlMamun258178
 
03-Non-Dir. Overcurrent.ppt
03-Non-Dir. Overcurrent.ppt03-Non-Dir. Overcurrent.ppt
03-Non-Dir. Overcurrent.pptssuserce455a1
 
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 NewOriginal Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 NewAUTHELECTRONIC
 
187787508-Over-Current-Earth-Fault-Setting-Calculations.pdf
187787508-Over-Current-Earth-Fault-Setting-Calculations.pdf187787508-Over-Current-Earth-Fault-Setting-Calculations.pdf
187787508-Over-Current-Earth-Fault-Setting-Calculations.pdfChadWood16
 
187787508-Over-Current-Earth-Fault-Setting-Calculations.pdf
187787508-Over-Current-Earth-Fault-Setting-Calculations.pdf187787508-Over-Current-Earth-Fault-Setting-Calculations.pdf
187787508-Over-Current-Earth-Fault-Setting-Calculations.pdfAhmadHamouda3
 
Electrical Protection Schemes in detail
Electrical Protection Schemes in detailElectrical Protection Schemes in detail
Electrical Protection Schemes in detailSlides Hub
 
Presentation_ON-CHIP CURRENT SENSING TECHNIQUE FOR CMOS MONOLITHIC SWITCH-MOD...
Presentation_ON-CHIP CURRENT SENSING TECHNIQUE FOR CMOS MONOLITHIC SWITCH-MOD...Presentation_ON-CHIP CURRENT SENSING TECHNIQUE FOR CMOS MONOLITHIC SWITCH-MOD...
Presentation_ON-CHIP CURRENT SENSING TECHNIQUE FOR CMOS MONOLITHIC SWITCH-MOD...Manmeet Singh
 
substation protection basics.ppt
substation protection basics.pptsubstation protection basics.ppt
substation protection basics.pptSalim Palayi
 
3_Overcurrent Protection.pdf
3_Overcurrent Protection.pdf3_Overcurrent Protection.pdf
3_Overcurrent Protection.pdfLiewChiaPing
 
Electrical Systems Safety
Electrical Systems SafetyElectrical Systems Safety
Electrical Systems SafetyTalia Carbis
 
Stk4192 stereo aplifier
Stk4192 stereo aplifierStk4192 stereo aplifier
Stk4192 stereo aplifierhliaslat
 
basic-partial-discharge.pdf
basic-partial-discharge.pdfbasic-partial-discharge.pdf
basic-partial-discharge.pdfThien Phan Bản
 
Lecture 7 Relay Coordination.pptx
Lecture 7 Relay Coordination.pptxLecture 7 Relay Coordination.pptx
Lecture 7 Relay Coordination.pptxssuserb444c3
 
Generator Transformer Protections.
Generator Transformer  Protections.Generator Transformer  Protections.
Generator Transformer Protections.Nischal Popat
 
47526172-DIFFERENTIAL-PROTECTION-8.pptx
47526172-DIFFERENTIAL-PROTECTION-8.pptx47526172-DIFFERENTIAL-PROTECTION-8.pptx
47526172-DIFFERENTIAL-PROTECTION-8.pptxThien Phan Bản
 

Ähnlich wie ECNG 3015 - Overcurrent Protection (20)

Transformerprotectionrelaycalculations.doc
Transformerprotectionrelaycalculations.docTransformerprotectionrelaycalculations.doc
Transformerprotectionrelaycalculations.doc
 
03-Non-Dir. Overcurrent.ppt
03-Non-Dir. Overcurrent.ppt03-Non-Dir. Overcurrent.ppt
03-Non-Dir. Overcurrent.ppt
 
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 NewOriginal Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
 
187787508-Over-Current-Earth-Fault-Setting-Calculations.pdf
187787508-Over-Current-Earth-Fault-Setting-Calculations.pdf187787508-Over-Current-Earth-Fault-Setting-Calculations.pdf
187787508-Over-Current-Earth-Fault-Setting-Calculations.pdf
 
187787508-Over-Current-Earth-Fault-Setting-Calculations.pdf
187787508-Over-Current-Earth-Fault-Setting-Calculations.pdf187787508-Over-Current-Earth-Fault-Setting-Calculations.pdf
187787508-Over-Current-Earth-Fault-Setting-Calculations.pdf
 
CT and VT.pptx
CT and VT.pptxCT and VT.pptx
CT and VT.pptx
 
Electrical Protection Schemes in detail
Electrical Protection Schemes in detailElectrical Protection Schemes in detail
Electrical Protection Schemes in detail
 
Presentation_ON-CHIP CURRENT SENSING TECHNIQUE FOR CMOS MONOLITHIC SWITCH-MOD...
Presentation_ON-CHIP CURRENT SENSING TECHNIQUE FOR CMOS MONOLITHIC SWITCH-MOD...Presentation_ON-CHIP CURRENT SENSING TECHNIQUE FOR CMOS MONOLITHIC SWITCH-MOD...
Presentation_ON-CHIP CURRENT SENSING TECHNIQUE FOR CMOS MONOLITHIC SWITCH-MOD...
 
DC Component of Fault Current
DC Component of Fault CurrentDC Component of Fault Current
DC Component of Fault Current
 
substation protection basics.ppt
substation protection basics.pptsubstation protection basics.ppt
substation protection basics.ppt
 
3_Overcurrent Protection.pdf
3_Overcurrent Protection.pdf3_Overcurrent Protection.pdf
3_Overcurrent Protection.pdf
 
Electrical Systems Safety
Electrical Systems SafetyElectrical Systems Safety
Electrical Systems Safety
 
Stk4192 stereo aplifier
Stk4192 stereo aplifierStk4192 stereo aplifier
Stk4192 stereo aplifier
 
Overcurrent coordination
Overcurrent coordinationOvercurrent coordination
Overcurrent coordination
 
basic-partial-discharge.pdf
basic-partial-discharge.pdfbasic-partial-discharge.pdf
basic-partial-discharge.pdf
 
Lecture 7 Relay Coordination.pptx
Lecture 7 Relay Coordination.pptxLecture 7 Relay Coordination.pptx
Lecture 7 Relay Coordination.pptx
 
Generator Transformer Protections.
Generator Transformer  Protections.Generator Transformer  Protections.
Generator Transformer Protections.
 
Spx29300 t 2.5-tr
Spx29300 t 2.5-trSpx29300 t 2.5-tr
Spx29300 t 2.5-tr
 
Distance Protection.ppt
Distance Protection.pptDistance Protection.ppt
Distance Protection.ppt
 
47526172-DIFFERENTIAL-PROTECTION-8.pptx
47526172-DIFFERENTIAL-PROTECTION-8.pptx47526172-DIFFERENTIAL-PROTECTION-8.pptx
47526172-DIFFERENTIAL-PROTECTION-8.pptx
 

Mehr von Chandrabhan Sharma

Mehr von Chandrabhan Sharma (16)

ECNG 3015 chapter 6 - switchgear technology
ECNG 3015  chapter 6 - switchgear technologyECNG 3015  chapter 6 - switchgear technology
ECNG 3015 chapter 6 - switchgear technology
 
Ices chapter 8 - illumination engineering
Ices   chapter 8 - illumination engineeringIces   chapter 8 - illumination engineering
Ices chapter 8 - illumination engineering
 
ECNG 3015 chapter 2 - pu system
ECNG 3015  chapter 2 - pu systemECNG 3015  chapter 2 - pu system
ECNG 3015 chapter 2 - pu system
 
ECNG 3015 Industrial and Commercial Electrical Systems
ECNG 3015   Industrial and Commercial Electrical SystemsECNG 3015   Industrial and Commercial Electrical Systems
ECNG 3015 Industrial and Commercial Electrical Systems
 
ECNG 6509 Transformer Technology
ECNG 6509  Transformer TechnologyECNG 6509  Transformer Technology
ECNG 6509 Transformer Technology
 
ECNG 3013 E
ECNG 3013 EECNG 3013 E
ECNG 3013 E
 
ECNG 6509 Switchgear Technology
ECNG 6509    Switchgear TechnologyECNG 6509    Switchgear Technology
ECNG 6509 Switchgear Technology
 
ECNG 3013 D
ECNG 3013 DECNG 3013 D
ECNG 3013 D
 
ECNG 3013 C
ECNG 3013 CECNG 3013 C
ECNG 3013 C
 
ECNG 3013 B
ECNG 3013 BECNG 3013 B
ECNG 3013 B
 
ECNG 3013 A
ECNG 3013 AECNG 3013 A
ECNG 3013 A
 
ECNG 3015- System Earthing
ECNG 3015- System EarthingECNG 3015- System Earthing
ECNG 3015- System Earthing
 
ECNG 3015 Power System Protection
ECNG 3015    Power System ProtectionECNG 3015    Power System Protection
ECNG 3015 Power System Protection
 
ECNG 6503 #4
ECNG 6503 #4ECNG 6503 #4
ECNG 6503 #4
 
ECNG 3015 - PU system and 3Phase Fault calculation
ECNG 3015 - PU system and 3Phase Fault calculation ECNG 3015 - PU system and 3Phase Fault calculation
ECNG 3015 - PU system and 3Phase Fault calculation
 
ECNG 6503 #1
ECNG 6503 #1 ECNG 6503 #1
ECNG 6503 #1
 

Kürzlich hochgeladen

Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 

Kürzlich hochgeladen (20)

Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 

ECNG 3015 - Overcurrent Protection

  • 1. ECNG 3015 Industrial and Commercial Electrical Systems Lecturer Prof Chandrabhan Sharma #4 Overcurrent Relays
  • 2. PLUG SETTING MULTIPLIER (PSM) - On Induction Disc relays current setting is made by inserting a plug into a plug bridge - Hence “Plug Setting” - If relay setting and CT ratio are known, can find fault current as a multiple of current setting – PSM - Relay characteristics give operating times at multiples of current setting (PSM) - Therefore the characteristics can be applied to any relay regardless of current setting and nominal rating.
  • 3. EXAMPLE CT Ratio = 100/1 A Fault Current = 1000 A Relay current settings are made in % of CT ratings Is = 100% of 100 A Is = 100 A primary PSM = If/Is = 1000/100 = 10 So read off operating time at 10 x current setting
  • 4. TIME MULTIPLIER SETTING (TMS) - Not a time setting in seconds - Multiplying factor which is applied to the basic relay operating time characteristic For Grading: Required operating time = TMS x operating time at TMS=1
  • 5. IDMT RELAYS Grade „B‟ with „A‟ at IFMAX Both Relays Normal IDMT (3/10) Relay A Current Setting = 5 AMP = 100 AMP (Pr) IFMAX = 1400 AMP = 14 x Setting PSM = 14 Relay operating time at 14 x Setting and TMS of 0.05 is 0.13 seconds
  • 6. Relay B Current Setting = 5 AMP = 200 AMP (Pr) IFMAX =1400 AMP = 7 x Setting Relay operating time at 7 x setting and TMS of 1.0 is 3.6 sec. Required operating time = 0.13 + 0.4 = 0.53 seconds Therefore required TMS = 0.53/3.6 = 0.147 Use TMS = 0.15 for relay B
  • 7.
  • 8. OVERCURRENT RELAY CO-ORDINATION Given: Tap Settings available are: 2, 4, 6, 8 Take discrimination time = 0.5 sec.
  • 9. Typical time/current characteristics of 3 seconds standard I.D.M.T. – Available p.s. = 2, 4, 6, 8
  • 10. Step 1: Start grading from extreme point i.e. load point Select the lowest TMS = 0.1 ∴Select P.S. = 4 For fault at D bus: From IDMT curve for PSM 12.5 and TMS 1.0 Operating time = 2.7 sec. ∴Actual operating time = (2.7)(0.1) = 0.27 sec.
  • 11. Step 2: Relay C: For fault at D at 2000A Relay C should take (0.27 + 0.5) =0.77 sec. ∴Set P.S. for C at 2 For fault at D: Operating time from characteristic (TMS =1.0, PSMC 16.67)=2.45 s But relay must operate in 0.77 s
  • 12. For Fault at C: ∴From characteristic, op. time = 2.2 s ∴ Actual op. time = (2.2)(.314) = 0.69 s Step 3: Relay B. For Fault of 3000 A (at C) Operate TimeB = 0.69 + 0.5 = 1.19 s IL(B)= 100A ∴ Select P.S. = 2
  • 13. ∴ From characteristic → op. time = 2.5 s But breaker should operate in 1.19 s For fault at B: ∴ Operating time =2.2 s Actual Operating time = 2.2 x 0.476 = 1.05 s For Relay at A: IL = 100 ∴ P.S. =2
  • 14. For fault at B(5000A), relay A should back up = 1.05 + 0.5 = 1.55 s ∴ Time to operate from characteristics = 2.32 s
  • 15. EARTH FAULT PROTECTION - Earth fault current may be limited. - Sensitivity and speed requirements may not be met by overcurrrent relays. - Use separate earth fault relays. - Connect to measure residual (zero sequence) currents. - Therefore can be set to values less than full load current.
  • 16. EARTH FAULT CONNECTIONS Combined with Overcurrent Relays
  • 17. For Economy, can use 2 x Overcurrent Relays
  • 18. 4-Wire Systems Earth Fault relay setting must be greater than “Normal” IN
  • 19. DIFFERENTIAL PROTECTION (Merz-Price Systems) (Unit Protection) 3 Categories of Protection: • Input and Output Terminals are close → transformer • Where ends are Geographically Separate → overhead/underground cables → pilots at supply frequency used • Very long lines P.L.C. → end → end signalling achieved by modulated carrier waveform. Main difference is in way signals derived & transmitted.
  • 20. Why needed?:- Overcomes application difficulties of simple O.C. Relays when applied to complex networks e.g. Co-ordination problems and excessive fault clearance times. Principle:- Measurement of current at each end of feeder and transmission of information between each end of feeder. Protection should operate for fault inside protected Zone only →Stable for others. i.e. Instantaneous Operation Possible!
  • 21. MERZ-PRICE SYSTEM Circulating Current Mode - Current confined to series path. No currents in relay - Both breakers tripped..
  • 22. ANALYSIS OF THE MERZ-PRICE UNIT PROTECTION Relay operates when IA≠ IB but IC = IA- IB ……… (1) ∴ Relay operates when Let Nr = kNo where o<k<1 ………. (3) Sub into (2) equations (1) and (3) ∴ From which for threshold we have:
  • 23. Question: A 1 100kVA 2400/240V transformer is to be differentially protected. Choose the C.T. ratios. Determine the ratio Nr/No if the relay is to tolerate a mismatch in current of up to 20% of primary current (bias).
  • 24. Solution: Rated Primary Current of T/F : = 100/2.4 = 41.7 A ∴ Rated secondary = 41.7 x 10 = 417 A For C.T. Secondary = 1A Primary C.T. ratio = 500:5 Secondary C.T. ratio = 5000:5 For 20% mismatch (bias) → Reduction in Sensitivity → IA = 0.8 IB (At threshold) or 2 - k = 1.6 + 0.8k k = 0.222
  • 25. OVERALL DIFFERENTIAL PROTECTION OF STAR/DELTA POWER TRANSFORMER
  • 27. For the above: Must Consider: * Magnetising inrush • Phase shift between primary and secondary • Turns ratio • Zero sequence cct. These can be compensated for by C.T. Connection